This document package includes construction drawings and specifications for corrective HVAC deficiencies at the Hampton VA Medical Center in Hampton, Virginia. The project involves relocating emergency power connections for chillers, switchgear, and other mechanical equipment from normal to emergency power sources. Drawings show demolition plans, new work layouts, phasing plans, and ICRA infection control classifications. Specifications require compliance with VA, NEC and NFPA standards, and coordination with the COR for equipment outages, containment, and infection controls. The solicitation is issued by the Department of Veterans Affairs VISN 6 for a small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to J045--Correct FCA Deficiencies in HVAC Systems, newest first.
File Type Posted
36C24624R0020 0005.docx DOCX document
36C24624R0020 0004.pdf PDF
590-21-120 - HVAMC - 100_ CD FINAL REV1 - Drawings.pdf PDF
36C24624R0020 0003.docx DOCX document
36C24624R0020 0002.docx DOCX document
Panel OEQH1.pdf PDF
36C24624R0020 0001.docx DOCX document
Panel OEQL2.pdf PDF
Attachment F_Base Proposal Breakdown Form.xlsx XLSX spreadsheet
Specifications.pdf PDF
Attachment B_Corp Experience Form.pdf PDF
36C24624R0020_1.pdf PDF
Attachment C_Past Performance Questionnaire.pdf PDF
Wage Determination.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER SHEET

N/A

R.C.N.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

FAX : (570) 253-1935

WWW.NEINFRA.COM

CORRECT FCA HVAC

DEFICIENCIES

590-21-120

05/26/2023 D.L.E.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667VA HAMPTON HEALTHCARE SYSTEM

100% CONSTRUCTION

DOCUMENTS

GI-01

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text GENERAL: GI-01 COVER SHEET COVER SHEET GI-02 GENERAL NOTES GENERAL NOTES GI-03 CAMPUS SITE PLAN CAMPUS SITE PLAN GI-04 CAMPUS SITE ENLARGED PLAN CAMPUS SITE ENLARGED PLAN GC-01 PHASING PLAN 1 PHASING PLAN 1 GC-02 PHASING PLAN 2 PHASING PLAN 2 ICRA: ICRA-01 ICRA GENERAL REQUIREMENTS ICRA GENERAL REQUIREMENTS ICRA-02 BUILDING 110 GROUND FLOOR & BUILDING 110A FOURTH FLOOR ICRA CLASSIFICATION PLANS BUILDING 110 GROUND FLOOR & BUILDING 110A FOURTH FLOOR ICRA CLASSIFICATION PLANS ICRA-03 BUILDING 110B GROUND FLOOR & CRAWLSPACE ICRA CLASSIFICATION PLANS BUILDING 110B GROUND FLOOR & CRAWLSPACE ICRA CLASSIFICATION PLANS ELECTRICAL: E-001 ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS ED-100 BUILDING 110 GROUND & THIRD FLOOR ELECTRICAL DEMOLITION PLANS BUILDING 110 GROUND & THIRD FLOOR ELECTRICAL DEMOLITION PLANS ED-101 BUILDING 110 PENTHOUSE & BUILDING 110A FOURTH FLOOR AND ROOF ELECTRICAL DEMOLITION PLANS BUILDING 110 PENTHOUSE & BUILDING 110A FOURTH FLOOR AND ROOF ELECTRICAL DEMOLITION PLANS ED-102 BUILDING 110B CRAWLSPACE AND GROUND FLOOR & BUILDING 110D GROUND FLOOR ELECTRICAL DEMOLITION PLANS BUILDING 110B CRAWLSPACE AND GROUND FLOOR & BUILDING 110D GROUND FLOOR ELECTRICAL DEMOLITION PLANS ED-600 BUILDINGS 110, 110B, & 110D PARTIAL DEMOLITION ONE-LINE DIAGRAMS BUILDINGS 110, 110B, & 110D PARTIAL DEMOLITION ONE-LINE DIAGRAMS ED-601 ELECTRICAL PANEL SCHEDULES - DEMOLITION ELECTRICAL PANEL SCHEDULES - DEMOLITION ED-602 MCC MCP ELEVATION - DEMOLITION MCC MCP ELEVATION - DEMOLITION E-100 BUILDING 110 GROUND & THIRD FLOOR ELECTRICAL NEW WORK PLANS BUILDING 110 GROUND & THIRD FLOOR ELECTRICAL NEW WORK PLANS E-101 BUILDING 110 PENTHOUSE & BUILDING 110A FOURTH FLOOR AND ROOF ELECTRICAL NEW WORK PLANS BUILDING 110 PENTHOUSE & BUILDING 110A FOURTH FLOOR AND ROOF ELECTRICAL NEW WORK PLANS E-102 BUILDING 110B CRAWLSPACE AND GROUND FLOOR & BUILDING 110D GROUND FLOOR ELECTRICAL NEW WORK PLANS BUILDING 110B CRAWLSPACE AND GROUND FLOOR & BUILDING 110D GROUND FLOOR ELECTRICAL NEW WORK PLANS E-500 ELECTRICAL DETAILS ELECTRICAL DETAILS E-501 AUTOMATIC TRANSFER SWITCH DETAILS & SCHEDULE AUTOMATIC TRANSFER SWITCH DETAILS & SCHEDULE E-600 BUILDING 110 PARTIAL NEW WORK ONE-LINE DIAGRAM BUILDING 110 PARTIAL NEW WORK ONE-LINE DIAGRAM E-601 BUILDINGS 110B & 110D PARTIAL NEW WORK ONE-LINE DIAGRAM BUILDINGS 110B & 110D PARTIAL NEW WORK ONE-LINE DIAGRAM E-602 ELECTRICAL PANEL SCHEDULES - NEW WORKELECTRICAL PANEL SCHEDULES - NEW WORK

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

BRISTOL

AutoCAD SHX Text

CHARLOTTESVILLE

AutoCAD SHX Text

HAMPTON PROJECT LOCATION

AutoCAD SHX Text

NORFOLK

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

HAMPTON VA MEDICAL CENTER

AutoCAD SHX Text

PROJECT NO. 590-21-120

AutoCAD SHX Text

HAMPTON, VIRGINIA

AutoCAD SHX Text

CORRECT FCA HVAC DEFICIENCIES

AutoCAD SHX Text

RICHMOND

AutoCAD SHX Text COR - ILSM & ICRA COMPLETED DATE: DATE: REVIEWED: AFGE DATE: DATE: REVIEWED: NAGE DATE: DATE: APPROVED: INFECTION CONTROL DATE: DATE: APPROVED: CONSTRUCTION SAFETY MANAGER DATE: DATE: APPROVED: SAFETY MANAGER DATE: DATE: APPROVED: INDUSTRIAL HYGIENIST DATE: DATE: APPROVED: SAFE PATIENT HANDLING AND MOBILITY FACILITY COORDINATOR DATE: DATE: APPROVED: FIRE INSPECTOR DATE: DATE: APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE: DATE: APPROVED: CHIEF, POLICE & SECURITY DATE: DATE: APPROVED: PHYSICAL SECURITY SPECIALIST DATE: DATE: APPROVED: ENVIRONMENTAL MANAGEMENT SERVICE DATE: DATE: APPROVED: OFFICE OF INFORMATION & TECHNOLOGY DATE: DATE: APPROVED: WOMEN'S VETERAN PROGRAM MANAGER DATE: DATE: APPROVED: CONTRACTING DATE: DATE: APPROVED: PATIENT SAFETY MANAGER DATE: DATE: APPROVED: HAMPTON ENERGY MANAGER DATE: DATE: APPROVED: SUPERVISORY PROJECT ENGINEER DATE: DATE: APPROVED: ASSISTANT CHIEF, ENGINEERING DATE: DATE: APPROVED: CHIEF, ENGINEERING DATE: DATE: APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE: DATE: APPROVED: CHIEF OF STAFF DATE: DATE: APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE: DATE: APPROVED: EXECUTIVE DIRECTOR, HAMPTON VA MEDICAL CENTER DATE:DATE:

AutoCAD SHX Text

APPROVAL SIGNATURES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

FAX : (570) 253-1935

WWW.NEINFRA.COM

CORRECT FCA HVAC

DEFICIENCIES

590-21-120

05/26/2023 D.L.E.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667VA HAMPTON HEALTHCARE SYSTEM

100% CONSTRUCTION

DOCUMENTS

GI-02

GENERAL NOTES

N/A

E.G.W.

