Attach 1 - FINAL SPEC_rev 21 July.pdf

PDF 6 MB Posted

Attached to
SIR/RFO: CONSTRUCTION - CARSR Training Center, Oklahoma City, OK
Solicitation number
DTFAAC-15-R-05677
Issued by

About this file

Attach 1 - FINAL SPEC_rev 21 July (pdf)

View the file

Other files

File Type Posted
A003 (Attach 13(a))- E1 0 ELECTRICAL SITE PLAN.Attach 13(a —
Attach 3 - SF 25 Perf Bond.pdf PDF
Attach 6 - DBA Wage Determination (OK140049) 6-20-14.OK140049 —
Amend 0001 - Nov 3 2014.pdf PDF
Attach 9 - Past Performance Experience Form.doc DOC document
Pre Proposal Conference Vendor List.pdf PDF
Attach 7 - AMP400 OSH-OC-CC1 Const Act-Stormwtr-Asbestos-Toxic 3-7-14.pdf PDF
Amend 0002 - Nov 6 2014.pdf PDF
Attach 5 - DOT-4220.4 Contractor's Release.doc DOC document
Amend 0004 - Nov 18 2014.pdf PDF
Attach 4 - SF 25a Payment Bond.doc DOC document
Attach 11 - Client Authorization Letter.doc DOC document
A003 (Added Nov 17) E1 2 ENLARGED SITE PLAN - CARSR BLDG.Added Nov 17 —
A004 (Attach 15) FInal Report G025-13 Nov 18.Attach 15 —
Attach 8 - Business Declaration Form.pdf PDF
A003 (Attach 12) Revised Specifications.Attach 12 —
Attach 10 - Past Performance Survey.doc DOC document
Attach 7 - AMP400 OSH-OC-CC Falls-Elect-Conf Space 11-25-13pdf.pdf PDF
A003 (Attach 14) E2 1 POWER PLAN.Attach 14 —
SIR-RFO DTFAAC-14-R-05677 Radar Reloc.pdf PDF
Amend 0003 - Nov 17 2014.pdf PDF
Attach 2 - FAA CARSR 100 DRAWINGS - COMPLETE SET_REVISED_08-27-2014.pdf PDF
Q A Nov 2014.pdf PDF
Attach 7 - AMP400 OSH-OC-CC2 Solid Waste 3-10-14.pdf PDF
A003 (Attach 13(b)) - SSK-1.Attach 13(b —
Amend 0001 - Nov 3 2014.pdf PDF
Pre Proposal Conference Vendor List.pdf PDF
Attach 8 - Business Declaration Form.pdf PDF
Attach 7 - AMP400 OSH-OC-CC1 Const Act-Stormwtr-Asbestos-Toxic 3-7-14.pdf PDF
Amend 0003 - Nov 17 2014.pdf PDF
Attach 9 - Past Performance Experience Form.doc DOC document
Attach 1 - FINAL SPEC_rev 21 July.pdf PDF
A003 (Attach 12) Revised Specifications.Attach 12 —
A003 (Attach 13(b)) - SSK-1.Attach 13(b —
Attach 6 - DBA Wage Determination (OK140049) 6-20-14.OK140049 —
Attach 7 - AMP400 OSH-OC-CC2 Solid Waste 3-10-14.pdf PDF
Attach 2 - FAA CARSR 100 DRAWINGS - COMPLETE SET_REVISED_08-27-2014.pdf PDF
A003 (Attach 14) E2 1 POWER PLAN.Attach 14 —
A003 (Added Nov 17) E1 2 ENLARGED SITE PLAN - CARSR BLDG.Added Nov 17 —
Attach 4 - SF 25a Payment Bond.doc DOC document
Attach 3 - SF 25 Perf Bond.pdf PDF
SIR-RFO DTFAAC-14-R-05677 Radar Reloc.pdf PDF
Amend 0002 - Nov 6 2014.pdf PDF
Attach 5 - DOT-4220.4 Contractor's Release.doc DOC document
Attach 7 - AMP400 OSH-OC-CC Falls-Elect-Conf Space 11-25-13pdf.pdf PDF
Q A Nov 2014.pdf PDF
Attach 10 - Past Performance Survey.doc DOC document
A003 (Attach 13(a))- E1 0 ELECTRICAL SITE PLAN.Attach 13(a —
Attach 11 - Client Authorization Letter.doc DOC document
Attach 7 - AMP400 OSH-OC-CC1 Const Act-Stormwtr-Asbestos-Toxic 3-7-14.pdf PDF
Show 40 more

Latest 50 of 165 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Blank page)

Technical Specification For Construction

Federal Aviation Administration TABLE OF CONTENTS MMAC CARSR Training Center 7/15/2014 TOC - 1

TABLE OF CONTENTS

DIVISION 00 – CONTRACT REQUIREMENTS

00 0107 SEALS PAGES

DIVISION 01 - GENERAL REQUIREMENTS (FAA FRONT END DOCUMENTS)

01 1000 SUMMARY OF WORK

01 1900 CONTRACT CONSIDERATIONS

01 2100 CASH ALLOWANCES

01 2700 UNIT PRICES

01 2800 MODIFICATION PROCEDURES

01 3000 SUBMITTALS

TRANSMITTAL FORM

SUBMITTAL SCHEDULE EXAMPLE

01 3010 OPTIONS

01 3013 COORDINATION AND MEETINGS

01 4000 QUALITY CONTROL

01 4500 CUTTING AND PATCHING

01 5000 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

01 5900 FIELD OFFICES AND SHEDS

01 6000 MATERIAL AND EQUIPMENT

SUBSTITUTION REQUEST FORM

01 6500 STARTING OF SYSTEMS

01 7000 CONTRACT CLOSEOUT

01 7300 OPERATION AND MAINTENANCE DATA

01 8150 COMMISSIONING OF SYSTEMS

DIVISION 02 - EXISTING CONDITIONS – NOT USED

DIVISION 03 - CONCRETE

03 3000 CAST-IN-PLACE CONCRETE

03 3053 CAST-IN-PLACE CONCRETE FOR SITE WORK

03 3511 CONCRETE FLOOR FINISHES

DIVISION 04 - MASONRY

04 2000 UNIT MASONRY

DIVISION 05 - METALS

05 1200 STRUCTURAL STEEL

05 2100 STEEL JOISTS

05 3100 STEEL DECKING

05 4000 COLD-FORMED METAL FRAMING

05 5000 METAL FABRICATIONS

DIVISION 06 – WOOD AND PLASTICS

06 1000 ROUGH CARPENTRY

06 2000 FINISH CARPENTRY

06 4100 ARCHITECTURAL WOOD CASEWORK

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 1113 BITUMINOUS DAMPPROOFING

07 1400 FLUID-APPLIED WATERPROOFING

07 1713 BENTONITE PANEL WATERPROOFING

07 2100 THERMAL INSULATION

07 2119 FOAMED-IN-PLACE INSULATION

MMAC CARSR Training Center 7/15/2014 TOC - 2

07 2500 WEATHER BARRIERS

07 4243 EXTERIOR METAL PANELS

07 5200 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 6200 SHEET METAL FLASHING AND TRIM

07 8400 FIRESTOPPING

07 9005 JOINT SEALERS

DIVISION 08 - OPENINGS

08 1113 HOLLOW METAL DOORS AND FRAMES

08 1416 FLUSH WOOD DOORS

08 3613 SECTIONAL DOORS

08 4313 ALUMINUM-FRAMED STOREFRONTS

08 4413 GLAZED ALUMINUM CURTAIN WALLS

08 7100 DOOR HARDWARE

08 8000 GLAZING

DIVISION 09 - FINISHES

09 2116 GYPSUM BOARD ASSEMBLIES

09 3000 TILING

09 5100 ACOUSTICAL CEILINGS

09 6500 RESILIENT FLOORING

09 6700 FLUID-APPLIED FLOORING

09 6813 TILE CARPETING

09 6900 ACCESS FLOORING

09 7200 WALL COVERINGS

09 7733 GLASS FIBER REINFORCED PLASTIC PANELS

09 8400 ACOUSTIC ROOM COMPONENTS

09 9000 PAINTING AND COATING

DIVISION 10 - SPECIALTIES

10 1101 VISUAL DISPLAY BOARDS

10 2113.19 PLASTIC TOILET COMPARTMENTS

10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES

10 4400 FIRE PROTECTION SPECIALTIES

10 7313 CANOPIES

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 - FURNISHINGS

12 1010 GRAPHIC PANELS

12 3600 COUNTERTOPS

DIVISION 13 – SPECIAL CONSTRUCTION – NOT USED

DIVISION 14 – CONVEYING EQUIPMENT – NOT USED

DIVISION 21 - FIRE SUPPRESSION

21 0400 COMMON REQUIREMENTS FOR FIRE SUPPRESSION

21 0500 COMMON WORK RESULTS FOR FIRE SUPPRESSION

21 0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21 1300 FIRE SUPPRESSION SPRINKLERS

DIVISION 22 - PLUMBING

22 0400 COMMON REQUIREMENTS FOR PLUMBING

22 0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

22 0519 METERS AND GAGES FOR PLUMBING PIPING

MMAC CARSR Training Center 7/15/2014 TOC - 3

22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 0719 PLUMBING PIPING INSULATION

22 1005 PLUMBING PIPING

22 1006 PLUMBING PIPING SPECIALTIES

22 3300 ELECTRIC DOMESTIC WATER HEATERS

22 4000 PLUMBING FIXTURES

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 0400 COMMON REQUIREMENTS FOR HVAC

23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 0519 METERS AND GAGES FOR HVAC PIPING

23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 0713 DUCT INSULATION

23 0719 HVAC PIPING INSULATION

23 0913.53 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC

23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

23 0993 SEQUENCE OF OPERATION FOR HVAC CONTROLS

23 2113 HYDRONIC PIPING

23 2113.33 GROUND-LOOP HEAT-PUMP PIPING

23 2114 HYDRONIC SPECIALTIES

23 2123 HYDRONIC PUMPS

23 3100 HVAC DUCTS AND CASINGS

23 3300 AIR DUCT ACCESSORIES

23 3423 HVAC POWER VENTILATORS

23 3700 AIR OUTLETS AND INLETS

23 8127 SMALL SPLIT-SYSTEM HEATING AND COOLING

23 8146 WATER-SOURCE HEAT PUMPS

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 - ELECTRICAL

26 0513 MEDIUM-VOLTAGE CABLES

26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 0534 CONDUIT

26 0537 BOXES

26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 0573 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

26 0918 REMOTE CONTROL SWITCHING DEVICES

26 0919 ENCLOSED CONTACTORS

26 0923 LIGHTING CONTROL DEVICES

26 1200 PAD MOUNTED TRANSFORMERS

26 1322 PAD MOUNTED MEDIUM-VOLTAGE SWITCHGEAR

26 2200 LOW-VOLTAGE TRANSFORMERS

26 2416 PANELBOARDS

26 2713.10 30 ELECTRIC METERS

26 2717 EQUIPMENT WIRING

26 2726 WIRING DEVICES

26 2813 FUSES

26 2817 ENCLOSED CIRCUIT BREAKERS

26 2818 ENCLOSED SWITCHES

26 2913 ENCLOSED CONTROLLERS

26 3305 BATTERY EMERGENCY POWER SUPPLY

26 3353 STATIC UNINTERRUPTIBLE POWER SUPPLY

MMAC CARSR Training Center 7/15/2014 TOC - 4

26 4113 LIGHTNING PROTECTION FOR STRUCTURES

26 4300 SURGE PROTECTIVE DEVICES

26 5100 INTERIOR LIGHTING

26 5600 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 0501 COMMON WORK RESULTS FOR COMMUNICATIONS

27 0527 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

27 0528 PATHWAYS FOR COMMUNICATIONS SYSTEMS

27 0553.01 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

27 1101 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

27 1360 CUSTOMER-OWNED OUTSIDE PLANT

27 1513 COMMUNICATIONS COPPER HORIZONTAL CABLING

27 1543 COMMUNICATIONS FACEPLATES AND CONNECTORS

27 5116.01 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 0500 COMMON WORK RESULTS FOR ELECTRONIC SECURITY

28 3100 FIRE DETECTION AND ALARM

DIVISION 31 - EARTHWORK

31 0000 EARTHWORK

31 0519 GEOTEXTILE

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 0119 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 1123 AGGREGATE BASE COURSE

32 1129 LIME-MODIFIED SUBGRADE

32 1210 BITUMINOUS TACK COAT

32 1217 BITUMINOUS CONCRETE PAVEMENT

32 1313.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES

32 1613 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 1723.00 20 PAVEMENT MARKINGS

32 9223.13 SODDING AND DRY BEDS

DIVISION 33 – UTILITIES

33 1100 WATER DISTRIBUTION SYSTEM

33 3000 SANITARY SEWERS

33 4000 STORM DRAINAGE UTILITIES

33 7119 ELECTRICAL UNDERGROUND DUCTS AND MANHOLES

Federal Aviation Administration SEALS PAGE MMAC CARSR Training Center 07/15/2014 00 0107- 2

09 6813 TILE CARPETING

09 6900 ACCESS FLOORING

09 7200 WALL COVERINGS

09 7733 GLASS FIBER REINFORCED PLASTIC PANELS

09 8400 ACOUSTIC ROOM COMPONENTS

09 9000 PAINTING AND COATING

10 1101 VISUAL DISPLAY BOARDS

10 2113.19 PLASTIC TOILET COMPARTMENTS

10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES

10 4400 FIRE PROTECTION SPECIALTIES

10 7313 CANOPIES

12 1010 GRAPHIC PANELS

12 3600 COUNTERTOPS

32 9223.13 SODDING AND DRY BEDS

Federal Aviation Administration SEALS PAGE MMAC CARSR Training Center 07/15/2014 00 0107- 4

SEALS PAGE

THE PROJECT:

Mike Monroney Aeronautical Center, Oklahoma City New CARSR Training Center and Radar Relocation

OWNER:

Federal Aviation Administration Oklahoma City, Oklahoma

STRUCTURAL ENGINEER:

KFC Engineering Co.

205 NW 63rd St., Suite 390 Oklahoma City, OK 73116

Telephone: (405) 528-4596 The following Sections of this Project Manual were reviewed by us and revisions made at our direction:

03 3000 CAST-IN-PLACE CONCRETE

05 1200 STRUCTURAL STEEL

05 2100 STEEL JOISTS

05 3100 STEEL DECKING

05 4000 COLD-FORMED METAL FRAMING

05 5000 METAL FABRICATIONS

jsears Snapshot

Technical Specification 100% Design Submittal

MMAC CARSR Training Center 7/15/2014 Page 1 Alvine No. 20133409

TABLE OF CONTENTS

DIVISION 21 - FIRE SUPPRESSION

21 0400 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 22

21 0500 COMMON WORK RESULTS FOR FIRE SUPPRESSION 5

21 0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND

EQUIPMENT

21 1300 FIRE SUPPRESSION SPRINKLERS 4

DIVISION 22 - PLUMBING

22 0400 COMMON REQUIREMENTS FOR PLUMBING 24

22 0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING

EQUIPMENT

22 0519 METERS AND GAGES FOR PLUMBING PIPING 3

22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 4

22 0719 PLUMBING PIPING INSULATION 5

22 1005 PLUMBING PIPING 14

22 1006 PLUMBING PIPING SPECIALTIES 9

22 1429 SUMP PUMPS 4

22 3300 ELECTRIC DOMESTIC WATER HEATERS 3

22 4000 PLUMBING FIXTURES 6

DIVISION 23 - HEATING, VENTILATING, AND AIR-

CONDITIONING (HVAC)

23 0400 COMMON REQUIREMENTS FOR HVAC 24

23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 4

23 0519 METERS AND GAGES FOR HVAC PIPING 3

23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 4

23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 12

23 0713 DUCT INSULATION 8

23 0719 HVAC PIPING INSULATION 7

23 0913.53 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC 4

23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 17

23 0993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 4

23 2113 HYDRONIC PIPING 14

23 2113.33 GROUND-LOOP HEAT-PUMP PIPING 9

23 2114 HYDRONIC SPECIALTIES 4

23 2123 HYDRONIC PUMPS 4

23 3100 HVAC DUCTS AND CASINGS 9

23 3300 AIR DUCT ACCESSORIES 7

23 3423 HVAC POWER VENTILATORS 4

23 3700 AIR OUTLETS AND INLETS 6

23 8127 SMALL SPLIT-SYSTEM HEATING AND COOLING 4

23 8146 WATER-SOURCE HEAT PUMPS 5

23 8149 WATER-TO-WATER HEAT PUMPS 6

DIVISION 27 - COMMUNICATIONS

27 0501 COMMON WORK RESULTS FOR COMMUNICATIONS 14

27 0527 GROUNDING AND BONDING FOR COMMUNICATIONS

SYSTEMS

Technical Specification 100% Design Submittal

MMAC CARSR Training Center 7/15/2014 Page 2 Alvine No. 20133409

27 0528 PATHWAYS FOR COMMUNICATIONS SYSTEMS 2

27 0553.01 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS 3

27 1101 COMMUNICATIONS EQUIPMENT ROOM FITTINGS 6

27 1360 CUSTOMER-OWNED OUTSIDE PLANT 4

27 1513 COMMUNICATIONS COPPER HORIZONTAL CABLING 6

27 1543 COMMUNICATIONS FACEPLATES AND CONNECTORS 3

27 5116.01 PUBLIC ADDRESS AND MASS NOTIFICATIONS SYSTEMS 5

7/15/14 7/15/14

Federal Aviation Administration SUMMARY OF WORK

MMAC CARSR Training Center 7/15/2014 01 1000 - 1

SECTION 01 1000

SUMMARY OF WORK

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Work Description.

B. Contractor use of site and premises.

C. Permits and Licenses.

D. Owner occupancy.

E. Project Funding

1.02 RELATED SECTIONS

A. Section 01 3010 OPTIONS.

1.03 WORK DESCRIPTION

A. Work Location: Federal Aviation Administration, Mike Monroney Aeronautical Center, CARSR Training Building, Oklahoma City, Oklahoma, 73169

B. Completion of Work: The Contractor shall be required to (a) commence Work under this contract within the designated calendar days after the date the Contractor receives the notice to proceed, (b) execute the Work diligently, and (c) complete the entire Work ready for occupancy and use not later than 300 calendar days after notice to proceed.

C. Work Includes: Construction of approximately 16,000 square feet of enclosed space to include but not limited to:

BASE BID:

1. New CARSR training center.

2. Separate storage building and container pad.

3. Foundation for radar tower by others.

4. Associated site work, paving, landscaping, and the extension of applicable utilities to serve new building.

OPTIONS:

1. LED Interior Lighting.

D. Work DOES NOT Include:

1. Furnishing or installation of new or existing equipment and/or furniture, except as specifically noted.

1.04 CONTRACTOR USE OF SITE AND PREMISES

A. Limit use of site and premises to allow:

1. Work by others.

B. Access to Site: Limited to area required for construction.

C. Security Requirements: Contractor shall comply with all applicable Department of

Transportation (DOT), FAA, and MMAC security directives while performing Work of this

Federal Aviation Administration SUMMARY OF WORK

MMAC CARSR Training Center 7/15/2014 01 1000 - 2 contract.

D. User / Owner Occupancy: Not applicable.

E. Time Restrictions – Base Bid: Work shall be conducted between 6:00 a.m. and 6:00 p.m.

on normal government workdays. No Work, with the exception of the demolition work as described below, shall occur at night, or on Saturday’s, Sunday’s or designated government holidays unless approved by the Contracting Officer seven (7) days in advance.

F. Utility Outages and Shutdown: Coordinate with the Contracting Officer at 954-4574.

Outages affecting FAA Operations are required to be accomplished at night, or on Saturday’s, Sunday’s or designated government holidays. Prior to any outage or shutdown, seven (7) working days notification must be made to coordinate scheduling of any Work to be performed during any hours.

1.05 PERMIT AND LICENSES

A. Contractor shall secure and pay for all permits, licenses, special inspections, etc. required in the execution of the Work, whether of a permanent or temporary nature.

1.06 OWNER OCCUPANCY

A. Cooperate with FAA to minimize conflict, and to facilitate FAA's operations.

B. Schedule the Work to accommodate this requirement.

1.07 PROJECT SCHEDULE OF VALUE

A. The successful bidder will be required to, within 20 days after the date established as the

Notice to Proceed, submit to the FAA a detailed schedule of values that clearly sets forth the scheduled prices for each component of the project.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

END OF SECTION

Federal Aviation Administration CONTRACT CONSIDERATIONS

MMAC CARSR Training Center 7/15/2014 01 1900 - 1

SECTION 01 1900

CONTRACT CONSIDERATIONS

A. Schedule of values.

A. Section 01 1000 – Summary of Work: Schedule of additional cost items to be included in the Schedule of Values.

B. Section 01 3000.10 – Options: Description of options that may or may not be considered.

C. Section 01 6000 - Material and Equipment: Product substitutions and options.

1.03 SCHEDULE OF VALUES

A. Submit a printed schedule on Contractor's standard form or electronic media printout.

B. Submit Schedule of Values and Detailed Schedule of Values in duplicate within twenty (20) days after date established in Notice to Proceed.

C. Format: Utilize the Table of Contents of this Project Manual. Identify each line item with number and title of the major Specification Section. Identify site mobilization, bonds and insurance.

D. Include separately for each line item, a direct proportional amount of Contractor's overhead and profit.

E. Revise schedule to list approved Change Orders, with each Application for Payment.

F. Include any additional items for breakdown as requested by the FAA project manager.-

Federal Aviation Administration CASH ALLOWANCES MMAC CARSR Training Center 7/15/2014 01 2100 - 1

SECTION 01 2100

CASH ALLOWANCES

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Cash allowances.

1.2 RELATED SECTIONS

A. Section 01027 - Applications For Payment.

B. Section 01028 - Modification Procedures.

C. Section 01600 - Material and Equipment: Product substitutions and options.

D. Section 02072 – Minor Demolition for Remodeling: Demolition and removal of concrete floor slab and interior walls, finishes, mechanical and electrical systems.

1.3 COSTS INCLUDED IN ALLOWANCES

A. Cost of Product to Contractor or Subcontractor, less applicable trade discounts.

B. Costs of shipping and delivery to project site.

C. Labor required for installation.

1.4 COSTS NOT INCLUDED IN ALLOWANCES BUT INCLUDED IN CONTRACT SUM

A. Product handling at the site, including unloading, uncrating, and storage.

B. Protection of Products from elements and from damage.

C. All applicable taxes.

D. Contractor's overhead and profit.

E. Other expenses required to complete installation.

1.5 ARCHITECT/ENGINEER RESPONSIBILITIES

A. Consult with Contractor for consideration and selection of Products.

B. Select Products in consultation with Owner and transmit decision to Contractor.

C. Prepare Change Order.

1.6 CONTRACTOR RESPONSIBILITIES

A. Assist Architect/Engineer in selection of Products, suppliers and installers.

B. Obtain proposals from suppliers and installers and offer recommendations.

Federal Aviation Administration CASH ALLOWANCES MMAC CARSR Training Center 7/15/2014 01 2100 - 2

C. On notification of selection by Architect/Engineer, execute purchase agreement with designated supplier and installer.

D. Arrange for and process shop drawings, product data, and samples. Arrange for delivery.

E. Promptly inspect Products upon delivery for completeness, damage, and defects. Submit claims for transportation damage.

1.7 CORRELATION WITH CONTRACTOR SUBMITTALS

A. Schedule shop drawings, product data, samples, and delivery dates in Progress Schedule for products selected under allowances.

1.8 COSTS ADJUSTMENTS

A. Differences in costs between allowance and actual costs will be adjusted by Change Order.

1.9 ALLOWANCES SCHEDULED

A. Section 02072 – Minor Demolition for Remodeling: Include the lump sum of $25,000.00 for the removal of unknown items below the existing concrete floor slab.

B. Section 02072 – Minor Demolition for Remodeling: Include the lump sum of $20,000.00 for the correction of unknown below grade site conditions or removal and relocation of unknown underground utilities that are within the limits of the construction of Options 2 & 3..

C. Section 02072 – Minor Demolition for Remodeling: Include the lump sum of $6,000.00 for the correction of unknown penetrations in the existing northwest stair tower for purposes of providing a rated wall at the stairway.

PART 2 - PRODUCTS

PART 3 - EXECUTION

Federal Aviation Administration UNIT PRICES MMAC CARSR Training Center 7/15/2014 01 2700 - 1

SECTION 01 2700

UNIT PRICES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Section:

1. Division 1 Section "Contract Modification Procedures" for procedures for submitting and handling Change Orders.

2. Division 1 Section “Summary of Work” for proposal form.

1.2 DEFINITIONS

A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.3 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

Federal Aviation Administration UNIT PRICES MMAC CARSR Training Center 7/15/2014 01 2700 - 2

(Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

A. Unit Price No. 1:

1. Description: 4 inch thick concrete sidewalk on 4 inch sand fill with 6x6, 10/10 w.w.m.

2. Unit of Measurement: Square Foot.

B. Unit Price No. 2:

1. Description: Removal of additional soil and miscellaneous debris. Unit of Measure:

Cubic Yard.

C. Unit Price No. 3:

1. Delivery and placement of select soil fill to be placed below the new concrete floor slab.

2. Unit of Measure: Cubic Yard.

Federal Aviation Administration MODIFICATION PROCEDURES

MMAC CARSR Training Center 7/15/2014 01 2800 - 1

SECTION 01 2800

MODIFICATION PROCEDURES

A. Submittals.

B. Documentation of change in Contract Sum and Contract Time.

C. Change procedures.

D. Construction Change Directive.

E. Stipulated Sum change order.

F. Unit price change order.

G. Time and material change order.

H. Execution of change orders.

I. Correlation of Contractor submittals.

A. Section 01027 - Applications for Payment: Payment applications.

B. Section 01300 - Submittals: Work schedule and schedule of values.

C. Section 01600 - Material and Equipment: Product options and substitutions.

D. Section 01700 - Contract Closeout: Project record documents.

1.3 SUBMITTALS

A. Submit name of the individual authorized to receive change documents, and be responsible for informing others in Contractor's employ or Subcontractors of changes to the Work.

B. Change Order Forms: Format provided in Document 00800.

1.4 DOCUMENTATION OF CHANGE IN CONTRACT SUM AND CONTRACT TIME

A. Maintain detailed records of work done on a time and material basis. Provide full information required for evaluation of proposed changes, and to substantiate costs of changes in the Work.

B. Document each quotation for a change in cost or time with sufficient data to allow evaluation of the quotation.

MMAC CARSR Training Center 7/15/2014 01 2800 - 2

C. On request, provide additional data to support computations:

1. Quantities of products, labor, and equipment.

2. Taxes, insurance, and bonds.

3. Overhead and profit.

4. Justification for any change in Contract Time.

5. Credit for deletions from Contract, similarly documented.

D. Support each claim for additional costs, and for work done on a time and material basis, with additional information:

1. Origin and date of claim.

2. Dates and times work was performed, and by whom.

3. Time records and wage rates paid.

4. Invoices and receipts for products, equipment, and subcontracts, similarly documented.

1.5 CHANGE PROCEDURES

A. The Architect/Engineer will advise of minor changes in the Work not involving an adjustment to Contract Sum or Contract Time as authorized by AIA A201, 1987 Edition, Paragraph 7.4 by issuing supplemental instructions on AIA Form G710.

B. The Architect/Engineer may issue a Proposal Request which includes a detailed description of a proposed change with supplementary or revised Drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor will prepare and submit an estimate within 10 days.

C. The Contractor may propose a change by submitting a request for change to the

Architect/Engineer, describing the proposed change and its full effect on the Work, with a statement describing the reason for the change, and the effect on the Contract Sum and

Contract Time with full documentation and a statement describing the effect on Work by separate or other contractors. Document any requested substitutions in accordance with

Section 01600.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Architect/Engineer may issue a document, signed by the Owner, instructing the

Contractor to proceed with a change in the Work, for subsequent inclusion in a Change

Order.

B. The document will describe changes in the Work, and will designate method of determining any change in Contract Sum/Price or Contract Time.

C. Promptly execute the change in Work.

1.7 STIPULATED SUM CHANGE ORDER

A. Based on Proposal Request and Contractor's fixed price quotation or Contractor's request for a Change Order as approved by Architect/Engineer.

1.8 UNIT PRICE CHANGE ORDER

A. For pre-determined unit prices and quantities, the Change Order will be executed on a

MMAC CARSR Training Center 7/15/2014 01 2800 - 3 fixed unit price basis.

B. For unit costs or quantities of units of work which are not pre-determined, execute Work under a Construction Change Directive.

C. Changes in Contract Sum or Contract Time will be computed as specified for Time and

Material Change Order.

1.9 TIME AND MATERIAL CHANGE ORDER

A. Submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract.

B. Architect/Engineer will determine the change allowable in Contract Sum/Price and

Contract Time as provided in the Contract Documents.

C. Maintain detailed records of work done on Time and Material basis.

D. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work.

1.10 EXECUTION OF CHANGE ORDERS

A. Execution of Change Orders: Architect/Engineer will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.

1.11 CORRELATION OF CONTRACTOR SUBMITTALS

A. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum.

B. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by the change, and resubmit.

C. Promptly enter changes in Project Record Documents.

Federal Aviation Administration SUBMITTALS

MMAC CARSR Training Center 7/15/2014 01 3000 - 1

SECTION 01 3000

SUBMITTALS

A. Submittal Schedule.

B. Submittal procedures.

C. Format Of Submittals.

D. Construction progress schedules.

E. Proposed Products list.

A. Section 01400 - Quality Control: Manufacturers' field services and reports.

B. Section 01700 - Contract Closeout: Contract warranties, bonds, manufacturers' certificates, and closeout submittals.

1.03 SUBMITTAL SCHEDULES

A. Submit to the Contracting Officer three (3) copies of a submittal schedule at the first progress meeting. Schedule shall include but not be limited to specification Section number, specification title, paragraph number, and/or drawing number, description of submitted item, date submitted, date to location, reviewer action. Update the schedule at each subsequent progress meeting. Refer to example of schedule as attached at the end of this Section.

1.04 SUBMITTAL PROCEDURES

A. Transmit each submittal with Contracting Officer accepted completed transmittal form as attached to this specification Section.

B. Sequentially number the transmittal forms. Revise submittals with original number and a sequential alphabetic suffix.

C. Identify Project, Contractor, Subcontractor or Supplier; pertinent drawing and detail number, and specification Section number, as appropriate.

D. Apply Contractor's stamp, signed or initialed certifying that review, verification of Products required, field dimensions, adjacent construction Work, and coordination of information, is in accordance with the requirements of the Work and Contract Documents.

E. Schedule submittals to expedite the Project, and deliver to Contracting Officer at business address. Coordinate submission of related items.

F. For each submittal for review, allow fourteen (14 days) excluding delivery time to and from the Contractor.

G. Identify variations from Contract Documents and Product or system limitations, which may

MMAC CARSR Training Center 7/15/2014 01 3000 - 2 be detrimental to successful performance of the completed Work.

H. Provide space for Contractor and Contracting Officer review stamps.

I. Revise and resubmit, identify all changes made since previous submission.

J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with provisions.

K. Submittals not requested will not be recognized or processed.

1.05 FORMAT OF SUBMITTALS

A. Each submittal shall be bound in a separate, loose leaf, three-ring binder with a pocket inside the front cover. Submittals of entire systems shall be submitted as a complete unit with necessary appurtenances related and/or a part of the systems unit. Systems shall be defined as follows but not limited to those listed: HVAC, plumbing, and any other system which will require sub-systems for the system to work in a manner as designed in the Contract Documents.

B. Identifying Submittals: Identify submittals, except sample panel and sample installation, with the following information permanently adhered to or noted on each separate component of each submittal and noted on the transmittal form. Tab indexed Section dividers as required to separate components or Products. Mark each copy of each submittal identically, with the following:

1. Project title and location.

2. Construction contract number.

3. The Section number of the specification Section by which the submittal is required.

4. The name, address, and telephone number of the Subcontractor, supplier, manufacturer and any other second tier Contractor associated with the submittal.

5. Product identification and location in Project.

C. Format for Product Data:

1. Submit the number of copies which the Contractor requires, one (1) copy the Contractor shall submit as a Project record documents in accordance with Section 01700, plus two (2) copies which will be retained by the Contracting Officer. Present Product data submittals for each Section as a complete, bound volume. Include a table of contents listing page and catalog item numbers for Product data.

2. Indicate, by prominent notation, each Product which is being submitted; indicate the specification Section number and paragraph number to which it pertains. Identify applicable Products, models, options, and other data. Provide results of test reports specified in each specification Section. Supplement manufacturers' standard data to provide information unique to this Project.

3. Indicate Product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

4. Supplement Product data with material prepared for the Project to satisfy submittal requirements for which Product data does not exist. Identify this material as developed specifically for the Project.

5. After review distribute in accordance with the Submittal Procedures article above and provide copies for record documents described in Section 01700 - CONTRACT

CLOSEOUT.

D. Format for Shop Drawings:

1. Submit the number of opaque reproductions which Contractor requires, one (1) copy the Contractor shall submit as a Project record documents in accordance with Section 01700, plus two (2) copies which will be retained by Contracting Officer.

MMAC CARSR Training Center 7/15/2014 01 3000 - 3

2. Shop drawings shall not be less than 8 1/2 by 11 inches nor more than 30 x 42 inches.

Present 8-1/2 x 11-sized shop drawings as a part of the bound volume for the submittals required by the Section. Present larger drawings in sets. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to the information required in the paragraph entitled "Identifying Submittals." Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Identify materials and Products for Work shown.

3. Shop Drawings: Submit for review. After review, produce copies and distribute in accordance with the SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT.

4. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

E. Format of Samples:

1. Furnish samples in the sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately the same size as specified:

a. Sample of Equipment or Device: Full size.

b. Sample of Materials less than 2 by 3 inches: Built up to 8 1/2 by 11 inches.

c. Sample of Materials exceeding 8 1/2 by 11 inches: Cut down to 8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.

d. Sample of Linear Devices or Materials: 10-inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.

e. Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.

f. Color Selection Samples: 2 inches by 4 inches.

g. Sample Panel: 4 feet by 4 feet.

h. Sample Installation: 100 square feet.

2. Submit the number of samples specified in individual specification Sections; one of which will be retained by Contracting Officer.

3. Submit samples to illustrate functional and aesthetic characteristics of the Product, with integral parts and attachment devices. Coordinate sample submittals for interfacing Work.

4. Submit samples of finishes from the full range of manufacturers' standard colors, textures, and patterns for Contracting Officer selection, if color is not specified or indicated on the Drawings.

5. Samples Showing Range of Variation: Where variations are unavoidable due to the nature of the materials, submit sets of samples of not less than three units showing the extremes and middle of the range.

6. Reusable Samples: Incorporate returned samples into the Work only if so specified or indicated. Incorporated samples shall be in undamaged condition at the time of use.

7. Recording of Sample Installation: Note and preserve the notation of the area constituting the sample installation but remove the notation at the final clean up of the Project.

8. When a color, texture or pattern is specified in naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.

F. Format of Administrative Submittals:

1. When the submittal includes a document which is to be used in the Project or become a part of the Project record, other than as a submittal, do not apply the Contractor's approval stamp to the document, but to a separate sheet accompanying the document.

2. Operation and Maintenance Manual Data: Submit in accordance with Section 01730, Operation and Maintenance Data. Include components required in that Section and the various technical Sections.

MMAC CARSR Training Center 7/15/2014 01 3000 - 4

G. Manufacturer Installation Instructions:

1. When specified in individual specification Sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Contracting Officer in quantities specified for Product Data.

2. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

H. Manufacturer Certificates:

1. When specified in individual specification Sections, submit certification by manufacturer to Contracting Officer, in quantities specified for Product Data.

2. Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

3. Certificates may be recent or previous test results on material or Product, but must be acceptable to Contracting Officer.

1.06 CONSTRUCTION PROGRESS SCHEDULES

A. Submit initial baseline schedule in duplicate within five (5) days after date established in Notice to Proceed.

B. Construction progress schedule shall have construction activity line items that correspond to the schedule of values as listed in Section 01019.

C. Revise and resubmit the construction progress schedule to reflect the actual progress of construction. The original baseline schedule shall not change except, as permitted with approved extension of time.

D. Submit revised schedules with each Application for Payment, identifying changes since previous version. The application for payment shall not be considered complete, and the application will not be processed until the schedule or revised schedule is submitted.

E. Submit a computer-generated chart with separate line for each major activity or Section of

Work, identifying first workday of each week.

F. Show complete sequence of construction by activity, identifying Work of separate stages and other logically grouped activities. Indicate the early and late start, early and late finish, float dates, and duration.

G. Indicate estimated percentage of completion for each item of Work at each submission.

H. Indicate submittal dates required for shop drawings, Product data, samples, and Product delivery dates, in relationship to the scheduled installation.

1.07 PROPOSED PRODUCTS LIST

A. Within fifteen (15) days after date of Notice to Proceed, submit list of major Products proposed for use, with name of manufacturer, trade name, and model number of each Product.

B. For Products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards.

MMAC CARSR Training Center 7/15/2014 01 3000 - 5

T R

A N

S M

IT

T

A L O

F S

H O

P D

R A

W

IN

G S

E

Q U

IP

M

E N

T D

A T

A M

A T

E R

IA

L S

A M

P L E

S O

M A

N U

F A

C T

U R

E R

'S C

E R

T

IF

IC

A

T E

S O

F C

O M

P L

IA

N C

E

D

S

P E

C S

E C

T

IO

N

U

B M

IS

S

IO

N

N

V

IE

W A

L R

E Q

U E

S T

F O

R T

H E

F O

L L O

W

IN

G I T

E M

S

T H

IS

S

E C

T

IO

N W

IL

L B

E I N

IT

IA

T E

D B

Y T

H E

C O

N T

R A

C T

F R

O M

C

O N

T R

A C

T N

O P

R O

J E

H

E C

K O

N

IS

I S

A N

E W

S U

B M

IT

T

L

IS

I S

A R

E S

U B

M

IT

T A

L

F

IT

S

C R

IP

T

IO

N

O F

S U

B M

IT

T

E D

I T

E M

(S

(T y p e S iz e M o d e l N u m b e r, E tc

Y

P E

O F

S U

B M

IT

T

(M fg

/C o n tr

C a ta lo g a ta

S h o p D w g

S a m p le

E tc

P

IE

N

T R

A

F E

R E

N

C U

E M

E

IS

U B

S T

IT

U

T

Q U

E S

T E

E

C

P A

R A

N

W G

E

(C

E

C K

O N

E

If Y e s R e q u e s t

F o rm

M u s t B e ro v id d

Y

M A

R K

S

(N a m e o f C o n tr a c to r)

R M

C S

/9

E

I c e rt if y t h a t th e a b o v e s u b m it te d i te m s h a v e b e e n r e v ie w e d i n d e ta il a n d a re c o rr e c t a n d i n c o n fo rm a n c e w it h t h e C o n tr a c t D o c u m e n ts a n d c a n b e i n s ta lle d i n t h llo c a te d s p a c e s e x c e p t a s o th e r w is e s ta te d

M E

A N

D S

IG

N

A T

U R

E O

F C

O N

T R

A C

T

X A

M P

L E

O F

S U

B M

IT

T

A L S

C H

E D

U g e N o

/3

N

IT

Y S

T A

O J E

C T

T

IT

E K

L Y

S U

B M

IT

T

A L R

E P

O

C

E C

T

IT

E

C

P A

R A

S

C R

IP

T

IO

N

O F

S U

B M

IT

T

E D

I T

T E

V

IE

W

.0

N E

R A

L P

R O

V

IS

IO

.5

O G

R E

S S

C H

A R

/0

/0

.0

N E

R A

L P

R O

V

IS

IO

.0

.B

H

E D

U L E

O F

V A

L U

/0

/0

.0

N

E R

A L P

R O

V

IS

IO

.B

H

E D

U L E

O F

V A

L U

/0

/1

.0

N E

R A

L P

R O

V

IS

IO

E R

G E

N C

Y V

E H

IC

L E

A C

C E

A

N F

IR

E

L A

/2

/2

.2

N E

R A

L P

R O

V

IS

IO

.5

O G

R E

S S

C H

A R

T S

R

E V

IS

/2

/0

.0

E C

IA

L P

R O

V

IS

IO

.1

H E

D U

L E

F O

R S

U B

M

IT

T A

/1

/1

/0

.0

V

IR

O N

M E

O

T E

C T

A

P L

/2

/1

.3

V

IR

O N

M E

O

T E

C T

A

P L

/2

/1

Federal Aviation Administration OPTIONS MMAC CARSR Training Center 7/15/2014 01 3010 - 1

SECTION 01 3010

OPTIONS

A. Identification and description of work included in Options.

A. Sections of Specifications identified in each Alternate.

1.3 PROCEDURES

A. Options will be exercised at the option of Owner.

B. Coordinate related work and modify surrounding work as required to complete the Work, including changes under each Option, when acceptance is designated in Owner- Contractor Agreement.

1.4 OPTIONS

A. Option No. 1 – Interior Lighting.

1. Base Bid Item: Provide fluorescent lighting (T8 and CF) at building interior.

2. Option Item: Provide LED lighting at building interior, in lieu of fluorescent.

B. Option No. 2 – Not Used.

Not used.

Not used.

Federal Aviation Administration COORDINATION AND MEETINGS

MMAC CARSR Training Center 7/15/2014 01 3013 - 1

SECTION 01 3013

COORDINATION AND MEETINGS

A. Coordination.

B. Pre-construction meeting.

C. Progress meetings.

D. Examination.

E. Preparation.

F. Cutting and Patching.

G. Alteration Project procedures.

1.02 COORDINATION

A. Coordinate scheduling, submittals, and Work of the various Sections of the Project Manual to assure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Coordinate completion and clean up of Work of separate Sections in preparation for

Substantial Completion.

1.03 PRE-CONSTRUCTION MEETING

A. Contracting Officer will schedule a meeting after Notice of Award.

B. Attendance Required: Contracting Officer, Project Manager, and Contractor.

C. Agenda:

1. Distribution of Contract Documents.

2. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule.

3. Designation of personnel representing the parties in Contract.

4. Procedures and processing of field decisions, Submittals, Substitutions, Applications for Payments, Proposal Request, Change Orders, and Contract Closeout procedures.

5. Scheduling.

D. Record minutes and distribute copies within seven (7) days after meeting to participants, with two (2) copies to Contracting Officer, Project Manager and participants, and those affected by decisions made.

1.04 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the Work at maximum bi-weekly intervals, unless otherwise required by the Contracting Officer.

B. Make arrangements for meetings, prepare agenda with copies for participants, preside at

MMAC CARSR Training Center 7/15/2014 01 3013 - 2 meetings.

C. Attendance Required: Job Superintendent, major Subcontractors and suppliers Contracting Officer, Project Manager and others as appropriate to agenda topics for each meeting.

D. Agenda:

1. Review minutes of previous meetings.

2. Review of Work progress.

3. Field observations, problems, and decisions.

4. Identification of problems which impede planned progress.

5. Review of submittals schedule and status of submittals.

6. Review of off-site fabrication and delivery schedules.

7. Maintenance of progress schedule.

8. Corrective measures to regain projected schedules.

9. Planned progress during succeeding work period.

10. Coordination of projected progress.

11. Maintenance of quality and work standards.

12. Effect of proposed changes on progress schedule and coordination.

13. Other business relating to Work.

14. Review segment of work

15. Identification of transmittals involved and status: Contractor or Number, Item Approval

Status, Code and Government

16. Whether all submittals have been approved, and if not, what items are outstanding

17. Are all materials on hand, and in accordance with approvals, and if not, identify items not on hand or not in accordance with transmittals

18. Test required in accordance with contract requirements, completed with test and paragraph notation

19. Accident prevention preplanning – Hazard control measures – with applicable outlines and attached completed copies

20. Operational Equipment Checklist – attached for and on file for

21. Quality Control – Prime Contractor with quality control work involved, and date.

E. Record minutes and distribute copies within seven (7) days after meeting to participants, with two (2) copies to Contracting Officer, Project Manager and participants, and those affected by decisions made.

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural attachment of new Work being applied or attached.

C. Examine and verify specific conditions described in individual specification Sections.

D. Verify that utility services are available, of the correct characteristics, and in the correct location.

MMAC CARSR Training Center 7/15/2014 01 3013 - 3

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply any manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 CUTTING AND PATCHING

A. Employ skilled and experienced installer to perform cutting and patching in locations as required.

B. Submit written request in advance of cutting or altering elements which affects:

1. Structural integrity of element.

2. Integrity of weather-exposed or moisture-resistant elements.

3. Efficiency, maintenance, or safety of element.

4. Visual qualities of sight exposed elements.

5. Work of OCAT, FAA or separate Contractor.

C. Execute cutting, fitting, and patching including excavation and fill, to complete Work, and to:

1. Fit the several parts together, to integrate with other Work.

2. Uncover Work to install or correct ill-timed Work.

3. Remove and replace defective and non-conforming Work.

4. Remove samples of installed Work for testing.

5. Provide openings in elements of Work for penetrations of mechanical and electrical

Work.

D. Execute Work by methods to avoid damage to other Work, and which will provide proper surfaces to receive patching and finishing.

E. Cut masonry and concrete materials using masonry saw or core drill.

F. Restore Work with new Products in accordance with requirements of Contract Documents.

G. Fit Work tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.

H. Maintain integrity of wall, ceiling, or floor construction; completely seal voids.

I. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for an assembly, refinish entire unit.

J. Identify any hazardous substance or condition exposed during the Work to the Contracting Officer for decision or remedy.

3.04 ALTERATION PROJECT PROCEDURES

A. Materials: As specified in Product Sections. Match existing Products and Work for patching and extending Work.

B. Employ skilled and experienced installer to perform cutting and patching.

C. Close openings in exterior surfaces to protect existing Work from weather and extremes of temperature and humidity.

MMAC CARSR Training Center 7/15/2014 01 3013 - 4

D. Remove, cut, and patch Work in a manner to minimize damage and to provide a means of restoring Products and finishes to original or specified condition.

E. Refinish existing visible surfaces to remain in renovated rooms and spaces, to specified condition for each material, with a neat transition to adjacent finishes.

F. Where new Work abuts or aligns with existing, provide a smooth and even transition.

Patch Work to match existing adjacent Work in texture and appearance.

G. When finished surfaces are cut so that a smooth transition with new Work is not possible, terminate existing surface along a straight line at a natural line of division and submit recommendation to Contracting Officer for review.

H. Where a change of plane of 1/4 inch or more occurs, submit recommendation for providing a smooth transition to Contracting Officer for review.

I. Patch or replace portions of existing surfaces which are damaged, lifted, discolored, or showing other imperfections.

J. Finish surfaces as specified in individual Product Sections.

Federal Aviation Administration QUALITY REQUIREMENTS MMAC CARSR Training Center 7/15/2014 01 4000 - 1

SECTION 01 4000

QUALITY REQUIREMENTS

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including F.A.A. General and Supple-mentary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for com-pliance with the Contract Document requirements.

1. Specific quality-control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's quality-control procedures that facilitate compliance with the Contract Document re-quirements.

3. Requirements for Contractor to provide quality-control services required by Own-er Representative, Contracting Officer, or authorities having jurisdiction are not limited by provisions of this Section.

C. Related Sections include the following:

1. Divisions 2 through 16 Sections for specific test and inspection requirements.

1.3 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and ensure that proposed construction complies with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that completed construction complies with re-quirements. Services do not include contract enforcement activities performed by Owner Representative.

C. Mockups: Full-size, physical example assemblies to illustrate finishes and materials.

Mockups are used to verify selections made under Sample submittals, to demonstrate aesthetic effects and, where indicated, qualities of materials and execution, and to review construction, coordination, testing, or operation; they are not Samples. Mockups estab-lish the standard by which the Work will be judged.

D. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Test-ing laboratory shall mean the same as testing agency.

1.4 DELEGATED DESIGN

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, MMAC CARSR Training Center 7/15/2014 01 4000 - 2 provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Owner Representative.

1.5 REGULATORY REQUIREMENTS

A. Reference F.A.A. General and Supplementary Conditions.

1.6 SPECIAL INSPECTIONS

A. The Contractor shall be required to acquire the services of an independent testing and inspection firm(s) to oversee and certify all Special Inspections required by the City of Ok-lahoma City and IBC, 2003. These independent firms shall not be affiliated with or have had any business relation, nor any other relationship that would imply any conflict of in-terest with respect to the Contractor. The fees for such testing and inspections shall be included in the Base Bid amount.

B. The Contractor shall be required to acquire the services of an independent air barrier consultant for inspection and design testing of the air barrier in accordance with ASTM E2178 and ASTM E2357, as required under Section 07 2119 Foamed-In-Place Insula-tion.

C. The MMAC is on OCAT leased land and adjacent to runways, airway clearance is re-quired by registering objects over 27’ high. The Contractor shall perform the survey for crane use and obtain approval from the Director of Airport Operations. A survey is re-quired at the conclusion of the project to register a new building, light poles, and con-structed object over 27’ high.

1.7 SUBMITTALS

A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

B. Delegated-Design Submittal: In…

This is the start of the file's text. The full file is on GovTribe.