Drawings.pdf

PDF 12 MB Posted

Attached to
Rough River Hydraulic System Components Replacement
Solicitation number
W912QR25QA069
Issued by

About this file

These are detailed mechanical engineering design drawings from the U.S. Army Corps of Engineers for the Rough River Reservoir in Kentucky, specifically focusing on mechanical equipment and substructure sections. The multi-page technical drawings include comprehensive schematics for a hydraulic pressure system with intricate details of cylinder assemblies, valves, indicators, and various mechanical components. Key annotated features include thru-floor access hatches, spiral staircase access, operating floor locations, 2T and 5T hoists, HPU (Hydraulic Power Unit) locations, and specific packing locations for oil, water, and indicator rods across multiple structural sections and elevations. The drawings provide precise technical specifications, dimensional details, and cross-sectional views of the mechanical infrastructure, with a focus on detailed mechanical equipment design for the reservoir's infrastructure.

View the file

Other files

File Type Posted
Reps and Certs.pdf PDF
Combined Photos for Solicitation.pdf PDF
Scope of Work.pdf PDF
Wage Determinations.pdf PDF
ProjNet Instructions.pdf PDF
PBS.pdf PDF
PIEE Directions.pdf PDF
Solicitation - W912QR25QA069.pdf PDF
Special Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

h2edddls Callout Entrance to tower h2edddls Rectangle h2edddls Callout Approximate location of pressure gauge install, line item 04 h2edddls Rectangle h2edddls Callout Spiral staircase, access to lower elevations h2edddls Text Box EL551. Operating Floor h2edddls Text Box EL537. Location of HPU h2edddls Callout

HPU

h2edddls Callout Thru-floor access hatch h2edddls

Thru-floor access hatch

Access window in bonnet to remove and replace oil and water packing h2edddls Callout Indicator rod packing location h2edddls Callout HPU location h2edddls Rectangle h2edddls Rectangle h2edddls Callout Operating floor and entrance to tower h2edddls Callout 1/2T and/or 5T hoist h2edddls

Thru floor opening. Typical all floors.

Indicator rod packing location.

h2edddls Callout Oil packing location.

h2edddls Callout Water packing location.

h2edddls Rectangle h2edddls Rectangle h2edddls Callout Spiral staircase access h2edddls Callout Cylinder location to replace packing h2edddls

Cylinder location to replace packing

Polygon h2edddls Typewritten Text Indicator Rod Packing h2edddls Polygon h2edddls

Oil and Water Packing

Indicator Rod Packing h2edddls Callout Oil Packing h2edddls

Water Packing

Line h2edddls Line h2edddls Line h2edddls Line h2edddls Line h2edddls Line h2edddls Callout Hydraulic Pump Components to be replaced. Reservoir lid to be replaced. rest of reservoir to remain.

h2edddls Oval h2edddls Line h2edddls Callout Approximate location of pressure gauge install, line item 04 h2edddls Callout Disconnect fitting h2edddls

Schedule of components for reference only. This is an aggregate list of all components, some may not be included in contract. Contractor shall confirm components and quantities. See Line item 01 specifications for components with updated requirements.

Gland and Seat Details.pdf
Packing Details.pdf
Floor plans.pdf
Bonnet Access.pdf
Cylinder Location.pdf
Existing HPU and Position Indicators.pdf