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

HVAMC PRE CONSTRUCTION RISK ASSESSMENT/EVALUATION

AutoCAD SHX Text

PROJECT NAME: CORRECT FCA HVAC DEFICIENCIES

AutoCAD SHX Text

EXPECTED IMPACTS

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING OUTAGES

AutoCAD SHX Text

NONE EXPECTED.

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL OUTAGES

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL OUTAGES

AutoCAD SHX Text

NORMAL AND EMERGENCY POWER OUTAGES ARE EXPECTED.

AutoCAD SHX Text

AutoCAD SHX Text

MISCELLANEOUS UTILITIES

AutoCAD SHX Text

AutoCAD SHX Text

FIRE ALARM

AutoCAD SHX Text

FIRE ALARM POWER FEED MAY BE INTERRUPTED.

AutoCAD SHX Text

AutoCAD SHX Text

VIBRATIONS

AutoCAD SHX Text

VIBRATIONS ARE EXPECTED DURING CONSTRUCTION.

AutoCAD SHX Text

AutoCAD SHX Text

DUST (INFECTION

AutoCAD SHX Text

CONTROL)/AIR QUALITY

AutoCAD SHX Text

MINIMAL DUST IS EXPECTED DURING DEMO/NEW WORK.

AutoCAD SHX Text

ASSESSMENT DATE: 10/18/22

AutoCAD SHX Text

PLANS/MEASURES TO ADDRESS IMPACTS

AutoCAD SHX Text

AutoCAD SHX Text

NOISE

AutoCAD SHX Text

NOISE IS EXPECTED DURING CONSTRUCTION.

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

HAND TOOLS, SMALL POWER TOOLS.

AutoCAD SHX Text

AutoCAD SHX Text

MINIMAL DUST IS EXPECTED DURING DEMO/ NEW WORK.

AutoCAD SHX Text

AutoCAD SHX Text

SHORT DISRUPTIONS OF PEDESTRIAN TRAFFIC MAY OCCUR.

AutoCAD SHX Text

AutoCAD SHX Text

LIMITS OF CONSTRUCTION,

AutoCAD SHX Text

BARRIER LOCATION

AutoCAD SHX Text

PROJECT LOCATION:

AutoCAD SHX Text

HVAMC 2020 ANNUAL

AutoCAD SHX Text

AutoCAD SHX Text

TB RISK ASSESSMENT LEVEL

AutoCAD SHX Text

IS LOW .

AutoCAD SHX Text N

AutoCAD SHX Text 110, 110A, 110B, 110D, 171

AutoCAD SHX Text X .

AutoCAD SHX Text

AutoCAD SHX Text OUTAGES FOR ELECTRICAL DEMO AND TIE-INS IS EXPECTED TO EFFECT MANY HOSPITAL UTILITY SYSTEMS.

AutoCAD SHX Text OUTAGES MUST BE GIVEN TO COR 2 WEEKS IN ADVANCE, COR IS TO APPROVE WHEN OUTAGE CAN BE PERFORMED, TYPICALLY OFF-HOURS OR WEEKENDS TO MINIMIZE HOSPITAL DISRUPTIONS. OUTAGES ARE EXPECTED TO LAST 4 HRS. OR LESS.

AutoCAD SHX Text OUTAGES MUST BE GIVEN TO COR 2 WEEKS IN ADVANCE, COR IS TO APPROVE WHEN OUTAGE CAN BE PERFORMED, TYPICALLY OFF-HOURS OR WEEKENDS TO MINIMIZE HOSPITAL DISRUPTIONS. OUTAGES ARE EXPECTED TO LAST 4 HRS. OR LESS.

AutoCAD SHX Text OUTAGES MUST BE GIVEN TO COR 2 WEEKS IN ADVANCE, COR IS TO APPROVE WHEN OUTAGE CAN BE PERFORMED, TYPICALLY OFF-HOURS OR WEEKENDS TO MINIMIZE HOSPITAL DISRUPTIONS. OUTAGES ARE EXPECTED TO LAST 4 HRS. OR LESS.

AutoCAD SHX Text ANY FIRE ALARM OUTAGE GREATER THAN 8 HOURS WILL REQUIRE A FIRE WATCH PERFORMED BY A QUALIFIED INDIVIDUAL SUPPLIED BY THE CONTRACTOR.

AutoCAD SHX Text ANY ACTIVITIES DEEMED BY THE COR MAKING EXCESSIVE VIBRATIONS OR NOISE MUST BE PERFORMED DURING OFF-HOURS OR WEEKENDS. TIMES MUST BE APPROVED BY THE COR.

AutoCAD SHX Text

MUST FOLLOW ALL ICRA GUIDELINES.

AutoCAD SHX Text ANY ACTIVITIES DEEMED BY THE COR MAKING EXCESSIVE VIBRATIONS OR NOISE MUST BE PERFORMED DURING OFF-HOURS OR WEEKENDS. TIMES MUST BE APPROVED BY THE COR.

AutoCAD SHX Text CONTRACTOR MUST KEEP CONTROL OF ALL TOOLS AT ALL TIMES. CONTRACTOR MUST NOT LEAVE TOOLS CONTRACTOR MUST NOT LEAVE TOOLS UNATTENDED.

AutoCAD SHX Text

MUST FOLLOW ALL ICRA GUIDELINES.

AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR ANY PEDESTRIAN TRAFFIC CONTROL, SIGNAGE TO REROUTE, AND BARRIERS TO PROTECT PEDESTRIANS, AS DEEMED APPROPRIATE BY HVAMC SAFETY PERSONNEL OR COR.

AutoCAD SHX Text

CONTRACTOR MUST KEEP WORKSITE SECURE AT ALL TIMES. NO EXCPTIONS.

AutoCAD SHX Text SUBJECT TO CHANGE DURING CONSTRUCTION PHASE: PPD / TB RISK ASSESSMENT COMPLETED: NON-PATIENT CARE AREA NO TB SCREENING:

AutoCAD SHX Text

MOST CONSTRUCTION EXPECTED TO OCCUR IN ELECTRICAL AND MECHANICAL ROOMS.

AutoCAD SHX Text OUTAGES FOR ELECTRICAL DEMO AND TIE-INS IS EXPECTED TO EFFECT MANY HOSPITAL UTILITY SYSTEMS.

AutoCAD SHX Text

TRAFFIC FLOW--PATIENTS, VISITORS, STAFF, CONTRACT PERSONNEL

AutoCAD SHX Text

CREATION OR SPREAD OF CONTAMINANTS

AutoCAD SHX Text

RISK ASSESSMENT REQUIRED BASED ON VICINITY OF PATIENT CARE AREAS?: Y

AutoCAD SHX Text GENERAL NOTES 1. INSTALL ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS INSTALL ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING COMPLETED TO PREVENT CONTAMINATION ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING COMPLETED TO PREVENT CONTAMINATION OF DUCT SYSTEM. 3. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL CENTER AT THE END OF EACH WORKDAY. VACUUM SHALL UTILIZE HEPA FILTRATION. MAINTAIN SURROUNDING AREA FREQUENTLY. 4. CONTAIN CONSTRUCTION WASTE, TOOLS, AND MATERIALS BEFORE TRANSPORT IN TIGHTLY COVERED CONTAIN CONSTRUCTION WASTE, TOOLS, AND MATERIALS BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 5. FOR ALL WORK COMPLETED IN CORRIDORS, PROVIDE A TEMPORARY CONSTRUCTION CONTAINMENT FOR ALL WORK COMPLETED IN CORRIDORS, PROVIDE A TEMPORARY CONSTRUCTION CONTAINMENT SYSTEM THAT IS GASKETED AT THE TOP AND BOTTOM TO CREATE AN AIRTIGHT SEAL WHICH MEETS OR EXCEEDS ICRA CLASS IV REQUIREMENTS AND EXCEEDS ASTM E-84 CLASS A STANDARDS FOR FLAME AND SMOKE SPREAD. 6. PROVIDE SUBMITTALS IN ELECTRONIC FORMAT, WITH THE EXCEPTION OF MATERIAL SAMPLES. USE PROVIDE SUBMITTALS IN ELECTRONIC FORMAT, WITH THE EXCEPTION OF MATERIAL SAMPLES. USE PDF AS THE ELECTRONIC FORMAT, UNLESS OTHERWISE SPECIFIED OR DIRECTED BY THE COR. THE SUBMITTAL SHALL BE COMPLETED USING PROCORE CONSTRUCTION SOFTWARE OR AN APPROVED EQUAL. THE CONTRACTOR SHALL PROVIDE THE PLATFORM FOR USE THROUGHOUT THE DURATION OF CONSTRUCTION INCLUDING BUT NOT LIMITED TO LOGIN ACCESS TO THE VA AND A/E.

AutoCAD SHX Text BASE BID NOTE 1. BASE BID INCLUDES ALL CONSTRUCTION ASSOCIATED WITH THE INSTALLATION OF THE NEW BASE BID INCLUDES ALL CONSTRUCTION ASSOCIATED WITH THE INSTALLATION OF THE NEW EMERGENCY DISTRIBUTION SWITCHBOARD, RELOCATING 1HN5 AND CHILLER 2 TO EMERGENCY POWER. THIS INCLUDES, BUT IT NOT LIMITED TO, THE ASSOCIATED ATS, CONTROLS, CONDUIT AND CONDUCTORS. BASE BID ALSO INCLUDES ALL ASSOCIATED WORK WITHIN CONTRACT DOCUMENTS FOR RELOCATION OF EQUIPMENT IN BUILDING 110 AND 110A TO EMERGENCY POWER (SEE CONTRACT DOCUMENTS FOR MORE INFORMATION).

BID DEDUCT NOTES 1. BID DEDUCT 1 INCLUDES ALL ASSOCIATED CONSTRUCTION TO RELOCATE THE SOURCE POWER FOR BID DEDUCT 1 INCLUDES ALL ASSOCIATED CONSTRUCTION TO RELOCATE THE SOURCE POWER FOR CHILLER 3 FROM NORMAL TO EMERGENCY POWER. THIS INCLUDES, BUT IS NOT LIMITED TO THE ASSOCIATED ATS, CONTROLS, CONDUIT, AND CONDUCTORS. 2. BID DEDUCT 2 INCLUDES ALL ASSOCIATED CONSTRUCTION TO RELOCATE THE SOURCE POWER FOR BID DEDUCT 2 INCLUDES ALL ASSOCIATED CONSTRUCTION TO RELOCATE THE SOURCE POWER FOR CHILLER 1 FROM NORMAL TO EMERGENCY POWER. THIS INCLUDES, BUT IS NOT LIMITED TO THE ASSOCIATED ATS, CONTROLS, CONDUIT, AND CONDUCTORS.

CAMPUS SITE PLAN

R.C.N.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

FAX : (570) 253-1935

WWW.NEINFRA.COM

CORRECT FCA HVAC

DEFICIENCIES

590-21-120

05/26/2023 D.L.E.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667VA HAMPTON HEALTHCARE SYSTEM

100% CONSTRUCTION

DOCUMENTS

GI-03

AutoCAD SHX Text

TV

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FRANKLIN BLVD

AutoCAD SHX Text 137C

AutoCAD SHX Text

AutoCAD SHX Text 137C

AutoCAD SHX Text 137D

AutoCAD SHX Text 110C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

148 D-POD

AutoCAD SHX Text

148 S-POD

AutoCAD SHX Text

148 C-POD

AutoCAD SHX Text 173A

AutoCAD SHX Text 137B

AutoCAD SHX Text 137A

AutoCAD SHX Text

AutoCAD SHX Text 146C

AutoCAD SHX Text 138A

AutoCAD SHX Text 146A

AutoCAD SHX Text 146B

AutoCAD SHX Text

AutoCAD SHX Text 148T

AutoCAD SHX Text

148 B-POD

AutoCAD SHX Text

148 A-POD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WOODFIN STREET

AutoCAD SHX Text

KNOX STREET

AutoCAD SHX Text

AVERILL AVENUE

AutoCAD SHX Text

BLACK AVENUE

AutoCAD SHX Text

SHORE ROAD

AutoCAD SHX Text

EMANCIPATION DRIVE

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

MARTIN L. KING JR. BOULEVARD

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

MCCLELALN AVENUE

AutoCAD SHX Text

FRANKLIN BOULEVARD

AutoCAD SHX Text

MARTIN L. KING JR. BOULEVARD

AutoCAD SHX Text

SEWELL AVENUE

AutoCAD SHX Text

THOMPSON STREET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 110A

AutoCAD SHX Text 110B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL PARKING AREA

AutoCAD SHX Text

AVERILL AVENUE

AutoCAD SHX Text

AutoCAD SHX Text 27B

AutoCAD SHX Text 27A

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

JONES CREEK

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HARRIS AVENUE

AutoCAD SHX Text

AutoCAD SHX Text 13W

AutoCAD SHX Text

AVERILL AVENUE

AutoCAD SHX Text

AMES STREET

AutoCAD SHX Text

FRANKLIN BOULEVARD

AutoCAD SHX Text

FRANKLIN BOULEVARD

AutoCAD SHX Text

AutoCAD SHX Text

GEN 110B-OR

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CAMPUS SITE PLAN

AutoCAD SHX Text 1"=100'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GI-03

AutoCAD SHX Text

BLDG #

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

VACANT

AutoCAD SHX Text

AutoCAD SHX Text

ENGINEERING SHOPS

AutoCAD SHX Text

AutoCAD SHX Text

ENGINEERING SHOPS

AutoCAD SHX Text

AutoCAD SHX Text

ENGINEERING SHOPS

AutoCAD SHX Text

AutoCAD SHX Text

ENGINEERING SHOPS

AutoCAD SHX Text

AutoCAD SHX Text

ENGINEERING OFFICES

AutoCAD SHX Text 13W

AutoCAD SHX Text

WOMEN'S CLINIC

AutoCAD SHX Text

AutoCAD SHX Text

OEF/OIF

AutoCAD SHX Text

AutoCAD SHX Text

BOILER PLANT

AutoCAD SHX Text

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

AutoCAD SHX Text

POLICE TRAINING

AutoCAD SHX Text

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text 27A

AutoCAD SHX Text

VACO NETWORK CONTRACTING ACTIVITY

AutoCAD SHX Text 27B

AutoCAD SHX Text

VACO NETWORK CONTRACTING ACTIVITY

AutoCAD SHX Text

AutoCAD SHX Text

MECH SHOP/ CREDIT UNION

AutoCAD SHX Text

AutoCAD SHX Text

CARPENTER SHOP

AutoCAD SHX Text

AutoCAD SHX Text

NATIONAL CHAPLIN TRAINING CENTER

AutoCAD SHX Text

AutoCAD SHX Text

POLICE, FIRE SAFETY, NURSE CALL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

FMS ADMIN; POLICE OPERATIONS

AutoCAD SHX Text

AutoCAD SHX Text

FMS PROJECT SECT/TRANS & SIGN SHOP

AutoCAD SHX Text

AutoCAD SHX Text

IRM; CCHT; IDES; VA STATE VET ASST

AutoCAD SHX Text

AutoCAD SHX Text

CHAPEL

AutoCAD SHX Text

AutoCAD SHX Text

HAS, PATIENT RECORDS

AutoCAD SHX Text

AutoCAD SHX Text

VACANT

AutoCAD SHX Text

AutoCAD SHX Text

HR; HAS; UNIONS; ISO; EMPLOYEE HEALTH

AutoCAD SHX Text

AutoCAD SHX Text

VOLUNTARY SVC; HUDVASH/VRT (INACTIVE)

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE & TRAINING CENTER

AutoCAD SHX Text

AutoCAD SHX Text

BUS STOP

AutoCAD SHX Text

AutoCAD SHX Text

PAINT STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

GAS PUMP & TANK

AutoCAD SHX Text

AutoCAD SHX Text

VACANT (QTRS LAUNDRY)

AutoCAD SHX Text

AutoCAD SHX Text

HOSPITAL; DENTAL; ICU; NUC MED

AutoCAD SHX Text 110A

AutoCAD SHX Text

SPS; PATH & LAB; RADIOLOGY; SURG OR

AutoCAD SHX Text 110B

AutoCAD SHX Text

EMERGENCY DEPT; PRIMARY CARE CLINICS

AutoCAD SHX Text 110C

AutoCAD SHX Text

MRI BUILDING

AutoCAD SHX Text 110D

AutoCAD SHX Text

MECHANICAL ROOM

AutoCAD SHX Text

AutoCAD SHX Text

NATIONAL CHAPLAIN TRAINING CENTER

AutoCAD SHX Text

AutoCAD SHX Text

CHAPLAIN SVC COUNCILING CENTER

AutoCAD SHX Text

AutoCAD SHX Text

NUTRITION AND FOOD SERVICE/DINING HALL

AutoCAD SHX Text

AutoCAD SHX Text

VACANT

AutoCAD SHX Text

AutoCAD SHX Text

CEMETARY WALL

AutoCAD SHX Text

AutoCAD SHX Text

FLAG POLE

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL STORAGE BUILDING

AutoCAD SHX Text

AutoCAD SHX Text

EMERGENCY GENERATOR

AutoCAD SHX Text

AutoCAD SHX Text

CANTEEN STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

EXECUTIVE OFFICES

AutoCAD SHX Text 137A

AutoCAD SHX Text

MH & BS AND SCIENCE ADMIN & CLINICS

AutoCAD SHX Text 137B

AutoCAD SHX Text

PSYCHIATRY WARDS

AutoCAD SHX Text 137C

AutoCAD SHX Text

SCI WARD

AutoCAD SHX Text 137D

AutoCAD SHX Text

SCI DINING

AutoCAD SHX Text

AutoCAD SHX Text

PSYCHIATRY

AutoCAD SHX Text 138A

AutoCAD SHX Text

PSYCHIATRY GROUP MEETINGS

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL DISTRIBUTION BUILDING

AutoCAD SHX Text

AutoCAD SHX Text

GAS METER

AutoCAD SHX Text

AutoCAD SHX Text

OIL TANKS

AutoCAD SHX Text

AutoCAD SHX Text

COOLING TOWER

AutoCAD SHX Text

AutoCAD SHX Text

COOLING TOWER

AutoCAD SHX Text 146A

AutoCAD SHX Text

EXTENDED CARE & REHAB CENTER

AutoCAD SHX Text 146B

AutoCAD SHX Text

EXTENDED CARE & REHAB CENTER

AutoCAD SHX Text 146C

AutoCAD SHX Text

CORRIDOR/MECH/LOADING DOCK

AutoCAD SHX Text

AutoCAD SHX Text

FORMER COOLING TOWER

AutoCAD SHX Text

AutoCAD SHX Text

DOMICILIARY

AutoCAD SHX Text

BLDG #

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text 148T

AutoCAD SHX Text

DOMICILIARY TREATMENT POD

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SUBSTATION 27, 28, 31

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SUBSTATION 48

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SUBSTATION 89, 70, 71, 72

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SUBSTATION 43, 50, 52

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SUBSTATION 66

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SUBSTATION 17, 35, 36, 37, 83

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL SUBSTATION 13, 16, 61

AutoCAD SHX Text

AutoCAD SHX Text

SUN SHELTER

AutoCAD SHX Text

AutoCAD SHX Text

SUN SHELTER

AutoCAD SHX Text

AutoCAD SHX Text

GENERATOR 137

AutoCAD SHX Text

AutoCAD SHX Text

IRM

AutoCAD SHX Text

AutoCAD SHX Text

WATER TOWER

AutoCAD SHX Text

AutoCAD SHX Text

GENERATORS FOR 110, 110A, 114

AutoCAD SHX Text

AutoCAD SHX Text

GENERATORS FOR 110, 110A, 114

AutoCAD SHX Text

AutoCAD SHX Text

OXYGEN TANK

AutoCAD SHX Text

AutoCAD SHX Text

CWT & WHEELCHAIR REPAIR

AutoCAD SHX Text 173A

AutoCAD SHX Text

CWT PRODUCTION

AutoCAD SHX Text

AutoCAD SHX Text

BOAT SHED

AutoCAD SHX Text

AutoCAD SHX Text

HAZARDOUS MATERIAL STORAGE BUILDING

AutoCAD SHX Text

AutoCAD SHX Text

SMOKING SHELTER

AutoCAD SHX Text

AutoCAD SHX Text

SMOKING SHELTER

AutoCAD SHX Text

AutoCAD SHX Text

BUS STOP

AutoCAD SHX Text

AutoCAD SHX Text

BUS STOP

AutoCAD SHX Text

AutoCAD SHX Text

BUS STOP

AutoCAD SHX Text

AutoCAD SHX Text

BUS STOP

AutoCAD SHX Text

AutoCAD SHX Text

BUS STOP

AutoCAD SHX Text

AutoCAD SHX Text

FISHING SHELTER

AutoCAD SHX Text

AutoCAD SHX Text

FISHING SHELTER

AutoCAD SHX Text

AutoCAD SHX Text

FISHING SHELTER

AutoCAD SHX Text

BUILDING LEGEND

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

KEY SYMBOL

AREA OF WORK

CAMPUS SITE ENLARGED PLAN

R.C.N.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

FAX : (570) 253-1935

WWW.NEINFRA.COM

CORRECT FCA HVAC

DEFICIENCIES

590-21-120

05/26/2023 D.L.E.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667VA HAMPTON HEALTHCARE SYSTEM

100% CONSTRUCTION

DOCUMENTS

GI-04

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 110C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 110B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 110A

AutoCAD SHX Text

AutoCAD SHX Text

GEN 110B-OR

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CAMPUS SITE ENLARGED PLAN

AutoCAD SHX Text 1"=30'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GI-04

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

KEY SYMBOL

AREA OF WORK

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

FAX : (570) 253-1935

WWW.NEINFRA.COM

CORRECT FCA HVAC

DEFICIENCIES

590-21-120

05/26/2023 D.L.E.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667VA HAMPTON HEALTHCARE SYSTEM

100% CONSTRUCTION

DOCUMENTS

GC-01

PHASING PLAN 1

N/A

R.C.N.

AutoCAD SHX Text

ELEC. ROOM GC-131

AutoCAD SHX Text

OBSERVATION/ TREATMENT CG-48

AutoCAD SHX Text

PROC. ROOM GD-119

AutoCAD SHX Text

DISASTER STORAGE GD-120

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

CRAWLSPACE (LOWER LEVEL)

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SERVICE MODULE G-CD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text 110C

AutoCAD SHX Text 110B

AutoCAD SHX Text

AutoCAD SHX Text 110A

AutoCAD SHX Text 110D

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text PHASING PLAN THE INTENT OF THE PHASING FOR THIS CONSTRUCTION IS TO MINIMIZE OUTAGE PERIODS. ALL WORK SHALL BE COORDINATED WITH THE VA COR. SHUTDOWNS SHALL BE COORDINATED WITH THE STATION AT A MINIMUM OF 2 WEEKS PRIOR TO REQUESTED TIME. TO MINIMIZE OUTAGE PERIODS ALL INSTALLATIONS TO BE COMPLETED UNDER THIS SCOPE SHALL BE COMPLETED TO THE FULLEST EXTENT PRIOR TO THE SHUT DOWN OF ANY EXISTING EQUIPMENT. ALL CONDUIT AND CONDUCTORS SHALL BE RUN FROM THE NEW DISTRIBUTION SOURCE TO EACH ASSOCIATED ENDPOINT DEVICE/PANELBOARD. ALL ATS'S SHALL BE INSTALLED AND PREPARED FOR CONNECTION PRIOR TO ANY OUTAGES. CONTRACTOR SHALL ENSURE AT THE COMPLETION OF EACH ATS INSTALLATION THE ATS IS INTEGRATED INTO THE EXISTING GENERATOR/ATS CONTROLS SYSTEM. THE ATS UNITS SHALL BE PROGRAMMED TO ENSURE FUNCTIONALITY AND COMPATIBILITY WITHIN THE FACILITY ESSENTIAL EMERGENCY SYSTEM. DEMOLITION OF THE EXISTING NORMAL POWER CONDUCTORS AND CONDUIT SHALL COMMENCE AFTER THE EMERGENCY POWER IS RESTORED TO THE ASSOCIATED ENDPOINT DEVICES/PANELBOARDS. ALL OUTAGES SHALL BE SCHEDULED DURING WEEKEND/OFF-HOURS TO ENSURE MINIMAL INTERRUPTION TO FACILITY OPERATIONS. CONTRACTOR SHALL ENSURE THAT AT THE END OF A PERIOD OF A SCHEDULE OUTAGE, ALL ASSOCIATED EQUIPMENT IS RETURNED TO OPERATIONAL STATUS. CONTRACTOR SHALL VERIFY EQUIPMENT HVAC CONTROLS AND BMS CONNECTIONS ARE RETURNED TO THEIR ORIGINAL FUNCTIONING STATUS AT THE COMPLETION OF CONSTRUCTION. CONTRACTOR SHALL SCHEDULE OUTAGES DURING PERIODS WHERE THE ASSOCIATED MECHANICAL EQUIPMENT IS NOT REQUIRED TO BE IN OPERATION.

AutoCAD SHX Text CONSTRUCTION PHASING HOURS ALL WORK THROUGHOUT MECHANICAL, ELECTRICAL, CRAWLSPACE, AND EXTERIOR (ROOF) AREAS SHALL BE COMPLETED DURING DAYTIME HOURS. ALL WORK THROUGHOUT OPERATIONAL VA FACILITY AREAS (CORRIDORS, PATIENT AREAS, OFFICES, ETC) SHALL BE COMPLETED DURING NIGHT/WEEKEND HOURS TO MINIMIZE THE IMPACT TO OPERATIONS. DAYTIME HOURS: 8:00 AM TO 5:00 PM NIGHT HOURS: 5:00 PM TO 8:00 AM WEEKEND HOURS: 5:00 PM FRIDAY TO 8:00 AM MONDAY CONTRACTOR SHALL SUBMIT A DETAILED PHASING SCHEDULE TO THE VA COR AND A/E FOR REVIEW INCLUDING PERIOD OF PERFORMANCE AND ASSOCIATED AREAS. OUTAGES SHALL BE COORDINATED WITH THE VA COR AND SCHEDULED DURING WEEKEND HOURS TO MINIMIZE IMPACT TO FACILITY OPERATIONS. NO WORK IS PERMITTED ON WEEKENDS AND HOLIDAYS WITHOUT VA NOTIFICATION TO MINIMIZE DISRUPTION TO STAFF.

AutoCAD SHX Text BUILDING 110D SCHEDULING ALL WORK SHALL BE COORDINATED WITH THE VA COR. ALL OUTAGES FOR ASSOCIATED CHILLERS AND PANELBOARDS WITHIN BUILDING 110D SHALL BE COORDINATED TO OCCUR DURING THE SAME PERIOD OF TYPICAL SCHEDULED MAINTENANCE TO THE ASSOCIATED EQUIPMENT (UNLESS OTHERWISE DIRECTED BY THE VA COR). ALL WORK SHALL BE SCHEDULED TO MINIMIZE ANY DISRUPTION TO OPERATIONS. CONTRACTOR SHALL UTILIZE ANY PERIODS OF SCHEDULED OUTAGES AS DIRECTED BY THE VA COR.

AutoCAD SHX Text

PHASING NOTES

AutoCAD SHX Text INSTALL ASSOCIATED EQUIPMENT PRIOR TO ANY SCHEDULED OUTAGES. ALL EQUIPMENT, CONDUIT, AND ASSOCIATED CONDUCTORS SHALL BE INSTALLED AND PREPARED FOR OPERATION TO THE FULLEST EXTENT PRIOR TO ANY SCHEDULED SHUT DOWNS. CONTRACTOR SHALL PROVIDE EXCESS CONDUCTOR LENGTH TO ENSURE ABILITY TO TERMINATE CONNECTION AT THE APPROPRIATE ENDPOINT DEVICE/POINT OF CONNECTION DURING INSTALLATION.

AutoCAD SHX Text

INSPECT INSTALLED EQUIPMENT/CONNECTIONS AND PREPARE FOR OPERATION.

AutoCAD SHX Text ALL EXISTING CONDUIT AND CONDUCTORS SHALL BE PARTIALLY DEMOLISHED TO THE NEW POINT OF CONNECTION.

AutoCAD SHX Text CONNECTIONS SHALL BE TERMINATED AT ASSOCIATED ENDPOINT DEVICE AND ENDPOINT DEVICE SHALL BE RETURNED TO OPERATIONAL STATUS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR &

AutoCAD SHX Text

CRAWLSPACE NEW WORK PHASING PLAN

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-01

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

1/GC-01 KEYED EQUIPMENT

AutoCAD SHX Text

PANELBOARD OEDP1, 480/277V (ETR)

AutoCAD SHX Text

SWBD-2, 480/277V (ETR)

AutoCAD SHX Text

SWBD-1, 480/277V (ETR)

AutoCAD SHX Text

ATS OLS (225A) (ETR)

AutoCAD SHX Text

ATS OCR (600A) (ETR)

AutoCAD SHX Text

ATS-OEQ (800A) (ETR)

AutoCAD SHX Text

SQ D LOGIC CONTROL PANEL (ETR)

AutoCAD SHX Text

ATS-CH-3 (600A)

AutoCAD SHX Text

ATS-CH-2-1 (600A)

AutoCAD SHX Text

ATS-CH-2-2 (600A)

AutoCAD SHX Text

ATS-CH-1 (800A)

AutoCAD SHX Text

ATS-1NH5 (800A)

AutoCAD SHX Text

EM DIST SWBD (2500A)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1/GC-01 KEYED NOTES

AutoCAD SHX Text

ASSOCIATED TAP CONNECTION SHALL BE LOCATED IN CRAWLSPACE.

AutoCAD SHX Text EXISTING CONDUIT AND CONDUCTORS CONTINUE TO ASSOCIATED ENDPOINT DEVICES CHILLER CH-1 & CHILLER CH-2 (FEED 1)

AutoCAD SHX Text EXISTING CONDUIT AND C0NDUCTORS CONTINUE TO ASSOCIATED ENDPOINT DEVICES CHILLER CH-2 (FEED 2), CHILLER CH-3, & PANELBOARD 1HN5.

AutoCAD SHX Text

ASSOCIATED AREA IS LOCATED IN CRAWLSPACE BELOW GROUND FLOOR.

AutoCAD SHX Text EXISTING CONDUIT AND CONDUCTORS CONTINUE TO GENERATOR GEN-110B-OR. SEE SITE PLAN GI-04.

AutoCAD SHX Text PROVIDE CONDUIT AND CONDUCTORS TO ASSOCIATED ATS. SEE ASSOCIATED ONE-LINE FOR ALL CONNECTIONS AND SIZING.

AutoCAD SHX Text PROVIDE CONDUIT AND CONDUCTORS TO ASSOCIATED SWITCHBOARD. SEE ASSOCIATED ONE-LINE FOR ALL CONNECTIONS AND SIZING.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CH-3 600A

AutoCAD SHX Text

CH-3

AutoCAD SHX Text

AutoCAD SHX Text

VFD

AutoCAD SHX Text

CH-2 (FEED 2) 600A

AutoCAD SHX Text

CH-2 (FEED 2)

AutoCAD SHX Text

AutoCAD SHX Text

VFD

AutoCAD SHX Text

110D-1HN5 1200AF/800AT

AutoCAD SHX Text

MCB 2000A

AutoCAD SHX Text

ATS-0EQ 800A

AutoCAD SHX Text

BUILDING 110A 4TH FLOOR ROOM C409

AutoCAD SHX Text

BUILDING 110A 4TH FLOOR ROOM C409

AutoCAD SHX Text

BUILDING 110A 4TH FLOOR ROOM C409

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR ROOM GC-131

AutoCAD SHX Text

ATS-OEQ 800A

AutoCAD SHX Text

EXISTING SWBD-2 480/277V 1200A 3ɸ 4W

AutoCAD SHX Text

TO XFMR4-110B-2

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR ROOM GC-131

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR ROOM GC-131

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDINGS 110B & 110D

AutoCAD SHX Text

PARTIAL PHASING DEMOLITION ONE-LINE DIAGRAM

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

GC-01

AutoCAD SHX Text

EXISTING SWBD-1 480/277V 1200A 3ɸ 4W

AutoCAD SHX Text

CH-1 800A

AutoCAD SHX Text

MCB 2000A

AutoCAD SHX Text

CH-1

AutoCAD SHX Text M

AutoCAD SHX Text

VFD

AutoCAD SHX Text

ATS-OLS 600AF/225AT

AutoCAD SHX Text

CH-2 (FEED 1) 600A

AutoCAD SHX Text

CH-2 (FEED 1)

AutoCAD SHX Text

AutoCAD SHX Text

VFD

AutoCAD SHX Text

ATS-OCR 600AF/500AT

AutoCAD SHX Text

TO XFMR4-110B-1

AutoCAD SHX Text G

AutoCAD SHX Text

GEN-110B-OR 900KW 480V

AutoCAD SHX Text

EXISTING PANELBOARD OEDP1 480/277V 1200A 3ɸ 4W

AutoCAD SHX Text

MCB 2500AF/1200AT

AutoCAD SHX Text

ATS-OCR 800AF/500AT

AutoCAD SHX Text

ATS-OCR 600A

AutoCAD SHX Text

ATS-OEQ 800A

AutoCAD SHX Text

EXISTING OCRH1 800A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

EXISTING OEQH1 800A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

ATS-OLS 250AF/225AT

AutoCAD SHX Text

ATS-OLS 225A

AutoCAD SHX Text

EXISTING OLSH1 225A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

EXISTING SWBD-2 480/277V 1200A 3ɸ 4W

AutoCAD SHX Text

MCB 2000AF/2000AT

AutoCAD SHX Text

ATS-OCR 600AF/500AT

AutoCAD SHX Text

MCC-2 600AF/400AT

AutoCAD SHX Text

CH-2-1 600A

AutoCAD SHX Text

CH-2 (FEED 1)

AutoCAD SHX Text

AutoCAD SHX Text

VFD

AutoCAD SHX Text

110B-1HN5 600A

AutoCAD SHX Text G

AutoCAD SHX Text

GEN-110B-OR 900KW 480V

AutoCAD SHX Text

EM DIST SWBD (NEW) 480/277V 2500A 3ɸ 4W

AutoCAD SHX Text

MCB 1200AT/2500AF

AutoCAD SHX Text

ATS-OCR 800AF/500AT

AutoCAD SHX Text

ATS-OCR 600A

AutoCAD SHX Text

ATS-OEQ 800A

AutoCAD SHX Text

ATS-OEQ 800A

AutoCAD SHX Text

EXISTING OCRH1 800A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

EXISTING OEQH1 800A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

ATS-OLS 250AF/225AT

AutoCAD SHX Text

ATS-OLS 225A

AutoCAD SHX Text

EXISTING OLSH1 225A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

ATS-1HN5 600A

AutoCAD SHX Text

ATS-1HN5 1200AF/800AT

AutoCAD SHX Text

ATS-CH-2-1 600A

AutoCAD SHX Text

ATS-CH-2-1 600A

AutoCAD SHX Text

CH-3

AutoCAD SHX Text

AutoCAD SHX Text

VFD

AutoCAD SHX Text

ATS-CH-3 600A

AutoCAD SHX Text

ATS-CH-3 600A

AutoCAD SHX Text

ATS-CH-2-2 600A

AutoCAD SHX Text

CH-3 600A

AutoCAD SHX Text

CH-2 (FEED 2)

AutoCAD SHX Text

AutoCAD SHX Text

VFD

AutoCAD SHX Text

ATS-CH-2-2 600A

AutoCAD SHX Text

CH-2-2 600A

AutoCAD SHX Text

BUILDING 110A 4TH FLOOR ROOM C409

AutoCAD SHX Text

BUILDING 110A 4TH FLOOR ROOM C409

AutoCAD SHX Text

BUILDING 110A 4TH FLOOR ROOM C409

AutoCAD SHX Text

TO XFM4-110B-1

AutoCAD SHX Text

CH-1 800A

AutoCAD SHX Text

CH-1

AutoCAD SHX Text M

AutoCAD SHX Text

VFD

AutoCAD SHX Text

ATS-CH-1 800A

AutoCAD SHX Text

ATS-1HN5 800A

AutoCAD SHX Text

ATS-CH-1 800A

AutoCAD SHX Text

ATS-OEQ 800AF/800AT

AutoCAD SHX Text

MCB 2000AF/2000AT

AutoCAD SHX Text

TO XFM4-110B-2

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR ROOM GC-131

AutoCAD SHX Text

EXISTING SWBD-1 480/277V 1200A 3ɸ 4W

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR ROOM GC-131

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR ROOM GC-131

AutoCAD SHX Text

EXISTING PANELBOARD OEDP1 480/277V

AutoCAD SHX Text

BUILDING 110B GROUND FLOOR ROOM GC-131

AutoCAD SHX Text

OEDP1 1200A

AutoCAD SHX Text

1200A MCB

AutoCAD SHX Text

GENERAL NOTE

AutoCAD SHX Text 1.

AutoCAD SHX Text SEE ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS SHEET E-001 FOR ONE-LINE SYMBOLS.

AutoCAD SHX Text

CHILLER INSTALLATION SEQUENCE

AutoCAD SHX Text CHILLER OUTAGES SHALL BE SCHEDULED IN THE FOLLOWING ORDER TO RETAIN FACILITY OPERATIONS THROUGOUT THE DURATION OF CONSTRUCTION. ALL OUTAGES SHALL BE COORDINATED WITH VA COR. CONTRACTOR SHALL SUBMIT A SCHEDULE AND OUTAGE REQUEST TO THE VA COR FOR APPROVAL.

AutoCAD SHX Text 1.

AutoCAD SHX Text CHILLER 1 AND 3 SHALL BE TAKEN OUT OF OPERATION. INSTALLATION OF CHILLER 1 AND 3 ATS'S, ASSOCIATED CONDUIT, AND CONDUCTORS SHALL BE COMPLETED. CHILLER 1 AND 3 SHALL BE BROUGHT BACK TO OPERATION UPON COMPLETION OF INSTALLATION. AT THIS TIME CHILLER 2 SHALL BE UTILIZED TO MAINTAIN OPERATIONS THROUGHOUT THE FACILITY DURING CONSTRUCTION.

AutoCAD SHX Text 2.

AutoCAD SHX Text CHILLER 2 SHALL BE TAKEN OUT OF OPERATION. INSTALLATION OF CHILLER 2 ATS'S, ASSOCIATED CONDUIT, AND CONDUCTORS SHALL BE COMPLETED. CHILLER 2 SHALL BE BROUGHT BACK TO OPERATION UPON COMPLETION OF INSTALLATION. AT THIS TIME CHILLERS 1 AND 3 SHALL BE UTILIZED TO MAINTAIN OPERATIONS THROUGHOUT THE FACILITY DURING CONSTRUCTION.

AutoCAD SHX Text 3.

AutoCAD SHX Text CHILLER ATS PROGRAMMING AND SEQUENCE OF OPERATIONS SHALL BE COORDINATE WITH THE VA COR.

AutoCAD SHX Text

BUILDING 110D GROUND FLOOR GENERATOR ROOM

AutoCAD SHX Text

EXISTING 1HN5 800A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

BUILDING 110D GROUND FLOOR GENERATOR ROOM

AutoCAD SHX Text

EXISTING 1HN5 800A MBC 480/277V 3ɸ 4W

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDINGS 110B & 110D

AutoCAD SHX Text

PARTIAL PHASING NEW WORK ONE-LINE DIAGRAM

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

GC-01

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 110B

AutoCAD SHX Text

GROUND FLOOR KEY PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text 1/128"=1'-0"

ATS-OLS 600AF/225AT

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

FAX : (570) 253-1935

WWW.NEINFRA.COM

CORRECT FCA HVAC

DEFICIENCIES

590-21-120

05/26/2023 D.L.E.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667VA HAMPTON HEALTHCARE SYSTEM

100% CONSTRUCTION

DOCUMENTS

GC-02

PHASING PLAN 2

N/A

R.C.N.

AutoCAD SHX Text

MECH ROOM "OFFICE" CG-03

AutoCAD SHX Text

CORR. CSC-2

AutoCAD SHX Text

CG-46

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

COMM CLOSET B310

AutoCAD SHX Text

CHASE B310A

AutoCAD SHX Text

NURSE MGR B309

AutoCAD SHX Text 110C

AutoCAD SHX Text 110B

AutoCAD SHX Text

AutoCAD SHX Text 110A

AutoCAD SHX Text 110D

AutoCAD SHX Text

AutoCAD SHX Text 110A

AutoCAD SHX Text 110B

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text CONSTRUCTION PHASING HOURS ALL WORK THROUGHOUT MECHANICAL, ELECTRICAL, AND EXTERIOR (ROOF) AREAS SHALL BE COMPLETED DURING DAYTIME HOURS. ALL WORK THROUGHOUT OPERATIONAL VA FACILITY AREAS (CORRIDORS, PATIENT AREAS, OFFICES, ETC) SHALL BE COMPLETED DURING NIGHT/WEEKEND HOURS TO MINIMIZE THE IMPACT TO OPERATIONS. DAYTIME HOURS: 8:00 AM TO 5:00 PM NIGHT HOURS: 5:00 PM TO 8:00 AM WEEKEND HOURS: 5:00 PM FRIDAY TO 8:00 AM MONDAY CONTRACTOR SHALL SUBMIT A DETAILED PHASING SCHEDULE TO THE VA COR AND A/E FOR REVIEW INCLUDING PERIOD OF PERFORMANCE AND ASSOCIATED AREAS. OUTAGES SHALL BE COORDINATED WITH THE VA COR AND SCHEDULED DURING WEEKEND HOURS TO MINIMIZE IMPACT TO FACILITY OPERATIONS. NO WORK ON WEEKENDS AND HOLIDAYS WITHOUT VA NOTIFICATION TO MINIMIZE DISRUPTION TO STAFF.

AutoCAD SHX Text

TO EXISTING

AutoCAD SHX Text

MCB 2000A

AutoCAD SHX Text

NH3A 400A

AutoCAD SHX Text

EXISTING SWBD-MDP1 480/277V 2000A 3ɸ 4W

AutoCAD SHX Text

BUILDING 110 GROUND FLOOR MECH ROOM CG-03

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text

ATS-110-ED 1000A

AutoCAD SHX Text

DISC-ATS-ED 1000A

AutoCAD SHX Text G

AutoCAD SHX Text

171-GEN-110 1200AF/1000AT

AutoCAD SHX Text

GEN-171-110 750KW 480V

AutoCAD SHX Text

EXISTING SWBD ED 480/277V 1000A 3ɸ 4W

AutoCAD SHX Text

MCB 1200AF/1000AT

AutoCAD SHX Text

EMCCP 800AF/500AT

AutoCAD SHX Text

BLADC-SUMP 80A

AutoCAD SHX Text

TO EXISTING

AutoCAD SHX Text

NH3A 400A

AutoCAD SHX Text

BUILDING 110A GROUND FLOOR ROOM CG-46

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 110A (PANELBOARD NH3A)

AutoCAD SHX Text

PARTIAL PHASING DEMOLITION ONE-LINE DIAGRAM

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

GC-02

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDINGS 110 & 110A (PANELBOARD NH3A)

AutoCAD SHX Text

PARTIAL PHASING NEW WORK ONE-LINE DIAGRAM

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

GC-02

AutoCAD SHX Text

KEYED EQUIPMENT

AutoCAD SHX Text

PANELBOARD NH3A, 480/277V (ETR)

AutoCAD SHX Text

SWBD-MDP1, 480/277V (ETR)

AutoCAD SHX Text

SWBD ED, 480/277V (ETR)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTE

AutoCAD SHX Text 1.

AutoCAD SHX Text SEE ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS SHEET E-001 FOR ONE-LINE SYMBOLS.

AutoCAD SHX Text

EXISTING NH3A 400A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

BUILDING 110 3RD FLOOR COMM CLOSET B310

AutoCAD SHX Text

EXISTING NH3A 400A MCB 480/277V 3ɸ 4W

AutoCAD SHX Text

BUILDING 110 3RD FLOOR COMM CLOSET B310

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 110 & 110A GROUND FLOOR

AutoCAD SHX Text

ROOMS CG-03 AND CG-46 PHASING PLAN

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-02

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

EDP1 400AF/300AT

AutoCAD SHX Text PHASING PLAN THE INTENT OF THE PHASING FOR THIS CONSTRUCTION IS TO MINIMIZE OUTAGE PERIODS. ALL WORK SHALL BE COORDINATED WITH THE VA COR. SHUTDOWNS SHALL BE COORDINATED WITH THE STATION AT A MINIMUM OF 2 WEEKS PRIOR TO REQUESTED TIME. TO MINIMIZE OUTAGE PERIODS ALL INSTALLATIONS TO BE COMPLETED UNDER THIS SCOPE SHALL BE COMPLETED TO THE FULLEST EXTENT PRIOR TO THE SHUT DOWN OF ANY EXISTING EQUIPMENT. ALL CONDUIT AND CONDUCTORS SHALL BE RUN FROM THE NEW DISTRIBUTION SOURCE TO EACH ASSOCIATED ENDPOINT DEVICE/ PANELBOARD. ALL ATS'S SHALL BE INSTALLED AND PREPARED FOR CONNECTION PRIOR TO ANY OUTAGES. DEMOLITION OF THE EXISTING NORMAL POWER CONDUCTORS AND CONDUIT SHALL COMMENCE AFTER THE EMERGENCY POWER IS RESTORED TO THE ASSOCIATED ENDPOINT DEVICES/PANELBOARDS. ALL OUTAGES SHALL BE SCHEDULED DURING WEEKEND/OFF-HOURS TO ENSURE MINIMAL INTERRUPTION TO FACILITY OPERATIONS. CONTRACTOR SHALL ENSURE THAT AT THE END OF A PERIOD OF A SCHEDULE OUTAGE, ALL ASSOCIATED EQUIPMENT IS RETURNED TO OPERATIONAL STATUS. CONTRACTOR SHALL SCHEDULE OUTAGES DURING PERIODS WHERE THE MECHANICAL EQUIPMENT IS NOT REQUIRED TO BE IN OPERATION.

AutoCAD SHX Text

PHASING NOTES

AutoCAD SHX Text INSTALL ASSOCIATED EQUIPMENT PRIOR TO ANY SCHEDULED OUTAGES. ALL EQUIPMENT, CONDUIT, AND ASSOCIATED CONDUCTORS SHALL BE INSTALLED AND PREPARED FOR OPERATION TO THE FULLEST EXTENT PRIOR TO ANY SCHEDULED SHUT DOWNS. CONTRACTOR SHALL PROVIDE EXCESS CONDUCTOR LENGTH TO ENSURE ABILITY TO TERMINATE CONNECTION AT THE APPROPRIATE ENDPOINT DEVICE/POINT OF CONNECTION DURING INSTALLATION.

AutoCAD SHX Text

INSPECT INSTALLED EQUIPMENT/CONNECTIONS AND PREPARE FOR OPERATION.

AutoCAD SHX Text ALL EXISTING CONDUIT AND CONDUCTORS SHALL BE PARTIALLY DEMOLISHED TO THE NEW POINT OF CONNECTION.

AutoCAD SHX Text CONNECTIONS SHALL BE TERMINATED AT ASSOCIATED ENDPOINT DEVICE AND ENDPOINT DEVICE SHALL BE RETURNED TO OPERATIONAL STATUS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 110 THIRD FLOOR

AutoCAD SHX Text

ROOM B310 PHASING PLAN

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-02

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text 1/128"=1'-0"

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 110 & 110A

AutoCAD SHX Text

GROUND FLOOR KEY PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 110

AutoCAD SHX Text

THIRD FLOOR KEY PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

1/128"=1'-0"

ICRA GENERAL REQUIREMENTS

R.C.N.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

FAX : (570) 253-1935

WWW.NEINFRA.COM

CORRECT FCA HVAC

DEFICIENCIES

590-21-120

05/26/2023 D.L.E.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667VA HAMPTON HEALTHCARE SYSTEM

100% CONSTRUCTION

DOCUMENTS

ICRA-01

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

ICRA GENERAL REQUIREMENTS

AutoCAD SHX Text

1. CONTRACTOR TO COMPLY WITH ICRA REQUIREMENTS FOR WORK IN HOSPITAL BUILDING THROUGH-OUT CONTRACTOR TO COMPLY WITH ICRA REQUIREMENTS FOR WORK IN HOSPITAL BUILDING THROUGH-OUT DEMOLITION AND CONSTRUCTION PERIOD. 2. PROVIDE TEMPORARY PLASTIC ZIPPER PARTITIONS FROM FLOOR TO UNDERSIDE OF DECK ABOVE TO SEAL PROVIDE TEMPORARY PLASTIC ZIPPER PARTITIONS FROM FLOOR TO UNDERSIDE OF DECK ABOVE TO SEAL AGAINST THE MIGRATION OF DUST AND DIRT ALONG ALL PATHS OF TRAVEL BETWEEN AREA OF WORK AND ADJACENT OCCUPIED AREAS. 3. PROVIDE PARTITIONS, AS REQUIRED ALONG THE PERIMETER BETWEEN AREA OF WORK AND EXISTING AREA TO PROVIDE PARTITIONS, AS REQUIRED ALONG THE PERIMETER BETWEEN AREA OF WORK AND EXISTING AREA TO REMAIN. PARTITIONS TO BE FROM FLOOR TO UNDERSIDE OF DECK ABOVE AND SEALED ALONG PERIMETER TO PREVENT MIGRATION OF DUST AND DIRT, WHERE TEMPORARILY NOT INSTALLED. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN AREA OF WORK FOR DURATION OF DEMOLITION AND CONSTRUCTION MAINTAIN NEGATIVE AIR PRESSURE WITHIN AREA OF WORK FOR DURATION OF DEMOLITION AND CONSTRUCTION ACTIVITIES. 5. BUILDING WILL BE CONTINUOUSLY OCCUPIED DURING CONSTRUCTION DURATION. MAINTAIN ACCESS TO STAIR BUILDING WILL BE CONTINUOUSLY OCCUPIED DURING CONSTRUCTION DURATION. MAINTAIN ACCESS TO STAIR EXITS AND FROM EXITS TO EXTERIOR. 6. PROVIDE STICKY WALK OFF MATS ON BOTH SIDES OF ALL DOORS AND REPLACE DAILY. PROVIDE STICKY WALK OFF MATS ON BOTH SIDES OF ALL DOORS AND REPLACE DAILY. 7. ALL FLOOR OR UNDERSIDE OF DECK HOLES EXPOSED OR CREATED DURING DEMOLITION/CONSTRUCTION WILL ALL FLOOR OR UNDERSIDE OF DECK HOLES EXPOSED OR CREATED DURING DEMOLITION/CONSTRUCTION WILL BE SEALED IMMEDIATELY. 8. AS THE PERIMETER FLOOR EDGE IS EXPOSED, ANY OPENING AT THE SLAB EXTERIOR WALL SHALL BE SEALED AS THE PERIMETER FLOOR EDGE IS EXPOSED, ANY OPENING AT THE SLAB EXTERIOR WALL SHALL BE SEALED IMMEDIATELY. 9. PROVIDE SWEEPS AND VERTICAL ASTRAGALS ON ALL ICRA DOORS AND STAIR TOWER DOORS. PROVIDE SWEEPS AND VERTICAL ASTRAGALS ON ALL ICRA DOORS AND STAIR TOWER DOORS. 10. EXISTING SMOKE DETECTORS WILL BE CONVERTED TO HEAT DETECTORS AND MAINTAINED DURING EXISTING SMOKE DETECTORS WILL BE CONVERTED TO HEAT DETECTORS AND MAINTAINED DURING CONSTRUCTION PERIOD. 11. MAINTAIN EGRESS TO ALL EXIT STAIR TOWERS AT ALL TIMES. MAINTAIN EGRESS TO ALL EXIT STAIR TOWERS AT ALL TIMES. 12. COORDINATE WITH COR ANY MEP SHUTDOWNS THAT MAY BE REQUIRED. COORDINATE WITH COR ANY MEP SHUTDOWNS THAT MAY BE REQUIRED. 13. TEMPORARY CONTAINMENT MEASURES PROVIDED MUST MEET HOSPITAL ICRA REQUIREMENTS. CONTRACTOR TEMPORARY CONTAINMENT MEASURES PROVIDED MUST MEET HOSPITAL ICRA REQUIREMENTS. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL TEMPORARY CONTAINMENT MEASURES FOR EACH CLASS AND AREA. APPROVAL MUST BE OBTAINED BEFORE ANY WORK CAN BEGIN.

AutoCAD SHX Text

INFECTION CONTROL RISK GROUPS

AutoCAD SHX Text

BUILDING: HAMPTON VAMC HAMPTON VAMC CONTRACTOR: TBD

AutoCAD SHX Text

SEE ABOVE

AutoCAD SHX Text PROJECT NAME: HAMPTON VAMC, CORRECT FCA HVAC DEFICIENCIES PROJECT MANAGER: DENNIS AYLING JR.DENNIS AYLING JR.

AutoCAD SHX Text

SEE ABOVE

AutoCAD SHX Text

SEE ABOVE

AutoCAD SHX Text USE THE DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS TO DETERMINE THE ICRA MEASURES TO BE IMPLEMENTED FOR THE DURATION OF CONSTRUCTION: CLASS I CLASS II CLASS III CLASS IV

AutoCAD SHX Text

SEE ABOVE

AutoCAD SHX Text THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .