DRUMWestCalamity_Outlaw-Work List.pdf
PDF 341 KB Posted
- Attached to
- PKAA, DRUM West Calamity Outlaw Project
- Solicitation number
- DQ1 PKAA 2027000029 2
- Issued by
- Mesa County, Colorado
About this file
This is a work list and feature inventory document for the DRUM West Calamity Outlaw Project in Colorado, detailing mine opening closure and remediation work across multiple mine sites. The project encompasses the closure and stabilization of 60+ mine features, including adits, prospect adits, shafts, and subsidence features distributed across numerous named mine locations such as Radium 7, Blue Ribbon, Lee Group, Little Maverick, Sunflower, and Small Spot. The work involves various closure methods including polyurethane foam backfill, steel grates with bat ladders, corrugated steel pipe installation, cable net systems, bulkheads, and simple backfill with native rock and waste rock. Each feature is cataloged with specific dimensions (excavated, eroded, and present sizes), depth measurements, and UTM coordinates for precise geographic location. Access descriptions are provided for each mine site, ranging from highway access with vehicle travel to remote locations requiring helicopter transport or extensive hiking.
The closure specifications reference Standard Work Specifications (SWS) sections and standardized drawings for construction guidance, with particular attention to bat exclusion and habitat protection requirements noted for several locations. Notable features include varying polyurethane foam requirements ranging from 1/3 cubic yard to 4 cubic yards per opening, with some sites requiring archaeologist monitoring during construction. Several sites present specific constraints such as limited equipment access, steep terrain, downed vegetation removal, or prior maintenance issues requiring remediation. Access routes are consistently documented starting from Highway 141 north of Gateway, Colorado, with detailed turn-by-turn directions to individual mine clusters. The project appears to be a comprehensive remediation effort focused on environmental stabilization and public safety while accommodating bat habitat protection requirements.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRUM West Calamity Outlaw – Feature Work List
Feature ID Type Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
264 A1 Radium 7 Adit
Excavated:5ft by 5ft Eroded:5ft by 5ft Present:5ft by 5ft
Depth:10 ft Lining:Rock Drainage:No
Bat Grate
Construct steel grate with full bat ladder in accordance with Grated Adit Closure Standard
Work Specification (SWS) Section 11 and
13, and standard drawings No. 6 sheets 1 and 2.
684678.373, 4276627.372
264 P1 Radium 7
Prospe ct Adit
Excavated:5ft by 5ft Eroded:5ft by 5ft Present:5ft by 5ft
Depth:6 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 wtih 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684658.362, 4276655.595
264 P2 Radium 7
Prospe ct Adit
Excavated:5ft by 4ft Eroded:5ft by 4ft Present:5ft by 4ft
Depth:8 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684694.996, 4276661.993
386 Sub1 Blue
Ribbon 1 &
Subsid ence
Feature
Excavated:15ft by 10ft
Eroded:15ft by 10ft Present:15ft by 10ft
Depth:38 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
685953.637, 4276970.339
48” diameter 15’ long CSP w/ bat grate sealed w/ 2 cuyd PUF/backfill
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
388 A1 Blue
Ribbon 17 Adit
Excavated:6ft by 4ft Eroded:6ft by 4ft Present:6ft by 4ft
Depth:15 ft Lining:Rock +
Timber Drainage:No
Bat Grate
Construct steel grate with full bat ladder in accordance with Grated Adit Closure SWS
Section 11 and 13, and standard drawings No. 6 sheets 1 and 2.
684169.423, 4274771.441
388 A2 Blue
Ribbon 17 Adit
Excavated:5ft by 4ft Eroded:7ft by 5ft Present:7ft by 5ft
Depth:15 ft Lining:Rock +
Timber Drainage:No
Bat Grate
Construct steel grate with full bat ladder in accordance with Grated Adit Closure SWS
Section 11 and 13, and standard drawings No. 6 sheets 1 and 2.
684165.495, 4274763.331
398 A1 Lee Group Adit
Excavated:4ft by 4ft Eroded:4ft by 4ft Present:4ft by 4ft
Depth:10 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
684588.510, 4272669.199
36” diameter 5’ long CSP w/ bat grate sealed w/ 1 cuyd PUF/ backfill
398 A2 Lee Group Adit
Excavated:5ft by 4ft Eroded:5ft by 4ft Present:5ft by 4ft
Depth:11 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
684591.442, 4272678.520
36” diameter 5’ long CSP w/ bat grate sealed w/ 1 cuyd PUF/ backfill
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
398 P1 Lee Group
Prospe ct Adit
Excavated:5ft by 3ft Eroded:5ft by 3ft Present:5ft by 3ft
Depth:8 ft Lining:Rock +
Timber Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
684592.552, 4272682.863
30” diameter 5’ long CSP w/ bat grate sealed w/ 1 cuyd PUF/backfill
398 P2 Lee Group
Prospe ct Adit
Excavated:4ft by 3ft Eroded:4ft by 3ft Present:4ft by 3ft
Depth:9 ft Lining:Rock +
Timber Drainage:No
Bulkhead SWS 14 684558.206, 4272639.506
398 P3 Lee Group
Prospe ct Adit
Excavated:3ft by 4ft Eroded:3ft by 4ft Present:3ft by 4ft
Depth:5 ft Lining:Rock Drainage:No
Backfill, w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684562.220, 4272643.917
399 A1 Little
Maverick 1 Adit
Excavated:5ft by 5ft Eroded:5ft by 5ft Present:5ft by 5ft
Depth:15 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 2 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685054.737, 4271918.425
Inset backfill w/ PUF behind structure;
archeological monitor during construction.
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
399 A2 Little
Maverick 1 Adit
Excavated:4ft by 5ft Eroded:4ft by 5ft Present:4ft by 5ft
Depth:15 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
685054.979, 4271907.944
36” diameter 5’ long CSP w/ bat grate door, sealed w/ 1 cuyd PUF/ backfill ; archeological monitor during construction
400 A1 Little
Maverick 4 & 5
Adit
Excavated:10ft by 4ft Eroded:10ft by 4ft Present:10ft by 4ft
Depth:10 ft Lining:Rock +
Timber Drainage:No
Bat Grate
Construct steel grate with full bat ladder in accordance with Grated Adit Closure SWS
Section 11 and 13, and standard drawings No. 6 sheets 1 and 2.
683541.464, 4269753.485
400 A2 Little
Maverick 4 & 5
Adit
Excavated:8ft by 3ft Eroded:8ft by 3ft Present:8ft by 3ft
Depth:10 ft Lining:Rock +
Timber Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
683543.913, 4269752.308
30” diameter 5’ long CSP w/ bat grate sealed w/ 2 cuyd PUF/ backfill
405 A1 Little
Maverick 6 Adit
Excavated:1ft by 1ft Eroded:1ft by 1ft Present:1ft by 1ft
Depth:10 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 w 2/3 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684373.799,
4268946.607 Bat Exclusion prior to construction
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
405 A2 Little
Maverick 6 Adit
Excavated:18ft by 5ft Eroded:18ft by 5ft Present:18ft by 5ft
Depth:10 ft Lining:Rock Drainage:No
Bat Grate
Construct steel grate with full bat ladder in accordance with Grated Adit Closure SWS
Section 11 and 13, and standard drawings No. 6 sheets 1 and 2.
684372.803, 4268958.305
411 A1 Supply 11 Adit
Excavated:8ft by 5ft Eroded:8ft by 5ft Present:8ft by 5ft
Depth:10 ft Lining:Rock Drainage:No
Backfill, Polyuretha ne Foam
SWS 2 with 2 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
688654.952, 4269762.541
Bat Exclusion prior to construction
436 A10 Fraction Adit
Excavated:3ft by 5ft Eroded:3ft by 5ft Present:3ft by 5ft
Depth:10+ ft Lining:Rock Drainage:No
Grate SWS 11 689989.315, 4276750.378
436 A9 Fraction Adit
Excavated:3ft by 5ft Eroded:3ft by 5ft Present:3ft by 5ft
Depth:10+ ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
690000.359, 4276743.855
454 Sub1 Outlaw
Economy
Subsid ence
Feature
Excavated:6ft by 15ft Eroded:6ft by 15ft Present:6ft by 15ft
Depth:13 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 4 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
690767.104, 4272073.263
Bat Exclusion prior to construction
Set bottom form at 5’ depth Good equipment access
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
457 Sub 1 Ronnie 1
Subsid ence
Feature
Excavated:6ft by 16ft Eroded:6ft by 6ft
Present:16ft by 6ft Depth:10 ft
Lining:Other Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 4 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
690102.710, 4275442.442
Set bottom form at 4 ft depth
5898 A1 Great
Hesper Adit
Excavated:5ft by 4ft Eroded:5ft by 4ft Present:5ft by 4ft
Depth:30 + ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684515.711, 4276000.864 needs maintenance, previous company backfill eroding
5898 A2 Great
Hesper Adit
Excavated:6ft by 6ft Eroded:6ft by 6ft Present:6ft by 6ft
Depth:20 ft Lining:Rock +
Timber Drainage:No
Fence Please see google drive folder for Specifications and Photos
684640.943,
4276048.173 Fence 17’ L x 10’ H & Sign
5900 Sub1 Hidden
Treasure
Subsid ence
Feature
Excavated:3ft by 4ft Eroded:3ft by 4ft Present:3ft by 4ft
Depth:15 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685371.527, 4277081.421
5901 A1 Sunflower Adit
Excavated:5ft by 1ft Eroded:5ft by 1ft Present:5ft by 1ft
Depth:10 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685136.726,
4277544.504 Hand Backfill w/PUF- no equipment access
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
5901 A3 Sunflower Adit
Excavated:5ft by 6ft Eroded:5ft by 6ft Present:5ft by 6ft
Depth:50 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
685111.655, 4277603.145
48” diameter 25‘ CSP w/ bat grate sealed w/ 1 cuyd PUF/backfill
5901 A5 Sunflower Adit
Excavated:5ft by 6ft Eroded:5ft by 6ft Present:5ft by 6ft
Depth:10 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
685099.396, 4277578.802
30” diameter 5’ long CSP w/ bat grate sealed w/ 1 cuyd PUF/backfill. Backfill and ⅓ cuyd
PUF 1’ x 6” crown hole opening
5901 A6 Sunflower Adit
Excavated:5ft by 6ft Eroded:5ft by 6ft Present:5ft by 6ft
Depth:10 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
685099.261, 4277574.172
30” diameter 5’ long CSP w/ bat grate sealed w/ 1 cuyd PUF/ backfill
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
5901 Sub 1 Sunflower
Subsid ence
Feature
Excavated:5ft by 1ft Eroded:5ft by 1ft Present:5ft by 1ft
Depth:10 ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
685136.726, 4277544.504
Vertical 24” diameter 5’ long CSP w/ bat grate sealed w/ 2 cuyd PUF/ backfill
5905 P1 Outlaw Mines
Prospe ct Adit
Excavated:10ft by 8ft Eroded:10ft by 8ft Present:10ft by 8ft
Depth:6 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 2 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
689659.239, 4276760.425
5906 Sub1 July
Subsid ence
Feature
Excavated:4ft by 5ft Eroded:4ft by 5ft Present:4ft by 5ft
Depth:3 ft Lining:Other Drainage:No
Backfill SWS 2 689671.480, 4276316.230
Remove & Dispose of Fence
5912 A2 Emerson
Blair Adit
Excavated:5ft by 10ft Eroded:5ft by 10ft Present:5ft by 10ft
Depth:10 ft Lining:Rock Drainage:No
Cable Net
Install Cable Net in accordance with Wire Rope Netting Closure SWS Section 16, and SWS 13, drawing 6 sheet 2 (NOTE: specification modification in bid document).
691881.016, 4272736.254
Concrete footer required
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
5912 Sub1 Emerson
Blair
Subsid ence
Feature
Excavated:1ft by 1ft Eroded:1ft by 1ft Present:1ft by 1ft
Depth:9 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 2/3 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
691782.834, 4272721.253
Excavate to 3x3 opening before installing PUF
5915 A2
Bluebird
Adit
Excavated:4ft by 5ft Eroded:4ft by 5ft Present:4ft by 5ft
Depth:10+ ft Lining:Rock Drainage:No
Grated Corrugate d Steel Pipe w Bat
Grate
Install Grated Corrugated Steel Pipe with Bat Ladder in accordance with
Corrugated Steel Pipe Adit Closure specifications Section 10, Drawing Number 5 and Number 6 sheet 2.
691534.336, 4272239.347
36 “ diameter 10’ long CSP w Bat Grate and bulkhead
5915 P2
Bluebird
Prospe ct Adit
Excavated:8ft by 4ft Eroded:8ft by 4ft Present:8ft by 4ft
Depth:4 ft Lining:Rock +
Timber Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 2 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
691537.606, 4272244.360
5915 S2
Bluebird
Shaft
Excavated:8ft by 8ft Eroded:8ft by 8ft Present:8ft by 8ft Depth:unknown ft
Lining:Other Drainage:No
Backfill SWS 2 691669.594, 4272212.974
Remove downed trees covering shaft.
Machine Backfill w waste rock. Bat Exclusion prior to construction
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
5916 A2 Klondike Adit
Excavated:10ft by 8ft Eroded:10ft by 8ft Present:10ft by 8ft
Depth:15 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 4 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
690492.383, 4270726.170
5940 A10 Small Spot Adit
Excavated:5ft by 6ft Eroded:5ft by 6ft Present:5ft by 6ft
Depth:10 ft Lining:Rock Drainage:No
Bat Grate
Construct steel grate with full bat ladder in accordance with Grated Adit Closure SWS
Section 11 and 13, and standard drawings No. 6 sheets 1 and 2.
685155.737, 4276974.937
5940 A3 Small Spot Adit
Excavated:10ft by 6ft Eroded:10ft by 6ft Present:10ft by 6ft
Depth:10 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 3 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685041.802, 4276722.764
5940 A5 Small Spot Adit
Excavated:1ft by 2ft Eroded:1ft by 2ft Present:1ft by 2ft
Depth:10 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 2/3 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685079.767, 4276849.181
5940 A7 Small Spot Adit
Excavated:4ft by 2ft Eroded:4ft by 2ft Present:4ft by 2ft
Depth:10 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685010.976, 4276841.727
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
5940 A8 Small Spot Adit
Excavated:5ft by 9ft Eroded:5ft by 9ft Present:5ft by 9ft
Depth:10 ft Lining:Rock Drainage:No
Cable Net
Install Cable Net in accordance with Wire Rope Netting Closure SWS Section 16, and SWS 13, drawing 6 sheet 2 (NOTE: specification
685144.508, 4276947.841
5940 A9 Small Spot Adit
Excavated:5ft by 5ft Eroded:5ft by 5ft Present:5ft by 5ft
Depth:10 ft Lining:Rock Drainage:No
Bat Grate
Construct steel grate with full bat ladder in accordance with Grated Adit Closure SWS
Section 11 and 13, and standard drawings No. 6 sheets 1 and 2.
685148.669, 4276956.266
5940 P1 Small Spot
Prospe ct Adit
Excavated:6ft by 2ft Eroded:6ft by 2ft Present:6ft by 2ft
Depth:8 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685023.806, 4276705.691
5940 P2 Small Spot
Prospe ct Adit
Excavated:5ft by 4ft Eroded:5ft by 4ft Present:5ft by 4ft
Depth:5 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
162708.71, 4281858.38
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
5940 P3 Small Spot
Prospe ct Adit
Excavated:4ft by 4ft Eroded:4ft by 4ft Present:4ft by 4ft
Depth:4 ft Lining:Rock Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
685010.557, 4276838.941
5940 P4 Small Spot
Prospe ct Adit
Excavated:5ft by 6ft Eroded:5ft by 6ft Present:5ft by 6ft
Depth:9 ft Lining:Rock Drainage:No
Cable Net
Install Cable Net in accordance with Wire Rope Netting Closure SWS Section 16, drawing 6 sheet 2 (NOTE: specification
685153.782, 4276965.329
5940 Sub 1 Small Spot
Subsid ence
Feature
Excavated:5ft by 5ft Eroded:5ft by 5ft Present:5ft by 5ft
Depth:30 + ft Lining:Rock Drainage:No
Grate Steel Grated Shaft SWS 8, drawing 4
685361.394,
4276788.161 Grate w Footer & Bat Cupola
6198 P1 Triangle
Prospe ct Adit
Excavated:3ft by 8ft Eroded:3ft by 8ft Present:3ft by 8ft
Depth:6 ft Lining:Rock Drainage:No
Backfill SWS 2 687804.959, 4275057.762
Modified Backfill- Dry Stack rocks for backfill at face
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
6198 P2 Triangle
Prospe ct Adit
Excavated:1ft by 4ft Eroded:1ft by 4ft Present:1ft by 4ft
Depth:6 ft Lining:Rock Drainage:No
Backfill SWS 2 687803.778, 4275056.501
Modified Backfill- Dry stack rocks
6208 A2 Hummer Adit
Excavated:1ft by 1ft Eroded:1ft by 1ft Present:1ft by 1ft
Depth:10 ft Lining:Rock +
Timber Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1/3 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684682.205, 4276189.469
6208 Sub1 Hummer
Subsid ence
Feature
Excavated:8ft by 5ft Eroded:8ft by 5ft Present:8ft by 5ft
Depth:6 ft Lining:Rock Drainage:No
Backfill SWS 2 684675.306, 4276142.426
Machine Backfill w adjacent waste rock pile 1 associated with 6208 A2
6209 A1 May Day Adit
Excavated:6ft by 4ft Eroded:6ft by 4ft Present:6ft by 4ft
Depth:15 ft Lining:Other Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 1 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684599.784, 4276446.966
6209 P1 May Day
Prospe ct Adit
Excavated:8ft by 4ft Eroded:8ft by 4ft Present:8ft by 4ft
Depth:6 ft Lining:Other Drainage:No
Polyuretha ne Foam w Bulkhead
SWS 14 & SWS 9 684596.227,
4276433.312 4 cuyd PUF w/ Bulkhead Facade
Description of Mine
Opening Closure Method
General Bid Specifications and
Drawings
UTM
(X,Y) NAD83 Work Description / Notes
6209 Sub1 May Day
Subsid ence
Feature
Excavated:10ft by 5ft Eroded:10ft by 5ft Present:10ft by 5ft
Depth:15 ft Lining:Other Drainage:No
Backfill w Polyuretha ne Foam
SWS 2 with 3 cuyd of PUF and hand backfill to cover PUF with native rock/ waste rock
684604.579, 4276438.440
Access Descriptions
Radium 7 Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 1 mile to sites Blue
Ribbon 1 &
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 mine on left (south) side of road 1/16 mile down Z2
Blue
Ribbon 17 Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10. 1.5 miles on 11 5/10 road to the Y- bear right and travel 1.75 miles on unmarked road Foot access only Mine access Accessible by 0.13-mile hike
398 Lee Group
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10. 6 miles on 11 5/10 road to the 670 road bear right and travel 2 miles on 4 x4 road. Mine access Accessible by 0.25-mile hike. Helicopter recommended for these sites
399 Little Maverick 1
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10. 6 miles on 11 5/10 road to the 670 road bear right and travel 2 miles on 4 x4 road. Accessible by 0.05-mile hike down a steep slope from a four-wheel-drive road. . Helicopter recommended for these sites Little
Maverick 4 & 5
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10. 8 miles on 11 5/10 road to the road bear right 836 road and travel 2 miles on 4 x4 road. Accessible by 0.05-mile hike down a steep slope from a four-wheel-drive road
Little
Maverick 6
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10. 8 miles on 11 5/10 road to the road bear right 836 road and travel 2 miles on 4 x4 road. Accessible by 0.05-mile hike down a steep slope from a four-wheel-drive road. West of 400 sites. Helicopter recommended for these sites 411 Supply
11 Access via Highway 141 north of Gateway 6 3/10 Road, Bear right or south on 19 5/10 Road for 4 miles, take right or head west on 895 Road for 2 miles. Mine on left side of road ½ mile off road
Fraction Access via Highway 141 north of Gateway 6 3/10 Road at the y of 6 3/10 and 19 5/10 road take a right to stay on 6 3/10- 1 mile to mine 454 Outlaw Economy Access via Highway 141 north of Gateway 6 310 Road, Bear right or south on 19 5/10 Road for 3.5 miles Mine on right 50 ft off road
Ronnie 1 Access via Highway 141 north of Gateway 6 3/10 Road, Bear right or south on 19 5/10 Road for 2.5 miles, take right at Z 2 3/10 Road. Mine on right or north die of road
5898 Great Hesper Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 1.3 mile to sites
Hidden
Treasure Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 .7 mile to site
Sunflower
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 0.7 mile on Z2- go right on unmarked 2 track. No equipment access Helicopter recommended
Outlaw Mines
Access via Highway 141 north of Gateway 6 3/10 Road at the y of 6 3/10 and 19 5/10 road take a right to stay on 6 3/10- 1.4 mile to mine
5906 July Access via Highway 141 north of Gateway 6 3/10 Road at the y of 6 3/10 and 19 5/10 road take a right to stay on 6 3/10- 1.1 mile to mine on left side of road
Emerson
Blair Access via Highway 141 north of Gateway 6 310 Road, Bear right or south on 19 5/10 Road for 3.5 miles Mine on right 50 ft off road
Emerson Bluebird
Access via Highway 141 north of Gateway 6 310 Road, Bear right or south on 19 5/10 Road for 3.5 miles Take unmarked 2 track on left head south 0.3 miles. Shaft on road, Adit and prospect in the drainage
Klondike Access via Highway 141 north of Gateway 6 310 Road, Bear right or south on 19 5/10 Road for 4 miles, take right or head west on 895 Road for 1/2 mile. Mine on left 50 ft off road
5940 Small Spot
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 .7 mile to site and park near cabin. No equipment access, helicopter recommended
Triangle
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 9/10 Road bear right on 11 9/10 BLM A878B Administrative route would be used to access the Triangle locations
Hummer Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 1.3 mile to sites
Mayday
Access via Highway 141 north of Gateway 6 3/10 Road- 10 miles to intersection with 11 5/10 Road bear right on 11 5/10 travel 3.5 miles to Z2 road bear right on Z2 1.5 mile to unmarked 2 track travel .26 miles to the west mine is 0.3 mile walk off road flat terrain