Drawings.pdf
PDF 12 MB Posted
- Solicitation number
- W912QR25QA069
About this file
These are detailed mechanical engineering design drawings from the U.S. Army Corps of Engineers for the Rough River Reservoir in Kentucky, specifically focusing on mechanical equipment and substructure sections. The multi-page technical drawings include comprehensive schematics for a hydraulic pressure system with intricate details of cylinder assemblies, valves, indicators, and various mechanical components. Key annotated features include thru-floor access hatches, spiral staircase access, operating floor locations, 2T and 5T hoists, HPU (Hydraulic Power Unit) locations, and specific packing locations for oil, water, and indicator rods across multiple structural sections and elevations. The drawings provide precise technical specifications, dimensional details, and cross-sectional views of the mechanical infrastructure, with a focus on detailed mechanical equipment design for the reservoir's infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Reps and Certs.pdf | ||
| Combined Photos for Solicitation.pdf | ||
| Scope of Work.pdf | ||
| Wage Determinations.pdf | ||
| ProjNet Instructions.pdf | ||
| PBS.pdf | ||
| PIEE Directions.pdf | ||
| Solicitation - W912QR25QA069.pdf | ||
| Special Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
h2edddls Callout Entrance to tower h2edddls Rectangle h2edddls Callout Approximate location of pressure gauge install, line item 04 h2edddls Rectangle h2edddls Callout Spiral staircase, access to lower elevations h2edddls Text Box EL551. Operating Floor h2edddls Text Box EL537. Location of HPU h2edddls Callout
HPU
h2edddls Callout Thru-floor access hatch h2edddls
Thru-floor access hatch
Access window in bonnet to remove and replace oil and water packing h2edddls Callout Indicator rod packing location h2edddls Callout HPU location h2edddls Rectangle h2edddls Rectangle h2edddls Callout Operating floor and entrance to tower h2edddls Callout 1/2T and/or 5T hoist h2edddls
Thru floor opening. Typical all floors.
Indicator rod packing location.
h2edddls Callout Oil packing location.
h2edddls Callout Water packing location.
h2edddls Rectangle h2edddls Rectangle h2edddls Callout Spiral staircase access h2edddls Callout Cylinder location to replace packing h2edddls
Cylinder location to replace packing
Polygon h2edddls Typewritten Text Indicator Rod Packing h2edddls Polygon h2edddls
Oil and Water Packing
Indicator Rod Packing h2edddls Callout Oil Packing h2edddls
Water Packing
Line h2edddls Line h2edddls Line h2edddls Line h2edddls Line h2edddls Line h2edddls Callout Hydraulic Pump Components to be replaced. Reservoir lid to be replaced. rest of reservoir to remain.
h2edddls Oval h2edddls Line h2edddls Callout Approximate location of pressure gauge install, line item 04 h2edddls Callout Disconnect fitting h2edddls
Schedule of components for reference only. This is an aggregate list of all components, some may not be included in contract. Contractor shall confirm components and quantities. See Line item 01 specifications for components with updated requirements.
| Gland and Seat Details.pdf |
| Packing Details.pdf |
| Floor plans.pdf |
| Bonnet Access.pdf |
| Cylinder Location.pdf |
| Existing HPU and Position Indicators.pdf |
File details come from the government source that posted it. Updated .