DRAWINGS OR 1-3-4.pdf
PDF 3 MB Posted
- Attached to
- FAYETTEVILLE | Z2DA | CON | 564-23-502 | UPGRADE ELECTRICAL POWER OR 1-4 | AMENDMENT 0001
- Solicitation number
- 36C25623R0104
About this file
This is a solicitation for an electrical upgrade project at a Department of Veterans Affairs medical center in Fayetteville, Arkansas. The project involves upgrading electrical power to operating rooms 1 through 4, including replacing existing isolated power system panels with new 120V and 208V panels equipped with integral line isolation monitors. The contractor must furnish management, labor, materials, tools and related services to complete the electrical system upgrade. Key requirements include demolishing existing panels; installing new 120V isolated power panels, 208V isolated power panels, and associated transformers and circuit breakers; enlarging wall openings; finishing wall bump outs; and reconnecting panels to existing feeders and receptacles. The response due date is not provided. The award date will be determined. Pricing terms and contract clauses are not specified in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
LL
EG
E
AV
E
E. HUNTSVILLE
ROAD
CAMPUS MAP
PROJECT DESCRIPTION AND GENERAL
REQUIREMENTS
LOCATION MAP
LIST OF DRAWINGS
FAYETTEVILLE, AR
ARKANSAS
FAYETTEVILLE,
AR
1100 N. COLLEGE AVE.
FAYETTEVILLE, AR
PROJECT
LOCATION
UPGRADE ELECTRIC POWER OR 1,3,4
PROJECT 564-23-502 VHSO FAYETTEVILLE, AR 72703
VETERANS HEALTH ADMINISTRATION
GENERAL
1 of 14 GI001 COVER SHEET 2 of 14 GI002 GENERAL NOTES, ABBREVIATIONS, AND STANDARD SYMBOLS 3 of 14 GC101 ENLARGED ICRA FLOOR PLAN - THIRD FLOOR
ARCHITECTURAL
4 of 14 AE100 OVERALL FLOOR PLAN - THIRD FLOOR 5 of 14 AE101 ENLARGED FLOOR PLAN - THIRD FLOOR - OR #1 6 of 14 AE102 ENLARGED FLOOR PLAN - THIRD FLOOR - OR #3 7 of 14 AE103 ENLARGED FLOOR PLAN - THIRD FLOOR - OR #4
ELECTRICAL
8 of 14 E001 ELECTRICAL LEGEND 9 of 14 E101 OVERALL ELECTRICAL PLAN - FIRST FLOOR 10 of 14 E103 OVERALL ELECTRICAL PLAN - THIRD FLOOR 11 of 14 E200 ENLARGED ELECTRICAL PLANS 12 of 14 E300 ELECTRICAL SCHEDULES AND RISER 13 of 14 E301 PANEL SCHEDULES 14 of 14 E302 PANEL SCHEDULES
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
DATE: 03/31/2023
DRAWN BY: C. STAGGS
CHECKED BY: T. STRAHAN
PROJ. NO: 564-23-502
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
GI001
COVER SHEET
OR 1,3,4 - 564-23-502
1100 NORTH COLLEGE AVENUE
FAYETTEVILLE, AR
NO DATE REVISION
BID DEDUCTIONS NOTES
1. DO NOT DEMOLISH PANEL IN E302.
2. REMOVE NEW IPU-12 IN OR #4 AND ASSOCIATED EQUIPMENT (CONDUIT, WIRE, CIRCUIT BREAKERS, ETC.)
3. REMOVE NEW IPU-8 OR #1 AND ASSOCIATED EQUIPMENT.
4. REMOVE NEW IPU-11 IN OR #3 AND ASSOCIATED EQUIPMENT.
*PROVIDE ALTERNATE BIDS WITH THE ABOVE ITEMS DEDUCTED IN ACCORDANCE WITH SPECIFICATION SECTION 01 00 00
THE CONTRACTOR MUST FURNISH ALL MANAGEMENT, SUPERVISION, LABOR, MATERIAL, EQUIPMENT, TOOLS, SUPPLIES, CONSUMABLES, PARTS, AND RELATED SERVICES, REQUIRED FOR THE UPGRADE OF THE ELECTRICAL
SYSTEM IN ORS 1, 3, AND 4.
A. REMOVE EXISTING ISOLATED POWER SYSTEM PANELS IN EACH ROOM. PANELS MUST BE OFFERED TO COR FOR VA USE AS SPARE. IF COR DOES NOT WANT PANEL, THEN IT IS THE RESPONSIBILITY OF CONTRACTOR TO PROPERLY DISPOSE OF PANEL OFF SITE. FURNISH AND INSTALL NEW 120-VOLT ISOLATED POWER SYSTEM PANEL IPU IN EACH ROOM, SQUARE D EQUAL WITH INTEGRAL LINE ISOLATION MONITOR IN EXISTING LOCATION INCLUDING: 1. SMIB - ISOLATED POWER PANEL INTERIOR BOLT-ON W/LIM, 2. SXMK05BASC - ISOLATED POWER PANEL TRANSFORMER/ BREAKER, 3. ST6826R- ISOLATED POWER PANEL TRIM STANDARD, 4. SB662408F - ISOLATED PANEL BACKBOX 8" DEEP, 5. 5 KVA TRANSFORMER WITH 16 QOB220 BREAKERS. CONTRACTOR MUST ENLARGE EXISTING OPENING IN WALL TO ACCEPT FLUSH MOUNTED NEW PANEL AND REPAIR FINISHED AS NEEDED. CONTRACTOR MUST RECONNECT PANEL TO EXISTING FEEDER AND RECEPTACLES. CONTRACTOR
MUST FURNISH CERTIFICATION CERTIFICATE.
B. FURNISH AND INSTALL NEW 208-VOLT ISOLATED POWER SYSTEM PANEL IPU IN EACH ROOM, SQUARE D, OR APPROVED EQUAL, WITH INTEGRAL LINE ISOLATION MONITOR IN LOCATION SHOWN ON DRAWING 3 INCLUDING: 1. SMIB - ISOLATED POWER PANEL INTERIOR BOLT-ON W/LIM, 2. SXMK07BBSC - ISOLATED POWER PANEL TRANSFORMER I BREAKER, 3. ST6826R - ISOLATED POWER PANEL TRIM STANDARD, 4. SB662408F - ISOLATED PANEL BACKBOX 8" DEEP, 5. 7.5 KVA TRANSFORMER WITH 8 QOB220 AND 8 QOB230 BREAKERS.
FURNISH, INSTALL, AND CONNECT PANEL FEEDER TO ISOLATION PANEL WITH NEW 60-AMP 2 POLE SQUARE D QOB BREAKER FROM PANEL 13SE. FEEDER MUST BE MINIMUM SIZE #6 COPPER WITH #10 GROUND IN 1" EMT.
CONTRACTOR MUST CUT OPENING IN WALL TO FLUSH MOUNT NEW PANEL AND REPAIR FINISHES AS REQUIRED.
FURNISH, INSTALL, AND CONNECT TWO 30- AMP TWIST LOCK 3 PRONG NEMA L6-30R FLUSH MOUNTED RECEPTACLES EACH ON THEIR DEDICATED BREAKER WITH STAINLESS STEEL COVER PLATES IN LOCATIONS AS SHOWN ON DRAWING 3. MUST USE COPPER CONDUCTORS WITH XHHW INSULATION AND A DIALECTIC CONSTANT LESS THAN 3.5 AND INSTALLED AS REQUIRED BY THE LATEST NEC CODE FOR THE RECEPTACLE
FEEDERS. CONTRACTOR MUST FURNISH CERTIFICATION CERTIFICATE.
C. DEMOLISH EXISTING PANELBOARD 13S AND FURNISH AND INSTALL A NEW 225A, THREE PHASE, 42 SPACE PANEL IN ITS PLACE. NEW PANEL TO BE FED BY A NEW 200A CIRCUIT BREAKER IN SWITCHBOARD SB-2.
COORDINATE WITH COR TO DETERMINE ROUTING OF CONDUIT FROM FIRST TO THIRD FLOOR.
D. ALL REPLACEMENT AND NEW PANELS TO BE LABELED WITH EACH IPU PANEL NUMBER. LABEL TO
MATCH EXISTING STYLE.
E. DEMOLISH EXISTING WALL IN AREAS LOCATED ON PLANS TO FACILITATE INSTALLATION WALL BUMP OUTS TO FACILITATE INSTALLATION OF NEW IPU PANELS AT LOCATIONS INDICATED ON PLANS.
F. INSTALL AND FINISH WALL BUMP OUTS AT LOCATIONS INDICATED ON PLANS TO FACILITATE IPU PANEL
INSTALLATION.
1. INSTALL 2 X 6” METAL STUDS AND GYPSUM WALL AS INDICATED ON PLANS.
2. INSTALL SOLID SURFACE PANELS TO MATCH EXISTING MATERIAL DIMENSIONS AND FINISH. INSTALL IN
ACCORDANCE WITH MANUFACTURERS INSTALLATION INSTRUCTIONS.
3. SALVAGE EXISTING SHEET VINYL FLOORING, MODIFY TO FIT NEW BUMP OUTS, AND FINISH TO MATCH
EXISTING BASE PROFILE AND SEAMLESS CONSTRUCTION.
a) IF EXISTING FLOORING IS NOT ABLE TO BE SALVAGED; MATCHING NEW FLOORING MUST BE PROVIDED, INSTALLED AND JOINED WITH EXISTING FLOORING A MINIMUM OF 12” AWAY FROM BASE AND FINISHED TO MATCH EXISTING BASE PROFILE AND SEAMLESS CONSTRUCTION. INSTALL IN
ACCORDANCE WITH MANUFACTURERS INSTALLATION INSTRUCTIONS.
4. FINISH GYPSUM WALLS TO MATCH EXISTING WALL FINISH, TEXTURE AND COLOR.
VETERANS
HEALTHCARE SYSTEM
OF THE OZARKS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text e85
AutoCAD SHX Text
AutoCAD SHX Text Garage
AutoCAD SHX Text Main Hospital 1
AutoCAD SHX Text
AutoCAD SHX Text Arkansas Veterans Home
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B-3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WOODSLEY AVE.
AutoCAD SHX Text
NORTH COLLEGE AVE.
AutoCAD SHX Text
WEST NORTH ST.
AutoCAD SHX Text Parking
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
NW
AutoCAD SHX Text
SW
AutoCAD SHX Text
NE
AutoCAD SHX Text
SE
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
NW
AutoCAD SHX Text
SW
AutoCAD SHX Text
NE
AutoCAD SHX Text
SE
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BUS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LITTLE ROCK
AutoCAD SHX Text
DUMAS
AutoCAD SHX Text
PINE BLUFF
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
NW
AutoCAD SHX Text
SW
AutoCAD SHX Text
NE
AutoCAD SHX Text
SE
AutoCAD SHX Text S
AutoCAD SHX Text W
SHIPPING
REF:1A123
ROOM NAME
ROOM NUMBER
REFERENCE ROOM NUMBER:
INDICATES ROOM TO REFERENCE
FOR TYPICAL MEDICAL EQUIPMENT
LAYOUT, GENERAL ANNOTATION
AND DIMENSIONS UON.
INTERIOR ELEVATION
REFERENCE
SPOT ELEVATION
CENTERLINE
EL: +10'-0"
PARTITION TYPE TAGXXXXX
BREAK, STRAIGHT (SEE SECTION
INDICATORS, BUILDING, WITH
BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR
DETAIL INDICATOR FOR
SMALL CONDITIONS
DRAWING BLOCK
TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIORA-201
A4
A2 A-202
A
BC
D
A-201 A4
A-512 D2
A-512 D2
A-512 D2
COLUMN GRID
A4 A-201
BUILDING SECTION
INDICATOR
MARK STUD SIZE OVERALL THK. "R" RATING FIRE TEST STC RATING
REFER TO PARTITION TAG AND
PARTITION NOTES FOR REQD.
INSULATION
ONE LAYER OF 5 8" GWB EACH SIDE
ON METAL STUDS
HOLD BOTTOM OF GWB 12" OFF FINISH FLOOR.
NO EXCEPTIONS.
REFER TO WALL DETAIL SHEET AND PARTITION NOTES
FOR HEAD DETAILS
PARTITION TAGS ARE READ LEFT TO RIGHT:
THE FIRST CHARACTER INDICATES WHICH PARTITION / BARRIER TYPE TO REFERENCE FOR
CONSTRUCTION.
THE SECOND CHARACTER INDICATES A REFERENCE TO THE STRUCTURAL CORE THICKNESS
(STUD OR CMU).
THE THIRD CHARACTER INDICATES:
"A" - ACOUSTICAL PARTITION
"R" - FIRE RATED
"S" - SMOKE RESISTANT PARTITION (UNRATED)
"T" - FIRE RATED / ACOUSTICAL BARRIER
"V" - FIRE RATED / SMOKE BARRIER
"W" - ACOUSTICAL / SMOKE RESISTANT PARTITION
"Z" - FIRE RATED / SMOKE / ACOUSTICAL BARRIER
EXAMPLE:
A TAG OF C3T INDICATES A 4-7 8" 1 HOUR RATED BARRIER WITH ACOUSTICAL INSULATION.
PLAN
SILL
PARTITION TYPE - C
PARTITION TAG NOTES:
C1
C2
C3
C4
C6
C8
1 5/8"
2 1/2"
3 5/8"
6"
8"
2 7/8"
3 3/4"
4 7/8"
5 1/4"
7 1/4"
9 1/4"
4"
1 HR
1 HR
1 HR
1 HR
U419 47
U419 47
U419 47
U419 47
GENERAL PROJECT NOTES
GENERAL FLOOR PLAN NOTES
1. REFER TO GENERAL REQUIREMENTS OF THE PROJECT SPECIFICATIONS FOR REQUIREMENTS RELATED TO WORK RESTRICTIONS, NOISE CONTROL, SECURITY, LIFE SAFETY, INFECTION CONTROL RISK ASSESSMENT.
2. REFER TO TITLE SHEET FOR COORDINATION DRAWING REQUIREMENTS.
3. THE EXISTING CONDITIONS AND DEMOLITION WORK INDICATED IS INTENDED TO SHOW THE GENERAL
SCOPE OF THE WORK. THE CONTRACTOR IS TO STUDY THE COMPLETE SET OF DOCUMENTS AND
PERFORM ANY AND ALL DEMOLITION AND NEW CONSTRUCTION REQUIRED TO COMPLETE THE WORK SHOWN. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND REPORT ANY DISCREPANCIES IN
CONDITIONS TO THE COR BEFORE BEGINNING OR CONTINUING WORK.
4. AT PROJECT COMPLETION, THE GENERAL CONTRACTOR SHALL PROVIDE TO THE COR AN “AS BUILT DRAWINGS” FOR THE WORK. REFER TO GENERAL REQUIREMENTS SECTION OF THE SPECIFICATIONS.
5. VERIFY AND ASCERTAIN THE LOCATION, DEPTH, DIRECTION, SIZE OF ANY AND ALL EXISTING UTILITIES IN THE GENERAL VICINITY OF THE WORK AREA. IT SHALL BE THE GENERAL CONTRACTOR’S RESPONSIBILITY TO REPAIR ANY UTILITY DISRUPTED, BROKEN, OR OTHERWISE RENDERED NON FUNCTIONAL DUE TO THE WORK PERFORMED AT NO ADDITIONAL COST TO THE VETERANS AFFAIRS DURING THIS COURSE OF WORK. THE GENERAL CONTRACTOR SHALL IDENTIFY ANY NON-FUNCTIONING UTILITY/SYSTEM, PRIOR TO THE START OF WORK TO THE COR. IDENTIFICATION OF SUCH AFTER THE START OF WORK SHALL BE DEEMED AS DISTURBED/DAMAGED BY THE GENERAL CONTRACTOR AND SHALL BE REPAIRED AT THE
EXPENSE OF THE GENERAL CONTRACTOR.
6. THE GENERAL CONTRACTOR SHALL PROPERLY SUPPORT ANY UTILITY ENCOUNTERED IN THE COURSE OF
THIS WORK.
7. THE GENERAL CONTRACTOR SHALL PROVIDE STORAGE FOR MATERIALS. MATERIALS SHALL NOT BE
STORED IN DEPARTMENT OF VETERANS AFFAIRS BUILDINGS, UNLESS AGREED TO BY VA.
8. COORDINATE MATERIAL STAGING AREAS WITH THE COR.
9' THE CONTRACTOR SHALL NOT LEAVE THE WORK AREA UNATTENDED FOR ANY REASON, UNLESS SAFETY
PARTITIONS, SAFETY FENCING ARE INSTALLED AND SECURED.
10. THE GENERAL CONTRACTOR IS ADVISED THAT ANY RIGGING SHALL BE PERFORMED BY PROFESSIONAL
RIGGERS AT THE EXPENSE OF THE GENERAL CONTRACTOR.
11. CONTRACTOR SHALL HAVE REPRESENTATIVE ON SITE AT ALL TIMES DURING CONSTRUCTION ACTIVITIES.
12. REFER TO SPECIFICATIONS FOR GENERAL REQUIREMENTS OF THE CONTRACT.
13. INFECTION CONTROL, SAFETY AND PHASING: VERIFY REQUIREMENTS RELATED TO INFECTION CONTROL, DUST MITIGATION, SAFETY AND RISK ASSESSMENT. CONTRACTOR TO DEVELOP AND PUBLISH WORK PLAN ADDRESSING INFECTION CONTROL, SAFETY, AND PHASING FOR APPROVAL BY COR PRIOR TO BEGINNING THEIR WORK. PLAN TO INCLUDE MEANS AND METHODS OF DEBRIS STAGING AND REMOVAL, BOTH INTERNALLY AND EXTERNALLY. INFECTION CONTROL PLAN TO INCLUDE TEMPORARY DUST AND DEBRIS
BARRIERS AND VESTIBULES AROUND PROJECT WORK AREAS. TEMPORARY BARRIERS ARE NOT TO
RESTRICT REQUIRED MEANS OF EGRESS PATHS AND WIDTHS.
14. CONTRACTOR SHALL PROVIDE EGRESS SIGNAGE AS REQUIRED BY THE VA COR.
15. ALL PENETRATIONS THROUGH RATED FLOOR/CEILING ASSEMBLIES AND THROUGH FIRE RATED WALL AND
SMOKE BARRIER ASSEMBLIES - THOSE CREATED BY REMOVAL OF DEMOLISHED ITEMS UNDER THIS CONTRACT AND THOSE DISCOVERED DURING CONSTRUCTION UNDER THIS CONTRACT AS A RESULT OF PREVIOUS WORK AND THOSE CREATED BY NEW WORK UNDER THIS CONTRACT - MUST BE SEALED AS PART OF THIS CONTRACT. ALL RATED SEPARATIONS MUST MEET CURRENT CODE REQUIREMENTS.
16. PROTECT EXISTING HORIZONTAL AND VERTICAL FIREPROOFING AND FIRE STOPPING DURING PROJECT.
ONCE DEMOLITION IS COMPLETE, CONTRACTOR SHALL REPAIR ALL DAMAGED FIREPROOFING AND RESTORE MISSING FIREPROOFING, WHETHER A RESULT OF DEMOLITION OPERATIONS OR NOT, TO MEET REQUIRED RATING(S). SEE SHEET GI003 FOR APPLICABLE UL DESIGNS FOR BASIS OF DESIGN.
1. PARTITION TYPES AS NOTED BY THE SYMBOL CONTINUE BETWEEN ROOM/SPACE
CORNERS OR ANY INTERSECTING PARTITION.
2. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES CONTINUE
UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS NOTED AS “CLR", "CLEAR” OR “MIN".
DIMENSIONS NOTED AS “HOLD” ARE CRITICAL TO COORDINATE OTHER WORK (E.G.
CEILING GRIDS, LIGHTING, FINISHES).
4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO INITIATING CONSTRUCTION
AND REPORT DISCREPANCIES TO COR PRIOR TO COMMENCING WORK.
5. CONTRACTOR SHALL PROVIDE ALL BLOCKING REQUIRED TO ANCHOR ALL WALL AND
CLG MOUNTED ITEMS, INCLUDING BUT NOT LIMITED TO EQUIPMENT BLOCKING
REQUIREMENT SCHEDULE ON SHEET QH601.
6. FIRE STOPPING SYSTEMS – REFER TO SPEC SECTION 07 84 00 FOR INFO REGARDING
PENETRATIONS OF ALL RATED ASSEMBLIES (BOTH SINGLE AND DOUBLE MEMBRANE
PENETRATIONS) INCLUDING BUT NOT LIMITED TO PENETRATIONS FOR DUCTWORK,
CONDUIT, PIPING AND SUPPORT FOR WALL MOUNTED EQUIPMENT, CABINETS AND
COUNTERTOPS.
GENERAL DEMOLITION NOTES
1. THE EXISTING CONDITIONS AND DEMOLITION WORK INDICATED IS INTENDED TO SHOW THE GENERAL
SCOPE OF THE WORK. THE CONTRACTOR IS TO STUDY THE COMPLETE SET OF DOCUMENTS AND
PERFORM ANY AND ALL DEMOLITION AND NEW CONSTRUCTION REQUIRED TO COMPLETE THE WORK SHOWN. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND REPORT ANY DISCREPENCIES IN
CONDITIONS TO THE COR BEFORE BEGINNING OR CONTINUING WORK.
2. ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE
ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH COULD NOT BE
PREDETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM FLOOR TO FLOOR, ETC., OR ARE
UNIDENTIFIED SHALL BE REPORTED TO THE COR BEFORE REMOVAL FOR FINAL DISPOSITION.
3. REMOVE ALL CONSTRUCTION DESIGNATED TO BE REMOVED AND CLEAR TO RECEIVE NEW WORK AS
HEREIN INDICATED.
4. REMOVE PORTIONS OF EXISTING CONSTRUCTION AS DRAWN AND PATCH TO MATCH ADJACENT
CONSTRUCTION.
5. WHEREVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGARS, BRACING, FOUNDATION, ETC. AFTER REMOVAL, AFFECTED CONSTRUCTION AND SURFACES, SUCH AS FLOORS, WALLS, BASES, AND CEILINGS, SHALL BE FINISHED TO
MATCH ADJACENT SURFACES UNLESS OTHERWISE NOTED.
6. NEW WORK AS A RESULT OF PATCHING SHALL ALIGN WITH AND MATCH EXISTING WORK EXCEPT WHERE
OTHERWISE DIMENSIONED OR DETAILED.
7. ANY EXISTING CONDITIONS WHICH ARE INCONSISTENT WITH CONTRACT DRAWINGS RELEVANT TO THIS
CONTRACT SHALL BE REPORTED TO THE COR.
8. WHERE DEMOLITION OR RELATED WORK LEAVES FLOOR SURFACES WITH IMPERFECTIONS OR NOT LEVEL
TO TOLERANCES SPECIFIED FOR NEW WORK, PROVIDE SELF-LEVELING UNDERLAYMENT.
9. WHERE DEMOLITION WORK UNCOVERS OR LEAVES OPENINGS IN PARTITIONS OR INCOMPLETE
PARTITIONS, EXTEND, RESTORE, AND/OR CLOSE OPENING IN PARTITION AS INDICATED AND/OR AS REQUIRED TO MAINTAIN FIRE RATINGS. MATCH EXISTING CONSTRUCTION, U.N.O., WITHIN THE LIMITS AND TOLERANCES FOR MATERIALS AS SPECIFIED OR RECOMMENDED BY THE MANUFACTURER. REFINISH
SURFACES TO ALIGN FLUSH WITH EXISTING.
10. WHERE DEMOLITION WORK OR RELOCATION OF EXISTING ITEMS LEAVES UNFINISHED SURFACES AND/OR SUBSTRATES, CUT AND PATCH AS REQUIRED TO RESTORE SUBSTRATE AND/OR FINISH MATERIAL EVEN
AND FLUSH WITH ADJOINING SURFACES. TEXTURE AND REFINISH TO MATCH EXISTING U.N.O.
11. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING A PRE-CONSTRUCTION
WALK-THROUGH.
12. WALK-OFF MATS, THE CONSTRUCTION BARRIER, AND IN PHASE I, NEGATIVE PRESSURE BY HEPA
FILTRATION SHALL BE IN PLACE PRIOR TO START DEMOLITION.
13. ALL OPENINGS AND SURFACES MADE BARE BY DEMOLITION AND/OR REMOVAL OF MATERIALS SHALL BE REPAIRED AND/OR PATCHED TO MATCH ADJACENT FINISH. PREPARE SURFACES TO RECEIVE NEW
FINISH(S).
14. DISTURBANCE OF EXISTING MATERIALS ARE THE RESPONSIBILITY OF THE CONTRACTOR WITH REFERENCE TO PROPER LEGAL DISPOSAL, LEGAL ABATEMENT, PATCHING AND FINISHING. ALL DISTURBED AREAS AND
MATERIALS SHALL MATCH EXISTING CONDITIONS.
15. COORDINATE WITH M/E/P DRAWINGS FOR ADDITIONAL DEMOLITION IN FLOORS, WALLS AND ROOFS & RELATED ITEMS AS REQUIRED TO ACCOMMODATE NEW CONSTRUCTION OR UTILITIES ON THESE FLOORS
OR RELATED ADJACENT FLOORS. PATCH/REPAIR BY EACH RESPECTIVE DISCIPLINE.
COORDINATE DEMOLITION WITH OTHER DISCIPLINES. HOLES/PENETRATIONS IN RATED WALLS CREATED WHEN DEMOLITION OCCURS ARE TO BE FILLED TO MATCH THE EXISTING RATED CONDITION OR BETTER.
16. WHERE TILE FLOORING OR TERRAZO FLOOR AND BASE ARE REMOVED, PROVIDE FLOOR LEVELING AS REQUIRED TO CREATE A LEVEL FLOOR SURFACE WITH THE FLOORS THAT ARE TO REMAIN. PREPARE NEW
SURFACE TO RECEIVE NEW FINISHES.
17. WHERE EXISTING WALL IS REMOVED, PROVIDE FLOOR LEVELING AS REQUIRED TO CREATE A LEVEL FLOOR SURFACE WITH THE FLOOR LEVELS AT EACH SIDE OF THE DEMO-ED WALL LOCATION. PREPARE
NEW SURFACE TO RECEIVE NEW FINISHES.
18. DURING DEMOLITION AND CONSTRUCTION PHASES, MAINTAIN ALL REQUIRED EXISTING WALL RATINGS AT WALLS TO REMAIN. AS ARE INDICATED ON DRAWINGS. REMOVE ALL MISC. FASTENING ANCHORS, CLIPS, CONDUIT, PIPING AND RELATED ITEMS THAT ARE NOT IN USE.
19. COORDINATE THE EXACT PHASING OF THE DEMOLITION FOR SPECIFIC STRUCTURAL MEMBERS WITH
DRAWINGS.
INTERIOR PARTITION NOTES
1. REFER TO PLANS FOR LOCATION OF PARTITION TYPES. C6 IS THE TYPICAL PARTITION
TYPE UNLESS OTHERWISE NOTED.
2. ERECT PARTITIONS IN ORDER OF RATING PRIORITY BEGINNING WITH HIGHEST FIRE
RATED PARTITION. CONSTRUCTION OF HIGHER RATED PARTITIONS SHALL BE
CONTINUOUS PAST/THROUGH LOWER RATED INTERSECTING PARTITION.
3. ALL STUD GAUGES AND LIMITING HEIGHTS IN GYPSUM BOARD REFERENCE
SPECIFICATIONS.
4. ANY MODIFICATIONS TO EXISTING PARTITIONS AND/OR SURFACES TO FINISHED TO MATCH EXISTING
CONSTRUCTION, QUALITY, DIMENSIONS, AND APPLICABLE VA STANDARD SPECIFICATIONS.
5. THE FOLLOWING LIST OF ROOMS (IF USED) SHALL HAVE THEIR PERIMETER
PARTITIONS INSULATED USING THERMAL INSULATION:
- ALL ELECTRICAL / MECHANICAL ROOMS
- A/V EQUIPMENT / LIGHTING ROOMS
- STAIRWAYS
6. THE FOLLOWING LIST OF ROOMS (IF USED) SHALL HAVE THEIR PERIMETER
PARTITIONS INSULATED WITH SOUND ATTENUATION BATTS:
- OFFICES AND OFFICE SUITES
- STAFF WORK AREAS, LOUNGES, AND LOCKER ROOMS
- WALLS CONTAINING WASTE OR DRAIN LINES
7. ALL PARTITIONS SHALL EXTEND FULL HEIGHT TO UNDERSIDE OF DECK /
INTERSTITIAL ABOVE OR HAVE THEIR TOPS BRACED PER PARTITION BRACING
DETAILS.
8. ALL RATED PARTITIONS TO EXTEND FROM TOP OF SLAB TO UNDERSIDE OF
STRUCTURE. SEAL ENTIRE PERIMETER WITH FIRESTOP SEALANT UON.
9. ALL INTERIOR ROOF AND OVERFLOW DRAIN LEADERS TO BE WRAPPED
CONTINUOUSLY WITH SOUND ATTENUATION INSULATION.
10. INSTALL FRAMING AND GWB TO OFFSET AROUND STRUCTURAL MEMBERS OR OTHER
OBSTRUCTIONS TO MAINTAIN FIRE RESISTIVE RATINGS.
11. WHERE GWB EXTENDS TO THE UNDERSIDE OF STRUCTURE, STOP GWB 1/2” BELOW
LINE OF STRUCTURE AND SEAL AS REQUIRED.
12. NON-RATED PARTITIONS SHALL HAVE ENTIRE PERIMETER SEALED WITH
ACOUSTICAL SEALANT, UON.
13. REFER TO MECHANICAL DRAWINGS FOR DETAILS ON PIPE PENETRATIONS THROUGH
ACOUSTICAL PARTITIONS AS WELL AS RATED PARTITIONS.
14. INSTALL METAL STUD BLOCKING IN PARTITIONS AT ALL WALL MOUNTED EQUIPMENT,
WHETHER CC, VC OR VV.
15. ALL PARTITIONS SCHEDULED TO RECEIVE TILE, IN BATHING ROOMS AND/OR
LOCATED ADJACENT TO OR BEHIND PLUMBING FIXTURES SHALL BE CONSTRUCTED
OF TILE BACKER BOARD (SEE SPECIFICATIONS).
16. FOR MOLD PREVENTION, DO NOT INSTALL GWB IN DIRECT CONTACT WITH THE
FLOOR. ALL GWB SHALL BE SHIMMED ½” OFF THE FLOOR WITH NON-POROUS SHIMS.
PLASTIC NON-POROUS HORSESHOE SHIMS ARE RECOMMENDED. GWB SHIMS ARE
NOT ACCEPTABLE.
17. CABLES PENETRATING RATED PARTITIONS (WITH OR WITHOUT SLEEVES) SHALL BE
SECURED ON BOTH SIDES OF THE PARTITION. METHOD OF SECURING THE CABLES
SHALL BE SLEEVED TO PRECLUDE ANY MOVEMENT OF THE CABLE DISTURBING THE
INTEGRITY OF THE PENETRATION FIRE - STOPPING ASSEMBLY. SEE
SPECIFICATIONS.
18. REFER TO DRAWINGS FOR TYPICAL WALL FRAMING FOR FIRE DAMPERS IN RATED
WALLS. COORDINATE EXACT FRAMING REQUIREMENTS WITH FIRE DAMPER
MANUFACTURER. COORDINATE ALL PARTITION CONSTRUCTION WITH MECHANICAL
PRIME CONTRACTOR PRIOR TO COMMENCING PARTITION CONSTRUCTION. GENERAL
CONTRACTOR SHALL OBTAIN FROM THE MECHANICAL CONTRACTOR THE PROPER
INSTALLATION INSTRUCTIONS FOR ALL FIRE AND SMOKE DAMPERS AND SHALL
PROVIDE THE REQUIRED METAL FRAMING, DRYWALL, ETC., ACCORDING TO THESE
INSTRUCTIONS. INSTALLATION INSTRUCTIONS TO BE SUBMITTED TO THE COR FOR
REVIEW.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FIRE AND SMOKE SEALED
PENETRATIONS IN ACCORDANCE WITH TESTED AND APPROVED PENETRATION
SEALING SYSTEM FOR THE PARTITION CONSTRUCTION / FIRE RATING AND THE
PENETRATING ELEMENTS.
20. PARTITION TYPES AS NOTED BY THE SYMBOL CONTINUE BETWEEN ROOM/SPACE
CORNERS OR ANY INTERSECTING PARTITION.
21. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES CONTINUE
UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.
NOTE:
THE RATING (FIRE) AND UL ASSEMBLY DESIGNATION ONLY
APPLIES WHEN THE PARTITION SUFFIX "R, T, V, & S" IS
ADDED TO THE WALL TAG(S) OTHERWISE THE PARTITION
TYPE IS A NON-RATED WALL AND / OR SOME OTHER
DISTINCTION NOTED UNDER PARTITION TAG NOTES.
IF NOTED ON TAG
DATE: 03/31/2023
DRAWN BY: C. STAGGS
CHECKED BY: T. STRAHAN
PROJ. NO: 564-23-502
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
OR 1,3,4 - 564-23-502
1100 NORTH COLLEGE AVENUE
FAYETTEVILLE, AR
VETERANS
HEALTHCARE
SYSTEM
OF THE
OZARKS
GI002
NOTES, PARTITION TYPES,
AND STANDARD SYMBOLS
NO DATE REVISION
AutoCAD SHX Text
DRAWING BLOCK TITLE
AutoCAD SHX Text 1 1/2" = 1'-0"
AutoCAD SHX Text C4
AutoCAD SHX Text 1 1/2'
AutoCAD SHX Text 1/2'
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
STANDARD SYMBOLS
AutoCAD SHX Text D4
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 6"
AutoCAD SHX Text 3"
AutoCAD SHX Text 1" = 1'-0"
AutoCAD SHX Text
PARTITION TYPES
D1
EXISTING
CORRIDOR
C319
337B
337D
341A
337C
323C
323D
305A
C304
S301
C302
S302
L04
M3-1
350349E302
T300 C309
C308
C306
C307
C300
C320
355-01
353-01
332328
323E
337A
360-01
L06
L05
STERILE CORE
STERILE PREP
CORRIDOR
ELEVATOR
LOBBY
GENERAL
STORAGE
CLEAN
EQPT
CLEAN
LINEN
CLEAN
UTILITY/
SCOPES
SOILED
UTILITY
MED
ROOM
EQPT
STORAGE
HVAC
MED RM
WAITING
SURGICAL
DUMBWAITER
ROOF
DRESSING
STERILIZER
MINOR OR
OR SUPERVISER
OPERATING RM
TOILET
CYSTO
STERILIZER
OPERATING RM
OFFICE, ICU
CONSULT
TOILET
RECOVERY
CORRIDOR
HAC
CORRIDOR
STAIR
CORRIDOR
CORRIDOR
STAIR
ELEVATOR
MECH
TOILET
CHAPEL
CONTROL
EDUCATION
OFFICE
ITS
BREAK RM
SOILED UTILMED GASELECTRICAL
TELECOM
CORRIDOR
HAC
FEMALE
TOILET
CORRIDOR
HAC
CORRIDOR
LOBBY
SURGERY WAITING
SERVICE
ELEVATOR
SERVICE
ELEVATOR
ELEVATOR
TOILET
MALE
OPERATING
ROOM #2
OPERATING
ROOM #1
OPERATING ROOM #3
OPERATING ROOM #4
1/8" = 1'-0"GC101
1 ENLARGED ICRA OR FLOOR PLAN
DATE: 03/31/2023
DRAWN BY: C. STAGGS
CHECKED BY: T. STRAHAN
PROJ. NO: 564-23-502
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
Au to de sk
D oc s:
//F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls /F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls _E
_R
.rv t
3/
/2
:4 7:
A
M
GC101
ENLARGED ICRA FLOOR
PLAN - THIRD FLOOR
OR #1,3,4 - 564-23-502
1100 NORTH COLLEGE AVENUE
FAYETTEVILLE, AR
VETERANS
HEALTHCARE SYSTEM
OF THE OZARKS
NO DATE REVISION
ICRA SYMBOL LEGEND
CLASS IV
PHASE 1A
PARTITION GRAPHICS
EXISTING PARTITION TO REMAIN
NEW PARTITION
TEMPORARY PARTITION
TEMPORARY DOOR SEAL
GENERAL NOTE
A. CONSTRUCT PHASE 1A FIRST. AFTER 1A IS COMPLETE, THEN
CONSTRUCT 1B. THEN FOLLOWED BY 1C.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA
CLASS DESIGNATION
TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE
GROUP 1-LOW RISK
PATIENT RISK GROUP TABLE
GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK
INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP TYPE A
I I I I
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION
ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE
NECESSARY.LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
1.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.
2.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN EXIT OF WORK AREA.
REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
7.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.
2.
3.
4.
5.
6.
7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERS.
1.
2.
3.
4.
1.
2.
3.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CLASS I
CLASS II
CLASS III
INCLUDES BUT IS NOT LIMITED TO:
TYPE A
INCLUDES BUT IS NOT LIMITED TO:
● INSTALLATION OF TELEPHONE AND COMPUTER CABLING
● ACCESS TO CHASE SPACES
TYPE B
INCLUDES BUT IS NOT LIMITED TO:
● MAJOR, UNCONTROLLED SANDING OF WALLS FOR PAINTING OR WALL COVERING
● REMOVAL OF FLOOR COVERINGS
● NEW WALL CONSTRUCTION
● MAJOR DUCT WORK OR MAJOR ELECTRICAL/CABLE SYSTEM WORK ABOVE CEILINGS
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT IS NOT LIMITED TO:
● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
● NEW CONSTRUCTION
TYPE D
ICRA GENERAL NOTES
● ENDOCARDIOGROPHY
● PRIMARY CARE
● MENTAL HYGIENE
● PHYSICAL THERAPY
● RESPIRATORY THERAPY
● NUCLEAR MEDICINE
● MRI/CT SCAN
● URGENT CARE
● SURGICAL INPATIENT
● MEDICAL INPATIENT
● PSYCHIATRY INPATIENT
● CLINICAL LABS
● PHARMACY
● VCS (CAFETERIA)
TYPE B
II
II
II
III
TYPE C
II
II
III
IV
III
IV
IV
IV
A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA.
B. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY WORK IN THE CEILING PLENUM.
C. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST.
D. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE; HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.
E. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES, DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF MATERIALS
TO / FROM LIMIT OF WORK. COORDINATE WITH COR AND SPECIFICATIONS FOR PROCEDURES/REQUIREMENTS.
CLASS IV
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
INSPECTION AND NON-INVASIVE ACTIVITIES
REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE IN 50 SQUARE FEET
PAINTING (BUT NOT SANDING), WALL COVERING
ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT DO NOT GENERATE
DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR
VISUAL INSPECTION
SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST
CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM
OFFICE AREAS
(NON-CLINICAL)
ULTRASOUND
ENDOSCOPY
AMBULATORY SUGERY PREP
NUTRITION & FOOD SERVICE
(CAFETERIA)
ALL OPERATING ROOMS INCLUDING LABOR AND DELIVERY
ANESTHESIA AND PUMP AREAS
ONCOLOGY CLINIC
SPD/STERILE PROCESSING
RADIATION ONCOLOGY
ALL INTENSIVE CARE UNITS
EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
WIPE WORK SURFACES WITH
DISINFECTANT.
CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK WAS BEING
PERFORMED.
COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM
NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR IMPLEMENT CONTROL
CUBE METHOD.
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR FILTRATION UNITS.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
WET MOP AND/OR VACUUM WORK
AREA WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREAS.
MINOR DUCT WORK OR MINOR ELECTRICAL/CABLE WORK ABOVE CEILINGS
SANDING OF WALLS FOR WALL COVERING WHERE DUST CAN BE CONTROLLED
NON PATIENT CARE ROOMS
PROSTHETICS
BUILDING 3
BUILDING 4 ADMIN
ENGINEERING SHOPS
LAUNDRY ● RADIOLOGY/IMAGING
NUCLEAR MEDICINE
ALL OUTPATIENT/DENTAL CLINICS
WOMEN'S HEALTH
● RADIOLOGY/SPECIAL
PROCEDURE
PHARMACY ADMIXTURE●
ICU/PACU●
NEGATIVE PRESSURE ISOLATION ROOMS/AREAS (INCLUDING
BRONCHOSCOPY AREA)
VACUUM WORK WITH HEPA-FILTERED
VACUUMS. WET MOP WITH DISINFECTANT
DEPENDING ON THE PROJECT LOCATION AND THE
ICRA, PROTECTIVE CLOTHING SHOULD BE WORN AND
REMOVED EACH TIME THE WORKER LEAVES THE
WORKSITE TO CONTROL DUST THROUGHOUT THE
MEDICAL CENTER. OTHERWISE, AND ANTEROOM
MUST BE CONSTRUCTED AND CLOTHING WILL BE
VACUUMED USING A HEPA-FILTERED VACUUM
BEFORE ENTERING THE "CLEAN" SPACE.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT
SYSTEM AS REQUIRED ON A PER PROJECT BASIS.
2. TAKE NECESSARY ACTIONS TO ENSURE HVAC SYSTEM CANNOT CROSS CONTAMINATE OTHER AREAS OF THE HOSPITAL.
3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AS REQUIRED ON
A PER PROJECT BASIS.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR APPROPRIATE PROTECTIVE CLOTHING AS REQUIRED BY
THE AREA.
7. PLACE TACKY MATS AT ENTRANCE AND EXIT OF WORK AREAS AND REPLACE WITH NEW MATS DAILY OR AS NECESSARY. IT
IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE CONTAMINATION IS KEPT AT AN ABSOLUTE MINIMUM OUTSIDE THE
WORK AREA.
8. PROVIDE APPROPRIATE CLEAN UP DAILY; WET MOP WITH DISINFECTANT AS REQUIRED.
9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE VA'S IH/SAFETY OFFICER, INFECTION CONTROL
COORDINATOR, & ENGINEERING SERVICE AND THOROUGHLY CLEANED BY THE
VA'S ENVIRONMENTAL MANAGEMENT SERVICE.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. WET MOP AREA AND/OR VACUUM WORK AREA WITH FILTERED VACUUMS.
4. PROTECTIVE CLOTHING SHOULD BE WORN AND REMOVED EACH TIME THE
WORKER LEAVES THE WORK SITE TO CONTROL DUST THROUGHOUT THE
MEDICAL CENTER. OTHERWISE AN ANTEROOM MUST BE CONSTRUCTED AND
CLOTHING WILL BE VACUUMED USING A HEPA-FILTERED VACUUM BEFORE
ENTERING THE "CLEAN SPACE".
1. CLEANUP AND DISPOSAL AS APPROPRIATE.
2. TRAFFIC: DECREASE PATIENTS' EXPOSURES.
3. WATER: SCHEDULE INTERRUPTIONS DURING LOW ACTIVITY.
KEY NOTES
01.01
01.05 TEMPORARY BARRIER SYSTEM PROVIDED BY G.C. BASIS OF DESIGN: STARC SYSTEMS http://starcsystems.com/ OR APPROVED EQUAL.
XX GENERAL SHEET NOTES
A. ALL WORK IS CLASS IV, UNLESS OTHERWISE NOTED.
B. WORK WITHIN OR #1's & OR #3's TEMPORARY BARRIERS CAN OCCUR DURING NORMAL HOURS.
C. ALL WORK FOR OR #4 TO OCCUR OUTSIDE OF NORMAL HOURS.
D. WORK OUTSIDE OF OR's TEMPORARY BARRIERS TO OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS AND REQUIRES ADDITIONAL CLEANING MEASURES BY VA's EMS
DEPARTMENT. COORDINATE WITH COR.
E. ANY WORK CREATING EXCESSIVE DISTURBANCE SHALL OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS. OR DEPARMENT LEAD RESERVES THE RIGHT TO STOP WORK
THAT MAY INTERFERE WITH SURGERY.
F. OR EMERGENCY PROCEDURES MAY OCCUR OUTSIDE OF NORMAL OR HOURS. CONTRACTOR MUST SUBMIT WRITTEN REQUEST A MIN. OF 14 DAYS AHEAD OF WORK
OUTSIDE OF CLASS IV ICRA BARRIERS FOR OR TO GO INTO DIVERT STATUS WHERE EMERGENCY PROCEDURES WOULD BE ROUTED TO OTHER LOCATIONS. IF OR IS NOT IN DIVERT STATUS; PRIORITY MUST BE GIVEN TO OR EMERGENCY PROCEDURE AND CONTRACTOR MUST ADJUST WORK SCHEDULE TO ACCOMMODATE OR
REQUIREMENTS.
G. CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING AND IDENTIFYING ALL UTILITIES THAT MAY PRESENT INTERFERENCE OR CONFLICTS IN PROJECT AREA.
DEMO EXISTING WALL TO ACCOMMODATE NEW IPU PANEL. NEW WALL PARTITION TO MATCH EXISTING CONSTRUCTION AND FINISHINGS.
01.06 TEMPORARILY SEAL DOOR OFF WITH VISQUEEN OR APPROVED EQUAL PER VA SPECIFICATIONS.
01.02 SALVAGE EXISTING FLOORING FROM EXISTING PARTITION. REUSE AND REATTACH TO NEW PARTITION TO MATCH EXISTING.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA
CLASS DESIGNATION
TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE
GROUP 1-LOW RISK
PATIENT RISK GROUP TABLE
GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK
INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP TYPE A
I I I I
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION
ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE
NECESSARY.LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
1.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.
2.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN EXIT OF WORK AREA.
REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
7.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.
2.
3.
4.
5.
6.
7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERS.
1.
2.
3.
4.
1.
2.
3.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CLASS I
CLASS II
CLASS III
INCLUDES BUT IS NOT LIMITED TO:
TYPE A
INCLUDES BUT IS NOT LIMITED TO:
● INSTALLATION OF TELEPHONE AND COMPUTER CABLING
● ACCESS TO CHASE SPACES
TYPE B
INCLUDES BUT IS NOT LIMITED TO:
● MAJOR, UNCONTROLLED SANDING OF WALLS FOR PAINTING OR WALL COVERING
● REMOVAL OF FLOOR COVERINGS
● NEW WALL CONSTRUCTION
● MAJOR DUCT WORK OR MAJOR ELECTRICAL/CABLE SYSTEM WORK ABOVE CEILINGS
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT IS NOT LIMITED TO:
● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
● NEW CONSTRUCTION
TYPE D
ICRA GENERAL NOTES
● ENDOCARDIOGROPHY
● PRIMARY CARE
● MENTAL HYGIENE
● PHYSICAL THERAPY
● RESPIRATORY THERAPY
● NUCLEAR MEDICINE
● MRI/CT SCAN
● URGENT CARE
● SURGICAL INPATIENT
● MEDICAL INPATIENT
● PSYCHIATRY INPATIENT
● CLINICAL LABS
● PHARMACY
● VCS (CAFETERIA)
TYPE B
II
II
II
III
TYPE C
II
II
III
IV
III
IV
IV
IV
A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA.
B. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY WORK IN THE CEILING PLENUM.
C. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST.
D. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE; HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.
E. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES, DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF MATERIALS
TO / FROM LIMIT OF WORK. COORDINATE WITH COR AND SPECIFICATIONS FOR PROCEDURES/REQUIREMENTS.
CLASS IV
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
INSPECTION AND NON-INVASIVE ACTIVITIES
REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE IN 50 SQUARE FEET
PAINTING (BUT NOT SANDING), WALL COVERING
ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT DO NOT GENERATE
DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR
VISUAL INSPECTION
SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST
CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM
OFFICE AREAS
(NON-CLINICAL)
ULTRASOUND
ENDOSCOPY
AMBULATORY SUGERY PREP
NUTRITION & FOOD SERVICE
(CAFETERIA)
ALL OPERATING ROOMS INCLUDING LABOR AND DELIVERY
ANESTHESIA AND PUMP AREAS
ONCOLOGY CLINIC
SPD/STERILE PROCESSING
RADIATION ONCOLOGY
ALL INTENSIVE CARE UNITS
EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
WIPE WORK SURFACES WITH
DISINFECTANT.
CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK WAS BEING
PERFORMED.
COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM
NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR IMPLEMENT CONTROL
CUBE METHOD.
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR FILTRATION UNITS.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
WET MOP AND/OR VACUUM WORK
AREA WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREAS.
MINOR DUCT WORK OR MINOR ELECTRICAL/CABLE WORK ABOVE CEILINGS
SANDING OF WALLS FOR WALL COVERING WHERE DUST CAN BE CONTROLLED
NON PATIENT CARE ROOMS
PROSTHETICS
BUILDING 3
BUILDING 4 ADMIN
ENGINEERING SHOPS
LAUNDRY ● RADIOLOGY/IMAGING
NUCLEAR MEDICINE
ALL OUTPATIENT/DENTAL CLINICS
WOMEN'S HEALTH
● RADIOLOGY/SPECIAL
PROCEDURE
PHARMACY ADMIXTURE●
ICU/PACU●
NEGATIVE PRESSURE ISOLATION ROOMS/AREAS (INCLUDING
BRONCHOSCOPY AREA)
VACUUM WORK WITH HEPA-FILTERED
VACUUMS. WET MOP WITH DISINFECTANT
DEPENDING ON THE PROJECT LOCATION AND THE
ICRA, PROTECTIVE CLOTHING SHOULD BE WORN AND
REMOVED EACH TIME THE WORKER LEAVES THE
WORKSITE TO CONTROL DUST THROUGHOUT THE
MEDICAL CENTER. OTHERWISE, AND ANTEROOM
MUST BE CONSTRUCTED AND CLOTHING WILL BE
VACUUMED USING A HEPA-FILTERED VACUUM
BEFORE ENTERING THE "CLEAN" SPACE.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT
SYSTEM AS REQUIRED ON A PER PROJECT BASIS.
2. TAKE NECESSARY ACTIONS TO ENSURE HVAC SYSTEM CANNOT CROSS CONTAMINATE OTHER AREAS OF THE HOSPITAL.
3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AS REQUIRED ON
A PER PROJECT BASIS.
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR APPROPRIATE PROTECTIVE CLOTHING AS REQUIRED BY
THE AREA.
7. PLACE TACKY MATS AT ENTRANCE AND EXIT OF WORK AREAS AND REPLACE WITH NEW MATS DAILY OR AS NECESSARY. IT
IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE CONTAMINATION IS KEPT AT AN ABSOLUTE MINIMUM OUTSIDE THE
WORK AREA.
8. PROVIDE APPROPRIATE CLEAN UP DAILY; WET MOP WITH DISINFECTANT AS REQUIRED.
9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE VA'S IH/SAFETY OFFICER, INFECTION CONTROL
COORDINATOR, & ENGINEERING SERVICE AND THOROUGHLY CLEANED BY THE
VA'S ENVIRONMENTAL MANAGEMENT SERVICE.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. WET MOP AREA AND/OR VACUUM WORK AREA WITH FILTERED VACUUMS.
4. PROTECTIVE CLOTHING SHOULD BE WORN AND REMOVED EACH TIME THE
WORKER LEAVES THE WORK SITE TO CONTROL DUST THROUGHOUT THE
MEDICAL CENTER. OTHERWISE AN ANTEROOM MUST BE CONSTRUCTED AND
CLOTHING WILL BE VACUUMED USING A HEPA-FILTERED VACUUM BEFORE
ENTERING THE "CLEAN SPACE".
1. CLEANUP AND DISPOSAL AS APPROPRIATE.
2. TRAFFIC: DECREASE PATIENTS' EXPOSURES.
3. WATER: SCHEDULE INTERRUPTIONS DURING LOW ACTIVITY.
CLASS IV
PHASE 1B
CLASS IV
PHASE 1C
AutoCAD SHX Text
PHASE 1A TEMPORARY WALLS
AutoCAD SHX Text
PHASE 1A DOOR SEAL
AutoCAD SHX Text 01.05
AutoCAD SHX Text 01.06
AutoCAD SHX Text 01.01
AutoCAD SHX Text
CLASS IV
AutoCAD SHX Text 01.01
AutoCAD SHX Text
BARRIER TO PROVIDE MIN. 36" CLEARANCE 36" CLEARANCE TO OR#2 ENTRANCE.
AutoCAD SHX Text
CLASS IV
AutoCAD SHX Text
PHASE 1A TEMPORARY WALLS
AutoCAD SHX Text 01.05
AutoCAD SHX Text
PHASE 1B TEMPORARY WALLS
AutoCAD SHX Text 01.05
AutoCAD SHX Text
PHASE 1C TEMPORARY WALLS
AutoCAD SHX Text 01.05
AutoCAD SHX Text 01.02
AutoCAD SHX Text
CLASS IV
AutoCAD SHX Text
PHASE 1B SEAL DOOR
AutoCAD SHX Text 01.06
AutoCAD SHX Text
PHASE 1C SEAL DOOR
AutoCAD SHX Text 01.06
AutoCAD SHX Text
PHASE 1C TEMPORARY WALLS
AutoCAD SHX Text 01.05
AutoCAD SHX Text 01.02
AutoCAD SHX Text
PHASE 1B TEMPORARY WALLS
AutoCAD SHX Text 01.05
AutoCAD SHX Text 01.01
AutoCAD SHX Text 01.02
AutoCAD SHX Text
ACCESS FOR PHASE 1A AND PHASE 1B.
AutoCAD SHX Text
GROUP 2-MEDIUM RISK
AutoCAD SHX Text
TYPE D
AutoCAD SHX Text
GROUP 2-MEDIUM RISK
TYPE D
C319
337B
337D
341A
337C
373A
374A
384384A
385A
386A
387388
370A
387A
323B
323C
323D
324322
305A
C304
C303
S301
303 302
C301
C302
S302
L04
M3-1
350349E302
T300 C309
C308
C306
C307
C310
3B330 3B331
3B332
3B333
3B334
3B335 3B3363B337
3B338A3B339
3B342
3B338
3B340
3B341
3B341A
3B343
3B344A3B344
3B345A
3B345
3B346
3B347 3B348
3B348A3B347A
3B330
3B330
S303
363362
C312
C300
301 C
301 A 301 B
308A
306A
313A 314
C320
355-01
353-01
303A
14131211
4 3 2 1
323E
323A
337A
360-01
E300
L06
L05
STERILE CORE
STERILE PREP
CORRIDOR
ELEVATOR
LOBBY
GENERAL
STORAGE
CLEAN
EQPT
CLEAN
LINEN
TOILET
CLEAN
UTILITY/
SCOPES
EXAM RM
EXAM RM
EXAM RM
EXAM RMEXAM RMEXAM RMRECOVERY
RECOVERY
RECOVERY
RECOVERY
EXAM RMEXAM RMEXAM RM
EXAM RM EXAM RM EXAM RM EXAM RM
SOILED
UTILITY
MED
ROOM
EQPT
STORAGE
EQPT
STORAGE
HVAC
MED RM
WAITING
SURGICAL
DUMBWAITER
BELOW
ROOF ROOF
ROOF
BELOW
ROOF
ROOF BELOW
1008-21
DRESSING
STERILIZER
MINOR OR
OR SUPERVISER
OPERATING RM
TOILET
CYSTO
STERILIZER
OPERATING RM
MEDICATION
STEP-DN
RM-6
TOILET
STEP-DN
RM-5
TOILET
NURSES
STATION
ELECT/IT
CLOSET
SOILED
UTILITY
CLEAN
LINEN
ISOLATION
STEP-DOWN-4TOILET
STEP-
DOWN-3
TOILET
STEP-
DOWN-2
STEP-
DOWN-1EQUIPMENT
STAFF
TOILET
NOURISHMENT
AISLE
TOILET
AISLE
OFFICE, ICU
CONSULT
TOILET
NURSES
ICU-7
RECOVERYICU-6
ICU-5
ICU-4
ICU-3
ICU-2
ICU-1
CORRIDOR
HAC
ENDOSCOPY
CORRIDOR
STAIR
ENDOSCOPY ENDOSCOPY
CORRIDOR
CORRIDOR
STAIR
ELEVATOR
MECH
TOILET
CHAPEL
CONTROL
EDUCATION
OFFICE
ITS
BREAK RM
SOILED UTILMED GASELECTRICAL
TELECOM
CORRIDOR
HAC
FEMALE
TOILET
CORRIDOR
HAC
CORRIDOR
CORRIDOR
HOUSEKEEP
DATA/TELE
CLEAN LINEN
WAITING
SOILED LINEN CONFERENCE RMTOILET
MEDSBREAK RM
NURSE STA
OFFICE
OFFICE
PATIENT
TOILET
LINEN
TOILETPATIENT
TOILET
PATIENT
KITCHEN
PATIENT PATIENT
TOILETTOILET
CORRIDOR
CORRIDOR
OFFICE/ IC
STAIR
ATTIC
OFFICE/ ANEST
ICU WAITINGLOUNGE
LOCKER RM
TOILET
TOILET
CORRIDOR
CORRIDOR
LOBBY
CHAPLIN SERVICES
STORAGE
CONSULT
OFFICE
SURGERY WAITING
UNDER
SUITENURSE MGR
CLEAN SUPPLY
TOILET
CLEAN LINEN
NURSE STA
TOILET
RECOVERY
RECOVERY
TOILET
BREAK RM
LOCKES
NURSES STORAGE
CLEAN LINEN
ELECTRICAL
SERVICE
ELEVATOR
SERVICE
ELEVATOR
ELEVATOR
TOILET
TOILET
MALE
OPERATING
ROOM #2
OPERATING
ROOM #1
OPERATING ROOM #3
OPERATING ROOM #4
AE101
AE101
AE102
AE103
AE101
3/32" = 1'-0"AE100
1 OVERALL THIRD FLOOR PLAN
DATE: 03/31/2023
DRAWN BY: C. STAGGS
CHECKED BY: T. STRAHAN
PROJ. NO: 564-23-502
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
Au to de sk
D oc s:
//F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls /F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls _E
_R
.rv t
3/
/2
:4 7:
A
M
AE100
OVERALL FLOOR
PLAN - THIRD FLOOR
OR #1,3,4 - 564-23-502
1100 NORTH COLLEGE AVENUE
FAYETTEVILLE, AR
VETERANS
HEALTHCARE SYSTEM
OF THE OZARKS
NO DATE REVISION
PARTITION GRAPHICS
EXISTING PARTITION TO REMAIN
NEW PARTITION
TEMPORARY PARTITION
TEMPORARY DOOR SEAL
337D
C308
C307
STERILE PREP
DRESSING
STERILIZER
MINOR OR
OR SUPERVISER
CORRIDOR
ROOM #2
OPERATING
ROOM #1
EXISTING
CORRIDOR
C319
337B
337D
341A
337C
323C
323D
305A
C304
S301
C302
S302
L04
M3-1
350349E302
T300 C309
C308
C306
C307
C300
C320
355-01
353-01
332328
323E
337A
360-01
L06
L05
STERILE CORE
STERILE PREP
CORRIDOR
ELEVATOR
LOBBY
GENERAL
STORAGE
CLEAN
EQPT
CLEAN
LINEN
CLEAN
UTILITY/
SCOPES
SOILED
UTILITY
MED
ROOM
EQPT
STORAGE
HVAC
MED RM
WAITING
SURGICAL
DUMBWAITER
ROOF
DRESSING
STERILIZER
MINOR OR
OR SUPERVISER
OPERATING RM
TOILET
CYSTO
STERILIZER
OPERATING RM
OFFICE, ICU
CONSULT
TOILET
RECOVERY
CORRIDOR
HAC
CORRIDOR
STAIR
CORRIDOR
CORRIDOR
STAIR
ELEVATOR
MECH
TOILET
CHAPEL
CONTROL
EDUCATION
OFFICE
ITS
BREAK RM
SOILED UTILMED GASELECTRICAL
TELECOM
CORRIDOR
HAC
FEMALE
TOILET
CORRIDOR
HAC
CORRIDOR
LOBBY
SURGERY WAITING
SERVICE
ELEVATOR
SERVICE
ELEVATOR
ELEVATOR
TOILET
MALE
OPERATING
ROOM #2
OPERATING
ROOM #1
OPERATING ROOM #3
OPERATING ROOM #4
1/8" = 1'-0"AE101
1 ENLARGED OR FLOOR PLAN - PHASE 1A
DATE: 03/31/2023
DRAWN BY: C. STAGGS
CHECKED BY: T. STRAHAN
PROJ. NO: 564-23-502
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
Au to de sk
D oc s:
//F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls /F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls _E
_R
.rv t
3/
/2
:4 7:
A
M
AE101
ENLARGED FLOOR
PLAN - THIRD FLOOR -
OR #1
OR #1,3,4 - 564-23-502
1100 NORTH COLLEGE AVENUE
FAYETTEVILLE, AR
VETERANS
HEALTHCARE SYSTEM
OF THE OZARKS
NO DATE REVISION
1/4" = 1'-0"AE101
2 ENLARGED OR#1
KEY NOTES
01.01
01.02
01.03
DEMO EXISTING WALL TO ACCOMMODATE NEW IPU PANEL. NEW WALL PARTITION TO MATCH EXISTING CONSTRUCTION AND FINISHINGS.
XX
SALVAGE EXISTING FLOORING FROM EXISTING PARTITION. REUSE AND REATTACH TO NEW PARTITION TO MATCH EXISTING.
CAP OFF AND ABANDON EXISTING MED GAS. COORDINATE SHUT DOWN WITH COR. TO BE SCHEDULED AFTER HOURS OR WEEKEND.
GENERAL SHEET NOTES
PARTITION GRAPHICS
EXISTING PARTITION TO REMAIN
NEW PARTITION
TEMPORARY PARTITION
TEMPORARY DOOR SEAL
GENERAL NOTE
A. CONSTRUCT PHASE 1A FIRST. AFTER 1A IS COMPLETE, THEN
CONSTRUCT 1B. THEN FOLLOWED BY 1C.
A. WORK WITHIN OR #1 TEMPORARY BARRIERS CAN OCCUR DURING NORMAL HOURS.
B. WORK OUTSIDE OF OR #1 TEMPORARY BARRIERS TO OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS AND REQUIRES ADDITIONAL CLEANING MEASURES BY VA's EMS
DEPARTMENT. COORDINATE WITH COR.
C. ANY WORK CREATING EXCESSIVE DISTURBANCE SHALL OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS. OR DEPARMENT LEAD RESERVES THE RIGHT TO STOP WORK
THAT MAY INTERFERE WITH SURGERY.
D. OR EMERGENCY PROCEDURES MAY OCCUR OUTSIDE OF NORMAL OR HOURS. CONTRACTOR MUST SUBMIT WRITTEN REQUEST A MIN. OF 14 DAYS AHEAD OF WORK
OUTSIDE OF CLASS IV ICRA BARRIERS FOR OR TO GO INTO DIVERT STATUS WHERE EMERGENCY PROCEDURES WOULD BE ROUTED TO OTHER LOCATIONS. IF OR IS NOT IN DIVERT STATUS; PRIORITY MUST BE GIVEN TO OR EMERGENCY PROCEDURE AND CONTRACTOR MUST ADJUST WORK SCHEDULE TO ACCOMMODATE OR
REQUIREMENTS.
E. CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING AND IDENTIFYING ALL UTILITIES THAT MAY PRESENT INTERFERENCE OR CONFLICTS IN PROJECT AREA.
AutoCAD SHX Text
PAHSE 1A PROJECT LIMITS
AutoCAD SHX Text 01.01
AutoCAD SHX Text 01.02
AutoCAD SHX Text 01.03
AutoCAD SHX Text
BARRIER TO PROVIDE MIN. 36" CLEARANCE 36" CLEARANCE TO OR#2 ENTRANCE.
AutoCAD SHX Text
PAHSE 1A PROJECT LIMITS
AutoCAD SHX Text
PHASE 1A PROJECT LIMITS (SEE GENERAL SHEET NOTE B)
AutoCAD SHX Text
COORDINATE WITH COR TO ESTABLISH ACCESS.
AutoCAD SHX Text 01.01
AutoCAD SHX Text 01.02
AutoCAD SHX Text 01.03
BARRIER TO PROVIDE MIN. 36" CLEARANCE 36" CLEARANCE TO OR#2 ENTRANCE.
341A
T300
OPERATING RM
TOILET
CYSTO
OPERATING RM
TELECOM
HAC
OPERATING
ROOM #2
OPERATING ROOM #3
OPERATING ROOM #4
EXISTING
CORRIDOR
C319
337B
337D
341A
337C
323C
323D
305A
C304
S301
C302
S302
L04
M3-1
350349E302
T300 C309
C308
C306
C307
C300
C320
355-01
353-01
332328
323E
337A
360-01
L06
L05
STERILE CORE
STERILE PREP
CORRIDOR
ELEVATOR
LOBBY
GENERAL
STORAGE
CLEAN
EQPT
CLEAN
LINEN
CLEAN
UTILITY/
SCOPES
SOILED
UTILITY
MED
ROOM
EQPT
STORAGE
HVAC
MED RM
WAITING
SURGICAL
DUMBWAITER
ROOF
DRESSING
STERILIZER
MINOR OR
OR SUPERVISER
OPERATING RM
TOILET
CYSTO
STERILIZER
OPERATING RM
OFFICE, ICU
CONSULT
TOILET
RECOVERY
CORRIDOR
HAC
CORRIDOR
STAIR
CORRIDOR
CORRIDOR
STAIR
ELEVATOR
MECH
TOILET
CHAPEL
CONTROL
EDUCATION
OFFICE
ITS
BREAK RM
SOILED UTILMED GASELECTRICAL
TELECOM
CORRIDOR
HAC
FEMALE
TOILET
CORRIDOR
HAC
CORRIDOR
LOBBY
SURGERY WAITING
SERVICE
ELEVATOR
SERVICE
ELEVATOR
ELEVATOR
TOILET
MALE
OPERATING
ROOM #2
OPERATING
ROOM #1
OPERATING ROOM #3
OPERATING ROOM #4
KEY NOTES
1/8" = 1'-0"AE102
1 ENLARGED OR FLOOR PLAN - PHASE 1B
DATE: 03/31/2023
DRAWN BY: C. STAGGS
CHECKED BY: T. STRAHAN
PROJ. NO: 564-23-502
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CLIENT:
Au to de sk
D oc s:
//F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls /F ay et te vi lle V
A O
R Is ol at io n
Pa ne ls _E
_R
.rv t
3/
/2
:4 7:
A
M
AE102
ENLARGED FLOOR
PLAN - THIRD FLOOR -
OR #3
OR #1,3,4 - 564-23-502
1100 NORTH COLLEGE AVENUE
FAYETTEVILLE, AR
VETERANS
HEALTHCARE SYSTEM
OF THE OZARKS
NO DATE REVISION
3/16" = 1'-0"AE102
2 ENLARGED OR#3 - PHASE 1B
01.01
01.02
DEMO EXISTING WALL TO ACCOMMODATE NEW IPU PANEL. NEW WALL PARTITION TO MATCH EXISTING CONSTRUCTION AND FINISHINGS.
XX
SALVAGE EXISTING FLOORING FROM EXISTING PARTITION. REUSE AND REATTACH TO NEW PARTITION TO MATCH EXISTING.
PARTITION GRAPHICS
EXISTING PARTITION TO REMAIN
NEW PARTITION
TEMPORARY PARTITION
01.04 TIE INTO AND MATCH EXISTING WALL EXPANSION FROM OR#2
TEMPORARY DOOR SEAL
GENERAL NOTE
A. CONSTRUCT PHASE 1A FIRST. AFTER 1A IS COMPLETE, THEN
CONSTRUCT 1B. THEN FOLLOWED BY 1C.
GENERAL SHEET NOTES
A. WORK WITHIN OR #3 TEMPORARY BARRIERS CAN OCCUR DURING NORMAL HOURS.
B. WORK OUTSIDE OF OR #3 TEMPORARY BARRIERS TO OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS AND REQUIRES ADDITIONAL CLEANING MEASURES BY VA's EMS
DEPARTMENT. COORDINATE WITH COR.
C. ANY WORK CREATING EXCESSIVE DISTURBANCE SHALL OCCUR AFTER OR DEPARTMENT'S NORMAL HOURS. OR DEPARMENT LEAD RESERVES THE RIGHT TO STOP WORK
THAT MAY INTERFERE WITH SURGERY.
D. OR EMERGENCY PROCEDURES MAY OCCUR OUTSIDE OF NORMAL OR HOURS. CONTRACTOR MUST SUBMIT WRITTEN REQUEST A MIN. OF 14 DAYS AHEAD OF WORK
OUTSIDE OF CLASS IV ICRA BARRIERS FOR OR TO GO INTO DIVERT STATUS WHERE EMERGENCY PROCEDURES WOULD BE ROUTED TO OTHER LOCATIONS. IF OR IS NOT IN DIVERT STATUS; PRIORITY MUST BE GIVEN TO OR EMERGENCY PROCEDURE AND CONTRACTOR MUST ADJUST WORK SCHEDULE TO ACCOMMODATE OR
REQUIREMENTS.
E. CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING AND IDENTIFYING ALL UTILITIES THAT MAY PRESENT INTERFERENCE OR CONFLICTS IN PROJECT AREA.
AutoCAD SHX Text
PHASE 1B PROJECT LIMITS (SEE GENERAL SHEET NOTE B)
AutoCAD SHX Text
PHASE 1B PROJECT LIMITS (SEE GENERAL SHEET NOTE B)