These construction documents detail a renovation project for a shell space at the Salem VA Medical Center located at 1970 Roanoke Blvd in Salem, VA. The project involves renovating an open workspace area, including the installation of 17 workstations, electrical and mechanical systems upgrades, and minimal architectural modifications. The project includes new pendant light fixtures suspended from existing structural steel, electrical infrastructure for modular furniture (power and data connections), and maintaining existing mechanical systems such as air handling and ventilation. The renovation will be fully sprinklered and must comply with multiple codes including NFPA 101 Life Safety Code, National Electrical Code, and VA design standards. The construction documents are dated 03 April 2024 and prepared by Above Group for the VA Office of Construction and Facilities Management, with a project number of 658-22-104.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION
SUBSYSTEM
BUILDING WALL
SECTION
ELEVATION
INTERIOR
ELEVATION
DOORS
ROOM NUMBER
EXTERIOR AND
INTERIOR WINDOWS
PLAN & SECTION
DETAIL REFERENCE
REFERS TO A TYPICAL
ASSEMBLY
LOCATION ON DRAWING
SHEET
SHEET DETAIL IS
LOCATED
REFERS TO NUMBER ON DOOR
SCHEDULE, SEE SHEET A401
REFERS TO NUMBER ON
FLOOR PLAN
REFERS TO FRAME TYPE, SEE
ENLARGED ELEVATIONS ON SHEET A402
LOCATION ON
DRAWING SHEET
ARROW INDICATES DIRECTION OF
ELEVATION
SHEET LOCATION WHERE
ELEVATION IS LOCATED
Room name
A101
SIM
NUMBER INDICATES ELEVATION
ON SHEET
LOCATION ON
DRAWING SHEET
101A
A101
A101
PARTITION
TYPES
REFERS TO INTERIOR PARTITIONS,
SEE SHEET G004
REVISION
REVISIONS ARE SHOWN WITHIN
"CLOUDED" AREA REVISION
NUMBER & DATE WILL APPEAR IN
TITLE BLOCK SPACE SO LABELED
SHEET LOCATION WHERE
ELEVATION IS LOCATED
A101
DEMOLITION NOTE
REFERS TO DEMOLITION
NOTES ON THAT SHEET
X
CONSTRUCTION NOTE REFERS TO CONSTRUCTION
NOTES ON THAT SHEET
X
EXTERIOR AND
INTERIOR STOREFRONT
REFERS TO FRAME TYPE, SEE
ENLARGED ELEVATIONS ON SHEET A40200
SF
REFERS TO EXISTING GRID
LINES IN PROJECT
REFERS TO NEW GRID LINES
EXISTING GRID LINE
NEW GRID LINE
DRAWING LIST
SHEET # SHEET TITLE
GENERAL
G001 COVER SHEET
G002 LIFESAFETY, ABBREVIATIONS & CODE NOTES
ARCHITECTURAL
A101 FIRST FLOOR DEMO , NEW WORK AND REFLECTED CEILING PLAN
MECHANICAL
M-001 MECHANICAL NOTES. LEGEND, & SYMBOLS
M-101 FLOOR PLAN - MECHANICAL - NEW WORK
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTED
E-100 FIRST FLOOR PARTIAL OVERALL
ED101 FLOOR PLAN - LIGHTING DEMO
ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMO
EL101 FLOOR PLAN - LIGHTING - NEW WORK
EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
SITE MAP SYMBOLS
IMAGE: GOOGLE EARTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll S p a c e
/2
V
A S a le m R e n o v a te
S h e ll
S p a c e
.r v t
/3
/2
:2
:0
P
M
G001
COVER SHEET Renovate Shell Space
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TB JC
CONSTRUCTION
DOCUMENTS
1970 ROANOKE BLVD
SALEM, VA 24153
Revisions: Date:
Salem VA Medical Center Renovate Shell Space
LaShaun Key Stamp
UP
ABBREVIATIONS:
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
ABV ABOVE
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADH ADHESIVE
ADJ ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT
ASB ASBESTOS
ASPH ASPHALT
ASSN ASSOCIATION
AUTO AUTOMATIC
AUX AUXILIARY
BAT BATTEN
BD BOARD
BEV BEVEL
BKG BACKING
BLDG BUILDING
BOT BOTTOM
BTWN BETWEEN
C TO C CENTER TO CENTER
CAB CABINET
CONC CONCRETE
CIR CIRCLE
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONC FLR CONCRETE FLOOR
CONSTR CONSTRUCTION
CONT CONTINUE
COORD COORDINATE
CPT CARPET OR CARPET TILE
CSWK CASEWORK
CT CERAMIC TILE
CTRL CONTROL
DAT DATUM
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DTL DETAIL
DIFF DIFFERENCE
DIM DIMENSION
DIR DIRECTION
DR DOOR, OR DRAIN
DR OPNG DOOR OPENING
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMO MEMORANDUM
MEZZ MEZZANINE
MID MIDDLE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MLWK MILLWORK
MO MASONRY OPENING
MTL METAL
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NUM NUMERAL
OC ON CENTER
OCC OCCUPY
OFF OFFICE
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY
AND HEALTH ADMINSTRATION
OZ OUNCE
PART PARTIAL
PAT PATTERN
PEN PENETRATE
PERF PERFORATED
PERP PERPENDICULAR
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PRB PROFILE BASE
PRCST PRECAST
PREFAB PREFABRICATE
PRELIM PRELIMINARY
PREP PREPARATION
PREV PREVIOUS
PROP PROPERTY
PTD PAINTED
PVC POLYVINYL CHLORIDE (PLASTIC)
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QT QUARRY TILE
QTB QUARRY TILE BASE
QTR QUARTER
QTY QUANTITY
R RADIUS OR RISER
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
E.J. EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESP ESPECIALLY
EXIST EXISTING
FA FIRE ALARM
FAS FASCIA
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLR FLOOR
FP FIRE PROTECTION OR FIREPROOF
FRT FIRE RETARDANT TREATED
FRZ FREEZER
FT FEET OR FOOT
FURN FURNISH OR FURNITURE
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL OR GENERATOR
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GT GROUT
GYP GYPSUM
GYP BD GYPSUM BOARD
HB HOSE BIBB
HC HOLLOW CORE
HDWD HARDWOOD
HM HOLLOW METAL
HT HEIGHT
HVAC HEATING, VENTILATING,
AND AIR CONDITIONING
ID IDENTIFICATION
ILLUM ILLUMINATION
INCL INCLUDED
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JAN JANITOR
J-BOX JUNCTION BOX
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LDR LEADER
LED LIGHT EMITTING DIODE
LT LIGHT
LVD LOUVERED
LVR LOUVER
LVT LUXURY VINYL TILE
LYR LAYER
REINF REINFORCE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RESIL RESILIENT
RET RETURN
REV REVISION
RF RUBBER FLOORING
RM ROOM
RND ROUND
RO ROUGH OPENING
SALV SALVAGE
SBSTR SUBSTRATE
SCHED SCHEDULE
SCHEM SCHEMATIC
SECT SECTION
SEP SEPARATE
SF SQUARE FOOT (FEET)
SLNT SEALANT
SMK SMOKE
SPEC SPECIFICATION
SPKLR SPRINKLER
SPLY SUPPLY
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURF SURFACE
SUSP SUSPEND
SVT SOLID VINYL FLOOR TILE
SYS SYSTEM
T&G TONGUE AND GROOVE
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
THK THICKNESS
THRU THROUGH
TMPD TEMPERED
TO TOP OF ___
TRANS TRANSOM
TRTD TREATED
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
UV ULTRAVIOLET
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VOL VOLUME
W/ WITH
W/O WITHOUT
WD WOOD
WSCT WAINSCOT
WSF WELDED SEAM SHEET FLOORING
WT WEIGHT
A. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION
THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE
FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE
MODERNIZATION, ALTERATION, ADDITION OR IMPROVEMENT OF ITS REAL PROPERTY AND THE
CONSTRUCTION OF NEW STRUCTURE.
