Attachment F_Base Proposal Breakdown Form.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- J045--Correct FCA Deficiencies in HVAC Systems Federal contract opportunity
- Solicitation number
- 36C24624R0020
About this file
This document is a cost breakdown template for a base proposal to correct FCA deficiencies in HVAC systems at the Hampton VAMC under solicitation number 36C24624R0020 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The template requires the offeror to provide labor and material costs by construction division, along with overhead, profit and bond percentages to be applied to the total division costs. However, all cost entries in the sample template are currently blank, indicating it is to be filled out by an offeror in response to the solicitation. The solicitation seeks to address corrective actions from a Federal Compliance Assessment of deficiencies in heating, ventilation, and air conditioning systems at the Hampton Veterans Affairs Medical Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24624R0020 0005.docx | DOCX document | |
| 36C24624R0020 0004.pdf | ||
| 590-21-120 - HVAMC - 100_ CD FINAL REV1 - Drawings.pdf | ||
| 36C24624R0020 0003.docx | DOCX document | |
| 36C24624R0020 0002.docx | DOCX document | |
| Panel OEQH1.pdf | ||
| 36C24624R0020 0001.docx | DOCX document | |
| Panel OEQL2.pdf | ||
| Drawings.pdf | ||
| Specifications.pdf | ||
| Attachment B_Corp Experience Form.pdf | ||
| Attachment C_Past Performance Questionnaire.pdf | ||
| Wage Determination.pdf | ||
| 36C24624R0020_1.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number: 590-21-120 Edward L Roy: VA assigned project #
| Date: | |
| Project Title | Correct FCA Deficiencies in HVAC Systems |
Edward L Roy: VA assigned Project Title
Edward L Roy: Date Offer Prepared/Submitted
| Project Location | Hampton VAMC | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Openings (Not Used) | - 0 | - 0 | - 0 |
| Division 9 | Finishes (Not Used) | - 0 | - 0 | - 0 |
| Division 10 | Specialties (Not Used) | - 0 | - 0 | - 0 |
| Division 11 | Equipment (Not Used) | - 0 | - 0 | - 0 |
| Division 12 | Furnishings (Not Used) | - 0 | - 0 | - 0 |
| Division 13 | Special Construction (Not Used) | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment (Not Used) | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression (Not Used) | - 0 | - 0 | - 0 |
| Division 22 | Plumbing (Not Used) | - 0 | - 0 | - 0 |
| Division 23 | HVAC (Not Used) | - 0 | - 0 | - 0 |
| Division 25 | Integrated Automation (Not Used) | |||
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security (Not Used) | - 0 | - 0 | - 0 |
| Division 31 | Earthwork (Not Used) | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements (Not Used) | - 0 | - 0 | - 0 |
| Division 33 | Utilities (Not Used) | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal (Not Used) | - 0 | - 0 | - 0 |
| Division 48 | Electical Power Generation (Not Used) | |||
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
| Overhead % | 0.00% | ||
| Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36). | - 0 | ||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
Edward L Roy: Enter all Material Costs by Division
| Edward L Roy: This Column is the sum of the Division's Labor and Material Costs | - 0 | |
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .