About this file

The file is a set of construction drawings for the Walker County Jail Facility Plumbing Upgrades, prepared by Goodwin Lasiter Strong in March 2023. The documents detail comprehensive plumbing system improvements across multiple project packages, including Package A (Plumbing Repairs), Package B (Water Conditioning System Upgrade), and Package C (Automated Water Shutoff Revisions). Key upgrades include replacing butterfly and ball valves, installing new digital mixing valves, re-insulating water lines, implementing NaturalSof water conditioning systems, adding carbon prefiltration, and installing electric solenoid-operated shutoff valves. The project involves multiple mechanical levels and areas of the jail facility, with specific attention to water management, temperature control, and system redundancy.

The project requires extensive technical specifications, with precise requirements for valve types, water conditioning equipment, and installation methods. The documents indicate a comprehensive approach to upgrading the facility's plumbing infrastructure, emphasizing NSF-61 compliance, system reliability, and maintenance accessibility. Notable elements include providing redundant water conditioning systems, installing 24V electric solenoid valves, and ensuring independent operation of various water system components. The project involves approximately 15 butterfly valve replacements, 220 branch line isolation valves, and 40-95 solenoid valves, with specific requirements for water sampling, startup assistance, and on-site training. The drawings and specifications suggest a meticulous approach to modernizing the jail's water systems with a focus on performance, efficiency, and long-term reliability.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARCH 2023

O K L A H O M A

N E W

M E X I C O

SITE LOCATION MAP

357023

JAIL FACILITY

PLUMBING UPGRADES

WALKER COUNTY

MECHANICAL &

PLUMBING ENGINEER ELECTRICAL ENGINEER

SHEET DRAWING INDEX

TS TITLE SHEET

PE8.11 PLUMBING/ELECTRICAL PLANS & DETAILS

P1.A.2 ENLARGED MECHANICAL LEVEL AREA A PLUMBING

P1.B.2 ENLARGED MECHANICAL LEVEL AREA B PLUMBING

P1.C.2 ENLARGED MECHANICAL LEVEL AREA C PLUMBING

P1.D.2 ENLARGED MECHANICAL LEVEL AREA D PLUMBING

P1.E.2 ENLARGED MECHANICAL LEVEL AREA E PLUMBING

P1.F.2 ENLARGED MECHANICAL LEVEL AREA F PLUMBING

P1.G.2 ENLARGED MECHANICAL LEVEL AREA G PLUMBING

P1.H.2 ENLARGED MECHANICAL LEVEL AREA H PLUMBING

PE8.12 PLUMBING/ELECTRICAL DETAILS

03/21/2023 03/21/2023

SCALE: 1/8" = 1'-0"

4' 8'0 16'

H

ET

R W

ES

T

BO

IL

ER

R

O O

M

TMV-3

TMV-2

RE: 5/P8.11

RE: PACKAGE A, ITEM 4

RE: PACKAGE A, ITEM 5

RE: PACKAGE

B, ITEM 1

3" F

LA

N

G E

H O

T W

AT

ER

IN

LE

T

3" F

LA

N

G E

H O

T M

IX

ED

W

AT

ER

O

U

TL

ET

1" S

W T

R

ET

U R

N

TO

H

EA

TE

R

1- 1/

2" S

W T

M

IX

ED

R

ET

U

R N

IN

LE

T

3" F

LA

N

G E

C O

LD

W

AT

ER

IN

LE

T

FACTORY-ASSEMBLED PIPING. REROUTE/RELOCATE

EXISTING INTERFERENCES AS REQUIRED TO PROVIDE

CLEAR SPACE FOR INSTALLATION. COORDINATE WITH

ELECTRICIAN FOR ELECTRICAL CIRCUIT.

R

ET

U R

N

TO

H

EA

TE

R

H O

T W

AT

ER

IN

LE

T

M

IX

ED

W

AT

ER

O U

TL

ET

C O

LD

W

AT

ER

IN

LE

T

R

EC

IR

C

R

ET

U

R N

FACTORY-ASSEMBLED PIPING. REROUTE/RELOCATE

EXISTING INTERFERENCES AS REQUIRED TO PROVIDE

CLEAR SPACE FOR INSTALLATION. COORDINATE WITH

ELECTRICIAN FOR ELECTRICAL CIRCUIT.

NOTE: A MARKED COPY OF THE ORIGINAL FOR-CONSTRUCTION FACILITY PLUMBING DRAWINGS IS PROVIDED FOR REFERENCE ONLY. THE REFERENCE DRAWINGS ARE NOT "AS BUILTS"; EXISTING QUANTITIES, LAYOUTS, ETC., MAY NOT BE REFLECTED CORRECTLY ON THE REFERENCE DRAWINGS. WHEN PLANS CALL FOR ADDRESSING "ALL" OCCURRENCES OF A SCOPE ITEM, THE CONTRACTOR SHALL VERIFY EXISTING QUANTITIES AND INCLUDE ALL

EXISTING OCCURRENCES IN THE SCOPE.

NOTE: ATTENDANCE AT A MANDATORY PRE-BID WALK-THROUGH IS REQUIRED AS A QUALIFICATION TO BID.

PACKAGE A - PLUMBING REPAIRS

1) REPLACE ALL LUGGED BUTTERFLY VALVES IN THE EAST AND WEST BOILER ROOMS. NEW VALVES SHALL BE NSF-61 COMPLIANT, 200 PSI (MIN.), LUGGED BUTTERFLY, DUCTILE IRON BODY, MULTI-POSITION LOCK-LEVER HANDLE, AND WITH ALL WETTED PARTS OF 316 SS OR EPDM. SUBMIT FOR APPROVAL. TYPICAL IN APPROXIMATELY 15 PLACES

(3"-4" LINE SIZE). (NOT SHOWN ON MARKUPS OF EXISTING PLANS).

2) REPLACE K5 & K6 ISOLATION BALL VALVES (2" LINE SIZE). NEW VALVES SHALL BE NSF-61 COMPLIANT, 600 PSI (CWP, MIN.), 3-PIECE BALL VALVES, STAINLESS STEEL BODY, PTFE SEAL RING, STAINLESS STEEL BALL AND STEM, AND WITH COPPER SOLDER END CONNECTIONS. SUBMIT FOR APPROVAL. (RE: MARKUPS OF EXISTING PLANS.)

3) REPLACE MIXING VALVE ASSEMBLY 1. NEW DIGITAL MIXING VALVE TO BE ARMSTRONG ("THE BRAIN") SIMPLEX

MIXING DEVICE. (SUBMIT FOR APPROVAL.) RE: PLANS AND DETAILS.

4)REPLACE MIXING VALVE ASSEMBLY 3. NEW DIGITAL MIXING VALVE TO BE ARMSTRONG ("THE BRAIN") DUPLEX

MIXING DEVICE. (SUBMIT FOR APPROVAL.) RE: PLANS AND DETAILS.

5) REMOVE MIXING VALVE ASSEMBLY 2 (1" PS, CURRENTLY PROVIDING 140°F TEMPERED WATER FOR THE KITCHEN AREA). RE-PLUMB TO CREATE A DIRECT FEED FROM THE HOT WATER STORAGE TANK (I.E., PROVIDING HOT WATER WITHOUT TEMPERING). INSTALL INDIVIDUAL TEMPERATURE-LIMITING DEVICES AT ALL SINKS OR LAVATORIES

RECEIVING THE ABOVE UNTEMPERED HOT WATER (APPROXIMATELY EIGHT LOCATIONS).

6) PERFORM STARTUP AND CALIBRATION OF NEW METERING DEVICES WITH A FACTORY TECHNICIAN ON-SITE.

7) RE-INSULATE ALL EXPOSED (I.E., CURRENTLY UNINSULATED) WATER LINES THROUGHOUT THE FACILITY PER CODE. (NOTE: MOST OCCURRENCES ARE THE RESULTS OF PIPING REPAIRS.) MATCH THE EXISTING INSULATION SYSTEM(S). SUBMIT FOR APPROVAL. (NOT SHOWN ON MARKUPS OF EXISTING PLANS).

8) PACKAGE A, ALTERNATE 1A: INSTALL REDUCING TEES & 1/2" STAINLESS STEEL BALL VALVE BLEED-OFF VALVES (SUBMIT FOR APPROVAL) AT ALL EXISTING PLUMBING HIGH POINTS (APPROXIMATELY 30, 1/2"-1" EXISTING LINE

SIZES). (RE: MARKUPS OF EXISTING PLANS).

9) PACKAGE A, ALTERNATE 2A: REPLACE ALL WATER HAMMER ARRESTORS (APPROXIMATELY 120 TOTAL, 3/4"-2" LINE SIZE. SUBMIT FOR APPROVAL.); INSTALL PROVIDED ARRESTORS PER MANUFACTURER'S RECOMMENDATIONS.

COORDINATE WITH THE OWNER FOR LOCATIONS. (NOT SHOWN ON MARKUPS OF EXISTING PLANS).

10) PACKAGE A, ALTERNATE 3A: INSTALL BRANCH LINE ISOLATION VALVES IN ALL CELL/DAYROOM BRANCH LINES THROUGHOUT THE FACILITY (APPROXIMATELY 220 TOTAL VALVES, 1/2" LINE SIZE). NEW VALVES SHALL BE NSF-61 COMPLIANT, 600 PSI (CWP, MIN.), 3-PIECE BALL VALVES, BRONZE OR STAINLESS BODY, PTFE SEAL RING, STAINLESS STEEL BALL AND STEM, AND WITH COPPER SOLDER END CONNECTIONS. (SUBMIT FOR APPROVAL.) (NOT SHOWN

ON MARKUPS OF EXISTING PLANS).

PACKAGE B - UPGRADE WATER CONDITIONING SYSTEM

1) NATURALSOF WATER CONDITIONING SYSTEM (OR PRE-APPROVED EQUAL). NOTE: SUBMIT ALL ITEMS FOR

APPROVAL. RE: PLANS AND DETAILS.

a) PROVIDE CATALYTIC INLINE CONDITIONERS, TWO EACH NATURALSOF PRO MODEL NS96 (3" PS) MOUNTED IN

PARALLEL:

i) SYSTEM DESIGN FLOW: 277 GPM

ii) EXISTING INLET PIPING: 4" PS iii)EXISTING OUTLET PIPING: 4" PS iv)CONTROLS VOLTAGE: 120V1PH

v) PROVIDE INLET & OUTLET ISOLATION VALVES AT EACH CONDITIONER SO THAT THE SYSTEM CAN OPERATE

INDEFINITELY AND EFFECTIVELY ON EITHER CONDITIONER WHILE THE OTHER CONDITIONER IS OUT OF SERVICE

FOR MAINTENANCE.

vi)PROVIDE WATER SAMPLING AND A FOLLOW-UP LAB REPORT.

b) PROVIDE CATALYTIC INLINE CONDITIONER, ONE EACH NATURALSOF PRO MODEL NS6 (1" PS) LOCATED

IMMEDIATELY AFTER THE DISCHARGE OF THE KITCHEN HW RECIRCULATION PUMP (RP2).

***CONTACT: BILLY BARRICK, 281.644.9454, BILLY@NATURALSOF.COM ***

2) INSTALL A NEW CARBON PREFILTRATION SYSTEM USING REPLACEABLE CANISTER-STYLE FILTER ELEMENTS

(SUBMIT FOR APPROVAL). RE: PLANS AND DETAILS.

a) FIL-TREK MODEL #S4UFVDV22-12-40-4F-V2-150, DUPLEX (PROVIDE AS A FACTORY-BUILT ASSEMBLY)

i) 12 EA 40" LONG REPLACEABLE CARBON FILTER CARTRIDGES PER FILTER HOUSING (24 TOTAL FILTER

CARTRIDGES FOR THE TWO FILTER HOUSING) OR PRE-APPROVED EQUAL.

ii) FLOW: 277 GPM; EXISTING CHLORIDE LEVEL ≥ 3.5 PPM iii)PROVIDE DUAL INDEPENDENT REDUNDANT HALF-SYSTEMS AND ISOLATION VALVING SO THAT EACH

HALF-SYSTEM CAN OPERATE INDEFINITELY AND EFFECTIVELY WHILE CHANGING FILTERS IN THE OTHER

HALF-SYSTEM, RE: DRAWING PLANS & DETAILS.

iv)THE CARBON PREFILTRATION SYSTEM LOCATES ON THE EXISTING CULLIGAN SYSTEMS HOUSEKEEPING RAISED SLAB (RE: PLANS). REMOVE THE EXISTING CULLIGAN WATER CONDITIONER SYSTEM IN ITS ENTIRETY AND SELL

FOR A CREDIT TO THE PROJECT.

v) ROUTE 2" PVC SCH 40 "CLEAN DRAIN" PIPNG FROM EACH FILTER HOUSING TO THE EDGE OF THE EXISTING RAISED PAD & ANGLED TOWARDS THE EXISTING FLOOR DRAIN LOCATION. ROUTE THE PIPING BENEATH HOUSING UNITS SO AS NOT TO INTERFERE WITH MAINTENANCE. SLOPE TO DRAIN & SUPPORT PER IPC.

vi)TO ALLOW FOR REMOVING/REPLACING 40" LONG FILTER CARTRIDGES, REVISE/REROUTE ANY EXISTING

OVERHEAD INTERFERENCES AS REQUIRED.

vii) PROVIDE 48 EACH SPARE FILTER CARTRIDGES.

viii) PROVIDE ON-SITE TRAINING (4-HOUR MINIMUM).

ix)PROVIDE STARTUP ASSISTANCE AND 4-HRS OF ON-SITE TRAINING.

x) PROVIDE A FOLLOW-UP SITE VISIT 30-45 DAYS AFTER STARTUP TO CHECK THE SYSTEM.

***CONTACT INFO: EVAN BOYD, 1-888-623-7448, eboyd@fil-trek.com***

PACKAGE C - AUTOMATED WATER SHUTOFF REVISIONS

1) RELOCATE MECHANICAL LEVEL WATER SOLENOID VALVES (CW & TW) TO BE IMMEDIATELY BEFORE THEIR RESPECTIVE DROPS THROUGH THE MECHANICAL LEVEL FLOOR TO THE GROUND FLOOR, TYPICAL AT SEVEN LOCATIONS; COORDINATE WITH CONTROLS CONTRACTOR AND OWNER. (NOT SHOWN ON MARKUPS OF EXISTING

PLANS).

2) PACKAGE C, ALTERNATE 1C: INSTALL LINE-SIZE (1-1/4"-2") 24V ELECTRIC SOLENOID-OPERATED SHUTOFF BALL VALVES (NSF-61 COMPLIANT, BRONZE OR STAINLESS BODY, PTFE SEAL RING, STAINLESS STEEL BALL AND STEM, AND WITH COPPER SOLDER END CONNECTIONS. (SUBMIT FOR APPROVAL) AT THE GROUND FLOOR OF EACH COLD WATER & HOT WATER HEADER (I.E., SECOND FLOOR-TO-GROUND FLOOR DROP, THE HEADER DROPS FEEDING THE GROUPS OF BRANCH LINE TAKEOFFS TO CELL/DAYROOM FIXTURES). PROVIDE STEP-DOWN TRANSFORMERS (SUBMIT FOR APPROVAL) WITH BRANCH CIRCUITS AS REQUIRED FROM THE NEAREST 120V SPARE CIRCUITS.

COORDINATE WITH THE OWNER'S DESIGNATED CONTROLS CONTRACTOR (SOLENOID OPERATION TO INTERFACE WITH THE EXISTING MONITORING STATION CONTROLS TO ALLOW REMOTE CONTROL OF SHUTOFF VALVES).

COORDINATE EXACT VALVE LOCATIONS WITH THE OWNER; COORDINATE WITH THE ELECTRICIAN. APPROXIMATELY

40 SOLENOID VALVES. (RE: MARKUPS OF EXISTING PLAN DRAWINGS).

3) PACKAGE C, ALTERNATE 2C: INSTALL LINE-SIZE (1-1/4"-2") 24V ELECTRIC SOLENOID-OPERATED SHUTOFF BALL VALVES (NSF-61 COMPLIANT, BRONZE OR STAINLESS BODY, PTFE SEAL RING, STAINLESS STEEL BALL AND STEM, AND WITH COPPER SOLDER END CONNECTIONS. (SUBMIT FOR APPROVAL) AT THE GROUND FLOOR OF EACH COLD WATER & HOT WATER HEADER (I.E., SECOND FLOOR-TO-GROUND FLOOR DROP, THE HEADER DROPS FEEDING THE GROUPS OF BRANCH LINE TAKEOFFS TO CELL/DAYROOM FIXTURES). PROVIDE STEP-DOWN TRANSFORMERS (SUBMIT FOR APPROVAL) WITH BRANCH CIRCUITS AS REQUIRED FROM THE NEAREST 120V SPARE CIRCUITS.

COORDINATE WITH THE OWNER'S DESIGNATED CONTROLS CONTRACTOR (SOLENOID OPERATION TO INTERFACE WITH THE EXISTING MONITORING STATION CONTROLS TO ALLOW REMOTE CONTROL OF SHUTOFF VALVES).

COORDINATE EXACT VALVE LOCATIONS WITH THE OWNER; COORDINATE WITH THE ELECTRICIAN. APPROXIMATELY 95 SOLENOID VALVES (TOTAL, SUBMIT FOR APPROVAL). REVISE THE EXISTING PLUMBING IN GROUND FLOOR CHASES AS REQUIRED SUCH THAT EACH CELL AND EACH DAYROOM WILL HAVE INDEPENDENT AUTOMATED

SHUTOFF CAPABILITY (NOT SHOWN ON MARKUPS OF EXISTING PLANS).

TAG LOCATION AREA

SERVED

VALVE

SIZE (IN)

PRESSURE

DIFF. (PSIG)

FLOWRATE

(GPM)

CW INLET

TEMP (°F)

HW INLET

TEMP (°F)

TW OUTLET

TEMP (°F) MFGR MODEL NOTES

TMV-1

INTERFACE WITH B.A.S.; PROVIDE

ALL AVAILABLE MONITORING &

CONTROL FUNCTIONS, RE: 7/P8.11.

COORDINATE WITH MFGR. TO

PROVIDE A FACTORY-ASSEMBLED

(INCLUDING MANIFOLDS)

PACKAGED SYSTEM, RE: 7/P8.11.

INTERFACE WITH B.A.S.; PROVIDE

ALL AVAILABLE MONITORING &

CONTROL FUNCTIONS. ASSEMBLY

CONSISTS OF 2 TMV'S;

COORDINATE WITH MFGR. TO

PROVIDE A FACTORY-ASSEMBLED

(INCLUDING MANIFOLDS)

PACKAGED SYSTEM, RE: 5/P8.11.

TMV-3

E130

H114

A, B, C, E, F, G

D, H

(133 PER

TMV)

ARMSTRONG

ARMSTRONG

THE BRAIN

DMC50BS

THE BRAIN

DMC50BS

(2 EACH)

RECIRCULATION PUMP

CHECK VALVE

(INSTALL HORIZONTALLY)

STOP VALVE

FULL-PORT

SHUT-OFF VALVE

THERMOMETER

STRAINER

COLD WATER

HOT WATER

MIXED WATER

NOTES:

1. COMPONENTS, OTHER THAN DMC ASSEMBLY, ARE EXISTING; VERIFY PLUMBING ARRANGEMENT PER THIS DIAGRAM & REVISE AS REQUIRED, COORDINATE WITH ENGINEER. IF INSTALLATION MANUAL PROVIDED WITH DCM DIFFERS, INSTALL PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROVIDE

BALANCING VALVES AS RECOMMENDED (NOT SHOWN).

2. INSTALL PER MANUFACTURER'S INSTRUCTIONS. PROGRAM/INTERFACE WITH THE EXISTING BAS TO

PROVIDE MONITORING OF TEMPERED WATER TEMPERATURE, ADJUSTMENT OF TEMPERED WATER

TEMPERATURE SETPOINT, AND ADJUSTMENT OF LOW/HIGH ALARM TEMPERATURES. COORDINATE WITH OWNER'S DESIGNATED CONTROLS CONTRACTOR. PROVIDE A QUALIFIED ARMSTRONG TECHNICIAN FOR

START-UP ASSISTANCE AS REQUIRED AND FOR 4 HOURS OF TRAINING.

CH

FROM HOT

WATER TANK

RETURN TO HOT

WATER TANK INLET

O U

TL

ET

S

OUTLETS

M

IX

ED

F

LO

W

M

IX

ED

F

LO

W

COLD WATER

SUPPLY

TW

DMC

ASS'Y

TW RETURN

NATURALSOF PRO #96, 3" PS,

FLANGED NOMINAL FLOW:

96-181 GPM EACH

DESIGN FLOW:

144 GPM EACH, TYP.

3" SCH. 40 316L

STAINLESS STEEL, TYP.

EXISTING 4" CW

SERVICE LINE

3" BUTTERFLY VALVE,

RE: PROJECT NOTE

PACKAGE B, ITEM 1 FOR

MODEL DETAILS, TYP.

INSTALL/SUPPORT PIPING SUCH

THAT EITHER CONDITIONER

MAY BE REMOVED WHILE THE

OTHER REMAINS IN SERVICE.

E130 ETR

EAST BOILER ROOM

TMV-1, RE: 7/P8.11

MOUNT CARBON FILTER SYSTEM

ON EXISTING CONCRETE PAD

REMOVE EXISTING CULLIGAN WATER

SOFTENER SYSTEM (BRINE TANK, RESIN

TANK, MANIFOLD ASSEMBLY, ETC.).

PROVIDE A CREDIT (SEE PROJECT MANUAL).

NEW FIL-TREK CARBON

FILTER SYSTEM, RE:

PACKAGE B, ITEM 2 IN

PROJECT NOTES & 1/PE8.1

TIE TO EX. CW (IN)

TIE TO EX.

CW (OUT)

FL

O

W D

IR

EC

TI

O

N

INSTALL NATURALSOF WATER

CONDITIONERS @ 8'-0" A.F.F.

(MIN.), RE: PACKAGE B, ITEM 1

IN PROJECT NOTES & 3/P8.11

RE: PACKAGE

A, ITEM 3

1/4 TURN, FULL-PORT BALL

VALVE, UL LISTED FOR SERVICE

ELBOW UP / ELBOW DOWN

LUGGED BUTTERFLY VALVE

WITH MULT-POSITION HANDLE

SCALE: 1/8" = 1'-0"

4' 8'0 16'

D :\3

\3

3\

-C D

\M

EP

\3

3-

PE

8.

.D

W G

S

C H

E S

T N

U T S

T

S T E

L U

F K

IN

T E X

A S

-4

C R

O S

S P

A R

K D

R

S T E

B R

Y A

N

T E X

A S

-9

R

IC

E

R O

A D

S T

E

T Y

L E

R

T E

X A

S

-3

G O

O D

W I N

L

A S

I T

E R

S

T R

O N

G E N

G

IN

E E R

IN

G

A

R C

H

IT

E C

T U

R E S

U R

V E Y

IN

G

L A

N D

S C

A P E A

R C

H

IT

E C

T U

R E I N

T E R

IO

R

D E S

IG

N

PE8.11

12N.T.S.PLUMBING LEGEND

13N.T.S.MIXING VALVE INSTALLATION (TYP.)

3N.T.S.WATER SOFTENER DETAIL

7SIMPLEX TEMP. MIXING VALVE PIPING

5DUPLEX TEMP. MIXING VALVE PIPING9N.T.S.PROJECT NOTES

4N.T.S.MIXING VALVE SCHEDULE

21/8"=1'-0"PLUMBING PLAN

11/8"=1'-0"PLUMBING PLAN

03/21/2023

1. ELECTRICAL TO CONFORM TO THE CURRENT EDITION OF THE NATIONAL ELECTRIC CODE (N.E.C.) AND APPLICABLE

ENERGY CODE.

2. ELECTRICAL CONTRACTOR TO SUPPLY CUT SHEETS FOR PROPOSED CONSTRUCTION FOR ACTUAL EQUIPMENT

USED AND SUBMIT TO THE ENGINEER FOR APPROVAL.

3. PROVIDE ELECTRICAL RECEPTACLES AT LOCATIONS AS REQUIRED. UNLESS OTHERWISE NOTED ON THE PLANS, THE HEIGHT OF RECEPTACLES SHALL COMPLY WITH ALL APPLICABLE CODE REQUIRED ACCESSIBILITY REQUIREMENTS. PROVIDE STAINLESS STEEL COVERS FOR RECEPTACLES AND COVER PLATES. (U.N.O.)

4. BUILDING WIRING TO BE MINIMUM 12-GAUGE GROUNDED COPPER WIRING INSTALLED IN METALLIC CONDUIT (EMT).

5. ALL CONDUIT TO EQUIPMENT IN PUBLIC AREAS SHALL BE IN WALLS.

6. USE MULTIPLE GANG J-BOX AND COVER PLATE WHENEVER POWER RECEPTACLES AND/OR SWITCHES ARE IN

CLOSE PROXIMITY TO EACH OTHER.

7. COMPUTER/DATA/COMMUNICATIONS/CABLE TERMINALS SHALL NOT BE COMBINED WITH ADJACENT POWER

RECEPTACLES INTO A COMMON J-BOX.

8. WIRE SIZES SHOWN ARE BASED ON ESTIMATED LENGTHS. FOR BRANCH CIRCUITS EXCEEDING 75 FEET ACTUAL LENGTH, VERIFY THAT THE VOLTAGE DROP DOES NOT EXCEED 3% PER N.E.C. RECOMMENDATIONS. AMPACITY OF MULTIPLE CONDUCTORS IN A SINGLE CONDUIT MUST ALSO BE ADJUSTED PER N.E.C. RECOMMENDATIONS. IF

CONDUCTOR SIZE IS INCREASED, INCREASE GROUND WIRE AS REQUIRED BY CURRENT N.E.C.

9. UNLESS OTHERWISE NOTED, SWITCHES, RECEPTACLES, J-BOXES, ETC., ARE DIAGRAMMATICALLY SHOWN ON THE THE PLANS TO CONVEY THE APPROXIMATE LOCATIONS FOR INSTALLATION. EVEN IF SHOWN BACK TO BACK ON THE PLANS, ALL BOXES ON EITHER SIDE OF A WALL OR PARTITION MUST BE SEPARATED HORIZONTALLY BY AT LEAST 6 INCHES. UNLESS SHOWN ON THE PLANS, REFER TO NOTES, LEGENDS, ADA REQUIREMENTS, ETC. FOR CORRECT

MOUNTING HEIGHTS.

10. ALL WIRES AND CABLES WILL BE SUPPORTED AS REQUIRED BY THE CURRENT VERSION OF THE N.E.C., WIRES AND

CABLES WILL NOT BE SUPPORTED BY THE CEILING GRID. NO EXCEPTIONS.

11. ALL OPENINGS AROUND ELECTRICAL PENETRATIONS INTO OR THROUGH FIRE-RATED WALLS, PARTITIONS, FLOORS, OR CEILINGS SHALL BE FIRE-STOPPED USING U.L. APPROVED MATERIALS AND METHODS TO MAINTAIN THE

FIRE RESISTANCE RATING IN ACCORDANCE WITH N.E.C. 300.21 AND APPLICABLE CODES.

12. CONTRACTOR SHALL PROVIDE LABELING ON ALL JUNCTION BOXES AND COVER PLATES IDENTIFYING BRANCH CIRCUIT. PROVIDE ADDITIONAL LABELING IN ACCORDANCE WITH N.E.C. AND A.H.J. REQUIREMENTS.

13. IN AREAS WHERE ELECTRICAL SUPPORTS, DEVICES, AND CONDUITS WILL BE EXPOSED TO PUBLIC VIEW, COORDINATE WITH OTHER DISCIPLINES AND THE PAINTER. ALL ELECTRICAL SUPPORTS, DEVICES, AND CONDUITS SHALL BE INSTALLED ON TIME FOR THE PAINTER TO COMPLETE WORK COINCIDENT WITH OTHER PAINTING

REQUIREMENTS IN THE AREA.

14. IF EXISTING ELECTRICAL PANELS DO NOT MEET N.E.C., MODIFY OR REPLACE AS REQUIRED.

15. TO THE EXTENT POSSIBLE, UTILIZE EXISTING ELECTRICAL PANELS AND SPACE CIRCUIT BREAKERS AS REQUIRED.

WHERE ADDITIONAL CIRCUIT BREAKERS ARE REQUIRED, TO THE EXTENT POSSIBLE, MATCH EXISTING. PROVIDE NEW 20A/1P CIRCUIT BREAKERS AS REQUIRED AND BRANCH CIRCUIT CONSISTING OF (3) #12 IN 1/2" CONDUIT.

DEMOLITION ELECTRICAL NOTES

1. PRIOR TO THE DEMOLITION OF WORK BY ANY TRADE, PROVIDE A QUALIFIED ELECTRICIAN TO DISCONNECT ALL SOURCES OF POWER SERVING EQUIPMENT, LIGHT FIXTURES, AND OUTLETS WITHIN THE AREA OF DEMOLITION. VERIFY BY TESTING THAT POWER HAS BEEN DISCONNECTED. THE ELECTRICIAN SHALL REMAIN ON SITE DURING DEMOLITION TO DISCONNECT AND TEST ALL ELECTRICAL WORK THAT BECOMES ACCESSIBLE DURING THE

COURSE OF DEMOLITION.

2. ALL DEMOLITION ITEMS SHALL BECOME THE CONTRACTORS PROPERTY AND SHALL BE REMOVED FROM THE SITE. HAZARDOUS MATERIALS SHALL BE DISPOSED OF IN ACCORDANCE WITH FEDERAL REGULATIONS AND THE

CONTRACT DOCUMENTS.

3. THE DISPOSAL OF LAMPS AND BALLASTS SHALL BE IN ACCORDANCE WITH EPA STANDARDS AND GUIDELINES.

4. WHERE EQUIPMENT, WIRING DEVICES, AND/OR LIGHT FIXTURES ARE SCHEDULED FOR DEMOLITION, REMOVE THE ASSOCIATED WIRE AND RACEWAY BACK TO THE CIRCUIT BREAKER SERVING THE EQUIPMENT, UNLESS SPECIFICALLY

NOTED OTHERWISE.

5. WHERE CEILINGS OR WALLS ARE SCHEDULED FOR DEMOLITION ON THE ARCHITECTURAL DRAWINGS, DISCONNECT AND REMOVE ALL WIRING DEVICES, LIGHT FIXTURES, AND SPEAKERS ASSOCIATED WITH THOSE WALLS AND

CEILINGS.

6. IDENTIFY CONDUITS AND WIRE PASSING THROUGH THE AREA OF DEMOLITION AND SERVING LOADS OUTSIDE THE

AREA THAT WILL REMAIN. MARK AND PROTECT THESE CONDUITS DURING DEMOLITION.

7. THE ELECTRICAL SERVICE TO AREAS NOT WITHIN THE DEMOLITION SCOPE OF WORK SHALL NOT LOSE POWER

UNLESS SCHEDULED AND AGREED TO BY THE OWNER.

3N.T.S.ELECTRICAL NOTES

1N.T.S.FIL-TREK CARBON FILTER

D :\3

\3

3\

-C D

\M

EP

\3

3-

PE

8.

.D

W G

S

C H

E S

T N

U T S

T

S T E

L U

F K

IN

T E X

A S

-4

C R

O S

S P

A R

K D

R

S T E

B R

Y A

N

T E X

A S

-9

R

IC

E

R O

A D

S T

E

T Y

L E

R

T E

X A

S

-3

G O

O D

W I N

L

A S

I T

E R

S

T R

O N

G E N

G

IN

E E R

IN

G

A

R C

H

IT

E C

T U

R E S

U R

V E Y

IN

G

L A

N D

S C

A P E A

R C

H

IT

E C

T U

R E I N

T E R

IO

R

D E S

IG

N

PE8.12

C-2

C-2

C-2

C-2

A-8 A-8 A-8

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

PACKAGE A, ITEM 8, RE: 9/PE8.11

PACKAGE C, ITEM 2, RE: 9/PE8.11

A-8

A-8 A-8

C-2

A-2 A-2

C-2

C-2 C-2

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

A-8 A-8 A-8

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

A-8 A-8

C-2

C-2 C-2

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

C-2

C-2

C-2

A-8

C-2

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

C-2 C-2

A-8

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

Oval Mark Description

A-2 A-8 C-2

PACKAGE A, ITEM 2, RE: 9/PE8.11

260083-TS
357023-PE8.11
357023-PE8.12
357023-P1.A.2
Sheets and Views
P1.A.2
357023-P1.B.2
Sheets and Views
P1.B.2
357023-P1.C.2
Sheets and Views
P1.C.2
357023-P1.D.2
Sheets and Views
P1.D.2
357023-P1.E.2
Sheets and Views
P1.E.2
357023-P1.F.2
Sheets and Views
P1.F.2
357023-P1.G.2
Sheets and Views
P1.G.2
357023-P1.H.2
Sheets and Views
P1.H.2