a. NFPA 101 LIFE SAFETY CODE, 2021 EDITION
b. NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900)
c. NATIONAL ELECTRIC CODE (NEC)
d. INTERNATIONAL PLUMBING CODE (IPC)
e. ASME BOILER AND PRESSURE VESSEL CODE
f. ASME CODE FOR PRESSURE PIPING
g. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
h. ENERGY POLICY ACT (EPAct)
i. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL)
j. INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN SPECIFICALLY REFERENCE IN VA
DESIGN DOCUMENTS
k. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
l. PHYSICAL SECURITY DESIGN MANUAL (PSDM)
3. RENOVATION TO EXISTING SUITE. REMOVAL OF PARTIAL HEIGHT PARTITION WITHIN
OPEN AREA FOR THE INSTALLATION OF 17 WORKSTATIONS.
NFPA 101 REVIEW
B. CHAPTER 39 EXISTING BUSINESS OCCUPANCIES
1. (39.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS OR
PORTIONS THEREOF USED AS BUSINESS OCCUPANCIES.
C. MEANS OF EGRESS - CHAPTER 39 AND CHAPTER 7
1. THERE IS NO CHANGE TO THE EXISTING SUITE EXITING.
D. FIRE PROTECTION EQUIPMENT - CHAPTER 39 AND CHAPTER 9
1. THE EXISTING SPACE IS FULLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM.
2. (39.3.5) EXTINGUISHMENT REQUIREMENTS. PORTABLE FIRE EXTINGUISHERS SHALL BE
PROVIDED IN EVERY BUSINESS OCCUPANCY IN ACCORDANCE WITH SECTION 9.9.
A. (9.9) WHERE REQUIRED BY ANOTHER SECTION OF THIS CODE, PORTABLE FIRE
EXTINGUISHERS SHALL BE SELECTED, INSTALLED, INSPECTED, AND MAINTAINED IN
ACCORDANCE WITH NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS.
E. INTERIOR FINISHES - CHAPTER 39 AND SECTION 10.2
1. (39.3.3.2.1) INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING WITH SECTION 10.2
SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS.
CODE NOTES:
OFFICE
IC-129E
OPEN
WORKSPACE
IC-129R
OFFICE
IC-129Q
OFFICE
IC-129L
MECHANICAL
IB-120
CONFERENCE
IC-129J
CORRIDOR
IC-129K
EQUIP STORAGE
IC-128A
TOILET
IC-129F
TOILET
IC-129G
OFFICE
IC-129H
TRAVEL DISTANCE TO EXIT = 181'-10"16 1
6TRAVEL DISTANCE TO EXIT = 228'-10"
16 70" 350 16 34" 170
FEC
16P
KEY PLAN
PROJECT AREA
EXIT SIGN
LIFESAFETY LEGEND:
1 HOUR RATED FIRE PARTITION
2 HOUR RATED FIRE PARTITION
EXIT ACCESS TRAVEL DISTANCE
FIRE EXTINGUISHER IN CABINETFEC
CUMULATIVE OCCUPANT LOAD00
XX 00" XXX EXIT INFORMATION
MAX. NO. PERSON EXIT ALLOWS
EXIT WIDTH IN INCHES
ACTUAL OCCUPANT LOAD
OCCUPANT LOAD5P5P
1 HOUR SMOKE RATED PARTITION
NOT IN SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll S p a c e
/2
V
A S a le m R e n o v a te
S h e ll
S p a c e
.r v t
/3
/2
:2
:0
P
M
G002
LIFESAFETY, ABBREVIATIONS &
CODE NOTES
Renovate Shell Space
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TB JC
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/8" = 1'-0"G002
FIRST FLOOR LIFE SAFETY PLANC4
N
PROJECT
NORTH
A. PATCH AND REPAIR ALL GYPSUM BOARD SURFACES WHERE DEMOLITION
OF ADJOINING OR INTERSECTING PARTITIONS HAS RESULTED IN LESS
THAN A FINISHED CONDITION. PATCHES SHALL BE FLUSH AND SMOOTH.
B. EXISTING ROOMS THAT ARE NOT INDICATED TO BE AFFECTED BY THE
WORK ARE TO BE PROTECTED FROM DAMAGE AND/OR PAINT
DEGRADATION. SHOULD THE GENERAL CONTRACTOR AFFECT THE
CONDITION OR FINISH OF THESE ROOMS, THE SURFACE OR SPACE SHALL
BE RESTORED TO ORIGINAL CONDITION.
C. REFERENCE DRAWING A00X FOR GENERAL DEMOLITION PLANS. VERIFY
ALL DIMENSIONS TO EXISTING ELEMENTS.
D. NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES BETWEEN
EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK. FAILURE TO NOTIFY
THE ARCHITECT WILL NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY TO PERFORM THE WORK AS INTENDED BY THE
CONTRACT DOCUMENTS.
E. VERIFY EXISTING DIMENSIONS, CONDITIONS AND CLEARANCES PRIOR TO
THE SUBMISSION OF SHOP DRAWINGS.
GENERAL FLOOR PLAN NOTES:
D6
A101
1 2 3 4
5 6 7 8
CORRIDOR
EQUIP STORAGE
IC-128A
TOILET
IC-129F
TOILET
IC-129G
OFFICE
IC-129H
CONFERENCE
IC-129J
OPEN
WORKSPACE
IC-129R
WORKSTATIONS NIC
CPT 1
121110
14 15 16
CPT 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
KEY PLAN
PROJECT AREA
NEW CONSTRUCTION LEGEND:
EXISTING CONSTRUCTION TO REMAIN
1 HOUR FIRE RESISTANCE RATED FIRE BARRIER
FIRE EXTINGUISHERE
EQ EQ
DIMENSIONAL CENTERLINE
NOT IN SCOPE
NOTE: EXISTING GLASS
PARTITION FRAMING AND
SLIDING DOORS TO REMAIN
OPEN
WORKSPACE
IC-129R
CONFERENCE
IC-129J
OFFICE
IC-129H
TOILET
IC-129G
TOILET
IC-129F
D6
A101
EQUIP STORAGE
IC-128A
TOILET
IC-129F
TOILET
IC-129G
OFFICE
IC-129H
CONFERENCE
IC-129J
7' -1
1/
2" 7'
-9
/2
7' -9
/2
7'
-9
/2
7' -8
/8
PENDANT MTD LIGHT
FIXTURES SUSPENDED
FROM STRUCTURE ABOVE
EXISTING CEILING
STRIP LIGHT
EXISTING CEILING
STRIP LIGHT
A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
IN THE FIELD AND COORDINATE ALL REMOVAL ACTIVITIES
WITH NEW CONSTRUCTION. THE CONTRACTOR SHALL
REPORT ALL DISCREPANCIES TO THE OWNER'S
REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING
REMOVALS.
B. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE
DURING REMOVAL OF ADJACENT CONSTRUCTION.
REPAIR/REPLACE CONSTRUCTION TO REMAIN THAT WAS
DAMAGED DURING DEMOLITION TO MATCH THE QUALITY OF
THE NEW WORK. PROVIDE DUST CONTROL AND CONTAINMENT
MATS, FLOOR AND WALL PROTECTION.
C. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS
WHERE WORK MUST BE ACCOMPLISHED UNDER THIS
CONTRACT. INCIDENTAL WORK MAY ALSO BE NECESSARY IN
AREAS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS DUE
TO CHANGES AFFECTING EXISTING ELECTRICAL, OR OTHER
SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A PART OF THE
CONTRACT. CONTRACTOR SHALL INSPECT THOSE AREAS
AND ASCERTAIN WORK NEEDED AND DO THAT WORK IN
ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND AT
NO ADDITIONAL COST TO THE OWNER.
D. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS,
COLUMNS OR OTHER STRUCTURAL ELEMENTS UNLESS
SPECIFICALLY NOTED. MAKE OPENINGS OF PROPER SIZE FOR
CONDUITS AND PIPING AND OTHER ITEMS PASSING THROUGH
OPENINGS.
E. GC TO SCAN THE SLAB AT EA LOCATION OF PROPOSED
FLOOR/SLAB PENETRATION PRIOR TO CUTTING TO ENSURE
THAT AREA IS CLEAR OF EMBEDDED CONDUITS AND/OR LIVE
CONDUCTORS.
F. REPAIR, PATCH AND FINISH, OR REFINISH AS APPLICABLE, TO
MATCH ADJACENT EXISTING FINISHES DAMAGED OR NEWLY
EXPOSED DURING THE PERFORMANCE OF THE WORK OF THIS
CONTRACT.
G. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF
EXISTING FINISHES IS REQUIRED TO PERFORM THE WORK
UNDER THIS CONTRACT, AND A NEW FINISH IS NOT
INDICATED, FILL RESULTING OPENINGS AND PATCH THE
SURFACE AFTER DOING THE WORK, AND FINISH TO MATCH
ADJACENT EXISTING SURFACES.
H. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL
CONDUITS AND PIPING IN EVERY CASE ABOVE THE CEILING.
REMOVE EXISTING CEILING AS NECESSARY. AFTER
INSTALLATION OF CONCEALED WORK, REINSTALL REMOVED
CEILING AND PATCH AND REFINISH TO MATCH ADJACENT UN-
REMOVED CEILINGS.
I. WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR
OTHERWISE INDICATED AS EXISTING.
J. PROVIDE HEADERS/LINTELS OVER EVERY OPENING IN BOTH
NEW AND EXISTING WALLS AND PARTITIONS.
K. WHERE "MATCH EXISTING" IS INDICATED, NEW
CONSTRUCTION OR FINISHES, AS APPROPRIATE TO THE
NOTE, SHALL MATCH THE EXISTING IN THE PARTICULAR.
GENERAL DEMOLITION NOTES:
L. DEFINITIONS
M1. REMOVE: REMOVE AND LEGALLY DISPOSE OF
ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED,
SALVAGED, OR EXISTING.
M2. SALVAGE: ITEMS INDICATED TO BE SALVAGED
SHALL REMAIN THE OWNER'S PROPERTY. REMOVE,
CLEAN AND PACK OR CRATE ITEMS TO PROTECT
AGAINST DAMAGE. IDENTIFY CONTENTS OF
CONTAINERS AND DELIVER TO OWNER'S DESIGNATED
STORAGE AREA.
M3. REINSTALL: REMOVE ITEMS INDICATED. CLEAN
SERVICE AND OTHERWISE PREPARE THEM FOR REUSE.
STORE AND PROTECT AGAINST DAMAGE. REINSTALL
ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS
INDICATED.
M4. EXISTING: ORIGINAL ITEM TO REMAIN. PROTECT
CONSTRUCTION INDICATED AS EXISTING AGAINST
DAMAGE AND SOILING DURING SELECTIVE DEMOLITION.
M5. RESTORE: ITEMS INDICATED SHALL BE BROUGHT
BACK TO THEIR ORIGINAL CONDITION. ORIGINAL
CONDITION IS THE CONDITION THAT THE REFERENCED
ITEM WAS IN WHEN THE BUILDING WAS FIRST
CONSTRUCTED.
M6. REPLACE: EXISTING ITEM TO BE REMOVED.
PROVIDE NEW ITEM TO MATCH EXISTING.
M. CONTRACTOR TO ABIDE BY ALL THE ICRA INFECTION
CONTROL REGULATIONS.
N. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL
TIMES AND COORDINATE TRASH REMOVAL WITH THE VA.
O. TEMPORARY CONTINUOUS CONSTRUCTION BARRIER
MUST BE IN PLACE PRIOR TO ANY DEMOLITION. G.C. TO
DETERMINE LOCATION FOR TEMPORARY
CONSTRUCTION BARRIER DOOR ACCESS.
CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-
CLOSING. PROVIDE STICKY MATS ON ALL ACCESS
DOORS INTO CONSTRUCTION AREA. ANTE-ROOM
REQUIRED AT CONSTRUCTION ENTRY. PAINT PUBLIC
FACE OF TEMP BARRIER WHITE.
P. PROVIDE NANOMETER PRESSURE MONITORS FOR ALL
CONSTRUCTION BARRIERS.
Q. PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND
EXHAUST TO EXTERIOR OF THE BUILDING.
R. CONTRACTOR TO REVIEW & FOLLOW ALL ABATEMENT
REQUIREMENTS PRIOR TO THE START OF GENERAL
DEMOLITION.
S. GC TO COORDINATE WITH VA WHEN MAJOR SHUTDOWNS
ARE TO OCCUR. SHUTDOWNS WILL NEED TO OCCUR
AFTER REGULAR BUSINESS HOURS, OVERNIGHT AND
WEEKENDS AS NEEDED TO MINIMIZE IMPACT TO
PATIENTS AND STAFF.
DEMOLITION LEGEND:
TEMPORARY CONSTRUCTION BARRIER
DEMOLITION SCOPE
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
DEMOLITION NOTE1
A. NEW PENDANT LIGHT FIXTURES TO BE SUSPENDED OFF THE
EXISTING STRUCTURAL ROOFING TUBE STEEL.
B. REFER TO MEP DRAWINGS FOR ADDITIONAL WORK NOT
SHOWN.
GENERAL RCP NOTES:
NO CEILING
EXIT SIGN
1 HOUR RATED FIRE BARRIER
RCP LEGEND:
PENDANT LIGHTING
PENDANT LIGHT FIXTURES TO
BE MOUNTED TO BEAM ABOVE.
9'-0"
TYPICAL
PENDANT
HEIGHT
DESKS PROVIDED BY VA
INSTALLED BY CONTRACTOR
3/16" = 1'-0"A101
FIRST FLOOR PLANF4
3/16" = 1'-0"A101
FIRST FLOOR DEMOLITION PLANF1
3/16" = 1'-0"A101
FIRST FLOOR RCPF6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll S p a c e
/2
V
A S a le m R e n o v a te
S h e ll
S p a c e
.r v t
/3
/2
:2
:1
P
M
A101
FIRST FLOOR DEMO , NEW WORK
AND REFLECTED CEILING PLAN
Renovate Shell Space
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TB JC
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/4" = 1'-0"A101
OPEN WORKSPACE SECTIOND6
N
PROJECT
NORTH
DEMOLITION NOTES
1 EXISTING CARPET TILE TO BE REMOVED IN ITS ENTIRITY.
REMOVE ADHESIVE AND PREPARE FLOORING TO RECEIVE
NEW FINISH
2 DEMOLISH STOREFRONT FRAMING, GLASS, AND OVERHEAD
BRACING TO THE EXTENT SHOWN
FLOOR FINISHES
KEY FINISH MATERIAL MANUF. ITEM NUMBER/COLOR/FINISH SIZE NOTES
CPT 1 CARPET TILE 1 FORBO FLOTEX LINEAR TILE / CIRRUS /t57007 mint 20"x20"
VB 1 6" VINYL BASE JOHNSONITE TRADITIONAL VINYL 1/8"/ TA4 GATEWAY 6"
1PH SINGLE-PHASE
3PH THREE-PHASE
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AF AMPERE FRAME OR AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMP AMPERE
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BLDG BUILDING
C CONDUIT
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CKT CIRCUIT
CLG CEILING
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
COORD COORDINATE
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DISC DISCONNECT
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DS DISCONNECT SWITCH
DWG DRAWING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
ETR EXISTING TO REMAIN
ELECTRICAL ABBREVIATIONS
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPS
FP FIRE PROTECTION
FT FEET OR FOOT
GND GROUND
G OR GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LRA LOCKED ROTOR AMPS
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PA PUBLIC ADDRESS
PCB POLYCHLORINATED BIPHENYL
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
AWG AMERICAN WIRE GAUGE
KCMIL ONE-THOUSAND CIRCULAR MILS
NA NOT APPLICABLE
HD HEAT DETECTOR
NEW (HEAVY, SOLID LINE)
EXISTING TO REMAIN (LIGHT, SOLID LINE)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
ABC
PANELBOARD MAIN CIRCUIT BREAKER TYPE, ONE-LINE
### - INDICATES BREAKER RATING
ABC - INDICATES PANEL DESIGNATION
ABC
PANELBOARD MAIN LUG TYPE, ONE-LINE
### - INDICATES BUS RATING
ABC - INDICATES PANEL DESIGNATION
JUNCTION BOX
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DOUBLE DUPLEX (QUADRAPLEX)
ELECTRICAL SYMBOLS - POWER/LIGHTING PLANS
SWITCH (# SUBSCRIPT AS INDICATED BELOW) - SEE PLANS AND SPECIFICATIONS FOR DETAILS
BLANK = SINGLE POLE a= SUBSCRIPT DEFINES FIXTURES THAT ARE CONTROLLED BY SWITCH
D = DIMMER
LV= LOW VOLTAGE - SEE BELOW FOR DETAILS
J
SYMBOL DESCRIPTION DESCRIPTION
ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:
NAC = BOOSTER PANEL
NAC
DESCRIPTION
TRANSFORMER, PLANT
TRANSFORMER, ONE-LINE
M
BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, SURFACE MOUNTED
BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, SURFACE MOUNTED
LOW VOLTAGE SWITCH - SEE PLANS, SPECIFICATIONS AND WIRING DIAGRAMS FOR DETAILS
LV2Dab
S
S
SUBSCRIPT(S) INDICATE FIXTURES CONTROLLED
'D' INDICATES 0-10V DIMMING
'2' INDICATES NUMBER OF LOW VOLTAGE ZONES
'LV' INDICATES LOW VOLTAGE SWITCH
A
EXIT LIGHT, LED, WALL MOUNTED
EXIT LIGHT, LED, CEILING OR PENDANT MOUNTED; DIRECTIONAL ARROWS AS
INDICATED; SHADED QUADRANT INDICATES FACE(S) OF LUMINAIRE
LED, RECESSED, PENDANT OR SURFACE CEILING LUMINAIRE
LED, RECESSED, PENDANT OR SURFACE CEILING LIGHTING FIXTURE
SHADING INDICATES FIXTURE CONNECTED TO EMERGENCY CIRCUIT
(TYPICAL FOR ALL LIGHT FIXTURE SYMBOLS)
LED FIXTURE, RECESSED, PENDANT OR SURFACE CEILING
FIXTURE TYPE
LOWER CASE LETTER INDICATES CONTROLLING SWITCH
a
CIRCUIT NUMBER
LED, WALL MOUNTED LUMINAIRE
J WALL MOUNTED FURNITURE FEED POWER CONNECTION. '#' REPRESENTS NUMBER OF
WORKSTATIONS POWERED BY FEED.
GROUND BUS BAR, COPPER
SYMBOL SYMBOL
WALL MOUNTED JUNCTION BOXJ LPP LIGHTING POWER PACK RELAY
a
SUBSCRIPT INDICATES CONTROLLING SWITCH AND FIXTURES CONTROLLED (TYPICAL)
LPD LIGHTING POWER PACK RELAY WITH 0-10V DIMMING
LPDE EMERGENCY LIGHTING POWER PACK RELAY - UL924 COMPLIANT AND 0-10V DIMMING
METER, ONE-LINE
ELECTRICAL ONE-LINE
ALARM, SPEAKER/LIGHT, ONE ASSEMBLY. ADJUSTABLE
15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
P(#)
J WALL MOUNTED FURNITURE FEED TELEPHONE/DATA CONNECTION. '#' REPRESENTS NUMBER OF
WORKSTATIONS POWERED BY FEED.
T/D(#)
WORK AREA TCO, COMBINATION TELEPHONE/DATA COMMUNICATION OUTLET - 2
DATA PORT FACE PLATE WITH 2 DATA PORTS - (1) CAT6A CABLE PER PORT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll
S p a c e /0
V A
M C
S a le m S h e ll
S p a c e
R M
E P
F A
F P
T .r v t
/3
/2
:2 :4
P
M
E-001
ELECTRICAL LEGENDS &
SYMBOLS
RENOVATE SHELL SPACE
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TDB SDL
CONSTRUCTION
DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
E-100 FIRST FLOOR PARTIAL OVERALL
ED101 FLOOR PLAN - LIGHTING - DEMOLITION
ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMOLITION
EL101 FLOOR PLAN - LIGHTING - NEW WORK
EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
Revisions Date
ELECTRICAL GENERAL NOTES
WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2023
b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2022
c. LIFE SAFETY CODE, NFPA 101 – 2021
d. EMERGENCY AND STANDBY POWER SYSTEMS, NFPA 110 – 2022
e. HEALTH CARE FACILITIES CODE, NFPA 99 - 2024
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2
3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
4. FACILITY GUIDELINES INSTITUTE (FGI):
a. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT FACILITIES
5. FEDERAL COMMUNICATION COMMISSION (FCC)
6. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
7. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
8. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
9. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
10. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
11. ILLUMINATION ENGINEERING SOCIETY (IES)
12. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)
13. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)
14. INTERNATIONAL CODE COUNCIL (ICC):
a. INTERNATIONAL BUILDING CODE (IBC)
15. UNIFORM BUILDING CODE (UBC)
16. COMBINED ANSI/ASHRAE/IES STANDARD 90.1 – “ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL
BUILDINGS”
17. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)
18. AMERICANS WITH DISABILITIES ACT (ADA)
19. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.
20. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE
a. AUTHORITIES HAVING JURISDICTION (AHJs).
21. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.
1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT
ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.
2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND
ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
3. INCLUDE ALL COSTS FOR EXCAVATION, SAW CUTTING, SURFACE RESTORATION, REPAIR OF FINISHES, ETC. THAT IS
REQUIRED IN ORDER TO MEET THE PROJECT REQUIREMENTS.
4. INCLUDE IN BID ALL COSTS ASSOCIATED WITH TEMPORARY ELECTRICAL SERVICE AS REQUIRED FOR USE BY ALL TRADES DURING CONSTRUCTION. REMOVE TEMPORARY POWER AT THE COMPLETION OF THE PROJECT. OBTAIN AND PAY FOR ALL REQUIRED PERMITS FOR TEMPORARY POWER. ENGINEER OF RECORD SHALL BE PROVIDED WITH ADDITIONAL COMPENSATION FROM THE CONTRACTOR WHERE SIGNED & SEALED DRAWINGS ARE REQUESTED BY THE CONTRACTOR TO THE ENGINEER OF RECORD IF REQUIRED BY THE AHJ FOR THE TEMPORARY POWER.
5. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH NORTH CAROLINA STATUTES REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN
CERTIFICATION OF ACCEPTED DISPOSAL.
6. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS ARE NOT ALLOWED
UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.
7. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL MECHANICAL, PLUMBING AND FIRE PROTECTION EQUIPMENT PRIOR TO SUBMITTAL OF SHOP DRAWINGS OF ELECTRICAL EQUIPMENT.
PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS, BOXES, EQUIPMENT, ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS, CONTROL TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL REQUIRED, UNLESS OTHERWISE NOTED.
8. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT OF WORK. AVOID INTERFERENCES WITH
THE PROGRESS OF OTHER DIVISIONS/TRADES.
9. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS
INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA.
10. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS AND DETAILS.
COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.
11. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR RELATED INFORMATION AND ADDITIONAL INSTALLATION REQUIREMENTS TO BE PERFORMED AS PART OF THE WORK. REFER TO ARCHITECTURAL ELEVATIONS
FOR EXACT MOUNTING HEIGHT AND LOCATIONS.
12. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
13. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR
PHASING.
14. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN WRITING BY THE OWNER AND SCHEDULED IN
ADVANCE.
15. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO
PROCEEDING WITH REPAIRS.
16. COORDINATE THE LOCATION OF ALL LIGHT FIXTURES, DEVICES AND BOXES WITH WINDOWS, MIRRORS, MILLWORK, CABINETS, GLASS CURTAIN WALLS, AND GLASS WALLS PRIOR TO INSTALLATION OF CONDUITS OR BOXES. REVIEW ALL CONTRACT DRAWINGS TO ASCERTAIN ANY CONFLICTS PRIOR TO BIDDING. OBTAIN CLARIFICATION FROM A/E PRIOR TO BID. CONTRACTOR SHALL NOT BE ENTITLED TO ADDITIONAL COMPENSATION FOR WORK REQUIRED TO
RELOCATE OUTLET BOXES OR RACEWAYS FOR COORDINATION WITH OTHER TRADE'S WORK.
17. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL
APPURTENANCES IN ACCORDANCE WITH NEC.
18. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNAGE REQUIRED DURING THE
PROJECT CONSTRUCTION PHASE.
19. THE INFRASTRUCTURE FOR THE ACCESS CONTROL/ CCTV OR SECURITY ELECTRONICS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE ACCESS CONTROL/CCTV OR SECURITY ELECTRONICS SYSTEM CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT. INSTALLATION OF THE CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE ACCESS CONTROL/ CCTV SYSTEM CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY
LOCATIONS, SIZES AND QUANTITY, CONDUIT STUB-UPS PRIOR TO ROUGH IN.
20. THE INFRASTRUCTURE FOR THE VOICE/DATA TELECOMMUNICATIONS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE TELECOMMUNICATIONS CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT AND COMPONENTS. INSTALLATION OF THE CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE TELECOMMUNICATIONS CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY LOCATIONS, SIZES AND QUANTITY, CONDUIT
STUB-UPS PRIOR TO ROUGH IN.
21. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L.
LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED
WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY.
22. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, TO THE
SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.
23. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS. WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO
REQUEST COMPENSATION FROM THE CONTRACTOR FOR SAID SERVICES.
24. MAINTAIN A CURRENT AND ACCURATE SET OF PROJECT RECORD DOCUMENTS (AS-BUILTS) AT THE SITE THROUGHOUT THE DURATION OF THE PROJECT. RECORD DRAWINGS SHALL BE UPDATED EACH DAY TO REFLECT THE ACTUAL LOCATIONS, SIZES, ROUTING, ETC. OF EACH PORTION OF THE ELECTRICAL SYSTEM AFFECTED BY THIS WORK. A FINAL SET OF RECORD DOCUMENTS SHALL BE ISSUED TO THE A/E FOR REVIEW AND THEN SUBMITTED TO THE OWNER WITHIN 30 DAYS AFTER THE DATE OF FINAL ACCEPTANCE. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION INCLUDING SINGLE LINE DIAGRAM, POWER RISER DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM, SITE PLANS AND ALL ELECTRICAL
FLOOR PLANS, DETAILS, PANEL SCHEDULES, ETC.
25. OWNER FURNISHED EQUIPMENT: VERIFY AND COORDINATE ELECTRICAL ROUGH IN REQUIREMENTS FOR OWNER
FURNISHED EQUIPMENT PRIOR TO ROUGH IN.
26. WHERE SUBMITTED EQUIPMENT REQUIRES REVISION TO OVERCURRENT PROTECTION, CONDUIT OR WIRING, MAKE
CHANGES IN ACCORDANCE WITH APPLICABLE CODES.
FIRE ALARM SYSTEM NOTES
FA1. ALL FIRE ALARM EQUIPMENT IS TO BE NEW, UL LISTED FOR FIRE SERVICE, AND SHALL BE COMPATIBLE WITH THE SYSTEM
BEING USED. THE EXISTING FIRE ALARM SYSTEM IS SIMPLEX 4100 ES.
FA2. ALL WIRING AND CONDUIT IS TO CONFORM TO NEC ARTICLE 760. WIRING SHALL BE UL LISTED, MINIMUM 300V TYPE FPLP
PLENUM RATED SOLID COPPER OR STANDARD COPPER WITH MAXIMUM 19 STRANDS.
FA3. LOW VOLTAGE CONDUCTORS: PROVIDE CONDUCTORS IN ACCORDANCE WITH NFPA 70 AND NFPA 72, AND AS
RECOMMENDED BY THE FIRE ALARM SYSTEM MANUFACTURER. CONDUCTORS SHALL BE COPPER, MINIMUM NO. 14 AWG, TWISTED SHIELDED PAIR.
FA4. SURVIVABILITY: A 2-HOUR RATED CABLE ASSEMBLY SHALL BE PROVIDED FOR NOTIFICATION APPLIANCE CIRCUITS AND ANY OTHER CIRCUITS NECESSARY FOR THE OPERATION OF THE NOTIFICATION APPLIANCE CIRCUITS FROM THE POINT AT WHICH THEY EXIT THE CONTROL UNIT UNTIL THE POINT THAT THEY ENTER THE NOTIFICATION ZONE THAT THEY SERVE.
FA5. ALL FIRE ALARM POWER CIRCUITS SHALL HAVE A DEDICATED 120V 20A BREAKER THAT SHALL BE RED IN COLOR AND MECHANICALLY PROTECTED (LOCKABLE IN THE "ON" POSITION), MARKED AS "FIRE ALARM CIRCUIT".
FA6. MINIMUM CANDELA RATING OF STROBES IS 15; "##" ADJACENT TO DEVICE INDICATES THE CANDELA RATING. PROVIDE SYNCHRONIZATION OF STROBES IN ALL ADJACENT AREAS WHERE STROBES ARE VISIBLE TO EACH OTHER.
FA7. WHERE A FIRE ALARM RISER IS INDICATED, IT IS DIAGRAMMATIC IN NATURE AND NOT INTENDED TO REPRESENT A COMPLETE WIRING AND DEVICE DISPLAY. ALL WIRING AND DEVICES SHALL BE IN ACCORDANCE WITH SELECTED VENDOR'S POINT-BY-POINT WIRING DIAGRAM. REFER TO FLOOR PLAN FOR DESIGN INTENT AND PROPOSED QUANTITY OF FIRE ALARM
SYSTEM COMPONENTS.
FA8. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE FIRE ALARM SYSTEM BE PROVIDED WITH ALL THE NECESSARY EQUIPMENT, WIRING, CONDUIT, AND CONTROLS, COMPLETELY COORDINATED WITH ALL DISCIPLINES. THE MINIMUM FIRE ALARM DESIGN CRITERIA IN THESE DOCUMENTS SHALL BE STRICTLY CONFORMED TO IN ACCORDANCE WITH. ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE FIRE ALARM SYSTEM, IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS, LOCAL AUTHORITIES AND THESE CONTRACT DOCUMENTS SHALL BE FURNISHED AT NO ADDITIONAL COST TO THE OWNER. THE FIRE ALARM CONTRACTOR SHALL CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND THE DESIGN OF OTHER TRADES
BEFORE PREPARING SHOP DRAWINGS.
FA9. FIRE ALARM CONTRACTOR SHALL BE AWARE OF THE TYPE OF FINISHES, DECOR AND OCCUPANCY. COORDINATION WITH THE STAKEHOLDERS(S) SHALL BE PERFORMED BY THE FIRE ALARM CONTRACTOR FOR PLACEMENT OF FIRE ALARM
DEVICES.
FA10. FIRE ALARM SYSTEM SHALL COMPLY WITH NFPA 70 AND 72 FOR PROPER INSTALLATION PRACTICES.
FA11. FIRE ALARM PATHWAYS IN ALL AREAS SHALL BE IN 3/4" EMT, AND SHALL BE PAINTED RED. ALL FIRE ALARM WIRING SHALL
BE ROUTED THROUGH CONDUIT THAT IS STRICTLY DEDICATED FOR FIRE ALARM. NO OTHER SYSTEMS MAY UTILIZE FIRE
ALARM WIRING CONDUIT OR EMT.
FA12. ALL FIRE ALARM JUNCTION BOX AND PULL BOX COVERS SHALL BE PAINTED RED.
FA13. INCREASE BATTERY CAPACITY OF FIRE ALARM SYSTEMS TO ACCOMMODATE ADDITIONAL LOAD.
FA14. PERFORM RE-ACCEPTANCE TESTING IN ACCORDANCE WITH NFPA 72.
FA15. FIRE ALARM CIRCUITS SHALL NOT HAVE SPLICES. CIRCUITS SHALL BE EXTENDED FROM DEVICE AND APPLIANCE SCREW
TERMINALS.
ELECTRICAL DEMOLITION NOTES
D1. THE FACILITY WILL REMAIN OCCUPIED DURING RENOVATIONS.
D2. DEVICES, LIGHT FIXTURES AND EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE DEMOLISHED; DEVICES, LIGHT FIXTURES AND EQUIPMENT SHOWN IN LIGHT SOLID LINE TYPE ARE EXISTING TO REMAIN, UNLESS OTHERWISE
NOTED.
D3. EXISTING EQUIPMENT, LIGHT FIXTURES, DEVICES SHOWN ARE BASED ON FIELD SURVEYS AND RECORD DRAWINGS PROVIDED BY THE OWNER, AND IS NOT NECESSARILY ALL INCLUSIVE IN EVERY AREA AS FAR AS EXISTING ELECTRICAL EQUIPMENT, LIGHT FIXTURES AND DEVICES. EXISTING CIRCUITING SHOWN IS BASED ON RECORD DRAWINGS AND THE SURVEYED PANEL DIRECTORIES, WHERE THEY WERE AVAILABLE. THE ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE CONDITIONS SHOWN ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT, WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK. FIELD
CONDITIONS SHALL GOVERN.
D4. WHERE EXISTING DEVICES ARE INDICATED TO REMAIN OR RELOCATED, LOCATED WITHIN THE SCOPE OF THIS PROJECT AND EXISTING CIRCUITING INFORMATION IS UNAVAILABLE, CONTRACTOR IS TO PROVIDE CIRCUIT TRACING TO IDENTIFY PANEL AND CIRCUIT DEVICES ARE CONNECTED TO AND PROVIDE THAT INFORMATION TO A/E PRIOR TO ROUTING CONDUITS AND WIRING FOR NEW DEVICES AND EQUIPMENT WITHIN THE SCOPE OF THIS PROJECT.
D5. PRIOR TO DEMOLITION, FIELD VERIFY CONDUIT AND WIRING WHICH SERVES AREAS OUTSIDE THE SCOPE OF WORK AND
PASSES THROUGH THE AREA OF WORK. MAINTAIN CONTINUITY OF SYSTEMS.
D6. WHERE EXISTING DEVICES ARE TO REMAIN, CONTRACTOR MUST EXTEND EXISTING CIRCUITING WHERE NECESSARY TO
MAINTAIN CONTINUITY OF CIRCUIT.
D7. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED. OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE ITEMS SUCH AS COVERPLATES, RECEPTACLES, LIGHT FIXTURES, PANELBOARDS, TRANSFORMERS, ETC. NOT BEING USED IN THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION. PROPERLY AND LEGALLY DISPOSE OF ALL EQUIPMENT AND MATERIALS BEING REMOVED.
D8. COORDINATE EXACT AREAS, WALLS, CEILINGS, ETC. TO BE DEMOLISHED WITH ARCHITECTURAL, STRUCTURAL, PLUMBING
AND MECHANICAL DEMOLITION PLANS.
D9. WHERE EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT ARE INDICATED TO BE DEMOLISHED, REMOVE ASSOCIATED CONDUIT AND WIRING BACK TO SOURCE PANEL OR TO NEAREST JUNCTION BOX TO MAINTAIN CIRCUIT CONTINUITY OF DEVICES TO REMAIN AND EQUIPMENT TO REMAIN. WHERE PANELS ARE TO BE REMAIN, TURN BREAKER TO "OFF" POSITION
AND LABEL THE CIRCUIT AS "SPARE" ON THE PANEL DIRECTORY.
D10. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE PHASING WITH CONSTRUCTION MANAGER AND OWNER PRIOR TO DEMOLITION WHICH MAY RESULT IN INTERRUPTION OF POWER.
D11. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENT OF AREA REQUIRING DEMOLITION AND ADDITIONAL INFORMATION ON ELECTRICAL DEMOLITION WITHIN THAT AREA. DISCONNECT ELECTRICAL SERVICE TO ALL EQUIPMENT BEING REMOVED. DEMOLITION SHALL BE PHASED AS REQUIRED BY DIVISION 1, OR DIRECTED BY THE OWNER.
D12. REMOVE ALL CONDUIT LEFT EXPOSED BY REMOVAL OF WALLS AND CEILINGS IN REMODELED OR RENOVATED AREA. CAP BOTH ENDS OF REMAINING CONDUIT IN WALL OR FLOOR WHERE CUT. REMOVE ALL ASSOCIATED SUPPORTS. REMOVE
WIRING BACK TO SOURCE OF VOLTAGE.
D13. ELECTRICAL DEVICES WITHIN THE AREA OF WORK., AND NOT NOTED ON THE DEMOLITION DRAWINGS, WHETHER DUE TO CONCEALMENT BY STORAGE SHELVING, CASEWORK, FURNITURE OR FOR OTHER REASONS, ARE TO BE REMOVED AS
REQUIRED, UNLESS SHOWN AS EXISTING TO REMAIN.
D14. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR.
D15. PROVIDE BLANK COVERPLATES WHERE DEVICES ARE BEING REMOVED FROM EXISTING WALLS TO REMAIN. MATCH COLOR
OF NEW ADJACENT DEVICE COVERPLATES.
D16. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND OBTAIN
CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.
D17. COORDINATE SERVICE INTERRUPTION WITH CONSTRUCTION MANAGER, OWNER, LANDLORD, AND UTILITY COMPANY, WHERE APPLICABLE, AND DO NOT INTERRUPT POWER WITHOUT WRITTEN PERMISSION. PROVIDE A MINIMUM OF ONE
WEEK'S WRITTEN NOTIFICATION WHEN POWER IS DESIRED TO BE INTERRUPTED.
D18. EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND EQUIPMENT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER WIRING DEVICES, EQUIPMENT AND LIGHT FIXTURES THAT MAY BE CONNECTED
TO THE SAME CIRCUIT REMAIN OPERATIONAL AND ACTIVE.
D19. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS DIAGRAMMATIC IN NATURE.
FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL ITEMS SCHEDULED TO BE DEMOLISHED AND
PERFORM THE WORK AS INTENDED AND DEPICTED ON THE DRAWINGS.
D20. UPDATE ALL EXISTING ELECTRICAL EQUIPMENT NAMEPLATES AND DIRECTORIES AS NECESSARY TO REFLECT FINAL AS-
BUILT CONDITIONS AT THE END OF CONSTRUCTION.
D21. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED AREA. NOTIFY OWNER
WHEN ITEMS ARE READY TO BE REMOVED.
D22. COORDINATE ANY ALTERATION AND CHANGES TO THE ELECTRICAL SERVICE WITH THE LOCAL UTILITY COMPANY AND THE
OWNER PRIOR TO COMMENCEMENT OF WORK.
D23. SCHEDULE ALL POWER INTERRUPTION WITH OWNER FOR EXACT DATE, TIME AND DURATION. PROVIDE A MINIMUM OF 72 HOURS NOTICE PRIOR TO DISCONNECTING ANY POWER TO ANY PORTION OF THE BUILDING, AND MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO
COMMENCEMENT OF WORK.
D24. PROVIDE ANY NECESSARY REPROGRAMMING OF EXISTING BUILDING FIRE ALARM SYSTEMS TO DISABLE FIRE ALARM DEVICES THAT ARE BEING DISCONNECTED AND REMOVED, AND FOR ANY NEW DEVICES THAT ARE ADDED, AS PART OF
BID PRICE.
D25. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT AREA. IT IS INTENDED TO PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE A/E. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED ELECTRICAL DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT.
D26. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC. ANY EXISTING CONDUIT IS INSTALLED BELOW THE HEIGHT OF THE NEW CEILING SHALL BE RELOCATED TO ABOVE THE NEW CEILING
HEIGHT.
D27. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO THE END OF
CONSTRUCTION.
D28. UPDATE PANELBOARD DIRECTORIES WHICH ARE MODIFIED BY THIS PROJECT.
D29. REPAIR DISTURBED AREAS TO MATCH EXISTING CONDITIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll
S p a c e /0
V A
M C
S a le m S h e ll
S p a c e
R M
E P
F A
F P
T .r v t
/3
/2
:2 :4
P
M
E-002
ELECTRICAL GENERAL NOTES RENOVATE SHELL SPACE
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TDB SDL
CONSTRUCTION
DOCUMENTS
OPEN
WORKSPACE
IC-129R
OFFICE
IC-129Q
OFFICE
IC-129L
CORRIDOR
IC-129K
AREA OF WORK
IT ROOM
FIRE
ALARM
CONTROL
PANEL
1LK
1HG
IRM
IB-121
LOUNGE
ID-166
BIO-
HAZARD
IB-115
TOILET
IC-114
STORAGE
IB-114
ID-175
IB-104
ID-152
IB-106
ID-170
ON CALL
IB-123
ELECTRICAL
IB-122 OFFICE
IB-117
STORAGE
IB-109TOILET
123A
IB-111
ID-172
MEN'S
TOILET
IB-124
WOMEN'S
TOILET
IB-125
CLEAN
LINEN
IB-105
MED RM
IB-107
SUPPLY
IB-102
HOUSE
KEEPING
IB-149
OFFICE
IB-101
TOILET
IB-104A
WAITING
ROOM
IC-110
OFFICE
IC-115
HOUSE
KEEPING
IC-105
IC-123
IC-109J
OR-7
IC-145
OFFICE
IC-120
IRM
IC-12
WORK RM
IC-122
OFFICE
IC-118
IC-125A
IC-125A
ANEST.
OFFICE
IC-116
REST RM
IC-106B
ISOLATION
RM
IC-117
ANTE RM
IC-119
OR-8
IC-106
STORAGE
IC-106A
OFFICE
IC-108
OFFICE
IC-109A
OFFICE
IC-109
CORRIDOR
IC-131
OR-1
IC-126
NURSE
STATION
ID-180
PACU
IC-128D
NURSE
STATION
IC-128O
LOUNGE
IB-104B
IB-108
ID-171
IB-113
ID-174
IB-112
ID-173
IB-116A
ID-176
ADMIN
OFFICE
IB-100
MECHANICAL
IB-120
CORRIDOR
ID-153
SUPPLY
IB-118
ISOLATION
RM
IB-116
IC-125
IC-128I
OFFICE
IC-124
CORRIDOR
IC-127
BIO-
HAZARD
IC-111
BREAK RM
IC-113
STORAGE
IC-112
RECOVERY
CI-13A
CORRIDOR
IC-130
CONFERENCE
IC-129J
OFFICE
IC-129H
TOILET
IC-129G
TOILET
IC-129F
EQUIP
STORAGE
IC-128A
OFFICE
IC-129E
ELEVATOR
ELEVATOR
ELEVATOR
Room
CORRIDOR
CHASE-1
0-1
CHASE-2
0-2
HOUSE
KEEPING
IC-101
HOUSE
KEEPING
IC-102
Room
Room
ELEVATOR
ELEVATOR
ELECTRICAL
CLOSET
IC-100
ELEVATOR
Room
LOCKER
IC-107A
OFFICE
CI-16
TOILET
IC-107B
Room
CORRIDOR
NAC
NAC
PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll
S p a c e /0
V A
M C
S a le m S h e ll
S p a c e
R M
E P
F A
F P
T .r v t
/3
/2
:2 :4
P
M
E-100
FIRST FLOOR PARTIAL OVERALL RENOVATE SHELL SPACE
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TDB SDL
CONSTRUCTION
DOCUMENTS
DRAWING NOTES:
1. NO NEW WORK INDICATED ON THIS SHEET. PARTIAL OVERALL FLOOR PLAN INCLUDED TO SHOW
AREA OF WORK AND EXISTING SYSTEM EQUIPMENT LOCATIONS.
3/32" = 1'-0"
FIRST FLOOR PARTIAL OVERALL
NN
0 8' 16' 24' 32'
3/32" = 1'-0"
N.T.S.
KEY PLAN
J J
WORKSPACE
IC-129R
OFFICE
IC-129Q
OFFICE
IC-129L
CORRIDOR
IC-129K
1LK
1HG
S
EXISTING TO REMAIN NURSE CALL DOME LIGHT
EXISTING TO REMAIN NURSE CALL DOME LIGHT
111111
1 1 1 1 1 1
TRANSFORMER
1LK
EQUIP
STORAGE
IC-128A
TOILET
IC-129F
TOILET
IC-129G
OFFICE
IC-129H
CONFERENCE
IC-129J
MECHANICAL
IB-120
CORRIDOR
IC-127
OFFICE
IC-129E
PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll
S p a c e /0
V A
M C
S a le m S h e ll
S p a c e
R M
E P
F A
F P
T .r v t
/3
/2
:2 :4
P
M
ED101
FLOOR PLAN - LIGHTING -
DEMOLITION
RENOVATE SHELL SPACE
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TDB SDL
CONSTRUCTION
DOCUMENTS
CODED NOTES:
DRAWING NOTES:
1. CONTRACTOR TO FIELD VERIFY EXACT QUANTITIES AND LOCATIONS OF DEVICES PRIOR TO
DEMOLITION. DEVICE LOCATIONS INDICATED ON THIS PLAN ARE APPROXIMATE.
EXISTING LIGHT FIXTURES ARE TO REMAIN AND BE PROTECTED DURING CONSTRUCTION.
NO WORK IN THIS AREA, UNLESS OTHERWISE NOTED.
1/4" = 1'-0"
FIRST FLOOR PLAN - LIGHTING - DEMOLITION
NN
0 2' 4' 8' 12'
1/4" = 1'-0"
N.T.S.
KEY PLAN
J
WORKSPACE
IC-129R
OFFICE
IC-129Q
OFFICE
IC-129L
CORRIDOR
IC-129K
1LK
1HG
EXISTING WATER COOLER
TRANSFORMER
1LK
CONFERENCE
IC-129J
OFFICE
IC-129H
TOILET
IC-129G
TOILET
IC-129F
EQUIP
STORAGE
IC-128A
OFF…
This is the start of the file's text. The full file is on GovTribe.