Drawings.pdf
PDF 11 MB Posted
- Attached to
- STAR Center AHU 1, 3, 9 Replacement
- Solicitation number
- 23-0312-ITB-CP
- Issued by
- Pinellas County, Florida
About this file
The image appears to be a default Foxit PDF Reader/Editor splash screen prompting users to open the PDF portfolio using Foxit's software. It features a purple and white PDF icon with the Foxit logo and a recommendation to download Foxit PDF Editor. There are no specific contract or government opportunity details contained in this image.
Given the context provided about the STAR Center AHU 1, 3, 9 Replacement project, this splash screen seems to be an initial loading page for a PDF document set related to the air handler unit replacement project in Florida. The actual project documents are likely contained in subsequent pages not shown in this image.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB.pdf | ||
| Section_E-SPECIFICATION.pdf | ||
| Section_F-Bid_Submittal.xlsx | XLSX spreadsheet | |
| Section_I-Agreement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Foxit PDF Reader or Foxit PDF Editor.
For the best experience, open this PDF portfolio in
Get Foxit PDF Editor Now!
http://globe-map.foxitservice.com/go.php?do=redirect&title=phantomPDF&product=Foxit%20phantomPDF&language=en-us&version=12.0.0&edition=Business&utm_source=client-app&utm_medium=button&utm_campaign=phantom12.0.0
UP
A
E
B
C
F
B.4
C.8
D
C.1
98A87A76A65A54A43A3
T
VV-3/11
VV-3/10
VV-3/15
VV-3/9
VV-3/7
VV-3/8
VV-1/6
VV-1/7
VV-1/8
VV-1/5
VV-1/2
VV-1/4
VV-1/3
VV-1/1
VV-1/10
VV-1/11
VV-1/12
VV-1/13
EDH-1/1
VV-1/16
VV-1/15
VV-1/17
VV-1/XX
VV-3/X
VV-3/6
VV-3/5
H1-19,21,23
EDH-1
EDH-1
VAV-3-16
BP1-25,27,29
H1(FRM EPP11)L1 (ON H1)
TXFR
KEYNOTES
1. AHU 1: IN PANEL H1 (200A MCB, 480V 3P) PROVIDE THE FOLLOWING:
CIRCUIT H1-19,21,23: PROVIDE NEW 30A-3P CIRCUIT BREAKER FOR
EDH-1 IN AVAILABLE SPACE. PROVIDE BRANCH CIRCUIT WIRING
FROM THE NEW CIRCUIT BREAKER TO THE NEW UNIT MOUNTED
EDH-1 HEAVY DUTY FUSED DISCONNECT SWITCH: (3) #10 THWN CU
AND (1) #10 THWN CU EGC IN 3/4 INCH EMT CONDUIT. FUSE
DISCONNECT SWITCH PER HVAC EQUIPMENT MANUFACTURER
RECOMMENDATIONS.
2. CONTINUE NEW BRANCH CIRCUIT WIRING FROM 2ND FLOOR,
ORIGINATING FROM BP1-25,27,29 CIRCUIT BREAKER. CONTINUE TO
VAV-3-16 WITH (4) #12 THWN CU AND (1) #12 THWN CU EGC IN
MINIMUM 3/4 INCH EMT CONDUIT. VERIFY ROUTING PRIOR TO
ROUGH-IN.
3. PROVIDE NEW VAV MOUNTED HEAVY DUTY 30 AMP FUSED
DISCONNECT SWITCH, FUSE PER VAV MANUFACTURER
RECOMMENDATIONS. PROVIDE CONNECTION FROM FUSED
DISCONNECT SWITCH TO VAV.
E1.1
Project Information:
Additional Information:
Sheet Number:
Sheet Title:
Original size is 24"x36". Copy Reductions N.T.S.
Project Number:
Professional Seal:
DateNo. Phase Description
PHASE ISSUED DRAWINGS:
No.
REVISED DRAWINGS:
Date Revision Description
21-034
STAR CENTER
AHU-1, 3, & 9
REPLACEMENT
7887 Bryan Dairy Road, Suite 120 Largo, Fl 33777
TH
IS
RA
W
IN
G
HE
P
RO
PE
RT
Y O
HA
HN
N
EE
RI
, I
RP
TE
IT
TO
RE
PR
UC
ED
HO
LE
R
US
ER
JE
T.
I
SH
LL
TU
RN
U
PO
EQ
UE
ST
. N
V
LI
SS
S
IG
EA
ct
. 2 4, :1 7:
M J:
\2 1-
's
0' s\
-0
TA
en te r A H
, 3 , a nd le c\
4-
EL
EC
.d w g
1 03.08.2022 60% Review Set
2 04.14.2022 95% Review Set
3 08.30.2022 100% Review Set
4 10.12.2022 100% Construction Docs
Scale:
Drawn By:
Checked By:
MECHANICAL & ELECTRICAL CONSULTING
HAHN
ENGINEERING,
C.
3060 S. Dale Mabry Hwy.
Tampa, Florida 33629
T: 813.831.8599 W: www.hahneng.com C.O.A.# 5653
AHU-1 & AHU-3
ELECTRICAL
1ST FLOOR PLAN
AS INDICATED
JDE
JJH
KEY PLAN
AHU-1 AND AHU-3 FLOOR 1 PLAN
SCALE: 1/8" = 1'-0"
LEGEND
1. IN EXISTING PANEL BP1 (400 AMP MCB, 480V 3P) REPLACE THE
FOLLOWING BREAKERS:
1.a. 30A-3P BP1-37,39,41 - REPLACE WITH A 25A-3P BREAKER FOR
AHU-1
1.b. 100A-3P BP1-25,27,29 - REPLACE WITH A 15A-3P BREAKER FOR
VAV-3-16.
2. PROVIDE NEW BRANCH CIRCUIT WIRING, (4) #10 THWN CU AND (1)
#10 THWN CU EGC IN MINIMUM 3/4 INCH EMT CONDUIT, FROM
BP1-37,39,41 CIRCUIT BREAKER TO AHU-1. IT IS ACEPTABLE TO
RE-UTILIZE ALL OR A PORTION OF EXISTING BRANCH CIRCUIT
WIRING IF APPROPRIATELY ROUTED, SUPPORTED AND SIZED.
3. PROVIDE (4) #12 THWN CU AND (1) #12 THWN CU EGC IN MINIMUM 3/4
INCH EMT CONDUIT FROM BP1-25,27,29 CIRCUIT BREAKER TO
VAV-3-16. CONDUIT DROPS DOWN TO CEILING SPACE OF FLOOR
BELOW, VERIFY CONDUIT ROUTE WITH OWNER PRIOR TO ROUGH-IN.
4. PROVIDE CONNECTION TO AHU. ROUTE CONDUIT INSIDE ROOF
CURB TO AHU. COORDINATE ROUTING WITH MECHANICAL
CONTRACTOR. TERMINATE WIRING ON AHU INTEGRAL NON-FUSED
DISCONNECTING MEANS PROVIDED BY THE AHU MANUFACTURER.
5. FIRE ALARM DUCT SMOKE DETECTOR MOUNTED ON RETURN AIR
METAL SCREEN SHALL BE REMOVED BY A LICENSED FIRE ALARM
CONTRACTOR DURING CONSTRUCTION AND REINSTALLED ON
SUPPLY SIDE DUCT UPON INSTALLATION OF NEW AHU. TEST
DETECTOR UPON REINSTALLATION, SEE ELECTRICAL SCOPE OF
WORK.
6. IN EXISTING PANEL LP1 (400A MCB, 480V 3P), REPLACE EXISTING
100A-3P CIRCUIT BREAKER LP1-13,15,17 WITH A 70A-3P BREAKER
FOR AHU-3.
7. PROVIDE NEW BRANCH CIRCUIT WIRING FROM LP1-13,15,17
BREAKER TO AHU-3, (4) #4 THWN CU AND (1) #8 THWN CU EGC IN
MINIMUM 1.25 INCH EMT CONDUIT. VERIFY CONDUIT ROUTE WITH
OWNER PRIOR TO ROUGH-IN.
8. CONTINUE NEW BRANCH CIRCUIT WIRING FROM LP1-13,15,17
BREAKER TO AHU-3, (4) #4 THWN CU AND (1) #8 THWN CU EGC IN
MINIMUM 1.25 INCH EMT CONDUIT. VERIFY CONDUIT ROUTE WITH
OWNER PRIOR TO ROUGH-IN. THE SPACE BELOW AHU-3 IS A
SECURE SPACE, COORDINATE ACCESS AND WORK REQUIREMENTS
WITH THE OWNER, REFER TO SPECIFICATIONS FOR ACCESS
REQUIREMENTS TO SECURE SPACES.
bottom of the roof +16'-3" to the
EM
PT
EM
PT
ES
SI
EMPTY ROOMEMPTY ROOMTELEPHONE ROOM
ELECTRICAL SWITCH GEAR ROOM 137
DATA MACHINE ROOM
LO
SE
OFFICE OFFICE OFFICE OFFICE OFFICE OPEN OFFICE OFFICE
OFFICEOFFICEOPEN OFFICE
OFFICE
BR
K
PA
AG
FRONT OFFICE
OFFICE AREA
CORRIDOR
OFFICEOFFICE
LOBBY
CARPET
2'X 4'X 2 2'X 2' +8'-8"
AHU
PROCESSING
STAIRS
ENTRY
MECH/ELECTRIC
CORRIDORSTAIRS
ID
ROOM
ADA RESTROOM
LOCKER
MEN'S
WOMEN'SJANITOR
AC
MACHINE AREA
PASSAGE
+1 6'
-3 to th e b ot m o f t he ro of
-1 0" bo tto
DNDN
DN
D 10A
D 9A
D 9
C 10A
C 9AC 9
D 8AD 7A
C 8A
C 7AC 6A
C 5A
D 6AD 5A
8A
BB 7A
B 7 B 6A
B 5A
B 5
E10E9 E8
E 7
E6E 5
A 10A
A 9AA 9
7A
A 7A6AA5AA5
F5 F6
F7 F8 F9
F10
CONFERENCE
OPEN OFFICE AREA
LAB
CLOSET
FD
ELECTRICAL EQUIPMENT
E.E.
ELECTRICAL EQUIPMENT el panel concrete pad concrete pad
DATA EQUIPMENT
NIC
10A
5 5A 6 6A 7 7A 8 8A 9 9A 10
AHU-1 ON ROOF
AHU-3 ON ROOF
BP1
SD
LP1
E1.2
7:
2ND FLOOR PLAN
W.H.A.
S.J.M.
AHU-1 AND AHU-3 FLOOR 2 PLAN
VTR
AHU-54
(TYPICAL)
AHU-5
AHU-3
AHU-7
AHU-3 CHWS&R
AHU-3 CHWS&R2
1. DEMO: REMOVE EXISTING UNIT MOUNTED DISCONNECT SWITCH
AND BRANCH CIRCUIT WIRING FOR AHU. CONDUIT SHALL REMAIN.
2. DEMO: REMOVE EXISTING LIGHTNING PROTECTION AIR TERMINALS,
CONDUCTORS AND ADHESIVE BASES AND PRESERVE FOR
REINSTALLATION ON NEW AHU.
3. RENOVATION: PROVIDE NEW POWER FEED TO AHU CONCEALED IN
ROOF CURB. NO NEW DISCONNECT SWITCH IS REQUIRED. THE AHU
IS PROVIDED WITH AN INTEGRAL NON-FUSED DISCONNECT SWITCH
AND THE CIRCUIT BREAKER FEEDING THE UNIT IS SIZED FOR
OVERCURRENT PROTECTION.
4. RENOVATION: EXTEND AND REINSTALL LIGHTNING PROTECTION
SYSTEM ON AHU (AHU WILL BE HIGHER DUE TO CURB ADAPTER,
AND UNIT SIZE IS LARGER THAN PREVIOUS UNIT, LIGHTNING
PROTECTION CONDUCTORS SHALL BE LENGTHENED
ACCORDINGLY). NEATLY ROUTE LIGHTNING PROTECTION
CONDUCTOR ACROSS ROOF TO CORNER OF AHU.
E1.3
8:
ROOF PLAN
1/8" = 1'-0"
AHU-1 DEMOLITION ROOF PLAN
SCALE: 1/4" = 1'-0"
AHU-1 RENOVATION ROOF PLAN
AHU-1 PICTURE FROM WEST OF UNIT
SCALE: NTS
4 3
6 AHU-3 PICTURE FROM WEST OF UNIT
AHU-3 DEMOLITION ROOF PLAN
AHU-3 RENOVATION ROOF PLAN
2 1
1. IN PANEL BP15 (400 AMP MCB, 480V 3P) PROVIDE THE FOLLOWING:
CIRCUIT BP15-25,27,29 IS A 100 AMP SPARE. PROVIDE NEW BRANCH
CIRCUIT WIRING FOR AHU-9 FROM CIRCUIT BREAKER, ONE SET OF
(4) #3 THWN CU AND (1) #8 THWN CU EGC IN NEW 1.25 INCH EMT
CONDUIT FROM PANEL BP15 TO NEW FUSED DISCONNECT SWITCH
AND THEN TO AHU 9. VERIFY CONDUIT ROUTE WITH OWNER PRIOR
TO ROUGH-IN.
2. CONDUIT ROUTE SHOWN IS DIAGRAMMATIC. COORDINATE ROUTE
OF CONDUIT WITH THE OWNER'S REPRESENTATIVE PRIOR TO
INSTALLATION TO AVOID FUTURE WORK IN ROOM 347.
3. CONDUIT ROUTE SHOWN IS DIAGRAMMATIC, PROVIDE NEW
CONDUIT AS HIGH AS POSSIBLE, COORDINATE ROUTE THROUGH
THIS SPACE WITH THE OWNER'S REPRESENTATIVE.
4. CONDUIT ROUTE SHOWN IS DIAGRAMMATIC, PROVIDE NEW
CONDUIT AS HIGH AS POSSIBLE, COORDINATE ROUTE THROUGH
THE CORRIDOR AND THE SPACE BELOW AHU-9 WITH THE OWNER'S
REPRESENTATIVE.
5. PROVIDE NEW 100A HEAVY DUTY FUSED DISCONNECT SWITCH
MOUNTED TO WALL. PROVIDE 80 AMP FUSES. FIELD VERIFY
MOUNTING LOCATION WITH OWNER PRIOR TO ROUGH-IN.
6. PROVIDE (4) #4 THWN CU AND (1) #8 THWN CU EGC IN NEW 1.25 INCH
MT CONDUIT. COORDINATE ROUTE THROUGH THE CORRIDOR AND
THE SPACE BELOW AHU-9 WITH THE OWNER'S REPRESENTATIVE.
7. PROVIDE CONNECTION TO AHU. ROUTE CONDUIT INSIDE ROOF
CURB TO AHU. COORDINATE ROUTING WITH MECHANICAL
CONTRACTOR. TERMINATE WIRING ON AHU INTEGRAL
DISCONNECTING MEANS PROVIDED BY THE AHU MANUFACTURER.
8. FIRE ALARM DUCT SMOKE DETECTOR MOUNTED ON RETURN AIR
METAL SCREEN SHALL BE REMOVED BY A LICENSED FIRE ALARM
CONTRACTOR DURING CONSTRUCTION AND REINSTALLED ON THE
SUPPLY SIDE DUCT UPON INSTALLATION OF NEW AHU. TEST
DETECTOR UPON REINSTALLATION, SEE ELECTRICAL SCOPE OF
WORK.
MEZZANINE ABOVE
H.9 18
J.5 18 J.5 19
K1 18 K1 19
K.7 19K7 18
L.6 19
L.6 18
J 20J 19.1
FE on mezzanine
L.6
K.7
K.1
H.9
J.5
L
22212018.918.31817.7 19
25x20 SA
THROUGH
ROOF
70X24 TA 36X12 TA
18x28 SA
18x16 SA
24x24
A = 4345 FT²
A = 568 FT²
A = 362 FT²
A = 227 FT²
A = 65 FT²
A = 339 FT²
A = 1585 FT²
AHU-9
OUTLINE
ABOVE
ON ROOF
BP15
E2.1
1ST FLOOR PLAN
AHU-9 1ST FLOOR PLAN
1. DEMO: REMOVE EXISTING UNIT MOUNTED DISCONNECT SWITCH
AND BRANCH CIRCUIT WIRING FOR AHU. CONDUIT SHALL REMAIN.
2. DEMO: REMOVE EXISTING LIGHTNING PROTECTION AIR TERMINALS,
CONDUCTORS AND ADHESIVE BASES AND PRESERVE FOR
REINSTALLATION ON NEW AHU.
3. RENOVATION: PROVIDE NEW POWER FEED TO AHU CONCEALED IN
ROOF CURB. NO NEW DISCONNECT SWITCH IS REQUIRED. THE AHU
IS PROVIDED WITH AN INTEGRAL NON-FUSED DISCONNECT SWITCH
AND THE CIRCUIT BREAKER FEEDING THE UNIT IS SIZED FOR
OVERCURRENT PROTECTION.
4. RENOVATION: EXTEND AND REINSTALL LIGHTNING PROTECTION
SYSTEM ON AHU (AHU WILL BE HIGHER DUE TO CURB ADAPTER,
AND UNIT SIZE IS LARGER THAN PREVIOUS UNIT, LIGHTNING
PROTECTION CONDUCTORS SHALL BE LENGTHENED
ACCORDINGLY). NEATLY ROUTE LIGHTNING PROTECTION
CONDUCTOR ACROSS ROOF TO CORNER OF AHU.
E2.2
ELECTRICAL ROOF PLAN
AHU-9 DEMOLITION ROOF PLAN
AHU-9 RENOVATION ROOF PLAN
1 2
AHU-9 PHOTO FROM SOUTHEAST OF UNIT
GENERAL NOTES
1. WORK SHALL MEET OR EXCEED REGULATORY REQUIREMENTS,
INCLUDING LATEST EDITION OF THE NFPA 101 (LIFE SAFETY
CODE), THE NATIONAL ELECTRICAL CODE 2017, FLORIDA
BUILDING CODE 7TH EDITION (2020) AND LOCAL REQUIREMENTS
& BUILDING CODES.
2. EQUIPMENT, FIXTURES, SWITCHES, STARTERS, CONTACTORS,
CONTROLS, DEVICES, CONNECTIONS, BOXES, MOUNTING
SUPPORTS, HARDWARE, WIRE, CONDUIT & ACCESSORIES SHALL
BE PER PLANS AND SPECIFICATIONS FOR COMPLETE AND
OPERATING ELECTRICAL SYSTEMS.
3. CIRCUIT NUMBERS INDICATED ON THE DRAWINGS ARE FOR
REFERENCE USE, CONTRACTOR TO BALANCE THE LOADS IN ALL
PANELS IN WHICH WORK IS PERFORMED. MAINTAIN COMPLETE
AS-BUILT DRAWINGS. PROVIDE ELECTRONIC AS-BUILT
DRAWINGS AT COMPLETION OF PROJECT. ELECTRONIC SET OF
DRAWINGS WILL BE PROVIDED FOR USE TO UPDATE
THROUGHOUT PROJECT.
4. PROVIDE ENGRAVED NAMEPLATES FOR ALL ELECTRICAL
EQUIPMENT.
5. PROVIDE REQUIRED CONDUIT & CABLE PENETRATIONS
THROUGH PARTITIONS, WALLS, FLOORS, SLABS & ROOFS, WITH
APPROVED FIRE SEALANT COMPOUND.
6. CONDUCTORS SHALL BE COPPER, 600 VOLT WITH MINIMUM SIZE
OF #12 AWG THWN / THHN, UNLESS OTHERWISE SPECIFIED.
WIRE SIZES OF #10 AND LARGER SHALL BE STRANDED.
7. EQUIPMENT SHALL BE RATED FOR MAXIMUM AVAILABLE
VOLTAGE AND GROUND FAULT CURRENT. ALL EQUIPMENT
SHALL BE TESTED BY A NATIONAL TESTING LAB.
8. CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS
AND MAKE FINAL CONNECTIONS OF EQUIPMENT FURNISHED BY
OTHER TRADES.
9. CONTRACTOR SHALL MAINTAIN A COMPLETE TEMPORARY
POWER SYSTEM DURING CONSTRUCTION. COORDINATE ALL
POWER OUTAGES & CHANGEOVERS WITH THE OWNER.
10. CONTRACTOR SHALL GUARANTEE MATERIALS AND
WORKMANSHIP FOR ONE YEAR.
11. CONTRACTOR SHALL OBTAIN AND PAY FOR PERMITS AND
INSPECTIONS.
12. EXPOSED EXTERIOR CONDUIT SHALL BE RIGID GALVANIZED
STEEL. ALL EXPOSED INTERIOR CONDUIT SHALL BE RIGID
GALVANIZED STEEL OR EMT. CONDUIT SHALL BE CONCEALED
WHERE POSSIBLE. EMT FITTINGS SHALL BE DIE CAST SET
SCREW TYPE AT DRY INTERIOR LOCATIONS. EMT FITTINGS AT
DAMP, OR WET LOCATIONS SHALL BE DIE CAST COMPRESSION
RAIN-TIGHT TYPE. WIRING (POWER, LIGHTING, FIRE ALARM)
SHALL BE IN CONDUIT.
13. PROVIDE GREEN GROUND WIRE IN EACH RACEWAY, SIZE WIRE
IN ACCORDANCE WITH TABLE 250.122 OF THE NEC.
14. PROVIDE A TYPEWRITTEN CIRCUIT DIRECTORY WITH
PROTECTIVE COVERING. WIRES IN PANEL SHALL BE TAGGED
WITH CIRCUIT NUMBER. CIRCUIT BREAKERS FOR MECHANICAL
EQUIPMENT SHALL BE HACR TYPE.
15. SWITCHBOARDS, MCC'S, PANELBOARDS, CIRCUIT BREAKERS,
TRANSFORMERS, DISCONNECT SWITCHES, MOTOR STARTERS
AND OTHER ELECTRICAL APPARATUS INSTALLED FOR THE
OPERATION OF ANY EQUIPMENT SHALL BE PROPERLY
IDENTIFIED WITH ENGRAVED LAMINATED PLASTIC NAMEPLATES
ATTACHED TO EQUIPMENT BY STAINLESS STEEL SCREWS.
16. WIREWAYS, PULLBOXES, OUTLETS AND JUNCTION BOXES SHALL
BE PROPERLY SIZED PER THE NATIONAL ELECTRICAL CODE.
ALL PULLBOXES AND OUTLET BOXES SHALL BE PLAINLY COLOR
CODED AND HAVE WIRING TAGGED TO INDICATE PANEL AND
CIRCUIT NUMBERS.
17. DISCONNECT SWITCHES SHALL BE SQUARE D, SIEMENS,
GENERAL ELECTRIC OR CUTLER HAMMER SAFETY SWITCHES.
SWITCHES SHALL BE HEAVY DUTY AND RATED FOR THE PROPER
VOLTAGE. SWITCHES SHALL BE RATED AS INDICATED ON THE
DRAWINGS FOR SIZE, NUMBER OF POLES AND TYPE
ENCLOSURE.
18. FUSES SHALL BE BUSSMAN CURRENT LIMITING TYPE.
19. EXTERIOR RECEPTACLES SHALL BE WP GFCI TYPE WITH WP
WHILE IN USE COVER. PROVIDE RECEPTACLE AT HVAC
EQUIPMENT.
20. BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR NO MORE
THAN 3% VOLTAGE DROP AT THE FARTHEST POINT. 20 AMPERE
BRANCH CIRCUITS SHALL HAVE MINIMUM SIZE #10 COPPER
HOMERUN WIRING FOR CIRCUITS OVER 57' LONG & #8 COPPER
HOMERUN WIRING FOR CIRCUITS OVER 150' LONG.
21. DISPOSE OF HAZARDOUS MATERIALS IN ACCORDANCE WITH
FEDERAL, STATE, LOCAL, & EPA REGULATIONS.
22. PROVIDE FLEXIBLE CONDUIT & WIRING CONNECTION TO
MOTORS & VIBRATING EQUIPMENT.
23. OUTDOOR EQUIPMENT, CONDUIT & CONNECTIONS SHALL BE
WEATHERPROOF.
24. PROVIDE A DEDICATED NEUTRAL FOR ALL CIRCUITS.
25. WHERE GFCI RECEPTACLES ARE SHOWN, A SEPARATE GFCI
DEVICE SHALL BE PROVIDED, THEY SHALL NOT BE SLAVED.
26. PRIOR TO COMPLETION OF THE PROJECT, PROVIDE WRITTEN
CERTIFICATION FOR EACH LIFE SAFETY AND LOW VOLTAGE
ELECTRICAL SYSTEM.
37. PER THE FLORIDA ENERGY CODE C408.3.2, THE CONTRACTOR
SHALL PROVIDE DOCUMENTS CERTIFYING THAT THE INSTALLED
LIGHTING CONTROLS MEET DOCUMENTED PERFORMANCE
CRITERIA OF SECTION C405 WITHIN 90 DAYS OF THE DATE OF
THE RECEIPT OF THE CERTIFICATE OF OCCUPANCY.
38. PER FLORIDA BUILDING CODE C405.5.4.1, WITHIN 30 DAYS AFTER
THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF
THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE
BUILDING OWNER, INCLUDING:
1.A SINGLE-LINE DIAGRAM OF THE BUILDING ELECTRICAL
DISTRIBUTION SYSTEM AND
2.FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR
ALL DISTRIBUTION.
ADDITIONALLY, AN OPERATING MANUAL AND MAINTENANCE
MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER. THE
MANUALS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING:
a.SUBMITTAL DATA STATING EQUIPMENT RATING AND
SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT
REQUIRING MAINTENANCE.
b.OPERATION MANUALS AND MAINTENANCE MANUALS FOR
EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE.
REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY
IDENTIFIED.
c.NAMES AND ADDRESSES OF AT LEAST ONE QUALIFIED
SERVICE AGENCY.
39. CONTROLS CONDUIT: PROVIDE CONDUIT FOR DIRECT DIGITAL
CONTROLS CONTRACTOR. COORDINATE REQUIREMENTS WITH
MECHANICAL DRAWINGS AND SPECIFICATIONS.
1. PROVIDE ALL EQUIPMENT AND MATERIAL SHOWN ON
DRAWINGS AND IN SPECIFICATIONS, WHETHER OR NOT NOTES
INCLUDE THE WORDS 'PROVIDE' OR 'ALL'.
2. PROVIDE ELECTRICAL FIXTURES, DEVICES AND EQUIPMENT
SHOWN AND REQUIRED MATERIALS, LABOR AND EQUIPMENT
FOR A COMPLETE AND OPERATIONAL FACILITY.
3. POWER: EXISTING ELECTRICAL SERVICE, POWER
DISTRIBUTION SYSTEM PANEL AND BRANCH CIRCUITS, OVER
CURRENT PROTECTION DEVICES, BREAKERS, EQUIPMENT
CONNECTIONS, SURGE SUPPRESSION AND OTHER DEVICES
SHALL REMAIN UNLESS OTHERWISE SHOWN. PROVIDE
PERMANENT LABELS ON ALL DEVICE COVERS WITH CIRCUIT
NUMBER. DEVICE COLOR AND COVER PLATES SHALL BE
SELECTED BY ARCHITECT. PROVIDE ENGRAVED NAMEPLATES
ON ALL EQUIPMENT WITH ITEM NAME AND CIRCUIT NUMBER.
PROVIDE NEW BRANCH CIRCUIT BREAKERS, WIRING AND
CONDUIT FOR AHU 1, AHU3 AND AHU 9.
4. CONTROLS CONDUIT: PROVIDE CONDUIT FOR DIRECT DIGITAL
CONTROLS CONTRACTOR. COORDINATE REQUIREMENTS WITH
MECHANICAL DRAWINGS AND SPECIFICATIONS.
5. FIRE ALARM SYSTEM: REMOVE, STORE AND REINSTALL
EXISTING DUCT SMOKE DETECTOR DEVICES, CONNECT,
PROGRAM AND TEST. PROVIDE ORIGINAL COPY OF SIGNED
NFPA TEST FORM COMPLETED BY QUALIFIED FIRE ALARM
CONTRACTOR TO OWNER. PROVIDE SIGNED AND SEALED
SHOP DRAWINGS WITH CUT SHEETS, SCALED FLOOR PLANS
AND BATTERY/VOLTAGE DROP CALCULATIONS FOR PERMIT
SUBMITTAL. TEST FIRE ALARM IN FRONT OF OWNER AND
ENGINEER. EXISTING DUCT DETECTORS ARE ON THE RETURN
AIR SIDE AND SHALL BE MOVED TO THE SUPPLY SIDE UPON
INSTALLATION OF NEW UNITS.
6. WORKMANSHIP FOR ALL ELECTRICAL SYSTEMS SHALL BE
NEAT AND PROFESSIONAL AND SHALL COMPLY WITH CURRENT
NECA/NEIS STANDARDS.
ELECTRICAL SCOPE
EXISTING PANEL 'H1' EXISTING PANEL 'BP1' EXISTING PANEL 'BP-15' EXISTING PANEL 'LP1'
LOAD NOTE:
EXISTING PEAK LOAD, PER OWNER METERING,
IS 10.44kW, EQUAL TO 12.5 AMPS ON THIS 200
AMP PANEL. ADDED LOAD IS 20KW. THE NEW
PEAK DEMAN D LOAD IS 10.44+20=30.44KW.
THE CAPACITY IS SUFFICIENT.
EXISTING PEAK LOAD, PER OWNER METERING, IS 50.44
kW, EQUAL TO 60.7 AMPS ON THIS 400 AMP PANEL.
ADDED LOAD IS 20.9KW. THE NEW PEAK DEMAND
LOAD IS 50.44+20.9=71.34KW. THE CAPACITY IS
SUFFICIENT.
IS 20.06kW, EQUAL TO 24.1 AMPS ON THIS 400
AMP PANEL. THE ADDED LOAD IS 63.16KW. THE
NEW DEMAND LOAD IS 20.06+63.16=83.22KW.
THE CAPACITY IS SUFFICIENT.
IS 13.06 kW, EQUAL TO 15.7 AMPS ON THIS 400
AMP PANEL. THE ADDED LOAD IS 53.68KW. THE
NEW DEMAND LOAD IS 13.06+53.68=66.74KW.
THE CAPACITY IS SUFFICIENT. E3.0
NOTES, DETAILS
& PANEL SCHEDULES
N.T.S.
Sheets and Views
21034-ELEC-21034-E1.1
21034-ELEC-21034-E1.2
21034-ELEC-21034-E1.3
21034-ELEC-21034-E2.1
21034-ELEC-21034-E2.2
21034-ELEC-21034-E3.0
2022-11-04T16:38:40-0400
Jeffrey J Hahn
AHU-1, 3, & 9 REPLACEMENT
100% CONSTRUCTION DOCUMENTS OCTOBER 12, 2022
INDEX OF DRAWINGS
CS1.0 COVERSHEET
GENERAL
M1.1 AHU-1 FLOOR PLANS
MECHANICAL
M1.2 AHU-1 HVAC ROOF PLAN
7887 BRYAN DAIRY ROAD, SUITE 120
LARGO, FL 33777
YOUNG-RAINEY STAR CENTER
APPLICABLE CODES
PROJECT MAPENGINEER OF RECORD
3060 S. DALE MABRY HWY.
M2.1 AHU-3 HVAC FLOOR PLANS
M2.2 AHU-3 HVAC ROOF PLAN
M3.1 AHU-9 FLOOR PLAN
M3.2 AHU-9 HVAC ROOF PLANS
M4.0 HVAC SCHEDULES, NOTES, AND DETAILS
M4.1 HVAC SCHEDULES
M4.2 HVAC SCHEDULES
ALL WORK SHALL BE PERFORMED IN STRICT
ACCORDANCE WITH THE REQUIREMENTS OF THE
FOLLOWING CODES AND STANDARDS AND ALL
APPLICABLE SUPPLEMENTS TO THESE EDITIONS.
2020 FLORIDA BUILDING CODE, BUILDING, 7TH EDITION
2020 FLORIDA BUILDING CODE, MECHANICAL, 7TH EDITION
2017 NFPA 70 (NATIONAL ELECTRICAL CODE)
E1.1 AHU-1 & AHU-3 ELECTRICAL 1ST FLOOR PLAN
E1.2 AHU-1 & AHU-3 ELECTRICAL 2ND FLOOR PLAN
E1.3 AHU-1 & AHU-3 ELECTRICAL ROOF PLAN
E2.1 AHU-9 ELECTRICAL 1ST FLOOR PLAN
E2.2 AHU-9 ELECTRICAL ROOF PLAN
E3.0 ELECTRICAL NOTES, DETAILS, AND PANEL SCHEDULES
1. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS.
2. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
REQUIREMENTS OF THE 2020 FLORIDA BUILDING CODE (7TH EDITION) AND THE
2020 FLORIDA FIRE PROTECTION CODE.
3. IN SOME CASES, THE REQUIREMENTS SET FORTH IN THE CONSTRUCTION
DRAWINGS AND SPECIFICATIONS EXCEED THE MINIMUM REQUIREMENTS OF
THE CODE.
4. THE CONTRACTOR SHALL COORDINATE THE SEQUENCING AND EXECUTION OF
ALL TRADES IN STRICT CONFORMANCE WITH THE REQUIREMENTS OF ALL
CONSTRUCTION DRAWINGS AND CONTRACT DOCUMENTS.
5. THE CONTRACTOR SHALL MAINTAIN AND PROTECT FROM DAMAGE ALL
PORTIONS OF THE EXISTING FACILITY SCHEDULED TO REMAIN OR NOT
INDICATED FOR DEMOLITION. ALL DAMAGED AREAS AND ELEMENTS SHALL BE
REPLACED TO MATCH EXISTING ADJACENT CONSTRUCTION IN ALL RESPECTS.
6. PRIOR TO ANY DEMOLITION, THE CONTRACTOR AND OWNER SHALL WALK
THROUGH THE PROJECT AND ESTABLISH A PUNCH LIST OF EXISTING
CONDITIONS. ITEMS NOT IDENTIFIED AND LATER DAMAGED DUE TO
CONSTRUCTION SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
7. FIELD VERIFY ALL DIMENSIONS PRIOR TO DEMOLITION WORK. COORDINATE AS
REQUIRED FOR NEW WORK.
8. THE CONTRACTOR SHALL PROVIDE FOR THE CUTTING, PATCHING, AND
PAINTING OF ALL EXTERIOR AND INTERIOR FINISHED SURFACES TO MATCH
EXISTING AS REQUIRED TO FACILITATE SCOPE OF WORK.
9. THE CONTRACTOR SHALL PROTECT THE PUBLIC FROM CONSTRUCTION
ACTIVITIES AND PROVIDE FOR A SECURE CONSTRUCTION SITE.
10. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH OWNER'S POLICIES
AND PROCEDURES PRIOR TO COMMENCEMENT OF CONSTRUCTION.
11. THE CONTRACTOR SHALL CONSTRUCT TEMPORARY DUST AND NOISE
CONTROL BARRIER AS REQUIRED FOR THE SAFETY AND PROTECTION OF THE
OCCUPANTS DURING WORK IN PROGRESS AND THROUGHOUT THE PHASES OF
THE WORK. COORDINATE SUCH BARRIERS WITH THE OWNER AND OCCUPANTS
AS REQUIRED.
12. ANY WORK THAT WILL CAUSE INTERRUPTIONS TO STAR CENTER TENANTS,
WHETHER THE WORK IS INSIDE THE TENANT SPACE OR OUTSIDE OF THE
TENANT SPACE, ESPECIALLY WELDING, MUST BE COMPLETED AFTER HOURS
OR ON WEEKENDS AND COORDINATED WITH THE STAR CENTER AND THE
TENANTS
SPECIAL GENERAL NOTES
1. SPECIAL SECURITY CLEARANCE REQUIREMENTS BELOW ROOF WORK
LOCATIONS:
AREAS BELOW ROOF WORK ARE OCCUPIED BY A GOVERNMENT
CONTRACTOR (RAYTHEON) AND REQUIRES A SECURITY BACKGROUND
CHECK FOR ALL CONTRACTOR PERSONNEL WORKING INSIDE RAYTHEON
AREAS FOR NON-ESCORT ACCESS. ALL CONTRACTOR EMPLOYEES REQUIRED
TO WORK WITHIN THE RAYTHEON TENANT AREAS FOR THIS PROJECT SHALL
BE REQUIRED TO REGISTER WITH, AND BE AUTHORIZED BY, RAYTHEON
SECURITY TO WORK IN THEIR SPACES. ALL VISITORS AND CREW PERSONNEL
SHALL COORDINATE ARRIVAL AND DEPARTURE TIMES WITH FACILITY
ENGINEER. A MAXIMUM OF THREE NON-ESCORT BADGES WILL BE AWARDED
TO THE PRIME CONTRACTOR. EACH SUBCONTRACTOR WILL BE ALLOWED A
MAXIMUM OF TWO NON-ESCORT BADGES. ALL OTHER TECHNICIANS SHALL
APPLY FOR DAILY VISITOR BADGES WHEN ENTERING RAYTHEON. SECURITY
CLEARANCE OF EMPLOYEES REQUIRED TO WORK WITHIN THE RAYTHEON
TENANT SPACES SHALL BE OBTAINED PRIOR TO THE START OF WORK IN
THESE AREAS. CONTACT THE STAR CENTER FACILITY ENGINEER FOR MORE
INFORMATION.
2. EXISTING ROOF SURFACE PROTECTION AND APPROVED CONTRACTOR NOTE:
AT ALL TIMES, AREAS ON THE ROOF USED FOR STAGING WORK / USED AS
ACCESS TO THE PROJECT AREAS, SHALL BE COVERED WITH PLYWOOD
SHEATHING TO PROTECT THE EXISTING ROOF SURFACE FROM DAMAGE OR
PUNCTURES, NO EXCEPTIONS. A STAR CENTER APPROVED ROOFING
CONTRACTOR SHALL BE USED FOR ALL ROOFING WORK ON THIS PROJECT,
NO EXCEPTIONS. ANY NEW ROOFING WORK WITHIN THE SCOPE OF THE
PROJECT, OR REPAIR TO THE DAMAGES TO THE EXISTING ROOF CAUSED BY
THE CONTRACTOR DURING THE PROJECT, SHALL BE DONE BY THE
CONTRACTOR USING A STAR CENTER APPROVED ROOFING CONTRACTOR.
(PCG SBE REGISTERED ROOFING CONTRACTORS - PRECISION ROOFING
SERVICES PRS OR ALLIED ROOFING).
3. THE CONTRACTOR SHALL PROVIDE A PROPOSED WORK SCHEDULE TO THE
STAR CENTER (SC) PROJECT MANAGER (PM) AT THE TIME OF THE
PRE-CONSTRUCTION MEETING. REFER TO PROJECT SPECIFICATIONS AND
DRAWINGS. THE WORK SCHEDULE FOR ALL TRADES SHALL BE COORDINATED
WITH THE STAR CENTER PM. ANY WORK AFFECTING TENANT OPERATIONS
SHALL BE SCHEDULED AT NIGHT OR ON THE WEEKEND AS APPROVED BY THE
STAR CENTER PROJECT MANAGER AND TENANT(S).
4. THE SPACE BELOW AHU-3 IS OCCUPIED BY A TENANT THAT REQUIRES
ESCORTING BY THE TENANT AT ALL TIMES. THIS WORK SHALL BE SCHEDULED
AND COORDINATED WELL IN ADVANCE WITH THE SC PM AND THE TENANT
REPRESENTATIVE. ANY WORK IN RAYTHEON SPACES SHALL FOLLOW THE
RAYTHEON BADGING REQUIREMENTS AND CONTRACTOR SAFETY
REQUIREMENTS LISTED IN ITEM 1, AND ELSEWHERE IN THE PROJECT
SPECIFICATIONS AND DRAWINGS.
5. THE REMOVAL AND INSTALLATION OF AHU-1, AHU-3, AND AHU-9 UTILIZING A
CRANE SHALL BE COMPLETED OVER SCHEDULED WEEKENDS. CRANE LIFTING
ACTIVITIES SHALL START AT APPROXIMATELY 5PM ON A FRIDAY AND UNIT
INSTALLATION SHALL BE COMPLETED BY MONDAY MORNING AT 7AM. THE
AHU'S MUST BE SET AND PROVIDING PROPER COOLING/HEATING TO THE
TENANTS BY 7AM MONDAY. FINAL CONTROLS INSTALLATION, OFFICIAL RTU
STARTUP, ETC. SHALL PROCEED AFTER THE INITIAL INSTALLATION.
S-001 AHU-1 STRUCTURAL PLAN, SECTIONS, & DETAILS
S-002 AHU-3 STRUCTURAL PLAN, SECTIONS, & DETAILS
S-003 AHU-9 STRUCTURAL PLAN, SECTIONS, & DETAILS
STRUCTURAL
SCOPE OF WORK
PROJECT INCLUDES A COMPLETE REPLACEMENT OF
EXISTING ROOFTOP AIR HANDLING UNITS, AHU-1, 3, AND
9. WORK INCLUDES DEMOLITION OF EXISTING UNITS AND
INSTALLATION OF NEW ON ROOF CURB ADAPTORS AND
ALL ASSOCIATED ELECTRICAL, CONTROLS, PIPING, AND
ALL NECESSARY WORK FOR COMPLETE SYSTEM
INSTALLATION.
M5.0 HVAC CONTROLS
M5.1 HVAC CONTROLS
Sheets and Views
21034-COVERSHEET-21034-CS1.0
2022-10-17T13:33:41-0500
Stephen J Morris
S-001
. 1 2, :5 9:
tru
St ru ur al
P.O. Box 1045, 4000 Hwy. 60 E.
Mulberry, Florida 33860 -1045
Office: 863-648-0818
MEI
MOODY ENGINEERING, INC.
CONSULTING ENGINEERS MULBERRY, FLORIDA
Certificate of Authorization No. 7646
AHU-1 STRUCTURAL PLAN,
SECTIONS, & DETAILS
T.J.M.
S.S.H.
AutoCAD SHX Text
PLAN VIEW (AHU-1) SCALE: " = 1'-0" 14" = 1'-0" INSTALLER TO CONFIRM ALL EXISTING STEEL AS SHOWN
5A
6A
EXIST. W14x30
EXIST. W10x21
EXIST. C8x11.5
EXIST. W10x22
NEW AHU-1
NEW CURB ADAPTER
GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING (TYP. 8 PLACES.) SEE DRAWING NOTE 6. CUT OPENINGS IN ROOF DECK AS NEEDED.
EXIST. L4x4x "14"
NEW L3x3x " 14" (TYP. 3 PLACES)
SCALE:
SECTION
1/2" = 1'-0"
EXISTING ROOF CURB, MODIFY AS NEEDED TO MAINTAIN EXISTING OPENINGS AND DUCT WORK.
EXISTING W14
NEW SEA COAST CURB FRAME OVER EXISTING ROOF CURB LAYOUT
REPAIR AND WATER PROOF AROUND ROOF PENETRATIONS
EXISTING ROOF MATERIALS OVER METAL DECKING
EXISTING W10
NEW AHU-1 ATTACH TO NEW CURB FRAMING PER MANUFACTURERS REQUIREMENTS
NEW AHU-1 ATTACH TO NEW CURB FRAMING PER MANUFACTURERS REQUIREMENTS
6A
EXIST. C8
EXISTING ROOF CURB
2 "x 12GA. GALVANIZED STEEL 12"x 12GA. GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING STEEL. (TYP.) SEE DRAWING NOTE 6. CUT CUT OPENINGS IN ROOF DECK AS NEEDED.
2 "x 12GA. GALVANIZED STEEL 12"x 12GA. GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING STEEL. (TYP.) SEE DRAWING NOTE 6. CUT CUT OPENINGS IN ROOF DECK AS NEEDED.
NEW L3x3x " (TYP. 3 PLACES) 14" (TYP. 3 PLACES) @ 5'-0" O.C. SPACING. FASTEN W/1 58" A325 BOLT INCLUDING HILLSIDE& FLAT WASHERS EACH END.
NOTE: 1. FIELD VERIFY ALL DIMENSIONS PRIOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND/OR INSTALLATION.
GENERAL NOTES - STRUCTURAL STEEL: 1. CODES AND STANDARDS CODES AND STANDARDS A. STRUCTURAL STEEL SHALL BE FURNISHED, DETAILED, FABRICATED AND DELIVERED IN ACCORDANCE WITH THESE NOTES AND THE A.I.S.C. MANUAL OF STEEL CONSTRUCTION, LATEST EDITION, INCLUDING ALL ITS CODES AND SUPPLEMENTS. CONTRACTOR SHALL COVER OR CLOSE ANY AND ALL VOIDS OR OPENINGS DUE TO NEW CONSTRUCTION AND SITE CLEARING OF EXISTING STEEL, MECHANCIAL EQUIPMENT AND PIPING. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS WITH THE CONSTRUCTION DOCUMENTS AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE FABRICATION AND ERECTION OF ANY STEEL. B. WELDING OF STRUCTURAL STEEL INCLUDING QUALIFICATIONS OF WELDERS AND OPERATION REQUIREMENTS PERTAINING TO ELECTRODES, WELD DETAILS, ETC. SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE STRUCTURAL WELDING CODE OF THE AMERICAN WELDING SOCIETY, AWS-D1.1 - LATEST EDITION. 2. MATERIAL MATERIAL A. STRUCTURAL STEEL WIDE FLANGE BEAMS SHALL BE A992 (50 KSI). B. CHANNELS AND ANGLES SHALL BE A36. C. MISCELLANEOUS STEEL AND PLATE SHALL BE A36. 3. CONNECTIONS CONNECTIONS A. REMOVED B. ALL SHOP WELDED CONNECTIONS SHALL BE THE MINIMUM SIZE SPECIFIED IN THE AISC SPECIFICATION, UNLESS OTHERWISE NOTED, BUT NOT LESS THAN ". 316". C. GUSSETS TO BE 3/8" PLATE MINIMUM THICKNESS, UNLESS OTHERWISE NOTED. D. NO FIELD WELDING SHALL BE DONE ON THE BUILDING. 4. COATINGS COATINGS STRUCTURAL STEEL COATING & COLOR SPECS SHALL BE APPROVED BY CLIENT. 5. DESIGN CRITERIA & DESIGN ASSUMPTIONS: DESIGN CRITERIA & DESIGN ASSUMPTIONS: : AIR HANDLER WT. = 2,823 LBS. +10% = 3,105 LBS. CURB ADAPTER WT. = 1,100 LBS. WIND LOADS: RISK CATEGORY II EXPOSURE B WIND SPEED 145 MPH (3 SEC. GUST) ASD WIND LOADS: N/S = 1,350 LBS E/W = 3,609LBS UPLIFT = 1,830 LBS ROOF LIVE LOAD = 12 PSF ROOF COLLATERAL LOAD = 10 PSF ROOF FRAMING = SELF WEIGHT ROOF DECKING = 3 PSF INSULATION & ROOFING = 15 PSF 6. NOT INCLUDED: NOT INCLUDED: : DESIGN OF AIR HANDLER UNITS CURB ADAPTER, DUCT WORK, DIFFUSERS AND DUCT SUPPORTS BY OTHERS. ALL ROOF OPENINGS AND FLASHING BY OTHERS. MAX. UPLIFT ON WINDARD SIDES OF AHU = 3,710 LBS. CURB ADAPTER & CONNECTIONS THRU TO ROOF JOISTS TO BE ADEQUATE FOR 1000 LBS. EACH.
REFERENCE DRAWINGS: : UNIT 1 REFERENCE DRAWINGS: US DOE PARTIAL ROOF PLAN AHU 1, JULY 1989. JOHNSON CONTROLS AHU-1, SHEETS 1 THRU 3 DATED 2/9/22. SEA COAST CURB ADAPTERS & CURBS, LLC - AHU-1
CONSTRUCTION SEQUENCE: : 1. FIELD MEASURE AND CONFIRM LOCATION OF NEW AHU FRAME FIELD MEASURE AND CONFIRM LOCATION OF NEW AHU FRAME RELATIVE TO EXISTING STRUCTURES. 2. INSTALL NEW AHU SUPPORT FRAME AND STEEL INSTALL NEW AHU SUPPORT FRAME AND STEEL REINFORCEMENT AS SPECIFIED. 3. INSTALL NEW AHU ON NEW SUPPORT FRAME. INSTALL NEW AHU ON NEW SUPPORT FRAME. 4. COMPLETE COMMISSIONING OF NEW AHU.COMPLETE COMMISSIONING OF NEW AHU.
S-002
AHU-3 STRUCTURAL PLAN,
9A
NEW AHU-3
EXIST. AHU-7
PLAN VIEW (AHU-3) SCALE: " = 1'-0" 14" = 1'-0" INSTALLER TO CONFIRM ALL EXISTING STEEL AS SHOWN
EXIST. W10
GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING (TYP. 8 PLACES.) SEE DRAWING NOTE 6. CUT OPENINGS IN ROOF DECK AS NEEDED.
EXISTING ROOF CURB, MODIFY AS NEEDED TO MAINTAIN EXISTING OPENINGS AND DUCT WORK.
EXISTING W14
NEW AHU-3 ATTACH TO NEW CURB FRAMING PER MANUFACTURERS REQUIREMENTS
NEW AHU-3 ATTACH TO NEW CURB FRAMING PER MANUFACTURERS REQUIREMENTS
9A
2 "x 12GA. GALVANIZED STEEL 12"x 12GA. GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING STEEL. (TYP.) SEE DRAWING NOTE 6. CUT CUT OPENINGS IN ROOF DECK AS NEEDED.
2 "x 12GA. GALVANIZED STEEL 12"x 12GA. GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING STEEL. (TYP.) SEE DRAWING NOTE 6. CUT CUT OPENINGS IN ROOF DECK AS NEEDED.
NOTE: 1. FIELD VERIFY ALL DIMENSIONS PRIOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND/OR INSTALLATION.
GENERAL NOTES - STRUCTURAL STEEL: 1. CODES AND STANDARDS CODES AND STANDARDS A. STRUCTURAL STEEL SHALL BE FURNISHED, DETAILED, FABRICATED AND DELIVERED IN ACCORDANCE WITH THESE NOTES AND THE A.I.S.C. MANUAL OF STEEL CONSTRUCTION, LATEST EDITION, INCLUDING ALL ITS CODES AND SUPPLEMENTS. CONTRACTOR SHALL COVER OR CLOSE ANY AND ALL VOIDS OR OPENINGS DUE TO NEW CONSTRUCTION AND SITE CLEARING OF EXISTING STEEL, MECHANCIAL EQUIPMENT AND PIPING. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS WITH THE CONSTRUCTION DOCUMENTS AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE FABRICATION AND ERECTION OF ANY STEEL. B. WELDING OF STRUCTURAL STEEL INCLUDING QUALIFICATIONS OF WELDERS AND OPERATION REQUIREMENTS PERTAINING TO ELECTRODES, WELD DETAILS, ETC. SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE STRUCTURAL WELDING CODE OF THE AMERICAN WELDING SOCIETY, AWS-D1.1 - LATEST EDITION. 2. MATERIAL MATERIAL A. STRUCTURAL STEEL WIDE FLANGE BEAMS SHALL BE A992 (50 KSI). B. CHANNELS AND ANGLES SHALL BE A36. C. MISCELLANEOUS STEEL AND PLATE SHALL BE A36. 3. CONNECTIONS CONNECTIONS A. REMOVED B. ALL SHOP WELDED CONNECTIONS SHALL BE THE MINIMUM SIZE SPECIFIED IN THE AISC SPECIFICATION, UNLESS OTHERWISE NOTED, BUT NOT LESS THAN ". 316". C. GUSSETS TO BE 3/8" PLATE MINIMUM THICKNESS, UNLESS OTHERWISE NOTED. D. NO FIELD WELDING SHALL BE DONE ON THE BUILDING. 4. COATINGS COATINGS STRUCTURAL STEEL COATING & COLOR SPECS SHALL BE APPROVED BY CLIENT. 5. DESIGN CRITERIA & DESIGN ASSUMPTIONS: DESIGN CRITERIA & DESIGN ASSUMPTIONS: : AIR HANDLER WT. = 3,509 LBS. +10% = 3,860 LBS. CURB ADAPTER WT. = 1,000 LBS. WIND LOADS: RISK CATEGORY II EXPOSURE B WIND SPEED 145 MPH (3 SEC. GUST) ASD WIND LOADS: N/S = 1,350 LBS E/W = 3,609LBS UPLIFT = 1,830 LBS ROOF LIVE LOAD = 12 PSF ROOF COLLATERAL LOAD = 10 PSF ROOF FRAMING = SELF WEIGHT ROOF DECKING = 3 PSF INSULATION & ROOFING = 15 PSF 6. NOT INCLUDED: NOT INCLUDED: : DESIGN OF AIR HANDLER UNITS CURB ADAPTER, DUCT WORK, DIFFUSERS AND DUCT SUPPORTS BY OTHERS. ALL ROOF OPENINGS AND FLASHING BY OTHERS. MAX. UPLIFT ON WINDARD SIDES OF AHU = 3,710 LBS. CURB ADAPTER & CONNECTIONS THRU TO ROOF JOISTS TO BE ADEQUATE FOR 1000 LBS EACH.
REFERENCE DRAWINGS: : UNIT 3 REFERENCE DRAWINGS: US DOE PARTIAL ROOF PLAN AHU 3, JULY 1989. JOHNSON CONTROLS AHU-3, SHEETS 1 THRU 3 DATED 3/21/22. SEA COAST CURB ADAPTERS & CURBS, LLC - AHU-3
CONSTRUCTION SEQUENCE: : 1. FIELD MEASURE AND CONFIRM LOCATION OF NEW AHU FRAME FIELD MEASURE AND CONFIRM LOCATION OF NEW AHU FRAME RELATIVE TO EXISTING STRUCTURES. 2. INSTALL NEW AHU SUPPORT FRAME AND STEEL INSTALL NEW AHU SUPPORT FRAME AND STEEL REINFORCEMENT AS SPECIFIED. 3. INSTALL NEW AHU ON NEW SUPPORT FRAME. INSTALL NEW AHU ON NEW SUPPORT FRAME. 4. COMPLETE COMMISSIONING OF NEW AHU.COMPLETE COMMISSIONING OF NEW AHU.
S-003
AHU-9 STRUCTURAL PLAN,
EXIST. TRUSS FRAME
NEW AHU-9
EXISTING C6x8.2 STEEL FRAMING (TYP.)
PLAN VIEW (AHU-9) SCALE: " = 1'-0" 14" = 1'-0" INSTALLER TO CONFIRM ALL EXISTING STEEL AS SHOWN
GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING (TYP. 12 PLACES.) SEE DRAWING NOTE 6. CUT OPENINGS IN ROOF DECK AS NEEDED.
REF. U.S. ATOMIC ENERGY COMMISION ROOF FRAMING PLAN DWG. NO. S-3 (PROJ. NO. 167) FOR GRID LINE (C)
CONC. BLOCK WALL
EXISTING ROOF CURB, MODIFY AS NEEDED TO MAINTAIN EXISTING OPENINGS AND DUCT WORK
NEW AHU-9 ATTACH TO NEW CURB FRAMING PER MANUFACTURERS REQUIREMENTS
NEW AHU-9 ATTACH TO NEW CURB FRAMING PER MANUFACTURERS REQUIREMENTS
2 "x 12GA. GALVANIZED STEEL 12"x 12GA. GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING STEEL. (TYP.) SEE DRAWING NOTE 6. CUT OPENINGS IN ROOF DECK AS NEEDED.
2 "x 12GA. GALVANIZED STEEL 12"x 12GA. GALVANIZED STEEL CONNECTOR STRAPS BETWEEN CURB ADAPTER & ROOF FRAMING STEEL. (TYP.) SEE DRAWING NOTE 6. CUT CUT OPENINGS IN ROOF DECK AS NEEDED.
EXISTING TRUSS
EXISTING C6 FRAMING
EXISTING TRUSS
EXIST. C6 (TYP.)
EXISTING TRUSS (BEYOND)
NOTE: 1. FIELD VERIFY ALL DIMENSIONS PRIOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND/OR INSTALLATION.
GENERAL NOTES - STRUCTURAL STEEL: 1. CODES AND STANDARDS CODES AND STANDARDS A. STRUCTURAL STEEL SHALL BE FURNISHED, DETAILED, FABRICATED AND DELIVERED IN ACCORDANCE WITH THESE NOTES AND THE A.I.S.C. MANUAL OF STEEL CONSTRUCTION, LATEST EDITION, INCLUDING ALL ITS CODES AND SUPPLEMENTS. CONTRACTOR SHALL COVER OR CLOSE ANY AND ALL VOIDS OR OPENINGS DUE TO NEW CONSTRUCTION AND SITE CLEARING OF EXISTING STEEL, MECHANCIAL EQUIPMENT AND PIPING. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS WITH THE CONSTRUCTION DOCUMENTS AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE FABRICATION AND ERECTION OF ANY STEEL. B. WELDING OF STRUCTURAL STEEL INCLUDING QUALIFICATIONS OF WELDERS AND OPERATION REQUIREMENTS PERTAINING TO ELECTRODES, WELD DETAILS, ETC. SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE STRUCTURAL WELDING CODE OF THE AMERICAN WELDING SOCIETY, AWS-D1.1 - LATEST EDITION. 2. MATERIAL MATERIAL A. STRUCTURAL STEEL WIDE FLANGE BEAMS SHALL BE A992 (50 KSI). B. CHANNELS AND ANGLES SHALL BE A36. C. MISCELLANEOUS STEEL AND PLATE SHALL BE A36. 3. CONNECTIONS CONNECTIONS A. REMOVED B. ALL SHOP WELDED CONNECTIONS SHALL BE THE MINIMUM SIZE SPECIFIED IN THE AISC SPECIFICATION, UNLESS OTHERWISE NOTED, BUT NOT LESS THAN ". 316". C. GUSSETS TO BE 3/8" PLATE MINIMUM THICKNESS, UNLESS OTHERWISE NOTED. D. NO FIELD WELDING SHALL BE DONE ON THE BUILDING. 4. COATINGS COATINGS STRUCTURAL STEEL COATING & COLOR SPECS SHALL BE APPROVED BY CLIENT. 5. DESIGN CRITERIA & DESIGN ASSUMPTIONS: DESIGN CRITERIA & DESIGN ASSUMPTIONS: : AIR HANDLER WT. = 3,828 LBS. +10% = 4,211 LBS. CURB ADAPTER WT. = 750 LBS. WIND LOADS: RISK CATEGORY II EXPOSURE B WIND SPEED 145 MPH (3 SEC. GUST) ASD WIND LOADS: N/S = 1,350 LBS E/W = 3,609LBS UPLIFT = 1,830 LBS ROOF LIVE LOAD = 12 PSF ROOF COLLATERAL LOAD = 10 PSF ROOF FRAMING = SELF WEIGHT ROOF DECKING = 3 PSF INSULATION & ROOFING = 15 PSF 6. NOT INCLUDED: NOT INCLUDED: : DESIGN OF AIR HANDLER UNITS CURB ADAPTER, DUCT WORK, DIFFUSERS AND DUCT SUPPORTS BY OTHERS. ALL ROOF OPENINGS AND FLASHING BY OTHERS. MAX. UPLIFT ON WINDARD SIDES OF AHU = 3,710 LBS. CURB ADAPTER & CONNECTIONS THRU TO ROOF JOISTS TO BE ADEQUATE FOR 1000 LBS. EACH.
REFERENCE DRAWINGS: : UNIT 9 REFERENCE DRAWINGS: US AEC PROJECT 167 STRUCTURAL DRAWINGS S-1 THRU 5, APPROVED 10/19/67. JOHNSON CONTROLS AHU-9, SHEET 1 SEA COAST CURB ADAPTERS & CURBS, LLC - AHU-9
CONSTRUCTION SEQUENCE: : 1. FIELD MEASURE AND CONFIRM LOCATION OF NEW AHU FRAME FIELD MEASURE AND CONFIRM LOCATION OF NEW AHU FRAME RELATIVE TO EXISTING STRUCTURES. 2. INSTALL NEW AHU SUPPORT FRAME AND STEEL INSTALL NEW AHU SUPPORT FRAME AND STEEL REINFORCEMENT AS SPECIFIED. 3. INSTALL NEW AHU ON NEW SUPPORT FRAME. INSTALL NEW AHU ON NEW SUPPORT FRAME. 4. COMPLETE COMMISSIONING OF NEW AHU.COMPLETE COMMISSIONING OF NEW AHU.
Sheets and Views
21034-Structural-STRUC-S-001
21034-Structural-STRUC-S-002
21034-Structural-STRUC-S-003
2022-10-28T09:09:33-0400
Shawn Hamrick
F8F7
F6F5
A5 A5A A6A A 7
E 5 E6
B 6A B 7
B 7A
D 5A D 6A
C 6A C 7A
D 7A
87A76A65A5 x1
24x10VAV-1-2 x6
12x6
12x11
12x1014x8
VAV-1-1
VAV-1-3
VAV-1-4
VV
-7
-8
14x8
6x
8x8H
-X HC-X VAV-1-9
6"Ø
8"Ø
8" Ø
12x10
-6
VAV-1-5
x6
24x10 x8
4"Ø
24x16 H
-X
8x128"Ø
6x6 8x12
18x12
12x12
"Ø
10"Ø
26x16
16x12
24x6
212x8
12x8 x2
24x12 18x12
EXISTING AHU-1
AREA
EXISTING AHU-1 AREA
VV-1/6
VV-1/7
VV-1/8
4"
VV-1/5
VV-1/2
5"
VV-1/4
VV-1/3
SA-1-24
VV-1/1
AB
AN
XH
AU
YS
12x24 TA
10x10
VV-1/10
22x16
10x8
HC-X
SA-1-23
SA-1-22
2SA-1-20
SA-1-19
SA-1-18
SA-1-17
SA
SA-1-21
36x16
SA-1-37 SA-1-38
6"
SA-1-36
SA-1-35
VV-1/11
VV-1/12
VV-1/13
EDH-1/1
VV-1/16
VV-1/15
VV-1/17
VV-1/XX
SA-1-28
SA-1-29
SA-1-27 SA-1-26
SA-1-30
SA-1-31
SA-1-32
SA-1-33
SA-1-34
SA-1-25
SA-1-1
SA-1-2
SA-1-7
SA-1-8
SA-1-3
SA-1-5
SA-1-6
SA-1-4
SA-1-10
SA-1-9
SA-1-12
SA-1-11
SA-1-13
SA-1-14
12x12 12x12
SA-3-2
SA-3-4
"Ø
SA-3-1
42x18 RA UP
TO 2ND FLR
42x20 SA DOWN
FROM AHU-1
EDH-1-22
4 4
ON
EDH-1-2
1. EXISTING DUCTWORK, AIR DEVICES, AND VAV BOXES
ASSOCIATED WITH AHU-1 TO REMAIN AS IS.
2. PROVIDE NEW ELECTRIC DUCT HEATER IN EXISTING SUPPLY AIR
DUCT. PROVIDE NEW WIRING, CONTROLS AND ALL ASSOCIATED
EQUIPMENT FOR COMPLETE INSTALLATION. DISABLE
THERMAFUSER CONTROL DAMPER IN ALL SUPPLY AIR DEVICES
DOWNSTREAM OF NEW ELECTRIC DUCT HEATER. THIS WORK TO
BE PERFORMED ON THE WEEKEND
3. NEW DISTECH DDC CONTROLS AND ASSOCIATED COMPONENTS
EXTENDED TO TIE-IN AT EXISTING FACILITY DISTECH EMS
SYSTEM. PROVIDE ALL LABOR AND MATERIALS FOR COMPLETE
SYSTEMS TIE-IN. COORDINATE ROUTE OF CONDUIT AND CABLING
WITH DDC CONTROL SITE MAP ON DRAWING M5.0 AND WITH THE
OWNER.
4. BALANCE EXISTING SUPPLY AIR DEVICE TO FINAL CFM AS LISTED
ON EXISTING AIR DEVICE SCHEDULE ON DRAWING M4.1.
5. REMOVE AND DISPOSE OF ALL EXISTING TRANE DDC CONTROLS
AND COMPONENTS AT AHU-1 AND AT ALL VAV BOXES
CONNECTED TO EXISTING TRANE DDC CONTROL SYSTEM.
6. PROVIDE ALL LABOR AND MATERIALS NECESSARY TO REPLACE
EXISTING AHU-1 TRANE VAV BOX CONTROLS WITH NEW DISTECH
CONTROLS. EXTEND NEW DISTECH VAV BOX CONTROLS TO AHU-1
UNIT CONTROL PANEL ON THE 2ND FLOOR.
7. REMOVE AND DISPOSE OF EXISTING HOT WATER COIL, PIPING ,
AND ALL ASSOCIATED EQUIPMENT. PATCH AND SEAL DUCT AND
FULLY INSULATE AT REMOVED HOT WATER COIL. THIS WORK TO
BE PERFORMED ON THE WEEKEND.
8. CAREFULLY DISCONNECT EXISTING 8"Ø SUPPLY DUCT FROM
EXISTING AIR DEVICE AND CAP AND SEAL DUCT BRANCH
TAKE-OFF FROM MAIN. EXTEND NEW INSULATED 8"Ø SUPPLY
DUCT FROM NEW CONNECTION WITH BALANCING DAMPER IN
SUPPLY DUCT DOWNSTREAM OF NEW DUCT HEATER EDH-1-2.
9. NOTE: EXISTING EDH-1-1 IS STANDALONE/NOT CONNECTED TO
FACILITY EMS AND TO REMAIN AS IS.
10. REMOVE ABANDONED THERMAFUSER CONTROLLER. DISABLE
THERMAFUSER CONTROL DAMPER IN ALL SUPPLY AIR DEVICES
DOWNSTREAM OF NEW ELECTRIC DUCT HEATER.
EXISTING PIPING TO REMAIN
CAP DUCT/PIPE
REMOVE EXISTING EQUIPMENT
REMOVE EXISTING PIPING
NEW PIPING
CONNECT TO EXISTING
MANUAL BALANCING DAMPER
RETURN / EXHAUST / TRANSFER AIR GRILLE
SUPPLY AIR DIFFUSER
NEW DUCTWORK
EXISTING EQUIPMENT TO REMAIN
ES
SI
ELECTRICAL SWITCH GEAR ROOM 137
FRONT OFFICE
LOBBY
CARPET
2'X 4'X 2 2'X 2' +8'-8"
AHU
PROCESSING
CORRIDORSTAIRS
ID
ROOM
ADA RESTROOM
LOCKER
MEN'S
WOMEN'SJANITOR
6' b ot
0" bo tto
D 7A
C 7AC 6A
D 6AD 5A
B 7A
B 7 B 6A
E6E 5
A 7A6AA5AA5
F5 F6
F7 F8
E.E.
NIC
5 5A 6 6A 7 7A 8
SA-1-39
"x
84"X24" RA DOWN FROM
AHU-1 TO RA PLENUM
EXISTING 42"X20" SA
DOWN FROM AHU-1
TO FIRST FLOOR
2.5"Ø CHWS&R
UP TO AHU-1
1.5"Ø COND.
DRAIN DOWN
54"X18" SA DOWN
EXISTING 36"X18" RA UP THROUGH
FLOOR AND TERMINATING IN ROOM
EXISTING AHU-1 DDC CONTROL PANEL
AHU-1 ON ROOF
EX
TI
AP
NOTE: ANY WORK THAT WILL CAUSE INTERRUPTIONS TO STAR CENTER
TENANTS, WHETHER THE WORK IS INSIDE THE TENANT SPACE OR
OUTSIDE OF THE TENANT SPACE, ESPECIALLY WELDING, MUST BE
COMPLETED AFTER HOURS OR ON WEEKENDS AND COORDINATED
WITH THE STAR CENTER AND THE TENANTS.
REFER TO COVER SHEET FOR SPECIAL SECURITY REQUIREMENTS.
M1.1
3, :2 ec h\
AHU-1 FLOOR PLANS
AHU-1 FLOOR 2 PLAN
AHU-1 FLOOR 1 PLAN
1. REMOVE AND DISPOSE OF EXISTING AHU-1 AND ALL ASSOCIATED
EQUIPMENT. CAREFULLY PRESERVE THE EXISTING ROOF CURB
FOR INSTALLATION OF NEW UNIT WITH CURB ADAPTER DURING
RENOVATION. EXISTING DUCTWORK BELOW THE ROOF AND THE
ROOF DUCT PENETRATIONS AND SECURITY BARS SHALL REMAIN
AS IS FOR CONNECTION TO NEW AHU WITH CURB ADAPTER.
2. REMOVE AND DISPOSE OF ROOF MOUNTED CHWS&R PIPING
CONNECTION TO AHU, ROOF SUPPORTS AND ALL ASSOCIATED
EQUIPMENT. DISCONNECT PIPING AT ROOF PENETRATION
PRESERVING THE EXISTING PIPE PENETRATION AND CHWS&R
PIPING THROUGH ROOF FOR CONNECTION TO NEW AHU DURING
RENOVATION.
3. DISCONNECT CONDENSATE DRAIN PIPING FROM AHU PRESERVING
FOR CONNECTION TO NEW AHU DURING RENOVATION.
4. EXISTING ROOFTOP EQUIPMENT TO REMAIN AS IS.
5. PROVIDE NEW ROOF MOUNTED AHU WITH MANUFACTURER'S ROOF
CURB ADAPTER FOR ATTACHMENT TO THE EXISTING ROOF CURB.
PROVIDE NEW CONTROLS, WIRING, PIPING, INSULATION,
SUPPORTS AND ALL REQUIRED EQUIPMENT FOR COMPLETE
6. PROVIDE NEW INSULATED CHWS&R PIPING WITH ALUMINUM
JACKET EXTENDED FROM EXISTING CHWS&R PIPING ROOF
PENETRATION TO NEW AHU COIL CONNECTIONS. PROVIDE NEW
VALVES, ACCESSORIES, ROOF SUPPORTS FOR NEW CHWS&R
PIPING AS REQUIRED.
7. PROVIDE NEW INSULATED CONDENSATE DRAIN WITH P-TRAP,
SLOPED FROM UNIT TO CONNECT AT EXISTING CONDENSATE
DRAIN. PROVIDE ALUMINUM JACKET FOR INSULATED EXTERIOR
CONDENSATE PIPING.
EF-1254
6 7
6 6A5A
2"Ø CHWS&R
EF-1254
2 3
6 6A5A
OUTSIDE OF THE TENANT SPACE, ESPECIALLY WELDING, MUST BE
M1.2
:3 0:
AHU-1 HVAC ROOF PLAN
AHU-1 DEMOLITION ROOF PLAN
AHU-1 RENOVATION ROOF PLAN
AHU-1 EAST VIEW
4AHU-1 WEST VIEW
SCALE: NTS3
1. EXISTING DUCTWORK, AIR DEVICES, AND VAV BOXES
ASSOCIATED WITH AHU-3 TO REMAIN AS IS.
2. NEW DISTECH DDC CONTROLS AND ASSOCIATED COMPONENTS
EXTENDED TO TIE-IN AT EXISTING DISTECH FACILITY EMS
SYSTEM. PROVIDE ALL LABOR AND MATERIALS FOR COMPLETE
SYSTEMS TIE-IN. COORDINATE ROUTE OF CONDUIT AND CABLING
WITH DDC CONTROL SITE MAP ON DRAWING M5.0 AND WITH THE
OWNER.
3. PROVIDE NEW VAV BOX WITH ELECTRIC HEATER, CONTROLS,
WIRING, SUPPORTS, DUCTWORK, AND ALL ASSOCIATED
EQUIPMENT. CONNECT VAV BOX TO THE EXISTING 20"X14"
SUPPLY DUCT MAIN FROM AHU-3. EXTEND INSULATED DUCT
FROM VAV BOX TO TIE-IN TO EXISTING SUPPLY DISTRIBUTION
SERVING TRAINING ROOM. EXTEND NEW VAV BOX CONTROLS
TO NEW AHU-3 DDC CONTROL PANEL ON 2ND FLOOR. THIS WORK
TO BE PERFORMED ON THE WEEKEND.
4. REMOVE AND DISPOSE OF EXISTING HATCHED DUCTWORK,
SUPPORTS, AND ALL ASSOCIATED EQUIPMENT. CAP AND SEAL
EXISTING DUCTWORK WHERE SHOWN. REMOVE AND DISPOSE
OF EXISTING RETURN AIR DEVICES. THIS WORK TO BE
PERFORMED ON THE WEEKEND.
5. PROVIDE NEW RETURN AIR DEVICE IN CEILING RETURN AIR
PLENUM.
6. BALANCE EXISTING SUPPLY AIR DEVICE TO FINAL CFM AS LISTED
ON EXISTING AIR DEVICE SCHEDULE ON DRAWING M4.2.
7. REMOVE AND DISPOSE OF ALL EXISTING TRANE DDC CONTROLS
AND COMPONENTS AT AHU-3 AND AT ALL ASSOCIATED VAV
BOXES CONNECTED TO THE EXISTING TRANE DDC CONTROL
SYSTEM.PROVIDE ALL LABOR AND MATERIALS NECESSARY TO
REPLACE EXISTING AHU-3 TRANE VAV CONTROLS WITH NEW
DISTECH CONTROLS. EXTEND NEW DISTECH CONTROLS TO
AHU-3 UNIT CONTROL PANEL ON THE 2ND FLOOR.
8. CAP AND SEAL ABANDONED AHU-65 SUPPLY AND RETURN DUCTS
WITH INSULATED CAP AT TRAINING ROOM SIDE OF WALL.
EMPTY ROOMEMPTY ROOMTELEPHONE ROOM
OFFICE OFFICE OFFICE OFFICE OFFICE OPEN OFFICE OFFICE
OFFICEOFFICEOPEN OFFICE
BR
STAIRS
ENTRY
MECH/ELECTRIC
PASSAGE
ELEVATOR
CONFERENCE ROOM
ELECTRIC
C 9AC 9
D 8AD 7A
C 7A
BB 7A
A1 11.3A 11A 10A
A 9AA 9
CONFERENCE
OPEN OFFICE AREA
CLOSET
10A7A 8 8A 9 9A 10 11 11.3
A.1
B.3
D.1
B.1
16X8
AH
-6
84"X24" RA DOWN FROM
AHU-3 TO RA PLENUM
54"X18" SA
DOWN FROM
EXISTING 42"X20" RA TRANSFER
OPENING TO CEILING PLENUM
EXISTING 42"X20" SA DOWN
FROM AHU-3 TO FIRST FLOOR
EXISTING 42"X18" RA UP
THROUGH FLOOR AND
TERMINATING IN ROOM
2"Ø CHWS&R UP TO
1.5"Ø CONDENSATE
DRAIN DOWN FROM
EXISTING AHU-3 DDC CONTROL PANEL
1 1
3 7
A 9 A 9A
A 10A A 11 A1 11.3
B 7A B
C 7A
D 7A D 8A
C 9 C 9A
B.1
D.1
B.3
A.1
11.311109A98A87A 10A
42x18 RA UP
TO 2ND FLR
22x12
-4
VV-3-2
VV-3-1
8x6
TVV-3/3
VV-3/4
8x10
8x8
8x
16x14 RA UP
TO AHU-65 ON
2ND FLR
16x8 SA DOWN
FROM AHU-65
ON 2ND FLR
VV-3/1
12x12 TA
6"Ø6"Ø
26x12
16x14
24x12
Ø14x8
10x10
16x18
VV-3/14
VV-3/12
VV-3/13
20x16
42x20 SA DOWN
FROM AHU-3
VV-3/11
AHU-65
VV-3/10
VV-3/15
EXISTING AHU-65
AREA = 867 FT²
EXISTING AHU-3 AREAEXISTING AHU-3 AREA
EXISTING AHU-1 AREA
VV-3/9
VV-3/7
VV-3/8
12x12 12x12
VAV-3-9
SA-3-2
SA-3-4 SA-3-5
SA-3-3
SA-3-33
SA-3-30 VAV-3-10 HC-X
VAV-3-11
X1
SA-3-10
SA-3-11
SA-3-12 SA-3-13 SA-3-14
16x8
SA-3-15
VAV-3-
SA-3-17
12"Ø10"Ø
12"Ø
VAV-3-13
16x16
16x16
VAV-3-14VAV-3-15
SA-3-7
SA-3-8
SA-3-9
8x
SA-3-25
-2
SA-3-23 SA-3-26
SA-3-32
VV-3/6
10x12
SA-3-34
SA-3-20
SA-3-18
10x12
7x12 8"Ø
TVV-3/2
10x10 TA
SA-3-X
SA-3-1
SA-3-16
SA-3-6
VV-3/5
14x121
M1.0 3,4
M2.1
3 7
6 6
2ND FLR FROM AHU-65
EXISTING AHU-3 AREA
8x8
2ND FLR FROM AHU-65
EXISTING AHU-3 AREA
14x12
5 5
OUTSIDE OF THE TENANT SPACE, ESPECIALLY WELDING, MUST BE
M2.1
AHU-3 FLOOR PLANS
AHU-3 FLOOR 2 PLAN
AHU-3 FLOOR 1 PLAN
AHU-3 DUCT DEMOLITION PLAN
3 AHU-3 DUCT RENOVATION PLAN
1. REMOVE AND DISPOSE OF EXISTING AHU--3 AND ALL ASSOCIATED
FOR INSTALLATION OF NEW UNIT WITH CURB ADAPTER DURING
RENOVATION. EXISTING DUCTWORK BELOW THE ROOF AND THE
CONNECTION TO AHU, ROOF SUPPORTS AND ALL ASSOCIATED
EQUIPMENT. DISCONNECT PIPING AT ROOF PENETRATION
PRESERVING THE EXISTING PIPE PENETRATION AND CHWS&R
PIPING THROUGH ROOF FOR CONNECTION TO NEW AHU DURING
RENOVATION.
PROVIDE NEW CONTROLS, WIRING, PIPING, INSULATION,
JACKET EXTENDED FROM EXISTING CHWS&R PIPING ROOF
PENETRATION TO NEW AHU COIL CONNECTIONS. COORDINATE
PIPE ROUTING WITH AHU MANUFACTURER'S CLEARANCE AND
ACCESS REQUIREMENTS. PROVIDE NEW VALVES, ACCESSORIES,
ROOF SUPPORTS FOR NEW CHWS&R PIPING AS REQUIRED.
8. EXISTING PIPING STANDS SHALL BE ATTACHED TO THE ROOF PER
MANUFACTURER'S INSTRUCTIONS. PROVIDE ADDITIONAL PIPING
SUPPORTS AS NECESSARY TO MEET SPACING REQUIREMENTS.AHU-3
AHU-3 & AHU-7 CONDENSATE DRAIN
9 9A
ROOF DRAIN
888888
NEW PIPE
SUPPORT
2"
S&
AHU-3 & AHU-7 CONDENSATE DRAIN
9 9A
ROOF DRAIN
OUTSIDE OF THE TENANT SPACE, ESPECIALLY WELDING, MUST BE
M2.2
AHU-3 HVAC ROOF PLAN
AHU-3 DEMOLITION ROOF PLAN
AHU-3 RENOVATION ROOF PLAN
AHU-3 WEST VIEW
3 AHU-3 EAST VIEW
4 AHU-3 CHWS&R PIPING CHASE
1. REMOVE AND DISPOSE OF EXISTING HATCHED DUCTWORK,
SUPPORTS, AND ALL ASSOCIATED EQUIPMENT.
2. CAP AND SEAL EXISTING DUCTS AT PENETRATION THROUGH ROOF
TO MECHANICAL PENTHOUSE.
3. REMOVE AND DISPOSE OF EXISTING TRANSFER AIR GRILLES. CAP
AND SEAL OPENINGS.
4. EXISTING HVAC SYSTEMS TO REMAIN AS IS.
5. PROVIDE NEW INSULATED SUPPLY AIR DUCTWORK TO CONNECT
EXISTING SUPPLY MAIN TO EXISTING DUCT SYSTEMS IN ADDED
AREAS. PROVIDE ALL HANGARS, SUPPORTS, DUCTWORK
ACCESSORIES, AND ASSOCIATED EQUIPMENT FOR COMPLETE
INSTALLATION
6. PROVIDE NEW RETURN AIR TRANSFER DUCT THROUGH CORRIDOR
WALL TO CEILING PLENUM BELOW AHU-9.
7. BALANCE AHU-9 SYSTEM SUPPLY AIR DEVICES TO FINAL CFM AS
LISTED ON EXISTING AIR DEVICE SCHEDULE ON DRAWING M4.1.
8. PROVIDE NEW TRANSFER AIR OPENING IN WALL.
9. NEW DISTECH DDC CONTROLS AND ASSOCIATED COMPONENTS
EXTENDED TO TIE-IN AT EXISTING FACILITY EMS SYSTEM. PROVIDE
ALL LABOR AND MATERIALS FOR COMPLETE SYSTEMS TIE-IN.
COORDINATE ROUTE OF CONDUIT AND CABLING WITH DDC
CONTROL SITE MAP ON DRAWING M5.0 AND WITH THE OWNER.
10. REMOVE AND DISPOSE OF ALL EXISTING TRANE DDC CONTROLS
AND COMPONENTS AT EXISTING AIR HANDLING UNIT AHU-9.
222120
18x28
20x24
18x16
2 28 "X
34"X10" SA
NEW AHU-9 TOTAL AREA = 8042 FT²
12x812x8 12x8
42x26 TA42x26 TA
226x26 SA DOWN
FROM AHU-9
36x10 TA36x10 TA
AHU-9-1
56x30 RA UP
TO AHU-9
30x3030x30
EXIST. SA
THROUGH ROOF
ABANDONED DUCT
SA-9-2SA-9-1 SA-9-3 SA-9-4
SA-9-5
SA-9-10
SA-9-9
SA-9-8
SA-9-7
SA-9-6
-9
SA-9-12
SA-9-13
AHU-9 ON ROOF
30"X28" SA30"X24" SA20"X20" SA
12"X12"
7 7 7 7
16"X12" TA
18"X12" TA 30"X20" TA
AHU-9-2
AHU-9-3
3 3
OUTSIDE OF THE TENANT SPACE, ESPECIALLY WELDING, MUST BE
M3.1
AHU-9 FLOOR PLAN
AHU-9 RENOVATION FLOOR PLAN
1AHU-9 DEMOLITION FLOOR PLAN
EXISTING 2"Ø CHWS&R
EXISTING COND. DRAIN
NEW 2"Ø CHWS&R
1. REMOVE AND DISPOSE OF EXISTING AHU--9 AND ALL ASSOCIATED
FOR INSTALLATION OF NEW UNIT WITH CURB ADAPTER DURING
RENOVATION. EXISTING DUCTWORK BELOW THE ROOF AND THE
CONNECTIONS AT AHU, ROOF PIPE SUPPORTS AND ALL
ASSOCIATED EQUIPMENT. DISCONNECT PIPING AT EXISTING
SYSTEM VALVE/FLANGE PRESERVING THE EXISTING ROOF
MOUNTED CHWS&R PIPING FOR CONNECTION TO NEW AHU
DURING RENOVATION.
PROVIDE NEW CONTROLS, WIRING, PIPING, INSULATION,
JACKET EXTENDED FROM EXISTING CHWS&R PIPING TO NEW AHU
COIL CONNECTIONS. PROVIDE NEW VALVES, ACCESSORIES, ROOF
SUPPORTS FOR NEW CHWS&R PIPING AS REQUIRED.
EXISTING 2"Ø CHWS&R
EXISTING COND. DRAIN
OUTSIDE OF THE TENANT SPACE, ESPECIALLY WELDING, MUST BE
M3.2
1:
AHU-9 HVAC ROOF PLAN
AHU-9 DEMOLITION ROOF PLAN
AHU-9 RENOVATION ROOF PLAN
AHU-9 SOUTHEAST VIEW
3 AHU-9 SOUTHWEST VIEW
UNION (TYP.)
MANUAL CALIBRATED
2-WAY VALVE
WITH CAP AND CHAIN
TYPICAL CHILLED WATER COIL PIPING DIAGRAM
AIR FLOW
AIR FLOW
"Y" STRAINERWELL (TYP.)
THERMOCOUPLE
ISOMETRIC VIEW
SHUT OFF VALVE (TYP.)
CHWR
CHWS
BALANCING VALVE
AIR VENT
COIL
GAUGE (IN
FEET TYP.)
DIFFERENTIAL PRESSURE
P/T PORT (TYP.)
(H) MUST BE AT LEAST 1 INCH PLUS
CASING STATIC PRESSURE
X
X=1/2 (H)
(MINIMUM)
TRAP DETAIL
NOTE: MODULE WITH NEGATIVE STATIC PRESSURE
DRAIN PLUG
TYPICAL DUCT WRAPPING DETAIL
NOTE
SECURE INSULATION WITH
WELDED STICK PINS ON
DUCTWORK 24" AND LARGER
2" MINIMUM THICKNESS
FLEXIBLE FIBERGLASS
INSULATION, R> 8.0
CUT INSULATION TO PROPER
LENGTH TO AVOID COMPRESSION
OF INSULATION
SEAL ALL DUCT SEAMS
AND JOINTS WITH
HARDCAST (TYP.)
STAPLE 2" FLANGE THEN
TAPE OVER THE JOINT AND
STAPLE TO PROVIDE
VAPOR-TIGHT SEAL
DETAIL APPLIES TO RECTANGLE
AND ROUND DUCT
DUCT
GENERAL MECHANICAL NOTES
1. THESE DRAWINGS ARE INTENDED TO BE SCHEMATIC AND DIAGRAMMATIC IN NATURE AND ARE NOT TO BE
SCALED. REFER TO ACTUAL SITE LOCATIONS FOR PLACEMENT OF EQUIPMENT. THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER IF THERE ARE SUBSTANTIAL DISCREPANCIES BETWEEN THESE
CONTRACT DRAWINGS AND ACTUAL SITE CONDITIONS PRIOR TO CONTINUING WORK.
2. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
3. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS.
4. PROVIDE TURNING VANES IN ALL RECTANGULAR AND SQUARE DUCT ELBOWS. INSTALL DUCT WORK IN
ACCORDANCE WITH SMACNA GUIDELINES. PROVIDE HANGER AND DUCT WORK ACCESSORIES AS PER
SMACNA RECOMMENDATIONS. PROVIDE BALANCING DAMPERS ON ALL BRANCH DUCT TAKE OFFS.
5. ALL NEW DUCT WORK SHALL BE SHEET METAL AND HAVE A MINIMUM INSTALLED INSULATED "R" VALUE
EQUAL TO 6.0
6. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE 2020 FLORIDA BUILDING CODE-MECHANICAL, 7TH EDITION, AND THE LATEST EDITIONS OF ASHRAE, SMACNA, NFPA, EPA, AND GOVERNMENT
REGULATIONS.
7. WHERE DUCT IS VISIBLE THROUGH DIFFUSERS AND/OR GRILLES, IT SHALL BE PAINTED FLAT BLACK.
8. ALL VOLUME DAMPERS SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION OR AN ACCESS DOOR SHALL BE
PROVIDED.
9. PROVIDE MANUFACTURER'S SUPERVISED STARTUP AND…