About this file
This is a bid set of architectural and engineering drawings for the Connecticut Department of Administrative Services (DAS) Division of Construction Services for structural upgrades at 395 West Main Street in Waterbury, Connecticut under project number BI-2B-455. The project scope encompasses structural reinforcement of the second floor framing, including reinforcement of existing steel beams and K-series joists, demolition and reinstallation of mechanical, electrical, plumbing, and fire protection systems, and replacement of ceiling systems on the first floor. The work area totals approximately 5,347 square feet in scope, with 4,191 square feet of occupied business space to remain operational during construction. The bid documents include site logistics plans, demolition plans, reflected ceiling plans, structural framing plans with reinforcement details and schedules, and mechanical, electrical, plumbing, and fire protection demolition and reinstallation plans. The project must comply with the 2022 Connecticut State Building Code and applicable model codes including the 2021 International Building Code and International Existing Building Code. Construction must maintain employee access and egress via basement level entrances with security escort, and contractor access is limited to designated routes with specific staging areas identified. All existing systems serving the building must remain operational during the phased construction work, with coordination required among all trades.
The structural reinforcement work involves welding and bolting operations on existing steel members using ASTM A992 Grade 50 wide flange shapes and ASTM A500 Grade C structural steel tubing, with all welding performed by certified welders in accordance with AWS D1.1 standards. Contractors must submit shop drawings for structural steel fabrication with AISC STD certification, coordinate temporary shoring design, and perform field verification of all existing conditions before commencing work. The MEP trades must coordinate removal and reinstallation of ceiling-mounted devices, ductwork, piping, and electrical systems to avoid conflicts with new structural reinforcement members, with particular attention to existing wiring runs supported by open web joists. Special inspections are required per the project's Statement of Special Inspections. All finishes and materials damaged during performance of work shall be restored to original condition, and all construction debris and temporary dust-proofing must be removed upon completion, leaving the area in clean and neat condition.
Text of this file
TENITSUS
TILUTSNART
IUQ
LOCATION PLAN
SITE PLAN
DAS LAND ID: 13755 FACULTY ID: 63400
DEPARTMENT OF ADMINISTRATIVE SERVICES
MICHELLE H. GILMAN
COMMISSIONER
GOVERNOR NED LAMONT
PROJECT NO. BI-2B-455
395 W. MAIN STREET STRUCTURAL UPGRADES
395 WEST MAIN STREET,
WATERBURY, CONNECTICUT
STATE OF CONNECTICUT
BID SET
DECEMBER 11, 2024
ARCHITECT
id3A, LLC
655 WINDING BROOK DR.
GLASTONBURY, CT 06033
860.657.2500
PROJECT
SITE
STRUCTURAL
Conlon Engineering, LLC
246 Federal Road, Suite B23 Brookfield, CT 06702
203.740.0990
MEP
RZ Design Associates, Inc.
750 Old Main Street, Suite 202 Rocky Hill, CT 06067
860.436.4336
WATERBURY
PROJECT
LOCATION
LIST OF DRAWINGS
GENERAL
G-000 COVER SHEET
G-001 GENERAL NOTES, SYMBOLS, LEGENDS AND ABBREVIATIONS
LS-001 CODE SHEET
ARCHITECTURAL
A-001 SITE LOGISTICS PLAN
A-101 FIRST FLOOR PLAN FOR REFERENCE
A-201 FIRST FLOOR DEMOLITION PLAN FIRST FLOOR REFLECTED CEILING PLAN
A-610 CEILING DETAILS
STRUCTURAL
S-101 PARTIAL SECOND FLOOR FRAMING STRENGTHENING PLAN, GENERAL NOTES AND MATERIAL SPECIFICATIONS
S-200 TYPICAL DETAILS AND SECTIONS
FIRE PROTECTION
FPD-101 FIRST FLOOR FIRE PROTECTION DEMOLITION AND REINSTALLATION PLAN
MECHANICAL
MPD-101 FIRST FLOOR MECHANICHAL AND PLUMBING DEMOLITION AND REINSTALLATION PLAN
ELECTRICAL
E-001 ELECTRICAL GENERAL INFORMATION
E-101 ELECTRICAL LIGHTING PLANS
E-201 ELECTRICAL POWER PLANS
AV
ACONC
ASCC
ACE
ACST
AD
ADJ
ADR
AF
AFF
AGGR
AL
ANDZ
AP
APPROX
ARCH
ASP
ACT
AUTO
AUX
AUDIO VISUAL
ARCHITECTURAL CONCRETE
ARCHITECTURAL SELF-CONSOLIDATING CONC
ACCESS CONTROL EQUIPMENT
ACOUSTICAL
AREA DRAIN
ADJACENT
ACCESS DOOR
ACCESS FLOOR
ABOVE FINISHED FLOOR
AGGREGATE
ALUMINUM
ANODIZED
ACCESS PANEL
APPROXIMATE(LY)
ARCHITECT(URAL)
ASPHALT
ACOUSTIC CEILING TILE
AUTOMATIC
AUXILARY
BO
BCL
BD
BEV
BF
BG
BLDG
BLK
BM
BME
BRK
BRZ
BSMT
BOTTOM OF
LOCAL CONTROL PANEL
BOARD
BEVELED
BASEMENT FUNCTIONS
BUMPER GUARD
BUILDING
BLOCK (WOOD BLOCKING)
BEAM
BUILDING MANTAINANCE EQUIPMENT
BRICK
BRONZE
BASEMENT
CB
CBD
CCTV
CF
CG
CJ
C
CLG
CLG HT
CLO
CLR OPNG
CMU
CO
COL
CONC
CONN
CONSTR
CONT
CONTR
CONV
CORR
CP
CPT
CR
CS
CT
CTR
CU
CW
CATCH BASIN
CEMENT BOARD
CLOSED CIRCUIT TELEVISION
CONCRETE FILL
CORNER GUARD(S)
CONTROL JOINT
CENTER LINE
CEILING
CEILING HT
CLOSET
CLEAR OPENING
CONCRETE MASONRY UNIT
CLEAN OUT
COLUMN
CONCRETE
CONNECT(ION)
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CONVECTOR
CORRIDOR
CEMENT PLASTER
CARPET(ED)
CONCRETE RENDER
CONCRETE SEALER
CERAMIC TILE
CENTER
CUBIC
CURTAIN WALL
E
EA
EB
EC
ED
EGR
EHD
EJ
EL
ELAST
ELEC
ELEC CL
ELEV
ELL
EM
EMER
ENCL
ENTR
EQ
EQPT
ESC
EWC
EXH
EXP
EXPN
EXST
EXT
EAST
EACH
ELECTRIC BOILER
EXPOSED CONSTRUCTION
ELECTRICAL DEVICE
EXTENSIVE GREEN ROOF SYSTEM
ELECTRIC HAND DRYER
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRICAL
ELECTRICAL CLOSET
ELEVATOR
ELLIPSE
ENTRANCE MAT
EMERGENCY
ENCLOSURE / ENCLOSE(D)
ENTRANCE
EQUAL
EQUIPMENT
ESCALATOR
ELECTRIC WATER COOLER
EXHAUST
EXPOSED
EXPANSION
EXISTING
EXTERIOR
FA
FAAP
FAB
FAF
FAI
FAP
FBP
FD
FDMPR
FDN
FDVC
FE
FEC
FF
FFL
FH
FHC
FHR
FIN
FIN FL
FIN GR
FLEX
FLG
FLMT
FLR
FO
F.O.F.
FR
FRM
FRTW
FS
FSS
FSE
FT
FTG
FWP
FIRE ALARM
FIRE ALARM ANNUNCIATOR PANEL
FABRIC
FLUID APPLIED FLOORING
FRESH AIR INTAKE
FOR ALL POINTS
FABRIC PANEL
FLOOR DRAIN
FIRE DAMPER
FOUNDATION
FIRE DEPARTMENT VALVE CABINET
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FLOATING FLOOR
FINISH FLOOR LEVEL
FIRE HYDRANT
FIRE HOSE CABINET
FIRE HOSE RACK (REEL)
FINISHED
FINISH FLOOR
FINISH GRADE
FLEXIBLE
FLASHING
FLUSH MOUNTED
FLOOR(S)
FINISHED OPENING
FACE OF FINISH
FIRE RETARDANT / RATING / RESISTANT
FRAME
FIRE RETARDANT TREATED WOOD
FULL SIZE
FIRE STOPPING SYSTEM
FOOD SERVICE EQUIPMENT
FEET (FOOT)
FOOTING
FABRIC WRAPPED PANEL
G
GA
GALV
GB
GFRC
GFRG
GG
GH
GI
GL
GLSB
GL BLK
GND
GP
GR
GS
GAS
GUAGE
GALVANIZED
GRAB BAR
GLASS FIBER REINFORCED CONCRETE
GLASS FIBER REINFORCED GYPSUM
GLAZING GASKET
GUARD HOUSE(S)
GALVANIZED IRON
GLASS
GLAZED SHADOW BOX
GLASS BLOCK
GROUND
GYPSUM BOARD
GRANITE
GRASS
HB
HD
HDW
HEX
HM
HDRL
HORIZ
HP
HPT
HQ
HR
HT
HVAC
HOSE BIB
HEAD
HARDWARE
HEXAGON(AL)
HOLLOW METAL
HANDRAIL
HORIZONTAL
HEDGE
HIGH POINT
HEADQUARTERS
HOUR
HEIGHT
HEATING, VENTILIATING, AIR CONDITIONING
ID
II
INCL
INFO
INSUL
INTR
ISO
INSIDE DIAMETER
INDUSTRIAL INFRASTRUCTURE
INCLUDE(D) / INCLUSIVE / INCLUDING
INFORMATION
INSULATION
INTERIOR
ISOLATE(D) / ISOLATION
JC
JF
JG
JMB
JT
JANITOR CLOSET
JOINT FILLER
JOINT GASKET
JANITOR MOP BASIN
JOINT
L
LAB
LAM
LAQ
LAV
LB(S)
LF
LH
LONG
LP
LPT
LS
LTG
LVL
LVR
LEATHER
LABORATORY
LAMINATE
LACQUER PANELS
LAVATORY
POUNDS
LIGHT FIXTURE
LEFT HAND
LONGITUDUNAL
LIGHTNING PROTECTION
LOW POINT
LIMESTONE
LIGHTING
LEVEL
LOUVER
MAINT
MACH
MATL
MAX
MECH
MED
MEZZMFR
MFR
MH
MIN
MISC
ML
MLWK
MO
MOD
MP
MR
MRH
MRV
MTD
MTL
MUL
MAINTAIN / MAINTANENCE
MACHINE
MATERIAL
MAXIMUM
MECHANICAL
MEDIUM
MEZZANINE
MANUFACTURER
MANHOLE
MINIMUM
MISCELLANEOUS
METAL LATH
MILLWORK
MASONRY OPENING
MODULE
METAL PANEL
MARBLE
MIRROR HORIZONTAL
MIRROR VERTICAL
MOUNTED
METAL
MULLION
OA
OC
OD
OF
OFD
OFF
OPNG
OPP
OPPH
OPR
OVERALL
ON CENTER
OUTSIDE DIAMETER
OFFICE INFRASTRUCTURE
OVERFLOW DRAIN
OFFICE
OPENING
OPPOSITE
OPPOSITE HAND
OPERATING / OPERABLE
PA
PAR
PART
PAV
PB
PC
PERF
PERP
PFP
PGL
PL
PLAM
PLAS
PLBG
PLSTC
PLYWD
PNEU
PNL
POL
PR
PREFAB
PROJ
PROP
PSF
PSI
PTD
PTN
PVG
PWR
PUBLIC ADDRESS
PARALLEL
PARTIAL
PAVERS
PLASTERBOARD
PRECAST CONCRETE
PERFORATED
PERPENDICULAR
PREPARED FOR PAINT
PLEXIGLAS
PLATE
PLASTIC LAMINATE
PLASTER
PLUMBING
PLASTIC
PLYWOOD
PNEUMATIC
PANEL
POLISHED
PAIR
PREFABRICATE
PROJECT(S)
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PAINTED
PARTITION
PAVING
POWER
QT
QTY
QUARRY TILE
QUANTITY
R
RB
RCF
RCP
RD
RECT
REF
REFR
REG
REINF
REQD
REV
RF
RFA
RM
RND
RO
RH
RISER
RESILIENT BASE
RAISED COMPUTER FLOOR
REFLECTED CEILING PLAN
ROOF DRAIN
RECTANGLE
REFERENCE
REFRIGERATOR
REGISTER
REINFORCED
REQUIRED
REVISION
RESILIENT FLOORING
ROOFING ACCESSORIES
ROOM
ROUND(ED)
ROUGH OPENING
ROBE HOOK
SL
SLDG
SMR
SN
SND
SP
SPE
SPEC
SPS
SQ
SS-n
SSC
SSL
STC
STD
STL
STOR
STRUCT
SURF MTD
SUSP
SWBD
SYMM
SOIL
SLIDE / SLIDING
SHEET METAL ROOFING
SANITARY NAPKIN DISPENSER
SANITARY NAPKIN DISPOSAL
SPECIALTY ITEM(S)
SPORTS EQUIPMENT
SPECIFICATION
SYNTHETIC POLYMER SURFACE
SQUARE
STAINLESS STEEL
SMOKE SEAL COMPOUND
STRUCTURAL SLAB LEVEL
SOUND TRANSMISSION CLASS
STANDARD
STEEL
STORAGE
STRUCTURE
SURFACE MOUNTED
SUSPENDED
SWITCHBOARD
SYMMETRICAL
T
TO
TA
TC
TD
TEL
TEMP
TER
TG
THK
THRES
TOC
TOPO
TPD
TRANS
TRAV
TYP
TREAD
TOP OF
TOILET ACCESSORIES
TRAFFIC COATING
TRENCH DRAIN
TELEPHONE
TEMPORARY
TERRAZZO
TONGUE AND GROOVE
THICK(NESS)
THRESHOLD
TOP OF CURB
TOPOGRAPHY MAP
TOILET PAPER DISPENSER
TRANSOM
TRAVERTINE
TYPICAL
UC
UNFIN
UON
UF
UPS
UR
UNDERCUT
UNFINISHED
UNLESS OTHERWISE NOTED
URBAN FURNITURE
UNINTERRUPTED POWER SUPPLY
URINAL
VAR
VB
VERT
VEST
VIF
VOL
VT
VWC
VARIES
VAPOR BARRIER
VERTICAL
VESTIBULE
VERIFY IN FIELD
VOLUME
VINYL COMPOSITION TILE
VINYL WALL COVERING
W W/ W/O
WC
WCV
WD
WDB
WDF
WDVR
WH
WOC
WP
WPG
WR
WS
WT
WV
WWF
WEST
WITH
WITHOUT
WATER CLOSET / TOILET
WALL COVERING
WOOD
WOOD BASE
WOOD FLOORING
WOOD VENEER
WALL HYDRANT
WHERE OCCURS
WORK POINT
WATERPROOFING MEMBRANE
WEATHER RESISTANT
WEATHER STRIPPING
WEIGHT
WOOD VENEER
WELDED WIRE FABRIC
AND
ANGLE
AT
NUMBER
A
B
ABBREVIATIONS
DB
DBL
DD
DEG
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DISP
DIV
DMPR
DN
DPL
DP
DR
DW
DWG
DWTR
DECIBEL
DOUBLE
DECK DRAIN
DEGREE(S)
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
AIR DIFFUSER(S)
DIMENSION
DISPENSER
DIVIDE / DIVISION
DAMPER
DOWN
DRAINAGE PANEL
DEMOUNTABLE PARTITION
DRAINAGE
DRYWALL
DRAWING
DUMBWAITER
C
D
E
F
G
H
I
J
L
M
O
P
Q
R
N
NA
NC-n
NIC
NO.
NOM
NRC
NTS
NORTH
NOT APPLICABLE
NOISE CRITERIA
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION COEFFICENT
NOT TO SCALE
N
S
S
SCHED
SCP
SD
SECT
SEG
SH
SHR
SHT
SHTHG
SI
SIM
SJ
SK
SOUTH
SCHEDULE(D)
SKIM COAT OPENING
SOAP DISPENSER
SECTION
SEGMENT(S)
SHOWER HEAD
SHOWER
SHEET
SHEATHING
SIGNAGE
SIMILAR
SEALANT JOINT
SERVICE SINK
T
U
V
W
WALL SECTION
View Name 1/8" = 1'-0"
ROOM NAME
150 SF
ROOM NAME
ROOM NUMBER
DOOR NUMBER
1T
1K
WINDOW TYPE
PARTITION TYPE
CEILING HEIGHT
FF99 EQUIPMENT TAG
ELEVATION ON
SECTIONS & DETAILS
FINISH FLOOR
10'-0"
A101
SIM
DETAIL SECTION
A101
SIM
A101
SIM
INTERIOR ELEVATION
KEY ON PLANS
REVISION TAG
0 GRID LINE
SPOT ELEVATION - PLAN
TRUE NORTH
PROJECT NORTH
ALIGN SYMBOLA
CENTER LINE
SYMBOL
VIEW REFERENCE
NORTH ARROW
SYMBOLS
A101
1 Ref
R e f
1Ref
R e f
SPOT ELEVATION - ELEVATION
MATERIAL TAGMT-99
PLAN DETAIL
BUILDING SECTION 1
A101
SIM
ACT-1
10'-0"
KEYNOTEX
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project
CAD no. project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S id3A, LLC.
655 WINDING BROOK DR.
GLASTONBURY, CT 06033
P:\103.08.001.rvt
GENERAL NOTES, SYMBOLS,
LEGENDS AND ABBREVIATIONS
G-001
JM
MF
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
05.31.24 90% CD Submission
12.11.24 BID SET
SPACE USE LEGEND
BUSINESS
@ 150
VERTICAL PENETRATIONS
Unoccupied
NOT IN SCOPE
5347 SQFT
IN SCOPE
4191 SQFT
BUSINESS
28 OCC
APPLICABLE CODES
2022 CONNECTICUT STATE BUILDING CODE CONSISTING OF THE FOLLOWING MODEL
CODES, AS AMMENDED BY THE STATE OF CONNECTICUT:
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2020 NATIONAL ELECTRICAL CODE (NFPA 70)
2017 ICC A117.1 ACCESSIBLE AND USEABLE BUILDINGS AND FACILITIES
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project
CAD no. project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S id3A, LLC.
655 WINDING BROOK DR.
GLASTONBURY, CT 06033
P:\103.08.001.rvt
CODE SHEET
LS-001
JM
MF
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
1/8" = 1'-0"
FIRST FLOOR PLAN
1 PROVIDE CONSTRUCTION ENCLOSURE
2 CONTRACTOR ACCESS
STAIRWELL MUST REMAIN CLEAR FOR EMPLOYEE EMERGENCY EGRESS.
STAIRWELL MAY BE USED FOR CONTRACTOR ACCESS, HOWEVER, EGRESS
DOORS (INTERIOR AND EXTERIOR) SHALL NOT BE IMPEDED FROM AUTOMATIC
FUNCTION AT ANY TIME, AND STAGING OF MATERIALS WITHIN THE STAIRWELL
IS STRICTLY PROHIBITED
CONTRACTOR ACCESS ROUTE
5 CONSTRUCTION ACCESS VIA WINDOW
6 ELEVATOR ACCESS AT FIRST FLOOR IS PROHIBITED DURING CONSTRUCTION
FLOOR PLAN NOTES
7 RESTROOM FOR CONTRACTOR USE ONLY
8 EMPLOYEE ELEVATOR ACCESS VIA BASEMENT LEVEL ENTRANCE DURING
CONSTRUCTION, SEE DETAIL 2/A-001
9 PROVIDE CONSTRUCTION BARRICADE WITH 3'x7' DOOR AND PANIC
HARDWARE, CLEARLY LABELED "EMERGENCY EGRESS ONLY"
10 PROTECT EXISTING LANDSCAPING
11 ELEVATED PARKING LOT AVAILIBLE FOR CONTRACTOR USE
12 EMPLOYEE EGRESS VIA BASEMENT LEVEL
13 EMPLOYEE ACCESS AND EGRESS VIA BASEMENT LEVEL ENTRANCE
DURING CONSTRUCTION
FLOOR PLAN KEYNOTES
SCOPE OF WORK
KEYNOTE
14 TEMPORARY SECURITY STATION DURING CONSTRUCTION. EMPLOYEE
ACCESS TO THE BUILDING DURING CONSTRUCTION WILL BE LIMITED AND
WILL BE ESCORTED BY SECURITY PERSONNEL AT ALL TIMES
15 RESERVED DAS EMPLOYEE PARKING SPACES
STAIR
ELEV.
ELEV.
STAIR
STAIR
DN
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project
CAD no. project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S id3A, LLC.
655 WINDING BROOK DR.
GLASTONBURY, CT 06033
P:\103.08.001.rvt
SITE LOGISTICS PLAN
A-001
JM
MF
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
WEST MAIN STREET
WEST MAIN STREET
WEST MAIN STREET
STAGING
AREA
SITE LOGISTICS PLAN
BASEMENT ELEVATOR ACCESS
1 1
A
B
C
D
E
1 2
4 5
60' - 0"
1' - 7" 12' - 9" 16' - 0" 16' - 8" 11' - 5" 1' - 7"
1'
0"
1'
CONFERENCE
1-084
CONFRENCE
1-092
VISITING
1-087
VISITING
1-083
HR
1-081
VISITING
1-086
CONFERENCE
1-089
POLICE
1-090
RR
1-091
OFFICE
1-085
WORK RM
1-088
COFFEE
1-082
OFFICE
1-096
OFFICE
1-095
OPEN OFFICE
1-097
VEST.
V-001
LOBBY
1-094
HALL
1-093
ELEV
E-001
STAIR
S-001
TYP.
TYP. TYP.
2 2
FLOOR PLAN LEGEND
FLOOR PLAN NOTES
EXISTING FULL HEIGHT PARTITION
EXISTING PARTIAL HEIGHT PARTITION
AREA NOT IN CONTRACT (NIC)
1. ALL WALLS ARE EXISTING TO REMAIN, INTERIOR PARTITION TYPES INDICATED FOR
INFORMATION ONLY AND ARE RELATED TO TOP OF THE WALL CONDITIONS ONLY
2. FLOOR PLAN IS PROVIDED FOR REFERENCE. EXISTING FINISHES SHALL BE
PROTECTED IN PLACE
1 EXISTING FULL HEIGHT PARTITION
2 EXISTING PARTITION 6" ABOVE CEILING
EXISTING LOW PARTITION 4' A.F.F.4
EXISTING PARTITION TO UNDERSIDE OF ACT
5 REMOVE WINDOW FOR CONSTRUCTION ACCESS, PROTECT
6 PROVIDE CONSTRUCTION BARRIER
FLOOR PLAN KEYNOTES
KEYNOTE TAG
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project
CAD no. project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S id3A, LLC.
655 WINDING BROOK DR.
GLASTONBURY, CT 06033
P:\103.08.001.rvt
FIRST FLOOR PLAN FOR
REFERENCE
A-101
JM
MF
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
1/8" = 1'-0"
FIRST FLOOR PLAN - FOR REFERENCE ONLY
B
C
D
E
4 5
D1
D2
D3
8'-4"
ACT1
8'-0"
ACT1
8'-0"
ACT1
8'-3"
ACT18'-2"
ACT1
8'-5"
ACT1
8'-9 1/2"
METAL
8'-3"
ACT1
7'-4"
ACT1
OFFICEWORK ROOM
VEST.LOBBY
HALL
POLICE
CONFERENCE
RR
VISITINGVISITING
HR
VISITING
CONFERENCE
CONFERENCE
COFFEE
OFFICE
OFFICE
ELEV.
D2 TYP. AT EXTERIOR WINDOWS
OPEN OFFICE
A
B
C
D
E
4 5
8'-3"
ACT2
8'-9 1/2"
ACT2
8'-2"
ACT2
8'-3"
ACT2
8'-4"
ACT3
8'-5"
ACT2
8'-2"
ACT1
8'-0"
ACT1
8'-0"
ACT2
8'-4"
ACT1
8'-0"
GYP
A
A
A-610
A-610
A
F U
LL
T
IL
E
FULL TILE
E Q
F
U
LL
T
IL
E E
Q
FULL TILE
FULL TILE
F U
LL
T
IL
E
CONFERENCE
CONFERENCE
OFFICEWORK ROOM
LOBBY VEST.
RR
CONFERENCE
VISITING VISITING
VISITINGHR
COFFEE
OFFICE
OFFICE
ELEV.
HALL
POLICE
F U
LL
T
IL
E
TYP
FULL TILE
A-610
8'-3"
ACT2
7'-4"
GYP
8" 8"
OPEN OFFICE
RCP DEMOLITION LEGEND
RCP DEMOLITION NOTES
REMOVE EXISTING LIGHT FIXTURE
EXISTING BASE BUILDING CONSTRUCTION TO REMAIN
REMOVE EXISTING LIGHT FIXTURE
REMOVE EXISTING ACOUSTICAL CEILING SYSTEM AND PADS,
INCLUDING ALL ASSOCIATED FRAMING + SUPPORTS
1. VERIFY AND COORDINATE ALL DIMENSIONS PRIOR TO BEGINNING WORK.
2. COORDINATE ACCESS POINTS AND STAGING AREAS WITH OWNER/CM PRIOR TO
BEGINNING WORK. SEE SITE LOGISTICS PLAN A-001.
3. PROVIDE TEMPORARY CONSTRUCTION BARRIERS AS REQUIRED TO PROTECT
ADJACENT. AREAS FROM CONSTRUCTION DUST AND DEBRIS
4. FURNISH ALL LABOR AND MATERIALS AS REQUIRED TO COMPLETE DEMOLITION AND
REMOVAL OF ITEMS SHOWN OR NOTED.
5. COORDINATE REMOVAL OF ALL MECHANICAL, ELECTRICAL AND PLUMBING RELATED
ITEMS WITH BOTH NEW AND EXISTING MEP ENGINEERING DOCUMENTS.
6. CONTRACTOR SHALL COORDINATE TEMPORARY POWER REQUIREMENTS DURING
DEMOLITION.
7. REFER TO MEP DOCUMENTS FOR REMOVAL REQUIREMENTS FOR ALL MEP DEVICES AND
ABOVE CEILING ITEMS.
8. TEMPORARILY SUPPORT ALL ITEMS SHOWN TO BE REMOVED BUT REQUIRED TO REMAIN
IN SERVICE DURING DEMOLITION AND CONSTRUCTION (i.e. LIFE SAFETY DEVICES, EXIT
SIGNS, SPRINKLER HEADS, ETC.). SEE MEP DRAWINGS.
9. CONTRACTOR TO NOTIFY ARCHITECT OF ANY UNFORESEEN EXISTING OBSTRUCTIONS
THAT ARISE, PRIOR TO THE INSTALLATION OF ANY LIGHT FIXTURES AND MECHANICAL
DIFFUSERS AND RETURNS.
AREA NOT IN SCOPE
REMOVE EXISTING GWB CEILING, INCLUDING ALL ASSOCIATED
FRAMING
REMOVE EXISTING METAL SLAT CEILING SYSTEM, INCLUDING
ALL ASSOCIATED FRAMING
REMOVE EXISTING LIGHT FIXTURE
D1
D2
REMOVE EXISTING WINDOW AS REQUIRED FOR CONSTRUCTION
ACCESS; PROTECT AND STORE FOR REINSTALLATION
EXISTING SOFFIT TO REMAIN, PROTECT IN PLACE
D3 REMOVE EXISTING ACT AS OCCURS ABOVE METAL CEILING
RCP DEMOLITION KEYNOTES
D4 REMOVE EXISTING EXTERIOR GYP SOFFIT, INCLUDING 2 SURFACE
MOUNTED LIGHTS
1 NEW GWB SOFFITS TO BE PAINTED TO MATCH ADJACENT WALLS.
2. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FIXTURE SCHEDULES FOR
TYPES AND SPECIFICATIONS.
3. FOR DIFFUSERS, SPRINKLERS HEADS, SWITCHING CIRCUITS AND OTHER MEP
ITEMS IN THE CEILING, REFER TO MECHANICAL AND ELECTRICAL DRAWINGS.
4. VERIFY WITH ARCHITECT LOCATION OF VISIBLE CEILING ELEMENTS NOT SHOWN
ON ARCHITECTURAL DRAWINGS PRIOR TO INSTALLATION.
5. TYPICAL CEILING COVER PLATE AND DEVICE FINISH SHALL BE WHITE UNLESS
OTHERWISE NOTED.
6. TYPICAL WALL COVER PLATE AND DEVICE FINISH SHALL MATCH (E) ADJCENT
IVORY, FIELD VERIFY.
7. LOCATE SPRINKLER HEADS, EXIT SIGNS, CEILING STROBES, LIGHT FIXTURES,
AUDIO VISUAL DEVICES, SMOKE DETECTORS AND OTHER DEVICES EXPOSED AT
ACOUSTICAL PANEL CEILINGS IN THE CENTER OF THE ACOUSTICAL CEILING PANEL,
UNLESS OTHERWISE NOTED.
8. CEILING SUPPORT SYSTEMS ARE NOT DESIGNED OR INTENDED TO SUPPORT
THE WEIGHT OF ADDITIONAL EQUIPMENT, CABLE, CONDUIT, LIGHTS, MECHANICAL
EQUIPMENT OR OTHER CONSTRUCTION. SUPPORT THESE ITEMS INDEPENDENTLY
FROM THE STRUCTURE ABOVE.
9. NOT USED
10. LIGHT FIXTURES ARE DIMENSIONED TO CENTER OF FIXTURE UNLESS
OTHERWISE NOTED.
11. G.C. IS RESPONSIBLE FOR COORDINATION OF MECHANICAL, ELECTRICAL,
LIGHTING, AND FIRE PROTECTION INSTALLATION. G.C. IS ALSO REQUIRED TO
COORDINATE THE WORK OF THE TENANT'S CONTRACTORS FOR
TELECOMMUNICATIONS, SECURITY, AND AUDIO VISUAL WORK.
12. ALL NEW SPRINKLER HEADS TO BE FLUSH MOUNTED HEADS, CENTERED IN
CEILING TILE. SEE FP DRAWINGS.
RCP FINISH NOTES
RCP NOTES
NEW SOFFITS
AREAS NOT IN SCOPE
EXISTING PARTITION TO REMAIN
NEW 2'X4' ACOUSTICAL CEILING TILE SYSTEM,
SEE SHEET A-610 FOR DETAILS
NEW GWB CEILING
INDICATES ALIGNMENT OF FINISHED SURFACES
A
RECESSED DOWN LIGHT FIXTURE, SEE MEP
DRAWINGS FOR SPECIFICATIONS
2x4 GRID LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
2x2 GRID LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS
1 REINSTALL EXTERIOR WINDOW
EXISTING SOFFIT TO REMAIN, TOUCH UP PAINT AS REQUIRED
RESTROOM TO RECEIVE SEPARATE ACT GRID, INSTALL
SOUND INSUL OVER ADJACENT WALLS, 2' MIN. EACH SIDE (SHOWN AS HATCHED)
CEILING GRID START POINT
RCP KEYNOTES
RCP LEGEND
ACT1 B.O.D. TO BE ARMSTRONG CIRRUS HIGH NRC TEGULAR 2x4 TEGULAR W/SUPRAFINE
XL 9/16" GRID, WHITE.
5 ALIGN GRID OVER WALL
ACT2 B.O.D. TO BE ARMSTRONG ULTIMA HIGH NRC 2x4 TEGULAR W/SUPRAFINE XL 9/16"
GRID, WHITE.
ACT3 B.O.D. TO BE ARMSTRONG CLEANASSURE DISINFECTABLE PRODUCTS 2x4 TEGULAR
W/SUPRAFINE XL 9/16" GRID, WHITE.
6 EXTERIOR GYP SOFFIT, SEE DETAIL 6/A610
NEW SOUND INSULATION
7 NEW GYP SOFFIT, SEE DETAIL 5/A610
NEW EXTERIOR GWB CEILING
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project
CAD no. project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S id3A, LLC.
655 WINDING BROOK DR.
GLASTONBURY, CT 06033
P:\103.08.001.rvt
FIRST FLOOR DEMOLITION
PLAN FIRST FLOOR REFLECTED
CEILING PLAN
A-201
JM
MF
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
1/8" = 1'-0"
FIRST FLOOR DEMOLITION CEILING PLAN
1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING PLAN KEY PLAN
TYPICAL MAIN RUNNER.
TYPICAL CROSS MEMBER.
TYPICAL STABILIZER BAR.
SEE NOTE 9.
#12 HANGER WIRES ANCHORED
TO STRUCTURE ABOVE.
TYPICAL WALL.
#12 HANGER WIRES ANCHORED
TO STRUCTURE ABOVE
(PREFERRED) OR ANGLED TO
WALL. SEE NOTE 7.
WHERE PERIMETER WIRES MUST
BE ANCHORED TO WALLS USE
METAL L-CLIPS SCREWED INTO
METAL STUD WALL FRAMING
±10° MAX.
SLOPE
3/8" MIN
3/8" MIN
7/8" WALL ANGLE MIN
OR LESS
8"
TYPICAL MAIN RUNNER.
TYPICAL STABILIZER BAR AT
PERIMETER. SEE NOTE 9.
#12 HANGER WIRES ANCHORED
TO STRUCTURE ABOVE
(PREFERRED) OR ANGLED TO
WALL. SEE NOTE 7.
TYPICAL WALL.
WHERE PERIMETER WIRES MUST
BE ANCHORED TO WALLS USE
METAL L-CLIPS SCREWED INTO
METAL STUD WALL FRAMING
±10° MAX.
SLOPE
3/8" MIN
7/8" WALL ANGLE MIN
3/8" MIN
OR LESS
8"
CEILING TILE
NOTCHED CEILING - ALL EDGES NOTCHED IN
FEILD TO BE PAINTED AND FINISHED TO
MATCH MANUFACTURES FINISHED EDGE - TYP
HANGER WIRES TO STRUCTURE
ABOVE ATTACHED TO FIXTURE
HOUSING - SEE NOTES
TYPICAL RECESSED LIGHT FIXTURE.
TYPICAL SUSPENDED ACOUSTIC
CEILING GRID TEE.
TYPICAL SEISMIC CLIP SCREWED
TO LIGHT FIXTURE WITH MINIMUM
#8X 1/4" SHEET METAL SCREWS.
NOTES
M A
IN
M A
IN
M A
IN
M A
IN
M A
IN
M A
IN
M A
IN
M A
IN
M A
IN
TYPICAL
CROSS
TEE
TYPICAL 7/8" WALL
ANGLE AT PERIMETER.
TYPICAL PERIMETER STABILIZER BAR
TO KEEP PERIMETER COMPONENTS
FROM SPREADING APART.
TYPICAL 12 GAUGE WIRE GRID
SUPPORT TO STRUCTURE OR
WALL ABOVE, SEE NOTE 7.
THESE DETAILS ARE FOR IBC TYPE "C" SEISMIC CEILING DESIGN,
AND FOR CISCA ZONES 0 TO 2.
TYPICAL 12 GAUGE WIRE GRID
SUPPORT TO STRUCTURE OR
WALL ABOVE, SEE NOTE 7.
TYPICAL PERIMETER
STABILIZER BAR TO KEEP
PERIMETER COMPONENTS
FROM SPREADING APART.
TYPICAL 12 GAUGE WIRES AT
4'-0" O.C. TO STRUCTURE
ABOVE.
1. CEILINGS WITH AN AREA OF 144 SQUARE FEET OR LESS AND SURROUNDED BY
WALLS THAT CONNECT DIRECTLY TO THE STRUCTURE ABOVE ARE EXEMPT FROM
THESE REQUIREMENTS.
2. CEILINGS CONSTRUCTED OF LATH AND PLASTER OR GYPSUM BOARD SCREW
ATTACHED TO SUSPENDED MEMBERS THAT SUPPORT THE CEILING ON ONE
SINGLE LEVEL EXTENDING FROM WALL TO WALL ARE EXEMPT FROM THESE
REQUIREMENTS.
3. EACH INDIVIDUAL FIXTURE AND ATTACHMENTS WITH A COMBINED WEIGHT OF 10
LBS. OR LESS SHALL HAVE ONE NO. 12 GAUGE WIRE HANGER CONNECTED FROM
THE FIXTURE HOUSING TO THE STRUCTURE ABOVE. THE WIRE DOES NOT NEED
TO BE TAUGHT.
EACH INDIVIDUAL FIXTURE AND ATTACHMENTS WITH A COMBINED WEIGHT OF 56
LBS. OR LESS SHALL HAVE TWO NO. 12 GAUGE WIRE HANGERS ATTACHED AT
DIAGONAL CORNERS OF THE FIXTURE AND CONNECTED FROM THE FIXTURE
HOUSING TO THE STRUCTURE ABOVE. THESE WIRES NEED NOT BE TAUGHT.
ANY FIXTURE AND ATTACHMENTS WITH A COMBINED WEIGHT GREATER THAN 56
LBS. MUST BE INDEPENDENTLY SUPPORTED FROM THE STRUCTURE.
4. THE MAIN RUNNER/CROSS RUNNER INTERSECTIONS AND ALL GRID SPLICES MUST
BE AN AVERAGE ULTIMATE TEST STRENGTH OF 60 LBS. OR MORE IN BOTH
TENSION AND COMPRESSION. THE TENSILE TEST MUST ALLOW FOR A 5" OFFSET
OF THE CONNECTION IN ANY DIRECTION.
5. THE ACTUAL AVERAGE WEIGHT OF THE CEILING SYSTEM INCLUDING GRID, PANELS
OR TILE, LIGHT FIXTURES, AND AIR TERMINALS MUST BE 2.5 LBS PER SQUARE
FOOT OR LESS. ALL OTHER SERVICES MUST BE SUPPORTED INDEPENDENTLY AND
NOT FROM THE CEILING SYSTEM. FOR CEILINGS THAT HAVE AN AVERAGE WEIGHT
GREATER THAN 2.5 LBS. PER SQUARE FOOT, THE CEILING MUST BE INSTALLED AS
SPECIFIED FOR CISCA ZONES 3-4. OTHER DEVIATIONS OR VARIATIONS MUST BE
SUBSTANTIATED BY VERIFIABLE ENGINEERING DATA.
6. THE SUSPENDED CEILING SYSTEM MUST NOT BE USED TO PROVIDE LATERAL
SUPPORT FOR WALLS OR PARTITIONS. WALLS AND PARTITIONS MAY BE
ATTACHED TO THE CEILING GRID PROVIDED THEY ALLOW THE CEILING MEMBRANE
TO MOVE LATERALLY TO ACCOMMODATE THE REQUIRED CLEARANCES.
7. ALL PERIMETER CLOSURE ANGLES OR CHANNELS MUST PROVIDE A SUPPORT 7/8"
OR GREATER. A PERIMETER END OF A GRID MEMBER MUST REST LEDGE OF 3/8"
CLEARANCE FROM AN EDGE OR ON THE LEDGE OR MOLDING WITH AT LEAST A 8
WALL AS SHOWN IN THE DETAILS. FOR PERIMETER CLOSURE ANGLES THAT 3/8",
THE PERIMETER ENDS OF EACH PROVIDE A SUPPORT LEDGE OF LESS THAN 3/8"
CROSS RUNNER AND MAIN RUNNER SHALL BE INDEPENDENTLY SUPPORTED
WITHIN 8" FROM EACH WALL OR CEILING DISCONTINUITY.
THIS SUPPORT SHALL BE A NO. 12 GAUGE HANGER WIRE TO PREVENT THE GRID
FROM FALLING. THIS WIRE NEED NOT BE VERTICAL, BUT SHOULD NOT BE OUT OF
PLUMB BY MORE THAN A 1 IN 6 ANGLE. A 3/8" GRID END CLEARANCE MUST BE
MAINTAINED.
8. ALL CEILING PENETRATIONS SUCH AS COLUMNS, PIPING, ETC. AND
INDEPENDENTLY SUPPORTED FIXTURES OR SERVICES ARE TO BE CONSIDERED
AS PERIMETER CLOSURES THAT ALSO MUST ALLOW THE NOTED CLEARANCES BY
USING SUITABLE ESCUTCHEONS OR CLOSURE DETAILS.
9. AT WALL CLOSURE LEDGES, THE CROSS RUNNER AND MAIN RUNNER ENDS SHALL
BE PREVENTED FROM SPREADING APART FROM EACH OTHER.
10. PERMANENT ATTACHMENTS TO THE WALL ANGLES (E.G. POP RIVETS) FOR GRID
ALIGNMENT PURPOSES IS NOT PERMITTED.
A-610
CORNER MOLDING;
L-BEAD, TYPICAL @
ALL OUTSIDE EDGES
5/8" GWB TYP
ACT, TYPICAL
STUD FRAMING EXTENDED TO
EXISTING STRUCTURE ABOVE.
PROVIDE DIAGONAL BRACING AS
REQUIRED.
1"
PER PLAN
6"
ACT
PER PLAN
ACT
PER PLAN
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project
CAD no. project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S id3A, LLC.
655 WINDING BROOK DR.
GLASTONBURY, CT 06033
P:\103.08.001.rvt
CEILING DETAILS
A-610
JM
MF
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
3" = 1'-0"1
CROSS MEMBER @ PERIMETER WALL
3" = 1'-0"2
MAIN MEMBER @ PERIMETER WALL
3/4" = 1'-0"3
CEILING @ RECESSED LIGHT FIXTURE
1/4" = 1'-0"4
TYP ROOM CLG PLAN (ROOMS GREATER THAN 144 SF IN AREA)
3" = 1'-0"5
NEW GWB SOFFIT
PARTIAL SECOND FLOOR FRAMING PLAN
1/8" = 1'-0"
'-7
'-1 0"±
'-4
'-1
12'-9"± 16'-0"± 16'-8"± 11'-5"±
'-0
4'-
0"±
4'-0"±
· DO NOT SCALE THIS DRAWING. ALL DIMENSIONS AND ELEVATIONS SHALL BE V.I.F. BY
CONTRACTOR.
· (J-X) INDICATES EXIST. STEEL BAR JOIST TO BE REINFORCED. SEE 3/S-200 FOR
REINFORCEMENT SCHEDULE AND DETAIL.
· (B-X) INDICATES EXIST. STEEL BEAM TO BE REINFORCED. SEE 1/S-200 FOR
REINFORCEMENT SCHEDULE AND DETAIL.
· INDICATES EXIST. CONC. FRAMED PORTION OF FLOOR NOT IN SCOPE
OF WORK.
EX
. 1
2K 5 (
J-4
EX
. 1 2K
5 (
2K 5 (
2K
5 (
. W
6K 4 (
J-3
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 (
6K 4 ( x1
5 ( B-
7) x1
5 (
7)
EX
W6x20, [DROPPED]
EX. W10
EX. W10
EX. W12
CA
NT
CANT.
EX. W21
EX. W18
EX. W16
EX. W18
6K 4 (
J-1
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 (
6K 4 (
6K
4 ( x1
9 (
5) x1
9 (
5)
EX. W18x35 (B-3)EX. W14x22 (B-4)CANT.
. B
M V.
I.F
0K 1 (
J-2
0K 1 (
0K 1 (
0K 1 (
0K 1 (
0K 1 (
0K 1 (
0K 1 (
0K 1 (
EX. W14x30 (B-6)CANT.
EX. W18x50 (B-2)
EX. W18x60 (B-1)EX. W14CANT.
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S
CONLON ENGINEERING, LLC.
246 FEDERAL RD, B-23 BROOKFIELD CT.
BROOKFIELD, CT 06804
19179.03 CE P/No.
90% CD Submission05.31.24
BID SET12.11.24
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
PART. SECOND FLOOR FRAMING
PLAN & GENERAL NOTES
S-101
N.D.
C.T.O.
GENERAL NOTES:
1. THE PURPOSE OF THESE DRAWINGS IS TO SHOW THE STRUCTURAL WORK ASSOCIATED WITH STRUCTURAL UPGRADES FOR THE PORTION OF THE FLOOR FRAMING
INDICATED AT 395 W MAIN STREET, WATERBURY, CT.
2. THE STRUCTURAL COMPONENTS HAVE BEEN DESIGNED/ANALYZED FOR THE FOLLOWING LOADS:
A. FLOOR LIVE LOAD:
OFFICES 50 PSF + 15 PSF PARTITION
CORRIDORS ABOVE FIRST FLOOR 80 PSF
B. EARTHQUAKE DESIGN DATA:
EARTHQUAKE DESIGN FOR EXISTING BUILDINGS:
NOT REQUIRED SINCE THE PROPOSED ADDITIONS AND ALTERATIONS DO NOT INCREASE THE DEMAND-CAPACITY RATIO IN ANY LATERAL LOAD CARRYING STRUCTURAL ELEMENT BY MORE THAN 10 PERCENT CUMULATIVE SINCE THE ORIGINAL CONSTRUCTION.
C. EXISTING BUILDINGS:
THE PROPOSED ALTERATIONS DO NOT INCREASE THE FORCE IN ANY STRUCTURAL ELEMENT BY MORE THAN 5 PERCENT NOR DO THEY DECREASE THE STRENGTH OF ANY STRUCTURAL ELEMENT TO LESS THAN REQUIRED BY THE BUILDING CODE FOR NEW STRUCTURES.
D. VIBRATION DESIGN CRITERIA:
MAXIMUM PEAK ACCELERATION 0.005 g
3. THIS STRUCTURE HAS BEEN DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE CONSTRUCTION OF THE BUILDING WORK SHOWN ON THESE DRAWINGS HAS BEEN COMPLETED. THE STABILITY OF THE STRUCTURE PRIOR TO COMPLETION IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. THIS RESPONSIBILITY EXTENDS TO ALL RELATED ASPECTS OF THE CONSTRUCTION ACTIVITY INCLUDING, BUT NOT LIMITED TO, ERECTION METHODS, ERECTION SEQUENCE, TEMPORARY BRACING, FORMS, SHORING, USE OF EQUIPMENT, AND SIMILAR CONSTRUCTION PROCEDURES. REVIEW OF THE CONSTRUCTION BY THE ENGINEER IS FOR CONFORMANCE WITH DESIGN ASPECTS ONLY, NOT TO REVIEW THE CONTRACTOR'S CONSTRUCTION PROCEDURES. LACK OF COMMENT ON THE PART OF THE ENGINEER WITH REGARD TO CONSTRUCTION PROCEDURES IS NOT TO BE INTERPRETED AS APPROVAL OF THOSE PROCEDURES.
4. SHORING NOTE: THE CONTRACTOR IS RESPONSIBLE FOR DESIGNING, PROVIDING AND INSTALLING ALL TEMPORARY SHORING THAT IS REQUIRED TO SUPPORT INSTABILITIES OF EXISTING STRUCTURE DURING CONSTRUCTION AND DUE TO THE REMOVAL OF EXISTING SUPPORTING WALLS AND EXISTING FRAMING MEMBERS FOR INSTALLATION OF NEW FRAMING AND FOUNDATIONS. SHORING SHALL BE FULLY INSTALLED AND STABLE PRIOR TO REMOVAL OF EXISTING STRUCTURAL ELEMENTS. THESE SHORING REQUIREMENTS ARE GENERALLY SHOWN ON THE DRAWINGS. HOWEVER, ALL CONDITIONS MAY NOT BE SHOWN DUE TO HIDDEN
CONDITIONS AT EXISTING STRUCTURES.
5. JOBSITE SAFETY AND CONSTRUCTION PROCEDURES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. REVIEW OF THE CONSTRUCTION BY THE ENGINEER IS FOR CONFORMANCE WITH DESIGN ASPECTS ONLY, NOT TO REVIEW THE CONTRACTOR'S PROVISIONS FOR JOB SITE SAFETY. LACK OF COMMENT BY THE ENGINEER IS
NOT TO BE INTERPRETED AS APPROVAL OF THOSE ASPECTS OF WORK.
6. ONE BLACKLINE PRINT OF ALL ERECTION AND DETAIL SHOP DRAWINGS FOR STRUCTURAL STEEL INDICATING THE FABRICATOR, MANUFACTURER, FINISH, LAYOUT, AND ALL ACCESSORIES MUST BE SUBMITTED TO AND BE CHECKED BY THE CONTRACTOR AND SUBCONTRACTOR AND BEAR THE CHECKER'S INITIALS BEFORE
SUBMISSION TO THE ARCHITECT FOR REVIEW PRIOR TO FABRICATION.
7. TESTING AND INSPECTION OF STRUCTURAL STEEL AND OTHER WORK IS DESCRIBED IN THE PROJECT "STATEMENT OF SPECIAL INSPECTIONS". THE CONTRACTOR SHALL REVIEW THE “STATEMENT OF SPECIAL INSPECTIONS" AND COORDINATE THE SCHEDULING OF INSPECTIONS WITH THE SPECIAL INSPECTOR.
8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND ANGLES WITH ARCHITECTURAL DRAWINGS AND EXISTING CONDITIONS BEFORE PROCEEDING
WITH ANY WORK.
9. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS BEFORE PROCEEDING WITH ANY WORK. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS
NOTED "±" THAT ARE INDICATED ON THE DRAWINGS.
10. THESE DRAWINGS ARE SUPPLEMENTED BY A DETAILED TECHNICAL SPECIFICATION. THE NOTES SHOWN UNDER CERTAIN CATEGORIES OF WORK ARE INTENDED TO
SUMMARIZE BASIC REQUIREMENTS.
11. WORK SHOWN AS "TYPICAL DETAILS" APPLY THROUGHOUT THE PROJECT AS REQUIRED. WORK SHOWN AS "SECTIONS" SHALL BE CONSIDERED TO APPLY FOR THE
SAME AND SIMILAR CONDITIONS IN THE BUILDING.
12. SOME DETAILS OF THE WORK ARE SHOWN ON THE ARCHITECTURAL DRAWINGS. A CAREFUL REVIEW AND STUDY OF THESE DETAILS IS NECESSARY BEFORE THE FULL
SCOPE OF THE WORK CAN BE COMPREHENDED.
13. DO NOT SCALE DRAWINGS.
SPECIAL NOTES TO THE CONTRACTOR:
1. CONTRACTORS MUST REVIEW THE WORK AREA PRIOR TO SUBMITTING CONSTRUCTION PROPOSALS TO DETERMINE THE FULL SCOPE OF WORK INVOLVED. THE DRAWINGS MAY NOT SHOW ALL PIPING, CONDUITS, EQUIPMENT, AND FIXTURES THAT MAY HAVE TO BE RE-ROUTED OR TEMPORARILY DISLOCATED TO PERFORM THE
STRUCTURAL WORK SHOWN.
2. THE CONTRACTOR SHALL VERIFY ALL CRITICAL DIMENSIONS AND ELEVATIONS OF THE EXISTING CONDITIONS BEFORE PROCEEDING WITH ANY WORK.
3. THE SCHEDULING OF ALL PHASES OF THE WORK, INCLUDING ANY TEMPORARY SERVICE OUTAGES, SHALL BE COORDINATED WITH THE OWNER'S DESIGNATED
ON-SITE REPRESENTATIVE.
4. BEFORE ANY WORK IS STARTED, THE WORK AREA MUST BE SECURELY DUST-PROOFED.
5. ALL FINISHES OR MATERIALS DAMAGED IN THE PERFORMANCE OF THE WORK SHALL BE RESTORED TO ORIGINAL CONDITION. TEMPORARILY RELOCATED UTILITIES
OR EQUIPMENT SHALL BE PUT BACK IN PROPER POSITION.
6. THE EXISTING FRAMING CONNECTIONS ARE ASSUMED TO BE CAPABLE OF SUPPORTING THE ADDITIONAL LOADS IMPOSED BY THIS WORK, EXCEPT WHERE NOTED ON PLAN. THE CONTRACTOR SHALL EXPOSE THE CONNECTIONS NOTED ON PLAN FOR VERIFICATION BY THE ENGINEER.
7. AT THE COMPLETION OF THE WORK, ALL TEMPORARY DUST-PROOFING AND CONSTRUCTION DEBRIS IS TO BE REMOVED, AND THE AREA LEFT IN A CLEAN AND NEAT
MANNER.
DEMOLITION NOTES:
1. CONDUCT DEMOLITION AND REMOVE DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED AND USED
FACILITIES.
2. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER.
3. CONDUCT DEMOLITION TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDINGS AND FACILITIES TO REMAIN. ENSURE SAFE PASSAGE OF PEOPLE
AROUND DEMOLITION AREA.
4. PROVIDE AND MAINTAIN SHORING, BRACING, AND STRUCTURAL SUPPORTS AS REQUIRED TO PRESERVE STABILITY AND PREVENT MOVEMENT, SETTLEMENT, OR
COLLAPSE OF CONSTRUCTION TO REMAIN.
5. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS.
6. CLEAN ADJACENT AREAS OF DUST, DIRT, AND DEBRIS CAUSED BY DEMOLITION. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE START OF DEMOLITION.
STRUCTURAL STEEL NOTES:
1. MATERIALS:
WIDE FLANGE SHAPES: ASTM A992 GRADE 50
AMERICAN STANDARD SHAPES, ANGLES, PLATES AND BARS: ASTM A36
STRUCTURAL STEEL TUBING, RECTANGULAR AND SQUARE: ASTM A500, GRADE C (Fy=50 KSI) STRUCTURAL STEEL TUBING, ROUND: ASTM A500, GRADE C (Fy=46 KSI) STRUCTURAL STEEL PIPE: ASTM A53, GRADE B (Fy=35 KSI)
BOLTS GRADE A325
WELDING ELECTRODE ASTM E70XX, LOW HYDROGEN
2. ALL WELDING SHALL CONFORM TO AMERICAN WELDING SOCIETY'S AWS D1.1 "STRUCTURAL WELDING CODE-STEEL" CODE FOR ARC AND GAS WELDING AND BE
PERFORMED BY A CERTIFIED WELDER IN ACCORDANCE WITH A.W.S. STANDARDS.
3. HIGH STRENGTH BOLTS: INSTALL HIGH-STRENGTH BOLTS ACCORDING TO RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS' (RCSC'S) "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A 490 BOLTS" FOR TYPE OF BOLT AND TYPE OF JOINT SPECIFIED:
JOINT TYPE: SNUG TIGHTENED
4. STRUCTURAL STEEL SHALL BE CLEANED IN ACCORDANCE WITH THE STEEL STRUCTURES PAINTING COUNCIL SPECIFICATION SP-3 FOR POWER TOOL CLEANING (EXCEPT FOR STEEL EXPOSED TO WEATHER) AND PAINTED TO A MINIMUM DRY FILM THICKNESS OF 2 MILS WITH THE SPECIFIED PRIMER.
5. PROVIDE 1/4" CLOSURE PLATE WITH SEAL WELD AT ENDS OF ALL HSS MEMBERS.
6. FABRICATOR SHALL HOLD A CURRENT AISC CERTIFICATION FOR "STANDARD FOR STEEL BUILDING STRUCTURES (STD)".
7. FOR MISCELLANEOUS STEEL, SEE ARCHITECTURAL DRAWINGS.
8. EXISTING STEEL SURFACES TO RECEIVE FIELD WELDS SHALL BE THOROUGHLY CLEANED AND FREE FROM PAINT, RUST, GREASE, ETC.
TYPICAL WIDE FLANGE BEAM STRENGTHENING DETAIL AND SCHEDULE
NO SCALE
NO SCALE
SECTION
3/4" = 1'-0"
EXIST. STEEL BM., SEE PLAN
NEW BOTTOM FLANGE
REINFORCEMENT ⅊, SEE
SCHEDULE FOR SIZE
NEW TOP FLANGE REINFORCEMENT
ANGLES, SEE SCHEDULE FOR SIZE
A 2-12
B 3-6
EXIST. STEEL JOIST,
SEE PLAN
NEW TOP CHORD
REINFORCEMENT BAR, SEE
SCHEDULE FOR DIAMETER
TYP.
3-12
TYPICAL K-SERIES STEEL JOIST STRENGTHENING DETAIL AND SCHEDULE
EXIST. BEAM SIZEMARK
W18x60B-1
WIDE FLANGE BEAM REINFORCEMENT SCHEDULE
WEB REINFORCEMENT
N/A
N/A
N/A
W14x22 N/A
W10x19B-5
W14x30B-6
B-2
B-3
B-4
W18x50
W18x35
N/A
N/A
TOP FLANGE REINFORCEMENT
(2) L2x2x1/4
(2) L2x2x1/4
(2) 1-1/2"Ø SCH. 80 PIPE
N/A
(2) L3x2x3/8 (LLH)
WELD A END WELD LENGTH
1/4 12"
1/4
1/4
RADIUS
N/A
12"
1/4 12"
12"
12"
12"
BOTTOM FLANGE REINFORCEMENT WELD B
5/16
5/16
5/16
1/4
3/16
5/16
EXIST. JOIST SIZEMARK
16K4J-1
K-SERIES STEEL JOIST REINFORCEMENT SCHEDULE
WEB REINFORCEMENT
N/A
N/A
N/A
C10x15.3
12K5 N/A
J-2
J-3
J-4
10K1
16K4
TOP CHORD REINFORCEMENT
(2) 1"Ø BAR
(2) 3/4"Ø BAR C6x8.2
C6x10.5(2) 3/4"Ø BAR
WELD A END WELD LENGTH
RADIUS 8"
RADIUS
RADIUS
8"
RADIUS 8"
8"
BOTTOM CHORD REINFORCEMENT WELD B
3/16**
3/16**
3/16**
3/16**
(2) 3/4"Ø BAR C6x8.2
NEW BOTTOM CHORD
REINFORCEMENT CHANNEL
(FLANGES POINTING DOWN), SEE
SCHEDULE FOR SIZE
(2) L2-1/2x2x3/8 (LLH)
EXIST. STEEL BM., SEE PLAN
NEW BOTTOM FLANGE REINFORCEMENT
TEE, SEE SCHEDULE FOR SIZE
NEW TOP FLANGE REINFORCEMENT
PIPES, SEE SCHEDULE FOR SIZE
B
TYP.
3-12
TYP.
2-12
W10x15B-7 N/A WT4x17.5(2) 1" SCH. 80 PIPE RADIUS 12"1/4
WT6x15
NOTES:
1. BEAM REINFORCEMENT SHALL START/END 18" FROM FACE OF BEAM SUPPORT
2. REINFORCEMENT SHALL BE CONTINUOUS ALONG THE LENGTH OF THE BEAM
3. REINFORCEMENT IS NOT REQUIRED ON CANTILEVERED END OF BEAM
W6, SEE PLAN
EXIST. TOP CHORD
EXTENSION TO BE
SUPPORTED
HSS 4x4x1/4 STUB COLUMN WITH 5"x5"x3/8" CAP AND BASE ⅊
EXIST. W8 TO BE
SUPPORTED, TYP.
EXIST. W14
BEAM TO BEAM CONNECTION BY
STEEL FABRICATOR, CONNECTION
SHALL BE DESIGNED FOR 6 KIP
(LRFD), TYP. EA. END
TOP OF SECOND FLOOR
SLAB
3/16
TYP.
NOTES:
1. TOP CHORD REINFORCEMENT SHALL START/END 3" FROM FACE OF THE JOIST SEAT.
2. BOTTOM CHORD REINFORCEMENT SHALL START/END AT FINAL PANEL POINT.
3. "**" INDICATES WELD SIZE IS LIMITED BY THICKNESS OF BASE METAL, PROVIDE MAX. SIZE OF FILLET WELD POSSIBLE
FOR FIELD CONDITIONS
A
A
B 2-12
TYP.
3/16
TYP., ALL MEMBERS TO W6
9"x5/8" ⅊
9"x5/8" ⅊
9"x5/8" ⅊
7"x3/8" ⅊
8"x1/4" ⅊ drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S
CONLON ENGINEERING, LLC.
246 FEDERAL RD, B-23 BROOKFIELD CT.
BROOKFIELD, CT 06804
19179.03 CE P/No.
90% CD Submission05.31.24
BID SET12.11.24
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
TYPICAL DETAILS AND
SECTIONS
S-200
N.D.
C.O.
B
C
D
E
1 2 3
5FIRE PROTECTION DEMOLITION NOTES
1. BEFORE SUBMITTING BID, THE CONTRACTORS SHALL VISIT THE JOB SITE AND BECOME FULLY FAMILIAR WITH THE EXISTING CONDITIONS AND THE DOCUMENTS OF OTHER TRADES UNDER WHICH THEIR WORK WILL BE ACCOMPLISHED. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS MADE AS A RESULT OF FAILURE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS.
2. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE NOTIFICATION OF OUTAGE AND IMPAIRMENT TO THE EXISTING FIRE PROTECTION SYSTEMS TO THE GENERAL CONTRACTOR, BUILDING OWNER AND LOCAL AUTHORITIES. LEAVE SPRINKLER SYSTEM OPERATIONAL DURING CONSTRUCTION TO
GREATEST EXTENT POSSIBLE.
3. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ANY DAILY INTERRUPTIONS OR SHUTDOWNS OF THE EXISTING SYSTEMS IN ADVANCE WITH OWNER'S DESIGNATED REPRESENTATIVE. THIS SHALL INCLUDE SERVICES INTERRUPTIONS AND CONNECTIONS, MECHANICAL AND ELECTRICAL DISRUPTIONS EFFECTING OTHER TRADES. INCLUDE ALL WORK REQUIRED TO ALLOW PHASED CONSTRUCTION WHERE NECESSARY.
4. DEMOLITION DRAWINGS ARE STRICTLY DIAGRAMMATIC AND SHOW GENERAL ARRANGEMENT AND APPROXIMATE LOCATION OF EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT. IT IS NOT THE INTENT OF THESE DRAWINGS TO SHOW ALL EQUIPMENT, PIPING OR CONDUIT TO BE REMOVED. EQUIPMENT NOT BEING REUSED SHALL BE REMOVED, INCLUDING ALL ASSOCIATED HANGERS, SUPPORTS, PIPES, CONDUITS, WIRES, AND
CONTROLS BACK TO THE POINT OF ORIGIN.
5. REFER TO THE ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS. THE FULL EXTENT OF THE DEMOLITION AND RECONSTRUCTION SCOPE OF WORK SHALL BE DETERMINED BY THE ENTIRE SET OF BID DOCUMENTS.
6. THE CONTRACTORS SHALL COORDINATE THE DEMOLITION SCOPE OF WORK WITH THE GENERAL CONTRACTOR'S OR CONSTRUCTION MANAGER'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF WORK. CARE MUST BE TAKEN SO AS NOT TO DESTROY, REMOVE OR DEMOLISH ANY EQUIPMENT, APPURTENANCES OR DEVICES INTENDED TO REMAIN. PROVIDE TEMPORARY SERVICES AND SYSTEM MODIFICATIONS TO
ACCOMMODATE CONTINUOUS OPERATION OF ACTIVE SYSTEM.
7. THE LOCATION OF EXISTING FIRE SUPPRESSION SYSTEM SHOWN ON FLOOR PLANS, IS BASED ON THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL FIELD VERIFY PRIOR TO COMMENCEMENT OF CONSTRUCTION, EXACT QUANTITY AND LOCATION(S) OF EXISTING EQUIPMENT, PIPING, SPRINKLER HEADS, ETC. TO BE REMOVED AND ADJUST AS NECESSARY. THE CONTRACTOR SHALL OBTAIN EXISTING SHOP DRAWINGS AND
BASE BUILDING DESIGN DOCUMENTS FROM THE OWNER WHERE AVAILABLE.
8. ALL EQUIPMENT, SPRINKLERS AND ASSOCIATED PIPING INDICATED TO BE REMOVED OR RELOCATED, SHALL BE DISCONNECTED AND REMOVED, INCLUDING HANGERS AND OTHER COMPONENTS, UP TO NEAREST EXISTING ACTIVE MAIN OR BRANCH LINE AND CAPPED AS CLOSE TO THE ACTIVE LINE AS POSSIBLE. NO EQUIPMENT, PIPING, OR CONDUIT SHALL BE ABANDONED IN PLACE, UNLESS SPECIFICALLY NOTED.
9. ALL SYSTEMS TO BE REMOVED SHALL BE REMOVED BACK TO THE POINT OF SOURCE. THE CONTRACTOR SHALL VERIFY WHICH SYSTEMS MUST REMAIN ACTIVE TO SERVE ADJACENT SPACES DURING CONSTRUCTION. SHOULD THE CONTRACTOR ENCOUNTER, DURING DEMOLITION OF EXISTING WALLS OR CHASES, ANY PIPING OR CONDUIT WHICH MUST REMAIN ACTIVE, IMMEDIATELY GIVE NOTICE TO THE ENGINEER, GENERAL CONTRACTOR
OR CONSTRUCTION MANAGER.
10. ALL SALVAGEABLE MATERIALS OR EQUIPMENT TO BE REMOVED SHALL BE TURNED OVER TO THE OWNER AT THE END OF EACH DAY. ITEMS REMOVED AND NOT REUSED OR CLAIMED BY THE OWNER SHALL BECOME PROPERTY OF THE TRADE CONTRACTOR AND SHALL BE TRANSPORTED
FROM THE SITE. SITE STORAGE OF REMOVED ITEMS WILL NOT BE PERMITTED.
11. MODIFICATION TO EXISTING SPRINKLER PIPING SYSTEM, MUST BE CONFIRMED BY HYDRAULIC CALCULATIONS, PERFORMED BY THE CONTRACTOR'S LICENSE PROFESSIONAL ENGINEER AND APPROVAL MUST BE GRANTED BEFORE COMMENCING INSTALLATION OF WORK.
12. WHERE EXISTING PIPING, SPRINKLERS OR EQUIPMENT ARE INDICATED TO REMAIN, BUT ARE IN CONFLICT WITH NEW EQUIPMENT INSTALLATION, THEY SHALL BE REMOVED AND REROUTED AS NECESSARY TO ACCOMMODATE THE NEW INSTALLATION.
13. PROPERLY DISPOSE OF ALL DEMOLISHED EQUIPMENT IN COMPLIANCE WITH DAS SPECIFICATIONS; THIS APPLIES TO HAZARDOUS MATERIALS AND
CONTAMINATED ITEMS TO BE DEMOLISHED.
14. NOTE: WHERE EXISTING UPRIGHT SPRINKLER HEADS ARE INSTALLED WITH REDUCING TEE OUTLET LESS THAN 1" DIA., THEY SHALL BE REMOVED AND REPLACED WITH A MINIMUM 1" FULL SIZE TEE OUTLETS. INSTALLATION OF NIPPLES LESS THAN 1" DIA. WILL NOT BE PERMITTED.
15. THE FIRE PROTECTION CONTRACTOR SHALL BE ON SITE FOR THE DURATION OF ALL OUTAGES. IF ANY SHUTDOWN REQUIRES SPRINKLER SYSTEM TO BE OUT OF ORDER FOR MORE THAN 4 HOURS IN A 24 HOUR PERIOD, THE CONTRACTOR SHALL PROVIDE FIRE WATCH PER CODE AND SHALL
COMPLY WITH THE FACILITY STANDARDS AND THE REQUIREMENTS OF THE AHJ.
FIRE PROTECTION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH CURRENT APPLICABLE CODES, ORDINANCES, THE REGULATORY AGENCIES HAVING JURISDICTION AND THE SPECIFICATIONS. THE SPECIFICATIONS MAY EXCEED THE REQUIREMENTS OF THE CODE, IN WHICH CASE, THE
SPECIFICATION MUST BE FOLLOWED.
THE INTENT OF THESE DOCUMENTS IS FOR THE MEP TRADES TO FURNISH AND INSTALL COMPLETE MECHANICAL AND ELECTRICAL SYSTEMS. THE SPECIFIED FIRE PROTECTION SYSTEM SHALL BE COMPLETE IN ALL RESPECTS; OPERATIONAL, TESTED, ADJUSTED, APPROVED BY THE
AUTHORITIES HAVING JURISDICTION AND READY FOR BENEFICIAL USE BY THE OWNER.
THE TRADES SHALL OBTAIN AND REVIEW ALL CONTRACT DOCUMENTS BEFORE SUBMITTING A BID. INFORMATION IS PROVIDED ON THE VARIOUS DRAWINGS, SCHEDULES, SPECIFICATIONS AND ALL OF THE VARIOUS DOCUMENTS IN THE BIDDING PACKAGE. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND FORM A TOTAL PROJECT DESIGN AND INFORMATION SOURCE FOR CONSTRUCTION PURPOSES.
THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT.
COORDINATE LOCATIONS OF EQUIPMENT WITH OTHER TRADES BEFORE AND DURING CONSTRUCTION. ANY MODIFICATION TO THE EQUIPMENT LAYOUT, REQUIRED FOR INSTALLATION, IS TO BE PERFORMED UNDER THE CONTRACT AGREEMENT, AT NO ADDITIONAL COST. REFER TO DETAILS, SCHEDULES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH THE PROJECT DOCUMENTS OF ALL TRADES. THE DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL ARRANGEMENT OF EQUIPMENT AND PIPING. THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF
EQUIPMENT AND PIPING INSTALLATION WITH ALL THE TRADES BEFORE COMMENCING WORK.
EQUIPMENT SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS, WHEN EQUIPMENT MUST BE LOCATED ABOVE AN INACCESSIBLE CEILING (GYP BOARD OR EQUIVALENT), OR BEHIND A WALL, AN APPROPRIATE ACCESS DOOR SHALL BE PROVIDED. ACCESS DOORS FOR FIRE RATED WALLS AND CEILINGS SHALL BE FURNISHED WITH A MINIMUM 1-1/2 HOUR LABEL "B" UL LISTED RATING OR GREATER AS REQUIRED BY THE ASSEMBLY RATING.
THE CONTRACTOR SHALL COORDINATE LOCATIONS OF ACCESS PANELS FOR ALL VALVES AND DEVICES, REQUIRING ACCESS, WITH THE
ARCHITECT, PRIOR TO INSTALLATION OF SUCH DEVICES OR OTHER APPURTENANCES.
WHERE A CONFLICT OCCURS BETWEEN THE DOCUMENTS, IT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. CARRY AS PART OF THE
BID THE LARGER QUANTITY AND/OR MORE EXPENSIVE ITEM(S).
THIS CONTRACT SHALL INCLUDE ALL THE NECESSARY PIPING, FITTINGS, TRANSITIONS ETC. AS REQUIRED TO INSTALL PIPING AND EQUIPMENT, AND TO AVOID ANY CONFLICTS WITH OTHER TRADES AND THE BUILDING STRUCTURE. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS HE MAKES AS A RESULT OF HIS FAILURE TO COORDINATE WITH OTHER TRADES OR BECOME FULLY
FAMILIAR WITH THE PROJECT DOCUMENTS OF ALL TRADES.
DO NOT INSTALL ANY PIPING OVER ELECTRICAL PANELS, TRANSFORMERS, SPECIAL EQUIPMENT, OR THROUGH ELECTRICAL ROOMS, DATA ROOMS, ELEVATOR MACHINE ROOM, STAIRWELL OR STAIRWELL WALLS THAT ARE NOT ASSOCIATED WITH OR SERVE THE RESPECTIVE ROOMS.
COORDINATE THE LOCATION OF ELECTRICAL EQUIPMENT IN THE FIELD AND ADJUST AS NECESSARY.
IT IS NOT THE INTENT OF THE DRAWINGS TO SHOW INDIVIDUAL BRANCH PIPING TO EACH AND EVERY SPRINKLER HEAD, ONLY THE SPRINKLER OR STANDPIPE MAIN ROUTING IS INDICATED TO AIDE IN COORDINATION WITH ALL TRADES. THE ENTIRE FIRE SUPPRESSION SYSTEM SHALL BE FULLY
OPERATIONAL AND READY FOR BENEFICIAL USE BEFORE THE JOB IS CONSIDERED COMPLETE.
REFER TO THE LATEST ARCHITECTURAL PLANS FOR CEILING CONSTRUCTION, ELEVATIONS, SECTIONS, DETAILS, LOCATIONS OF SOFFITS, CEILING POCKETS, STEPPED CEILING, SKYLIGHT, ETC. PROVIDE ADDITIONAL PIPING AND SPRINKLER HEADS AS THE CONDITIONS WARRANT.
WHERE SPRINKLER HEADS ARE SHOWN ON CONTRACT DOCUMENTS, THEY ARE INDICATED FOR GENERAL COORDINATION PURPOSES ONLY AND DO NOT RELIEVE THE CONTRACTOR FROM FULL COMPLIANCE WITH APPLICABLE CODES AND GOOD INSTALLATION PRACTICE. THE CONTRACTOR SHALL FURNISH AND INSTALL ADDITIONAL SPRINKLERS AS NECESSARY DUE TO OBSTRUCTION FOR A COMPLETE SPRINKLER SYSTEM PER NFPA 13.
SPRINKLER HEAD LOCATIONS SHALL BE COORDINATED WITH THE LATEST ARCHITECTURAL REFLECTED CEILING PLANS, LIGHT FIXTURES, DIFFUSERS, SPEAKERS, SMOKE DETECTORS, MECHANICAL AND ELECTRICAL EQUIPMENT. INSTALL SPRINKLER HEADS BENEATH DUCTS AND CEILING MOUNTED EQUIPMENT MORE THAN 4 FEET WIDE. FULL SPRINKLER COVERAGE TO ACCOUNT FOR OBSTRUCTIONS IS THE RESPONSIBILITY
OF THE INSTALLING PROFESSIONAL.
SPRINKLER HEADS SHALL NOT BE INSTALLED DIRECTLY FROM THE BOTTOM OF HORIZONTAL SPRINKLER MAINS OR BRANCH LINES. ALL CONNECTIONS TO SPRINKLER HEADS SHALL BE MADE FROM THE TOP OR SIDES OF THE MAIN OR BRANCH LINES.
BRANCH PIPING TO SPRINKLER HEADS SHALL BE A MINIMUM OF 1" DIA. WITH FULL SIZE REDUCING TEE OR LARGER. INSTALLATION OF REDUCING TEES LESS THAN 1" DIA. WILL NOT BE ALLOWED. INSTALLATION OF NIPPLES LESS THAN 1" DIA. WILL NOT BE PERMITTED.
INSTALL ALL PIPING WITH PROVISION FOR COMPLETE DRAINAGE. WET-PIPE SPRINKLER SYSTEM MAY BE INSTALLED LEVEL AND WITHOUT SLOPE.
ALL FIRE PROTECTION PIPING SHALL HAVE SEISMIC BRACING IN ACCORDANCE WITH THE STATE BUILDING CODE, NFPA 13 AND THE AUTHORITY HAVING JURISDICTION. SUBMIT ENGINEERED INSTALLATION DETAILS AND CALCULATIONS PER THE SPECIFICATIONS. THE CONTRACTOR'S SEISMIC ENGINEER SHALL REVIEW THE INSTALLATION AND PROVIDE A DETAILED REPORT FOR THE RECORD.
KEY PLAN
A
B
C
D
E
1 2 3
OFFICE
1-078
OFFICE
1-076
HR
1-091
VISITING
1-086
CONFERENCE
1-080
POLICE
NO #
HALL
NO #
RR
1-081
VEST.
NO #
OFFICE
1-085
WORK ROOM
1-088
CONFERENCE
1-092
CONFERENCE
1-084
STAIRWELL
NO #
drawing prepared by drawing title descriptiondatemark
BI-2B-455
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF CONSTRUCTION SERVICES
project
CAD no. project no.
date scale drawn by approved by drawing no.
AS NOTED
12/11/2024
H I S T O R Y O F S U B M I S S I O N S
R E V I S I O N S
RZ Design Associates, Inc.
750 Old Main St, Suite 202
Rocky Hill, CT 06067
90% CD Submission05.31.24
BID SET12.11.24
FIRST FLOOR FIRE
PROTECTION DEMOLITION AND
REINSTALLATION PLAN
FPD-101
FM
RR
DAS - 395 Main Street Structural Upgrades
395 West Main Street, Waterbury, CT 06702
1/8" = 1'-0"1
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
SPRINKLER DEMOLITION AND REINSTALLATION NOTES:
1. REMOVE ALL SPRINKLER PIPING, HEADS AND ASSOCIATED HANGERS AS
REQUIRED FOR THE INSTALLATION OF THE NEW STRUCTURAL REINFORCING
STEEL. COORDINATE WITH GENERAL CONTRACTOR PRIOR TO REMOVAL.
FIELD VERIFY ALL SPRINKLER PIPING LOCATIONS AND SIZES PRIOR TO
REMOVAL.
2. REINSTALL SPRINKLER PIPING, HEADS AND ASSOCIATED HANGERS.
COORDINATE SPRINKLER HEAD LOCATIONS WITH NEW LIGHTING LAYOUT.
PROVIDE ALL ADDITIONAL HARDWARE TO HANG FROM THE NEW
REINFORCING STEEL. REFER TO THE STRUCTURAL DRAWINGS AND DETAILS
FOR THE REINFORCING STEEL.
1/8" = 1'-0"4
FIRST FLOOR FIRE PROTECTION PLAN
(EX) 3" UP
(EX) 1/2" UP
(EX) 1/2" UP
(EX) 3"S
(EX) 3/4"DHW
(EX) 3/4"DCW
(EX) 3" DN
PD01
PD01
PD01
MD01
30x12
30x16
14ø10ø
12ø
12ø
12ø x x
10ø
6ø
6ø
12ø
10ø
18x1012ø 8ø
6ø
6ø
6ø
8ø
14ø x
24x12 ø ø
10ø12ø
6ø
8ø
8ø ø ø ø
8ø
6ø
MD01
MD01
MD01
MD01
MD01
ZONE
DAMPER
ZONE
DAMPER
ZONE
DAMPER
ZONE
DAMPER
ZONE
DAMPER
M01
M01
M01
M01
HVAC GENERAL NOTES
1. ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH CURRENT APPLICABLE CODES, ORDINANCES, THE REGULATORY AGENCIES HAVING JURISDICTION AND THE SPECIFICATIONS. THE SPECIFICATIONS MAY EXCEED THE
REQUIREMENTS OF THE CODE, IN WHICH CASE, THE SPECIFICATION MUST BE FOLLOWED.
2. THE INTENT OF THESE DOCUMENTS IS FOR THE MEP TRADES TO FURNISH AND INSTALL COMPLETE MECHANICAL AND ELECTRICAL SYSTEMS. THE SPECIFIED HVAC SYSTEM SHALL BE COMPLETE IN ALL RESPECTS; OPERATIONAL, TESTED, ADJUSTED, APPROVED BY THE AUTHORITIES HAVING JURISDICTION AND READY FOR BENEFICIAL USE BY THE OWNER.
3. THE TRADES SHALL OBTAIN AND REVIEW ALL CONTRACT DOCUMENTS BEFORE SUBMITTING A BID. INFORMATION IS PROVIDED ON THE VARIOUS DRAWINGS, SCHEDULES, SPECIFICATIONS AND ALL OF THE VARIOUS DOCUMENTS IN THE BIDDING PACKAGE. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND FORM A TOTAL PROJECT DESIGN AND
INFORMATION SOURCE FOR CONSTRUCTION PURPOSES.
4. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. COORDINATE LOCATIONS OF EQUIPMENT WITH OTHER TRADES BEFORE AND DURING CONSTRUCTION. ANY MODIFICATION TO THE EQUIPMENT LAYOUT, REQUIRED FOR INSTALLATION, IS TO BE PERFORMED UNDER THE CONTRACT AGREEMENT, AT NO ADDITIONAL COST. REFER TOP DETAILS, SCHEDULES AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH THE PROJECT DOCUMENTS OF ALL TRADES. THE DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL ARRANGEMENT OF EQUIPMENT AND PIPING. THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF EQUIPMENT AND PIPING INSTALLATION WITH ALL THE
TRADES BEFORE COMMENCING WORK.
6. WHERE A CONFLICT OCCURS BETWEEN THE DOCUMENTS, IT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. CARRY AS PART OF THE BID THE LARGER QUANTITY AND/OR MORE EXPENSIVE ITEM(S).
7. THIS CONTRACT SHALL INCLUDE ALL THE NECESSARY PIPING, FITTINGS, TRANSITIONS ETC. AS REQUIRED TO INSTALL PIPING AND EQUIPMENT, AND TO AVOID ANY CONFLICTS WITH OTHER TRADES AND THE BUILDING STRUCTURE. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS HE MAKES AS A RESULT OF HIS FAILURE TO COORDINATE WITH OTHER TRADES OR BECOME FULLY FAMILIAR WITH THE PROJECT
DOCUMENTS OF ALL TRADES.
8. ALL SUPPLY RECTANGULAR 90° ELBOWS SHALL HAVE TURNING VANES.
9. PROVIDE DUCT TAKE-OFF TYPES AND VOLUME DAMPERS PER THE SPECIFICATIONS AND DUCT TAKE-OFF DETAILS ON DRAWINGS. TAKE-OFFS SHOWN ON FLOOR PLANS DO NOT REPRESENT THE SPECIFIC TYPE OF TAKE-OFF REQUIRED;
CONSULT THE DETAILS AND SPECIFICATIONS.
10. PROVIDE VOLUME DAMPERS ON ALL SUPPLY, EXHAUST, AND RETURN BRANCH DUCTS.
11. COORDINATE AND VERIFY LOCATIONS OF ALL ITEMS REQUIRING ACCESS WITH ARCHITECT IN FIELD., INCLUDING
VALVES, VOLUME DAMPERS, FIRE DAMPERS, ETC.
12. ALL DUCTWORK AND PIPING CROSSING SEISMIC JOINTS SHALL ACCOMMODATE DIFFERENTIAL…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| DCF Contractors All SECURITY CLEARANCE.pdf | ||
| 2616BI2B455_Aug_3_26_solicitation_doc.pdf | ||
| 00 40 14 CertOfAuthority 20231001.docx | DOCX document | |
| Bid Addendum 3.pdf | ||
| 00 43 16 BidBond 20240924.docx | DOCX document | |
| 00 45 20 Named Sub Signature Page 20251001.docx | DOCX document | |
| 00 45 14 GC Bidder Qual Statement 20251001.docx | DOCX document | |
| 2616BI2B455_Jun_9_26_solicitation_doc.pdf | ||
| Bid Addendum 1.pdf | ||
| Bid Addendum 1.pdf.crdownload | CRDOWNLOAD file | |
| 00 40 16 DAS Update Stmt Reqts 20251001.docx | DOCX document | |
| Bid Addendum 2.pdf | ||
| 00 40 15 DAS Prequal Cert Reqts 20251001.docx | DOCX document | |
| Specifications Volume 1 of 1.pdf.crdownload | CRDOWNLOAD file | |
| 00 11 16 DAS-CS Invitation to Bid.pdf | ||
| 00 41 00 DAS-CS Bid Proposal REVISED.docx | DOCX document | |
| 00 41 00 DAS-CS Bid Proposal Form LOCKED 20251001.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .