DRAWINGS.pdf
PDF 28 MB Posted
- Solicitation number
- 36C24625B0013
About this file
The file contains architectural drawings and specifications for a renovation project at the Hampton VA Medical Center in Hampton, Virginia. The project involves renovating Building 110's ground floor, specifically focusing on the Dialysis Area and creating a new administrative space. The contract is managed by the Department of Veterans Affairs, with the contract number 36C24622C0073 and project number 590-21-121.
The renovation scope includes demolishing and reconfiguring existing spaces, which involves removing partitions, modifying electrical and fire protection systems, and installing new finishes. The project is divided into two primary phases to maintain the facility's operational status during construction. Key areas of work include creating a new Open Admin Space (3,893 sq ft), storage rooms, an IT room, and an electrical room. The renovation will involve new lighting, power systems, fire protection, and interior finishes. The project documents indicate a fully sprinklered building with careful attention to infection control and phased construction to minimize disruption to existing medical operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HANDRAIL SUBMITTALS REDACTED.pdf | ||
| 36C24625B0013 0005.docx | DOCX document | |
| 36C24625B0013 0004.docx | DOCX document | |
| ROOFSCAN REPORT.pdf | ||
| 36C24625B0013 0003.docx | DOCX document | |
| SITE VISIT ATTENDEES LOG SHEET - 28 April 2025.pdf | ||
| 36C24625B0013 0002.docx | DOCX document | |
| SITE VISIT ATTENDEES LOG SHEET.pdf | ||
| 36C24625B0013 0001.docx | DOCX document | |
| MARKET SURVEY CONSTRUCTION MATERIALS TEMPLATE.xlsx | XLSX spreadsheet | |
| SPECIFICATIONS.pdf | ||
| 36C24625B0013_IFB.docx | DOCX document | |
| BID ITEMS COST BREAKDOWN.xlsx | XLSX spreadsheet | |
| WAGE DETERMINATIONS - DAVIS-BACON ACT.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPT. OF VETERANS AFFAIRS
L2e-OCULUS JV CONTRACT NUMBER: 36C24622C0073
VA PROJECT NUMBER: 590-21-121
VETERANS HEALTH CARE SYSTEM
100 Emancipation Dr, Hampton, VA 23667
HAMPTON VA MEDICAL CENTER -
RENOVATE BLDG 110 GROUND FLOOR
o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
A
B
C
D
E
F
G
5 4 3 2 1678910
A
B
C
D
E
F
G
5 4 3 2 1678910
Project Number
Building Number
Drawing NumberLocation
Issue Date
Project Title
Checked Drawn
Drawing Title
Approved:
NOT FOR CONSTRUCTION
Phase
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
REVISIONS: DATE:
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
GI000
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AM, EL CK
COVER SHEET 100% CONSTRUCTION
DOCUMENTS (CD)
A101
SIM
A101
SIM
BUILDING ELEVATION/SECTIONDetail No.
Sheet No.
Reference Label
Detail No.
Sheet No.
Reference Label
Room No.
Room Area
Door/Room No.
Key Note No.
ALIGN
WALL SECTION
DETAIL SECTION/CALLOUT
ROOM TAG
DOOR TAG
PARTITION TAG
KEYNOTE
ALIGNED SURFACES
Room Name
Area
AREA TAG
Area NameArea Name
150 SF
SCOPE OF PROJECT
Project Limit Line
Grid No.
CENTERLINE
COLUMN GRID LINE
Level/Datum Elevation AFF
LEVEL MARKER
Level/Datum Name
Window Type WINDOW TYPE TAG1t
Highpoint @ Tail SLOPE INDICATOR
Starting Point @ Center DIMENSION CROSSHAIR
NORTH ARROW
Plan North Reference Label
0 1 Revision Reference Number
Revision Cloud Depicting Area Revised
REVISION
CEILING TAG
A101
SIM
Detail No.
Sheet No.
Reference Label
XX-1
1'-0"A.F.F. Clg Height
Clg Type
Xx.x
Xx.x
Sheet No.
Detail No.
Partition Traits
Partition Configuration
X#x
#X ##
ELEVATION
Room Name
150 SF
A. WORK INCLUDES APPLYING AND PAYING FOR REQUIRED PERMITS AND INSPECTIONS.
B. NOTIFY ARCHITECT OF ANY CLARIFICATIONS NEEDED PRIOR TO COMMENCING WORK.
C. EMPLOY ONLY SKILLED WORKERS, EXPERIENCED IN THEIR RESPECTIVE TRADES.
D. COORDINATE WORK OF VARIOUS TRADES. ENSURE EACH HAS ADEQUATE SPACE AND RESOURCES FOR PROPER
INSTALLATION OF THE WORK.
E. SCALING DRAWINGS IS DISCOURAGED AND PERFORMED AT CONTRACTOR’S SOLE RISK. NOTIFY ARCHITECT IF
ADDITIONAL DIMENSION INFORMATION OR CLARIFICATION IS REQUIRED.
F. COORDINATE SCHEDULE FOR WORK INDICATED TO BE PROVIDED BY OTHERS. ALLOW ACCESS, SPACE FOR
PERFORMANCE OF WORK AND STORAGE AND OTHER RESOURCES.
G. Existing buildings only DRAWINGS OF EXISTING CONDITIONS ARE BASED UPON OWNER PROVIDED DRAWINGS AND OTHER DOCUMENTS AND UPON CURSORY ON-SITE OBSERVATION. THEY ARE INTENDED AS A REASONABLE PRESENTATION OF EXISTING CONDITIONS. THEY ARE NOT A COMPLETE OR EXHAUSTIVE REPRESENTATION OF EXISTING CONDITIONS.
H. CONTRACTORS SHALL USE THE ONLINE DOCUMENT EXCHANGE SYSTEM "SUBMITTAL EXCHANGE" FOR ALL SUBMITTALS REQUIRED BY SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE TO INCUR ALL
COSTS REQUIRED TO ALLOW FULL ACCESS AND USER CAPABILITY FOR ALL CONTRACTORS.
I. VERIFY PRESENCE/LOCATION OF STEEL REINFORCING, TENSIONING RODS, CONDUIT AND SIMILAR ITEMS IN EXISTING CONCRETE FLOOR SLABS PRIOR TO SLAB CUTTING OPERATIONS. ADJUST LOCATION OF SLAB CUTS AS
NEEDED TO PERFORM WORK WITHOUT DAMAGING EXISTING STRUCTURAL OR UTILITY ELEMENTS.
J. PRIOR TO BIDDING, THE CONTRACTOR IS RESPONSIBLE FOR BEING FAMILIAR WITH THE SITE.
N.I.S.
N.I.S.
N.I.S.
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
GI001
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AHM CJK
DRAWING INDEX, ABBREVIATIONS,
GENERAL NOTES AND SYMBOLS
100% CONSTRUCTION
DOCUMENTS (CD)
SHEET INDEXLEGEND PROJECT GENERAL NOTES
SHEET # SHEET NAME REV. # REV. DATE
00 - GENERAL
GI000 COVER SHEET
GI001 DRAWING INDEX, ABBREVIATIONS, GENERAL NOTES AND SYMBOLS
GI100 LIFE SAFETY PLAN
02 - ARCHITECTURAL DEMOLITION
AD101 FIRST FLOOR PLAN - DEMOLITION PLAN
AD102 FIRST FLOOR REFLECTED CEILING PLAN - DEMOLITION
AD103 FIRST FLOOR PLAN - PHASING PLAN
03 - ARCHITECTURAL
AE010 PARTITION TYPES & DOOR INFORMATION
AE110 FIRST FLOOR PLAN - NEW WORK
AE210 REFLECTED CEILING PLAN - NEW WORK
AE300 ALTERNATE 3 ROOF PLAN
06 - INTERIOR DESIGN
ID110 FIRST FLOOR FINISH PLAN
07 - FIRE PROTECTION
FP000 FIRE PROTECTION COVERSHEET
FP101 FIRST FLOOR PLAN - FIRE PROTECTION DEMOLITION
FP201 FIRST FLOOR PLAN - FIRE PROTECTION
FP400 FIRE PROTECTION DETAILS
08 - MED GAS
MG000 MEDICAL GAS COVERSHEET
MG101 UNDERFLOOR PLAN - MEDICAL GAS DEMOLITION
MG102 FIRST FLOOR PLAN - MEDICAL GAS DEMOLITION
MG202 FIRST FLOOR PLAN - MEDICAL GAS
09 - PLUMBING
P000 PLUMBING COVERSHEET
P101 UNDERFLOOR PLAN - PLUMBING DEMOLITION
P102 FIRST FLOOR PLAN - PLUMBING DEMOLITION
10 - VENTILATION
V000 VENTILATION COVERSHEET
V101 FIRST FLOOR PLAN - VENTILATION DEMOLITION
V201 FIRST FLOOR PLAN - VENTILATION
V400 MECHANICAL DETAILS
V500 MECHANICAL DIAGRAMS
V600 MECHANICAL SCHEDULES
11 - PIPING
MP000 PIPING COVERSHEET
MP101 FIRST FLOOR PLAN - PIPING DEMOLITION
MP201 FIRST FLOOR PLAN - PIPING
MP401 MECHANICAL DETAILS
12 - ELECTRICAL
E000 ELECTRICAL COVERSHEET
E101 FIRST FLOOR PLAN - LIGHTING DEMOLITION
E111 FIRST FLOOR PLAN - POWER AND SYSTEMS DEMOLITION
E200 OVERALL FIRST FLOOR PLAN - ELECTRICAL
E201 FIRST FLOOR PLAN - LIGHTING
E211 FIRST FLOOR PLAN - POWER
E221 FIRST FLOOR PLAN - SYSTEMS
E400 ELECTRICAL DETAILS
E500 ELECTRICAL DIAGRAMS
E600 ELECTRICAL SCHEDULES
E700 ELECTRICAL PANEL SCHEDULES
E701 ELECTRICAL PANEL SCHEDULES
13 - TECHNOLOGY
T000 TECHNOLOGY COVERSHEET
T101 FIRST FLOOR PLAN - TECHNOLOGY DEMOLITION
T201 FIRST FLOOR PLAN - TECHNOLOGY
T300 ROOM ENLARGEMENTS - TECHNOLOGY
T400 TECHNOLOGY DETAILS
T500 TECHNOLOGY DIAGRAMS
T600 TECHNOLOGY SCHEDULES
ABBREVIATIONS
AB ANCHOR BOLT
ABV ABOVE
AC AIR CONDITIONING
ACC ACCESS
ACOUS ACOUSTICAL
ACP ACOUSTIC CEILING
PANEL
ACR ACRYLIC PANEL
ACT ACOUSTIC CEILING TILE
AD ACCESS DOOR
ADD ADDENDUM
ADH ADHESIVE
ADJ ADJUSTABLE
ADJC Adjacent
AFF Above Finished Floor
AHU Air Handling Unit
AL/ALUM Aluminum
ALT Alternate
ANC Anchor/Anchorage
ANOD Anodized
AP Acoustical Panel
APPROX Approximate
ARCH Architect (ural)
ASB Asbestos
AUX Auxillary
B/D Bottom of Deck
BD Board
BEL Below
BET Between
BEV Beveled
BIT Bituminous
BLDG Building
BLK/G Blocking
BM Beam
BOT Bottom
BRG Bearing
BRG PL Bearing Plate
BRK Brick
BS Both Sides
BSMT Basement
BUR Built Up Roofing
BW Both Ways
C Conduit
CAB Cabinet
CC Center to Center
CCTV Closed Circuit Television
CEM Cement
CER Ceramic
CFL Counter Flashing
CG Corner Guard
CIRC Circumference
CJ Construction Joint
CK Caulk (ing)
CLG Ceiling
CLS Closure
CMU Concrete Masonry Unit
CO Clean Out
COL Column
COMP Compress (ed), (ion), (ible)
CONC Concrete
CONN Connection
CONST Construction
CONT Continuous or Continue
CORR Corridor
CPT Carpet (ing)
CR Card Reader
CTR Center/Counter
CTSK Countersink
DEMO Demolish, Demolition
DEPR Depressed
DET Detail
DF Drinking Fountain
DIA Diameter
DIAG Diagonal
DIM Dimension
DIV Division
DMT Demountable
DN Down
DP Damp Proofing
DR Door
DS Downspout
DWG Drawing
DWR DRAWER
EA EACH
EB Expansion Bolt
EG Exterior Grade
EJ Expansion Joint
EL Elevation
ELEC Electric (al)
ELEV Elevator
EMERG Emergency
ENAM Enamel
ENT Entrance
EQ Equal
EQUIP Equipment
EST Estimate
EWC Electric Water Cooler
EXF Exhaust Fan
EXH Exhaust
EXP Exposed/Expansion
EXT Exterior
EXTG Existing
F/CONC Face of Concrete
F/FIN Face of Finish
F/MAS Face of Masonry
FA Fire Alarm
FAB Fabric
FAS Fasten, Fastener
FBO Furnished By Others
FD Floor Drain
FDN Foundation
FE Fire Extinguisher
FEC Fire Extinguisher Cabinet
FF Finished Floor/Face
FGL Fiberglass
FHC Fire Hose Cabinet
FHS Fire Hose Station
FIN Finish (ed)
FLASH Flashing
FLX Flexible
FPRFG Fireproofing
FR Fire Resistant
FRP Fiber Reinforced Plastic
FS Face of Studs
FSZ Full Size
FT Feet/Foot
FTG Footing
FURR Furring
GA Gage, Guage
GALV Galvenized
GB Grab Bar
GC General Contract (or)
GFI Ground Fault Interrupt
GL Glass, Glazing
GVL Gravel
GWB Gypsum Wall Board
GYP/BD Gypsum (Board)
HB Hose Bib
HC Hollow Core
HM Hollow Metal
HORIZ Horizontal
HP High Point/Horsepower
HR Handrail
HT Height
HTG Heating
HVAC Heating/Ventilating/AC
ID Inside Diameter
IF Inside Face
INCL Include (d), (ing)
INFO Information
INSUL Insulate (d), (ion)
INT Interior
INV Invert
JBOX Junction Box
JC Janitor's Closet
JT Joint
KD Knock Down
KO Knockout
KP Kick Plate
L Long
LAB Laboratory
LAM Laminate (d)
LAV Lavatory
LB Pound
LP Low Point
LT Light
LVT Luxury Vinyl Tile
MAINT Maintenance
MAS Masonry
MAT Material (s)
MAX Maximum
MCB Metal Corner Bead
MDF Medium Density Fiberboard
MECH Mechanic (al)
MED Medium
MET Metal
MFR Manufacture (r)
MIN Minimum
MIR Mirror
MISC Miscellaneous
MO Masonry Opening
MTL Material
MULL Mullion
N/A Not Applicable
NIS Not In Scope
NOM Nominal
NRC Noise Reduction Coefficient
NTS Not To Scale
OA Overall
OC On Center
OD Outside Diameter
OH Opposite Hand
OHD Overhead
OPNG Opening
OPP Opposite
OTO Out To Out
PD Panic Device
PFB Prefabricate (d)
PFN Pre-Finished
PLYWD Plywood
PNT Paint
POL Polished
PROP Property
PRT Partial/Preservative Treated
PTD Painted
PTN Partition
PTR Paper Towel Dispenser
PVC Polyvinyl Chloride
QT Quarry Tile
QZ Quartz
RAD Radius
RD Roof Drain
RDC Roof Drain Conductor
REF Reference
REFL Reflect (ed), (ive), (or)
REINF Reinforce (d)
REQD Required
REV Revision (s), Revised
RFG Roofing
RM Room
RO Rough Opening
RS Resinous Floor
RSF Resilient Sheet Flooring
S Sink
SC Sealed Concrete
SCH Schedule
SECT Section
SFGL Safety Class
SIM Similar
SNT Sealant
SQ Square
SS Stainless Steel
SSM Solid Surface Material
STA Station
STD Standard
STG Seating
STL Steel
STRUCT Structural
SUSP Suspended
SYM Symmetry (ical)
SYS System
T Tile
T&G Tongue And Groove
T/S Top of Slab
T/W Top of Wall
TEL Telephone
TERR Terrazzo
TH Threshold
THK Thick (ness)
TKS Tack Strip
TLB Towel Bar
TO Top Of
TOL Tolerance
TOS Top of Steel
TP Toilet Partition
TPD Toilet Paper Dispenser
TRAN Transition
TYP Typical
UNF Unfinished
UNO Unless Noted Otherwise
UR Urinal
VCT Vinyl Composition Tile
VERT Vertical
VIF Verify In Field
VIN Vinyl
VPB Vapor Barrier
W/ With
W/O Without
WB Wall Base
WC Water Closet
WD Wood
WG Wired Glass
WH Water Heater
WIN Window
WP Waterproofed
WPF Weather Proofing
WPT Working Point
WSCT Wainscot
WT Window Treatment
WWF Welded Wire Fabric
XFMR Transformer
PROJECT LOCATION MAP (NTS)
PROJECT LOCATION
BUILDING KEY PLAN (NTS)
PLAN
NORTH
ACTUAL
NORTH
ACTUAL
NORTH
PLAN
NORTH
ALTERNATES
INFECTION CONTROL GENERAL NOTES (ICRA)
1. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND
CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.
2. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITION, RENOVATION, OR CONSTRUCTION ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. PARTITIONS SHALL BE FULL HEIGHT, EXTENDING THROUGH SUSPENDED CEILINGS TO THE FLOOR SLAB OR ROOF DECK ABOVE AND SHALL BE ONE-HOUR FIRE RATED. BARRIER MUST BE
PRESENTABLE ON OCCUPIED SIDE.
3. DRYWALL BARRIER ERECTED WITH JOINTS COVERED OR SEALED TO PREVENT DUST AND DEBRIS FROM ESCAPING.
4. BARRIER DOORS: SELF CLOSING MINIMUM 45 MIN. RATED SOLID CORE WOOD IN STEEL FRAME, PAINTED.
5. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
6. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED
AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
7. EXHAUST HOSES REQUIRED: HEAVY DUTY, FLEXIBLE STEEL REINFORCED; VENTILATION BLOWER HOSE.
8. DHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE CONSTRUCTION AREA TO
OCCUPIED MEDICAL CENTER AREA. PROVIDE MINIMUM SIZE MATS OF 24 INCHES X 36INCHES. THESE MATS SHALL BE CHANGED AS OFTEN AS REQUIRED TO MAINTAIN CLEAN WORK AREAS DIRECTLY OUTSIDE CONSTRUCTION AREA AT
ALL TIMES.
9. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL CENTER AT THE END OF EACH WORKDAY. VACUUM SHALL UTILIZE HEPA FILTRATION. MAINTAIN SURROUNDING AREA FREQUENTLY.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
11. UPON COMPLETION:
•DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR
AND THOROUGHLY CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT.
•REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS.
•VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
•WET MOP AREA WITH CLEANER/DISINFECTANT.
•UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
ALT 1. DOUBLE DOORS FROM HALLWAY INTO NEW OPEN ADMIN SPACE
TO REMAIN. NO CHANGE TO DOORS, FRAME, OR
HARDWARE. RESTORE/ REFINISH EXISTING DOORS AND FRAME
AS REQUIRED TO LOOK LIKE NEW.
ALT 2. STORAGE ROOMS – THE GROUP OF THREE (3) STORAGE ROOMS
(DG26, DG24, AND DG20) TO REMAIN AS INDIVIDUAL ROOMS
REPURPOSED FOR STORAGE. ROOM DG20 WITH WATER
FILTRATION SYSTEM TO HAVE TANKS AND RELATED SYSTEMS
DEMOLISH SO THAT THE ROOM CAN BE REPURPOSED FOR
STORAGE. NO CHANGES TO EXISTING DOORS AND HARDWARE
FOR ALL THREE ROOMS.
ALT 3. SELECTIVE ROOF REPAIRS - PATCH AROUND EXISTING DRAINS
AND PROVIDE NEW CAST IRON STRAINERS WHERE NEEDED.
REFER TO INFRARED SCAN.
ALT 4. EXISTING ELECTRICAL PANELS LOCATED IN HALLWAY (NEAR
DG21A IT ROOM) TO REMAIN AS EXISTING. SEE ELECTRICAL
DRAWINGS FOR SCOPE OF WORK.
N.I.S.
N.I.S.
N.I.S.
PATH A
PATH C
STORAGE
DG23
ELECTRICAL RM
DG50
IT ROOM
DG21A
STORAGE
DG24
OPEN ADMIN
SPACE
DG52
6'
PATH B PATH D
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
AREA 4
DIALYSIS
AREA 5
DIALYSIS
AREA 6
DIALYSIS
AREA 7
REMODELED
AREA
DIALYSIS
AREA 1
V A
PATH OF TRAVEL (FEET)
VOICE/ALARM SYSTEM THROUGHOUT
(COORDINATE W/ ELECTRICAL)
EXIT FLOW
START OF TRAVEL
EXIT SIGN
(COORDINATE W/ ELECTRICAL)
PORTABLE FIRE EXTINGUISHER
(COORDINATE W/ FIRE MARSHAL)
ICRA BARRIER CONSTRUCTION
ONE HOUR FIRE BARRIER CONSTRUCTION
EXISTING 1 HOUR RATED WALLS ARE SHOWN FOR REFERENCE. THESE ARE
SHOWN ONLY IN THE AREAS OF WORK FOR THIS PROJECT. THESE SHOULD
BE FIELD CONFIRMED PRIOR TO CONSTRUCTION.
EXISTING ONE HOUR WALL - FOR REFRENCE ONLY
GC TO CONFIRM IN AREAS OF WORK AND CHANGE
WALL AS NEEDED TO MEET ONE HOUR.
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
GI100
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AHM CJK
LIFE SAFETY PLAN 100% CONSTRUCTION
DOCUMENTS (CD)
1. THE MINIMUM WIDTH OF EACH DOOR OPENING SHALL BE SUFFICIENT
FOR THE OCCUPANT LOAD THEREOF AND SHALL PROVIDE A CLEAR
WIDTH OF NOT LESS THAN 32 INCHES. THE HEIGHT OF DOORS SHALL
NOT BE LESS THAN 80 INCHES. (DETERMINED BY IBC CHAPTER 10 -
SECTION 1004)(REFERENCE DOOR SCHEDULE SHEET A601)
2. EGRESS DOORS SHALL BE READILY OPERABLE FROM THE EGRESS SIDE
WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT.
ALL EGRESS DOORS TO HAVE PANIC HARDWARE. PANIC HARDWARE
SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE
WRIST. FORCE REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5
POUNDS. REFERENCE SHEET A601 FOR ADDITIONAL INFORMATION.
(DETERMINED BY IBC CHAPTER 10 - SECTION 1010)
3. THE MEANS OF EGRESS, AND EXIT DISCHARGE, SHALL BE ILLUMINATED
AT ANY TIME THE BUILDING IS OCCUPIED WITH A LIGHT INTENSITY OF
NOT LESS THAN 1 FOOT-CANDLE AT THE WALKING SURFACE LEVEL.
(DETERMINED BY IBC CHAPTER 10 - SECTION 1008)
4. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL
OBSTRUCTIONS AT ALL TIMES. NO STORAGE IS PERMITTED IN ANY
EGRESS PATHS. (DETERMINED BY IBC CHAPTER 10 - SECTION 1003)
5. ALL NEW PROPOSED FIRE EXTINGUISHER LOCATIONS ARE DETERMINED
BY IFC TABLE 906.3(1) AND/OR BY THE DIRECTION OF THE LOCAL
AUTHORITY.
6. THE INFORMATION CONTAINED IN THESE LIFE SAFETY PLANS (SHEET)
ARE IN REFERENCE TO THE PROJECT SCOPE OF WORK (PROJECT LIMIT
LINE) CONTAINED IN THE ARCHITECTURAL PLANS (ONLY). A COMPLETE
LIFE SAFETY REVIEW OF THE FACILITY WAS NOT COMPLETED AS PART
OF THIS SCOPE OF WORK. AREAS OUTSIDE OF THE SCOPE OF WORK
(PROJECT LIMIT LINE) OF THESE DOCUMENTS WERE PROVIDED BY VAMC
FOR REFERENCE BY THE DESIGN TEAM AND ARE ASSUMED TO BE
ACCURATE AND COMPLETE FOR USE IN THESE CONSTRUCTION
DOCUMENTS. COORDINATE WITH VAMC FOR ANY ADDITIONAL LIFE
SAFETY INFORMATION OUTSIDE OF THIS SCOPE OF WORK.
Path ID Common Path
Distance Allowable
Common Path Actual Travel
Distance
Allowable Travel
Distance
PATH A 23' - 8" 100' - 0" 43' - 3" 300' - 0"
PATH B 135' - 3" 100' - 0" 135' - 3" 300' - 0"
PATH C 65' - 7" 100' - 0" 65' - 7" 300' - 0"
PATH D 21' - 3" 100' - 0" 21' - 3" 300' - 0"
GENERAL SHEET NOTES
LIFE SAFETY LEGEND
EXIT ACCESS TRAVEL DISTANCE
1/8" = 1'-0"G1 OCCUPANCY PLAN
NAME Number AREA OCCUPANCY
LOAD
FACTOR
OCCUPANT
LOAD
OPEN ADMIN
SPACE
DG52 3,893 SF BUSINESS 150 26
ELECTRICAL
RM
DG50 79 SF STORAGE 300 1
IT ROOM DG21A 166 SF STORAGE 300 1
STORAGE DG23 205 SF STORAGE 300 1
STORAGE DG24 641 SF STORAGE 300 3
Grand total: 5 4,985 SF 32
OCCUPANCY SCHEDULE
LIFE SAFETY - BUILDING CODE ANALYSIS
PROJECT NAME: BUILDING 110 GROUND FLOOR RENOVATIONS
CITY: HAMPTON, VA
COUNTY: HAMPTON
STATE: VIRGINIA
AUTHORITY HAVING
JURISDICTION:
VA SAFETY OFFICE
APPLICABLE CODES AND
STANDARDS
NATIONAL FIRE CODES (NFC) PUBLISHED Y NATIONAL FIRE PROTECTION ASSOCIATION
NFPA 101 LIFE SAFETY CODE 2021
DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL / JUNE 1,2021
1.3 FIRE PROTECTION CODES AND STANDARDS:
2021 INTERNATIONAL BUIDING CODE (IBC)
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2021 INTERANATION ENERGY CONSERVATION CODE (IECC)
2021 INTERNATIONAL GREEN CONSTRUCTION CODE (IgCC)
2021 INTERNATIONAL MECHANICAL CODE (IPC)
2017 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS
2023 NATIONAL ELECTRICAL CODE (NFPA 70)
CONSTRUCTION TYPE (IBC
TABLE 601)
II B (ASSUMED)
OCCUPANCY CLASSIFICATION HEALTH CARE USE, NFPA101, TABLE 7.3.1.2 OCCUPANT LOAD FACTOR
SPRINKLERS YES, PROVIDED. AUTOMATIC SPRINKLER SYSTEM THROUGHOUT BUILDING
FIRE ALARM SYSTEM YES, PROVIDED.
DETECTION SYSTEM REQUIRED (NFPA 90A, ASME 17.1)
SMOKE CONTROL SYSTEM NOTE REQUIRED, NOT PROVIDED
PORTABLE FIRE EXTINGUISHERS PROVIDED PER NFPA 10. 75' TRAVEL DISTANCE TO A LOCATION
EXIT IDENTIFICATION REQUIRED, PROVIDED
EXIT ILLUMINATION REQUIRED, PROVIDED
PASSIVE FIRE SAFETY
FEATURES
TRAVEL DISTANCE, NFPA 101, 38.2.5 ARRANGEMENT OF EGRESS
NFPA 101, 38.2.5.2.1 COMMON
PATH OF TRAVEL
38.2.5.2.1 COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FT IN A BUILDING
PROTECTED THROUGHOUT BY AN APPROVED, SUPREVISED AUTOMITIC SPRINKLER
SYSTEM IN ACCORDANCE WITH 9.7.1
NFPA 101, 38.2.5.3 DEAD END
CORRIDORS
38.2.5.3.1 IN BUILDINGS PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED
AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH 9.7.1.1(1), DEAD-END
CORRIDORS SHALL NOT EXCEED 50 FT.
NFPA 101, 38.2.6 TRAVEL
DISTANCE TO EXITS
38.2.6.3 TRAVEL DISTANCE SHALL NOT EXCEED 300 FT IN BUIDNESS OCCUPANCIES
PROTECTED THROUGHTOUT BY AN APPROVED, SUPERVISED AUTOMTIC SPRINKLER
SYSTEM IN ACCORDANCE WITH 9.7.1
123456
A
B
C
D
E
F
G
STORAGE
DG23
STORAGE
DG24
IT ROOM
DG21A
WATER
FILTRATION ROOM
DG20
STORAGE
DG26
111112
D G
A
DG05A
17' - 0" 19' - 0" 19' - 6" 19' - 4" 19' - 8"
1"
1/ 2"
1/ 2"
0"
37' - 0"
25' - 0"
NOTE:
DIALYSIS AREAS ARE NUMBERED ON
SELECTED PLANS FOR REFERENCE ONLY.
SCOPE OF WORK IS AS INDICATED.
DIALYSIS
AREA 1
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
AREA 4
DIALYSIS
AREA 5
DIALYSIS
AREA 6
DIALYSIS
AREA 7
DIALYSIS
AREA 8
DIALYSIS
AREA 9
DIALYSIS
AREA 10
DIALYSIS
AREA 11
N.I.S.
N.I.S.
N.I.S.
EXISTING CONSTRUCTION TO BE
DEMOLISHED
EXISTING CONSTRUCTION TO
REMAIN
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
(DEMO)
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
AD101
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AM, EL CK
FIRST FLOOR PLAN - DEMOLITION PLAN 100% CONSTRUCTION
DOCUMENTS (CD)
1/8" = 1'-0"G8 FIRST FLOOR DEMOLITION PLAN
A DRAWINGS ARE REPRESENTATIVE OF THE GENERAL LAYOUT, SIZE, AND CONSTRUCTION OF
AREAS TO RECEIVE SELECTIVE DEMOLITION. DRAWINGS ARE BASED UPON EXISTING
AS-BUILT DRAWINGS AND LIMITED FIELD OBSERVATION.
B IT IS THE INTENT OF THE DEMOLITION TO REMOVE ALL OF THE EXISTING CONSTRUCTION
WHICH CONFLICTS WITH THE INTENT OF THE NEW CONSTRUCTION.
C ALL WALLS, PARTITIONS, CEILINGS, STRUCTURAL ELEMENTS, EQUIPMENT, ETC. INDICATED
BY DASHED LINES SHALL BE REMOVED. ALL MECHANICAL, ELECTRICAL, PLUMBING, AND
OTHER SERVICES WHICH ARE CONTAINED IN THE ELEMENTS TO BE REMOVED SHALL BE
REMOVED OR RE-ROUTED IN ACCORDANCE WITH THE DRAWINGS.
D REFER TO THE CORRESPONDING ENGINEERING DISCIPLINE FOR THE REMOVAL OF
ENGINEERING ITEMS. EXISTING ITEMS TO REMAIN SHOULD BE PATCHED TO MATCH
EXISTING.
E WHERE REMOVAL OF PARTITIONS CREATES VOIDS OR DEPRESSIONS IN EXISTING
SUBSTRATE, FILL AND LEVEL VOIDS WITH CONCRETE AND LATEX UNDERLAYMENT TO
PROVIDE A LEVEL SURFACE TO RECEIVE NEW FLOOR COVERINGS.
F REMOVE AND SALVAGE ALL DOOR HARDWARE FROM EACH DOOR WITHIN AREAS OF
RENOVATION. ANY REMAINING HARDWARE THAT IS NOT REUSED SHALL BE RETURNED TO
THE BUILDING OWNER.
G PATCH EXISTING CONCRETE FLOOR SLAB AS REQUIRED AFTER REMOVAL OF EXISTING
FLOORING AND MEP PIPING AND DEVICES, SEE MEP DRAWINGS FOR LOCATIONS.
H THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING ITEMS TO REMAIN DURING
DEMOLITION AND NEW CONSTRUCTION.
I PATCH EXISTING TO MATCH ADJACENT MATERIALS WHERE DEMOLITION AND NEW
CONSTRUCTION OCCUR UNLESS NOTED OTHERWISE.
J AFTER DEMO OF PIPING, CLEAN EDGES OF HOLE IN CONCRETE SLAB. PROVIDE AND
SUPPORT BOTTOM FORM WORK. APPLY BONDING AGENT TO CONCRETE EDGES AND FILL
VOID WITH NEW CONCRETE. PROVIDE STEEL TROWEL FINISH.
LEGEND
KEYNOTES
1 DEMO DOOR, FRAME AND HARDWARE.
2 DEMO PARTITION, TYP.
7 DEMO SINK AND MILLWORK ALONG OUTSIDE WALL, TYP. PATCH AND REPAIR GYP. BD.
AS NEEDED FOR EXTERIOR WALL FINISHES.
8 DEMO RESTROOMS IN THEIR ENTIRETY.
11 DEMO MILLWORK CABINETS, SINKS AND COUNTERTOPS.
12 DEMO PORTION OF EXISTING WALL FOR NEW DOOR AND COORDINATE NEW DOOR
LOCATION.
13 REMOVE EXISTING DOOR AND FRAME. DELIVER TO COR. FINISH TO MATCH EXISTING.
23 EXISTING SCALE TO REMAIN. PROTECT DURING CONSTRUCTION.
24 EXISTING SINK AND COUNTER TO REMAIN.
25 COORDINATE EXTENT OF DEMO WITH NEW PARTITION LOCATION.
30 PATCH EXISTING CONCRETE FLOOR SLAB AT AREAS OF REMOVED PIPING AND
DRAINS, SEE MEP DRAWINGS FOR PATCHING SCOPE OF WORK AND COORDINATE
FLOOR PATCHING WITH DEMOLITION.
38 SEE MEP FOR ELECTRICAL PANEL SCOPE OF WORK. WORK AFFECTED BY ALT. 4
40 REFERENCE LINE SHOWING APPROXIMATE LOCATION OF NEW DEMISING WALL. SEE
SHEET AE110 FOR LOCATION INFORMATION.
41 MEDGAS MONITOR TO BE RELOCATED.
42 REMOVE COLUMN SURROUNDS TO STRUCTURE. NOTIFY COR IF ANY PIPING IS
DISCOVERED AND MUST REMAIN. TYPICAL AT ALL COL. IN AREA OF WORK.
44 DEMO FLOORING AND BASE IN OPEN ADMIN AREA OF WORK. PATCH AND REPAIR
DRYWALL AT EXTERIOR WALL WHERE SINKS ARE REMOVED AS NEEDED.
45 MAINTAIN FLOORING IN THIS AREA AND PATCH AND REPAIR AS REQUIRED AFTER
MILLWORK REMOVAL.
53 ALTERNATE 1. SEE LIST OF ALTERNATE ON SHEET GI001.
54 ALTERNATE 2. SEE LIST OF ALTERNATE ON SHEET GI001.
56 ALTERNATE 4. SEE LIST OF ALTERNATE ON SHEET GI001.
59 MILLWORK AND COUNTERTOP TO BE SALVAGED FOR REINSTALLATION IN THIS
LOCATION. CONFIRM THAT MILLWORK WILL BE STORED IN DIALYSIS AREA 1 PER VA.
63 SALVAGE EXISTING GUARD RAIL AND WOOD TRIM.
SHEET NOTES
AREA KEY PLAN
PLAN
NORTH
ACTUAL
NORTH
B
C
D
E
F
G
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
N.I.S.
N.I.S.
N.I.S.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
ACT-1
9' - 0"A.F.F.
17' - 0" 19' - 0" 19' - 6" 19' - 4" 19' - 8"
1"
1/ 2"
1/ 2"
0"
35' - 8 1/2"
33' - 2 3/8"
NOTE:
DIALYSIS AREAS ARE NUMBERED ON
SELECTED PLANS FOR REFERENCE ONLY.
SCOPE OF WORK IS AS INDICATED.
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
AREA 4
DIALYSIS
AREA 5
DIALYSIS
AREA 6
DIALYSIS
AREA 7
DIALYSIS
AREA 8
DIALYSIS
AREA 9
DIALYSIS
AREA 10
DIALYSIS
AREA 11
DIALYSIS
AREA 1
N.I.S.
N.I.S.
N.I.S.
EXISTING CONSTRUCTION TO BE
DEMOLISHED
EXISTING CONSTRUCTION TO
REMAIN
DEMO EXISTING 2X4 LIGHT FIXTURE
DEMO EXISTING 2X2 LIGHT FIXTURE
DEMO EXISTING LINEAR LIGHT
FIXTURE
DEMO EXISTING 6" ROUND LIGHT
FIXTURE
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
AD102
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AHM CJK
FIRST FLOOR REFLECTED CEILING PLAN
- DEMOLITION
100% CONSTRUCTION
DOCUMENTS (CD)
1/8" = 1'-0"G8 FIRST FLOOR REFLECTED CEILING PLAN - DEMO
LEGEND
KEYNOTES
17 EXISTING PERIMETER SOFFIT TO REMAIN.
40 REFERENCE LINE SHOWING APPROXIMATE LOCATION OF NEW DEMISING WALL. SEE
SHEET AE110 FOR LOCATION INFORMATION.
54 ALTERNATE 2. SEE LIST OF ALTERNATE ON SHEET GI001.
SHEET NOTES
AREA KEY PLAN
PLAN
NORTH
ACTUAL
NORTH
1. REMOVE ALL CEILING TILE, GRID AND LIGHT FIXTURES IN AREA OF WORK
2. FOR MEP DEVICES, SEE MEP AND TECHNOLOGY DRAWINGS.
3. REMOVE SOFFITS AS INDICATED.
B
C
D
E
F
G
STORAGE
DG23
STORAGE
DG24
IT ROOM
DG21A
WATER
FILTRATION ROOM
DG20
STORAGE
DG26
DG21A
17' - 0" 19' - 0" 19' - 6" 19' - 4" 19' - 8"
1"
1/ 2"
1/ 2"
0"
37' - 0"
T P
T P
T P
DIALYSIS
AREA 1
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
AREA 4
DIALYSIS
AREA 5
DIALYSIS
AREA 6
DIALYSIS
AREA 7
DIALYSIS
AREA 8
DIALYSIS
AREA 9
DIALYSIS
AREA 10
DIALYSIS
AREA 11
ADMIN
AREA
DIALYSIS
AREA 12
TP05
M
IN
4'
T P
TP06
N.I.S.
N.I.S.
N.I.S.
123456
A
B
C
D
E
F
G
STORAGE
DG23
STORAGE
DG24
IT ROOM
DG21A
WATER
FILTRATION ROOM
DG20
STORAGE
DG26
DG21A
17' - 0" 19' - 0" 19' - 6" 19' - 4" 19' - 8"
1"
1/ 2"
1/ 2"
0"
T P
T P
T P
DIALYSIS
AREA 1
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
AREA 4
DIALYSIS
AREA 5
DIALYSIS
AREA 6
DIALYSIS
AREA 7
ADMIN
AREA
REMODELED
AREA
50T P
TP07
T P
TP09
EXISTING CONSTRUCTION TO BE
DEMOLISHED
EXISTING CONSTRUCTION TO
REMAIN
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
(DEMO)
TEMPORARY ICRA BARRIER WALL CONSTRUCTION
AREA OF CONSTRUCTION
MODIFIED EXISTING WALL TO MEET
ICRA REQUIREMENT
ONE HOUR FIRE BARRIER CONSTRUCTION
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
AD103
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AM, EL CK
FIRST FLOOR PLAN - PHASING PLAN 100% CONSTRUCTION
DOCUMENTS (CD)
3/32" = 1'-0"1 FIRST FLOOR PHASING PLAN - PHASE 1
LEGEND
KEYNOTES
46 TEMPORARY WALL,DOOR AND FRAME TO BE PROVIDED DURING THE DURATION OF
CONSTRUCTION. COORDINATE FINAL LOCATION WITH COR. ALL CORRIDORS SHALL
ALLOW FOR A 4'-0" MIN. CLEARANCE DIMENSION.
48 CASEWORK TO REMAIN FOR USE DURING PHASE 1.
49 AREA TO BE OCCUPIED BY THE VA STAFF DURING PHASE 1.
50 AREA TO BE OCCUPIED BY THE VA DIALYSIS STAFF DURING PHASE 2.
52 MODIFY EXISTING WALLS TO EXTEND TO DECK TO MEET ICRA REQUIRMENTS.
58 COORDINATE ICRA BARRIERS AND ACCESS TO THIS AREA OF THE CORRIDOR WITH
THE COR AND VAMC STAFF DURING CONSTRUCTION IN ORDER TO INSTALL THE NEW
CEILING.
60 WALL CONSTRUCTED IN PHASE 1 COMPLIES WITH ICRA REQUIREMENTS.
61 EXISTING WALL MODIFIED IN PHASE 1 TO MEET ICRA REQUIRMENTS.
SHEET NOTES
AREA KEY PLAN
PLAN
NORTH
ACTUAL
NORTH
3/32" = 1'-0"2 FIRST FLOOR PHASING PLAN - PHASE 2
A. THE FACILITY WILL REMAIN OCCUPIED AND IN OPERATION THROUGHOUT THE
CONSTRUCTION PERIOD. PREVENT INTERRUPTION OF SERVICES THAT MAY INTERRUPT
NORMAL OPERATIONS. COORDINATE WORK WITH VAMC TO MINIMIZE DISRUPTIONS OF
NORMAL ACTIVITIES. SCHEDULE ACCESS TO CORRIDORS, STORAGE AREAS, UTILITY
ROOMS AND ELEVATORS WITH COR.
B. PERFORM WORK IN MANNER TO MEET REQUIREMENTS FOR CLASS IV SYSTEM
INFECTION CONTROL SYSTEM AS PER SECTION 01 35 26 AND THE VAMC ICRA
REQUIREMENTS. PRIOR TO COMMENCING WORK, COORDINATE WORK WITH INFECTION
CONTROL PROCEDURES WITH THE VAMC INFECTION CONTROL STAFF. REVIEW
REQUIREMENTS, PROCESSES AND PROCEDURES. FOLLOW VAMC INFECTION CONTROL
INSTRUCTIONS AND RECOMMENDATIONS.
C. PROVIDE PLASTIC ZIP WALL/DOOR OVER ANY CONSTRUCTION AREA OPENINGS.
D. TEMPORARY CONSTRUCTION BARRIERS ARE PERMITTED TO USE EXISTING WALLS IF
APPLICABLE. CONTRACTOR TO FIELD INSPECT WALLS TO DETERMINE THE EXISTING
RATING OF THE WALL. CONTRACTOR TO COORDINATE ANY REPAIR OF WALLS TO
MAINTAIN THE EXISTING RATING WITH THE COR.
E. CONSTRUCTION BARRIERS MUST BE CONSTRUCTED AND APPROVED PRIOR TO ANY
DEMOLITION IS TO OCCUR. ONCE CONSTRUCTION BARRIERS ARE BUILT AND APPROVED
BY THE COR, THE SPRINKLER WITHIN THE CONSTRUCTION SITE CAN BE REMOVED.
ONCE COMPLETED, DEMOLITION MAY START.
F. COMPLY WITH VA ICRA REQUIREMENTS WHERE WORK IS REQUIRED, WHETHER ICRA
IMPACT AREA IS INDICATED ON DRAWINGS OR NOT.
G. ALL ICRA AND ISLM REQUIREMENTS INCLUDING BUT NOT LIMITED TO; VAMC SPECIFIC
H. OPERATIONAL PROCEDURES, PHASING, SITE AND CONSTRUCTION ACCESS,
SCHEDULING, AND TEMPORARY CONSTRUCTION MEASURES TO BE COORDINATED IN
THE FIELD WITH VAMC COR.
I. TEMPORARY CONSTRUCTION BARRIER TO BE PROVIDED TO SURROUND
CONSTRUCTION SITE AND BE INSTALLED SLAB-TO-SLAB. COORDINATE FINAL LOCATION
WITH COR PRIOR TO CONSTRUCTION.
J. ALL WORK THAT OCCURS WITHIN THE EXISTING CORRIDORS IS TO BE COMPLETED
DURING "OFF HOURS" WHEN THE FACILITY IS NOT IN OPERATION AND CLEANED UP FOR
OCCUPANCY BEFORE THE CONTRACTOR LEAVES THE SITE FOR THE DAY.
PHASING PLAN NARRATIVE
TO MEET THE OBJECTIVE TO MAINTAIN AN OPERATIONAL DIALYSIS UNIT WHILE
DOWNSIZING THE OVERALL DIALYSIS UNIT AND CREATE FUTURE ADMIN SPACE THESE
PLANS PROPOSE 2 PRIMARY PHASES. THERE MAY BE SUB-PHASES WITHIN EACH PHASE,
BUT THESE DIAGRAMS ARE INTENDED TO OUTLINE THE BASIC CONCEPT FOR THE SCOPE
OF WORK. THE WORK TO BE PERFORMED IN THE OTHER AREAS OF THE PLAN (NEW
ELECTRICAL ROOM, REMODELED IT ROOM, AND NEW STORAGE ROOMS) CAN BE DONE
ACROSS BOTH PHASES AS DETERMINED BY THE GENERAL CONTRACTOR TO MEET THE
NEEDS OF THE OVERALL PROJECT.
PHASE 1, AS OUTLINED ON THE PLAN, ALLOWS THE REGULATION DEMISING WALL BETWEEN
THE SUITES TO BE BUILT AND FINISHED ON THE DIALYSIS SIDE OF THE WALL (PLAN WEST)
ALONG WITH FLOOR REPAIRS AND CEILING/LIGHTING REMODELING AND ASSOCIATED MEP.
ONCE THE WALL IS COMPLETED ON THE DIALYSIS SIDE IT WILL ALLOW THE TREATMENT
AND SUPPORT AREAS TO BE BROUGHT BACK INTO USE. IN PHASE 1 THE LOWER PART OF
THE PLAN THAT HAS EXISTING 2 ENCLOSED PATIENT ROOMS, AND OPEN TREATMENT
AREAS WOULD SERVE AS THE DIALYSIS UNIT WHILE PHASE 1 WORK IS PROGRESSING.
ONCE THE DEMISING WALL AND ASSOCIATED MEP WORK IS COMPLETE DIALYSIS WOULD
REOCCUPY THE ORIGINAL TREATMENT AREAS AND PHASE 2 WOULD BEGIN. PHASE 2 WILL
BE THE WORK REQUIRED TO COMPLETE THE REMODELING OF THE REMAINING AREA TO
BECOME FUTURE ADMIN SPACE.
FRAME MATERIAL: HM (HOLLOW METAL) UNO IN OPENING SCHEDULE
F R
A M
E P
R O
F
IL
E G
R O
U P
(F
R O
M O
P E
N
IN
G S
C H
E D
U
LE
FRAME PROFILE MEMBER (FROM FRAME ELEVATION)
FRAME
PROFILES
MATRIX
ER
EQUAL
RABBET
JP JAMB/HEAD PROFILE
1/2"
THICKNESS
GWB PARTITION
1/2"
F W
DT+3/16" VARIES DT+3/16"
5/ 8"
ASSEMBLY DESIGNATION
A ACOUSTICAL (1-LAYER GWB 1 SIDE, 2-LAYERS GWB OPPOSITE SIDE)
C CHASE WALL
F FURRING (1-LAYER ONE SIDE ONLY)
G GWB (1-LAYER EA. SIDE)
H GWB (2-LAYERS EA. SIDE)
J GWB (3-LAYERS EA. SIDE)
K GWB (4-LAYERS EA. SIDE)
M MASONRY
S SHAFTWALL
P SPECIAL PARTITION
Z Z-FURRING (1-LAYER ONE SIDE ONLY)
SECTION TYPE
a ABOVE (STRUCTURE TO DECK, FINISH STOPS ABOVE CLG.)
d DECK (STRUCTURE AND FINISH EXTENDS TO DECK) p PARTIAL HEIGHT s SMOKE BARRIER (ONE SIDE OF FINISH EXTENDS TO DECK) t THROUGH (STRUCTURE AND FINISH STOP ABOVE CLG.)
u UNDERSIDE (STRUCTURE AND FINISH STOP BELOW CLG.)
QUALIFIER
B BULLET RESISTANT
L LEAD LINED
LS LEAD LINED W/ SOUND ATTENUATION BATTS
M MESH (STEEL SECURITY MESH)
MS MESH W/ SOUND ATTENUATION BATTS
S SOUND ATTENUATION BATTS
T THERMAL INSULATION
## HEIGHT (INCHES)
ASSEMBLY DESIGNATION
STRUCTURE SIZE
SECTION TYPE
QUALIFIER
G3d
S
2 HR FIRE/SMOKE
CEILING LINE
PERMANENT RED PAINT
LETTERING - TYP
NOTES FOR STENCILING:
1. LETTERED STENCILS SHALL BE APPLIED TO EACH SIDE OF
RATED BARRIERS AT 10'-0" INTERVALS; BUT NO LESS THAN
ONCE PER BARRIER LENGTH.
2. USE THE FOLLOWING LANGUAGE FOR STENCILS:
"1HR FIRE / SMOKE" "1HR FIRE"
"2HR FIRE / SMOKE" "2HR FIRE"
"LIMIT TRANSFER OF SMOKE"
FIRE BARRIER TYPE
FIRE BARRIER TYPE
P PARTITION TO LIMIT THE TRANSFER OF SMOKE
B SMOKE BARRIER
1 1 - HOUR FIRE
1B 1 - HOUR FIRE / SMOKE BARRIER
2 2 - HOUR FIRE
2B 2 - HOUR FIRE / SMOKE BARRIER
TYPICAL
FRAME
F1
JP
JP
TYP.
SEE SCHEDFW FW
F W
1 HOUR FIRE RATED
TEMPORARY
ICRA FRAME
T2
JP
JP
TYP.
SEE SCHEDFW FW
F W
1 HOUR FIRE RATED
FLUSH
S
SEE SCHED.
S E
E S
C H
E D
DOUBLE FLUSH
V
SEE SCHED.
S E
E S
C H
E D
SCWD SCWD
7 7
TEMPORARY
ICRA DOOR
T1
SEE SCHED.
S E
E S
C H
E D
HOLLOW METAL
FINISHED FLOOR, VARIES,
SEE ID 110
(1) LAYER 5/8" TYPE "X" GWB
AT EACH SIDE
STEEL STUD FRAMING (SEE
PARTITION TYPE LEGEND
MARKED ON FLOOR PLAN)
SOUND ATTENUATION INSULATION
(SEE FLOOR PLAN FOR PARTITION
QUALIFERS)
FINISHED CEILING (SEE RCP)
DEFLECTION TRACK
UNDERSIDE OF
STRUCTURE ABOVE
NOTES
1. ALL DOORS SHALL BE FLUSH - 1 3/4" THICK UNLESS OTHERWISE
NOTED.
2. EVEN NUMBERS ARE METAL CONSTRUCTION. ODD NUMBERS ARE
WOOD CONSTRUCTION.
FRAME TYPE
DOOR TYPE
DOOR SIZE
A
(1) LAYER 5/8" TYPE "X" GWB
AT EACH SIDE
STEEL STUD FRAMING (SEE
PARTITION TYPE LEGEND
MARKED ON FLOOR PLAN)
DEFLECTION TRACK
UNDERSIDE OF
STRUCTURE ABOVE
RATED WALL
3"
3/8"
STEEL STUD
(BY OTHERS)
G.W.B.
(BY OTHERS)
ALUMINUM RETAINER
(24A339000)
#6 X 1 5/8" BUGLE HD SMS
18" [457.2mm] MAX.
ACROVYN 4000 COVER
(24U002xxx) ACROVYN Woodgrains and Brushed Metals (24U634xxx)
R1/4" [R6.4mm]
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
AE010
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AHM CJK
PARTITION TYPES & DOOR
INFORMATION
100% CONSTRUCTION
DOCUMENTS (CD)
A. COORDINATE KEYING WITH COR AND VAMC MAINTENANCE STAFF.
PROVIDE BUILDING STANDARD FINISH TO MATCH EXISTING.
B. CONTRACTOR TO COORDINATE DOOR UNDERCUTS AS REQUIRED WITH
MECHANICAL CONTRACTOR.
SHEET NOTES
PARTITION TYPE LEGEND
MARK WIDTH HEIGHT
DOOR
HARDWARE
FRAME
FIRE
RATINGTYPE
FIRE
RATING TYPE
* TP01 3' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP02 3' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP03 4' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP04 4' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP05 3' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP06 3' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP07 3' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP08 3' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
* TP09 3' - 0" 7' - 0" T1 1 HR HDW-01 T2 1 HR
**DG21A 4' - 0" 8' - 0" S 1HR HDW-06 F1 1HR
DG50 3' - 0" 7' - 0" S 1 HR HDW-05 F1 1 HR
DG52A 7' - 6" 7' - 0" V 1 HR HDW-04 F1 1 HR
DG52D 4' - 0" 7' - 0" S 1 HR HDW-02 F1 1 HR
DG52E 4' - 0" 7' - 0" S 1 HR HDW-02 F1 1 HR
DOOR SCHEDULE
FRAME AND DOOR TYPES
1/4" = 1'-0"E5 FRAME TYPE F1
1/4" = 1'-0"E4 DOOR TYPES
1 1/2" = 1'-0"B4 PARTITION TYPES - Gd SERIES
HARDWARE TYPES
NOTE: NEW DOORS TO MATCH EXISTING
BUILDING STANDARD IN MATERIAL, COLOR
AND FINISH.
NOTE: "7" INDICATES WOOD
CONSTRUCTION.
NOTE #1: NEW DOORS AND FRAMES TO
MATCH RATING OF EXISTING OR NEW
PARTITION. FIELD VERIFY FOR RATING.
HDW-01
TEMPORARY ICRA DOORS
1-1/2 PR BUTTS
1 EA CYLINDRICAL LOCKSET F84
1 EA CLOSER
1 SET WEATHER SEALS
1 EA SWEEP
HWD-02
DOOR DG52E, DG52D
2 PR BALL BEARING HINGES
1 EA MORTISE LOCKSET F04
1 EA CLOSER
1 EA ARMOUR PLATE
1 EA FLOOR STOP
HWD-03 - NOT USED
HDW-04
DOORS DG52A
3 PR BALL BEARING HINGES
2 EA VERTICAL ROD DEVICE, CONCEALED (IN
WOOD DOOR)
2 EA DUSTPROOF STRIKE
1 EA PUSH PAD DEVICE W/ DOGGING
CAPABILITY
1 EA EXIT TRIM WITH KEY LOCK AND LEVER
1 EA CLOSER
1 EA ARMOUR PLATE/PUSH SIDE
1 EA WALL STOP
HWD-05
DOORS DG50
1-1/2 PR BALL BEARING HINGES
1 EA MORTISE LOCKSET F07
1 EA CLOSER W/ STOP & HOLD-OPEN
1 EA ARMOUR PLATE
HWD-06
DOORS DG21A
THIS DOOR WILL HAVE THE FOLLOWING HARDWARE
PLUS SDO 218 PER ERHM REQUIREMENTS.
ELECTRONIC ACCESS CONTROL HARDWARE:
1 EA ELECTRIC STRIKE
1 EA CARD READER
COORDINATE KEYING WITH VA. MANUFACTURE MEDICO
SYSTEM, 7 PIN INTERCHANGEABLE, SMALL FORMAT,
GRANDMASTER.
SDO 218
1 EA CONTINUOUS HINGE
1 EA *FLUSH BOLTS
1 EA MORTISE LOCK
OPERATION AT ALL TIMES:
1 EA OUTSIDE LEVER ALWAYS RIGID
1 EA LATCHBOLT RELEASED BY KEY OUTSIDE
AND LEVER INSIDE
*THE USE OF FLUSH BOLTS TO BE CONFIRMED FOR THIS
LOCATION
PROVIDE 24" HIGH X DOOR WIDTH STAINLESS STEEL
ARMOR PLATE AT ALL DOORS. TEMPORARY
CONSTRUCTION DOORS ARE EXCLUDED.
NOTE #2: EXISTING DOORS AT STORAGE
ROOMS TO REMAIN, NO CHANGE TO
HARDWARE.
DOOR SYMBOL LEGEND
1 1/2" = 1'-0"B5 PARTITION TYPES - TEMPORARY WALL ICRA BARRIER
ICRA DOOR FINISH:
PAINT TEMPORARY (ICRA) DOORS
AND FRAMES TO MATCH ADJACENT
WALL.
* TEMPORARY DOORS ARE INDICATED ON THE PHASING PLANS, SHEET AD103
* TEMPORARY ICRA BARRIERS ARE INDICATED ON THE PHASING PLANS, SHEET AD103
ALL MANUFACTURERS, MODEL NUMBERS, STYLES AND
FINISHES OF DOOR HARDWARE ARE TO MATCH EXISTING.
12" = 1'-0"G10 CORNER GUARD TYP
**CEILING TO BE MODIFIED TO WORK WITH DOOR HEIGHT
B
C
D
E
F
G
N.I.S.
N.I.S.
N.I.S.
STORAGE
DG23
IT ROOM
DG21A
S
F1
ELECTRICAL RM
DG50
V
F1
OPEN ADMIN
SPACE
DG52
8' - 0"
G3d
1 S
G3d
1 S
9' - 6"
S
F1
G3d
1 S
S
F1
G3d
D G
D G
E
DG52D
DG52A
G3d
1 S
CL
/8
19' - 2"
2'
/1
6"
9' - 7 3/4"
6"
1'
47 47
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
AREA 4
DIALYSIS
AREA 5
DIALYSIS
AREA 6
DIALYSIS
AREA 7
DIALYSIS
AREA 1
STORAGE
DG24
REMODELED
AREA
D
G
A
S
F1
N.I.S.
N.I.S.
N.I.S.
DOOR NUMBER
EXISTING WALL/PARTITION TO REMAIN IN PLACE
NEW PARTITION; REFER TO PARTITION TYPES
EXISTING DOOR AND FRAME TO REMAIN IN PLACE
NEW DOOR AND FRAME; REFER TO DOOR SCHEDULE
(INSTALLED IN EXISTING OR NEW WALLS/PARTITIONS)
ONE HOUR FIRE BARRIER CONSTRUCTION
TEMPORARY ICRA BARRIER WALL CONSTRUCTION
MODIFIED EXISTING WALL TO MEET
ICRA REQUIREMENT
MATCH (EXIST.) REBAR SIZE
AND SPACING
NEW 4,000 PSI CONCRETE SLAB
OVER MIN 40 MIL POLYETHYLENE
VAPOR BARRIER OVER MIN. 4"
CLEAN AGGREGATE BASE.
COMPACT BACKFILL. PROVIDE
STEEL TROWEL FIN ON NEW
SLAB.
EXIST. CONC SLAB
WIDTH AS REQ'D FOR UTILITY WORK BUT NOT LESS THAN 24"
DRILL AND EPOXY REBAR W/ HILTI
HITHY 200 SAFE SET SYSTEM
ADHESIVE W 6" MIN EMBED MIN 24" OC.
WOOD TRIM
GUARD RAIL (TYP)
ACCENT PAINT (TYP)
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
AE110
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AHM CJK
FIRST FLOOR PLAN - NEW WORK 100% CONSTRUCTION
DOCUMENTS (CD)
1/8" = 1'-0"G8 FIRST FLOOR PLAN - NEW
SHEET NOTES
AREA KEY PLAN
PLAN
NORTH
ACTUAL
NORTH
LEGEND
KEYNOTES
21 WALL TO MATCH EXISTING CONSTRUCTION AND RATING.
29 NEW DOOR TO ALIGNED TO EXISTING EXTERIOR OPENING.
47 PROVIDE NEW COLUMN SURROUNDS IN DRYWALL. 3-5/8" METAL STUDS TIGHT TO
STRUCTURE WITH 5/8" GWB AROUND EXISTING COLUMNS.
53 ALTERNATE 1. SEE LIST OF ALTERNATE ON SHEET GI001.
54 ALTERNATE 2. SEE LIST OF ALTERNATE ON SHEET GI001.
56 ALTERNATE 4. SEE LIST OF ALTERNATE ON SHEET GI001.
62 PROVIDE GUARD RAILING TO MATCH EXISTING.
A. LIMITED SCOPE IN OPEN ADMIN SPACE. REFER TO ALTERNATIVE LIST ON SHEET GI001.
B. PATCH EXISTING CONCRETE FLOOR SLAB AS REQUIRED BY MEP SCOPE OF WORK. SEE
MEP DRAWINGS FOR PIPING AND DRAIN REMOVAL AND COORDINATE FLOOR PATCHING
PRIOR TO INSTALLATION OF NEW FLOORING.
N.T.SG10 TRENCH REPAIR - TYPICAL
N.T.SF10 IMAGE OF TYPICAL CORRIDOR
PRICING SET
08/07/2023
B
C
D
E
F
G
N.I.S.
N.I.S.
N.I.S.
ACT-1
9' - 0"A.F.F.
OPEN TO
ABOVE
OPEN TO
ABOVE
ACT-1
9' - 0"A.F.F.
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
AREA 4
DIALYSIS
AREA 5
DIALYSIS
AREA 6
DIALYSIS
AREA 7
166 SF
IT ROOM
DG21A
79 SF
ELECTRICAL RM
DG50
205 SF
STORAGE
DG23
OPEN ADMIN
SPACE
DG52
641 SF
STORAGE
DG24
REMODELED
AREA
DIALYSIS
AREA 1
N.I.S.
N.I.S.
N.I.S.
EXISTING WALL/PARTITION TO REMAIN IN PLACE
NEW PARTITION; REFER TO PARTITION TYPES
EXISTING DOOR AND FRAME TO REMAIN IN PLACE
NEW 2'x2' SUSPENDED ACOUSTICAL CEILING GRID
AND PADS.
NEW LIGHT FIXTURE
SUPPLY AIR DIFFUSER
RETURN AIR EXHAUST DIFFUSER
EXIT SIGN
RECESSED DOWNLIGHT
ONE HOUR FIRE BARRIER CONSTRUCTION
TEMPORARY ICRA BARRIER WALL CONSTRUCTION
MODIFIED EXISTING WALL TO MEET
ICRA REQUIREMENT
SHEET NOTES
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
AE210
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AHM CJK
REFLECTED CEILING PLAN - NEW WORK 100% CONSTRUCTION
DOCUMENTS (CD)
KEYNOTES
LEGEND
1/8" = 1'-0"G8 FIRST FLOOR REFLECTED CEILING PLAN - NEW
AREA KEY PLAN
PLAN
NORTH
ACTUAL
NORTH
18 PATCH EXISTING SOFFIT AS REQUIRED TO MATCH EXISTING.
54 ALTERNATE 2. SEE LIST OF ALTERNATE ON SHEET GI001.
57 SOFFITS IN ADMIN AREA TO BE PAINTED PER FINISH SCHEDULE.
B
C
D
E
F
G
N.I.S.
N.I.S.
N.I.S.
N.I.S.
ROOF AREA 1
ROOF AREA 2
N.I.S.
DOME STRAINER
CLAMPING RING
MODIFIED BITUMEN ROOF
SYSTEM TYPICAL
DRAIN FLANGE
INSULATION TAPERED FOR DRAINAGE
5/8" GYPSUM SHEATHING
TYPICAL SLOPE FOR TAPERED INSULATION SHALL BE
1/4" = 1'-0" UNLESS OTHERWISE NOTED.
ROOF DRAIN / OVERFLOW DRAIN (EXISTING)
AREA OF CONCERN
N.I.S. N.I.S.
SHEET NOTES
Location
Issue Date o n e e ig h th i n c h o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
REVISIONS: DATE:
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
A
4 3 2 1678910
5 4 3 2 1678910
B
C
D
E
F
G
A
B
C
D
E
F
G
Phase
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
ARCHITECT / ENGINEERS OF RECORD:CONSULTANT:
Mechanical, Electrical, Plumbing & Technology Engineers:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: 314-645-1132, Fax: 314-645-1173 Cost Estimating:
OCMI, Inc.
1722 Routh Street, Suite 900 Dallas, TX 75201 Phone: 469-431-0571
A/E:
L2e-Oculus JV 20 South Sarah Street St. Louis, MO 63108 Phone: 314-730-2779 Firm POC: Justin Quinn
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
AE300
BUILDING 110
590-21-121AE Services - Renovate Building 110 Ground
Floor Hampton VAMC
36C24622C0073; #590-C20216
Hampton VA Medical Center
August 17, 2023 AHM CJK
ALTERNATE 3 ROOF PLAN 100% CONSTRUCTION
DOCUMENTS (CD)
KEYNOTES
LEGEND
AREA KEY PLAN
PLAN
NORTH
ACTUAL
NORTH
36 EXISTING ROOF DRAIN.SEAL PERIMETER OF ROOF PENETRATION (TYP).
37 EXISTING OVERFLOW DRAIN. SEAL PERIMETER OF ROOF PENETRATION (TYP).
1/8" = 1'-0"G8 ALTERNATE 3 ROOF PLAN
3/32" = 1'-0"A10 ROOF DRAIN DETAIL*
A. ROOF WORK IS LIMITED TO ROOF AREA 1 AND ROOF AREA 2 AS SHOWN ON THIS PLAN.
B. FULLY CLOSE AND SEAL ANY AREAS WHERE PIPING IS REMOVED AS PART OF THE
SCOPE OF THIS PROJECT. SEE MEP DRAWINGS FOR MORE INFORMATION.
C. PATCH AROUND ALL EXISTING ROOF DRAINS. CUT 3’ RADIUS CIRCLE AROUND DRAIN
AND WELD IN NEW BITUMEN TO MATCH EXISTING.
D. PROVIDE NEW STRAINERS AT ALL ROOF DRAINS WHERE MISSING.
E. AREAS OF CONCERN ARE ROUGHLY INDICATED ON THIS PLAN. REVIEW SEAMS FOR
NECESSARY REPAIRS.
F. REFER TO INFRARED SCAN REPORT TAKEN 1/20/2023 FOR MORE DETAIL ON THE
CONDITIONS OF ROOF. REPORT IS PART OF PROJECT DOCUMENTS.
*EXISTING CONSTRUCTION SHOWN FOR REFRENCE
B
C
D
E
F
G
205 SF
STORAGE
DG23
ACT P-1
RB-1 VT
79 SF
ELECTRICAL RM
DG50
AT P-1
RB-1 SD-1
166 SF
IT ROOM
DG21A
AT P-1
RB-1 SD-1
641 SF
STORAGE
DG24
ACT P-1
RB-1 VT
3,893 SF
OPEN ADMIN SPACE
DG52
ACT P-1
RB-1 LVT-1
17' - 0" 19' - 0" 19' - 6" 19' - 4" 19' - 8"
1"
1/ 2"
1/ 2"
0"
DIALYSIS
AREA 2
DIALYSIS
AREA 3
DIALYSIS
ARE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .