This is an amendment to a federal solicitation seeking proposals to upgrade the electrical power in operating rooms 1 through 4 at the Veterans Affairs Medical Center in Fayetteville, Arkansas. The amendment provides additional time for offerors to submit proposals, extending the response deadline from April 3rd to April 17th, 2023. The work includes replacing existing isolation panels and adding new panels to meet current electrical codes. The solicitation is designated for small businesses under the Veterans First Contracting Program set-aside. The Department of Veterans Affairs is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

LL

EG

E

AV

E

E. HUNTSVILLE

ROAD

CAMPUS MAP

PROJECT DESCRIPTION AND GENERAL

REQUIREMENTS

LOCATION MAP

LIST OF DRAWINGS

FAYETTEVILLE, AR

ARKANSAS

FAYETTEVILLE,

AR

1100 N. COLLEGE AVE.

FAYETTEVILLE, AR

PROJECT

LOCATION

UPGRADE ELECTRICAL POWER IN OR-2 (B-1)

PROJECT 564-23-501 VHSO FAYETTEVILLE, AR 72703

VETERANS HEALTH ADMINISTRATION

GENERAL

1 of 10 GI001 COVER SHEET 2 of 10 GI002 GENERAL NOTES, ABBREVIATIONS, AND STANDARD SYMBOLS 3 of 10 GC101 ENLARGED ICRA FLOOR PLAN - THIRD FLOOR

ARCHITECTURAL

4 of 10 AE100 OVERALL FLOOR PLAN - THIRD FLOOR 5 of 10 AE101 ENLARGED FLOOR PLAN - THIRD FLOOR

ELECTRICAL

6 of 10 E001 ELECTRICAL LEGEND 7 of 10 E103 OVERALL ELECTRICAL PLAN - THIRD FLOOR 8 of 10 E200 ENLARGED ELECTRICAL PLANS 9 of 10 E300 ELECTRICAL SCHEDULES AND RISER 10 of 10 E301 PANEL SCHEDULES

ETERANS EALTH ARE YSTEMV H C S

OF THE ZARKSO

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

03/31/2023

GI001

COVER SHEET

OR #2 - 564-23-501

1100 NORTH COLLEGE AVENUE

FAYETTEVILLE, AR

THE CONTRACTOR MUST FURNISH ALL MANAGEMENT, SUPERVISION, LABOR, MATERIAL, EQUIPMENT, TOOLS, SUPPLIES, CONSUMABLES, PARTS, AND RELATED SERVICES, REQUIRED FOR THE UPGRADE OF THE ELECTRICAL SYSTEM IN ORS 2.

REMOVE EXISTING ISOLATED POWER SYSTEM PANEL IPU-3. PANEL MUST BE OFFERED TO COR FOR VA USE AS SPARE. IF COR DOES NOT WANT PANEL, THEN IT IS THE RESPONSIBILITY OF CONTRACTOR TO PROPERLY DISPOSE OF PANEL OFF SITE. FURNISH AND INSTALL NEW 120-VOLT ISOLATED POWER SYSTEM PANEL IPU, SQUARE D, OR APPROVED EQUAL, WITH INTEGRAL LINE ISOLATION MONITOR IN EXISTING LOCATION INCLUDING: 1. SMIB - ISOLATED POWER PANEL INTERIOR BOLT-ON W/LIM, 2. SXMK05BASC - ISOLATED POWER PANEL TRANSFORMER/ BREAKER,

3. ST6826R- ISOLATED POWER PANEL TRIM STANDARD, 4. SB662408F - ISOLATED PANEL BACKBOX 8" DEEP, 5. 5 KVA TRANSFORMER WITH 16 QOB220 BREAKERS. CONTRACTOR MUST ENLARGE EXISTING OPENING IN WALL TO ACCEPT FLUSH MOUNTED NEW PANEL AND REPAIR FINISHED AS NEEDED. CONTRACTOR MUST RECONNECT PANEL TO EXISTING FEEDER AND RECEPTACLES. CONTRACTOR MUST FURNISH

CERTIFICATION CERTIFICATE.

FURNISH AND INSTALL NEW 120-VOLT ISOLATED POWER SYSTEM PANEL IPU-10, SQUARE D, OR APPROVED EQUAL, WITH INTEGRAL LINE ISOLATION MONITOR IN EXISTING LOCATION INCLUDING: 1. SMIB - ISOLATED POWER PANEL INTERIOR BOLT-ON W/LIM, 2. SXMK05BASC - ISOLATED POWER PANEL TRANSFORMER/ BREAKER, 3. ST6826R - ISOLATED POWER PANEL TRIM STANDARD, 4. SB662408F - ISOLATED PANEL BACKBOX 8" DEEP, 5. 5 KVA TRANSFORMER WITH 16 QOB220 BREAKERS. FURNISH, INSTALL, AND CONNECT PANEL FEEDER TO ISOLATION PANEL WITH NEW 30-AMP 2 POLE SQUARE D QOB BREAKER FROM PANEL 13S, ROOM E302. FEEDER MUST BE MINIMUM SIZE #10 COPPER WITH #10 GROUND IN ¾" EMT. CONTRACTOR MUST CUT OPENING IN WALL TO FLUSH MOUNT NEW PANEL AND REPAIR FINISHES AS REQUIRED.

FURNISH, INSTALL, AND CONNECT POWER PANEL WITH FOUR RED DUPLEX HOSPITAL GRADE RECEPTACLES, FOUR GROUNDING CONNECTIONS, AND #304 STAINLESS STEEL WITH A #4 BRUSHED FINISH FRONT TRIM, SQUARE D MODEL SGPPMF4DR4 AND SB120804, OR APPROVED EQUAL, IN LOCATION AS SHOWN ON DRAWING 3. MUST USE COPPER CONDUCTORS WITH XHHW INSULATION AND A DIALECTIC CONSTANT LESS THAN 3.5 AND INSTALLED AS REQUIRED BY THE LATEST NEC CODE FOR THE RECEPTACLE FEEDERS. CONTRACTOR MUST

FURNISH CERTIFICATION CERTIFICATE.

FURNISH AND INSTALL NEW 208-VOLT ISOLATED POWER SYSTEM PANEL IPU-9, SQUARE D, OR APPROVED EQUAL, WITH INTEGRAL LINE ISOLATION MONITOR IN LOCATION SHOWN ON DRAWING 3 INCLUDING: 1. SMIB - ISOLATED POWER PANEL INTERIOR BOLT-ON W/LIM, 2.

SXMK07BBSC - ISOLATED POWER PANEL TRANSFORMER I BREAKER, 3. ST6826R - ISOLATED POWER PANEL TRIM STANDARD, 4. SB662408F - ISOLATED PANEL BACKBOX 8" DEEP, 5. 7.5 KVA TRANSFORMER WITH 8 QOB220 AND 8 QOB230 BREAKERS. FURNISH, INSTALL, AND CONNECT PANEL FEEDER TO ISOLATION PANEL WITH NEW 60-AMP 2 POLE SQUARE D QOB BREAKER FROM PANEL 13SE ROOM E302. FEEDER MUST BE MINIMUM SIZE #6 COPPER WITH #10 GROUND IN 1" EMT. CONTRACTOR MUST CUT OPENING IN WALL TO FLUSH MOUNT NEW PANEL AND REPAIR FINISHES AS REQUIRED. FURNISH, INSTALL, AND CONNECT TWO 30- AMP TWIST LOCK 3 PRONG NEMA L6-30R FLUSH MOUNTED RECEPTACLES EACH ON THEIR DEDICATED BREAKER WITH STAINLESS STEEL COVER PLATES IN LOCATIONS AS SHOWN ON DRAWING 3. MUST USE COPPER CONDUCTORS WITH XHHW INSULATION AND A DIALECTIC CONSTANT LESS THAN 3.5 AND INSTALLED AS REQUIRED BY THE LATEST NEC CODE

FOR THE RECEPTACLE FEEDERS. CONTRACTOR MUST FURNISH CERTIFICATION CERTIFICATE.

A. DEMOLISH EXISTING WALL IN AREAS LOCATED ON PLANS TO FACILITATE INSTALLATION WALL BUMP OUTS TO FACILITATE

INSTALLATION OF NEW IPU PANELS AT LOCATIONS INDICATED ON PLANS.

B.INSTALL AND FINISH WALL BUMP OUTS AT LOCATIONS INDICATED ON PLANS TO FACILITATE IPU PANEL INSTALLATION.

1. INSTALL 2 X 6” METAL STUDS AND GYPSUM WALL AS INDICATED ON PLANS.

2. INSTALL SOLID SURFACE PANELS TO MATCH EXISTING MATERIAL DIMENSIONS AND FINISH. INSTALL IN ACCORDANCE WITH

MANUFACTURERS INSTALLATION INSTRUCTIONS.

3. SALVAGE EXISTING SHEET VINYL FLOORING, MODIFY TO FIT NEW BUMP OUTS, AND FINISH TO MATCH EXISTING BASE PROFILE

AND SEAMLESS CONSTRUCTION.

a) IF EXISTING FLOORING IS NOT ABLE TO BE SALVAGED; MATCHING NEW FLOORING MUST BE PROVIDED, INSTALLED, AND JOINED WITH EXISTING FLOORING A MINIMUM OF 12” AWAY FROM BASE AND FINISHED TO MATCH EXISTING BASE PROFILE AND SEAMLESS CONSTRUCTION. INSTALL IN ACCORDANCE WITH MANUFACTURERS INSTALLATION INSTRUCTIONS.

4. FINISH GYPSUM WALLS TO MATCH EXISTING WALL FINISH, TEXTURE, AND COLOR.

NO DATE REVISION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text e85

AutoCAD SHX Text

AutoCAD SHX Text Garage

AutoCAD SHX Text Main Hospital 1

AutoCAD SHX Text

AutoCAD SHX Text Arkansas Veterans Home

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B-3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WOODSLEY AVE.

AutoCAD SHX Text

NORTH COLLEGE AVE.

AutoCAD SHX Text

WEST NORTH ST.

AutoCAD SHX Text Parking

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text

NW

AutoCAD SHX Text

SW

AutoCAD SHX Text

NE

AutoCAD SHX Text

SE

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text

NW

AutoCAD SHX Text

SW

AutoCAD SHX Text

NE

AutoCAD SHX Text

SE

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BUS

AutoCAD SHX Text

BUS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LITTLE ROCK

AutoCAD SHX Text

DUMAS

AutoCAD SHX Text

PINE BLUFF

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text

NW

AutoCAD SHX Text

SW

AutoCAD SHX Text

NE

AutoCAD SHX Text

SE

AutoCAD SHX Text S

AutoCAD SHX Text W

SHIPPING

REF:1A123

ROOM NAME

ROOM NUMBER

REFERENCE ROOM NUMBER:

INDICATES ROOM TO REFERENCE

FOR TYPICAL MEDICAL EQUIPMENT

LAYOUT, GENERAL ANNOTATION

AND DIMENSIONS UON.

INTERIOR ELEVATION

REFERENCE

SPOT ELEVATION

CENTERLINE

EL: +10'-0"

PARTITION TYPE TAGXXXXX

BREAK, STRAIGHT (SEE SECTION

INDICATORS, BUILDING, WITH

BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR

SMALL CONDITIONS

DRAWING BLOCK

TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIORA-201

A4

A2 A-202

A

BC

D

A-201 A4

A-512 D2

A-512 D2

A-512 D2

COLUMN GRID

A4 A-201

BUILDING SECTION

INDICATOR

MARK STUD SIZE OVERALL THK. "R" RATING FIRE TEST STC RATING

REFER TO PARTITION TAG AND

PARTITION NOTES FOR REQD.

INSULATION

ONE LAYER OF 5 8" GWB EACH SIDE

ON METAL STUDS

HOLD BOTTOM OF GWB 12" OFF FINISH FLOOR.

NO EXCEPTIONS.

REFER TO WALL DETAIL SHEET AND PARTITION NOTES

FOR HEAD DETAILS

PARTITION TAGS ARE READ LEFT TO RIGHT:

THE FIRST CHARACTER INDICATES WHICH PARTITION / BARRIER TYPE TO REFERENCE FOR

CONSTRUCTION.

THE SECOND CHARACTER INDICATES A REFERENCE TO THE STRUCTURAL CORE THICKNESS

(STUD OR CMU).

THE THIRD CHARACTER INDICATES:

"A" - ACOUSTICAL PARTITION

"R" - FIRE RATED

"S" - SMOKE RESISTANT PARTITION (UNRATED)

"T" - FIRE RATED / ACOUSTICAL BARRIER

"V" - FIRE RATED / SMOKE BARRIER

"W" - ACOUSTICAL / SMOKE RESISTANT PARTITION

"Z" - FIRE RATED / SMOKE / ACOUSTICAL BARRIER

EXAMPLE:

A TAG OF C3T INDICATES A 4-7 8" 1 HOUR RATED BARRIER WITH ACOUSTICAL INSULATION.

PLAN

SILL

PARTITION TYPE - C

PARTITION TAG NOTES:

C1

C2

C3

C4

C6

C8

1 5/8"

2 1/2"

3 5/8"

6"

8"

2 7/8"

3 3/4"

4 7/8"

5 1/4"

7 1/4"

9 1/4"

4"

1 HR

1 HR

1 HR

1 HR

U419 47

U419 47

U419 47

U419 47

GENERAL PROJECT NOTES

GENERAL FLOOR PLAN NOTES

1. REFER TO GENERAL REQUIREMENTS OF THE PROJECT SPECIFICATIONS FOR REQUIREMENTS RELATED TO WORK RESTRICTIONS, NOISE CONTROL, SECURITY, LIFE SAFETY, INFECTION CONTROL RISK ASSESSMENT.

2. REFER TO TITLE SHEET FOR COORDINATION DRAWING REQUIREMENTS.

3. THE EXISTING CONDITIONS AND DEMOLITION WORK INDICATED IS INTENDED TO SHOW THE GENERAL

SCOPE OF THE WORK. THE CONTRACTOR IS TO STUDY THE COMPLETE SET OF DOCUMENTS AND

PERFORM ANY AND ALL DEMOLITION AND NEW CONSTRUCTION REQUIRED TO COMPLETE THE WORK SHOWN. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND REPORT ANY DISCREPANCIES IN

CONDITIONS TO THE COR BEFORE BEGINNING OR CONTINUING WORK.

4. AT PROJECT COMPLETION, THE GENERAL CONTRACTOR SHALL PROVIDE TO THE COR AN “AS BUILT DRAWINGS” FOR THE WORK. REFER TO GENERAL REQUIREMENTS SECTION OF THE SPECIFICATIONS.

5. VERIFY AND ASCERTAIN THE LOCATION, DEPTH, DIRECTION, SIZE OF ANY AND ALL EXISTING UTILITIES IN THE GENERAL VICINITY OF THE WORK AREA. IT SHALL BE THE GENERAL CONTRACTOR’S RESPONSIBILITY TO REPAIR ANY UTILITY DISRUPTED, BROKEN, OR OTHERWISE RENDERED NON FUNCTIONAL DUE TO THE WORK PERFORMED AT NO ADDITIONAL COST TO THE VETERANS AFFAIRS DURING THIS COURSE OF WORK. THE GENERAL CONTRACTOR SHALL IDENTIFY ANY NON-FUNCTIONING UTILITY/SYSTEM, PRIOR TO THE START OF WORK TO THE COR. IDENTIFICATION OF SUCH AFTER THE START OF WORK SHALL BE DEEMED AS DISTURBED/DAMAGED BY THE GENERAL CONTRACTOR AND SHALL BE REPAIRED AT THE

EXPENSE OF THE GENERAL CONTRACTOR.

6. THE GENERAL CONTRACTOR SHALL PROPERLY SUPPORT ANY UTILITY ENCOUNTERED IN THE COURSE OF

THIS WORK.

7. THE GENERAL CONTRACTOR SHALL PROVIDE STORAGE FOR MATERIALS. MATERIALS SHALL NOT BE

STORED IN DEPARTMENT OF VETERANS AFFAIRS BUILDINGS, UNLESS AGREED TO BY VA.

8. COORDINATE MATERIAL STAGING AREAS WITH THE COR.

9' THE CONTRACTOR SHALL NOT LEAVE THE WORK AREA UNATTENDED FOR ANY REASON, UNLESS SAFETY

PARTITIONS, SAFETY FENCING ARE INSTALLED AND SECURED.

10. THE GENERAL CONTRACTOR IS ADVISED THAT ANY RIGGING SHALL BE PERFORMED BY PROFESSIONAL

RIGGERS AT THE EXPENSE OF THE GENERAL CONTRACTOR.

11. CONTRACTOR SHALL HAVE REPRESENTATIVE ON SITE AT ALL TIMES DURING CONSTRUCTION ACTIVITIES.

12. REFER TO SPECIFICATIONS FOR GENERAL REQUIREMENTS OF THE CONTRACT.

13. INFECTION CONTROL, SAFETY AND PHASING: VERIFY REQUIREMENTS RELATED TO INFECTION CONTROL, DUST MITIGATION, SAFETY AND RISK ASSESSMENT. CONTRACTOR TO DEVELOP AND PUBLISH WORK PLAN ADDRESSING INFECTION CONTROL, SAFETY, AND PHASING FOR APPROVAL BY COR PRIOR TO BEGINNING THEIR WORK. PLAN TO INCLUDE MEANS AND METHODS OF DEBRIS STAGING AND REMOVAL, BOTH INTERNALLY AND EXTERNALLY. INFECTION CONTROL PLAN TO INCLUDE TEMPORARY DUST AND DEBRIS

BARRIERS AND VESTIBULES AROUND PROJECT WORK AREAS. TEMPORARY BARRIERS ARE NOT TO

RESTRICT REQUIRED MEANS OF EGRESS PATHS AND WIDTHS.

14. CONTRACTOR SHALL PROVIDE EGRESS SIGNAGE AS REQUIRED BY THE VA COR.

15. ALL PENETRATIONS THROUGH RATED FLOOR/CEILING ASSEMBLIES AND THROUGH FIRE RATED WALL AND

SMOKE BARRIER ASSEMBLIES - THOSE CREATED BY REMOVAL OF DEMOLISHED ITEMS UNDER THIS CONTRACT AND THOSE DISCOVERED DURING CONSTRUCTION UNDER THIS CONTRACT AS A RESULT OF PREVIOUS WORK AND THOSE CREATED BY NEW WORK UNDER THIS CONTRACT - MUST BE SEALED AS PART OF THIS CONTRACT. ALL RATED SEPARATIONS MUST MEET CURRENT CODE REQUIREMENTS.

16. PROTECT EXISTING HORIZONTAL AND VERTICAL FIREPROOFING AND FIRE STOPPING DURING PROJECT.

ONCE DEMOLITION IS COMPLETE, CONTRACTOR SHALL REPAIR ALL DAMAGED FIREPROOFING AND RESTORE MISSING FIREPROOFING, WHETHER A RESULT OF DEMOLITION OPERATIONS OR NOT, TO MEET REQUIRED RATING(S). SEE SHEET GI003 FOR APPLICABLE UL DESIGNS FOR BASIS OF DESIGN.

1. PARTITION TYPES AS NOTED BY THE SYMBOL CONTINUE BETWEEN ROOM/SPACE

CORNERS OR ANY INTERSECTING PARTITION.

2. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES CONTINUE

UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.

3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS NOTED AS “CLR", "CLEAR” OR “MIN".

DIMENSIONS NOTED AS “HOLD” ARE CRITICAL TO COORDINATE OTHER WORK (E.G.

CEILING GRIDS, LIGHTING, FINISHES).

4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO INITIATING CONSTRUCTION

AND REPORT DISCREPANCIES TO COR PRIOR TO COMMENCING WORK.

5. CONTRACTOR SHALL PROVIDE ALL BLOCKING REQUIRED TO ANCHOR ALL WALL AND

CLG MOUNTED ITEMS, INCLUDING BUT NOT LIMITED TO EQUIPMENT BLOCKING

REQUIREMENT SCHEDULE ON SHEET QH601.

6. FIRE STOPPING SYSTEMS – REFER TO SPEC SECTION 07 84 00 FOR INFO REGARDING

PENETRATIONS OF ALL RATED ASSEMBLIES (BOTH SINGLE AND DOUBLE MEMBRANE

PENETRATIONS) INCLUDING BUT NOT LIMITED TO PENETRATIONS FOR DUCTWORK,

CONDUIT, PIPING AND SUPPORT FOR WALL MOUNTED EQUIPMENT, CABINETS AND

COUNTERTOPS.

GENERAL DEMOLITION NOTES

1. THE EXISTING CONDITIONS AND DEMOLITION WORK INDICATED IS INTENDED TO SHOW THE GENERAL

SCOPE OF THE WORK. THE CONTRACTOR IS TO STUDY THE COMPLETE SET OF DOCUMENTS AND

PERFORM ANY AND ALL DEMOLITION AND NEW CONSTRUCTION REQUIRED TO COMPLETE THE WORK SHOWN. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND REPORT ANY DISCREPENCIES IN

CONDITIONS TO THE COR BEFORE BEGINNING OR CONTINUING WORK.

2. ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE

ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH COULD NOT BE

PREDETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM FLOOR TO FLOOR, ETC., OR ARE

UNIDENTIFIED SHALL BE REPORTED TO THE COR BEFORE REMOVAL FOR FINAL DISPOSITION.

3. REMOVE ALL CONSTRUCTION DESIGNATED TO BE REMOVED AND CLEAR TO RECEIVE NEW WORK AS

HEREIN INDICATED.

4. REMOVE PORTIONS OF EXISTING CONSTRUCTION AS DRAWN AND PATCH TO MATCH ADJACENT

CONSTRUCTION.

5. WHEREVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGARS, BRACING, FOUNDATION, ETC. AFTER REMOVAL, AFFECTED CONSTRUCTION AND SURFACES, SUCH AS FLOORS, WALLS, BASES, AND CEILINGS, SHALL BE FINISHED TO

MATCH ADJACENT SURFACES UNLESS OTHERWISE NOTED.

6. NEW WORK AS A RESULT OF PATCHING SHALL ALIGN WITH AND MATCH EXISTING WORK EXCEPT WHERE

OTHERWISE DIMENSIONED OR DETAILED.

7. ANY EXISTING CONDITIONS WHICH ARE INCONSISTENT WITH CONTRACT DRAWINGS RELEVANT TO THIS

CONTRACT SHALL BE REPORTED TO THE COR.

8. WHERE DEMOLITION OR RELATED WORK LEAVES FLOOR SURFACES WITH IMPERFECTIONS OR NOT LEVEL

TO TOLERANCES SPECIFIED FOR NEW WORK, PROVIDE SELF-LEVELING UNDERLAYMENT.

9. WHERE DEMOLITION WORK UNCOVERS OR LEAVES OPENINGS IN PARTITIONS OR INCOMPLETE

PARTITIONS, EXTEND, RESTORE, AND/OR CLOSE OPENING IN PARTITION AS INDICATED AND/OR AS REQUIRED TO MAINTAIN FIRE RATINGS. MATCH EXISTING CONSTRUCTION, U.N.O., WITHIN THE LIMITS AND TOLERANCES FOR MATERIALS AS SPECIFIED OR RECOMMENDED BY THE MANUFACTURER. REFINISH

SURFACES TO ALIGN FLUSH WITH EXISTING.

10. WHERE DEMOLITION WORK OR RELOCATION OF EXISTING ITEMS LEAVES UNFINISHED SURFACES AND/OR SUBSTRATES, CUT AND PATCH AS REQUIRED TO RESTORE SUBSTRATE AND/OR FINISH MATERIAL EVEN

AND FLUSH WITH ADJOINING SURFACES. TEXTURE AND REFINISH TO MATCH EXISTING U.N.O.

11. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING A PRE-CONSTRUCTION

WALK-THROUGH.

12. WALK-OFF MATS, THE CONSTRUCTION BARRIER, AND IN PHASE I, NEGATIVE PRESSURE BY HEPA

FILTRATION SHALL BE IN PLACE PRIOR TO START DEMOLITION.

13. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. PREPARE SURFACES TO RECEIVE NEW

FINISH(S).

14. DISTURBANCE OF EXISTING MATERIALS ARE THE RESPONSIBILITY OF THE CONTRACTOR WITH REFERENCE TO PROPER LEGAL DISPOSAL, LEGAL ABATEMENT, PATCHING AND FINISHING. ALL DISTURBED AREAS AND

MATERIALS SHALL MATCH EXISTING CONDITIONS.

15. COORDINATE WITH M/E/P DRAWINGS FOR ADDITIONAL DEMOLITION IN FLOORS, WALLS AND ROOFS & RELATED ITEMS AS REQUIRED TO ACCOMMODATE NEW CONSTRUCTION OR UTILITIES ON THESE FLOORS

OR RELATED ADJACENT FLOORS. PATCH/REPAIR BY EACH RESPECTIVE DISCIPLINE.

COORDINATE DEMOLITION WITH OTHER DISCIPLINES. HOLES/PENETRATIONS IN RATED WALLS CREATED WHEN DEMOLITION OCCURS ARE TO BE FILLED TO MATCH THE EXISTING RATED CONDITION OR BETTER.

16. WHERE TILE FLOORING OR TERRAZO FLOOR AND BASE ARE REMOVED, PROVIDE FLOOR LEVELING AS REQUIRED TO CREATE A LEVEL FLOOR SURFACE WITH THE FLOORS THAT ARE TO REMAIN. PREPARE NEW

SURFACE TO RECEIVE NEW FINISHES.

17. WHERE EXISTING WALL IS REMOVED, PROVIDE FLOOR LEVELING AS REQUIRED TO CREATE A LEVEL FLOOR SURFACE WITH THE FLOOR LEVELS AT EACH SIDE OF THE DEMO-ED WALL LOCATION. PREPARE

NEW SURFACE TO RECEIVE NEW FINISHES.

18. DURING DEMOLITION AND CONSTRUCTION PHASES, MAINTAIN ALL REQUIRED EXISTING WALL RATINGS AT WALLS TO REMAIN. AS ARE INDICATED ON DRAWINGS. REMOVE ALL MISC. FASTENING ANCHORS, CLIPS, CONDUIT, PIPING AND RELATED ITEMS THAT ARE NOT IN USE.

19. COORDINATE THE EXACT PHASING OF THE DEMOLITION FOR SPECIFIC STRUCTURAL MEMBERS WITH

DRAWINGS.

INTERIOR PARTITION NOTES

1. REFER TO PLANS FOR LOCATION OF PARTITION TYPES. C6 IS THE TYPICAL PARTITION

TYPE UNLESS OTHERWISE NOTED.

2. ERECT PARTITIONS IN ORDER OF RATING PRIORITY BEGINNING WITH HIGHEST FIRE

RATED PARTITION. CONSTRUCTION OF HIGHER RATED PARTITIONS SHALL BE

CONTINUOUS PAST/THROUGH LOWER RATED INTERSECTING PARTITION.

3. ALL STUD GAUGES AND LIMITING HEIGHTS IN GYPSUM BOARD REFERENCE

SPECIFICATIONS.

4. ANY MODIFICATIONS TO EXISTING PARTITIONS AND/OR SURFACES TO FINISHED TO MATCH EXISTING

CONSTRUCTION, QUALITY, DIMENSIONS, AND APPLICABLE VA STANDARD SPECIFICATIONS.

5. THE FOLLOWING LIST OF ROOMS (IF USED) SHALL HAVE THEIR PERIMETER

PARTITIONS INSULATED USING THERMAL INSULATION:

- ALL ELECTRICAL / MECHANICAL ROOMS

- A/V EQUIPMENT / LIGHTING ROOMS

- STAIRWAYS

6. THE FOLLOWING LIST OF ROOMS (IF USED) SHALL HAVE THEIR PERIMETER

PARTITIONS INSULATED WITH SOUND ATTENUATION BATTS:

- OFFICES AND OFFICE SUITES

- STAFF WORK AREAS, LOUNGES, AND LOCKER ROOMS

- WALLS CONTAINING WASTE OR DRAIN LINES

7. ALL PARTITIONS SHALL EXTEND FULL HEIGHT TO UNDERSIDE OF DECK /

INTERSTITIAL ABOVE OR HAVE THEIR TOPS BRACED PER PARTITION BRACING

DETAILS.

8. ALL RATED PARTITIONS TO EXTEND FROM TOP OF SLAB TO UNDERSIDE OF

STRUCTURE. SEAL ENTIRE PERIMETER WITH FIRESTOP SEALANT UON.

9. ALL INTERIOR ROOF AND OVERFLOW DRAIN LEADERS TO BE WRAPPED

CONTINUOUSLY WITH SOUND ATTENUATION INSULATION.

10. INSTALL FRAMING AND GWB TO OFFSET AROUND STRUCTURAL MEMBERS OR OTHER

OBSTRUCTIONS TO MAINTAIN FIRE RESISTIVE RATINGS.

11. WHERE GWB EXTENDS TO THE UNDERSIDE OF STRUCTURE, STOP GWB 1/2” BELOW

LINE OF STRUCTURE AND SEAL AS REQUIRED.

12. NON-RATED PARTITIONS SHALL HAVE ENTIRE PERIMETER SEALED WITH

ACOUSTICAL SEALANT, UON.

13. REFER TO MECHANICAL DRAWINGS FOR DETAILS ON PIPE PENETRATIONS THROUGH

ACOUSTICAL PARTITIONS AS WELL AS RATED PARTITIONS.

14. INSTALL METAL STUD BLOCKING IN PARTITIONS AT ALL WALL MOUNTED EQUIPMENT,

WHETHER CC, VC OR VV.

15. ALL PARTITIONS SCHEDULED TO RECEIVE TILE, IN BATHING ROOMS AND/OR

LOCATED ADJACENT TO OR BEHIND PLUMBING FIXTURES SHALL BE CONSTRUCTED

OF TILE BACKER BOARD (SEE SPECIFICATIONS).

16. FOR MOLD PREVENTION, DO NOT INSTALL GWB IN DIRECT CONTACT WITH THE

FLOOR. ALL GWB SHALL BE SHIMMED ½” OFF THE FLOOR WITH NON-POROUS SHIMS.

PLASTIC NON-POROUS HORSESHOE SHIMS ARE RECOMMENDED. GWB SHIMS ARE

NOT ACCEPTABLE.

17. CABLES PENETRATING RATED PARTITIONS (WITH OR WITHOUT SLEEVES) SHALL BE

SECURED ON BOTH SIDES OF THE PARTITION. METHOD OF SECURING THE CABLES

SHALL BE SLEEVED TO PRECLUDE ANY MOVEMENT OF THE CABLE DISTURBING THE

INTEGRITY OF THE PENETRATION FIRE - STOPPING ASSEMBLY. SEE

SPECIFICATIONS.

18. REFER TO DRAWINGS FOR TYPICAL WALL FRAMING FOR FIRE DAMPERS IN RATED

WALLS. COORDINATE EXACT FRAMING REQUIREMENTS WITH FIRE DAMPER

MANUFACTURER. COORDINATE ALL PARTITION CONSTRUCTION WITH MECHANICAL

PRIME CONTRACTOR PRIOR TO COMMENCING PARTITION CONSTRUCTION. GENERAL

CONTRACTOR SHALL OBTAIN FROM THE MECHANICAL CONTRACTOR THE PROPER

INSTALLATION INSTRUCTIONS FOR ALL FIRE AND SMOKE DAMPERS AND SHALL

PROVIDE THE REQUIRED METAL FRAMING, DRYWALL, ETC., ACCORDING TO THESE

INSTRUCTIONS. INSTALLATION INSTRUCTIONS TO BE SUBMITTED TO THE COR FOR

REVIEW.

19. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FIRE AND SMOKE SEALED

PENETRATIONS IN ACCORDANCE WITH TESTED AND APPROVED PENETRATION

SEALING SYSTEM FOR THE PARTITION CONSTRUCTION / FIRE RATING AND THE

PENETRATING ELEMENTS.

20. PARTITION TYPES AS NOTED BY THE SYMBOL CONTINUE BETWEEN ROOM/SPACE

CORNERS OR ANY INTERSECTING PARTITION.

21. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES CONTINUE

UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.

NOTE:

THE RATING (FIRE) AND UL ASSEMBLY DESIGNATION ONLY

APPLIES WHEN THE PARTITION SUFFIX "R, T, V, & S" IS

ADDED TO THE WALL TAG(S) OTHERWISE THE PARTITION

TYPE IS A NON-RATED WALL AND / OR SOME OTHER

DISTINCTION NOTED UNDER PARTITION TAG NOTES.

IF NOTED ON TAG

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

XXX

Author Checker 230080F

OR #2 - 564-23-501

1100 NORTH COLLEGE AVENUE

FAYETTEVILLE, AR

VETERANS

HEALTHCARE

SYSTEM

OF THE

OZARKS

GI002

NOTES, PARTITION TYPES,

AND STANDARD SYMBOLS

AutoCAD SHX Text

DRAWING BLOCK TITLE

AutoCAD SHX Text 1 1/2" = 1'-0"

AutoCAD SHX Text C4

AutoCAD SHX Text 1 1/2'

AutoCAD SHX Text 1/2'

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

STANDARD SYMBOLS

AutoCAD SHX Text D4

AutoCAD SHX Text

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1'

AutoCAD SHX Text 2'

AutoCAD SHX Text 6"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1" = 1'-0"

AutoCAD SHX Text

PARTITION TYPES

D1

EXISTING

CORRIDOR

C319

337B

337D

341A

337C

323C

323D

305A

C304

S301

C302

S302

L04

M3-1

350349E302

T300C309

C308

C306

C307

C300

C320

355-01

353-01

332328

323E

337A

360-01

L06

L05

STERILE CORE

STERILE PREP

CORRIDOR

ELEVATOR

LOBBY

GENERAL

STORAGE

CLEAN

EQPT

CLEAN

LINEN

CLEAN

UTILITY/

SCOPES

SOILED

UTILITY

MED

ROOM

EQPT

STORAGE

HVAC

MED RM

WAITING

SURGICAL

DUMBWAITER

ROOF

DRESSING

STERILIZER

MINOR OR

OR SUPERVISER

TOILET

OPERATING RM

TOILET

CYSTO

STERILIZER

OPERATING RM

OFFICE, ICU

CONSULT

TOILET

RECOVERY

CORRIDOR

HAC

CORRIDOR

STAIR

CORRIDOR

CORRIDOR

STAIR

ELEVATOR

MECH

TOILET

CHAPEL

CONTROL

EDUCATION

OFFICE

ITS

BREAK RM

SOILED UTILMED GASELECTRICAL

TELECOMCORRIDOR

HAC

FEMALE

TOILET

CORRIDOR

HAC

CORRIDOR

LOBBY

SURGERY WAITING

SERVICEELEVATOR

SERVICEELEVATOR

ELEVATOR

TOILET

MALE

OPERATING

ROOM #2

OPERATING

ROOM #1

OPERATING ROOM #3

OPERATING ROOM #4

1/8" = 1'-0"

1 ENLARGED ICRA OR FLOOR PLAN

DATE:

DRAWN BY: C. STAGGS

CHECKED BY: T. STRAHAN

PROJ. NO: 564-23-501

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

03/31/2023

Au to de sk

D oc s:

//F ay et te vi lle V

A O

R Is ol at io n

Pa ne ls /F ay et te vi lle V

A O

R Is ol at io n

Pa ne ls _E

_R

.rv t

3/

/2

:4 7:

A

M

GC101

ENLARGED ICRA FLOOR

PLAN - THIRD FLOOR

OR #2 - 564-23-501

1100 NORTH COLLEGE AVENUE

FAYETTEVILLE, AR

VETERANS

HEALTHCARE SYSTEM

OF THE OZARKS

NO DATE REVISION

KEY NOTES

01.01

01.04 TEMPORARY BARRIER SYSTEM PROVIDED BY G.C. BASIS OF DESIGN: STARC SYSTEMS http://starcsystems.com/ OR APPROVED EQUAL.

XX GENERAL SHEET NOTES

A. ALL WORK IS CLASS IV, UNLESS OTHERWISE NOTED.

B. WORK WITHIN OR #2 TEMPORARY BARRIERS CAN OCCUR DURING NORMAL HOURS.

C. WORK OUTSIDE OF OR #2 TEMPORARY BARRIERS TO OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS AND REQUIRES ADDITIONAL CLEANING MEASURES BY VA's EMS

DEPARTMENT. COORDINATE WITH COR.

D. ANY WORK CREATING EXCESSIVE DISTURBANCE SHALL OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS. OR DEPARMENT LEAD RESERVES THE RIGHT TO STOP WORK

THAT MAY INTERFERE WITH SURGERY.

E. OR EMERGENCY PROCEDURES MAY OCCUR OUTSIDE OF NORMAL OR HOURS. CONTRACTOR MUST SUBMIT WRITTEN REQUEST A MIN. OF 14 DAYS AHEAD OF WORK

OUTSIDE OF CLASS IV ICRA BARRIERS FOR OR TO GO INTO DIVERT STATUS WHERE EMERGENCY PROCEDURES WOULD BE ROUTED TO OTHER LOCATIONS. IF OR IS NOT IN DIVERT STATUS; PRIORITY MUST BE GIVEN TO OR EMERGENCY PROCEDURE AND CONTRACTOR MUST ADJUST WORK SCHEDULE TO ACCOMMODATE OR

REQUIREMENTS.

F. CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING AND IDENTIFYING ALL UTILITIES THAT MAY PRESENT INTERFERENCE OR CONFLICTS IN PROJECT AREA. ICRA SYMBOL LEGEND

CLASS IV

DEMO EXISTING WALL TO ACCOMMODATE NEW IPU PANEL. NEW WALL PARTITION TO MATCH EXISTING CONSTRUCTION AND FINISHINGS.

PARTITION GRAPHICS

EXISTING PARTITION TO REMAIN

NEW PARTITION

TEMPORARY PARTITION

01.05 TEMPORARILY SEAL DOOR OFF WITH VISQUEEN OR APPROVED EQUAL PER VA SPECIFICATIONS.

TEMPORARY DOOR SEAL

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA

CLASS DESIGNATION

TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE

GROUP 1-LOW RISK

PATIENT RISK GROUP TABLE

GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK

INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

PATIENT RISK GROUP TYPE A

I I I I

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION

ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE

NECESSARY.LOW RISK GROUP 1

MEDIUM RISK GROUP 2

HIGH RISK GROUP 3

HIGHEST RISK GROUP 4

1.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.

2.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN EXIT OF WORK AREA.

REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

7.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.

2.

3.

4.

5.

6.

7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERS.

1.

2.

3.

4.

1.

2.

3.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

CLASS I

CLASS II

CLASS III

INCLUDES BUT IS NOT LIMITED TO:

TYPE A

INCLUDES BUT IS NOT LIMITED TO:

● INSTALLATION OF TELEPHONE AND COMPUTER CABLING

● ACCESS TO CHASE SPACES

TYPE B

INCLUDES BUT IS NOT LIMITED TO:

● MAJOR, UNCONTROLLED SANDING OF WALLS FOR PAINTING OR WALL COVERING

● REMOVAL OF FLOOR COVERINGS

● NEW WALL CONSTRUCTION

● MAJOR DUCT WORK OR MAJOR ELECTRICAL/CABLE SYSTEM WORK ABOVE CEILINGS

TYPE C

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES BUT IS NOT LIMITED TO:

● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS

● NEW CONSTRUCTION

TYPE D

ICRA GENERAL NOTES

● ENDOCARDIOGROPHY

● PRIMARY CARE

● MENTAL HYGIENE

● PHYSICAL THERAPY

● RESPIRATORY THERAPY

● NUCLEAR MEDICINE

● MRI/CT SCAN

● URGENT CARE

● SURGICAL INPATIENT

● MEDICAL INPATIENT

● PSYCHIATRY INPATIENT

● CLINICAL LABS

● PHARMACY

● VCS (CAFETERIA)

TYPE B

II

II

II

III

TYPE C

II

II

III

IV

III

IV

IV

IV

A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA.

B. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY WORK IN THE CEILING PLENUM.

C. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST.

D. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE; HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.

E. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES, DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF MATERIALS

TO / FROM LIMIT OF WORK. COORDINATE WITH COR AND SPECIFICATIONS FOR PROCEDURES/REQUIREMENTS.

CLASS IV

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

INSPECTION AND NON-INVASIVE ACTIVITIES

REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE IN 50 SQUARE

FEET

PAINTING (BUT NOT SANDING), WALL COVERING

ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT DO NOT

GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER

THAN FOR VISUAL INSPECTION

SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST

CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING

SYSTEM

OFFICE AREAS

(NON-CLINICAL)

ULTRASOUND

ENDOSCOPY

AMBULATORY SUGERY

PREP

NUTRITION & FOOD SERVICE

(CAFETERIA)

ALL OPERATING ROOMS INCLUDING LABOR AND DELIVERY

ANESTHESIA AND PUMP AREAS

ONCOLOGY CLINIC

SPD/STERILE PROCESSING

RADIATION ONCOLOGY

ALL INTENSIVE CARE UNITS

EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

WIPE WORK SURFACES WITH

DISINFECTANT.

CONTAIN CONSTRUCTION WASTE

BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK WAS BEING

PERFORMED.

COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM

NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.

REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR IMPLEMENT

CONTROL CUBE METHOD.

MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR FILTRATION

UNITS.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

REMOVE BARRIER MATERIALS CAREFULLY

TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH

CONSTRUCTION.

WET MOP AND/OR VACUUM WORK

AREA WITH HEPA FILTERED

VACUUM BEFORE LEAVING WORK

AREAS.

MINOR DUCT WORK OR MINOR ELECTRICAL/CABLE WORK ABOVE CEILINGS

SANDING OF WALLS FOR WALL COVERING WHERE DUST CAN BE CONTROLLED

NON PATIENT CARE ROOMS

PROSTHETICS

BUILDING 3

BUILDING 4 ADMIN

ENGINEERING SHOPS

LAUNDRY ● RADIOLOGY/IMAGING

NUCLEAR MEDICINE

ALL OUTPATIENT/DENTAL CLINICS

WOMEN'S HEALTH

● RADIOLOGY/SPECIAL

PROCEDURE

PHARMACY ADMIXTURE●

ICU/PACU●

NEGATIVE PRESSURE ISOLATION ROOMS/AREAS

(INCLUDING BRONCHOSCOPY AREA)

VACUUM WORK WITH HEPA-FILTERED

VACUUMS. WET MOP WITH DISINFECTANT

DEPENDING ON THE PROJECT LOCATION AND THE

ICRA, PROTECTIVE CLOTHING SHOULD BE WORN

AND REMOVED EACH TIME THE WORKER LEAVES

THE WORKSITE TO CONTROL DUST THROUGHOUT

THE MEDICAL CENTER. OTHERWISE, AND

ANTEROOM MUST BE CONSTRUCTED AND

CLOTHING WILL BE VACUUMED USING A

HEPA-FILTERED VACUUM BEFORE ENTERING THE

"CLEAN" SPACE.

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT

SYSTEM AS REQUIRED ON A PER PROJECT BASIS.

2. TAKE NECESSARY ACTIONS TO ENSURE HVAC SYSTEM CANNOT CROSS CONTAMINATE OTHER AREAS OF THE HOSPITAL.

3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR

IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.

4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AS REQUIRED ON

A PER PROJECT BASIS.

5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR APPROPRIATE PROTECTIVE CLOTHING AS REQUIRED BY

THE AREA.

7. PLACE TACKY MATS AT ENTRANCE AND EXIT OF WORK AREAS AND REPLACE WITH NEW MATS DAILY OR AS NECESSARY. IT

IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE CONTAMINATION IS KEPT AT AN ABSOLUTE MINIMUM OUTSIDE THE

WORK AREA.

8. PROVIDE APPROPRIATE CLEAN UP DAILY; WET MOP WITH DISINFECTANT AS REQUIRED.

9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE VA'S IH/SAFETY OFFICER, INFECTION CONTROL

COORDINATOR, & ENGINEERING SERVICE AND THOROUGHLY CLEANED BY THE

VA'S ENVIRONMENTAL MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. WET MOP AREA AND/OR VACUUM WORK AREA WITH FILTERED VACUUMS.

4. PROTECTIVE CLOTHING SHOULD BE WORN AND REMOVED EACH TIME THE

WORKER LEAVES THE WORK SITE TO CONTROL DUST THROUGHOUT THE

MEDICAL CENTER. OTHERWISE AN ANTEROOM MUST BE CONSTRUCTED AND

CLOTHING WILL BE VACUUMED USING A HEPA-FILTERED VACUUM BEFORE

ENTERING THE "CLEAN SPACE".

1. CLEANUP AND DISPOSAL AS APPROPRIATE.

2. TRAFFIC: DECREASE PATIENTS' EXPOSURES.

3. WATER: SCHEDULE INTERRUPTIONS DURING LOW ACTIVITY.

01.06 MAINTAIN ACCESS TO FIRE DEPARTMENT VALVE.

GC101

01.02 SALVAGE EXISTING FLOORING FROM EXISTING PARTITION. REUSE AND REATTACH TO NEW PARTITION TO MATCH EXISTING.

AutoCAD SHX Text

TEMPORARY WALL

AutoCAD SHX Text 01.04

AutoCAD SHX Text

TEMPORARY WALL

AutoCAD SHX Text

TEMPORARY DOOR SEAL

AutoCAD SHX Text 01.04

AutoCAD SHX Text 01.05

AutoCAD SHX Text

CLASS IV

AutoCAD SHX Text 01.02

AutoCAD SHX Text 01.01

AutoCAD SHX Text 01.06

AutoCAD SHX Text

GROUP 2-MEDIUM RISK

TYPE D

C319

337B

337D

341A

337C

373A

374A

384384A

385A

386A

387388

370A

387A

323B

323C

323D

324322

305A

C304

C303

S301

303 302

C301

C302

S302

L04

M3-1

350349E302

T300C309

C308

C306

C307

C310

3B330 3B331

3B332

3B333

3B334

3B335 3B3363B337

3B338A3B339

3B342

3B338

3B340

3B341

3B341A

3B343

3B344A3B344

3B345A

3B345

3B346

3B347 3B348

3B348A3B347A

3B330

3B330

S303

363362

C312

C300

301 C

301 A 301 B

308A

306A

313A 314

C320

355-01

353-01

303A

14131211

4 3 2 1

323E

323A

337A

360-01

E300

L06

L05

STERILE CORE

STERILE PREP

CORRIDOR

ELEVATOR

LOBBY

GENERAL

STORAGE

CLEAN

EQPT

CLEAN

LINEN

TOILET

CLEAN

UTILITY/

SCOPES

EXAM RM

EXAM RM

EXAM RM

EXAM RMEXAM RMEXAM RMRECOVERY

RECOVERY

RECOVERY

RECOVERY

EXAM RMEXAM RMEXAM RM

EXAM RM EXAM RM EXAM RM EXAM RM

SOILED

UTILITY

MED

ROOM

EQPT

STORAGE

EQPT

STORAGE

HVAC

MED RM

WAITING

SURGICAL

DUMBWAITER

BELOW

ROOF ROOF

ROOF

BELOW

ROOF

ROOF BELOW

1008-21

DRESSING

STERILIZER

MINOR OR

OR SUPERVISER

TOILET

OPERATING RM

TOILET

CYSTO

STERILIZER

OPERATING RM

MEDICATION

STEP-DN

RM-6

TOILET

STEP-DN

RM-5

TOILET

NURSES

STATION

ELECT/IT

CLOSET

SOILED

UTILITY

CLEAN

LINEN

ISOLATION

STEP-DOWN-4TOILET

STEP-

DOWN-3

TOILET

STEP-

DOWN-2

STEP-

DOWN-1EQUIPMENT

STAFF

TOILET

NOURISHMENT

AISLE

TOILET

AISLE

OFFICE, ICU

CONSULT

TOILET

NURSES

ICU-7

RECOVERYICU-6

ICU-5

ICU-4

ICU-3

ICU-2

ICU-1

CORRIDOR

HAC

ENDOSCOPY

CORRIDOR

STAIR

ENDOSCOPY ENDOSCOPY

CORRIDOR

CORRIDOR

STAIR

ELEVATOR

MECH

TOILET

CHAPEL

CONTROL

EDUCATION

OFFICE

ITS

BREAK RM

SOILED UTILMED GASELECTRICAL

TELECOMCORRIDOR

HAC

FEMALE

TOILET

CORRIDOR

HAC

CORRIDOR

CORRIDOR

HOUSEKEEP

DATA/TELE

CLEAN LINEN

WAITING

SOILED LINEN CONFERENCE RMTOILET

MEDSBREAK RM

NURSE STA

OFFICE

OFFICE

PATIENT

TOILET

LINEN

TOILETPATIENT

TOILET

PATIENT

KITCHEN

PATIENT

PATIENT

TOILETTOILET

CORRIDOR

CORRIDOR

OFFICE/ IC

STAIR

ATTIC

OFFICE/ ANEST

ICU WAITINGLOUNGE

LOCKER RM

TOILET

TOILET

CORRIDOR

CORRIDOR

LOBBY

CHAPLIN SERVICES

STORAGE

CONSULT

OFFICE

SURGERY WAITING

UNDER

SUITENURSE MGR

CLEAN SUPPLY

TOILET

CLEAN LINEN

NURSE STA

TOILET

RECOVERY

RECOVERY

TOILET

BREAK RM

LOCKES

NURSES STORAGE

CLEAN LINEN

ELECTRICAL

SERVICEELEVATOR

SERVICEELEVATOR

ELEVATOR

TOILET

TOILET

MALE

OPERATING

ROOM #2

OPERATING

ROOM #1

OPERATING ROOM #3

OPERATING ROOM #4

AE101

AE101

3/32" = 1'-0"AE100

1 OVERALL THIRD FLOOR PLAN

DATE:

DRAWN BY: C. STAGGS

CHECKED BY: T. STRAHAN

PROJ. NO: 564-23-501

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

03/31/2023

Au to de sk

D oc s:

//F ay et te vi lle V

A O

R Is ol at io n

Pa ne ls /F ay et te vi lle V

A O

R Is ol at io n

Pa ne ls _E

_R

.rv t

3/

/2

:4 7:

A

M

AE100

OVERALL FLOOR

PLAN - THIRD FLOOR

OR #2 - 564-23-501

1100 NORTH COLLEGE AVENUE

FAYETTEVILLE, AR

VETERANS

HEALTHCARE SYSTEM

OF THE OZARKS

NO DATE REVISION

PARTITION GRAPHICS

EXISTING PARTITION TO REMAIN

NEW PARTITION

TEMPORARY PARTITION

TEMPORARY DOOR SEAL

337B 337D

341A

STERILE PREP

STERILIZER

MINOR OR

TOILET

CYSTO

CORRIDOR

OPERATING

ROOM #2

OPERATING

ROOM #1

EXISTING

CORRIDOR

C319

337B

337D

341A

337C

323C

323D

305A

C304

S301

C302

S302

L04

M3-1

350349E302

T300C309

C308

C306

C307

C300

C320

355-01

353-01

332328

323E

337A

360-01

L06

L05

STERILE CORE

STERILE PREP

CORRIDOR

ELEVATOR

LOBBY

GENERAL

STORAGE

CLEAN

EQPT

CLEAN

LINEN

CLEAN

UTILITY/

SCOPES

SOILED

UTILITY

MED

ROOM

EQPT

STORAGE

HVAC

MED RM

WAITING

SURGICAL

DUMBWAITER

ROOF

DRESSING

STERILIZER

MINOR OR

OR SUPERVISER

TOILET

OPERATING RM

TOILET

CYSTO

STERILIZER

OPERATING RM

OFFICE, ICU

CONSULT

TOILET

RECOVERY

CORRIDOR

HAC

CORRIDOR

STAIR

CORRIDOR

CORRIDOR

STAIR

ELEVATOR

MECH

TOILET

CHAPEL

CONTROL

EDUCATION

OFFICE

ITS

BREAK RM

SOILED UTILMED GASELECTRICAL

TELECOMCORRIDOR

HAC

FEMALE

TOILET

CORRIDOR

HAC

CORRIDOR

LOBBY

SURGERY WAITING

SERVICEELEVATOR

SERVICEELEVATOR

ELEVATOR

TOILET

MALE

OPERATING

ROOM #2

OPERATING

ROOM #1

OPERATING ROOM #3

OPERATING ROOM #4

1/8" = 1'-0"AE101

1 ENLARGED OR FLOOR PLAN

DATE:

DRAWN BY: C. STAGGS

CHECKED BY: T. STRAHAN

PROJ. NO: 564-23-501

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

03/31/2023

Au to de sk

D oc s:

//F ay et te vi lle V

A O

R Is ol at io n

Pa ne ls /F ay et te vi lle V

A O

R Is ol at io n

Pa ne ls _E

_R

.rv t

3/

/2

:4 7:

A

M

AE101

ENLARGED FLOOR

PLAN - THIRD FLOOR

OR #2 - 564-23-501

1100 NORTH COLLEGE AVENUE

FAYETTEVILLE, AR

VETERANS

HEALTHCARE SYSTEM

OF THE OZARKS

NO DATE REVISION

1/4" = 1'-0"AE101

2 ENLARGED OR#2 FLOOR PLAN

KEY NOTES

01.01

01.02

01.03

DEMO EXTERIOR PORTION OF EXISTING WALL TO ACCOMMODATE NEW IPU PANEL. NEW WALL PARTITION TO MATCH EXISTING

CONSTRUCTION AND FINISHINGS.

XX

SALVAGE EXISTING FLOORING FROM EXISTING PARTITION. REUSE AND REATTACH TO NEW PARTITION TO MATCH EXISTING.

EXTENTS OF WALL PARTITION TO AVOID CONFLICT WITH EXISTING MED GAS LINES AND VALVE BOX.

GENERAL SHEET NOTES

PARTITION GRAPHICS

EXISTING PARTITION TO REMAIN

NEW PARTITION

TEMPORARY PARTITION

TEMPORARY DOOR SEAL

A. WORK WITHIN OR #2 TEMPORARY BARRIERS CAN OCCUR DURING NORMAL HOURS.

B. WORK OUTSIDE OF OR #2 TEMPORARY BARRIERS TO OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS AND REQUIRES ADDITIONAL CLEANING MEASURES BY VA's EMS

DEPARTMENT. COORDINATE WITH COR.

C. ANY WORK CREATING EXCESSIVE DISTURBANCE SHALL OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS. OR DEPARMENT LEAD RESERVES THE RIGHT TO STOP WORK

THAT MAY INTERFERE WITH SURGERY.

D. OR EMERGENCY PROCEDURES MAY OCCUR OUTSIDE OF NORMAL OR HOURS. CONTRACTOR MUST SUBMIT WRITTEN REQUEST A MIN. OF 14 DAYS AHEAD OF WORK

OUTSIDE OF CLASS IV ICRA BARRIERS FOR OR TO GO INTO DIVERT STATUS WHERE EMERGENCY PROCEDURES WOULD BE ROUTED TO OTHER LOCATIONS. IF OR IS NOT IN DIVERT STATUS; PRIORITY MUST BE GIVEN TO OR EMERGENCY PROCEDURE AND CONTRACTOR MUST ADJUST WORK SCHEDULE TO ACCOMMODATE OR

REQUIREMENTS.

E. CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING AND IDENTIFYING ALL UTILITIES THAT MAY PRESENT INTERFERENCE OR CONFLICTS IN PROJECT AREA.

AutoCAD SHX Text

PROJECT LIMITS

AutoCAD SHX Text 01.03

AutoCAD SHX Text 01.02

AutoCAD SHX Text 01.01

AutoCAD SHX Text

PROJECT LIMITS

AutoCAD SHX Text

PROJECT LIMITS (SEE GENERAL SHEET NOTE B)

AutoCAD SHX Text

COORDINATE WITH COR TO ESTABLISH ACCESS.

AutoCAD SHX Text 01.03

AutoCAD SHX Text 01.02

01.01

DUPLEX RECEPTACLE (NEMA 5-20R); MOUNTED

8" ABOVE COUNTERTOP.

QUADRUPLEX RECEPTACLE (TWO NEMA 5-20R)

SPECIAL RECEPTACLE: VERIFY NEMA TYPE WITH MANUFACTURER

GFI DUPLEX RECEPTACLE (NEMA 5-20R), SELF-TEST TYPE

GFI DUPLEX RECEPTACLE (NEMA 5-20R), SELF-TEST TYPE;

MOUNTED 8" ABOVE COUNTERTOP.

ABBREVIATIONS

AC ABOVE COUNTER

AFF ABOVE FINISHED FLOOR

CB CIRCUIT BREAKER

E EXISTING

EC ELECTRICAL CONTRACTOR

EP EXPLOSION PROOF

GFI GROUND FAULT CIRCUIT INTERRUPTER

GR GROUND

HP HORSE POWER

SWITCH MOUNTED AT +48"; SINGLE POLE UON.

LOWER CASE LETTER, WHEN PRESENT, INDICATES FIXTURES CONTROLLED.

* ABBREVIATIONS FOR SWITCH

2 DOUBLE POLE SWITCH

3 3-WAY SWITCH

4 4-WAY SWITCH

D DIMMER SWITCH (SHALL BE COMPATABLE WITH FIXTURE BEING DIMMED)

F FAN SWITCH: DUAL OPERATION WITH DIMMER

K KEYED SWITCH

M MOTOR RATED SWITCH

OS DUAL TECHNOLOGY OCCUPANCY SENSOR

V VOLUME CONTROL SWITCH

OSD OCCUPANCY SENSOR/DIMMER COMBO

CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR WITH SPARE

DRY CONTACTS.

FLOOR BOX WITH DATA: LEGRAND WIREMOLD SERIES RFB4E-OG OR RFB6E-

OG WITH EVOLUTION COVER. ROUTE (2)1" FOR DATA FROM FLOOR BOX TO

NEAREST ACCESSIBLE CEILING SPACE. ON FLOOR LEVELS WITH ACCESSIBLE

SPACE BELOW, USE POKE-THRU STYLE FLOOR BOXES: LEGRAND 6AT SERIES.

SEE ARCHITECTURAL PLANS FOR LOCATION UON.

DIRECT EQUIPMENT CONNECTION: VERIFY CONNECTION DETAILS WITH

MANUFACTURER

J

EQUIPMENT DISCONNECT: INTERIOR DISCONNECTS SHALL BE NEMA 1 TYPE.

EXTERIOR DISCONNECTS SHALL BE NEMA 3R TYPE. SIZE AS INDICATED IN THE

PLANS AND PER NAMEPLATE RATING.

DUPLEX RECEPTACLE (NEMA 5-20R)

PHONE/DATA: PROVIDE 4"X4", 30-1/4 CUBIC INCH OUTLET BOX AT 8" ABOVE

COUNTER (UON) WITH (2) 3/4" CONDUITS (WITH PULL STRINGS) ROUTED TO

ACCESSIBLE CEILING SPACE. PROVIDE SINGLE GANG MUD RING WITH BLANK

COVER. PROVIDE PLASTIC BUSHINGS ON EXPOSED CONDUIT ENDS. WIRING BY

OTHERS.

PHONE/DATA: PROVIDE 4"X4", 30-1/4 CUBIC INCH OUTLET BOX AT +18" (UON)

WITH (2) 3/4" CONDUITS (WITH PULL STRINGS) ROUTED TO ACCESSIBLE CEILING

SPACE. PROVIDE SINGLE GANG MUD RING WITH BLANK COVER. PROVIDE

PLASTIC BUSHINGS ON EXPOSED CONDUIT ENDS. WIRING BY OTHERS.

IG ISOLATED GROUND

MCC MOTOR CONTROL CENTER

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOC.

NIC NOT IN CONTRACT

NL NIGHT LIGHT

UG UNDERGROUND

UON UNLESS OTHERWISE NOTED

WP WEATHERPROOF

WR WEATHER RESISTANT

SWITCHES

RECEPTACLES

SINGLE RECEPTACLE (NEMA 5-20R)

SPLIT WIRED DUPLEX RECEPTACLE (NEMA 5-20R)

PANELS AND MISC.

FLOOR BOX: HUBBEL 3SFBSS WITH 3SFBC COVER. EC SHALL ROUTE A 1"C FOR

FLOOR BOX TO NEAREST ACCESSIBLE CEILING SPACE. ON FLOOR LEVELS

WITH ACCESSIBLE SPACE BELOW, USE POKE-THRU STYLE FLOOR BOXES:

HUBBELL PT2X2 SERIES. SEE ARCHITECTURAL PLANS FOR LOCATION UON.

LIGHT OR POWER PANEL

TV

4x4 JUNCTION BOX.

S CEILING MOUNTED SPEAKER

TELEVISION: PROVIDE 4X4 JUNCTION BOX WITH (2) 3/4" CONDUITS (WITH PULL

STRINGS) ROUTED TO ACCESSIBLE CEILING SPACE. PROVIDE SINGLE GANG MUD

RING WITH BLANK COVER. CONFIRM HEIGHTS WITH ARCHITECT PRIOR TO

ROUGH-IN.

CR CARD READER: REFER TO SYSTEM PLANS AND SPECIFICATIONS. AT EACH

DOOR WITH A CARD READER PROVIDE ALL ELECTRICAL CONNECTIONS FOR

DOOR HARDWARE SYSTEMS AS REQUIRED TO MAKE A COMPLETE

OPERATIONAL SYSTEM. WHERE REQUIRED, BACK TO BACK 2"X4" BOXES ARE

ALLOWED FOR CARD READER AND PUSH TO EXIT SWITCH. PROVIDE POWER

TO THE LOCK SYSTEM IN THE I.T. ROOM WHERE NEEDED BY CONTRACTOR

INSTALLING SYSTEM.

CEILING MOUNTED RECEPTACLE(NEMA 5-20R)

(ALL RECEPTACLE TYPES) WITH USB CHARGING PORTSU

PHONE/DATA: PROVIDE 4"X4", 30-1/4 CUBIC INCH OUTLET BOX IN CEILING.

PROVIDE SINGLE GANG MUD RING WITH BLANK COVER. WIRING BY OTHERS.

TELEVISION: PROVIDE THREE INDIVIDUAL DEVICE BOXES WITH 1/2" CONDUIT FOR

POWER AND 1" CONDUIT (WITH PULL STRINGS) FOR A/V AND DATA ROUTED TO

ACCESSIBLE CEILING SPACE. PROVIDE CONNECTIONS FOR POWER, DATA, COAX,

AND HDMI. MOUNT AT +72" AFF UNO. CONFRIM HEIGHTS WITH ARCHITECT PRIOR

TO ROUGH-IN.

SECURITY CAMERA: DOUBLE GANG BOX AND 3/4"C TO ABOVE CEILING.

F FURNITURE FEED FLOOR BOX: LEGRAND WIREMOLD EVOLUTION

POKE THRU WITH FF COVER ASSEMBLY.

OS

TV

U T H

N

IC

C E

R

T

AS -

A

A N

HP

ENGINEERING,

INC.

#1653

E E

OF

R

A R

K

S

E

A

ENG I

T

I F

HP ENGINEERING

FILE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

5504 W PINNACLE POINT DR

Suite 200

ROGERS, AR 72758

TEL 479-899-6370

CLIENT:

XXX

PROJECT NUMBER:

COMPLETION

A u to d e sk D o cs

/F a ye tt e vi lle

V A

O R

I so la tio n P a n e ls

/F a ye tt e vi lle

V A

O R

E

R

.r vt

/3

/2

:1 :5

A

M

E001

CPB

CPB

230080F

ELECTRICAL LEGEND

OR #2 - 564-23-501

1100 NORTH COLLEGE AVENUE

FAYETTEVILLE, AR

VETERANS

HEALTHCARE SYSTEM

OF THE OZARKS

230080F

100%

INDEX OF ELECTRICAL DRAWINGS

E001 ELECTRICAL LEGEND

E103 OVERALL ELECTRICAL PLAN - THIRD FLOOR

E200 ENLARGED ELECTRICAL PLANS

E301 PANEL SCHEDULES

GENERAL ELECTRICAL NOTES

1 DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE

WORK. REVIEW ALL GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL

REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE

CONSTRUCTION DOCUMENTS.

2 SPECIAL ATTENTION SHALL BE GIVEN TO ALL RACEWAYS WITHIN FINISHED AREAS

WITHOUT CEILINGS AND EXPOSED TO STRUCTURE. IN GENERAL, ALL RACEWAYS SHALL

BE CONCEALED WITHIN WALLS, ABOVE STRUCTURE FINISH, OR BELOW FLOOR SLABS

WHEN SPECIFIED. WHERE EXPOSED CONDITIONS ARE NECESSARY OR UNAVOIDABLE DUE

TO OTHER CONDITIONS, THE BID SHALL INCLUDE ANY REASONABLE MEANS TO MINIMIZE

THE AMOUNT OF SURFACE MOUNTED EQUIPMENT. PRIOR TO ROUGH-IN, COORDINATE

ALL EXPOSED RACEWAY AND BOX CONDITIONS WITH ARCHITECT PRIOR TO

CONSTRUCTION OF WALLS, ROOF DECK, OR FLOOR SLABS. ATTACHMENT TO ROOF DECK

OR JOIST WEBBINGS IS NOT ALLOWED, MAINTAIN A MINIMUM SPACING OF 1-1/2” FROM

CONDUIT TO ROOF DECK. IN AREAS WHERE EXPOSED RACEWAYS ARE REQUIRED,

INSTALL SYSTEMS SQUARE AND TIGHT TO STRUCTURE AND PAINT TO MATCH THE

STRUCTURE PER ARCHITECT AND/OR OWNER SPECIFICATIONS. FAILURE TO PROPERLY

COORDINATE THE ROUTING OF EXPOSED RACEWAYS MAY RESULT IN RELOCATION OF

SUCH RACEWAYS AT NO ADDITIONAL COST TO THE OWNER.

3 OPENINGS AROUND ELECTRICAL PENETRATIONS THROUGH FIRE-RESISTANT-RATED

WALLS, PARTITIONS, FLOORS OR CEILINGS SHALL BE FIRESTOPPED USING APPROVED

METHODS TO MAINTAIN THE FIRE RESISTANCE RATING. PROVIDE PENETRATION FIRE

STOPPING WITH RATINGS DETERMINED PER ASTM E 814 OR UL 1479. FIRE STOPPING

SHALL NOT BE LESS THAN FIRE RESISTANCE RATING OF CONSTRUCTED PENETRATIONS.

4 INSTALL EQUIPMENT IN A MANNER TO REMAIN ACCESSIBLE WITH REASONABLE MEANS BY

THE OWNER FOLLOWING COMPLETION OF WORK. SPECIAL ATTENTION AND ADDITIONAL

COORDINATION IS EXPECTED IN AREAS OF THE BUILDING WHERE THE CEILING AND

STRUCTURE HEIGHTS HAVE SIGNIFICANT DIFFERENT ELEVATIONS. EQUIPMENT

REQUIRING POSSIBLE FUTURE ACCESS SHALL BE INSTALLED SUCH THAT IT MAY BE

SAFELY ACCESSED FROM A STANDARD STEP LADDER OR PERSONNEL LIFT SUITABLE FOR

THE LOCATION AND CEILING HEIGHT, WITHOUT REMOVING OR DAMAGING THE CEILING

GRID STRUCTURE.

5 FIELD VERIFY LOCATIONS OF EXISTING ELECTRICAL EQUIPMENT, INCLUDING POWER

POLES, TELEPHONE PEDESTALS, OVERHEAD AND UNDERGROUND FEEDERS, METERS,

PANELS, DEVICES, ETC. PROVIDE FOR COORDINATION WITH EXISTING EQUIPMENT.

6 ROOM NAMES/NUMBERS SHOWN IN PANELBOARD SCHEDULES ARE PER ARCHITECTURAL

FLOOR PLANS. CONTRACTOR SHALL PROVIDE FINALIZED PANELBOARD SCHEDULES AT

COMPLETION OF PROJECT WITH OWNER PROVIDED ROOM NAMES/NUMBERS.

7 CONDUCTORS FOR BRANCH CIRCUITS AS DEFINED IN ARTICLE 100, SHALL BE SIZED TO

PREVENT A VOLTAGE DROP EXCEEDING 3% AT THE FARTHEST LOAD, AND WHERE THE

MAXIMUM TOTAL VOLTAGE DROP ON BOTH FEEDERS AND BRANCH CIRCUITS TO THE

FARTHEST LOAD DOES NOT EXCEED 5%.

8 ALL WORK IS TO BE PERFORMED IN STRICT COMPLIANCE WITH THE NATIONAL

ELECTRICAL CODE, STATE LAWS, ALL AUTHORITIES HAVING JUISDICTION, AND ALL OTHER

REGULATIONS GOVERNING WORK OF THIS NATURE.

9 THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK, MATERIAL, AND LABOR TO SATISFY A

COMPLETE AND WORKING SYSTEM WHETHER SPECIFIED OR IMPLIED.

10 CONTRACTOR TO CONFIRM EXACT LOCATION OF EXISTING AND NEW EQUIPMENT.

11 THE CONTRACTOR SHALL FURNISH AND INSTALL ALL GROUNDING SYSTEMS (AS

REQUIRED) IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE.

12 ALL ELECTRIC MATERIALS AND EQUIPMENT FOR THE PROJECT SHALL BE NEW AND U.L.

OR EQUALLY LISTED.

13 SUBMIT TO THE OWNER CERTIFICATES OF INSPECTIONS IN DUPLICATE FROM AN

APPROVED INSPECTION AGENCY UPON COMPLETION.

14 THE CONTRACTOR SHALL SECURE ALL PERMITS OR APPLICATIONS AND PAY ANY AND ALL

FEES AS REQUIRED,

15 THE CONTRACTOR SHALL FURNISH ALL INSTRUMENTS AND QUALIFIED PERSONNEL OR

FIRM TO PERFORM ALL REQUIRED TESTS.

16 NO EQUIPMENT SHALL BE ENERGIZED UNTIL ALL TEST AND ADJUSTMENTS HAVE BEEN

MADE. THREE COPIES OF ALL TEST RESULTS SHALL BE DELIVERED TO THE OWNER

17 JUNCTION BOXES LOCATED ABOVE GRID CEILINGS SHALL BE LOCATED NO GREATER

THAN 4-FEET ABOVE THE CEILING IN A LOCATION ACCESSIBLE VIA A LADDER FROM THE

ROOM BELOW.

18 ALL WIRING DEVICE COVERPLATES SHALL INDICATE PANELBOARD AND CIRCUIT SERVING

THE DEVICE. UTILIZE CLEAR VINYL (BLACK LETTERING) IDENTIFICATION LABLES

MANUFACTURED BY 3M COMPANY (OR APPROVED EQUIVALENT).

19 SEISMIC PROTECTION FOR SEISMIC CONCERNS OF ALL BUILDING SYSTEMS INCLUDING

BUT NOT LIMITED TO MECHANICAL, PLUMBING, AND ELECTRICAL MUST MEET MINIMUM

REQUIREMENTS OF ALL APPLICABLE CODES FOR BUILDINGS’ CLASSIFIED SEISMIC USE

GROUP AND SEISMIC DESIGN CATEGORY. ANY REQUIREMENTS FOR SEISMIC

PROTECTION MEASURES TO BE APPLIED SHALL BE INSTALLED IN STRICT ACCORDANCE

WITH ALL APPLICABLE LOCAL, STATE, AND/OR FEDERAL CODES AND WITH

MANUFACTURER’S REQUIREMENTS, THE MOST STRINGENT SHALL APPLY.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE TYPE AND LOCATION

OF SEISMIC RESTRAINTS REQUIRED FOR THE VARIOUS SYSTEM’S ELEMENTS CONTAINED

IN THE CONSTRUCTION DOCUMENTS BASED ON THE RELATED SEISMIC CODE CRITERIA,

THE SIZE AND WEIGHT OF THE SUPPORTED ELEMENT AND THE DISTANCE FROM

STRUCTURE THAT THE ELEMENT WILL BE INSTALLED. IF REQUIRED BY LOCAL, STATE,

FEDERAL CODES AND/OR OTHER AUTHORITY HAVING JURISDICTION (AHJ) THE

CONTRACTOR SHALL SUBMIT DESCRIPTIVE CATALOG DATA OF SEISMIC RESTRAINTS,

SHOP DRAWINGS SHOWING THE TYPES, LOCATIONS AND INSTALLATION DETAILS OF

SEISMIC RESTRAINTS AND CALCULATIONS SHOWING THAT THE SEISMIC RESTRAINTS

MEET THE SEISMIC REQUIREMENTS TO THE LOCAL AHJ FOR REVIEW AND APPROVAL.

CALCULATIONS SHALL BE SIGNED AND SEALED BY A REGISTERED PROFESSIONAL

ENGINEER, LICENSED IN THE STATE OF THE PROJECT LOCATION AND EMPLOYED BY THE

MANUFACTURER OF THE SEISMIC RESTRAINT PRODUCTS. CALCULATIONS SHALL INCLUDE

DEAD LOADS, STATIC SEISMIC LOADS AND CAPACITY OF MATERIALS UTILIZED FOR

CONNECTIONS TO EQUIPMENT AND STRUCTURE.

20 THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL

SYSTEM TESTING THAT IS REQUIRED IN THE LOCALLY ADOPTED EDITION OF NFPA 99:

STANDARD FOR HEALTHCARE FACILITIES. THE ELECTRICAL CONTRACTOR SHALL

PROVIDE ALL EQUIPMENT TO PERFORM THE VOLTAGE AND IMPEDANCE TESTS REQUIRED

IN NFPA 99. PROVIDE COMPLETE RESULT DOCUMENTATION TO THE ELECTRICAL

ENGINEER, LOCAL AND STATE AUTHORITY UPON COMPLETION OF THE TESTS.

21 DESIGNATED SPARE CIRCUIT BREAKERS SHALL BE PLACED IN THE OFF POSITION

22 PROVIDE SPECIAL PROTECTION AGAINST ELECTRICAL SHOCK IN WET PROCEDURE

LOCATIONS AS REQUIRED IN NEC ARTICLE 517.

EXISTING ELECTRICAL AND DEMOLITION NOTES

1 PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITH THE

EXISTING CONDITIONS OF THE FACILITY AND RELATED SITE. REVIEW THE GENERAL NOTES

AND ALL OTHER TRADE DRAWINGS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE

CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT,

ENGINEER OR OWNER, AS SPECIFIED, OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO

SUBMITTING BID.

2 ANY EXISTING CONDITIONS REFLECTED WERE TAKEN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .