Salem VAMC_Renovated Shell Space_658-22-104_Drawings Bid Docs_251222.pdf

PDF 7 MB Posted

Attached to
Z1DA--RENOVATE SHELL SPACE (658-22-104)
Solicitation number
36C24626B0015
Issued by

About this file

These documents are construction documents for a VA Medical Center shell space renovation project located at 1970 Roanoke Blvd in Salem, VA. The project involves renovating an existing open workspace by installing 17 workstations and associated electrical, mechanical, and architectural modifications. The renovation will utilize existing infrastructure, including an air handling unit (BB4) serving the space, with minimal changes to the overall building systems.

Key technical details include installing new pendant lighting fixtures (types P1 and P2) with integral daylight and occupancy sensors, new electrical connections for workstations, and a new notification appliance (NAC) panel. The project is fully sprinklered and follows VA construction standards, with work conducted under VA Office of Construction and Facilities Management. The construction documents are dated 03 April 2024, with a project number of 658-22-104, and were prepared by Above Group architecture and engineering firm. The renovation aims to modernize the workspace while maintaining existing building systems and compliance with applicable VA and national building codes.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION

SUBSYSTEM

BUILDING WALL

SECTION

ELEVATION

INTERIOR

ELEVATION

DOORS

ROOM NUMBER

EXTERIOR AND

INTERIOR WINDOWS

PLAN & SECTION

DETAIL REFERENCE

REFERS TO A TYPICAL

ASSEMBLY

LOCATION ON DRAWING

SHEET

SHEET DETAIL IS

LOCATED

REFERS TO NUMBER ON DOOR

SCHEDULE, SEE SHEET A401

REFERS TO NUMBER ON

FLOOR PLAN

REFERS TO FRAME TYPE, SEE

ENLARGED ELEVATIONS ON SHEET A402

LOCATION ON

DRAWING SHEET

ARROW INDICATES DIRECTION OF

ELEVATION

SHEET LOCATION WHERE

ELEVATION IS LOCATED

Room name

A101

SIM

NUMBER INDICATES ELEVATION

ON SHEET

LOCATION ON

DRAWING SHEET

101A

A101

A101

PARTITION

TYPES

REFERS TO INTERIOR PARTITIONS,

SEE SHEET G004

REVISION

REVISIONS ARE SHOWN WITHIN

"CLOUDED" AREA REVISION

NUMBER & DATE WILL APPEAR IN

TITLE BLOCK SPACE SO LABELED

SHEET LOCATION WHERE

ELEVATION IS LOCATED

A101

DEMOLITION NOTE

REFERS TO DEMOLITION

NOTES ON THAT SHEET

X

CONSTRUCTION NOTE REFERS TO CONSTRUCTION

NOTES ON THAT SHEET

X

EXTERIOR AND

INTERIOR STOREFRONT

REFERS TO FRAME TYPE, SEE

ENLARGED ELEVATIONS ON SHEET A40200

SF

REFERS TO EXISTING GRID

LINES IN PROJECT

REFERS TO NEW GRID LINES

EXISTING GRID LINE

NEW GRID LINE

DRAWING LIST

SHEET # SHEET TITLE

GENERAL

G001 COVER SHEET

G002 LIFESAFETY, ABBREVIATIONS & CODE NOTES

ARCHITECTURAL

A101 FIRST FLOOR DEMO , NEW WORK AND REFLECTED CEILING PLAN

MECHANICAL

M-001 MECHANICAL NOTES. LEGEND, & SYMBOLS

M-101 FLOOR PLAN - MECHANICAL - NEW WORK

ELECTRICAL

E-001 ELECTRICAL LEGENDS & SYMBOLS

E-002 ELECTRICAL GENERAL NOTED

E-100 FIRST FLOOR PARTIAL OVERALL

ED101 FLOOR PLAN - LIGHTING DEMO

ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMO

EL101 FLOOR PLAN - LIGHTING - NEW WORK

EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL DIAGRAMS

SITE MAP SYMBOLS

IMAGE: GOOGLE EARTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /2

V

A S a le m R e n o v a te

S h e ll S p a c e

/2

V

A S a le m R e n o v a te

S h e ll

S p a c e

.r v t

/3

/2

:2

:0

P

M

G001

COVER SHEET Renovate Shell Space

1970 ROANOKE BLVD

SALEM, VA 24153

658-22-104

03 APRIL 2024 TB JC

CONSTRUCTION

DOCUMENTS

1970 ROANOKE BLVD

SALEM, VA 24153

Revisions: Date:

Salem VA Medical Center Renovate Shell Space

LaShaun Key Stamp

UP

ABBREVIATIONS:

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/E ARCHITECT/ENGINEER

ABV ABOVE

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADH ADHESIVE

ADJ ADJACENT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATE

ARCH ARCHITECT

ASB ASBESTOS

ASPH ASPHALT

ASSN ASSOCIATION

AUTO AUTOMATIC

AUX AUXILIARY

BAT BATTEN

BD BOARD

BEV BEVEL

BKG BACKING

BLDG BUILDING

BOT BOTTOM

BTWN BETWEEN

C TO C CENTER TO CENTER

CAB CABINET

CONC CONCRETE

CIR CIRCLE

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

COL COLUMN

CONC FLR CONCRETE FLOOR

CONSTR CONSTRUCTION

CONT CONTINUE

COORD COORDINATE

CPT CARPET OR CARPET TILE

CSWK CASEWORK

CT CERAMIC TILE

CTRL CONTROL

DAT DATUM

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DTL DETAIL

DIFF DIFFERENCE

DIM DIMENSION

DIR DIRECTION

DR DOOR, OR DRAIN

DR OPNG DOOR OPENING

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMO MEMORANDUM

MEZZ MEZZANINE

MID MIDDLE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MO MASONRY OPENING

MTL METAL

MULL MULLION

NA NOT APPLICABLE

NAT NATURAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NUM NUMERAL

OC ON CENTER

OCC OCCUPY

OFF OFFICE

OPNG OPENING

OPP OPPOSITE

OSHA OCCUPATIONAL SAFETY

AND HEALTH ADMINSTRATION

OZ OUNCE

PART PARTIAL

PAT PATTERN

PEN PENETRATE

PERF PERFORATED

PERP PERPENDICULAR

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL

PRB PROFILE BASE

PRCST PRECAST

PREFAB PREFABRICATE

PRELIM PRELIMINARY

PREP PREPARATION

PREV PREVIOUS

PROP PROPERTY

PTD PAINTED

PVC POLYVINYL CHLORIDE (PLASTIC)

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QT QUARRY TILE

QTB QUARRY TILE BASE

QTR QUARTER

QTY QUANTITY

R RADIUS OR RISER

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RBR RUBBER

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

E.J. EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC

ELEV ELEVATOR

EMER EMERGENCY

ENGR ENGINEER

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ESP ESPECIALLY

EXIST EXISTING

FA FIRE ALARM

FAS FASCIA

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FLR FINISH FLOOR

FIXT FIXTURE

FLR FLOOR

FP FIRE PROTECTION OR FIREPROOF

FRT FIRE RETARDANT TREATED

FRZ FREEZER

FT FEET OR FOOT

FURN FURNISH OR FURNITURE

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENERAL OR GENERATOR

GL GLASS

GLU LAM GLUED LAMINATED WOOD

GT GROUT

GYP GYPSUM

GYP BD GYPSUM BOARD

HB HOSE BIBB

HC HOLLOW CORE

HDWD HARDWOOD

HM HOLLOW METAL

HT HEIGHT

HVAC HEATING, VENTILATING,

AND AIR CONDITIONING

ID IDENTIFICATION

ILLUM ILLUMINATION

INCL INCLUDED

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

JAN JANITOR

J-BOX JUNCTION BOX

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LDR LEADER

LED LIGHT EMITTING DIODE

LT LIGHT

LVD LOUVERED

LVR LOUVER

LVT LUXURY VINYL TILE

LYR LAYER

REINF REINFORCE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RESIL RESILIENT

RET RETURN

REV REVISION

RF RUBBER FLOORING

RM ROOM

RND ROUND

RO ROUGH OPENING

SALV SALVAGE

SBSTR SUBSTRATE

SCHED SCHEDULE

SCHEM SCHEMATIC

SECT SECTION

SEP SEPARATE

SF SQUARE FOOT (FEET)

SLNT SEALANT

SMK SMOKE

SPEC SPECIFICATION

SPKLR SPRINKLER

SPLY SUPPLY

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SURF SURFACE

SUSP SUSPEND

SVT SOLID VINYL FLOOR TILE

SYS SYSTEM

T&G TONGUE AND GROOVE

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

THK THICKNESS

THRU THROUGH

TMPD TEMPERED

TO TOP OF ___

TRANS TRANSOM

TRTD TREATED

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

UV ULTRAVIOLET

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VOL VOLUME

W/ WITH

W/O WITHOUT

WD WOOD

WSCT WAINSCOT

WSF WELDED SEAM SHEET FLOORING

WT WEIGHT

A. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION

THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE

FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE

MODERNIZATION, ALTERATION, ADDITION OR IMPROVEMENT OF ITS REAL PROPERTY AND THE

CONSTRUCTION OF NEW STRUCTURE.

a. NFPA 101 LIFE SAFETY CODE, 2021 EDITION

b. NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900)

c. NATIONAL ELECTRIC CODE (NEC)

d. INTERNATIONAL PLUMBING CODE (IPC)

e. ASME BOILER AND PRESSURE VESSEL CODE

f. ASME CODE FOR PRESSURE PIPING

g. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

h. ENERGY POLICY ACT (EPAct)

i. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL)

j. INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN SPECIFICALLY REFERENCE IN VA

DESIGN DOCUMENTS

k. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

l. PHYSICAL SECURITY DESIGN MANUAL (PSDM)

3. RENOVATION TO EXISTING SUITE. REMOVAL OF PARTIAL HEIGHT PARTITION WITHIN

OPEN AREA FOR THE INSTALLATION OF 17 WORKSTATIONS.

NFPA 101 REVIEW

B. CHAPTER 39 EXISTING BUSINESS OCCUPANCIES

1. (39.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS OR

PORTIONS THEREOF USED AS BUSINESS OCCUPANCIES.

C. MEANS OF EGRESS - CHAPTER 39 AND CHAPTER 7

1. THERE IS NO CHANGE TO THE EXISTING SUITE EXITING.

D. FIRE PROTECTION EQUIPMENT - CHAPTER 39 AND CHAPTER 9

1. THE EXISTING SPACE IS FULLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM.

2. (39.3.5) EXTINGUISHMENT REQUIREMENTS. PORTABLE FIRE EXTINGUISHERS SHALL BE

PROVIDED IN EVERY BUSINESS OCCUPANCY IN ACCORDANCE WITH SECTION 9.9.

A. (9.9) WHERE REQUIRED BY ANOTHER SECTION OF THIS CODE, PORTABLE FIRE

EXTINGUISHERS SHALL BE SELECTED, INSTALLED, INSPECTED, AND MAINTAINED IN

ACCORDANCE WITH NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS.

E. INTERIOR FINISHES - CHAPTER 39 AND SECTION 10.2

1. (39.3.3.2.1) INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING WITH SECTION 10.2

SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS.

CODE NOTES:

OFFICE

IC-129E

OPEN

WORKSPACE

IC-129R

OFFICE

IC-129Q

OFFICE

IC-129L

MECHANICAL

IB-120

CONFERENCE

IC-129J

CORRIDOR

IC-129K

EQUIP STORAGE

IC-128A

TOILET

IC-129F

TOILET

IC-129G

OFFICE

IC-129H

TRAVEL DISTANCE TO EXIT = 181'-10"16 1

6TRAVEL DISTANCE TO EXIT = 228'-10"

16 70" 350 16 34" 170

FEC

16P

KEY PLAN

PROJECT AREA

EXIT SIGN

LIFESAFETY LEGEND:

1 HOUR RATED FIRE PARTITION

2 HOUR RATED FIRE PARTITION

EXIT ACCESS TRAVEL DISTANCE

FIRE EXTINGUISHER IN CABINETFEC

CUMULATIVE OCCUPANT LOAD00

XX 00" XXX EXIT INFORMATION

MAX. NO. PERSON EXIT ALLOWS

EXIT WIDTH IN INCHES

ACTUAL OCCUPANT LOAD

OCCUPANT LOAD5P5P

1 HOUR SMOKE RATED PARTITION

NOT IN SCOPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /2

V

A S a le m R e n o v a te

S h e ll S p a c e

/2

V

A S a le m R e n o v a te

S h e ll

S p a c e

.r v t

/3

/2

:2

:0

P

M

G002

LIFESAFETY, ABBREVIATIONS &

CODE NOTES

Renovate Shell Space

1970 ROANOKE BLVD

SALEM, VA 24153

658-22-104

03 APRIL 2024 TB JC

CONSTRUCTION

DOCUMENTS

Revisions: Date:

1/8" = 1'-0"G002

FIRST FLOOR LIFE SAFETY PLANC4

N

PROJECT

NORTH

LaShaun Key Stamp

A. PATCH AND REPAIR ALL GYPSUM BOARD SURFACES WHERE DEMOLITION

OF ADJOINING OR INTERSECTING PARTITIONS HAS RESULTED IN LESS

THAN A FINISHED CONDITION. PATCHES SHALL BE FLUSH AND SMOOTH.

B. EXISTING ROOMS THAT ARE NOT INDICATED TO BE AFFECTED BY THE

WORK ARE TO BE PROTECTED FROM DAMAGE AND/OR PAINT

DEGRADATION. SHOULD THE GENERAL CONTRACTOR AFFECT THE

CONDITION OR FINISH OF THESE ROOMS, THE SURFACE OR SPACE SHALL

BE RESTORED TO ORIGINAL CONDITION.

C. REFERENCE DRAWING A00X FOR GENERAL DEMOLITION PLANS. VERIFY

ALL DIMENSIONS TO EXISTING ELEMENTS.

D. NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES BETWEEN

EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS BEFORE

PROCEEDING WITH THAT PORTION OF THE WORK. FAILURE TO NOTIFY

THE ARCHITECT WILL NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY TO PERFORM THE WORK AS INTENDED BY THE

CONTRACT DOCUMENTS.

E. VERIFY EXISTING DIMENSIONS, CONDITIONS AND CLEARANCES PRIOR TO

THE SUBMISSION OF SHOP DRAWINGS.

GENERAL FLOOR PLAN NOTES:

D6

A101

1 2 3 4

5 6 7 8

CORRIDOR

IC-129K

EQUIP STORAGE

IC-128A

TOILET

IC-129F

TOILET

IC-129G

OFFICE

IC-129H

CONFERENCE

IC-129J

OPEN

WORKSPACE

IC-129R

WORKSTATIONS NIC

CPT 1

121110

14 15 16

CPT 1

VB 1

VB 1

VB 1

VB 1

VB 1

VB 1

VB 1

VB 1

VB 1

CPT 1

CPT 1

VB 1

VB 1

KEY PLAN

PROJECT AREA

NEW CONSTRUCTION LEGEND:

EXISTING CONSTRUCTION TO REMAIN

1 HOUR FIRE RESISTANCE RATED FIRE BARRIER

FIRE EXTINGUISHERE

EQ EQ

DIMENSIONAL CENTERLINE

NOT IN SCOPE

NOTE: EXISTING GLASS

PARTITION FRAMING AND

SLIDING DOORS TO REMAIN

OPEN

WORKSPACE

IC-129R

CONFERENCE

IC-129J

OFFICE

IC-129H

TOILET

IC-129G

TOILET

IC-129F

CORRIDOR

IC-129K

D6

A101

EQUIP STORAGE

IC-128A

TOILET

IC-129F

TOILET

IC-129G

OFFICE

IC-129H

CONFERENCE

IC-129J

7' -1

1/

2" 7'

-9

/2

7' -9

/2

7'

-9

/2

7' -8

/8

PENDANT MTD LIGHT

FIXTURES SUSPENDED

FROM STRUCTURE ABOVE

EXISTING CEILING

STRIP LIGHT

EXISTING CEILING

STRIP LIGHT

A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS

IN THE FIELD AND COORDINATE ALL REMOVAL ACTIVITIES

WITH NEW CONSTRUCTION. THE CONTRACTOR SHALL

REPORT ALL DISCREPANCIES TO THE OWNER'S

REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING

REMOVALS.

B. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE

DURING REMOVAL OF ADJACENT CONSTRUCTION.

REPAIR/REPLACE CONSTRUCTION TO REMAIN THAT WAS

DAMAGED DURING DEMOLITION TO MATCH THE QUALITY OF

THE NEW WORK. PROVIDE DUST CONTROL AND CONTAINMENT

MATS, FLOOR AND WALL PROTECTION.

C. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS

WHERE WORK MUST BE ACCOMPLISHED UNDER THIS

CONTRACT. INCIDENTAL WORK MAY ALSO BE NECESSARY IN

AREAS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS DUE

TO CHANGES AFFECTING EXISTING ELECTRICAL, OR OTHER

SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A PART OF THE

CONTRACT. CONTRACTOR SHALL INSPECT THOSE AREAS

AND ASCERTAIN WORK NEEDED AND DO THAT WORK IN

ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND AT

NO ADDITIONAL COST TO THE OWNER.

D. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS,

COLUMNS OR OTHER STRUCTURAL ELEMENTS UNLESS

SPECIFICALLY NOTED. MAKE OPENINGS OF PROPER SIZE FOR

CONDUITS AND PIPING AND OTHER ITEMS PASSING THROUGH

OPENINGS.

E. GC TO SCAN THE SLAB AT EA LOCATION OF PROPOSED

FLOOR/SLAB PENETRATION PRIOR TO CUTTING TO ENSURE

THAT AREA IS CLEAR OF EMBEDDED CONDUITS AND/OR LIVE

CONDUCTORS.

F. REPAIR, PATCH AND FINISH, OR REFINISH AS APPLICABLE, TO

MATCH ADJACENT EXISTING FINISHES DAMAGED OR NEWLY

EXPOSED DURING THE PERFORMANCE OF THE WORK OF THIS

CONTRACT.

G. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF

EXISTING FINISHES IS REQUIRED TO PERFORM THE WORK

UNDER THIS CONTRACT, AND A NEW FINISH IS NOT

INDICATED, FILL RESULTING OPENINGS AND PATCH THE

SURFACE AFTER DOING THE WORK, AND FINISH TO MATCH

ADJACENT EXISTING SURFACES.

H. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL

CONDUITS AND PIPING IN EVERY CASE ABOVE THE CEILING.

REMOVE EXISTING CEILING AS NECESSARY. AFTER

INSTALLATION OF CONCEALED WORK, REINSTALL REMOVED

CEILING AND PATCH AND REFINISH TO MATCH ADJACENT UN-

REMOVED CEILINGS.

I. WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR

OTHERWISE INDICATED AS EXISTING.

J. PROVIDE HEADERS/LINTELS OVER EVERY OPENING IN BOTH

NEW AND EXISTING WALLS AND PARTITIONS.

K. WHERE "MATCH EXISTING" IS INDICATED, NEW

CONSTRUCTION OR FINISHES, AS APPROPRIATE TO THE

NOTE, SHALL MATCH THE EXISTING IN THE PARTICULAR.

GENERAL DEMOLITION NOTES:

L. DEFINITIONS

M1. REMOVE: REMOVE AND LEGALLY DISPOSE OF

ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED,

SALVAGED, OR EXISTING.

M2. SALVAGE: ITEMS INDICATED TO BE SALVAGED

SHALL REMAIN THE OWNER'S PROPERTY. REMOVE,

CLEAN AND PACK OR CRATE ITEMS TO PROTECT

AGAINST DAMAGE. IDENTIFY CONTENTS OF

CONTAINERS AND DELIVER TO OWNER'S DESIGNATED

STORAGE AREA.

M3. REINSTALL: REMOVE ITEMS INDICATED. CLEAN

SERVICE AND OTHERWISE PREPARE THEM FOR REUSE.

STORE AND PROTECT AGAINST DAMAGE. REINSTALL

ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS

INDICATED.

M4. EXISTING: ORIGINAL ITEM TO REMAIN. PROTECT

CONSTRUCTION INDICATED AS EXISTING AGAINST

DAMAGE AND SOILING DURING SELECTIVE DEMOLITION.

M5. RESTORE: ITEMS INDICATED SHALL BE BROUGHT

BACK TO THEIR ORIGINAL CONDITION. ORIGINAL

CONDITION IS THE CONDITION THAT THE REFERENCED

ITEM WAS IN WHEN THE BUILDING WAS FIRST

CONSTRUCTED.

M6. REPLACE: EXISTING ITEM TO BE REMOVED.

PROVIDE NEW ITEM TO MATCH EXISTING.

M. CONTRACTOR TO ABIDE BY ALL THE ICRA INFECTION

CONTROL REGULATIONS.

N. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL

TIMES AND COORDINATE TRASH REMOVAL WITH THE VA.

O. TEMPORARY CONTINUOUS CONSTRUCTION BARRIER

MUST BE IN PLACE PRIOR TO ANY DEMOLITION. G.C. TO

DETERMINE LOCATION FOR TEMPORARY

CONSTRUCTION BARRIER DOOR ACCESS.

CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-

CLOSING. PROVIDE STICKY MATS ON ALL ACCESS

DOORS INTO CONSTRUCTION AREA. ANTE-ROOM

REQUIRED AT CONSTRUCTION ENTRY. PAINT PUBLIC

FACE OF TEMP BARRIER WHITE.

P. PROVIDE NANOMETER PRESSURE MONITORS FOR ALL

CONSTRUCTION BARRIERS.

Q. PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND

EXHAUST TO EXTERIOR OF THE BUILDING.

R. CONTRACTOR TO REVIEW & FOLLOW ALL ABATEMENT

REQUIREMENTS PRIOR TO THE START OF GENERAL

DEMOLITION.

S. GC TO COORDINATE WITH VA WHEN MAJOR SHUTDOWNS

ARE TO OCCUR. SHUTDOWNS WILL NEED TO OCCUR

AFTER REGULAR BUSINESS HOURS, OVERNIGHT AND

WEEKENDS AS NEEDED TO MINIMIZE IMPACT TO

PATIENTS AND STAFF.

DEMOLITION LEGEND:

TEMPORARY CONSTRUCTION BARRIER

DEMOLITION SCOPE

EXISTING WALL TO REMAIN

EXISTING DOOR TO REMAIN

DEMOLITION NOTE1

A. NEW PENDANT LIGHT FIXTURES TO BE SUSPENDED OFF THE

EXISTING STRUCTURAL ROOFING TUBE STEEL.

B. REFER TO MEP DRAWINGS FOR ADDITIONAL WORK NOT

SHOWN.

GENERAL RCP NOTES:

NO CEILING

EXIT SIGN

1 HOUR RATED FIRE BARRIER

RCP LEGEND:

PENDANT LIGHTING

PENDANT LIGHT FIXTURES TO

BE MOUNTED TO BEAM ABOVE.

9'-0"

TYPICAL

PENDANT

HEIGHT

DESKS PROVIDED BY VA

INSTALLED BY CONTRACTOR

3/16" = 1'-0"A101

FIRST FLOOR PLANF4

3/16" = 1'-0"A101

FIRST FLOOR DEMOLITION PLANF1

3/16" = 1'-0"A101

FIRST FLOOR RCPF6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /2

V

A S a le m R e n o v a te

S h e ll S p a c e

/2

V

A S a le m R e n o v a te

S h e ll

S p a c e

.r v t

/1 /2

:2

:5

A M

A101

FIRST FLOOR DEMO , NEW WORK

AND REFLECTED CEILING PLAN

Renovate Shell Space

1970 ROANOKE BLVD

SALEM, VA 24153

658-22-104

03 APRIL 2024 TB JC

BID DOCUMENTS

Revisions: Date:

1/4" = 1'-0"A101

OPEN WORKSPACE SECTIOND6

N

PROJECT

NORTH

DEMOLITION NOTES

1 EXISTING CARPET TILE TO BE REMOVED IN ITS ENTIRITY.

REMOVE ADHESIVE AND PREPARE FLOORING TO RECEIVE

NEW FINISH

2 DEMOLISH STOREFRONT FRAMING, GLASS, AND OVERHEAD

BRACING TO THE EXTENT SHOWN

FLOOR FINISHES

KEY FINISH MATERIAL MANUF. ITEM NUMBER/COLOR/FINISH SIZE NOTES

CPT 1 CARPET TILE 1 FORBO FLOTEX LINEAR TILE / CIRRUS /t57007 mint 20"x20"

VB 1 6" VINYL BASE JOHNSONITE TRADITIONAL VINYL 1/8"/ TA4 GATEWAY 6"

EXPANSION OF PROJECT AREA 12.19.2025

SPININ TAKE-OFF

RECTANGLE-TO-ROUND TAKE-OFF

DNUP

TRANSITION, SQUARE TO ROUND

CEILING EXHAUST

CEILING RETURN

STANDARD BRANCH TAKE-OFF

RADIUS ELBOW

TRANSITION, ECCENTRIC

FLEXIBLE DUCT

CHANGE OF ELEVATION

TRANSITION, CONCENTRIC

SQUARE THROAT ELBOW W/ TURNING VANES

RECTANGULAR / ROUND BRANCH TAKE-OFF

OR ROUND / ROUND BRANCH TAKE-OFF

SQUARE THROAT TEE W/ TURNING VANES

RADIUS TEE

SUPPLY DIFFUSER OR GRILLE

(VERTICAL MOUNT, SIDEWALL)

RETURN / EXHAUST REGISTER OR GRILLE

(VERTICAL MOUNT, SIDEWALL)

CEILING DIFFUSER, ROUND NECK

(CEILING DIFFUSERS ARE 4-WAY THROW UNO)

CEILING DIFFUSER, RECTANGULAR OR SQUARE

NECK (CEILING DIFFUSERS ARE 4-WAY THROW

UNO)

HVAC ABBREVIATIONSHVAC SYMBOL LEGEND

SYMBOL DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL SYMBOL DESCRIPTION

BASIC MATERIALS

MANUAL BALANCING DAMPER

MOTOR OPERATED CONTROL DAMPER

(MOD)

FLEXIBLE CONNECTION

ACCESS DOORS, VERTICAL OR

HORIZONTAL

DOOR GRILLE

UNDERCUT DOOR

DUCT ELBOW, RETURN AIR

DUCT ELBOW, EXHAUST AIR

DUCT ELBOW, SUPPLY OR OUTSIDE AIR

NEW DUCTWORK, FIRST DIMENSION IS

SIDE SHOWN

HUMIDISTAT / HUMIDITY SENSOR

THERMOSTAT / TEMPERATURE SENSOR

DUCT SMOKE DETECTOR

T

H

DOWN UP

UC

CONNECT TO EXISTING

DEMOLISH TO POINT INDICATED

HUMIDITY SENSOR (DUCT MOUNTED)H

CARBON DIOXIDE SENSORCO2

FIRE DAMPER (WITH ACCESS PANEL)

SMOKE DAMPER (WITH ACCESS PANEL)

EXISTING TO BE REMOVED (HEAVY, DASHED LINE)

EXISTING TO REMAIN (THIN, HALFTONED, SOLID LINE)

NEW (HEAVY, SOLID LINE)

VIEW NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

H1

H1

A

SHEET NUMBER

DRAWING SYMBOLS

REVISION REFERENCE1

SHEET NOTE CALLOUT1

EQUIPMENT WITH MANUFACTURER'S CLEARANCE

SHOWN IN DASHED LINES

EQUIPMENT

1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE

COMPONENTS INDICATED IN DETAILS, RISER DIAGRAMS, CONTROL DIAGRAMS, AND/OR FLOW

DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR

CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND

APPLICABLE SPECIFICATIONS, NOTIFY THE COR IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE

MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH

APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN

STANDARDS SHALL GOVERN.

2. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.

TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

3. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR

FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH

AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO

OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.

4. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC

DUCT CONSTRUCTION STANDARD.

5. INSTALL ALL FIRE DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS IN

ACCORDANCE WITH MANUFACTURE'S INSTALLATION DIRECTIONS. PROVIDE ACCESS DOORS TO

ALLOW COMPLETE INSPECTION AND MAINTENANCE OF ALL DEVICES.

6. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED

CEILING PLANS AND EQUIPMENT OF ALL TRADES.

7. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.

8. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE

PAINTED FLAT BLACK.

9. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.

10. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR

OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.

11. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO

FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

12. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS

AND OTHER AIR DISTRIBUTION DEVICES.

13. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE

CONNECTED.

14. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.

15. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

16. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.

17. VENT PIPING SHOWN IS ONLY FOR DIAGRAMMATIC PURPOSES. COORDINATE VTRS WITH HVAC AIR

INTAKES.

GENERAL NOTES

24x12

SD

FD

MOD

VD

APPLICABLE CODES

1. VA HVAC DESIGN MANUAL (HVACDM) REV. NOVEMBER 1, 2023

2. VA PLUMBING DESIGN MANUAL 2023 EDITION

3. INTERNATIONAL BUILDING CODE (IBC) 2021 EDITION

A. INTERNATIONAL MECHANICAL CODE (IMC) 2021 EDITION

B. INTERNATIONAL PLUMBING CODE (IPC) 2021 EDITION

C. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2021 EDITION

4. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE):

A. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1) 2022 EDITION

B. ENERGY STANDARD FOR BUILDINGS (ASHRAE 90.1) 2022 EDITION

C. VENTILATION OF HEALTH CARE FACILITIES (ASHRAE 170) 2021 EDITION

5. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):

A. NATIONAL ELECTRICAL CODE (NEC) 2023 EDITION

B. NATIONAL FIRE ALARM CODE (NFPA 72) 2022 EDITION

C. STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS (NFPA 90A)

2021 EDITION

D. STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS

(NFPA 90B) 2021 EDITION

E. HEALTH CARE FACILITIES CODE (NFPA 99) 2021 EDITION

F. LIFE SAFETY CODE (NFPA 101) 2021 EDITION

6. APPLICABLE PUBLICATIONS INCLUDING BUT NOT LIMITED TO:

A. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)

B. AMERICANS WITH DISABILITIES ACT (ADA)

C. AIR-CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE (AHRI)

D. AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)

E. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

F. ASSOCIATION FOR RUBBER PRODUCTS MANUFACTURERS (ARPM)

G. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)

H. MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY, INC. (MSS)

I. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

J. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)

DESCRIPTIONDESCRIPTION

A/E ARCHITECT / ENGINEER

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

AHU AIR HANDLING UNIT

AP ACCESS PANEL

APPROX APPROXIMATE

ASTM AMERICAN STANDARDS TESTING MATERIALS

BAS BUILDING AUTOMATION SYSTEM

BHP BRAKE HORSEPOWER

BFV BUTTERFLY VALVE

BTU BRITISH THERMAL UNIT

CAV CONSTANT AIR VOLUME

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CO CLEAN OUT

COR CONTRACTING OFFICER'S REPRESENTATIVE

CU CONDENSING UNIT

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DN DOWN

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATING

EQUIP EQUIPMENT

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

EWT ENTERING WATER TEMPERATURE

EX EXISTING

ºF DEGREES FAHRENHEIT

FAS FIRE ALARM SYSTEM

FD FLOOR DAMPER

FE FLUE EXHAUST

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

FT FEET

GPM GALLONS PER MINUTE

HP HORSEPOWER

HR HOUR

HZ HERTZ

IN INCHES

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTUs PER HOUR

MCA MINIMUM CIRCUIT AMPS

MIN MINIMUM

MOD MOTORIZED CONTROL DAMPER

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OA OUTSIDE AIR

OAT OUTSIDE AIR TEMPERATURE

PSI POUNDS PER SQUARE INCH

PSIG PSI GAUGE

PVC POLYVINYL CHLORIDE PIPE

RA RETURN AIR

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RTU ROOFTOP AIR CONDITIONING UNIT

SA SUPPLY AIR

SF SQUARE FEET

SP STATIC PRESSURE

SPEC SPECIFICATION

TA TRANSFER AIR

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U/G UNDERGROUND

V/PH VOTS/PHASE

VA U.S. DEPARTMENT OF VETERANS AFFAIRS

VAV VARIABLE AIR VOLUME

W WATTS

W/ WITH

WB WET BULB

NOTE: SOME SYMBOLS AND ABBREVIATIONS SHOWN MAY NOT PERTAIN TO THIS PROJECT

2-AHU-3-1

26-TU-1-5

TYPICAL UNIT NUMBER; AHU NO. 1, LOCATED ON LEVEL 3, LOCATED IN BLDG. 2

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

AHU NUMBER

EQUIPMENT ABBREVIATION. AN "EX" SHOWN IN FRONT OF EQUIPMENT TAGS

NOTIFIES THAT EQUIPMENT IS EXISTING.

ITEM NUMBER

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NUMBER

BUILDING NO. WHERE EQUIPMENT IS LOCATED

S1 200

DEVICE MARK AND NUMBER (S = SUPPLY, R = RETURN, E = EXHAUST)

DEVICE FLOW RATE (CFM)

12X10 SA

INTERIOR DUCT DIMENSIONS IN INCHES. FIRST DIMENSION IS SIDE SHOWN.

TYPICAL AIR DISTRIBUTION DEVICE TAG

TYPICAL DUCTWORK TAG

SYSTEM TYPE (SA = SUPPLY AIR , RA = RETURN AIR, OA = OUTSIDE AIR,

EA = EXHAUST AIR, SS EA = STAINLESSSTEEL EXHAUST)

LEVEL EQUIPMENT LOCATED ON / LEVEL IT SERVES

TYPICAL UNIT NUMBER; TU NO. 5, SERVED BY AHU NO. 1, LOCATED IN BLDG. 26

PIPING SYMBOL LEGEND

SYMBOL DESCRIPTION

HOT WATER PIPINGHW

HOT WATER RETURN PIPINGHWR

SANITARY DRAINAGE PIPING (UNDERGROUND)SAN U/G

SANITARY DRAINAGE PIPING (ABOVE SLAB)SAN

V VENT PIPING

GATE VALVE

CHECK VALVE

BALL VALVE

PIPE END CAP

PIPE TURNING DOWN

PIPE TURNING UP

PIPE TURNING DOWN (TEE)

CLEANOUTS

CW COLD WATER PIPING

CIRCUIT SETTER VALVE

OR

PDI-"A" WATER HAMMER ARRESTER & SIZE

THERMOSTATIC MIXING VALVE

HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT

FLOW ARROW

P-TRAP

ROLL DOWN

PIPING TEE

PRESSURE REGULATING VALVE

BUTTERFLY VALVE

SYMBOL DESCRIPTION

CONTROL VALVE

BUTTERFLY VALVE

CALIBRATING BALANCING VALVE

BALL VALVE

STRAINER

UNION

CHECK VALVE

GLOBE VALVE

AUTOMATIC AIR VENT

PIPING ABBREVIATIONS

ABBR. DESCRIPTION ABBR. DESCRIPTION

AS ABOVE SLAB

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AP ACCESS PANEL

ASTM AMERICAN STANDARDS TESTING MATERIALS

AWWA AMERICAN WATER WORKS ASSOCIATION

BFP BACKFLOW PREVENTER

BS BELOW SLAB

BF BELOW FLOOR

BG BELOW GRADE

CA COMPRESSED AIR

CD CONDENSATE

CO CLEANOUT

CONN CONNECTION

CONT CONTINUOUS

CP CIRCULATING PUMP

CW COLD WATER

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNITS

DIA DIAMETER

DN DOWN

DWG DRAWING

DW DOMESTIC WATER

ECO EXTERIOR CLEANOUT

ELEV ELEVATION

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

ºF DEGREES FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FIN FINISH

FL FLOOR

FM FIRE MAIN

FPS FEET PER SECOND

FT FEET

FU FIXTURE UNITS

G NATURAL GAS

GAL GALLON(S)

GPM GALLONS PER MINUTE

GR GREASE WASTE

HB HOSE BIBB

HP HORSEPOWER

HR HOUR

HW HOT WATER

HWR HOT WATER RETURN

HZ HERTZ

IE INVERT ELEVATION

ID INTERNAL DIAMETER

IN INCHES

IPS INTERNATIONAL PIPE STANDARD

IRR IRRIGATION WATER

KW KILOWATT

LAV LAVATORY

LF LINEAR FEET

MAX MAXIMUM

MIN MINIMUM

MNTG MOUNTING

MS MOP SINK

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NSF NATIONAL SANITATION FOUNDATION

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

ORWL OVERFLOW RAIN WATER LEADER

PDI PLUMBING DRAINAGE INSTITUTE

PH PHASE

PPP PRECISION PLUMBING PRODUCTS

PSI POUNDS PER SQUARE INCH

RD ROOF DRAIN

RPM REVOLUTIONS PER MINUTE

RWL RAIN WATER LEADER

S SANITARY

SAN SANITARY

SH SHOWER

SK SINK

SL SODA LINE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

ST STORM

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TET THERMAL EXPANSION TANK

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U/G UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VENT

VTR VENT THROUGH ROOF

VIV VALVE IN VERTICAL

VLV VALVE

VOL VOLUME

W WATTS

W/ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WHA WATER HAMMER ARRESTOR

WHY WALL HYDRANT

WFU WATER SUPPLY FIXTURE UNITS

SIDEWALL SPRINKLER HEAD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

V

A S a le m R e n o v a te

S h e ll

S p a c e /0

V A

M C

S a le m S h e ll

S p a c e

R M

E P

F A

F P

T .r v t

/3

/2

:2 :3

P

M

M-001

MECHANICAL NOTES, LEGENDS, &

SYMBOLS

RENOVATE SHELL SPACE

1970 ROANOKE BLVD

SALEM, VA 24153

658-22-104

03 APRIL 2024 JMC AJZ

CONSTRUCTION

DOCUMENTS

SHEET LIST

SHEET NUMBER SHEET NAME

M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS

M-101 FLOOR PLAN - MECHANICAL - NEW WORK

Revisions Date

OPEN

WORKSPACE

IC-129R

OFFICE

IC-129Q

OFFICE

IC-129L

CORRIDOR

IC-129K

E X

O A

CONFERENCE

IC-129J

OFFICE

IC-129H

TOILET

IC-129G

TOILET

IC-129FEQUIP

STORAGE

IC-128A

OFFICE

IC-129E

EX 14001

T

EX 14001

EX 14001

EX 14001

EX 14001

EX 1400

1EX 1400

1EX 1400

1EX 1400

1EX 1400

E X x S

A

EX 28x18 SA

E X x S

A E

X x S

A

E X x O

A

E X

R A

EX VAV

AREA OF WORK

EX 1 1/2" FM

EX 1 1/2" FM

EX 1 1/2" FM

EX 1 1/2" FM

PROJECT AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

V

A S a le m R e n o v a te

S h e ll

S p a c e /0

V A

M C

S a le m S h e ll

S p a c e

R M

E P

F A

F P

T .r v t

/3

/2

:2 :3

P

M

M-101

FLOOR PLAN - MECHANICAL - NEW

WORK

RENOVATE SHELL SPACE

1970 ROANOKE BLVD

SALEM, VA 24153

658-22-104

03 APRIL 2024 JMC AJZ

CONSTRUCTION

DOCUMENTS

CODED NOTES:

DRAWING NOTES:

1. BASED ON LIMITED FIELD VERIFICATION PERFORMED BY ABOVE GROUP ON 10/12/2023, THE EXISTING

OPEN OFFICE IS CURRENTLY SERVED BY EXISTING AIR HANDLING UNIT BB4 LOCATED IN THE

MECHANICAL ROOM BELOW. THE TOTAL SUPPLY AIR VOLUME FOR THE UNIT IS 7,600 CFM BASED ON LIMITED EXISTING DOCUMENTATION FROM THE UNIT MANUFACTURER. EXISTING VENTILATION AND RETURN AIR CONDITIONS ARE UNKNOWN. BASED ON THE EXISTING CONDITIONS OBSERVED, THE SPACE FUNCTION SHALL REMAIN THE SAME. THEREFORE, THE EXISTING OPEN OFFICE VENTILATION REQUIREMENTS SHALL BE EQUAL TO THE RENOVATED OPEN OFFICE AT 2 MINIMUM OUTSIDE AIR CHANGES PER HOUR (855 CFM). REFER TO DRAWING NOTE #4 FOR PRE-DEMO TEST AND BALANCE

REPORT TO BE COMPLETED PRIOR TO START OF NEW WORK.

2. EXISTING PIPING OR EQUIPMENT REQUIRED TO REMAIN IN SERVICE WHICH IS AFFECTED BY DEMOLITION AND/OR NEW WORK INSTALLATION SHALL BE TEMPORARILY SUPPORTED, PROTECTED

AND REINSTALLED AS REQUIRED WITH APPROVAL OF THE OWNER AND AT NO ADDITIONAL

CONTRACT COST.

3. EXISTING DUCTWORK, PIPING, AND EQUIPMENT INDICATED ON THE DRAWINGS ARE BASED ON LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE OF ALL EXISTING

DUCTWORK AND PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY.

CONTRACTOR SHALL MAKE COR AWARE OF ANY DEVIATIONS OF THE EXISTING DUCTWORK, PIPING, OR EQUIPMENT INDICATED.

4. PROVIDE PRE-DEMO TEST AND BALANCE REPORT OF ALL EXISTING AIR DEVICES INDICATED ON THE DRAWINGS. IN ADDITION, PROVIDE PRE-DEMO TEST AND BALANCE FOR EXISTING AIR HANDLING UNIT BB4 AND ASSOCIATED RETURN FAN (I.E., SUPPLY, RETURN, OA) LOCATED IN THE MECHANICAL ROOM BELOW. THE REPORT SHALL INCLUDE, BUT IS NOT LIMITED TO: SUPPLY AIR TEMPERATURE, SUPPLY AIR CFM, RETURN AIR CFM, OUTSIDE AIR CFM, MOTOR HP, AND MOTOR ESP. REPORT SHALL INCLUDE AIRFLOW VALUES WITH VAV BOXES SET AT MAXIMUM COOLING, MINIMUM COOLING, AND HEATING.

PROVIDE REPORT TO THE COR/CO WITHIN 5 DAYS.

5. EXISTING FIRE PROTECTION SYSTEM SERVING THE OPEN OFFICE SHALL REMAIN ACTIVE AT ALL

TIMES.

6. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND

AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SPECIFICATIONS FOR ADDITIONAL TAB

REQUIREMENTS.

EXISTING TO REMAIN GRILLE/DIFFUSER. MECHANICAL CONTRACTOR SHALL REMOVE, CLEAN, AND

REINSTALL IN EXISTING LOCATION.

EXISTING TO REMAIN ELECTRIC WATER COOLER AND ASSOCIATED, CW, SAN, AND VENT PIPING.

EXISTING EXPOSED, INSULATED OUTSIDE AIR DUCTWORK ABOVE TO REMAIN. CONTRACTOR SHALL

PAINT EXPOSED DUCTWORK TO MATCH ROOM FINISH AS SHOWN ON ARCHITECTURAL DRAWINGS.

EXISTING OUTDOOR AIR LOUVER TO REMAIN.

RELOCATE EXISTING THERMOSTAT SERVING THE OPEN OFFICE AS INDICATED ON DRAWINGS AND

RECONNECT FOR OPERATION.

EXISTING TO REMAIN SPRINKLER HEAD.

N

0 2' 4' 8' 12'

1/4" = 1'-0"

1/4" = 1'-0"

FIRST FLOOR PLAN - MECHANICAL - NEW WORK

N.T.S.

KEY PLAN

1PH SINGLE-PHASE

3PH THREE-PHASE

4W FOUR-WIRE

A/E ARCHITECT/ENGINEER

AF AMPERE FRAME OR AMP FUSE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMP AMPERE

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BLDG BUILDING

C CONDUIT

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CKT CIRCUIT

CLG CEILING

COAX COAX CABLE

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUE

COORD COORDINATE

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CU COPPER

DB DECIBEL OR DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DISC DISCONNECT

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DS DISCONNECT SWITCH

DWG DRAWING

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

ETR EXISTING TO REMAIN

ELECTRICAL ABBREVIATIONS

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FLA FULL LOAD AMPS

FP FIRE PROTECTION

FT FEET OR FOOT

GND GROUND

G OR GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LRA LOCKED ROTOR AMPS

LTG LIGHTING

LV LOW VOLTAGE

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MLO MAIN LUGS ONLY

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT-AMPERE

MW MEGAWATT MICROWAVE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEUT OR N NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PA PUBLIC ADDRESS

PCB POLYCHLORINATED BIPHENYL

PH PHASE

PNL PANEL

POD POWER OPERATED DAMPER

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

REQD REQUIRED

SCC SHORT CIRCUIT CAPACITY

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION

AWG AMERICAN WIRE GAUGE

KCMIL ONE-THOUSAND CIRCULAR MILS

NA NOT APPLICABLE

HD HEAT DETECTOR

NEW (HEAVY, SOLID LINE)

EXISTING TO REMAIN (LIGHT, SOLID LINE)

EXISTING TO BE REMOVED (HEAVY, DASHED LINE)

ABC

PANELBOARD MAIN CIRCUIT BREAKER TYPE, ONE-LINE

### - INDICATES BREAKER RATING

ABC - INDICATES PANEL DESIGNATION

ABC

PANELBOARD MAIN LUG TYPE, ONE-LINE

### - INDICATES BUS RATING

ABC - INDICATES PANEL DESIGNATION

JUNCTION BOX

RECEPTACLE, DUPLEX

RECEPTACLE, DUPLEX ON EMERGENCY POWER

RECEPTACLE, DOUBLE DUPLEX (QUADRAPLEX)

ELECTRICAL SYMBOLS - POWER/LIGHTING PLANS

SWITCH (# SUBSCRIPT AS INDICATED BELOW) - SEE PLANS AND SPECIFICATIONS FOR DETAILS

BLANK = SINGLE POLE a= SUBSCRIPT DEFINES FIXTURES THAT ARE CONTROLLED BY SWITCH

D = DIMMER

LV= LOW VOLTAGE - SEE BELOW FOR DETAILS

J

SYMBOL DESCRIPTION DESCRIPTION

ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:

NAC = BOOSTER PANEL

NAC

DESCRIPTION

TRANSFORMER, PLANT

TRANSFORMER, ONE-LINE

M

BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, SURFACE MOUNTED

BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, SURFACE MOUNTED

LOW VOLTAGE SWITCH - SEE PLANS, SPECIFICATIONS AND WIRING DIAGRAMS FOR DETAILS

LV2Dab

S

S

SUBSCRIPT(S) INDICATE FIXTURES CONTROLLED

'D' INDICATES 0-10V DIMMING

'2' INDICATES NUMBER OF LOW VOLTAGE ZONES

'LV' INDICATES LOW VOLTAGE SWITCH

A

EXIT LIGHT, LED, WALL MOUNTED

EXIT LIGHT, LED, CEILING OR PENDANT MOUNTED; DIRECTIONAL ARROWS AS

INDICATED; SHADED QUADRANT INDICATES FACE(S) OF LUMINAIRE

LED, RECESSED, PENDANT OR SURFACE CEILING LUMINAIRE

LED, RECESSED, PENDANT OR SURFACE CEILING LIGHTING FIXTURE

SHADING INDICATES FIXTURE CONNECTED TO EMERGENCY CIRCUIT

(TYPICAL FOR ALL LIGHT FIXTURE SYMBOLS)

LED FIXTURE, RECESSED, PENDANT OR SURFACE CEILING

FIXTURE TYPE

LOWER CASE LETTER INDICATES CONTROLLING SWITCH

a

CIRCUIT NUMBER

LED, WALL MOUNTED LUMINAIRE

J WALL MOUNTED FURNITURE FEED POWER CONNECTION. '#' REPRESENTS NUMBER OF

WORKSTATIONS POWERED BY FEED.

GROUND BUS BAR, COPPER

SYMBOL SYMBOL

WALL MOUNTED JUNCTION BOXJ LPP LIGHTING POWER PACK RELAY

a

SUBSCRIPT INDICATES CONTROLLING SWITCH AND FIXTURES CONTROLLED (TYPICAL)

LPD LIGHTING POWER PACK RELAY WITH 0-10V DIMMING

LPDE EMERGENCY LIGHTING POWER PACK RELAY - UL924 COMPLIANT AND 0-10V DIMMING

METER, ONE-LINE

ELECTRICAL ONE-LINE

ALARM, SPEAKER/LIGHT, ONE ASSEMBLY. ADJUSTABLE

15CD, 30CD, 75CD UNLESS OTHERWISE NOTED

P(#)

J WALL MOUNTED FURNITURE FEED TELEPHONE/DATA CONNECTION. '#' REPRESENTS NUMBER OF

WORKSTATIONS POWERED BY FEED.

T/D(#)

WORK AREA TCO, COMBINATION TELEPHONE/DATA COMMUNICATION OUTLET - 2

DATA PORT FACE PLATE WITH 2 DATA PORTS - (1) CAT6A CABLE PER PORT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

V

A S a le m R e n o v a te

S h e ll

S p a c e /0

V A

M C

S a le m S h e ll

S p a c e

R M

E P

F A

F P

T .r v t

/3

/2

:2 :4

P

M

E-001

ELECTRICAL LEGENDS &

SYMBOLS

RENOVATE SHELL SPACE

1970 ROANOKE BLVD

SALEM, VA 24153

658-22-104

03 APRIL 2024 TDB SDL

CONSTRUCTION

DOCUMENTS

SHEET LIST

SHEET NUMBER SHEET NAME

E-001 ELECTRICAL LEGENDS & SYMBOLS

E-002 ELECTRICAL GENERAL NOTES

E-100 FIRST FLOOR PARTIAL OVERALL

ED101 FLOOR PLAN - LIGHTING - DEMOLITION

ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMOLITION

EL101 FLOOR PLAN - LIGHTING - NEW WORK

EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL DIAGRAMS

ELECTRICAL GENERAL NOTES

WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED

APPLICABLE CODES

1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):

a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2023

b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2022

c. LIFE SAFETY CODE, NFPA 101 – 2021

d. EMERGENCY AND STANDBY POWER SYSTEMS, NFPA 110 – 2022

e. HEALTH CARE FACILITIES CODE, NFPA 99 - 2024

2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):

a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2

3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

4. FACILITY GUIDELINES INSTITUTE (FGI):

a. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT FACILITIES

5. FEDERAL COMMUNICATION COMMISSION (FCC)

6. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

7. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

8. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

9. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

10. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)

11. ILLUMINATION ENGINEERING SOCIETY (IES)

12. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)

13. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)

14. INTERNATIONAL CODE COUNCIL (ICC):

a. INTERNATIONAL BUILDING CODE (IBC)

15. UNIFORM BUILDING CODE (UBC)

16. COMBINED ANSI/ASHRAE/IES STANDARD 90.1 – “ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL

BUILDINGS”

17. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)

18. AMERICANS WITH DISABILITIES ACT (ADA)

19. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.

20. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE

a. AUTHORITIES HAVING JURISDICTION (AHJs).

21. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.

1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT

ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.

2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND

ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.

3. INCLUDE ALL COSTS FOR EXCAVATION, SAW CUTTING, SURFACE RESTORATION, REPAIR OF FINISHES, ETC. THAT IS

REQUIRED IN ORDER TO MEET THE PROJECT REQUIREMENTS.

4. INCLUDE IN BID ALL COSTS ASSOCIATED WITH TEMPORARY ELECTRICAL SERVICE AS REQUIRED FOR USE BY ALL TRADES DURING CONSTRUCTION. REMOVE TEMPORARY POWER AT THE COMPLETION OF THE PROJECT. OBTAIN AND PAY FOR ALL REQUIRED PERMITS FOR TEMPORARY POWER. ENGINEER OF RECORD SHALL BE PROVIDED WITH ADDITIONAL COMPENSATION FROM THE CONTRACTOR WHERE SIGNED & SEALED DRAWINGS ARE REQUESTED BY THE CONTRACTOR TO THE ENGINEER OF RECORD IF REQUIRED BY THE AHJ FOR THE TEMPORARY POWER.

5. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH NORTH CAROLINA STATUTES REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN

CERTIFICATION OF ACCEPTED DISPOSAL.

6. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS ARE NOT ALLOWED

UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.

7. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL MECHANICAL, PLUMBING AND FIRE PROTECTION EQUIPMENT PRIOR TO SUBMITTAL OF SHOP DRAWINGS OF ELECTRICAL EQUIPMENT.

PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS, BOXES, EQUIPMENT, ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS, CONTROL TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL REQUIRED, UNLESS OTHERWISE NOTED.

8. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT OF WORK. AVOID INTERFERENCES WITH

THE PROGRESS OF OTHER DIVISIONS/TRADES.

9. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS

INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA.

10. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS AND DETAILS.

COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.

11. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR RELATED INFORMATION AND ADDITIONAL INSTALLATION REQUIREMENTS TO BE PERFORMED AS PART OF THE WORK. REFER TO ARCHITECTURAL ELEVATIONS

FOR EXACT MOUNTING HEIGHT AND LOCATIONS.

12. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.

13. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR

PHASING.

14. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN WRITING BY THE OWNER AND SCHEDULED IN

ADVANCE.

15. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.

CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO

PROCEEDING WITH REPAIRS.

16. COORDINATE THE LOCATION OF ALL LIGHT FIXTURES, DEVICES AND BOXES WITH WINDOWS, MIRRORS, MILLWORK, CABINETS, GLASS CURTAIN WALLS, AND GLASS WALLS PRIOR TO INSTALLATION OF CONDUITS OR BOXES. REVIEW ALL CONTRACT DRAWINGS TO ASCERTAIN ANY CONFLICTS PRIOR TO BIDDING. OBTAIN CLARIFICATION FROM A/E PRIOR TO BID. CONTRACTOR SHALL NOT BE ENTITLED TO ADDITIONAL COMPENSATION FOR WORK REQUIRED TO

RELOCATE OUTLET BOXES OR RACEWAYS FOR COORDINATION WITH OTHER TRADE'S WORK.

17. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL

APPURTENANCES IN ACCORDANCE WITH NEC.

18. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNAGE REQUIRED DURING THE

PROJECT CONSTRUCTION PHASE.

19. THE INFRASTRUCTURE FOR THE ACCESS CONTROL/ CCTV OR SECURITY ELECTRONICS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE ACCESS CONTROL/CCTV OR SECURITY ELECTRONICS SYSTEM CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT. INSTALLATION OF THE CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE ACCESS CONTROL/ CCTV SYSTEM CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY

LOCATIONS, SIZES AND QUANTITY, CONDUIT STUB-UPS PRIOR TO ROUGH IN.

20. THE INFRASTRUCTURE FOR THE VOICE/DATA TELECOMMUNICATIONS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE TELECOMMUNICATIONS CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT AND COMPONENTS. INSTALLATION OF THE CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE TELECOMMUNICATIONS CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY LOCATIONS, SIZES AND QUANTITY, CONDUIT

STUB-UPS PRIOR TO ROUGH IN.

21. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L.

LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED

WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY.

22. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, TO THE

SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.

23. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS.