Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTATION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD F F E I n c Engineering and Technical Services 420 Springfield Pike Wyoming OH 45215 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
T 513.241.4474 720 E Pete Rose Way, Cincinnati, OH 45202
F 513.241.0081 ISSUED FOR BID
Ryan Jeter
C :\R ev it
U se r F ile s\ R
_V
A C hi llic ot he
B ld g
R en ov at io n_ pa tri ck .h illi er ffe
-s er v.
co m .rv t 3/
9/
:5 5:
A
M
G000
COVER SHEET RENOVATE B25 TO IMPROVE
EFFICIENCY
Chillicothe VA Medical Center
538-16-101
07/20/2020 BJR JRR
CONSTRUCTION DOCUMENTS - JULY 20, 2020
VAMC CHILLICOTHE
BUILDING 25 RENOVATION
DEPARTMENT OF VETERANS AFFAIRS
CHILLICOTHE, OHIO
AD100 BASEMENT DEMOLITION PLAN
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 FIRST FLOOR REFLECTED CEILING DEMOLITION
AD103 ROOF DEMOLITION PLAN
AD200 DEMOLITION ELEVATIONS
AD300 SITE DEMOLITION PLAN
A100 BASEMENT NEW WORK FLOOR PLAN
A101 FIRST FLOOR NEW WORK PLAN
A101.1 FIRST FLOOR NEW WORK PLAN - ALTERNATE 3
A102 CLERESTORY PLAN
A103 ROOF PLAN
A110 BASEMENT REFLECTED CEILING PLAN
A111 FIRST FLOOR REFLECTED CEILING PLAN
A200 BUILDING ELEVATIONS
A300 BUILDING SECTIONS
A301 BUILDING SECTIONS
A310 WALL SECTIONS
A311 WALL SECTIONS
A401 ENLARGED RESTROOM PLANS AND ELEVATIONS
A402 ENLARGED PLANS AND ELEVATIONS
A403 INTERIOR ELEVATIONS
A501 PARTITION TYPES AND DETAILS
A510 EXTERIOR SECTION DETAILS
A511 EXTERIOR SECTION DETAILS
A520 CASEWORK SECTIONS AND DETAILS
A530 PLAN DETAILS
A540 STORAGE RACK PLAN AND ELEVATIONS
A601 DOOR SCHEDULE AND DOOR DETAILS
A602 DOOR AND WINDOW DETAILS
A701 STAIR PLANS AND SECTIONS
A702 STAIR PLANS AND SECTIONS
A703 RAMP PLANS AND SECTIONS
A704 RAMP AND STAIR DETAILS
A901 FINISH SCHEDULE AND DETAILS
A902 WALL PROTECTION AND FLOOR FINISH PLAN
A903 EQUIPMENT PLANS
A904 FURNITURE PLAN
A905 INTERIOR SIGN LOCATION PLANS
SHEET NUMBER SHEET NAME
G000 COVER SHEET
G001 PROJECT GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS
G002 SITE PLAN
G003 LIFE SAFETY PLANS
C100 DEMOLITION PLAN
C101 UTILITY PLAN
C102 GRADING PLAN
C103 LOCATION AND MATERIAL PLAN
C500 DETAILS
L100 PLANTING PLAN
FP001 FIRE PROTECTION LEGEND
FP101 BASEMENT & FIRST FLOOR FIRE PROTECTION PLANS
VIEW FROM NORTHEAST CORNER
VIEW FROM SOUTHWEST CORNER
PD101 PLUMBING DEMOLITION - BASEMENT PLAN
PD102 PLUMBING DEMOLITION - FIRST FLOOR PLAN
PD103 PLUMBING DEMOLITION - BUILDINGS 228, 38, 39, 40, 41
PL101 PLUMBING NEW WORK - BASEMENT PLAN
PL102 PLUMBING NEW WORK - FIRST FLOOR PLAN
PL103 PLUMBING NEW WORK - ROOF PLAN
PL401 PLUMBING NEW WORK - ENLARGED PLANS
PL501 PLUMBING DETAILS
PL601 PLUMBING SCHEDULES AND DIAGRAMS
PL602 PLUMBING SANITARY & VENT ISOMETRICS
MD101 BASEMENT AND FIRST FLOOR DEMOLITION
MD102 MECHANICAL STEAM PIPING - DEMOLITION BASEMENT PLAN
MD103 MECHANICAL STEAM PIPING - DEMOLITION FIRST FLOOR PLAN
MD104 MECHANICAL STEAM PIPING - DEMOLITION BUILDINGS 228, 38,
39, 40, 41
MH101 BASEMENT HVAC NEW WORK
MH102 FIRST FLOOR HVAC NEW WORK
MH103 ROOF HVAC
MH501 DETAILS
MH502 CONTROL DETAILS
MH503 HVAC SECTION VIEW, AIRFLOW DIAGRAM
MH504 BASEMENT DETAILS
MH601 HVAC SCHEDULES
MH602 HVAC SCHEDULES
E001 ELECTRICAL SYMBOL LEGEND & LIGHTING SCHEDULE
EL100 NEW LIGHTING BASEMENT & CRAWL SPACE PLAN
EL101 NEW LIGHTING FIRST FLOOR PLAN
SB100 OVERALL FOUNDATION PLAN
SB101 NEW BUILDING AND EAST LOADING DOCK FOUNDATION/SLAB
PLANS
SB101.1 EAST LOADING DOCK FOUNDATION/SLAB PLANS - ALT. #3
SB102 FOUNDATION PLAN NORTH SIDE
SB301 FOUNDATION SECTIONS
SB501 FOUNDATION/SLAB DETAILS
MP101 BASEMENT PIPING NEW WORK
MP102 FIRST FLOOR PIPING NEW WORK
MP103 MECHANICAL STEAM PIPING PLANS
MP501 MECHANICAL PIPING DETAILS
MP502 MECHANICAL PIPING DETAILS II
MP503 MECHANICAL PIPING CONTROL DETAILS
MP601 MECHANICAL PIPING SCHEDULES AND DIAGRAMS
ED100 DEMOLITION ELECTRIC-BUILDNG 25-BASEMENT FLOOR PLAN
ED101 DEMOLITION POWER / SIGNAL-BUILDING 25-FIRST FLOOR
ED102 DEMOLITION LIGHTING FIRST FLOOR PLAN
ED103 DEMOLITION SITE POWER PLAN - BUILDING T41, T233, T313
ED104 DEMOLITION FIRE ALARM BUILDING 25 FLOOR PLAN
ED105 DEMOLITION FIRE ALARM SITE PLAN - BUILDING T228, T38,
T39, T40
ED106 DEMOLITION FIRE ALARM SITE PLAN - BUILDING T41, T233,
T313
ED202 ELECTRICAL DEMOLITION SINGLE LINE DIAGRAM
EP100 NEW POWER BASEMENT FLOOR PLAN
EP101 NEW POWER FIRST FLOOR PLAN
EP102 NEW POWER ROOF PLAN
EP301 ELECTRICAL DETAILS
EP302 ENLARGED PRIMARY POWER PLAN & DETAILS
EP400 PARTIAL ELECTRICAL SINGLE LINE DIAGRAM - CAMPUS
EP401 ELECTRICAL SINGLE LINE DIAGRAM - BUILDING 25
EP601 PANEL SCHEDULES
EP602 PANEL SCHEDULES
ES100 ELECTRICAL SITE PLAN
ES101 SIGNAL SITE EXISTING MANHOLE PLAN
ES102 ELECTRICAL SITE PLAN
SF100 OVERALL FRAMING LAYOUT
SF101 MAIN STRUCTURAL FRAME
SF301 FRAMING SECTIONS
SF501 FRAMING DETAILS
S001 GENERAL NOTES
P001 PLUMBING LEGEND AND GENERAL NOTES
M001 MECHANICAL SYMBOLS
GENERAL
CIVIL
LANDSCAPE
ARCHITECTURAL
STRUCTURAL
FIRE PROTECTION
PLUMBING
HEATING, VENTILATING, AIR
CONDITIONING AND REFRIGERATION
ELECTRICAL
EY100 NEW SIGNAL & FIRE ALARM BASEMENT FLOOR PLAN
EY101 NEW SIGNAL & FIRE ALARM FIRST FLOOR PLAN
EY102 NEW FIRE ALAM BUILDING 213, T233, & T313
EY200 SECURITY FIBER SINGLE LINE DIAGRAM
EY201 FIRE ALARM SINGLE LINE DIAGRAM
EY300 SIGNAL CLOSET DETAILS
EY301 ACCESS CONTROL DETAILS
EXP DATE 12/31/19 08/14/19Revisions: Date:
A.D.
AC.T.
ACOUS.
A/C
A.C.P.
A.B.
AREA DRAIN
ACOUSTICAL TILE/PANEL
ACOUSTIC
AIR CONDITIONING
ASPHALT CONCRETE
ANCHOR BOLT
PAVING
POUND OR NUMBER
PROPERTY LINE
FLOOR LINE
ANGLE
DIAMETER
CENTERLINE
AT
AND
BD.
APPROX.
ARCH.
ASPH.
ALT.
AL.
AGG.
BLDG.
BLK.
BLKG.
BM.
BRG.
BRK.
BOT.
BITUM.
CEM.
C.B.
CARP.
CAB.
B.U.R.
BTWN.
CLKG.
CLG.J.
CLG.
C.J.
CIR.
C.I.
CER.T.
CER.
BRZ.
COMB.
COL.
C.O.
CNTR.
C.M.U.
CLS.
CLR.
C.W.
CTR.
CONV.O.
CONT.
CONST.
CONN.
CONC.
COMP.
DF.
D.F.
DIAG.
DIA.
DIM.
DISP.
DET.
DN.
D.O.
DR.
D.S.
D.T.
D.W.
DWR.
DIV.
CLO.
DOUGLAS FIR
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DISPOSAL
DIVISION
DOWN
DOOR OPENING
DOOR
DOWN SPOUT
DRAIN TILE
DISHWASHER
DRAWER
DETAIL
COLD WATER
CENTER
CONVECTION OVEN
CONTINUOUS
CONSTRUCTION
CONNECTION
CONCRETE
COMPOSITION
BENCH MARK or BEAM
BOARD
BITUMINOUS
BUILDING
BLOCK
BLOCKING
APPROXIMATE
ARCHITECT
ASPHALT
CONCRETE MASONRY
COMBINATION
COLUMN
CLEAN OUT
COUNTER
CLOSURE
CLEAR
CLOSET
CAULKING
CEILING JOIST
UNIT
CEILING
BRICK
BEARING
CONSTRUCTION JOINT
CIRCLE
CAST IRON
CERAMIC TILE
CERAMIC
CEMENT
CATCH BASIN
CARPET
CABINET
BUILT-UP ROOFING
BETWEEN
BRONZE
BOTTOM
ALTERNATE
ALUMINUM
AGGREGATE
EA.
E.E.
E.F.
E.J.
ELEC.
ELEV.
E.N.
EXISTING
EACH
EACH END
EXHAUST FAN
EXPANSION JOINT
ELECTRICAL
ELEVATION
EDGE NAIL
(E)
ADJUSTABLEADJ.
LP
LC
LF
Ø
ABOVE FINISH FLOORAFF.
E.C. ELECTRICAL CONTRACTOR
C.HK. COAT HOOK
C.B.B. CEMENTITIOUS BACKER
BOARD
A.C.M. ASBESTOS CONTAINING
MATERIALS
CW. CURTAINWALL
DWG(S). DRAWING(S)
FACE OF BUILDINGF.O.B.
FIXTURE
FACE OF CONCRETE
FLOOR
FLOOR JOIST
FLOOR LINE
FLASHING
FACE NAIL
GAUGE
FOOTING
FUTURE
FACE OF STUD
FIRE RETARDANT
TREATED WOOD
FACE OF MASONRY
FACE OF FINISH
F.O.S.
F.R.T.W.
FTG.
FUT.
GA.
FIXT.
F.J.
F.L.
FLASH.
FLR.
F.N.
F.O.C.
F.O.F.
F.O.M.
BEAM
GLASS
GLUE LAMINATED
GALVANIZED IRON
GRATE ELEVATION
GRAB BAR
GARBAGE DISPOSAL
GRADE
HOSE BIB
SHEET METAL
GYPSUM BOARD
HANDICAPPED
GALVANIZED
GROUND
HC.
GYP.BD.
H.B.
G.B.
G.D.
G.S.M.
GR.
GND.
GLB.
GL.
G.I.
G.E.
HEIGHT
HOUR
HEATING
HIGH POINT
HORIZONTAL
HOLLOW METAL
HARDWARE
HARDWOOD
INTERIOR
INVERT
HOT WATER
INSULATION
INSIDE DIAMETER
& AIR CONDITIONING
HEATING, VENTILATION
H.W.
INV.
INT.
INSUL.
I.D.
HDWE.
HDWD.
H.V.A.C.
HTG.
HR.
H.P.
HORIZ.
H.M.
HGT.
HDR. HEADER
JOIST
JANITOR
KITCHEN
JOINT
LABORATORY
JOIST HANGER
LAG BOLT
LAVATORY
LAMINATE
J.H.
JAN.
L.B.
LAV.
LAM.
LAB.
KIT.
JT.
JST.
EQUIV.
E.S.
E.W.
EXP.
EXP.B.
EXPO.
EXT.
F.
ENCL.
F.B.
F.BD.
F.BELL
F.B.O.
F.D.
FDN.
F.E.
FH.M.S.
F.HORN
F.F.
F.G.
FGL.
F.H.
F.E.C.
F.A.
FH.W.S.
FIN.
F.H.S.
ENCLOSURE
EQUIVALENT
EACH SIDE
EACH WAY
EXPANSION
EXPANSION BOLT
EXPOSURE
EXTERIOR
FLAT HEAD MACHINE
SCREW
SCREW
FIRE HORN
FIRE HOSE STATION
FLAT HEAD WOOD
FINISH
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FINISH FLOOR
FINISH GRADE
FIBERGLASS
FIRE HYDRANT
CABINET
FIRE ALARM
FACE BRICK
FIREBOARD
FIRE BELL
FURNISHED BY OTHERS
FACE
GALV. GALVANIZED
HOLLOW STRUC. STL.H.S.S.
FLUORESCENTFLOUR.
GENERAL CONTRACTORG.C.
E.W.C. ELECTRIC WATER CLOSET
FIRE VALVE CABINETF.V.C.
FOOD SERVICE EQUIPMENT
CONTRACTOR
F.S.E.C.
H.V.A.C. CONTRACTORH.C.
FIRE SUPPRESSION
CONTRACTOR
F.S.C.
PLASTIC LAMINATEP.LAM.
O.H.W.S.
SCREW
OVAL HEAD WOOD
APPROVAL)
PAPER TOWEL DISPENSER
PAPER TOWEL
PARTITION
DOUGLAS FIR
PRESSURE TREATED
REFLECTED CEILING
RADIUS
RUBBER BASE
QUARRY TILE
POLYVINYL-CHLORIDE
RECEPTACLE
R.C.P.
Q.T.
RAD.
R.B.
P.T.D.
PTN.
P.T.R.
P.V.C.
P.T.D.F.
REDWOOD
REFERENCE
REINFORCING
ROOF HATCH
ROUND HEAD METAL
RESILIENT
REFRIGERATOR
ROOF DRAIN
SCREW
ROOM
RAIN WATER LEADER
ROUGH OPENING
ROUND HEAD WOOD
SCREW
RDWD.
R.H.W.S.
R.W.L.
R.O.
RM.
R.H.M.S.
R.H.
RESIL.
REINF.
REFR.
REF.
R.D.
LIGHT
MATERIAL
LOW POINT
LIVE LOAD
LEFT HAND
MAT.
LT.
L.P.
L.L.
L.H.
MANHOLE
MINIMUM
MEDIUM
MANUFACTURER
MEMBRANE
MECHANICAL
MEDICINE CABINET
MACHINE BOLT
METAL
MASONRY OPENING
METAL THRESHOLD
MISCELLANEOUS
MODULAR
MOISTURE RESISTANT
MIRROR
M.C.
M.B.
MIN.
MH.
MFG.
MEMB.
MED.
MECH.
MIR.
MISC.
M.O.
MOD.
M.R.
M.T.
MTL.
MAX. MAXIMUM
NORTH
NATURAL
OVER
NUMBER
NOMINAL
NOT TO SCALE
NOT IN CONTRACT
OBSCURE
OUTSIDE DIAMETER
STUD
OFFICE
OUTSIDE FACE OF
ON CENTER
OVERFLOW
OVERALL
N.T.S.
O/ O.A.
OBS.
O.C.
O.D.
O.F.
OFF.
O.F.S.
(NOT PART OF OSA
N.
NAT.
N.I.C.
NO.
NOM.
PAINT
PLATE
PERFORATED
FOOT
POUNDS PER CUBIC
PANEL EDGE NAILING
PRESSED METAL
PAIR
FRAME
FOOT
POUNDS PER LINEAR
PLYWOOD
POUNDS PER SQUARE
PROPERTY
PLASTER
P.
P.C.F.
P.E.N.
PERF.
PL.
PLAS.
P.L.F.
PLYWD.
P.M.F.
PR.
P.S.F.
PROP.
OPP. OPPOSITE
POINT
PULL STATION
POUNDS PER SQUARE
INCH
P.STA.
PT.
P.S.I.
FOOT
(N) NEW
PLAN
REQUIREDREQD.
NON-COMBUSTIBLENON/COM
PLUMBING CONTRACTORP.C.
MECHANICAL, ELECTRICAL,
PLUMBING
M.E.P.
FRAMED MIRRORMR.
ROBE HOOKR.HK.
MOP HOLDERMP.H.
MOUNTEDMTD.
PAINTEDPTD.
TONGUE AND GROOVE
DRAWINGS
SOUTH
SEE CIVIL DRAWINGS
STORM DRAIN
SOLID CORE
DRAWINGS
SHEET
SIMILAR
SLIDING
SHEATHING
SHOWER
SECTION
SEALANT
SEE ELECTRICAL
SOLID BLOCKING
SOAP DISPENSER
SEE ARCHITECTURAL
S.E.D.
SHR.
SHT.
SIM.
SL.
SHTG.
S.BLKG.
S.A.D.
S.
SECT.
SEAL.
S.DISP.
S.D.
S.C.D.
S.C.
SQUARE
DRAWINGS
SPECIFICATION
SOUNDPROOF
DRAWINGS
STATION
STEEL
STORAGE
STANDARD
SUSPENDED
STRUCTURAL
DRAWINGS
STAINLESS STEEL
SEE MECHANICAL
SANITARY SEWER
SEE STRUCTURAL
SQUARE FOOT (FEET)
THICK
TEMPERED
TELEPHONE
TERRAZZO
TACKBOARD
TOP OF CURB
TRANSOM
TOP OF PLATE
TOP OF WALL
TOILET PAPER DISPENSER
TOE NAIL
TOOL JOINT
TOP OF PAVEMENT
TOP AND BOTTOM
T.O.C.
T.O.P.
T.O.PL.
T.O.W.
T.P.D.
TRN.
S.M.D.
SPEC.
S.P.
SQ.
S.S.D.
S. STL.
STO.
STL.
STD.
STA.
S.S.
SQ. FT.
T.B.
T&BOT.
TEL.
TEMP.
TER.
T&G.
SUSP.
T.J.
T.N.
THK.
STRUC.
S.L.D. SEE LANDSCAPE
TYPICAL
UNLESS NOTED OTHERWISE
URINAL
UNFINISHED
TELEVISION
VENT TO ROOF
VERTICAL
VESTIBULE
VERIFY IN FIELD
VINYL TILE
VINYL COMPOSITION
TILE
VERTICAL GRAIN
WEST
WITH
WINDOW
WOOD
WATER CLOSET
VINYL WALL COVERING
WITHOUT
WEIGHT
YARD
WATER PROOF
WATER HEATER
WATER COOLER
WELDED WIRE FABRIC
WATER RESISTANT
W/O
W.W.F.
W.P.
W.R.
WT.
YD.
T.V.
TYP.
UNF.
U.N.O.
V.C.T.
VERT.
VEST.
V.G.
V.I.F.
UR.
V.W.C.
W.
W/
W.C.
V.T.R.
W.F.
W.H
WDW.
WD.
V.T.
T.S. TUBE STEEL
SELF ADHERED SHEET
MEMBRANE
S.A.S.M.
SELF ADHERED FLEXIBLE
FLASHING
S.A.F.F.
WITHINW/IN
UNDERSIDEU/S
SANITARY NAPKIN
DISPOSAL
S.N.D.
T.S.C.D. TOILET SEAT COVER
DISPENSER
SANITARY NAPKIN
DISPENSER
S.N.V.
TOP OF SEATT.O.S.
SOUND ATTENUATION
BATT
S.A.B.
ABBREVIATIONS
COR CONTRACTING
OFFICER
REPRESENTATIVE
SIM
A102 A103
Room name
150 SF
A101
SIM
1 View Name 1/8" = 1'-0"A101
Name Elevation
A101
SIM
1i
A101
SIM
A
C1
10'-0"A.F.F.
LEVEL NAME W/ ELEVATION
GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER, AREA & OCCUPANCY
BUILDING SECTION NUMBER W/ SHEET NUMBER
WALL SECTION NUMBER W/ SHEET NUMBER
DOOR NUMBER
WALL TAG
WINDOW TAG
VIEW NAME W/ SCALE
ADDENDUM TAG
CEILING TAG W// HEIGHT
DETAIL SECTION NUMBER W/ SHEET NUMBER
NORTH ARROW
CL
CLOCK
LIGHT
SWITCH
ELECTRICAL
CABINETCOUNTER
30" HIGH
OUTLET ABOVE
ELECTRICAL
OUTLET ABOVE
36" HIGH BASE
THERMOSTAT
PAPER
TOWEL
DISPENSER
COAT
HOOK
ELECTRICAL
OUTLET
ROBE
HOOK
WALL
PHONE/
INTERCOM
FIRE
EXTINGUISHER
CABINET
NOTE: TYPICAL MOUNTING HEIGHTS,
UNLESS NOTED OTHERWISE
CL
T Y
P
" 3
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING
FACILITY.
2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING
DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE
AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE
PROJECT.
6. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE OWNER TO MINIMIZE
DISRUPTIONS OF NORMAL FUNCTIONS OF THE OWNER'S OCCUPIED AREAS.
8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE OWNER FOR THE SCHEDULED TIME
OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE OWNER.
THE OWNER RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE
PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES.
9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH OWNER. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE OWNER'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES
DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE OWNER.
10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO OWNER'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION
ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE OWNER BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE
EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
12. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
13. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT
ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL
FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE OWNER FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
16. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER
DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
17. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS
TEMPORARY CONSTRUCTION LIGHTING.
18. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED
UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
19. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE
PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
20. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE
NEW CONDITION TO MATCH THE EXISTING FINISH.
21. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY
TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
22. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL
PENETRATIONS AND CAULK.
23. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFED TO ACHIEVE THE PROPER FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
24. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH
THE EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.
25. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED
STOCK BEFORE ORDERING NEW MATERIAL.
26. IF THE CONTRACTOR ENCOUNTERS A HAZARDOUS MATERIAL OR SUBSTANCE NOT ADDRESSED IN THE CONTRACT DOCUMENTS AND IF REASONABLE PRECAUTIONS WILL BE INADEQUATE TO PREVENT FORESEEABLE BODILY INJURY OR DEATH TO PERSONS RESULTING FROM A MATERIAL OR SUBSTANCE, INCLUDING BUT NOT LIMITED TO ASBESTOS OR POLYCHLORINATED BIPHENYL (pcb), ENCOUNTERED ON THE SITE BY THE CONTRACTOR, THE CONTRACTOR SHALL, UPON RECOGNIZING THE CONDITION, IMMEDIATELY STOP WORK IN THE AFFECTED AREA AND NOTIFY THE OWNER AND
ARCHITECT OF THE CONDITION.
GENERAL PROJECT NOTES FOR EXISTING FACILITIES:GENERAL PROJECT NOTES FOR NEW WORK:
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL
AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM
QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN
RELEVANT MANUFACTURER’S INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT PRIOR
TO PROCEEDING WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT
TO THE IMMEDIATE ATTENTION OF THE ARCHITECT. THE CONTRACTOR SHALL NOT PROCEED
WITH WORK UNTIL WRITTEN CLARIFICATION FROM THE ARCHITECT IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE
APPLICABLE PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND/OR OF A
QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS. WHERE SPECIFIED
PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY
THE ARCHITECT TO OBTAIN A MINIMUM STANDARD OF QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES
FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT
LIMITED TO THE ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN
THE STATE WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR
INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE
SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER
STRUCTURES, BLOCK EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A
FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION
SITE.
11. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO
MECHANICAL, ELECTRICAL, PLUMBING & SITE DRAWINGS. EXACT SIZE AND LOCATION OF ALL
ROOF AND FLOOR OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH
THE ASSOCIATED SUB-CONTRACTORS PRIOR TO CONSTRUCTION.
12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO
FINISH FACE OF CONSTRUCTION.
13. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO CONSTRUCTION FOR CLEARANCES
AND DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
14. WITHIN ALL METAL STUD PARTITIONS, THE GENERAL CONTRACTOR IS TO PROVIDE BLOCKING
FOR ALL WALL MOUNTED EQUIPMENT AND ACCESSORIES INCLUDING BUT NOT LIMITED TO:
MECHANICAL, ELECTRICAL AND PLUMBING DEVICES, FURNITURE, CASEWORK, MILLWORK AND
ALL OTHER WALL MOUNTED ACCESSORIES AND ITEMS. THE LOCATIONS, MOUNTING HEIGHTS
AND BLOCKING REQUIREMENTS SHOWN HEREON ARE GIVEN FOR INFORMATIONAL PURPOSES
ONLY AND IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY THIS
INFORMATION WITH THE ASSOCIATED SUB-CONTRACTORS, MANUFACTURERS, OR EQUIPMENT
SUPPLIERS. SEE TYPICAL BLOCKING DETAILS IN METAL STUD WALLS INCLUDED IN THESE
DOCUMENTS FOR BLOCKING AND ANCHORING REQUIREMENTS.
15. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
16. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT
NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING, TO DETERMINE THE SIZE AND
LOCATION OF ALL PENETRATIONS IN NEW CONSTRUCTION. COORDINATE AND PROVIDE ALL
OPENINGS. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND CAULK.
17. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFED IN
ACCORDANCE WITH THE SPECIFICATIONS.
18. PROVIDE CONTROL JOINTS IN GYPSUM WALLBOARD INTERIOR PARTITIONS AT 30 FEET ON
CENTER MAXIMUM. WHERE POSSIBLE, LOCATE AT CORNERS ABOVE OPENINGS. VERIFY
LOCATIONS WITH ARCHITECT. SEE THE ASSOCIATED TYPICAL DETAILS INCLUDED IN THESE
DOCUMENTS.
19. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT
INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS
WITH THE EQUIPMENT MANUFACTURER, OWNER AND ARCHITECT PRIOR TO CONSTRUCTION.
BLOCKING = 2x8 FIRE
RETARDANT TREATED WOOD,
(FRTW). USE SPRUCE PINE FIR
NO. 2, TREATED W/ DRICON
WHERE BLOCKING ATTACHES
TO THE OPEN SIDE OF WALL STUD,
PROVIDE 20 GA. TRACK x 7 1/4"
LONG.
SCREW TO STUD W/ 4 - NO.10-16
SCREWS EA. SIDE.
SCREW THROUGH STUD OR
TRACK INTO THE END OF THE
WOOD BLOCKING W/ 4 - NO. 9-18 x
1 1/2" CUT THREAD WOOD
SCREWS. SCREWS SHALL HAVE A
PROTECTIVE COATING.
AN ACCEPTABLE FASTERNER IS
BUILDEX 9-18 x 1 1/2" HWH
TRUGRIP COATED W/ CLIMASEAL.
TYP.
3/4" MAX.
BLOCKING = 8" DEEP x 14 GA.
TRACK W/ 1 1/4" FLANGES
CLIP & BEND FLANGES EA. END.
CONNECT EA. END
W/ 4 - NO.10-16 SCREWS
WHERE BLOCKING ATTACHES
TO OPEN SIDE OF WALL STUD,
PROVIDE 20 GA. TRACK x 8"
LONG.
SCREW TO STUD W/ 4 - NO.10-16
SCREWS EA. SIDE
WHERE BLOCKING ATTACHES
TO OPEN SIDE OF WALL STUD,
PROVIDE 20 GA. TRACK x 8" LONG.
SCREW TO STUD W/ 4 - NO.10-16
SCREWS EA. SIDE
BLOCKING = 8" DEEP x 14 GA.
TRACK W/ 1 1/4" FLANGES
12 GA.CLIP ANGLE 2"x2"x7 1/2" TALL
W/ 4 - NO. 10-16 SCREWS IN EA. LAG.
WALL BLOCKING
TYPE 1
WALL BLOCKING
TYPE 2
WALL BLOCKING
TYPE 3
OPTION B - PLAN VIEW
OPTION A - PLAN VIEW
OPTION A - ELEVATION VIEW
OPTION B - (SIMILAR)
BLOCKING = 18 GA. x 8" MIN.
TALL SHEET STEEL.
SCREW TO STUDS W/ 4 - NO.
10-16 SCREWS @ EA. END.
PROVIDE ONE ADDITIONAL
SCREW EA. END FOR EACH
2" ADDITIONAL HEIGHT
INCREASE IN THE BLOCKING
PLATE.
IF BLOCKING PLATE IS
CONTINUOUS @ A WALL
STUD, PROVIDE 2 ROWS OF
SCREWS.
OF PLATE TYP.
1/2" MIN. DISTANCE
FROM EDGE
PLAN VIEW
ELEVATION VIEW
PLAN VIEW
ELEVATION VIEW
NOTES:
WALL BLOCKING TYPE 1:
TO BE USED FOR WALL MOUNTED ITEMS THAT WEIGH 50 POUNDS OR LESS AND THAT ARE NOT INTENDED FOR HUMAN SUPPORT. EXAMPLES OF WALL MOUNTED ITEMS THAT ARE INTENDED FOR HUMAN SUPPORT ARE HANDRAILS AND GRAB BARS. THESE CANNOT HAVE WALL BLOCKING TYPE 1.
WALL BLOCKING TYPE 2 OR 3:
TO BE USED FOR ALL OTHER WALL MOUNTED ITEMS NOT MEETING THE REQUIREMENTS FOR WALL BLOCKING TYPE 1.
THE CONTRACTOR MUST COORDINATE WITH ALL TRADES TO DETERMINE WHICH TYPE OF WALL BLOCKING IS REQUIRED FOR EACH WALL MOUNTED ITEM. ALL ANCHORS SHALL EXTEND THROUGH THE WALL FINISH INTO THE BLOCKING. AVOID THE USE OF PLASTIC TYPE ANCHOR DEVISES. MANUFACTURERS OF THE WALL MOUNTED ITEMS MUST PROVIDE THE PULLOUT AND SHEAR FORCES AT THE ANCHORS DUE TO THE WEIGHT OF THE ITEM AS WELL AS THE LOADS THAT ARE REQUIRED TO BE SUPPORTED BY THE ITEM AS MANDATED BY THE GOVERNING AUTHORITY. ANCHORS MUST HAVE ADEQUATE STRENGTH TO SUPPORT THESE FORCES. CONTRACTOR HAS THE OPTION TO USE A PROPRIETARY
BLOCKING SYSTEM WHICH MUST BE SUBMITTED TO THE C.O.R. FOR APPROVAL.
CHILLICOTHE
VETERANS AFFAIRS
MEDICAL CENTER
US ROUTE
STATE ROUTE 104
NORTH
N.T.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTATION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
F F E I n c Engineering and Technical Services 420 Springfield Pike Wyoming OH 45215 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
T 513.241.4474
720 E Pete Rose Way, Cincinnati, OH 45202
F 513.241.0081
ISSUED FOR BID
Ryan Jeter
C U s e rs
\p a tr i\ O n e
D ri v e
\D o c u m e n ts
\R
V
A C h ill ic o th e
B ld g
R e n o v a ti o n p a tr ic k .h ill ie r@ ff e -s e rv
.c o m
.r v t
/2
/2
:0
:1
A
M
G001
PROJECT GENERAL NOTES,
ABBREVIATIONS AND SYMBOLS
RENOVATE B25 TO IMPROVE
EFFICIENCY
Chillicothe VA Medical Center
538-16-101
07/20/2020 BJR JRR
ABBREVIATIONS
SYMBOLS & ANNOTATIONS
TYP. MOUNTING HEIGHTSGENERAL PROJECT NOTES FOR EXISTING FACILITIESGENERAL PROJECT NOTES FOR NEW WORK
TYPICAL BLOCKING DETAILS IN METAL STUD WALLS VICINITY MAPSUMMARY OF BID ALTERNATES
ALTERNATES
SEE BLOCK 10, STANDARD FORM (SF) 1442, AND ANY CONTINUATION THERTO, FOR A DETAILED LIST OF BID
ITEMS.
Revisions: Date:
CHAIN LINK FABRIC
6" X 6" SQ TUBE POST
6" X 2" BOLT ON 180° HINGE
1" SQ GUSSETS
GATE FRAMING TYP.
3/16"∅ CABLE TRUSSING
2" X 2" SQ TUBE
LATCH FOR
PADLOCK
DROP ROD GATE HELPER
WHEELS
GALVANIZED
2" 5'-10 5__
" 2" 5'-10
5__
" 2" 3 1_
" 2" 5'-10 5__
" 2" 5'-10 5__
" 2" 1
5_
"1 5_
25'-0"
6' -0
A2003
A200
A200
A200
NORTH
BUILDING 22
BLDG 20
BUILDING 25
BUILDING 25 ADDITION
1,000 SF
50'-0"
AIR-COOLED
CHILLER
TRANSFORMER
HINES BLVD
R.D.R.D.
10 10
5'-0"
6'-0"
1. 5'-0" WIDE SIDEWALK TO BUILDING EXIT
2. ADA RAMP. REFER TO RAMP DETAILS ON SHEET A501
3. NOT USED.
4. MATERIAL STORAGE CANOPY. REFER TO PLANS AN DETAILS ON SHEET A540.
(OMIT STORAGE CANOPY FOR ALTERNATE #2)
5. OUTDOOR PAVILLION PAVING. REFER TO CIVIL DRAWINGS. (OMIT FOR ALTERNATE #2)
6. NOT USED.
7. INSTALL 8'-0" TALL CHAIN LINK FENCE WITH DUAL GATES MOUNTED ON PAD OF PREVIOUSLY
DEMOLISHED BUILDING. REFER TO ALTERNATE 1 SCOPE.
8. 6' CHAIN LINK FENCE
9. 4' WIDE MAN GATE WITH PAD LOCK AND HASP (HW-20).
10. 25' BI-PARTING GATE WITH PAD LOCK AND HASP (HW-20). GATE TO HAVE WHEELS PER DETAIL.
11. 10' SECTION OF FENCE 4' FROM LOADING DOCK. STEP UP FENCE ONTO LOADING DOCK AND
PROVIDE A GATE ON LOADING DOCK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTATION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
F F E I n c Engineering and Technical Services 420 Springfield Pike Wyoming OH 45215 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
T 513.241.4474
720 E Pete Rose Way, Cincinnati, OH 45202
F 513.241.0081
ISSUED FOR BID
Ryan Jeter
C U s e rs
\c a rt e \D o c u m e n ts
\0 R e v it L o c a l M o d e ls
\2
\R
V A
C h ill ic o th e
B ld g
R e n o v a ti o n c a rt e r.
d a n ie l0
.r v t
/8
/2
:4
:3
A
M
G002
SITE PLAN RENOVATE B25 TO IMPROVE
EFFICIENCY
Chillicothe VA Medical Center
538-16-101
07/20/2020 BJR JRR
1/16" = 1'-0"G002
1 SITE PLAN
KEYNOTES - SITE PLAN 1
1/4" = 1'-0"G002
2 Gate
MECHANICAL
ROOM / PIPE
MECHANICAL
MIXING ROOM
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
FEC-1
FEC-1
FEC-1
OFFICE AND
SCHNEIDER
ELECTRIC
MONITORING
STATION
OFFICE AND
BAS
MONITORING
STATION
MECHANICAL
ELEC.
UNISEX
MEN
TOOL
STORAGE
ELECTRICAL
CONFERENCE
ROOM
ELECTRICAL
SHOP
WELDING
PAINT SHOP
OFFICE
BREAK ROOM
TLT
PAINT
STORAGE
PEST
CONTROL /
SIGNAGE
SHOP
SOILED LINEN
CLEAN LINEN
STORAGE
ENVIRONMENTAL
MANAGEMENT
TOOL
STORAGE
103A
OFFICE
LAUNDRY
PAINT OFFICE
A/C PIPE SHOP
CONFERENCE
ROOM
IT ROOM
CORRIDOR
CORRIDOR
LOCKER
ROOM
WORKSHOP
(81') (139')
FE-2FE-2
FE-2
FE-1
FE-1
FE-2
FE-1
FE-1
EXIT TRAVEL (DISTANCE)
STORAGE, ORDINARY HAZARD
SPECIAL-PURPOSE INDUSTRIAL, ORDINARY HAZARD
SPECIAL-PURPOSE INDUSTRIAL, HIGH HAZARD
FIRE EXTINGUISHER ON WALL HOOK
(xx')
FE-1
1-HR FIRE RESISTANCE-RATED WALL
SMOKE PARTITION, NON-RATED
FULLY-RECESSED FIRE EXTINGUISHER CABINETFE-2
SEMI-RECESSED FIRE EXTINGUISHER CABINETFE-3
NFPA 101 2015 Code Review Joint Commission employs 2015 NFPA 101 for its code review.
Chapter 6 – Classification of Occupancy and Hazard of Contents
• 6.1.14.4 - Separated Occupancies consisting of:
- 6.1.12 - Special Purpose Industrial Occupancy, 6.2.2.3 - Ordinary Hazard Contents
- 6.1.12 - Industrial Occupancy, 6.2.2.4 - High Hazard Contents
- 6.1.13 - Storage Occupancy, 6.2.2.3 - Ordinary Hazard Contents
Required separation of occupancies: 1-hr fire-resistance rated (Table 6.1.14.4 (b))
Chapter 7 – Means of Egress
• 7.1.3.2.1 – Exit Separation
(1) Connecting 3 or fewer stories: 1-hr fire rating req’d.
(8) Openings in separation wall: fire doors with closers per 7.2.1.8.
• with ANSI/UL 294, Standard for Access Control System Units.Table 7.2.2.2.1.2(B) – Minimum new stair width: <2000 occup load all stories = 44” min width.
• 7.2.4.3 – Fire Barriers – Minimum 2-Hr. fire rating at horizontal exits.
• 7.3.1 – Occupant Load:
1st Floor:
Industrial Use, Special-Purpose Maximum probable occupants = # occup.
Industrial Use, High Hazard 884 s.f. @ 100 s.f./occ. = 9 occup Storage Use Maximum probable occupants = # occup.
# s.f. Total occupants = # occup.
Basement:
Accessory Spaces # s.f. @ 100 s.f./occ. = # occup.
# s.f. Total occupants = # occup.
• 7.3.3.1 – Egress capacity:
• Stairs - 0.3” per occup; Level components and ramps - 0.2” per occup.
• Stairs (High hazard) - 0.7" per occup; Level components and ramps - 0.4" per occup.
• 7.4.1.1 – Min. number of means of egress from any story = 2.
(1) Single means of egress permitted where in Chapter 11 though 43.
Chapter 8 – Features of Fire Protection
• Table 8.3.4.2 – Min Fire Protection for Openings in Fire-rated Assemblies:
Component Walls Fire Drs Fire Window Vert. shafts (stairs, exits):2 hr 1-1/2 hr NP
1 hr 1 hr NP Fire Barriers: 2 hr 1-1/2 hr NP
1 hr ¾ hr NP Horiz. Exits: 2 hr 1-1/2 hr ¾ hr Smoke Barriers: 1 hr 1/3 hr ¾ hr
• 8.3.5.1 – Firestop Systems – Penetrations that pass thru a barrier shall be protected by a firestop system or device.
• 8.3.5.7 – Openings thru fire barriers for air-handling ductwork shall be protected per 9.2.1.
• 8.4.3.5 – Smoke Partition doors shall be self or auto-closing per 7.2.1.8. Exception: see 18.3.6.3.11 and
20.3.6.2.1.
• 8.5.3 – A Fire Barrier shall be permitted to be used as Smoke Barrier per Section 8.5.
• 8.6.1 - Floor Smoke Barriers – Every floor that separates stories in a Building. shall be constructed as a smoke barrier per 8.5 and shall be permitted opg’s. per 8.6.6 thru 8.6.9.
• 8.6.5 – Shafts- Req’d Fire Rating:
Connecting 4 or more stories: 2-hr Fire Barrier.
Other new shaft enclosures: 1-hr Fire Barrier.
• 8.6.9 -- Convenience Opening - Unenclosed vertical openings not concealed within building constructed as follows (18.3.1.2):
(1) Such openings shall connect not more than two adjacent stories (one floor pierced only).
(2) Such openings shall be separated from unprotected vertical openings serving other floors by a barrier complying with 8.6.5.
(3) Such openings shall be separated from corridors.
(4) In other than approved, existing convenience openings, such openings shall be separated from other fire or smoke compartments on the same floor.
(5) In new construction openings shall be separated from the corridor referenced in 8.6.9.1(3) by a smoke partition.
(6) Such openings shall not serve as a required means of egress.
• 8.7.1.1 – Protection from any degree of hazard shall be provided by one of the following means:
(2) Protecting an area with an automatic extinguishing system per section 9.7.
• 8.7.1.3 – Special Hazard Protection – Doors: min. ¾ hr fire rated, self or auto-closing per 7.2.1.8
• 8.7.3 - Flammable Liquids and Gasses - The storage and handling of flammable liquids and gasses shall be in accordance with the following standards:
(1) NFPA 30, Flammable and Combustible Liquids Code
(2) NFPA 54, National Fuel Gas Code
(3) NFPA 58, Liquefied Petroleum Gas Code
Chapter 9 – Building Service and Fire Protection Equipment
• 9.6.1.3 – Fire Alarm System req’d for life safety shall be per NFPA 70 and 72.
• 9.6.3.1 – Occupant notification shall be provided per 9.6.3, 18.3.4.3.1, and 20.3.4.3.1.
• 9.6.3.4 – Where permitted by Chapters 11 thru 43, a positive alarm sequence shall be permitted per NFPA 72 (See 20.4.3).
• 9.6.4.1 – Emergency Forces notification req’d per 9.6.4, 18.3.4.3.2.1, and 20.3.4.3.2.1.
• 9.6.5.1 – Fire safety functions shall be installed per NFPA 72 as req’d per 9.6.5, 18.3.4.4, and 20.3.4.4.
• 9.6.7.1 – Alarm annunciation is required per 9.6.7 through 9.6.7.8.
• 9.7.1.1 – Supervised automatic sprinkler system as req’d by 9.7.1, 18.3.5.1, and 20.2.5.2.1 shall comply with NFPA 13.
Chapter 42 – Storage Occupancies
• 42.1.2.2 - Incidental in another occupancy shall not be the basis for overall occupancy classification.
• 42.2.1.1 - Each required means of egress shall be in accordance with applicable portions of Chapter 7.
• 42.2.4.1 - Number of means of egress
(2) In ordinary hazard storage occupancies, a single means of egress shall be permitted from any story provided that the exit can be reached within the distance permitted as a common path of travel.
(3) The building shall have not less than two separate means of egress as remotely located from each other as practicable.
• Table 42.2.5 - Arrangement of Means of Egress, Ordinary Hazard Storage
Dead end corridor, protected by sprinkler - 100' Common path of travel, protected by sprinkler - 100'
• Table 42.2.6 - Maximum Travel Distance to Exits Protected, Ordinary Hazard Storage - 400'
Chapter 40 – Industrial Occupancies
• 40.1.1.5 - Incidental High Hazard operations protected in accordance with sections 8.7 and 40.3.2 shall not be the basis for high hazard industrial occupancy classification.
• 40.2.4.1.1 - Not less than two means of egress shall be provided from every story, not less than one exit shall be reached without traversing another story.
• 40.2.4.1.2 - A single means of egress shall be permitted from any story in low or ordinary hazard industrial occupancies, provided that the exit can be reached within the distance permitted as a common path of travel.
• 40.2.5.1 - Arrangement of Means of Egress, Special-Purpose Industrial
Dead end corridor, protected by sprinkler - 50' Common path of travel, protected by sprinkler - 100'
• 40.2.6.1 - Maximum Travel Distance to Exits Protected, Special-Purpose Industrial - 400'
• 40.3.3.2 - Interior ceiling and wall finish shall be class A, B, or C
• 40.3.3.3.1 - Interior floor finish in exit enclosures and exit access corridors shall not be less than Class II.
• 40.7.2 - Soiled Linen and Trash Receptacles - requirements of 10.3.9 for containers with capacity of 20 gal or more shall not apply.
NFPA 30 (2015) – Flammable Liquids (Used in Industrial Occupancy)
• 18.5 - Incidental Operations
• 18.5.5.4.1 - Maximum quantity of liquids permitted in a single fire area shall not exceed:
(1) The amount required to supply incidental operations for one continuous 24-hour period or
(2) The aggregate sum of the following:
(a) 25 gal of Class IA liquids in containers
(b) 120 gal of Class IB, Class IC, Class II, or Class III liquids in containers
(c) 1585 gal of any combination of the following:
i. Class IB, IC, or IIIA liquids in metal portable tanks or metal intermediate bulk containers, each not exceeding 793 gal.
ii. Class II or Class IIIA liquids in nonmetallic intermediate bulk containers, each not exceeding 793 gal.
(d) 20 portable tanks or intermediate bulk containers each not exceeding 793 gal or Class IIIB liquids.
NFPA 10 (2013) – Installation of Portable Fire Extinguishers Table 6.2.1.1 Class A - Ordinary (Moderate) Hazard Occupancy
Min rated extinguisher - 2-A Max floor area for extinguisher per unit of A - 1,500 square feet Max floor area for extinguisher - 11,250 ft Max travel distance - 75 ft
Class A - Extra (High) Hazard Occupancy Min rated extinguisher - 4-A Max floor area for extinguisher per unit of A - 1,000 square feet Max floor area for extinguisher - 11,250 ft Max travel distance - 75 ft
Plumbing 2017 Ohio Plumbing Code VA TIL plumbing requirements
NFPA 13
HVAC
2019 VA HVAC Design Manual 2017 Ohio Mechanical Code NFPA 90A Standard for the Installation of Air-Conditioning and Ventilating Systems NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations
Eletrical NFPA 70-11 National Electric Code.
NFPA 101-12 Life Safety Code.
NFPA 72-13 Fire Alarm and Signaling Code.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTATION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
F F E I n c Engineering and Technical Services 420 Springfield Pike Wyoming OH 45215 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
T 513.241.4474
720 E Pete Rose Way, Cincinnati, OH 45202
F 513.241.0081
ISSUED FOR BID
Ryan Jeter
C U s e rs
\p a tr i\ O n e
D ri v e
\D o c u m e n ts
\R
V
A C h ill ic o th e
B ld g
R e n o v a ti o n p a tr ic k .h ill ie r@ ff e -s e rv
.c o m
.r v t
/1
/2
:4
:5
P
M
G003
LIFE SAFETY PLANS RENOVATE B25 TO IMPROVE
EFFICIENCY
Chillicothe VA Medical Center
538-16-101
07/20/2020 BJR JRR
3/32" = 1'-0"G003
1 BASEMENT LIFE SAFETY PLAN
3/32" = 1'-0"G003
2 FIRST FLOOR LIFE SAFETY PLAN
LIFE SAFETY LEGEND
CODE REVIEW
MISC. CODES
WW
W W
W W W
W
W
W W
W W
W W
W W
W
BUILDING # 25
BUILDING # 22
BUILDING # 20
HEINZ BLVD.
BU
IL
D
IN
G
BUILDING
# T41
10 12
10 12
W3
VIVIAN LLAMBI & ASSOCIATES, INC.
ENVIRONMENTAL DESIGN LANDSCAPE ARCHITECTURE
COMMUNITY PLANNING URBAN DESIGN
2312 Park Avenue, Cincinnati, Ohio 45206 Phone: 513.559.9444, Fax: 513.559.0164
101 North 7th Street, Louisville, KY 40202 Phone: 502.409.0479, Fax: 502.561.3444
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTATION
ISSUED FOR BID
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD F F E I n c Engineering and Technical Services 420 Springfield Pike Wyoming OH 45215 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C :\U se rs
\C ra ig Li eg ib el \D oc um en ts
\S tru ct ur al _c ra ig
.li eg ib el ffe
-s er v.
co m .rv t
538-16-101
08/14/2019Revisions: Date:
REBID 03/01/2019
Chillicothe VAMC
CHILLICOTHE BLDG 25
RENOVATION
Feet 1:240
40200 10
EROSION CONTROL NOTES
A. FORTY-EIGHT HOURS PRIOR TO ANY EARTH DISTURBING WORK, THE CONTRACTOR SHALL NOTIFY THE OWNER'S
REPRESENTATIVE.
B. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO, OR AS THE FIRST STEP IN, CONSTRUCTION.
SEDIMENT CONTROL PRACTICES SHALL BE APPLIED AS A PERIMETER DEFENSE AGAINST ANY TRANSPORTING OF SILT OFF THE SITE. ALL RUNOFF RESULTING FROM CONSTRUCTION OPERATIONS MUST BE FILTERED BY APPROVED METHODS PRIOR TO
DISCHARGING TO THE STORM SEWER SYSTEM.
C. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR AND REPAIRED ONCE A WEEK AND AFTER EVERY 12" OF RAIN. RECORDS OF SUCH INSPECTION SHALL BE KEPT AT THE JOB SITE AND BE AVAILABLE FOR
IMMEDIATE REVIEW UPON REQUEST.
D. IN ADDITION TO ANY TEMPORARY EROSION, SEDIMENT, AND DEBRIS CONTROL DETAILS AND NOTES SHOWN ON THE PLANS, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY SEDIMENT BASINS, EARTH DIKES, TEMPORARY OR PERMANENT SEEDING, MULCHING AND/OR MULCH NETTING, OR ANY OTHER GENERALLY ACCEPTED METHODS TO PREVENT EROSION, MUD, AND DEBRIS FROM BEING DEPOSITED ON OTHER PROPERTY, ON NEWLY CONSTRUCTED OR EXISTING ROADS, OR INTO EXISTING
SEWERS OR NEW SEWERS WITHIN THE DEVELOPMENT.
E. ALL GROUND SURFACE AREAS THAT HAVE BEEN EXPOSED OR LEFT BARE AS A RESULT OF CONSTRUCTION AND ARE TO FINAL GRADE AND ARE TO REMAIN SO SHALL BE SEEDED AND MULCHED AS SOON AS PRACTICAL. DISTURBED AREAS THAT LIE DORMANT FOR 21 DAYS OR MORE SHALL BE SEEDED OR PROTECTED WITHIN 7 CALENDAR DAYS OF THE DISTURBANCE.
OTHER SEDIMENT CONTROLS THAT ARE INSTALLED SHALL BE MAINTAINED UNTIL VEGETATIVE GROWTH HAS BEEN ESTABLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY SEDIMENT DEVICES AT
THE CONCLUSION OF CONSTRUCTION, BUT NOT BEFORE GROWTH OF PERMANENT GROUND COVER.
F. UNTIL IMPROVEMENTS IN THE DEVELOPMENT HAVE BEEN COMPLETED, THE CONTRACTOR SHALL TAKE SUCH MEASURES AS ARE NECESSARY TO PREVENT EROSION OF GRADED SURFACES ONTO ROADWAYS, INTO DRAINAGE COURSES, OR ADJOINING
PROPERTY WHEN THE MUD AND DEBRIS ORIGINATES FROM THE EARTH MOVING OPERATIONS.
G. ALL MUD/DIRT TRACKED ONTO ROADS FROM THE SITE, DUE TO CONSTRUCTION, SHALL BE PROMPTLY (WITHIN 24 HOURS)
REMOVED.
H. ALL MEASURES SHALL COMPLY WITH "RAINWATER AND LAND DEVELOPMENT, OHIO'S STANDARD FOR STORM WATER
MANAGEMENT, LAND DEVELOPMENT, AND URBAN STREAM PROTECTION", (LATEST EDITION).
DEMOLITION KEY NOTES:
1. EXISTING STEAM TUNNEL TO REMAIN. PROTECT FROM DAMAGE.
2. EXISTING STEAM CHAMBER TO REMAIN. PROTECT FROM DAMAGE.
3. EXISTING DRAINAGE STRUCTURE TO REMAIN. PROTECT FROM DAMAGE.
4. EXISTING ASPHALT PAVING TO REMAIN. PROTECT FROM DAMAGE.
5. NOT USED.
6. EXISTING FIRE HYDRANT TO BE RELOCATED. REFER TO UTILITY PLAN.
7. EXISTING STRUCTURES TO BE DEMOLISHED. REFER TO ARCHITECTURAL PLANS.
8. NOT USED.
9. EXISTING POST INDICATOR VALVE (PIV) TO BE RELOCATED. REFER TO SHEET C101 FOR NEW LOCATION.
10. SAWCUT EX. PAVEMENT IN NEAT, STRAIGHT LINES TO CREATE A CLEAN JOINT. (TYPICAL ALL LOCATIONS.)
11. REMOVE EXISTING CONCRETE PAVEMENT TO THE EXTENTS INDICATED.
12. REMOVE EXISTING ASPHALT PAVEMENT TO THE EXTENTS INDICATED
13. REMOVE EXISTING CURB.
14. REMOVE EXISTING SHED AND SLAB.
15. REMOVE EXISTING DOWNSPOUT LEADER. PLUG AND ABANDONED BELOW GRADE.
16. REMOVE EXISTING ELECTRICAL BOX.
17. DEDUCT ALTERNATE BID ITEM 1. REMOVE EXISTING STRUCTURE. PRESERVE SLAB. REFER TO SHEET C103.
18. DEDUCT ALTERNATE BID ITEM 2. EXISTING LIGHT TO BE REMOVED FOR STORAGE. CONVERT BASE TO PULL BOX. REFER TO
SHEET C101.
19. DEDUCT ALTERNATE BID ITEM 2. LIMIT OF DEDUCT ALTERNATE BID ITEM 2. ALL WORK SOUTH OF THIS LINE IS OMITTED IF THE
ALTERNATE IS SELECTED.
GENERAL NOTES
A. SITE UTILITY CONTRACTOR RESPONSIBLE TO 5' OUTSIDE OF BUILDING. REFER TO MEP DRAWINGS FOR CONTINUATION.
B. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS.
VLA MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES IN THE AREA EITHER IN-SERVICE OR ABANDONED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL EXISTING UTILITIES AND ELEVATIONS BEFORE THE START OF
CONSTRUCTION.
C. CONTRACTOR SHALL ACCOMPLISH A UTILITY LOCATE SURVEY TO LOCATE AND VERIFY LOCATION OF ALL SURFACE AND SUB-SURFACE UTILITIES (CHARTED AND UNCHARTED) PRIOR TO CONSTRUCTION. MARKINGS SHALL BE MAINTAINED BY THE
CONTRACTOR.
D. CONTRACTOR SHALL APPLY FOR A CHILLICOTHE VAMC DIG PERMIT A MINIMUM OF 7 DAYS IN ADVANCE OF DIGGING ACCORDING TO STANDARD OPERATING PROCEDURE 32. AN APPROVED PERMIT IS REQUIRED PRIOR TO ANY DIGGING.
E. CONTACT OHIO UTILITIES PROTECTION SERVICE 1-800-362-2764 TWO WORKING DAYS BEFORE DIGGING.
F. FIELD VERIFY EXISTING ELEVATIONS AS INDICATED. REPORT ANY DISCREPANCY TO CONSTRUCTION MANAGER PRIOR TO
START OF GRADING OPERATIONS.
G. THE CONTRACTOR SHALL COORDINATE DEMOLITION TO MAINTAIN UTILITY SERVICE.
H. THE CONTRACTOR IS URGED TO DIVERT CONSTRUCTION DEBRIS FROM DISPOSAL IN LANDFILLS AND INCINERATORS.
REDIRECT RECYCLABLE RECOVERED RESOURCES BACK TO THE MANUFACTURING PROCESS WHENEVER POSSIBLE.
REDIRECT REUSABLE MATERIALS TO APPROPRIATE SITES OR RECYCLING FACILITIES.
I. VIVIAN LLAMBI & ASSOCIATES MAKES NO WARRANTY OR REPRESENTATION AS TO THE QUALITY AND ACCURACY OF BASE INFORMATION AND EXISTING CONDITIONS. CONTRACTOR IS ADVISED TO VERIFY ALL CRITICAL DIMENSIONS AND ELEVATIONS.
C100
DEMOLITION PLAN
07/20/2020
RYAN JETER
WW
W
W W W
W
W
W W
W W
W W
W W
W
BUILDING # 25
BUILDING # 22
BUILDING # 20
HEINZ BLVD.
BU
IL
D
IN
G
BUILDING
# T41
EX SAN MH 08
RIM:660.74
INV IN:651.74 12" VCP
INV OUT:651.74 12" VCP
BUILDING CONNECTION
INV OUT:658.00 4"
W3
A101.1
EX SAN MH 04
RIM:662.04
INV IN:653.74 10" VCP
INV OUT:653.34 12" VCP
EX STRM MH03
RIM:669.31
INV IN:662.23 18" VCP
INV IN:663.01 12" VCP
INV OUT:662.23 18" VCP
EX MH06
RIM:662.83
INV IN:658.46 18" VCP
P3
P2BP1
P2A
B
B
B
0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50
BUILDING CONNECTION
INV OUT:658.00 4"
EXISTING 12" SANITARY
PROPOSED DOWNSPOUT LEADER
VIVIAN LLAMBI & ASSOCIATES, INC.
ENVIRONMENTAL DESIGN LANDSCAPE ARCHITECTURE
COMMUNITY PLANNING URBAN DESIGN
2312 Park Avenue, Cincinnati, Ohio 45206 Phone: 513.559.9444, Fax: 513.559.0164
101 North 7th Street, Louisville, KY 40202 Phone: 502.409.0479, Fax: 502.561.3444
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTATION
ISSUED FOR BID
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD F F E I n c Engineering and Technical Services 420 Springfield Pike Wyoming OH 45215 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C :\U se rs
\C ra ig Li eg ib el \D oc um en ts
\S tru ct ur al _c ra ig
.li eg ib el ffe
-s er v.
co m .rv t
538-16-101
08/14/2019Revisions: Date:
REBID 03/01/2019
Chillicothe VAMC
CHILLICOTHE BLDG 25
RENOVATION
Feet 1:240
40200 10
GENERAL NOTES
A. SITE UTILITY CONTRACTOR RESPONSIBLE TO 5' OUTSIDE OF BUILDING. REFER TO MEP DRAWINGS FOR CONTINUATION.
B. CONTRACTOR SHALL USE EXTREME CAUTION WHEN EXCAVATING NEAR ANY UTILITY.
C. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS.
VLA MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES IN THE AREA EITHER IN-SERVICE OR ABANDONED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL EXISTING UTILITIES AND ELEVATIONS BEFORE THE START OF
CONSTRUCTION.
D. CONTRACTOR SHALL ACCOMPLISHED A UTILITY LOCATE SURVEY TO LOCATE AND VERIFY LOCATION OF ALL SURFACE AND SUB-SURFACE UTILITIES (CHARTED AND UNCHARTED) PRIOR TO CONSTRUCTION. MARKINGS SHALL BE MAINTAINED BY THE
CONTRACTOR.
E. CONTRACTOR SHALL APPLIED FOR A CHILLICOTHE VAMC DIG PERMIT A MINIMUM OF 7 DAYS IN ADVANCE OF DIGGING ACCORDING TO STANDARD OPERATING PROCEDURE 32. AN APPROVED PERMIT IS REQUIRED PRIOR TO ANY DIGGING.
F. CONTACT OHIO UTILITIES PROTECTION SERVICE 1-800-362-2764 TWO WORKING DAYS BEFORE DIGGING.
G. FIELD VERIFY EXISTING ELEVATIONS AS INDICATED. REPORT ANY DISCREPANCY TO CONSTRUCTION MANAGER PRIOR TO
START OF GRADING OPERATIONS.
H. THE CONTRACTOR SHALL COORDINATE DEMOLITION TO MAINTAIN UTILITY SERVICE.
I. THE CONTRACTOR IS URGED TO DIVERT CONSTRUCTION DEBRIS FROM DISPOSAL IN LANDFILLS AND INCINERATORS.
REDIRECT RECYCLABLE RECOVERED RESOURCES BACK TO THE MANUFACTURING PROCESS WHENEVER POSSIBLE.
REDIRECT REUSABLE MATERIALS TO APPROPRIATE SITES OR RECYCLING FACILITIES.
J. VIVIAN LLAMBI & ASSOCIATES MAKES NO WARRANTY OR REPRESENTATION AS TO THE QUALITY AND ACCURACY OF BASE INFORMATION AND EXISTING CONDITIONS. CONTRACTOR IS ADVISED TO VERIFY ALL CRITICAL DIMENSIONS AND ELEVATIONS.
UTILITY PLAN KEY NOTES:
1. EXISTING 6" WATER LINE TO REMAIN. PROTECT FROM DAMAGE.
2. EXISTING FIRE HYDRANT TO BE RELOCATED.
3. EXISTING PIV TO BE REMOVED, REPLACED AND RELOCATED.
4. EXISTING STRUCTURES TO BE DEMOLISHED. REFER TO SHEETS C100 AND ARCHITECTURAL PLANS.
5. EXISTING DRAIN PIPE TO BE REMOVED. PLUG OPENING IN DRAINAGE STRUCTURE.
6. EXISTING WATER SERVICE TO BE ABANDONED. DISCONNECT AND CAP AT BUILDING #21.
7. EXISTING WATER SERVICE TO BE ABANDONED. DISCONNECT AND CAP AT VALVE.
8. INSTALL NEW 4" SANITARY SEWER WITH CLEANOUTS. SLOPE 2% MINIMUM. CONNECT TO EXISTING SEWER WITH SEALTITE
9. INSTALL NEW 8" DOWNSPOUT LEADER. SLOPE 1% MINIMUM. CONNECT TO EXISTING STORM. FIELD VERIFY LOCATION. RFER
TO PLUMBING AND ARCHITECTURAL PLANS FOR CONTINUATION.
10. INSTALL RELOCATED FIRE HYDRANT.
11. INSTALL NEW PIV.
12. CONNECT TO EXISTING DRAIN. FIELD VERIFY LOCATION AND DEPTH.
13. DEDUCT ALTERNATE BID ITEM 2. DEMOLISH EXISTING LIGHTING STANDARD. INSTALL ROADWAY RATED PULLBOX IN PLACE OF
POLE-BASE. MAINTAIN CIRCUITRY. EXTEND EXISTING LIGHTING CIRCUIT TO NEW POLE LOCATIONS PER PLAN. REFER TO SHEET
C103 FOR POLE LOCATIONS.
14. DEDUCT ALTERNATE BID ITEM 2. INSTALL NEW LIGHTED BOLLARDS. REFER TO ELECTRICAL PLANS FOR CONTINUATION IN
BUILDING. REFER TO SHEET C103 FOR POLE LOCATIONS.
15. DEDUCT ALTERNATE BID ITEM 2. LIMIT OF DEDUCT ALTERNATE BID ITEM 2. ALL WORK SOUTH OF THIS LINE IS OMITTED IF THE
ALTERNATE IS SELECTED.
16. EXISTING STEAM TUNNEL TO REMAIN. PROTECT FROM DAMAGE.
17. EXISTING STEAM CHAMBER TO REMAIN. PROTECT FROM DAMAGE.
18. EXISTING DRAINAGE STRUCTURE TO REMAIN. PROTECT FROM DAMAGE.
19. EXISTING DOWNSPOUT TO REMAIN. PROTECT FROM DAMAGE. CONNECT TO NEW DOWNSPOUT LEADER.
FIXTURE SCHEDULE
P1 - 35 WATT LUMINAIRE ON 15'X5" SQUARE STEEL POLE. POLE BASE TO HAVE FUSES INSTALLED WITH HANDHOLD.
PROVIDE CONCRETE POURED ROUND BAS AND FULL INSTALLATION OF STANDARD.
P2A - • • ••• •• • •• • •• • • •• • •• • • ••••••••••••••••••••••••
P2B - • • ••• •• • •• • •• • • •• • •• • • ••••••••••••••••••••••••
P3 - (3) P1 FIXTURES.
B - 277V IP BOLLARD.
C101
UTILITY PLAN
BUILDING # 25
BUILDING # 22
BUILDING # 20
HEINZ BLVD.
BU
IL
D
IN
G
BUILDING
# T41
FFE 665
W3
A101.1
FFE 661.75661.58
661.58 661.58
661.58 661.74
661.50
VIVIAN LLAMBI & ASSOCIATES, INC.
ENVIRONMENTAL DESIGN LANDSCAPE ARCHITECTURE
COMMUNITY PLANNING URBAN DESIGN
2312 Park Avenue, Cincinnati, Ohio 45206 Phone: 513.559.9444, Fax: 513.559.0164
101 North 7th Street, Louisville, KY 40202 Phone: 502.409.0479, Fax: 502.561.3444
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTATION
ISSUED FOR BID
CONSTRUCTION
Office of Construction and Facilities Management
U.S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .