DTFAEN-16-R-00186 Amendment 0002 (pdf)

View the file

Other files

File Type Posted
DTFAEN 16 C 00186 Amendment 0005.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
DTFAEN 16 C 00186 Amendment 0006.pdf PDF
BOS RTR-2016-final cnstrct drwgs.pdf PDF
DTFAEN 16 C 00186 Amendment 0004.pdf PDF
DTFAEN 16 C 00186 Amendment 0007.pdf PDF
DTFAEN-16-R-00186 SIR final copy (2).2 —
DTFAEN-16-R-00186 Amendment 0002.pdf PDF
BusinessDeclaration May 2016.pdf PDF
DTFAEN 16 C 00186 Amendment 0008.pdf PDF
Section B Bid Schedule.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
DTFAEN 16 C 00186 Amendment 0003.pdf PDF
MASSPORT Contractor Requirements as of August 2006.pdf PDF
BOS RTR Final Specs 28July16 - JT (2) (3).2 —
BOS RTR- wage determination.pdf PDF
BusinessDeclaration May 2016.pdf PDF
BOS RTR- wage determination.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
DTFAEN 16 C 00186 Amendment 0004.pdf PDF
Section B Bid Schedule.pdf PDF
DTFAEN 16 C 00186 Amendment 0003.pdf PDF
DTFAEN 16 C 00186 Amendment 0005.pdf PDF
DTFAEN 16 C 00186 Amendment 0007.pdf PDF
DTFAEN-16-R-00186 SIR final copy (2).2 —
DTFAEN-16-R-00186 Amendment 0002.pdf PDF
BOS RTR-2016-final cnstrct drwgs.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
BOS RTR Final Specs 28July16 - JT (2) (3).2 —
MASSPORT Contractor Requirements as of August 2006.pdf PDF
DTFAEN 16 C 00186 Amendment 0006.pdf PDF
BOS RTR Final Specs 28July16 - JT (2) (3).2 —
BusinessDeclaration May 2016.pdf PDF
MASSPORT Contractor Requirements as of August 2006.pdf PDF
Section B Bid Schedule.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
BOS RTR-2016-final cnstrct drwgs.pdf PDF
DTFAEN 16 C 00186 Amendment 0005.pdf PDF
DTFAEN 16 C 00186 Amendment 0003.pdf PDF
DTFAEN 16 C 00186 Amendment 0004.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
BOS RTR- wage determination.pdf PDF
DTFAEN-16-R-00186 SIR final copy (2).2 —
DTFAEN 16 C 00186 Amendment 0006.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
DTFAEN-16-R-00186 Amendment 0002.pdf PDF
Section B Bid Schedule.pdf PDF
MASSPORT Contractor Requirements as of August 2006.pdf PDF
BusinessDeclaration May 2016.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (8/97)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 7

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 12/27/2016 SO-16-02659

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6) Federal Aviation Administration

SAME AS BLOCK 7

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9A. AMENDMENT OF SOLICITATION NO.

DTFAEN-16-R-00186

9B. DATED (SEE ITEM 11)

12/27/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment 0002 to SIR- Request for Proposals DTFAEN-16-R-00186 is being executed to publish Answers and Clarifications to RFIs. Please see attached.

No other changes or updates added.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Regina Singleton

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer) 12/27/2016

DTFAEN‐‐‐‐16‐‐‐‐R‐‐‐‐00186 – Boston Antenna Towers

Pre‐‐‐‐Bid RFIs

Is the FAA going to provide detail foundation plans for equipment shelter?

No; the contractor will provide the foundation design based on the contractors results of soil borings data. For bidding purposes; contractors can assume a “minimum allowable soil bearing capacity” of 2500 psf. If soil results prove to be insufficient, the FAA will work with the contractor and issue a change order as needed.

Given this site will not likely be built until spring – we are requesting an extension to provide the best and most accurate bid for this requirement. Since the FAA has to respond to questions, 12/20/2016 is not an adequate time frame to process them into our bid.

It has been extended to 13 January 2016. Please refer to Amendment 0001 for specific details.

The solicitation is Posted as a DRAFT, Is there final document posted?

Yes, it has been posted.

The FAA announcement refers to Small business and the SIR says Full and Open Competition?

“System Size Standards (NAICS): 237130 Power and Communication Line and Related Structures Construction, with a small business size standard of $36.5 million average annual receipts over the past 3 fiscal years”

The requirement will be awarded utilizing full and open competition based on the responses received from the publicized Market Survey from Small Business.

Section B includes a breakdown of costs per division and then there is also a bid document listed as an attachment called Section B. Which is required?

Please use bid document listed as an attachment titled Section B.

Invoicing G.5 refers to monthly billing and options years, this is not typical of construction contracts? Will the CO accept a schedule of values upon approved Schedule of work? Disregard reference to Option Years.

Please provide the schedule of Values.

Period of Performance is 215 days, we are currently working a similar FAA project at another airport and were given 270 days. Due to Design built and Shelter MFG lead times, there is a potential of multiple revisions prior to approved drawings.

215 days is approx.. 7 months… the FAA understands it may take up to 9 months to fully complete the project….

Section L.7: how does the FAA assess these criteria? Can you indicate how these are measured?

Each Technical Factor is as equally as important as Price. Please visit Section M of the SIR document for a detailed explanation of how each Factor will be evaluated.

Technical Plan -Is the FAA looking for a site specific safety plan or a sample plan used in previous performance? That is quite a bit of work and is usually done upon award.

Please provide the Site Specific safety plan.

Is there any way the FAA will reconsider electronic submissions? We have done many proposals for the FAA and very few require printing and mailing documents?

All packages are required to be submitted on disc and in hard copy to make the packages available and ready for Proposal Evaluation quickly and also to save the government the expense of time and printing of all packages for the evaluation process. Also, it allows each Offeror the opportunity to ensure that all their desired and required documents are contained in each proposal package.

The constraints of the PAST Performance surveys is very time consuming and labor intensive for our FAA references is there any way we can provide the data to you in the exactly the format needed with contract number, value and contacts? We do this routinely for the FAA.

Please attempt to have your references provide the their unbiased assessment of your past performance for consideration during the Source Selection Board’s Technical Evaluation.

Past performance – is the disqualifier 500K per project for all 5? We have vast experience at major airports, design/build of towers and shelters. Not all projects are in that realm of value?

Please provide your past performance that is relevant to the required Scope and Cost Magnitude that you would like the Government to consider.

Massport Requirements – 1-1.1 – Is Massport requiring full time sweeper & operator for this work? All work is on non-paved roadway and much of the traffic will be escort of workers only.

NO – sweeper & operator is not required as long as dust/debris is maintained and kept off the: runways/taxiways/perimeter roadway….

Massport Requirements – 1-1.2 – Contractor shall pay a “sum of money” to public safety if badges are not returned at project close. What is sum of money??

You would have to contact Massport Badging office for the precise answer…. A lost badge used to cost $50…. Confirm with Massport….

E001 - Overall site plan shows fuel pit at trench path from RVR to RTR.

C001 – trench paths should/will be safely located “South” of old fuel pits….

Comprehensive ground penetrating radar study to be performed prior to excavations…

Site Plan Notes – Note 8 – What is the contractor responsible for on compaction testing specifically? Note says required as needed.

No trench work in Runway/Taxiway safety area is required….so no compaction required…. The trenching under dirt roadway will be concrete encased (no compaction needed)…. Remainder of trenching in grass field area… backfill thoroughly and general compaction so trenches are level with surrounding area…no specific testing required….

Can we confirm that the work being performed is outside of the RSA for Runway

33L? It appears we are clear on the plan but very close.

Work is located outside of the RSA…

Spec 2.0.6 - Seeing there is gas detection in the building is there a requirement for local notification alarm for evacuation (i.e. fire alarm NAC)?

When/if the hydrogen sensor goes into Alarm, it is audible locally within the bldg..;

this facility is considered an “unmanned facility”.

Is it required that the foundation design be supplied by the shelter MFG or can it be an independent firm providing they supply PE stamp?

It can be an independent firm.

A001 Shelter front elevation – What is the desired orientation of the stairs? Straight off the building or along the side of the shelter.

Straight off the building.

Are the stairs into the shelter required to have removable handrails for equipment loading at door?

No.

Upon further review I believe that there is a spec section missing: The Table Of

Contents lists Section 13-2 “Shelter Installation”. This section is not in the package, That is a misprint…. Please refer to Appendix “C” for shelter information.

Should the bid bond be included in Volume #1?

You may include it in your Pricing Volume.

Confirming this project is not tax exempt correct?

It is not.

On the section B Pricing sheet Do you want prices for the bolded lines or each line and subtotals as bolded lines?

On each line and subtotals as bolded lines.

Are you using any portable storage containers on-site during the construction?

The contractor can use portable storage containers… the location will have to be coordinated and approved through Massport. It is anticipated to be at one of these two locations: at the worksite location itself or; adjacent to Perimeter road on the way to the worksite, easy access.

Boston Transmitter Site – Transformer Requirements

Cooper Power Systems or Approved Equal

Exterior NEMA 3R, Padmount, KNAN FR3 Fluid-filled Transformer

• High Voltage: 4160GRDY/2400

• Low Voltage: 240/120

• KVA: 75

• Phase: 1

With:

• Copper windings

• Dead front

• Bushings

• Load Break Inserts

• Bayonet fusing and 1 spare

• Loop feed

• 2400V Arrestor

• Load Break Switch

• Taps: 2 at +2 ½%, 2 at -2 ½%

• Oil level view port

• Oil fill port

• Oil drain/sample valve

• Temperature gauge

• Pressure gauge

File details come from the government source that posted it. Updated .