Salem VAMC_Renovated Shell Space_658-22-104_Drawings Bid Docs_251222.pdf
PDF 7 MB Posted
- Attached to
- Z1DA--RENOVATE SHELL SPACE (658-22-104)
- Solicitation number
- 36C24626B0015
About this file
These documents are construction documents for a VA Medical Center shell space renovation project located at 1970 Roanoke Blvd in Salem, VA. The project involves renovating an existing open workspace by installing 17 workstations and associated electrical, mechanical, and architectural modifications. The renovation will utilize existing infrastructure, including an air handling unit (BB4) serving the space, with minimal changes to the overall building systems.
Key technical details include installing new pendant lighting fixtures (types P1 and P2) with integral daylight and occupancy sensors, new electrical connections for workstations, and a new notification appliance (NAC) panel. The project is fully sprinklered and follows VA construction standards, with work conducted under VA Office of Construction and Facilities Management. The construction documents are dated 03 April 2024, with a project number of 658-22-104, and were prepared by Above Group architecture and engineering firm. The renovation aims to modernize the workspace while maintaining existing building systems and compliance with applicable VA and national building codes.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION
SUBSYSTEM
BUILDING WALL
SECTION
ELEVATION
INTERIOR
ELEVATION
DOORS
ROOM NUMBER
EXTERIOR AND
INTERIOR WINDOWS
PLAN & SECTION
DETAIL REFERENCE
REFERS TO A TYPICAL
ASSEMBLY
LOCATION ON DRAWING
SHEET
SHEET DETAIL IS
LOCATED
REFERS TO NUMBER ON DOOR
SCHEDULE, SEE SHEET A401
REFERS TO NUMBER ON
FLOOR PLAN
REFERS TO FRAME TYPE, SEE
ENLARGED ELEVATIONS ON SHEET A402
LOCATION ON
DRAWING SHEET
ARROW INDICATES DIRECTION OF
ELEVATION
SHEET LOCATION WHERE
ELEVATION IS LOCATED
Room name
A101
SIM
NUMBER INDICATES ELEVATION
ON SHEET
LOCATION ON
DRAWING SHEET
101A
A101
A101
PARTITION
TYPES
REFERS TO INTERIOR PARTITIONS,
SEE SHEET G004
REVISION
REVISIONS ARE SHOWN WITHIN
"CLOUDED" AREA REVISION
NUMBER & DATE WILL APPEAR IN
TITLE BLOCK SPACE SO LABELED
SHEET LOCATION WHERE
ELEVATION IS LOCATED
A101
DEMOLITION NOTE
REFERS TO DEMOLITION
NOTES ON THAT SHEET
X
CONSTRUCTION NOTE REFERS TO CONSTRUCTION
NOTES ON THAT SHEET
X
EXTERIOR AND
INTERIOR STOREFRONT
REFERS TO FRAME TYPE, SEE
ENLARGED ELEVATIONS ON SHEET A40200
SF
REFERS TO EXISTING GRID
LINES IN PROJECT
REFERS TO NEW GRID LINES
EXISTING GRID LINE
NEW GRID LINE
DRAWING LIST
SHEET # SHEET TITLE
GENERAL
G001 COVER SHEET
G002 LIFESAFETY, ABBREVIATIONS & CODE NOTES
ARCHITECTURAL
A101 FIRST FLOOR DEMO , NEW WORK AND REFLECTED CEILING PLAN
MECHANICAL
M-001 MECHANICAL NOTES. LEGEND, & SYMBOLS
M-101 FLOOR PLAN - MECHANICAL - NEW WORK
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTED
E-100 FIRST FLOOR PARTIAL OVERALL
ED101 FLOOR PLAN - LIGHTING DEMO
ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMO
EL101 FLOOR PLAN - LIGHTING - NEW WORK
EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
SITE MAP SYMBOLS
IMAGE: GOOGLE EARTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll S p a c e
/2
V
A S a le m R e n o v a te
S h e ll
S p a c e
.r v t
/3
/2
:2
:0
P
M
G001
COVER SHEET Renovate Shell Space
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TB JC
CONSTRUCTION
DOCUMENTS
1970 ROANOKE BLVD
SALEM, VA 24153
Revisions: Date:
Salem VA Medical Center Renovate Shell Space
LaShaun Key Stamp
UP
ABBREVIATIONS:
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
ABV ABOVE
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADH ADHESIVE
ADJ ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT
ASB ASBESTOS
ASPH ASPHALT
ASSN ASSOCIATION
AUTO AUTOMATIC
AUX AUXILIARY
BAT BATTEN
BD BOARD
BEV BEVEL
BKG BACKING
BLDG BUILDING
BOT BOTTOM
BTWN BETWEEN
C TO C CENTER TO CENTER
CAB CABINET
CONC CONCRETE
CIR CIRCLE
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONC FLR CONCRETE FLOOR
CONSTR CONSTRUCTION
CONT CONTINUE
COORD COORDINATE
CPT CARPET OR CARPET TILE
CSWK CASEWORK
CT CERAMIC TILE
CTRL CONTROL
DAT DATUM
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DTL DETAIL
DIFF DIFFERENCE
DIM DIMENSION
DIR DIRECTION
DR DOOR, OR DRAIN
DR OPNG DOOR OPENING
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMO MEMORANDUM
MEZZ MEZZANINE
MID MIDDLE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MLWK MILLWORK
MO MASONRY OPENING
MTL METAL
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NUM NUMERAL
OC ON CENTER
OCC OCCUPY
OFF OFFICE
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY
AND HEALTH ADMINSTRATION
OZ OUNCE
PART PARTIAL
PAT PATTERN
PEN PENETRATE
PERF PERFORATED
PERP PERPENDICULAR
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PRB PROFILE BASE
PRCST PRECAST
PREFAB PREFABRICATE
PRELIM PRELIMINARY
PREP PREPARATION
PREV PREVIOUS
PROP PROPERTY
PTD PAINTED
PVC POLYVINYL CHLORIDE (PLASTIC)
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QT QUARRY TILE
QTB QUARRY TILE BASE
QTR QUARTER
QTY QUANTITY
R RADIUS OR RISER
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
E.J. EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESP ESPECIALLY
EXIST EXISTING
FA FIRE ALARM
FAS FASCIA
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLR FLOOR
FP FIRE PROTECTION OR FIREPROOF
FRT FIRE RETARDANT TREATED
FRZ FREEZER
FT FEET OR FOOT
FURN FURNISH OR FURNITURE
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL OR GENERATOR
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GT GROUT
GYP GYPSUM
GYP BD GYPSUM BOARD
HB HOSE BIBB
HC HOLLOW CORE
HDWD HARDWOOD
HM HOLLOW METAL
HT HEIGHT
HVAC HEATING, VENTILATING,
AND AIR CONDITIONING
ID IDENTIFICATION
ILLUM ILLUMINATION
INCL INCLUDED
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JAN JANITOR
J-BOX JUNCTION BOX
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LDR LEADER
LED LIGHT EMITTING DIODE
LT LIGHT
LVD LOUVERED
LVR LOUVER
LVT LUXURY VINYL TILE
LYR LAYER
REINF REINFORCE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RESIL RESILIENT
RET RETURN
REV REVISION
RF RUBBER FLOORING
RM ROOM
RND ROUND
RO ROUGH OPENING
SALV SALVAGE
SBSTR SUBSTRATE
SCHED SCHEDULE
SCHEM SCHEMATIC
SECT SECTION
SEP SEPARATE
SF SQUARE FOOT (FEET)
SLNT SEALANT
SMK SMOKE
SPEC SPECIFICATION
SPKLR SPRINKLER
SPLY SUPPLY
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURF SURFACE
SUSP SUSPEND
SVT SOLID VINYL FLOOR TILE
SYS SYSTEM
T&G TONGUE AND GROOVE
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
THK THICKNESS
THRU THROUGH
TMPD TEMPERED
TO TOP OF ___
TRANS TRANSOM
TRTD TREATED
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
UV ULTRAVIOLET
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VOL VOLUME
W/ WITH
W/O WITHOUT
WD WOOD
WSCT WAINSCOT
WSF WELDED SEAM SHEET FLOORING
WT WEIGHT
A. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION
THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE
FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE
MODERNIZATION, ALTERATION, ADDITION OR IMPROVEMENT OF ITS REAL PROPERTY AND THE
CONSTRUCTION OF NEW STRUCTURE.
a. NFPA 101 LIFE SAFETY CODE, 2021 EDITION
b. NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900)
c. NATIONAL ELECTRIC CODE (NEC)
d. INTERNATIONAL PLUMBING CODE (IPC)
e. ASME BOILER AND PRESSURE VESSEL CODE
f. ASME CODE FOR PRESSURE PIPING
g. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
h. ENERGY POLICY ACT (EPAct)
i. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL)
j. INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN SPECIFICALLY REFERENCE IN VA
DESIGN DOCUMENTS
k. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
l. PHYSICAL SECURITY DESIGN MANUAL (PSDM)
3. RENOVATION TO EXISTING SUITE. REMOVAL OF PARTIAL HEIGHT PARTITION WITHIN
OPEN AREA FOR THE INSTALLATION OF 17 WORKSTATIONS.
NFPA 101 REVIEW
B. CHAPTER 39 EXISTING BUSINESS OCCUPANCIES
1. (39.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS OR
PORTIONS THEREOF USED AS BUSINESS OCCUPANCIES.
C. MEANS OF EGRESS - CHAPTER 39 AND CHAPTER 7
1. THERE IS NO CHANGE TO THE EXISTING SUITE EXITING.
D. FIRE PROTECTION EQUIPMENT - CHAPTER 39 AND CHAPTER 9
1. THE EXISTING SPACE IS FULLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM.
2. (39.3.5) EXTINGUISHMENT REQUIREMENTS. PORTABLE FIRE EXTINGUISHERS SHALL BE
PROVIDED IN EVERY BUSINESS OCCUPANCY IN ACCORDANCE WITH SECTION 9.9.
A. (9.9) WHERE REQUIRED BY ANOTHER SECTION OF THIS CODE, PORTABLE FIRE
EXTINGUISHERS SHALL BE SELECTED, INSTALLED, INSPECTED, AND MAINTAINED IN
ACCORDANCE WITH NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS.
E. INTERIOR FINISHES - CHAPTER 39 AND SECTION 10.2
1. (39.3.3.2.1) INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING WITH SECTION 10.2
SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS.
CODE NOTES:
OFFICE
IC-129E
OPEN
WORKSPACE
IC-129R
OFFICE
IC-129Q
OFFICE
IC-129L
MECHANICAL
IB-120
CONFERENCE
IC-129J
CORRIDOR
IC-129K
EQUIP STORAGE
IC-128A
TOILET
IC-129F
TOILET
IC-129G
OFFICE
IC-129H
TRAVEL DISTANCE TO EXIT = 181'-10"16 1
6TRAVEL DISTANCE TO EXIT = 228'-10"
16 70" 350 16 34" 170
FEC
16P
KEY PLAN
PROJECT AREA
EXIT SIGN
LIFESAFETY LEGEND:
1 HOUR RATED FIRE PARTITION
2 HOUR RATED FIRE PARTITION
EXIT ACCESS TRAVEL DISTANCE
FIRE EXTINGUISHER IN CABINETFEC
CUMULATIVE OCCUPANT LOAD00
XX 00" XXX EXIT INFORMATION
MAX. NO. PERSON EXIT ALLOWS
EXIT WIDTH IN INCHES
ACTUAL OCCUPANT LOAD
OCCUPANT LOAD5P5P
1 HOUR SMOKE RATED PARTITION
NOT IN SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll S p a c e
/2
V
A S a le m R e n o v a te
S h e ll
S p a c e
.r v t
/3
/2
:2
:0
P
M
G002
LIFESAFETY, ABBREVIATIONS &
CODE NOTES
Renovate Shell Space
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TB JC
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/8" = 1'-0"G002
FIRST FLOOR LIFE SAFETY PLANC4
N
PROJECT
NORTH
LaShaun Key Stamp
A. PATCH AND REPAIR ALL GYPSUM BOARD SURFACES WHERE DEMOLITION
OF ADJOINING OR INTERSECTING PARTITIONS HAS RESULTED IN LESS
THAN A FINISHED CONDITION. PATCHES SHALL BE FLUSH AND SMOOTH.
B. EXISTING ROOMS THAT ARE NOT INDICATED TO BE AFFECTED BY THE
WORK ARE TO BE PROTECTED FROM DAMAGE AND/OR PAINT
DEGRADATION. SHOULD THE GENERAL CONTRACTOR AFFECT THE
CONDITION OR FINISH OF THESE ROOMS, THE SURFACE OR SPACE SHALL
BE RESTORED TO ORIGINAL CONDITION.
C. REFERENCE DRAWING A00X FOR GENERAL DEMOLITION PLANS. VERIFY
ALL DIMENSIONS TO EXISTING ELEMENTS.
D. NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES BETWEEN
EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK. FAILURE TO NOTIFY
THE ARCHITECT WILL NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY TO PERFORM THE WORK AS INTENDED BY THE
CONTRACT DOCUMENTS.
E. VERIFY EXISTING DIMENSIONS, CONDITIONS AND CLEARANCES PRIOR TO
THE SUBMISSION OF SHOP DRAWINGS.
GENERAL FLOOR PLAN NOTES:
D6
A101
1 2 3 4
5 6 7 8
CORRIDOR
IC-129K
EQUIP STORAGE
IC-128A
TOILET
IC-129F
TOILET
IC-129G
OFFICE
IC-129H
CONFERENCE
IC-129J
OPEN
WORKSPACE
IC-129R
WORKSTATIONS NIC
CPT 1
121110
14 15 16
CPT 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
VB 1
CPT 1
CPT 1
VB 1
VB 1
KEY PLAN
PROJECT AREA
NEW CONSTRUCTION LEGEND:
EXISTING CONSTRUCTION TO REMAIN
1 HOUR FIRE RESISTANCE RATED FIRE BARRIER
FIRE EXTINGUISHERE
EQ EQ
DIMENSIONAL CENTERLINE
NOT IN SCOPE
NOTE: EXISTING GLASS
PARTITION FRAMING AND
SLIDING DOORS TO REMAIN
OPEN
WORKSPACE
IC-129R
CONFERENCE
IC-129J
OFFICE
IC-129H
TOILET
IC-129G
TOILET
IC-129F
CORRIDOR
IC-129K
D6
A101
EQUIP STORAGE
IC-128A
TOILET
IC-129F
TOILET
IC-129G
OFFICE
IC-129H
CONFERENCE
IC-129J
7' -1
1/
2" 7'
-9
/2
7' -9
/2
7'
-9
/2
7' -8
/8
PENDANT MTD LIGHT
FIXTURES SUSPENDED
FROM STRUCTURE ABOVE
EXISTING CEILING
STRIP LIGHT
EXISTING CEILING
STRIP LIGHT
A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
IN THE FIELD AND COORDINATE ALL REMOVAL ACTIVITIES
WITH NEW CONSTRUCTION. THE CONTRACTOR SHALL
REPORT ALL DISCREPANCIES TO THE OWNER'S
REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING
REMOVALS.
B. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE
DURING REMOVAL OF ADJACENT CONSTRUCTION.
REPAIR/REPLACE CONSTRUCTION TO REMAIN THAT WAS
DAMAGED DURING DEMOLITION TO MATCH THE QUALITY OF
THE NEW WORK. PROVIDE DUST CONTROL AND CONTAINMENT
MATS, FLOOR AND WALL PROTECTION.
C. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS
WHERE WORK MUST BE ACCOMPLISHED UNDER THIS
CONTRACT. INCIDENTAL WORK MAY ALSO BE NECESSARY IN
AREAS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS DUE
TO CHANGES AFFECTING EXISTING ELECTRICAL, OR OTHER
SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A PART OF THE
CONTRACT. CONTRACTOR SHALL INSPECT THOSE AREAS
AND ASCERTAIN WORK NEEDED AND DO THAT WORK IN
ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND AT
NO ADDITIONAL COST TO THE OWNER.
D. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS,
COLUMNS OR OTHER STRUCTURAL ELEMENTS UNLESS
SPECIFICALLY NOTED. MAKE OPENINGS OF PROPER SIZE FOR
CONDUITS AND PIPING AND OTHER ITEMS PASSING THROUGH
OPENINGS.
E. GC TO SCAN THE SLAB AT EA LOCATION OF PROPOSED
FLOOR/SLAB PENETRATION PRIOR TO CUTTING TO ENSURE
THAT AREA IS CLEAR OF EMBEDDED CONDUITS AND/OR LIVE
CONDUCTORS.
F. REPAIR, PATCH AND FINISH, OR REFINISH AS APPLICABLE, TO
MATCH ADJACENT EXISTING FINISHES DAMAGED OR NEWLY
EXPOSED DURING THE PERFORMANCE OF THE WORK OF THIS
CONTRACT.
G. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF
EXISTING FINISHES IS REQUIRED TO PERFORM THE WORK
UNDER THIS CONTRACT, AND A NEW FINISH IS NOT
INDICATED, FILL RESULTING OPENINGS AND PATCH THE
SURFACE AFTER DOING THE WORK, AND FINISH TO MATCH
ADJACENT EXISTING SURFACES.
H. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL
CONDUITS AND PIPING IN EVERY CASE ABOVE THE CEILING.
REMOVE EXISTING CEILING AS NECESSARY. AFTER
INSTALLATION OF CONCEALED WORK, REINSTALL REMOVED
CEILING AND PATCH AND REFINISH TO MATCH ADJACENT UN-
REMOVED CEILINGS.
I. WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR
OTHERWISE INDICATED AS EXISTING.
J. PROVIDE HEADERS/LINTELS OVER EVERY OPENING IN BOTH
NEW AND EXISTING WALLS AND PARTITIONS.
K. WHERE "MATCH EXISTING" IS INDICATED, NEW
CONSTRUCTION OR FINISHES, AS APPROPRIATE TO THE
NOTE, SHALL MATCH THE EXISTING IN THE PARTICULAR.
GENERAL DEMOLITION NOTES:
L. DEFINITIONS
M1. REMOVE: REMOVE AND LEGALLY DISPOSE OF
ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED,
SALVAGED, OR EXISTING.
M2. SALVAGE: ITEMS INDICATED TO BE SALVAGED
SHALL REMAIN THE OWNER'S PROPERTY. REMOVE,
CLEAN AND PACK OR CRATE ITEMS TO PROTECT
AGAINST DAMAGE. IDENTIFY CONTENTS OF
CONTAINERS AND DELIVER TO OWNER'S DESIGNATED
STORAGE AREA.
M3. REINSTALL: REMOVE ITEMS INDICATED. CLEAN
SERVICE AND OTHERWISE PREPARE THEM FOR REUSE.
STORE AND PROTECT AGAINST DAMAGE. REINSTALL
ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS
INDICATED.
M4. EXISTING: ORIGINAL ITEM TO REMAIN. PROTECT
CONSTRUCTION INDICATED AS EXISTING AGAINST
DAMAGE AND SOILING DURING SELECTIVE DEMOLITION.
M5. RESTORE: ITEMS INDICATED SHALL BE BROUGHT
BACK TO THEIR ORIGINAL CONDITION. ORIGINAL
CONDITION IS THE CONDITION THAT THE REFERENCED
ITEM WAS IN WHEN THE BUILDING WAS FIRST
CONSTRUCTED.
M6. REPLACE: EXISTING ITEM TO BE REMOVED.
PROVIDE NEW ITEM TO MATCH EXISTING.
M. CONTRACTOR TO ABIDE BY ALL THE ICRA INFECTION
CONTROL REGULATIONS.
N. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL
TIMES AND COORDINATE TRASH REMOVAL WITH THE VA.
O. TEMPORARY CONTINUOUS CONSTRUCTION BARRIER
MUST BE IN PLACE PRIOR TO ANY DEMOLITION. G.C. TO
DETERMINE LOCATION FOR TEMPORARY
CONSTRUCTION BARRIER DOOR ACCESS.
CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-
CLOSING. PROVIDE STICKY MATS ON ALL ACCESS
DOORS INTO CONSTRUCTION AREA. ANTE-ROOM
REQUIRED AT CONSTRUCTION ENTRY. PAINT PUBLIC
FACE OF TEMP BARRIER WHITE.
P. PROVIDE NANOMETER PRESSURE MONITORS FOR ALL
CONSTRUCTION BARRIERS.
Q. PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND
EXHAUST TO EXTERIOR OF THE BUILDING.
R. CONTRACTOR TO REVIEW & FOLLOW ALL ABATEMENT
REQUIREMENTS PRIOR TO THE START OF GENERAL
DEMOLITION.
S. GC TO COORDINATE WITH VA WHEN MAJOR SHUTDOWNS
ARE TO OCCUR. SHUTDOWNS WILL NEED TO OCCUR
AFTER REGULAR BUSINESS HOURS, OVERNIGHT AND
WEEKENDS AS NEEDED TO MINIMIZE IMPACT TO
PATIENTS AND STAFF.
DEMOLITION LEGEND:
TEMPORARY CONSTRUCTION BARRIER
DEMOLITION SCOPE
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
DEMOLITION NOTE1
A. NEW PENDANT LIGHT FIXTURES TO BE SUSPENDED OFF THE
EXISTING STRUCTURAL ROOFING TUBE STEEL.
B. REFER TO MEP DRAWINGS FOR ADDITIONAL WORK NOT
SHOWN.
GENERAL RCP NOTES:
NO CEILING
EXIT SIGN
1 HOUR RATED FIRE BARRIER
RCP LEGEND:
PENDANT LIGHTING
PENDANT LIGHT FIXTURES TO
BE MOUNTED TO BEAM ABOVE.
9'-0"
TYPICAL
PENDANT
HEIGHT
DESKS PROVIDED BY VA
INSTALLED BY CONTRACTOR
3/16" = 1'-0"A101
FIRST FLOOR PLANF4
3/16" = 1'-0"A101
FIRST FLOOR DEMOLITION PLANF1
3/16" = 1'-0"A101
FIRST FLOOR RCPF6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll S p a c e
/2
V
A S a le m R e n o v a te
S h e ll
S p a c e
.r v t
/1 /2
:2
:5
A M
A101
FIRST FLOOR DEMO , NEW WORK
AND REFLECTED CEILING PLAN
Renovate Shell Space
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TB JC
BID DOCUMENTS
Revisions: Date:
1/4" = 1'-0"A101
OPEN WORKSPACE SECTIOND6
N
PROJECT
NORTH
DEMOLITION NOTES
1 EXISTING CARPET TILE TO BE REMOVED IN ITS ENTIRITY.
REMOVE ADHESIVE AND PREPARE FLOORING TO RECEIVE
NEW FINISH
2 DEMOLISH STOREFRONT FRAMING, GLASS, AND OVERHEAD
BRACING TO THE EXTENT SHOWN
FLOOR FINISHES
KEY FINISH MATERIAL MANUF. ITEM NUMBER/COLOR/FINISH SIZE NOTES
CPT 1 CARPET TILE 1 FORBO FLOTEX LINEAR TILE / CIRRUS /t57007 mint 20"x20"
VB 1 6" VINYL BASE JOHNSONITE TRADITIONAL VINYL 1/8"/ TA4 GATEWAY 6"
EXPANSION OF PROJECT AREA 12.19.2025
SPININ TAKE-OFF
RECTANGLE-TO-ROUND TAKE-OFF
DNUP
TRANSITION, SQUARE TO ROUND
CEILING EXHAUST
CEILING RETURN
STANDARD BRANCH TAKE-OFF
RADIUS ELBOW
TRANSITION, ECCENTRIC
FLEXIBLE DUCT
CHANGE OF ELEVATION
TRANSITION, CONCENTRIC
SQUARE THROAT ELBOW W/ TURNING VANES
RECTANGULAR / ROUND BRANCH TAKE-OFF
OR ROUND / ROUND BRANCH TAKE-OFF
SQUARE THROAT TEE W/ TURNING VANES
RADIUS TEE
SUPPLY DIFFUSER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
RETURN / EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
CEILING DIFFUSER, ROUND NECK
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
CEILING DIFFUSER, RECTANGULAR OR SQUARE
NECK (CEILING DIFFUSERS ARE 4-WAY THROW
UNO)
HVAC ABBREVIATIONSHVAC SYMBOL LEGEND
SYMBOL DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL SYMBOL DESCRIPTION
BASIC MATERIALS
MANUAL BALANCING DAMPER
MOTOR OPERATED CONTROL DAMPER
(MOD)
FLEXIBLE CONNECTION
ACCESS DOORS, VERTICAL OR
HORIZONTAL
DOOR GRILLE
UNDERCUT DOOR
DUCT ELBOW, RETURN AIR
DUCT ELBOW, EXHAUST AIR
DUCT ELBOW, SUPPLY OR OUTSIDE AIR
NEW DUCTWORK, FIRST DIMENSION IS
SIDE SHOWN
HUMIDISTAT / HUMIDITY SENSOR
THERMOSTAT / TEMPERATURE SENSOR
DUCT SMOKE DETECTOR
T
H
DOWN UP
UC
CONNECT TO EXISTING
DEMOLISH TO POINT INDICATED
HUMIDITY SENSOR (DUCT MOUNTED)H
CARBON DIOXIDE SENSORCO2
FIRE DAMPER (WITH ACCESS PANEL)
SMOKE DAMPER (WITH ACCESS PANEL)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
EXISTING TO REMAIN (THIN, HALFTONED, SOLID LINE)
NEW (HEAVY, SOLID LINE)
VIEW NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
H1
H1
A
SHEET NUMBER
DRAWING SYMBOLS
REVISION REFERENCE1
SHEET NOTE CALLOUT1
EQUIPMENT WITH MANUFACTURER'S CLEARANCE
SHOWN IN DASHED LINES
EQUIPMENT
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE
COMPONENTS INDICATED IN DETAILS, RISER DIAGRAMS, CONTROL DIAGRAMS, AND/OR FLOW
DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR
CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND
APPLICABLE SPECIFICATIONS, NOTIFY THE COR IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE
MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH
APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN
STANDARDS SHALL GOVERN.
2. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.
TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
3. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH
AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.
4. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC
DUCT CONSTRUCTION STANDARD.
5. INSTALL ALL FIRE DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS IN
ACCORDANCE WITH MANUFACTURE'S INSTALLATION DIRECTIONS. PROVIDE ACCESS DOORS TO
ALLOW COMPLETE INSPECTION AND MAINTENANCE OF ALL DEVICES.
6. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED
CEILING PLANS AND EQUIPMENT OF ALL TRADES.
7. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
8. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE
PAINTED FLAT BLACK.
9. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
10. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR
OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
11. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO
FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
12. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS
AND OTHER AIR DISTRIBUTION DEVICES.
13. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE
CONNECTED.
14. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.
15. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
16. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.
17. VENT PIPING SHOWN IS ONLY FOR DIAGRAMMATIC PURPOSES. COORDINATE VTRS WITH HVAC AIR
INTAKES.
GENERAL NOTES
24x12
SD
FD
MOD
VD
APPLICABLE CODES
1. VA HVAC DESIGN MANUAL (HVACDM) REV. NOVEMBER 1, 2023
2. VA PLUMBING DESIGN MANUAL 2023 EDITION
3. INTERNATIONAL BUILDING CODE (IBC) 2021 EDITION
A. INTERNATIONAL MECHANICAL CODE (IMC) 2021 EDITION
B. INTERNATIONAL PLUMBING CODE (IPC) 2021 EDITION
C. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2021 EDITION
4. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE):
A. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1) 2022 EDITION
B. ENERGY STANDARD FOR BUILDINGS (ASHRAE 90.1) 2022 EDITION
C. VENTILATION OF HEALTH CARE FACILITIES (ASHRAE 170) 2021 EDITION
5. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):
A. NATIONAL ELECTRICAL CODE (NEC) 2023 EDITION
B. NATIONAL FIRE ALARM CODE (NFPA 72) 2022 EDITION
C. STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS (NFPA 90A)
2021 EDITION
D. STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS
(NFPA 90B) 2021 EDITION
E. HEALTH CARE FACILITIES CODE (NFPA 99) 2021 EDITION
F. LIFE SAFETY CODE (NFPA 101) 2021 EDITION
6. APPLICABLE PUBLICATIONS INCLUDING BUT NOT LIMITED TO:
A. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)
B. AMERICANS WITH DISABILITIES ACT (ADA)
C. AIR-CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE (AHRI)
D. AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)
E. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
F. ASSOCIATION FOR RUBBER PRODUCTS MANUFACTURERS (ARPM)
G. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
H. MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY, INC. (MSS)
I. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
J. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
DESCRIPTIONDESCRIPTION
A/E ARCHITECT / ENGINEER
AFF ABOVE FINISHED FLOOR
AFR ABOVE FINISHED ROOF
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APPROX APPROXIMATE
ASTM AMERICAN STANDARDS TESTING MATERIALS
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSEPOWER
BFV BUTTERFLY VALVE
BTU BRITISH THERMAL UNIT
CAV CONSTANT AIR VOLUME
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CO CLEAN OUT
COR CONTRACTING OFFICER'S REPRESENTATIVE
CU CONDENSING UNIT
DB DRY BULB
DDC DIRECT DIGITAL CONTROLS
DN DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATING
EQUIP EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE
EX EXISTING
ºF DEGREES FAHRENHEIT
FAS FIRE ALARM SYSTEM
FD FLOOR DAMPER
FE FLUE EXHAUST
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FT FEET
GPM GALLONS PER MINUTE
HP HORSEPOWER
HR HOUR
HZ HERTZ
IN INCHES
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTUs PER HOUR
MCA MINIMUM CIRCUIT AMPS
MIN MINIMUM
MOD MOTORIZED CONTROL DAMPER
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OA OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE
PSI POUNDS PER SQUARE INCH
PSIG PSI GAUGE
PVC POLYVINYL CHLORIDE PIPE
RA RETURN AIR
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP AIR CONDITIONING UNIT
SA SUPPLY AIR
SF SQUARE FEET
SP STATIC PRESSURE
SPEC SPECIFICATION
TA TRANSFER AIR
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U/G UNDERGROUND
V/PH VOTS/PHASE
VA U.S. DEPARTMENT OF VETERANS AFFAIRS
VAV VARIABLE AIR VOLUME
W WATTS
W/ WITH
WB WET BULB
NOTE: SOME SYMBOLS AND ABBREVIATIONS SHOWN MAY NOT PERTAIN TO THIS PROJECT
2-AHU-3-1
26-TU-1-5
TYPICAL UNIT NUMBER; AHU NO. 1, LOCATED ON LEVEL 3, LOCATED IN BLDG. 2
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
AHU NUMBER
EQUIPMENT ABBREVIATION. AN "EX" SHOWN IN FRONT OF EQUIPMENT TAGS
NOTIFIES THAT EQUIPMENT IS EXISTING.
ITEM NUMBER
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED
S1 200
DEVICE MARK AND NUMBER (S = SUPPLY, R = RETURN, E = EXHAUST)
DEVICE FLOW RATE (CFM)
12X10 SA
INTERIOR DUCT DIMENSIONS IN INCHES. FIRST DIMENSION IS SIDE SHOWN.
TYPICAL AIR DISTRIBUTION DEVICE TAG
TYPICAL DUCTWORK TAG
SYSTEM TYPE (SA = SUPPLY AIR , RA = RETURN AIR, OA = OUTSIDE AIR,
EA = EXHAUST AIR, SS EA = STAINLESSSTEEL EXHAUST)
LEVEL EQUIPMENT LOCATED ON / LEVEL IT SERVES
TYPICAL UNIT NUMBER; TU NO. 5, SERVED BY AHU NO. 1, LOCATED IN BLDG. 26
PIPING SYMBOL LEGEND
SYMBOL DESCRIPTION
HOT WATER PIPINGHW
HOT WATER RETURN PIPINGHWR
SANITARY DRAINAGE PIPING (UNDERGROUND)SAN U/G
SANITARY DRAINAGE PIPING (ABOVE SLAB)SAN
V VENT PIPING
GATE VALVE
CHECK VALVE
BALL VALVE
PIPE END CAP
PIPE TURNING DOWN
PIPE TURNING UP
PIPE TURNING DOWN (TEE)
CLEANOUTS
CW COLD WATER PIPING
CIRCUIT SETTER VALVE
OR
PDI-"A" WATER HAMMER ARRESTER & SIZE
THERMOSTATIC MIXING VALVE
HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT
FLOW ARROW
P-TRAP
ROLL DOWN
PIPING TEE
PRESSURE REGULATING VALVE
BUTTERFLY VALVE
SYMBOL DESCRIPTION
CONTROL VALVE
BUTTERFLY VALVE
CALIBRATING BALANCING VALVE
BALL VALVE
STRAINER
UNION
CHECK VALVE
GLOBE VALVE
AUTOMATIC AIR VENT
PIPING ABBREVIATIONS
ABBR. DESCRIPTION ABBR. DESCRIPTION
AS ABOVE SLAB
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
ASTM AMERICAN STANDARDS TESTING MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
BFP BACKFLOW PREVENTER
BS BELOW SLAB
BF BELOW FLOOR
BG BELOW GRADE
CA COMPRESSED AIR
CD CONDENSATE
CO CLEANOUT
CONN CONNECTION
CONT CONTINUOUS
CP CIRCULATING PUMP
CW COLD WATER
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNITS
DIA DIAMETER
DN DOWN
DWG DRAWING
DW DOMESTIC WATER
ECO EXTERIOR CLEANOUT
ELEV ELEVATION
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
ºF DEGREES FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FIN FINISH
FL FLOOR
FM FIRE MAIN
FPS FEET PER SECOND
FT FEET
FU FIXTURE UNITS
G NATURAL GAS
GAL GALLON(S)
GPM GALLONS PER MINUTE
GR GREASE WASTE
HB HOSE BIBB
HP HORSEPOWER
HR HOUR
HW HOT WATER
HWR HOT WATER RETURN
HZ HERTZ
IE INVERT ELEVATION
ID INTERNAL DIAMETER
IN INCHES
IPS INTERNATIONAL PIPE STANDARD
IRR IRRIGATION WATER
KW KILOWATT
LAV LAVATORY
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
MNTG MOUNTING
MS MOP SINK
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NSF NATIONAL SANITATION FOUNDATION
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
ORWL OVERFLOW RAIN WATER LEADER
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE
PPP PRECISION PLUMBING PRODUCTS
PSI POUNDS PER SQUARE INCH
RD ROOF DRAIN
RPM REVOLUTIONS PER MINUTE
RWL RAIN WATER LEADER
S SANITARY
SAN SANITARY
SH SHOWER
SK SINK
SL SODA LINE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
ST STORM
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TET THERMAL EXPANSION TANK
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U/G UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VENT
VTR VENT THROUGH ROOF
VIV VALVE IN VERTICAL
VLV VALVE
VOL VOLUME
W WATTS
W/ WITH
WC WATER CLOSET
WCO WALL CLEANOUT
WHA WATER HAMMER ARRESTOR
WHY WALL HYDRANT
WFU WATER SUPPLY FIXTURE UNITS
SIDEWALL SPRINKLER HEAD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll
S p a c e /0
V A
M C
S a le m S h e ll
S p a c e
R M
E P
F A
F P
T .r v t
/3
/2
:2 :3
P
M
M-001
MECHANICAL NOTES, LEGENDS, &
SYMBOLS
RENOVATE SHELL SPACE
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 JMC AJZ
CONSTRUCTION
DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
M-101 FLOOR PLAN - MECHANICAL - NEW WORK
Revisions Date
OPEN
WORKSPACE
IC-129R
OFFICE
IC-129Q
OFFICE
IC-129L
CORRIDOR
IC-129K
E X
O A
CONFERENCE
IC-129J
OFFICE
IC-129H
TOILET
IC-129G
TOILET
IC-129FEQUIP
STORAGE
IC-128A
OFFICE
IC-129E
EX 14001
T
EX 14001
EX 14001
EX 14001
EX 14001
EX 1400
1EX 1400
1EX 1400
1EX 1400
1EX 1400
E X x S
A
EX 28x18 SA
E X x S
A E
X x S
A
E X x O
A
E X
R A
EX VAV
AREA OF WORK
EX 1 1/2" FM
EX 1 1/2" FM
EX 1 1/2" FM
EX 1 1/2" FM
PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll
S p a c e /0
V A
M C
S a le m S h e ll
S p a c e
R M
E P
F A
F P
T .r v t
/3
/2
:2 :3
P
M
M-101
FLOOR PLAN - MECHANICAL - NEW
WORK
RENOVATE SHELL SPACE
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 JMC AJZ
CONSTRUCTION
DOCUMENTS
CODED NOTES:
DRAWING NOTES:
1. BASED ON LIMITED FIELD VERIFICATION PERFORMED BY ABOVE GROUP ON 10/12/2023, THE EXISTING
OPEN OFFICE IS CURRENTLY SERVED BY EXISTING AIR HANDLING UNIT BB4 LOCATED IN THE
MECHANICAL ROOM BELOW. THE TOTAL SUPPLY AIR VOLUME FOR THE UNIT IS 7,600 CFM BASED ON LIMITED EXISTING DOCUMENTATION FROM THE UNIT MANUFACTURER. EXISTING VENTILATION AND RETURN AIR CONDITIONS ARE UNKNOWN. BASED ON THE EXISTING CONDITIONS OBSERVED, THE SPACE FUNCTION SHALL REMAIN THE SAME. THEREFORE, THE EXISTING OPEN OFFICE VENTILATION REQUIREMENTS SHALL BE EQUAL TO THE RENOVATED OPEN OFFICE AT 2 MINIMUM OUTSIDE AIR CHANGES PER HOUR (855 CFM). REFER TO DRAWING NOTE #4 FOR PRE-DEMO TEST AND BALANCE
REPORT TO BE COMPLETED PRIOR TO START OF NEW WORK.
2. EXISTING PIPING OR EQUIPMENT REQUIRED TO REMAIN IN SERVICE WHICH IS AFFECTED BY DEMOLITION AND/OR NEW WORK INSTALLATION SHALL BE TEMPORARILY SUPPORTED, PROTECTED
AND REINSTALLED AS REQUIRED WITH APPROVAL OF THE OWNER AND AT NO ADDITIONAL
CONTRACT COST.
3. EXISTING DUCTWORK, PIPING, AND EQUIPMENT INDICATED ON THE DRAWINGS ARE BASED ON LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE OF ALL EXISTING
DUCTWORK AND PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY.
CONTRACTOR SHALL MAKE COR AWARE OF ANY DEVIATIONS OF THE EXISTING DUCTWORK, PIPING, OR EQUIPMENT INDICATED.
4. PROVIDE PRE-DEMO TEST AND BALANCE REPORT OF ALL EXISTING AIR DEVICES INDICATED ON THE DRAWINGS. IN ADDITION, PROVIDE PRE-DEMO TEST AND BALANCE FOR EXISTING AIR HANDLING UNIT BB4 AND ASSOCIATED RETURN FAN (I.E., SUPPLY, RETURN, OA) LOCATED IN THE MECHANICAL ROOM BELOW. THE REPORT SHALL INCLUDE, BUT IS NOT LIMITED TO: SUPPLY AIR TEMPERATURE, SUPPLY AIR CFM, RETURN AIR CFM, OUTSIDE AIR CFM, MOTOR HP, AND MOTOR ESP. REPORT SHALL INCLUDE AIRFLOW VALUES WITH VAV BOXES SET AT MAXIMUM COOLING, MINIMUM COOLING, AND HEATING.
PROVIDE REPORT TO THE COR/CO WITHIN 5 DAYS.
5. EXISTING FIRE PROTECTION SYSTEM SERVING THE OPEN OFFICE SHALL REMAIN ACTIVE AT ALL
TIMES.
6. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND
AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SPECIFICATIONS FOR ADDITIONAL TAB
REQUIREMENTS.
EXISTING TO REMAIN GRILLE/DIFFUSER. MECHANICAL CONTRACTOR SHALL REMOVE, CLEAN, AND
REINSTALL IN EXISTING LOCATION.
EXISTING TO REMAIN ELECTRIC WATER COOLER AND ASSOCIATED, CW, SAN, AND VENT PIPING.
EXISTING EXPOSED, INSULATED OUTSIDE AIR DUCTWORK ABOVE TO REMAIN. CONTRACTOR SHALL
PAINT EXPOSED DUCTWORK TO MATCH ROOM FINISH AS SHOWN ON ARCHITECTURAL DRAWINGS.
EXISTING OUTDOOR AIR LOUVER TO REMAIN.
RELOCATE EXISTING THERMOSTAT SERVING THE OPEN OFFICE AS INDICATED ON DRAWINGS AND
RECONNECT FOR OPERATION.
EXISTING TO REMAIN SPRINKLER HEAD.
N
0 2' 4' 8' 12'
1/4" = 1'-0"
1/4" = 1'-0"
FIRST FLOOR PLAN - MECHANICAL - NEW WORK
N.T.S.
KEY PLAN
1PH SINGLE-PHASE
3PH THREE-PHASE
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AF AMPERE FRAME OR AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMP AMPERE
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BLDG BUILDING
C CONDUIT
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CKT CIRCUIT
CLG CEILING
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
COORD COORDINATE
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DISC DISCONNECT
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DS DISCONNECT SWITCH
DWG DRAWING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
ETR EXISTING TO REMAIN
ELECTRICAL ABBREVIATIONS
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPS
FP FIRE PROTECTION
FT FEET OR FOOT
GND GROUND
G OR GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LRA LOCKED ROTOR AMPS
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PA PUBLIC ADDRESS
PCB POLYCHLORINATED BIPHENYL
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
AWG AMERICAN WIRE GAUGE
KCMIL ONE-THOUSAND CIRCULAR MILS
NA NOT APPLICABLE
HD HEAT DETECTOR
NEW (HEAVY, SOLID LINE)
EXISTING TO REMAIN (LIGHT, SOLID LINE)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
ABC
PANELBOARD MAIN CIRCUIT BREAKER TYPE, ONE-LINE
### - INDICATES BREAKER RATING
ABC - INDICATES PANEL DESIGNATION
ABC
PANELBOARD MAIN LUG TYPE, ONE-LINE
### - INDICATES BUS RATING
ABC - INDICATES PANEL DESIGNATION
JUNCTION BOX
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DOUBLE DUPLEX (QUADRAPLEX)
ELECTRICAL SYMBOLS - POWER/LIGHTING PLANS
SWITCH (# SUBSCRIPT AS INDICATED BELOW) - SEE PLANS AND SPECIFICATIONS FOR DETAILS
BLANK = SINGLE POLE a= SUBSCRIPT DEFINES FIXTURES THAT ARE CONTROLLED BY SWITCH
D = DIMMER
LV= LOW VOLTAGE - SEE BELOW FOR DETAILS
J
SYMBOL DESCRIPTION DESCRIPTION
ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:
NAC = BOOSTER PANEL
NAC
DESCRIPTION
TRANSFORMER, PLANT
TRANSFORMER, ONE-LINE
M
BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, SURFACE MOUNTED
BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, SURFACE MOUNTED
LOW VOLTAGE SWITCH - SEE PLANS, SPECIFICATIONS AND WIRING DIAGRAMS FOR DETAILS
LV2Dab
S
S
SUBSCRIPT(S) INDICATE FIXTURES CONTROLLED
'D' INDICATES 0-10V DIMMING
'2' INDICATES NUMBER OF LOW VOLTAGE ZONES
'LV' INDICATES LOW VOLTAGE SWITCH
A
EXIT LIGHT, LED, WALL MOUNTED
EXIT LIGHT, LED, CEILING OR PENDANT MOUNTED; DIRECTIONAL ARROWS AS
INDICATED; SHADED QUADRANT INDICATES FACE(S) OF LUMINAIRE
LED, RECESSED, PENDANT OR SURFACE CEILING LUMINAIRE
LED, RECESSED, PENDANT OR SURFACE CEILING LIGHTING FIXTURE
SHADING INDICATES FIXTURE CONNECTED TO EMERGENCY CIRCUIT
(TYPICAL FOR ALL LIGHT FIXTURE SYMBOLS)
LED FIXTURE, RECESSED, PENDANT OR SURFACE CEILING
FIXTURE TYPE
LOWER CASE LETTER INDICATES CONTROLLING SWITCH
a
CIRCUIT NUMBER
LED, WALL MOUNTED LUMINAIRE
J WALL MOUNTED FURNITURE FEED POWER CONNECTION. '#' REPRESENTS NUMBER OF
WORKSTATIONS POWERED BY FEED.
GROUND BUS BAR, COPPER
SYMBOL SYMBOL
WALL MOUNTED JUNCTION BOXJ LPP LIGHTING POWER PACK RELAY
a
SUBSCRIPT INDICATES CONTROLLING SWITCH AND FIXTURES CONTROLLED (TYPICAL)
LPD LIGHTING POWER PACK RELAY WITH 0-10V DIMMING
LPDE EMERGENCY LIGHTING POWER PACK RELAY - UL924 COMPLIANT AND 0-10V DIMMING
METER, ONE-LINE
ELECTRICAL ONE-LINE
ALARM, SPEAKER/LIGHT, ONE ASSEMBLY. ADJUSTABLE
15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
P(#)
J WALL MOUNTED FURNITURE FEED TELEPHONE/DATA CONNECTION. '#' REPRESENTS NUMBER OF
WORKSTATIONS POWERED BY FEED.
T/D(#)
WORK AREA TCO, COMBINATION TELEPHONE/DATA COMMUNICATION OUTLET - 2
DATA PORT FACE PLATE WITH 2 DATA PORTS - (1) CAT6A CABLE PER PORT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
V
A S a le m R e n o v a te
S h e ll
S p a c e /0
V A
M C
S a le m S h e ll
S p a c e
R M
E P
F A
F P
T .r v t
/3
/2
:2 :4
P
M
E-001
ELECTRICAL LEGENDS &
SYMBOLS
RENOVATE SHELL SPACE
1970 ROANOKE BLVD
SALEM, VA 24153
658-22-104
03 APRIL 2024 TDB SDL
CONSTRUCTION
DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
E-100 FIRST FLOOR PARTIAL OVERALL
ED101 FLOOR PLAN - LIGHTING - DEMOLITION
ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMOLITION
EL101 FLOOR PLAN - LIGHTING - NEW WORK
EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
ELECTRICAL GENERAL NOTES
WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2023
b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2022
c. LIFE SAFETY CODE, NFPA 101 – 2021
d. EMERGENCY AND STANDBY POWER SYSTEMS, NFPA 110 – 2022
e. HEALTH CARE FACILITIES CODE, NFPA 99 - 2024
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2
3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
4. FACILITY GUIDELINES INSTITUTE (FGI):
a. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT FACILITIES
5. FEDERAL COMMUNICATION COMMISSION (FCC)
6. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
7. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
8. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
9. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
10. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
11. ILLUMINATION ENGINEERING SOCIETY (IES)
12. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)
13. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)
14. INTERNATIONAL CODE COUNCIL (ICC):
a. INTERNATIONAL BUILDING CODE (IBC)
15. UNIFORM BUILDING CODE (UBC)
16. COMBINED ANSI/ASHRAE/IES STANDARD 90.1 – “ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL
BUILDINGS”
17. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)
18. AMERICANS WITH DISABILITIES ACT (ADA)
19. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.
20. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE
a. AUTHORITIES HAVING JURISDICTION (AHJs).
21. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.
1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT
ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.
2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND
ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
3. INCLUDE ALL COSTS FOR EXCAVATION, SAW CUTTING, SURFACE RESTORATION, REPAIR OF FINISHES, ETC. THAT IS
REQUIRED IN ORDER TO MEET THE PROJECT REQUIREMENTS.
4. INCLUDE IN BID ALL COSTS ASSOCIATED WITH TEMPORARY ELECTRICAL SERVICE AS REQUIRED FOR USE BY ALL TRADES DURING CONSTRUCTION. REMOVE TEMPORARY POWER AT THE COMPLETION OF THE PROJECT. OBTAIN AND PAY FOR ALL REQUIRED PERMITS FOR TEMPORARY POWER. ENGINEER OF RECORD SHALL BE PROVIDED WITH ADDITIONAL COMPENSATION FROM THE CONTRACTOR WHERE SIGNED & SEALED DRAWINGS ARE REQUESTED BY THE CONTRACTOR TO THE ENGINEER OF RECORD IF REQUIRED BY THE AHJ FOR THE TEMPORARY POWER.
5. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH NORTH CAROLINA STATUTES REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN
CERTIFICATION OF ACCEPTED DISPOSAL.
6. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS ARE NOT ALLOWED
UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.
7. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL MECHANICAL, PLUMBING AND FIRE PROTECTION EQUIPMENT PRIOR TO SUBMITTAL OF SHOP DRAWINGS OF ELECTRICAL EQUIPMENT.
PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS, BOXES, EQUIPMENT, ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS, CONTROL TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL REQUIRED, UNLESS OTHERWISE NOTED.
8. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT OF WORK. AVOID INTERFERENCES WITH
THE PROGRESS OF OTHER DIVISIONS/TRADES.
9. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS
INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA.
10. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS AND DETAILS.
COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.
11. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR RELATED INFORMATION AND ADDITIONAL INSTALLATION REQUIREMENTS TO BE PERFORMED AS PART OF THE WORK. REFER TO ARCHITECTURAL ELEVATIONS
FOR EXACT MOUNTING HEIGHT AND LOCATIONS.
12. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
13. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR
PHASING.
14. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN WRITING BY THE OWNER AND SCHEDULED IN
ADVANCE.
15. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO
PROCEEDING WITH REPAIRS.
16. COORDINATE THE LOCATION OF ALL LIGHT FIXTURES, DEVICES AND BOXES WITH WINDOWS, MIRRORS, MILLWORK, CABINETS, GLASS CURTAIN WALLS, AND GLASS WALLS PRIOR TO INSTALLATION OF CONDUITS OR BOXES. REVIEW ALL CONTRACT DRAWINGS TO ASCERTAIN ANY CONFLICTS PRIOR TO BIDDING. OBTAIN CLARIFICATION FROM A/E PRIOR TO BID. CONTRACTOR SHALL NOT BE ENTITLED TO ADDITIONAL COMPENSATION FOR WORK REQUIRED TO
RELOCATE OUTLET BOXES OR RACEWAYS FOR COORDINATION WITH OTHER TRADE'S WORK.
17. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL
APPURTENANCES IN ACCORDANCE WITH NEC.
18. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNAGE REQUIRED DURING THE
PROJECT CONSTRUCTION PHASE.
19. THE INFRASTRUCTURE FOR THE ACCESS CONTROL/ CCTV OR SECURITY ELECTRONICS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE ACCESS CONTROL/CCTV OR SECURITY ELECTRONICS SYSTEM CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT. INSTALLATION OF THE CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE ACCESS CONTROL/ CCTV SYSTEM CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY
LOCATIONS, SIZES AND QUANTITY, CONDUIT STUB-UPS PRIOR TO ROUGH IN.
20. THE INFRASTRUCTURE FOR THE VOICE/DATA TELECOMMUNICATIONS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE TELECOMMUNICATIONS CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT AND COMPONENTS. INSTALLATION OF THE CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE TELECOMMUNICATIONS CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY LOCATIONS, SIZES AND QUANTITY, CONDUIT
STUB-UPS PRIOR TO ROUGH IN.
21. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L.
LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED
WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY.
22. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, TO THE
SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.
23. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS.
This is the start of the file's text. The full file is on GovTribe.