About this file
This is a solicitation for a design-build project to upgrade the radiation therapy tomotherapy at the Veterans Affairs Pittsburgh Healthcare System University Drive campus. The VA intends to award a firm-fixed-price contract to a single offeror as the best value to the government based on evaluation factors and price. The project involves upgrading the existing radiation therapy equipment and related infrastructure with a budget of approximately $5 million. Phase I of the solicitation involves submitting qualifications for the design portion, with selected offerors advancing to Phase II for proposals including price. Phase II submissions are due within 30 days of notification, with award anticipated within 90 days thereafter. At least 50% of the work is reserved for service-disabled veteran-owned small businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRE AVE
UN
IV
ER
SI
TY
D
RI
VE
A
CENTRE AVE
ROBINSON ST
RO
BI
NS
ON
S T
PROJECT LOCATION
PROJECT LOCATION
PROJECT LOCATION
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
PROJECT LOCATION:
PROJECT TITLE:
BUILDING NUMBER:
ARCHITECT/ENGINEER OF RECORD:
BANCROFT ARCHITECTS + ENGINEERS
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007 T:847.952.9362 F:847.952.9403 www.bancroft-ae.com
CONTRACT NUMBER:
STATION PROJECT NUMBER:
BAE PROJECT NUMBER:
CONSULTANTS:
75% PROGRESS SET - FOR BID
02/10/2020
75% DESIGN DEVELOPMENT REVISED
02/10/2020
COVER SHEET UD Radiation Therapy Tomotherapy Upgrade
Pittsburgh VA Medical Center
MTB LD
646CSI112
GI001
UD Radiation Therapy Tomotherapy Upgrade
646CSI112
36C24419N0862
16-128
Building 1
Building 1
(UD) UNIVERSITY DRIVE DIVISION
PITTSBURGH, PA 15240
75% DESIGN DEVELOPMENT
Pittsburgh VA Medical Center
NOT TO
SCALE
2 VICINITY MAP
NOT TO
SCALE
1 REGIONAL PLAN
NOT TO
SCALE
3 CAMPUS MAP
330 SOUTH NAPERVILLE RD.
SUITE 300
WHEATON, IL 60187
P: 630-653-9060 www.jma-eng.com
550 NORTH REO STREET
SUITE 203
TAMPA, FL 33609
P: 813-289-4700 www.mesgroupinc.com
STRUCTURAL ENGINEER OF RECORD
JOHNSON WILBUR ADAMS
MEP ENGINEER OF RECORD
MES GROUP
DRAWING INDEX
SHEET NUMBER SHEET TITLE 35% 50% 75%
00-GENERAL
GI001 COVER SHEET • • •
GI002 GENERAL NOTES, SAFETY NOTES, BOD COMPLIANCE • • •
GI003 INFECTION CONTROL NOTES • • •
GI004 INFECTION CONTROL PLANS AND DETAILS • •
GI005 LOGISTICS/PHASING PLAN • • •
GI006 LIFE SAFETY PLAN, CODE AND BUILDING INFORMATION • • •
03-STRUCTURAL
9-S-0 STRUCTURAL GENERAL NOTES • •
9-S-1 STRUCTURAL BASEMENT PLAN • •
9-S-2 STRUCTURAL GROUND FLOOR PLAN • •
9-S-3 STRUCTURAL FOUNDATION SECTIONS • •
9-S-4 STRUCTURAL SECTIONS • •
07-ARCHITECTURAL
A001 ARCHITECTURAL ABBREVIATIONS & SYMBOLS • • •
AD001 BASEMENT DEMOLITION PLAN / CEILING • • •
AD101 GROUND FLOOR DEMOLITION PLAN • • •
AE001 BASEMENT GENERAL ARRANGEMENT PLAN / CEILING • • •
AE101 GROUND FLOOR GENERAL ARRANGEMENT PLAN • • •
AE401 BASEMENT ENLARGED FLOOR PLAN • • •
AE402 BASEMENT ENLARGED CEILING PLAN • • •
AE403 EXISTING SHIELDING OVERLAY •
AE404 INTERIOR ELEVATIONS • • •
AE501 EXTERIOR ELEVATIONS • • •
AE502 SECTIONS • • •
AE503 ARCHITECTURAL - CEILING DETAILS •
AE601 PARTITION SCHEDULE AND DETAILS • • •
AE602 CASEWORK DETAILS • •
10-FIRE PROTECTION
FP100 BASEMENT FLOOR PLAN - FIRE PROTECTION • • •
FP101 BASEMENT FIRE PROTECTION ZONING PLAN • •
11-PLUMBING
P-001 NOTES AND LEGEND - PLUMBING • •
PD-100 BASEMENT DEMOLITION PLAN - PLUMBING • •
P-100 BASEMENT FLOOR PLAN - PLUMBING • •
13-MECHANICAL
M-001 NOTES, LEGEND & SCHEDULES - HVAC • • •
MD100 BASEMENT DEMOLITION PLAN - HVAC • • •
M-100 BASEMENT FLOOR PLAN - HVAC • •
14-ELECTRICAL
E001 NOTES AND LEGEND - ELECTRICAL • • •
ELD100 BASEMENT DEMOLITION PLAN - LIGHTING • • •
EPD100 BASEMENT DEMOLITION PLAN - POWER & SPECIAL SYSTEMS • • •
EL100 BASEMENT PLAN - LIGHTING • •
EP100 BASEMENT PLAN - POWER & SPECIAL SYSTEMS • •
E501 ELECTRICAL RISER •
N
N
N
Revisions: Date:
35% SCHEMATIC DESIGN 11/12/2019
50% DESIGN DEVELOPMENT 12/12/2019
75% DESIGN DEVELOPMENT 01/14/2020
75% DESIGN DEVELOPMENT REVISED 02/10/2020
ACCURAY DESIGN DRAWINGS FOR SUPPLEMENTAL REFERENCE ONLY
SHEET NUMBER SHEET TITLE 35% 50% 75%
15-EQUIPMENT
A-101 ARCHITECTURAL - FLOOR PLAN •
A-102 ARCHITECTURAL - RIGGING PLAN •
A-104 ARCHITECTURAL - INTERIOR ELEVATIONS •
S-101 STRUCTURAL - FLOOR PLAN •
S-301 STRUCTURAL - INTERIOR SECTION •
S-501 STRUCTURAL - PLAN AND SECTION DETAILS •
M-101 MECHANICAL - FLOOR PLAN •
M-501 MECHANICAL - PLAN AND SECTION DETAILS •
E-101 ELECTRICAL - FLOOR PLAN •
E-111 ELECTRICAL - REFLECTED CEILING PLAN •
E-301 ELECTRICAL - INTERIOR SECTIONS •
E-501 ELECTRICAL - PLAN AND SECTION DETAILS •
E-901 ELECTRICAL - INTERIOR PERSPECTIVES •
N-101 NETWORK - FLOOR PLAN •
Q-501 EQUIPMENT - PLAN AND SCHEDULE DETAILS •
Q-901 EQUIPMENT - INTERIOR PERSPECTIVE •
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
75% PROGRESS SET - FOR BID
02/10/2020
GENERAL NOTES, SAFETY
NOTES, BOD COMPLIANCE
UD Radiation Therapy Tomotherapy Upgrade
Pittsburgh VA Medical Center
MTB LD
646CSI112
GI002
Building 1
75% DESIGN DEVELOPMENT
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL PUBLISHED APPLICABLE LOCAL
/ STATE / FEDERAL / NATIONAL CODES, ORDINANCES AND REGULATIONS ALONG WITH ALL
RELATED VA DIRECTIVES, DESIGN GUIDES AND MANUALS, SPECIFICATIONS AND STANDARDS
PLUS ALL VA REQUIREMENTS (FEDERAL AND LOCAL) THAT ARE PROJECT SPECIFIC TO THE
DOCUMENTED SCOPE OF WORK ON THIS SITE.
2. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE AND WORKMAN'S
COMPENSATION INSURANCE AS REQUIRED BY THE VA IN THE BIDDING DOCUMENTATION.
CONTACT THE VA/CO DURING THE BIDDING PHASE WITH ANY QUESTIONS, VERIFICATIONS,
AND DOCUMENTATION NECESSARY CONCERNING ALL REQUIREMENTS FOR PROJECT
INSURANCE COVERAGE.
3. BEFORE SUBMITTING A BID, ALL CONTRACTORS WILL CAREFULLY EXAMINE THE DRAWINGS
AND SPECIFICATIONS SO AS TO BE THOROUGHLY FAMILIAR WITH ALL THE CONTRACT
REQUIREMENTS. EACH BIDDER SHOULD THEN VISIT THE SITE OF THE WORK TO BECOME
ACQUAINTED WITH ALL VISIBLE FIELD CONDITIONS AFFECTING THE CONTRACT, SUCH AS
OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL OTHER CONDITIONS RELATIVE TO
WHAT COULD AFFECT/IMPACT THE WORK OR BE AFFECTED BY THE PERFORMANCE OF THE
WORK.
4. IF AWARDED THE CONTRACT, THE CONTRACTORS SHALL NOT BE ALLOWED ANY EXTRA
COMPENSATION BY REASON OF ANY UNFORESEEN DIFFICULTIES OR OBSTACLES WHICH THE
BIDDER COULD HAVE REASONABLY ANTICIPATED PRIOR TO BIDDING. SHOULD ANY
DISCREPANCIES, ERRORS, CONFLICT OR ITEMS NEEDING CLARIFICATION BE DISCOVERED IN
THE PLANS AND/OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE VA/CO PRIOR TO
SUBMITTING A BID AND THE VA/COR BEFORE STARTING ANY OF THE WORK.
5. CONTRACTORS SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS OF WORK FOR FULLY
DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES AND COORDINATE SAME WITH THE
GENERAL/PRIME CONTRACTOR. SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE ARE
ADVISED THAT INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS IN
OTHER SECTIONS OF THE DRAWINGS AND THE COMPLETE SET OF CONTRACT DOCUMENTS.
6. ALL ENGINEERING SYSTEMS WORK INCLUDED IN THE CONTRACT DRAWINGS SHALL BE
TAKEN IN A SENSE AS A DIAGRAMMATIC REPRESENTATION OF ITS INTENDED PLACEMENT
AND DISTRIBUTION WITHIN THE GENERAL PROXIMITY WHERE SHOWN. THE SIZE AND THE
MEANS OF RUNNING DISTRIBUTION SYSTEMS ARE SHOWN BUT IT IS NOT INTENDED TO SHOW
EVERY CONNECTION, FITTING, OFFSET, SUPPORT ELEMENT, OR EVERY STRUCTURAL
DIFFICULTY THAT CAN BE ENCOUNTERED DURING THE INSTALLATION OF THE WORK.
7. PROJECT LIMIT LINES ARE SHOWN ON THE DRAWINGS FOR ORIENTATION PURPOSES ONLY
AND SHOULD NOT BE CONSTRUED TO INDICATE THE FULL EXTENT OR LIMITS OF THE
AREA(S) OF WORK.
8. EACH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK SHALL FULLY COORDINATE
AND VERIFY WITH ALL OTHER CONTRACTORS, OTHER TRADES AND THE VA/COR
CONCERNING ALL SPACE REQUIREMENTS FOR THIS PROJECT. THE GENERAL/PRIME
CONTRACTOR SHALL BE RESPONSIBLE FOR COMMUNICATING, DOCUMENTING AND
COORDINATING ALL SPACE REQUIREMENTS WITH THE VA/COR TO AVOID CONFLICTS AND
MISCOMMUNICATION.
9. ALL EXISTING BUILDING UTILITIES AND INFRASTRUCTURE SERVICES SYSTEMS THAT FEED
OTHER SPACES OUTSIDE THE DEMISED PROJECT AREA AND THAT ARE LOCATED WITHIN THE
AREA OF WORK, THEREBY INTERFERING WITH THE NEW CONSTRUCTION, SHALL BE
REROUTED AND RELOCATED AS REQUIRED TO MAINTAIN FULL SERVICE TO THE AFFECTED
AREAS.
10. ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION
ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND
DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE
OCCUPIED AREA PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS
SECTION AND COORDINATE ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH
THE VA/COR.
11. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS.
12. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL SHOP
DRAWING REQUIREMENTS WITH ALL OF THE AFFECTED TRADES, THE VA/COR AND WITH THE
AE.
13. OBTAIN ALL REQUIRED VA/COR AUTHORIZATIONS BEFORE BEGINNING ANY DEMOLITION
WORK OR NEW CONSTRUCTION, INCLUDING TEMPORARY BARRICADES AND PROTECTION
WORK.
14. EACH CONTRACTOR SHALL MAINTAIN A COMPETENT OSHA-30 FOREMAN OR EQUALLY
QUALIFIED DIRECT REPRESENTATIVE ON THE JOB SITE AT ALL TIMES.
15. EACH CONTRACTOR SHALL COOPERATE AND COORDINATE WITH THE GENERAL/PRIME
CONTRACTOR’S SUPERINTENDENT AND WITH THE FOREMAN OF ALL OTHER TRADES IN
ORDER THAT THERE BE NO DELAYS IN THE EXECUTION AND COMPLETION OF THE WORK.
16. DURING CONSTRUCTION EACH CONTRACTOR SHALL KEEP ON SITE ACCURATE FIELD
RECORDS OF ALL CONCEALED AND VISUALLY ACCESSIBLE WORK THAT DIFFERS FROM THE
CONTRACT DRAWINGS/DOCUMENTS. THESE AS-BUILT MARKED-UP RECORD
DRAWINGS/DOCUMENTS WILL BE KEPT UP TO DATE BY THE GENERAL/PRIME CONTRACTOR
AND PROVIDED TO THE VA/COR FOR DISTRIBUTION AT THE COMPLETION OF THE PROJECT.
17. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT
EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE
DEMOLITION AND CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS
SHALL BE RESTORED AND REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE VA/COR'S
ACCEPTANCE OF THAT WORK.
18. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING
AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT,
SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY
CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS,
EQUIPMENT, MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF
WORK.
19. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW
CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS
REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.
20. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY
CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPING, CONDUITS OR
OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING OR
PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF THE
INTENDED AREAS AND DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH
INTERFERENCES. COORDINATE WITH AND OBTAIN VA/COR APPROVAL BEFORE PROCEED
WITH ANY SUCH REQUIRED PENETRATIONS WORK.
21. RELOCATIONS OF ANY INFRASTRUCTURE DISTRIBUTION SYSTEMS OR EQUIPMENT, WHICH
MAY ALTER THE ARCHITECTURAL OR STRUCTURAL CONSTRUCTION, MUST BE APPROVED
FIRST BY THE VA/COR PRIOR TO STARTING ITS RELOCATION.
22. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL
CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON A
DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC
LOGISTICAL SEQUENCING REQUIREMENTS.
23. CONTRACTORS TO ENSURE ALL FIRE RESISTIVE RATINGS ARE MAINTAINED PER LOCATIONS
SHOWN ON THE DRAWINGS AND AS DISCOVERED IN THE FIELD. ALL PENETRATIONS ARE TO
BE SEALED BY AN APPROVED UL FIRESTOPPING SYSTEM. SEAL ALL EXISTING
PENETRATIONS EXPOSED DURING CONSTRUCTION AS PER THE APPROVED UL
FIRESTOPPING SYSTEM INSTALLATION REQUIREMENTS. FOLLOW THE MANUFACTURE'S
DESIGN RECOMMENDATIONS FOR THE PROPER FIRE STOPPING MATERIAL TO BE USED IN
EACH SPECIFIC APPLICATION.
24. ALL FIRESTOPS SHALL MATCH THE FIRE RATING OF THE CONSTRUCTION BEING
PENETRATED, SUCH AS WALLS, FLOORS, CEILINGS, PARTITIONS ETC. AND SHALL COMPLY
WITH ALL CODE REQUIREMENTS. USE ONLY A SINGLE (FMRC) APPROVED MANUFACTURERS
LINE OF PRODUCTS FOR ALL PROJECT FIRESTOPPING.
25. THE BASIS OF DESIGN FOR ALL FIRE STOPPING WILL BE PRODUCTS AS MANUFACTURED BY
THE 3M COMPANY.
26. PROVIDE AN HOURLY RATED FIRESTOP AT ALL PENETRATIONS OF RATED CONSTRUCTION
AND/OR ASSEMBLIES, WHETHER NEW OR EXISTING, AND AS A DIRECT RESULT OF THE
PROJECT DEMOLITION WORK OR NEW CONSTRUCTION. WHERE COMBUSTIBLE PENETRANTS
OCCUR USE A FIRE RATED INTUMESCENT MATERIAL AND WHERE NONCOMBUSTIBLE
PENETRANTS OCCUR USE A FIRE RATED ENDOTHERMIC MATERIAL. ALL FIRESTOPPING
WORK MUST BE APPROVED BY THE VA/COR BEFORE CONCEALED BY CONSTRUCTION.
1. ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES
WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR TO AND
DURING THE COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE
SAFETY OF THEIR EMPLOYEES, ALL OTHERS AND ARE TO BE IN CARE
OF THE PROPERTY.
2. EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF
THEIR EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER
WHICH THEY WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE
SAFE AND MEET ALL APPLICABLE REQUIREMENTS OF THE
OCCUPATIONAL SAFETY AND HAZARD ACT, ALONG WITH ALL OTHER
APPLICABLE GOVERNING REGULATIONS AND VA REQUIREMENTS.
3. THE BEGINNING OF WORK ON SITE BY A CONTRACTOR OR
SUBCONTRACTOR SHALL INDICATE HIS/HER SATISFACTION AND FULL
ACCEPTANCE OF THE CURRENT SITE CONDITIONS REGARDING SAFETY
AND THE NECESSARY COMPLIANCE WITH ALL CONTRACT
REQUIREMENTS REGARDING SAME. THE CONTRACTOR ACCEPTS FULL
RESPONSIBILITY FOR ANY ACCIDENTS, INJURIES, AND/OR DAMAGES
INCURRED AS A RESULT OF ANY VISIBLE OR KNOWN UNSAFE
CONDITIONS THAT EXIST.
4. IF UNSATISFIED WITH THE CURRENT SITE SAFETY CONDITIONS AND/OR
THE NECESSARY COMPLIANCE, THE CONTRACTOR OR
SUBCONTRACTOR SHALL INDICATE THE ACTIONS AND/OR DEVICES
NECESSARY TO RENDER THE JOB-SITE SAFE. IF THE WORK OF OTHER
PARTIES, UPON INSPECTION, IS FOUND AT ANY TIME TO BE UNSAFE THE
CONTRACTOR OR SUBCONTRACTOR SHALL IMMEDIATELY STOP ALL
WORK AND NOTIFY THE GENERAL/PRIME CONTRACTOR AND THE
VA/COR. THE SUBMISSION OF A BID FOR ANY PORTION OF WORK
INCLUDED IN THIS CONTRACT SHALL ALSO INDICATE
ACKNOWLEDGMENT AND ACCEPTANCE OF THESE REQUIREMENTS.
SUMMARY DESCRIPTION:
1. THE BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS ARE TO BE
FOLLOWED FOR ALL CONTRACTOR PROPOSED EQUIVALENT
SUBSTITUTIONS OR DEVIATIONS FROM THE BASE
BID/CONSTRUCTION DOCUMENTS.
2. AN EQUIVALENT SUBSTITUTION REPRESENTS ANY DEVIATION FROM
THE CONTRACT DOCUMENTS ORIGINAL DESIGN INTENT, SCOPE OF
WORK REQUIREMENTS, THE DETAILING OR SPECIFICATIONS.
3. NO SUCH EQUIVALENT SUBSTITUTION OR DEVIATION WILL BE
ALLOWED WITHOUT FIRST GOING THROUGH THE BOD COMPLIANCE
PROTOCOLS PROCESS AND OBTAINING VA APPROVAL.
4. ONCE VA APPROVAL OF THE EQUIVALENT SUBSTITUTION OR
DEVIATION REQUEST HAS BEEN OBTAINED, THE FORMAL SHOP
DRAWING PREPARATION AND SUBMITTAL PROCESS MAY BEGIN FOR
THAT WORK.
5. THE FOLLOWING BOD COMPLIANCE PROTOCOLS DEFINE IN DETAIL
THE RESPONSIBILITIES AND THE EVALUATION PROCESS ALONG
WITH THE REQUIREMENTS AND PROCEDURES TO BE FOLLOWED
WHEN REQUESTING VA CONSIDERATION OF ANY PROPOSED
EQUIVALENT SUBSTITUTION OR DEVIATION.
BOD COMPLIANCE PROTOCOLS:
1. THE BOD COMPLIANCE PROTOCOLS APPLY TO ALL MATERIALS,
EQUIPMENT, HARDWARE, FINISHES, CONTROLS, ENGINEERING
SYSTEMS AND THEIR INCLUSIVE PARTS, DETAILED ASSEMBLIES
PLUS ALL RELATED DESIGN ELEMENTS AND SPECIFIED
PARAMETERS THAT ARE CONTAINED WITHIN THE BID/ISSUED FOR
CONSTRUCTION DRAWINGS AND SPECIFICATIONS DOCUMENTATION,
OR AS SPECIFICALLY REFERENCED BY SAME.
2. SPECIFIC DESIGN CHARACTERISTICS REQUIRING BOD COMPLIANCE
ANALYSIS WILL VARY WITH EACH SPECIFIC ITEM BEING PROPOSED
AS AN EQUIVALENT SUBSTITUTION AND WILL NEED TO BE FULLY
COMPARED TO ESTABLISH BOD COMPLIANCE.
3. CRITICAL DESIGN CHARACTERISTICS AND ELEMENTS ARE SPECIFIC
TO EACH ITEM NEEDING CONSIDERATION AND COULD CONSIST OF,
BUT NOT LIMITED TO, CRITERIA SUCH AS DIMENSIONAL LOGISTICS,
PERFORMANCE CHARACTERISTICS, CAPACITY, DUTY
REQUIREMENTS, OPERATIONAL EFFICIENCIES, ACOUSTICAL
REQUIREMENTS, UTILITIES IMPACTS, CONNECTION VARIANCES,
DETAILING DEVIATIONS, FRAMING MODIFICATIONS, ROUGH IN
REQUIREMENTS, WEIGHT INCREASES AND/OR DISTRIBUTIONS,
STRUCTURAL IMPACTS, ATTACHMENTS, SUPPORTS, FINISHES,
AVAILABILITY, COMPATIBILITY, CONSTRUCTABILITY, WARRANTIES,
SERVICE LIFE, MAINTENANCE REQUIREMENTS, ENVIRONMENTAL
CONSIDERATIONS, LEED RELATED DESIGN CONSIDERATIONS, ETC.
4. A VERY CRITICALLY IMPORTANT DESIGN CHARACTERISTIC OF ALL
BOD ITEMS NEEDING TO BE FULLY EVALUATED AND PROPERLY
COORDINATED WOULD BE THE DESIGN AND LAYOUT DIMENSIONAL
LOGISTICS REQUIREMENTS. THOSE CRITICAL PARAMETERS COULD
CONSIST OF, BUT NOT LIMITED TO, ALL DIMENSIONAL ELEMENTS
THAT AFFECT SIZE, HEIGHT, WIDTH, DEPTH, THICKNESS,
PLACEMENT, SPACING, CLEARANCES, ACCESS, MOUNTING,
CONNECTION/LOCATION REQUIREMENTS, INSTALLATION
TOLERANCES, OPERABLE ELEMENT CLEARANCES, ETC., ALL OF
WHICH COULD IMPACT OTHER AREAS OR COMPONENTS OF WORK.
5. CONTRACTORS WILL BE RESPONSIBLE TO FULLY IDENTIFY ALL
PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS, IMPACTS
AND MODIFICATIONS FROM THE "BASIS OF DESIGN" INTENT WITH
THE GENERAL/PRIME CONTRACTOR DURING THE BIDDING PROCESS
AND OBTAIN THEIR APPROVAL BEFORE COMPLETING THEIR PRICING
AND SUBMITTING A BID.
6. IF A PROPOSED EQUIVALENT SUBSTITUTION ITEM WILL REQUIRE
THAT MODIFICATIONS NEED TO BE MADE, TO THE WORK OF THE
PROVIDING CONTRACTOR, THE WORK OF OTHER CONTRACTORS OR
THE WORK OF THE VA, THE SUBMITTING CONTRACTOR SHALL BE
FULLY RESPONSIBLE TO INFORM AND ADVISE THE GENERAL/PRIME
CONTRACTOR OF ANY AND ALL SUCH NECESSARY IMPACTS AND
POSSIBLE MODIFICATIONS REQUIRED AS A PART OF THEIR BIDDING
AND BASE CONTRACTUAL SCOPE OF WORK RESPONSIBILITIES.
7. THE CONTRACTOR PROPOSING THE EQUIVALENT SUBSTITUTION
SHALL BE RESPONSIBLE FOR ALL RELATED WORK AND SHALL
IDENTIFY, VERIFY, COORDINATE AND PROVIDE ENGINEERED
SOLUTIONS FOR ALL IMPACT ISSUES AFFECTING INFRASTRUCTURE
SYSTEMS, UTILITIES SERVICES, BUILDING STRUCTURE,
SURROUNDING ELEMENTS, AND SYSTEMS AFFECTED FROM WEIGHT
DIFFERENTIALS, REVISED LOADING CHARACTERISTICS,
CONNECTION/MOUNTING VARIANCES, INSTALLATION CONFLICTS
AND DETAILING MODIFICATIONS, ETC. CAUSED BY THE EQUIVALENT
SUBSTITUTION REQUIREMENTS.
8. SPECIAL ATTENTION NEEDS TO BE PAID TO ANY SYSTEMS
EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS
INCLUDING ALL ASPECTS OF THEIR DIMENSIONAL LOGISTICS
FEATURES AND REQUIREMENTS ALONG WITH ANY STRUCTURAL
AND UTILITIES IMPACTS.
9. EACH EQUIVALENT SUBSTITUTION REQUEST ALONG WITH ANY/ALL
IMPACTS, DEVIATIONS/VARIANCES AND MODIFICATIONS WILL
REQUIRE VA/CO APPROVAL(S) BEFORE ANY SUCH REQUEST IS
DEEMED APPROPRIATE BY THE VA AND ALLOWED TO PROCEED INTO
THE NORMAL SHOP DRAWING PREPARATION, SUBMITTAL AND
REVIEW PROCESS.
10. NO REQUEST FOR AN EQUIVALENT SUBSTITUTION REVIEW CAN BE
MADE VIA A SHOP DRAWING SUBMISSION. ANY SUCH SUBMISSION
WILL NOT BE REVIEWED AND WILL BE REJECTED AS NON-
CONFORMING WITH THE DESIGN INTENT AND NOTED THAT THE
CONTRACTOR IS TO FOLLOW THE STANDARD BOD COMPLIANCE
PROTOCOLS.
11. ANY DEVIATIONS FROM THE BOD REQUIREMENTS THAT SURFACE
DURING THE CONSTRUCTION PHASE SHALL IMMEDIATELY BE MADE
KNOWN TO THE GENERAL/PRIME CONTRACTOR WHO WILL IN TURN
NOTIFY THE VA/COR. ALL SUCH DEVIATIONS, VARIANCES AND
IMPACTS WILL BE FULLY IDENTIFIED, DOCUMENTED AND SUBMITTED
TO THE VA/COR FOR REVIEW, EVALUATION AND DIRECTION(S) ON
HOW TO PROCEED.
12. ANY NON-COMPLIANT EQUIVALENT SUBSTITUTIONS WORK FOUND
TO BE IN PLACE DURING THE CONSTRUCTION PHASE THAT HAD NOT
GONE THROUGH THE BOD COMPLIANCE PROTOCOLS APPROVAL
PROCESS AND THAT DOESN'T HAVE THE VA/CO'S APPROVAL WILL BE
SUBJECT TO REJECTION AND REMOVAL.
13. THE FINAL INSTALLATION OF ANY EQUIVALENT SUBSTITUTION AND
ITS IMPACTS SHALL NOT COMPROMISE ANY OF THE BOD
PERFORMANCE CHARACTERISTICS NOR SHALL IT ENCUMBER ANY
OF THE ASSOCIATED DESIGN LAYOUT AND DIMENSIONAL LOGISTICS
REQUIREMENTS.
14. THE FINAL INSTALLATION OF ANY EQUIVALENT SUBSTITUTION AND
ITS IMPACTS SHALL COMPLY WITH ALL APPLICABLE BUILDING
CODES, REGULATIONS AND VA REQUIREMENTS, PLUS ALLOW ANY
SYSTEMS, EQUIPMENT AND/OR MATERIALS TO FUNCTION PROPERLY
AND SAFELY.
GENERAL NOTES SPECIAL SAFETY NOTES BASIS OF DESIGN (BOD) COMPLIANCE PROTOCALS
OCCUPIED AREAS PROTECTION
PROTOCOLS
VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE
PROVIDED FOR EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK
WITH THE VA/COR, BEFORE BEGINNING ANY WORK. WHEN PERFORMING
CONSTRUCTION WORK (DEMOLITION OR NEW) IN OCCUPIED SPACES, THE
FOLLOWING PROTECTION PROTOCOLS WILL BE FOLLOWED ON A DAILY
BASIS UNLESS MODIFIED IN WRITING BY THE VA/COR ON A CASE BY CASE
BASIS:
1. CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS, BLINDS,
CURTAINS, ETC. THAT ARE WITHIN THE AREA/ZONE WHERE THE WORK IS
TO BE ACCOMPLISHED AND IN DANGER OF BEING DAMAGED BY THE
PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN BE
CAUSED BY FALLING OBJECTS, DUST OR MOISTURE. NOTE: THIS ALSO
APPLIES TO THE DIRECT ACCESS ROUTE(S) THRU THE OCCUPIED
AREA(S) TO AND FROM THE ACTUAL WORK AREA/ZONE.
2. CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE
PREVENTION BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED
ABOVE INCLUDING THE ADDITIONAL PROTECTION OF ALL WALL
SURFACES/FINISHES, WINDOWS/GLAZING, DOORS, FRAMES, HARDWARE,
CARPETING, FLOOR COVERINGS, WALL BASE, ELECTRICAL DEVICES,
WALL/CEILING MOUNTED EQUIPMENT & CONTROLS, CEILING
CONSTRUCTION, TILE, GRID, WALL ANGLES, LIGHT FIXTURES,
DIFFUSERS, GRILLES, LIFE SAFETY DEVICES, FIRE SPRINKLER HEADS,
ETC.
3. FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH
A 6 MIL HEAVY DUTY STRING REINFORCED FIRE RETARDANT
POLYETHYLENE SHEETING (VISQUEEN) AND/OR TEMPORARY
TARPAULIN(S)/DROP CLOTH(S) AS A MINIMUM FOR DUST, MOISTURE AND
VERY LIGHT FOOT TRAFFIC PROTECTION.
4. ALL MAIN TRAFFIC AREAS TO AND INSIDE THE WORK ZONE/AREAS SHALL
HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY
STRING REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING
(VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16” TEMPERED
HARDBOARD (MASONITE) 4'X8' PANELS. ALL MASONITE PANELS SHALL
BE FIRMLY HELD TOGETHER AND SECURED IN PLACE VIA THE USE OF AN
INDUSTRY APPROVED 2" HEAVY DUTY CONSTRUCTION ADHESIVE TAPE,
INTENDED FOR THIS APPLICATION. NOTE: ALL BOARD TO BOARD JOINTS
WILL BE FULLY TAPED THE LENGTH OF THE JOINT AND ALL BOARD TO
VISQUEEN JOINTS WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8”
LENGTH OF TAPE. PAINTERS TAPE AND/OR MASKING TAPE ARE NOT
CONSIDERED EQUIVALENTS TO THE HEAVY DUTY CONSTRUCTION
ADHESIVE TAPE BEING SPECIFIED.
5. CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED,
CONTAINMENT ENCLOSURE AROUND ALL CONSTRUCTION AREAS/ZONES
IN ORDER TO CONTAIN AS MUCH DUST AND DEBRIS AS POSSIBLE
DURING THE PERFORMANCE OF ANY DEMOLITION, CONSTRUCTION AND
CLEAN-UP WORK.
6. REFER TO ICRA WORKSHEETS AND PLAN ON SHEET GI003 FOR TYPE OF
TEMPORARY BARRIERS TO BE UTILIZED. FULL HEIGHT FOAM PADDED
RAILS, PRESSURE FIT AT ALL PERIMETER WALL/PARTITION CONNECTION
CONDITIONS ARE TO BE UTILIZED IN ORDER TO MINIMIZE THE USE OF
TAPE SEALS ON ALL FINISHED WALL SURFACES. IF REQUIRED (PER ICRA)
TEMPORARY FULL HEIGHT CONTAINMENT BARRIERS WILL BE
CONSTRUCTED OF METAL FRAMING, 5/8" TYPE X GYPSUM BOARD EACH
SIDE WITH APPROPRIATE UL LISTED JOINT AND PENETRATION
ASSEMBLIES TO MAINTAIN 1HR FIRE BARRIER RATING. ALL JOINTS TO BE
FIRE TAPED AND ALL SCREW HOLES TO COVERED WITH JOINT
COMPOUND.
7. WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC
LOCATION(S), SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME
THE ENTIRE AREA IS TO BE FULLY CLEANED-UP, ALL TEMPORARY
CONTAINMENT ENCLOSURES AND PROTECTION REMOVED WITH ALL
ITEMS IDENTIFIED IN NOTE #1 RETURNED TO THEIR PRIOR FUNCTIONING
POSITIONS. NOTE: FULLY CLEANED-UP MEANS COMMERCIALLY VACUUM
CLEANED WITH ALL SURFACES BEING FULLY WIPED DOWN AND DUST
FREE AS THE CONTRACTOR ACCEPTED THE AREA/SPACE PRIOR TO
PERFORMING THE WORK.
8. ALL SPACES WILL BE RETURNED TO THE USER, BY THE CONTRACTOR,
AS A COMMERCIALLY CLEAN ENVIRONMENT WITH ALL OPEN
CONSTRUCTION SURFACES SEALED WITH TEMPORARY CONSTRUCTION
MATERIALS INCLUDING THE USE OF 6 MIL HEAVY DUTY STRING
REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING (VISQUEEN),
IN ORDER TO AVOID DUST PARTICLES FROM THE CONSTRUCTION AREA
MIGRATING INTO THE OCCUPIED USER’S AREA/SPACE/ROOM(S).
9. THE BASIS OF DESIGN FOR ALL 6 MIL HEAVY DUTY STRING REINFORCED
FIRE RETARDANT POLYETHYLENE SHEETING WILL BE IN FULL
COMPLIANCE WITH NFPA 701-04, ASTM E84 AND CPAI 84 SECTION 6. IT
SHALL BE MANUFACTURED WITH 3 PLY CONSTRUCTION CONSISTING OF
FIRE RETARDANT VIRGIN POLYETHYLENE IN THE (2) OUTER LAYERS OF
PLASTIC WITH A DIAMOND SCRIM REINFORCING MESH PLACED
BETWEEN.
10. MOBILE CONTAINMENT SYSTEMS MAY BE UTILIZED WHERE APPLICABLE,
IF APPROVED FOR USE BY THE VA/COR. MOBILE UNITS SHALL BE FULLY
EQUIPPED WITH A NEGATIVE AIR HEPA FILTRATION SYSTEM THAT IS IN
COMPLIANCE WITH THE INFECTION CONTROL REQUIREMENTS OF EACH
SPECIFIC AREA OF WORK AND TASK BEING PERFORMED.
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND
PROVIDED HEREIN.
PROTECTION PROTOCOLS: VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE PROVIDED FOR EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR, BEFORE BEGINNING ANY WORK. WHEN PERFORMING DEMOLITION WORK IN ANY OCCUPIED SPACES FOLLOW THE “OCCUPIED AREAS PROTECTION PROTOCOLS”
UNLESS MODIFIED IN WRITING BY THE VA/CO ON A CASE BY CASE BASIS.
1. BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR AND DISCIPLINE SHALL PERFORM A FULL EXAMINATION OF ALL AREAS OF WORK AND FULLY VERIFY ALL EXISTING CONDITIONS ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN CONDITIONS OR DISCREPANCIES FROM THE DOCUMENTATION THAT WOULD AFFECT THEIR WORK AND/OR THE WORK OF OTHERS. ANY UNFORESEEN CONDITIONS OR DISCREPANCIES DISCOVERED ARE TO BE IMMEDIATELY IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR WHO SHALL IN TURN DOCUMENT AND PROMPTLY REPORT ANY SUCH CONDITIONS DIRECTLY TO THE VA/CO FOR DIR ECTION ON HOW TO
PROCEED BEFORE ALLOWING ANY WORK TO BEGIN.
2. ALL REQUIRED DEMOLITION WORK IS NOT NECESSARILY LIMITED TO WHAT IS ONLY SPECIFICALLY SHOWN OR DIRECTLY CALLED OUT ON THE DEMOLITION PLANS OR THAT IS ONLY SPECIFICALLY IDENTIFIED WITHIN THE DEMOLITION NOTES DESCRIPTIONS. THE INTENT OF THE DOCUMENTATION IS TO GENERALLY IDENTIFY THE MORE SPECIFIC MAJOR ELEMENTS OF WORK IN PLACE THAT SHALL REQUIRE REMOVAL AND/OR REWORK IN ORDER TO ACCOMPLISH THE DESIGN INTENT OF THE DOCUMENTS. THE FULL EXTENT OF DEMOLITION WORK COULD INCLUDE BUT NOT NECESSARILY BE LIMITED TO ALL AFFECTED LESSER ELEMENTS OF ARCHITECTURAL, STRUCTURAL, ME CHANICAL, PLUMBING, MEDICAL GASES, FIRE PROTECTION SPRINKLER SYSTEMS AND ALL ELECTRICAL SYSTEMS WORK INCLUDING HIGH AND LOW VOLTAGE POWER, COMMUNICATION SYSTEMS SUCH AS CCTV, SECURITY, IT DATA, LIFE SAFETY, FIRE PROTECTION, NURSE CALL, PA, BAS CONTROLS SYSTEMS, TEMPERATURE AND OTHERWISE, ET C.
3. ALL REQUIRED DEMOLITION WORK IS NECESSARY TO FACILITATE THE EXTENT OF BOTH THE NEW CONSTRUCTION WORK AS WELL AS TO FACILITATE THE REPLACEMENT, RELOCATION AND/OR THE REWORKING OF THE EXISTING SYSTEMS. ANY REWORKING OF THE CURRENT ELEMENTS AND COMPONENTS CURRENTLY NEED ING TO BE MODIFIED IN ORDER TO PROPERLY SUPPORT THE COMPLETED PROJECT SHALL BE PROVIDED AS INTENDED TO CONFORM WITH THE ORIGINAL DESIGN INTENT WHETHER SPECIFICALLY CALLED FOR IN GREAT DETAIL WITH EVERY ANCILLARY ELEMENT FULLY NAMED AND IDENTIFIED OR AS CALLED OUT AS A GENERAL COMPONENT PORTION OF WORK THAT NEEDS TO BE PROPERLY REMOVED IN ORDER TO COMPLETE THE SCOPE OF WORK AS INTENDED TO COMPLY WITH ALL BASES OF DESIGN REQUIREMEN TS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DEMOLITION AND REMOVAL OF ALL EXISTING WALLS, CEILINGS, SUSPENSION SYSTEMS, FLOORING, ELECTRICAL, TELEPHONE AND PLUMBING CONSTRUCTION AS WELL AS ALL MATERIALS, FINISHES AND EQUIPMENT THAT IS NOT SPECIFICALLY SHOWN OR CALLED FOR AS REQUIRED TO FACILITATE THE NEW CONSTRUCTION WORK INSIDE THE CONTRACT AREA, THE ADJACENT SPACES AND THE SPACES ABOVE AND BELOW . SOME ADDITIONAL ITEMS THAT MAY NOT BE SPECIFICALLY SHOWN IN GREAT DETAIL ON THE DEMOLITION PLAN THAT ARE A PART OF THE DEMOLITION WORK, BUT NOT LIMITED TO, ARE CASEWORK, SHELVING, BRACKETS, STANDARDS, DOOR HARDWARE, MISCELLANEOUS OTHER HARDWARE, SIGNAGE, FLOORING MATERIALS, WALL BASE, WOOD GROUNDS, WALL COVERING MATERIALS, BACKING LINERS OR BOARDS, ANY REMAINING MASTIC, GROUT, CAULKING AND SEALANTS, EXPOSED ANCHORS AND FASTENE RS, FRAMING MATERIALS, BACKER BOARDS OR METAL PLATES, CHAIR RAILS, BRACKETS, HOOKS, SURFACE MOUNTED OR RECESSED ACCESSORIES, PRIVACY CURTAINS AND TR ACKS, ETC.
5. ALL DEMOLITION WORK SHALL BE PERFORMED IN A SYSTEMATICALLY SAFE FULLY SUPERVISED COORDINATED AND PROPERLY MANAGED SEQUENCE OF WORK UNDER THE DIRECT SUPERVISION OF THE GENERAL/PRIME CONTRACTOR’S SUPERINTENDENT AND/OR THEIR MANAGEMENT PERSONNEL INCLUDING THE PERFORMANCE OF ANY ANCILLARY
ELEMENTS OF SELECTIVE DEMOLITION.
6. ALL DEMOLITION, THE HANDLING OF MATERIALS AND EQUIPMENT ALONG WITH THE MOVEMENT OF THESE ELEMENTS THROUGHOUT THE FACILITY SHALL BE PERFORMED SO AS TO PREVENT DAMAGE TO ADJACENT IMPROVEMENTS AND FACILITIES TO REMAIN AS WELL AS TO PROVIDE SAFETY FOR ALL TRADESPEOPLE, STAFF, RESIDENTS/PATIENTS, VISITORS AND SERVICE PROVIDERS.
7. PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE MEASURES AS REQUIRED BY THE PROJECT DOCUMENTS, VA FEDERAL AND LOCAL REQUIRE MENTS, APPLICABLE OSHA REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL AUTHORITIES, NFPA REQUIREMENTS, THE VA/COR AND ALL OTHER REGULATORY AGENCIES AND VA
AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT.
8. PROVIDE ALL TEMPORARY PARTITIONS, PROTECTION, DOOR ACCESS UNITS, ENCLOSURES, WALKWAYS, FENCING, RAILINGS, CANOPIES, AIR FILTRATION DEVICES, VESTIBULES, AIRLOCKS, ETC., WHERE REQUIRED BY THE CONTRACT DOCUMENTS, THE VA/COR AND ALL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT AND SHALL BE SURE TO MAINTAIN ADEQUATE AND SAFE EMERGENCY MEANS OF EGRESS FROM ALL AREAS. ALL SUCH WORK NEEDING TO BE PROVIDED WILL REQUIRE VA/CO R REVIEW AND APPROVAL
BEFORE BEGINNING ANY OF SUCH WORK.
9. GREAT CARE SHALL BE TAKEN WHEN PERFORMING SELECTIVE DEMOLITION IN THE UTILIZATION OF MORE SENSITIVE AND LESS EVASIVE METHODS OF DEMOLITION/REMOVAL, AS WELL AS PROVIDING THE APPROPRIATE ENHANCED PROTECTIVE BARRIERS IN ORDER TO PROVIDE FOR THE LEAST AMOUNT OF DAMAGE TO THE W ORK THAT IS TO REMAIN IN PLACE. EXISTING FINISHED SURFACES, MATERIALS AND EXPOSED EQUIPMENT THAT WOULD RECEIVE SIGNIFICANT AMOUNTS OF SURFACE DAMA GE AND WOULD REQUIRE SIGNIFICANT AMOUNTS OF PATCHING, REPAIRS AND REFINISHING WORK SHALL BE DEEMED AS DAMAGED AND UNUSABLE AND WILL NEED TO BE REP LACED IN WHOLE BY THE RESPONSIBLE CONTRACTOR AND ITS REPLACEMENT ONCE COMPLETED WILL NEED TO RECEIVE VA/COR APPROVAL.
10. WHERE EXISTING FLOOR FINISHES ARE TO BE FULLY REMOVED TO ALLOW FOR THE INSTALLATION OF NEW, PROVIDE FOR THE COMPLETE REMOVAL OF THE EXISTING FLOOR FINISHES ALONG WITH ALL ASSOCIATED ATTACHMENT SYSTEMS SUCH AS MASTICS, ADHESIVES, TACKLES STRIPS, STAPLES, SETTING BEDS OF GR OUT, MORTAR OR CONCRETE, CARPET PADDING, ATTACHED SUBFLOORING MATERIALS, ETC. AS REQUIRED TO GET DOWN TO THE EXISTING STRUCTURAL FLOOR SUBSTRATE THAT CAN BE PROPERLY
PATCHED, REPAIRED, LEVELED AND MADE READY TO RECEIVE THE NEW FLOOR FINISHES.
11. ITEMS INDICATED TO BE REMOVED AND SALVAGED FOR THE VA SHALL REMAIN THE VA’S PROPERTY AND SHALL BE CAREFULLY REMOVED, CLEANED AND PROTECTED FROM DAMAGE BY THE CONTRACTOR RESPONSIBLE AT ALL TIMES. ALL SUCH ITEMS INDICATED TO BE SALVAGED WILL BE PACKAGED AND/OR CRATED AS REQUIRED BY THE VA/COR TO PROPERLY PROTECT THEM FROM DAMAGE CAUSED BY THE HANDLING, MOVING AND/OR THE STORAGE OF THESE ITEMS. ALL PACKAGES AND/OR C RATES OF ITEMS SHALL HAVE THEIR CONTENTS CLEARLY MARKED AND FULLY IDENTIFIED ON BOTH THE TOP AND ONE SIDE OF EACH CONTAINER TO BE COORDINATED WITH AND APPROVED BY THE VA/COR. DELIVER ALL SALVAGED MATERIALS TO THE LOCATIONS INDICATED IN THE PROJECT DOCUMENTATION OR TO THE GOVERNMENTS DESIGNATED STORAGE FACILITY ON
THE STATIONS CAMPUS AS DIRECTED BY THE VA/COR.
12. UNLESS OTHERWISE INDICATED OR STATED TO BE SAVED, SALVAGED OR IDENTIFIED AS NEEDING TO REMAIN OR BE RELOCATED AND/OR REUSED, ALL ITEMS IDENTIFIED TO BE REMOVED, DEMOLISHED, SCRAPED, ETC. BECOMES THE PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR AND AS SUCH IT IS THEIR RESPONSIBILITY TO REMOVE ALL SUCH ITEMS FROM THE SIT ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE VA/COR.
13. DEMOLITION ITEMS OF VALUE TO THE CONTRACTOR(S) ARE NOT TO BE STORED ON SITE AND NEED TO BE REMOVED ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE
VA/COR.
14. ALL ITEMS OF WORK THAT ARE IDENTIFIED AS EXISTING TO BE REMOVED AND REUSED/REINSTALLED SHALL BE CAREFULLY DISCONNECTED, DETAC HED, REMOVED AND DISASSEMBLED AS REQUIRED FOR CONVENIENCE AND EASE OF HANDLING, MOVING, STORAGE AND FOR THEIR PROTECTION FROM DAMAGE. ALL SUC H ITEMS ARE TO BE INDIVIDUALLY WRAPPED, BOXED OR PLACED IN CARTONS FOR THE EASE OF HANDLING THE MATERIALS AND THEIR PLACEMENT IN A VA/COR IDENT IFIED PROTECTED STORAGE AREA (TBD) LOCATED ON THE STATION BUT NOT NECESSARILY CONVENIENT TO THE SITE OF THE WORK. EACH ITEM SHALL BE FULLY CLEANED, FREE FROM DAMAGE, PREPARED FOR SERVICE AND FULLY TESTED TO VERIFY ITS ABILITY FOR PROPER FUNCTIONAL REUSE PRIOR TO BEING PLACED IN STORAGE. TH E CONTRACTOR TAKES RESPONSIBILITY FOR AND CERTIFIES ITS PERFORMANCE CAPABILITIES AND THE FACT THAT IT IS NOT DAMAGED AND FULLY CAPABLE FOR REUSE WHEN READY FOR ITS REINSTALLATION. IN THE EVENTUALITY THAT AN ITEM IS ULTIMATELY FOUND TO BE DAMAGED OR INOPERABLE AT THE POINT OF REINSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A NEW ITEM/DEVICE ALONG WITH ALL ANCILLARY SUPPORT WORK AND EQUIPMENT NECESSARY TO FULLY REPLACE TH E EXISTING.
15. WHERE EXISTING MATERIALS, ITEMS OR EQUIPMENT ARE TO BE REMOVED FOR THEIR REPLACEMENT IN THE SAME LOCATION BY THE SAME OR SIMILAR NEW MATERIALS, ITEMS OR EQUIPMENT, CAREFULLY DISCONNECT, DETACH, DISASSEMBLE IF REQUIRED, REMOVE AND DISPOSE OF THE ITEMS INDICATED ALONG WITH ANY AND ALL ANCILLARY SYSTEM COMPONENTRY OR SUPPORT ITEMS ADDITIONALLY IDENTIFIED OR REQUIRED TO BE REPLACED.
16. WHERE STRUCTURAL SUPPORT OF EXISTING CONSTRUCTION ELEMENTS OR PORTIONS OF STRUCTURAL ELEMENTS TO REMAIN IS REQUIRED THE RESPO NSIBLE CONTRACTOR PERFORMING THE WORK SHALL PROVIDE AND MAINTAINING ALL NECESSARY STRUCTURAL SUPPORTS, SHORING, STIFFENERS, BRACING, BEAMS, COL UMNS, FOOTINGS AND SUPPORTS AS NECESSARY TO ENSURE THE STABILITY OF THE ELEMENTS BEING SUPPORTED AND TO ADEQUATELY DISTRIBUTE ANY TEMPORARY LOAD ING SO AS NOT TO OVER LOAD ANY OF THE EXISTING STRUCTURE AND THE CONSTRUCTION BELOW. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL STRUCT URAL ENGINEERING ANALYSIS, CALCULATIONS AND SOLUTIONS FOR PROVIDING ANY SUCH WORK AND WILL NEED TO PROVIDE ALL SUCH PROPER DOCUMENTATION PREPA RED BY A LICENSED STRUCTURAL ENGINEER TO THE VA/CO AS A SHOP DRAWING SUBMITTAL FOR PROPER REVIEW AND APPROVAL BEFORE BEING ALLOWED TO BEGIN ANY SUCH WORK
17. ALL EXISTING CONSTRUCTION OR ITEMS INDICATED TO REMAIN IN PLACE AND OPERATION SHALL BE PROTECTED FROM DAMAGE BOTH DURING THE DEMOLITION OPERATIONS AS WELL AS THE NEW CONSTRUCTION EFFORTS. WHERE PRACTICABLE, AND WITH THE VA/COR'S APPROVAL, THE CONTRACTOR MAY ELECT TO REMO VE SUCH ITEMS TO A SUITABLE STORAGE LOCATION DURING THE DEMOLITION PHASE AND THEN PROPERLY CLEAN AND REINSTALL THE ITEMS WHEN APPLICABLE. IN NO CASE SHALL ANY LIFE SAFETY DEVICES, SYSTEMS OR MEASURES BE COMPROMISED BY THE TEMPORARY REMOVAL OF ANY NECESSARY ELEMENTS OF WORK, FOR THE CONVEN IENCE OF THE CONTRACTOR, THAT WERE NOT PROPERLY REPLACED IN KIND WITH A SIMILAR PROPERLY OPERATING TEMPORARY DEVICE.
18. DURING THE COURSE OF SELECTIVE DEMOLITION OR REMOVAL OPERATIONS AND THE EXISTING SUBSTRATE MATERIALS/CONSTRUCTION IS DAMAGED BEYOND REASONABLE REPAIR, THE CONTRACTOR SHALL BE RESPONSIBLE TO FULLY REPLACE THE ENTIRE DAMAGED SECTION AND/OR SECTIONS. THIS DAMAGED AREA S HALL BE REMOVED AND REPLACED AS REQUIRED TO REPAIR THE SUBSTRATE TO A LIKE NEW CONDITION THAT CONTAINS NO IRREGULAR JOINT CONNECTIONS, CONDITIONS, DEFECTS, WEAKNESS OR WILL CAUSE ADVERSE EFFECTS THAT WILL RESULT IN ANY DIFFERENTIAL FINISHED SURFACE CONDITIONS OR AREAS OF JOINT WEAKNESS THAT W ILL RESULT IN SURFACE
CRACKING AND BE APPARENT THAT THE CONDITION IS IN FACT A PATCH/REPAIR.
19. REFER TO ALL ENGINEERING DISCIPLINE DRAWINGS AND DOCUMENTATION FOR THE BASIC EXTENT BEING REQUIRED FOR ALL INFRASTRUCTURE AND SYSTEMS DEMOLITION AS WELL AS FOR IDENTIFYING ALL EXISTING EQUIPMENT, PIPING, CONDUITS, DUCTWORK, WIRING, CONTROLS, ETC. THAT ARE INTENDED TO REMAIN WITHIN ANY OF THE AREAS OF DEMOLITION, THE AREAS OF REWORKING OF EXISTING SYSTEMS AND THE AREAS OF NEW WORK.
20. UNLESS OTHERWISE NOTED ALL EXISTING PARTITION CONSTRUCTION WITHIN THE PROJECT AREA OF WORK SCHEDULED TO RECEIVE NEW FINISHES SHALL HAVE ALL EXISTING FINISHES REMOVED INCLUDING BUT NOT LIMITED TO ALL CERAMIC TILE, VINYL WALL COVERING, WOOD PANELING, WAINSCOT MATERIALS, GROUT, MASTIC, WALL COVERING BACKING, WALL BASE, ADHESIVE, STAPLES, EXPOSED FASTENERS, ETC. SUCH THAT THE SUB-STRAIGHT WALL/PARTITION SURFACES REQUIRE NO FURTHER DEMOLITION AND ARE PREPARED TO RECEIVE ALL REQUIRED PATCHING, REPAIRS, RESURFACING AND REFINISHING AS REQUIRED TO RECEIVE THE NEW FINISHES.
21. ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHA LL BE PROTECTED FROM DUST AND DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE OCCUPIED AREA PROTECTION PROTOCOLS PROVIDED I N THE "GENERAL" DRAWINGS SECTION AND COORDINATE ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH THE VA/COR.
22. ALL NEW WORK ALONG WITH ANY PORTIONS OF EXISTING EQUIPMENT, MATERIALS OR REWORKED ELEMENTS WHEN COMPLETED SHALL FULLY COMPLY WITH ALL BASES OF
DESIGN REQUIREMENTS.
23. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE DEMOLITION AND CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE
VA/COR'S ACCEPTANCE OF THAT WORK.
24. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.
25. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS
REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.
26. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, P IPING, CONDUITS OR OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING OR PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF THE INTENDED AREAS AND DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH INTERFERENCES. COORDINATE WITH AND OBTAIN VA/COR APPROV AL BEFORE PROCEEDING
WITH ANY SUCH REQUIRED PENETRATIONS WORK.
27. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC LOGISTICAL SEQUENCING REQUIREMENTS OR AS AP PROVED BY THE VA/COR.
GENERAL DEMOLITION NOTES
BOD EQUIVALENT SUBSTITUTIONS PROCESS SEQUENCE:
1. BIDDING PHASE
A. ALL BOD PROPOSED EQUIVALENT SUBSTITUTIONS, DEVIATIONS AND ASSOCIATED IMPACTS
SHALL BE FULLY IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR(S)
DURING THE BIDDING PROCESS SUCH THAT THE COST OF ALL ASSOCIATED BOD
SUBSTITUTION MODIFICATIONS, REQUIRED DEVIATIONS AND SCOPE OF WORK IMPACTS
DIRECTLY AFFECTING OTHER TRADES SHALL BE INCLUDED IN THE BASE BIDS OF ALL
AFFECTED CONTRACTORS.
A. ONCE APPROVED BY THE VA/CO THE CONTRACTORS SHALL PERFORM THEIR FINAL
COORDINATION EFFORTS AND BEGIN THE NORMAL SHOP DRAWING PREPARATION AND
SUBMITTAL PROCESS INCLUDING PROVIDING ANY ADDITIONAL ENGINEERING WORK
NECESSITATED BY THE EQUIVALENT SUBSTITUTION.
B. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK
ASSOCIATED WITH AND IMPACTED BY ANY EQUIVALENT SUBSTITUTION ALONG WITH THE
COMPLETE COORDINATION AND MANAGEMENT OF THE WORK.
2. GENERAL/PRIME CONTRACTOR RESPONSIBLE FOR COORDINATION
A. THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY,
DOCUMENT, MAKE SUBMISSIONS, TRACK, COORDINATE, OBTAIN APPROVALS AND INCLUDE
THE COST OF ALL SUCH EQUIVALENT SUBSTITUTIONS, VARIANCE MODIFICATIONS AND ALL
IMPACT SCOPE OF WORK IN THEIR BASE BID COST OF CONSTRUCTION AS WELL AS
ALLOWED FOR WITHIN THEIR PROJECT SCHEDULE.
B. THE GENERAL/PRIME CONTRACTOR SHORTLY AFTER CONTRACT AWARD/EXECUTION SHALL
NOTIFY AND COORDINATE WITH THE VA/CO, ALL SUCH KNOWN EQUIVALENT SUBSTITUTION
DEVIATION REQUESTS AND POSSIBLE IMPACTS FROM THE SPECIFIC BOD REQUIREMENTS
PROVIDED IN THE DRAWINGS AND SPECIFICATIONS.
C. ALL SUCH DEVIATIONS, VARIANCES AND IMPACTS WILL BE FULLY IDENTIFIED, DOCUMENTED
AND SUBMITTED TO THE VA/COR FOR REVIEW, EVALUATION AND DIRECTION(S) ON HOW TO
PROCEED.
D. FULLY REVIEW DOCUMENTATION BEFORE STARTING THE WORK. THE GENERAL/PRIME
CONTRACTOR WILL ALSO BE RESPONSIBLE TO FULLY IDENTIFY AND COORDINATE THE ALL
AFFECTED SUBCONTRACTORS INCLUDING ACCURAY EQUIPMENT DRAWINGS TO BE SURE
THAT ALL SUCH WORK IS INCLUDED IN THEIR BASE BID SCOPE OF WORK.
3. CONTRACTORS IDENTIFY PROPOSED EQUIVALENT SUBSTITUTION(S)
A. ALL CONTRACTORS, BEFORE SUBMITTING THEIR REQUEST FOR EQUIVALENT SUBSTITUTION
SHALL BE RESPONSIBLE TO HAVE FULLY VERIFIED AND CERTIFIED IN WRITING THAT THE
DESIGN CHARACTERISTICS OF THE ITEMS THEY WILL BE SUBMITTING FOR BOD COMPLIANCE
REVIEW MEETS OR EXCEEDS THE DESIGN INTENT AND PERFORMANCE REQUIREMENTS AS
DESIGNED, DETAILED AND SPECIFIED.
4. CONTRACTORS PREPARE DETAILED COMPARISONS
A. THE REQUESTING CONTRACTOR SHALL PREPARE AND PROVIDE TO THE GENERAL/PRIME
CONTRACTOR A FULL LINE ITEM, SIDE-BY-SIDE COMPARISON LISTING OF ALL BOD DESIGN AND
MANUFACTURED CHARACTERISTICS VERSUS THE SAME FOR THE EQUIVALENT SUBSTITUTION
BEING PROPOSED.
B. ALL EQUIPMENT, MATERIALS OR ASSEMBLY EQUIVALENT SUBSTITUTIONS SHALL BE PROVIDED
ON A CONTRACTOR PREPARED ITEMIZED LISTING PER EACH REQUESTED SUBSTITUTION WITH A
FULL AND DETAILED COMPARATIVE DESCRIPTION OF ALL SPECIFICATIONS, PERFORMANCE
CHARACTERISTICS, CAPACITIES, WEIGHT, DIMENSIONAL LOGISTICS AND KNOWN DEVIATIONS
FROM THE ORIGINAL BOD.
5. CONTRACTORS IDENTIFY RELATED IMPACTS AND DEVIATIONS
A. THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE TO FULLY IDENTIFY AND DOCUMENT
ALL PROPOSED EQUIVALENT SUBSTITUTION CAUSED IMPACTS, DEVIATIONS AND
MODIFICATIONS FROM THE ORIGINAL BOD REQUIREMENTS WITH THE GENERAL/PRIME
CONTRACTOR AS WELL AS ALL AFFECTED CONTRACTORS.
B. SEE THE DETAILED PROTOCOL REQUIREMENTS FOR THE EXTENT OF RESPONSIBILITIES AND
DOCUMENTATION REQUIRED FOR THIS CRITICAL ITEM.
6. CONTRACTOR'S DOCUMENTATION TO GENERAL/PRIME CONTRACTOR
A. CONTRACTORS SHALL COORDINATE WITH THE GENERAL/PRIME CONTRACTOR AS TO THE
SPECIFIC DATE THAT EACH IS REQUIRED FOR THE COMPLETION OF THEIR EQUIVALENT
SUBSTITUTION SUBMISSION REQUEST DOCUMENTATION AND DELIVERY OF THE COMPLETED
PACKAGE(S) TO THEM.
B. THE GENERAL/PRIME CONTRACTOR HAVING BEEN MADE FULLY AWARE OF THESE POTENTIAL
EQUIVALENCY SUBSTITUTIONS AND IMPACTS DURING THE BIDDING PROCESS SHALL INCLUDE
AND DOCUMENT THIS BOD PROCESS IN THEIR DETAILED PROJECT SCHEDULE ALLOWING A
SEPARATE TASK ITEM TIMELINE WITH CRITICAL DATES AND PERFORMANCE TARGETS
IDENTIFIED AND TRACKED.
7. TRACKING LIST OF PROPOSED EQUIVALENT SUBSTITUTIONS AND IMPACTS
A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL PREPARE A COMPLETE MASTER
LISTING, BY SPECIFICATION AND/OR DRAWING SECTIONS, OF ALL PROPOSED EQUIVALENT
SUBSTITUTION REQUESTS.
B. THIS MASTER LISTING WILL CONSIST OF A SUMMARY DESCRIPTION OF EACH REQUEST ALONG WITH A BULLET POINT LISTING OF THE MAJOR IMPACTS AND DEVIATIONS RESULTING FROM IT.
C. THIS DOCUMENT WILL BE PREPARED AS A SPREAD SHEET AND UTILIZED AS A TRACKING TOOL
FOR DOCUMENTING ALL SIGNIFICANT ASSOCIATED DATES, ACTION ITEMS, CURRENT STATUS,
REJECTIONS/APPROVALS AND ADDITIONAL PERTINENT ISSUES AND ITEMS TO BE RECORDED
AND TRACKED AS REQUIRED BY THE VA/COR.
8. EQUIVALENCY REQUEST(S) SUBMITTED TO VA
A. THE SUCCESSFUL GENERAL/PRIME CONTRACTOR SHALL SUBMIT TO THE VA/CO FOR
PRELIMINARY REVIEW A MASTER SUMMARY LISTING OF ALL EQUIVALENT SUBSTITUTION
REQUESTS WITH ANY/ALL IMPACTS IDENTIFIED.
B. A SEPARATE FULLY DETAILED SUBMISSION DOCUMENTATION PACKAGE SHALL BE PREPARED
FOR EACH SUBSTITUTION REQUEST AND WILL CONSIST OF SEQUENCE ITEMS NUMBER 3, 4, 5 & 6
ALONG WITH ANY ADDITIONAL PERTINENT INFORMATION DEEMED NECESSARY SUCH AS
SKETCHES, DETAILED DRAWINGS, ENGINEERING DESIGN AND CALCULATIONS, MORE DETAILED
DESCRIPTIONS, ETC.
9. VA REVIEW AND ACTION NOTIFICATION
A. THE VA/COR SHALL REVIEW EACH SUBSTITUTION REQUEST PACKAGE AND TAKE SUCH ACTION
AS DEEMED NECESSARY ON EACH. SUCH ACTION COULD CONSIST OF REJECTION, APPROVAL
OR DIRECTION ON PROVIDING MORE DETAILED INFORMATION AND/OR CLARIFICATION(S) ON
EACH SUBMISSION AND/OR EACH IMPACT.
B. AS PART OF THE VA'S REVIEW PROCESS THE AE WILL ALSO BE INCLUDED IN A SIMILAR
FASHION TO THE SHOP DRAWING REVIEW PROCESS AND SHALL CONSULT WITH THE VA/COR
AND PROVIDE A RECOMMENDATION FOR THE VA'S CONSIDERATION.
C. THE AE WILL REJECT IMMEDIATELY WITHOUT REVIEWING ANY SUBMITTAL THAT IS DEEMED
INCOMPLETE AND NOT IN COMPLIANCE WITH THE BOD PROTOCOLS COMPLIANCE
REQUIREMENTS.
D. IT SHOULD BE NOTED THAT IT IS NOT THE AE'S RESPONSIBILITY TO RESEARCH, DOCUMENT
AND PROVE EQUIVALENCE, THAT IS THE REQUESTING/SUBMITTING CONTRACTOR'S
RESPONSIBILITY AS PER THESE PROTOCOLS. THE AE'S RESPONSIBILITY IS TO REVIEW AND
ANALYZE THE DETAILED COMPARATIVE DOCUMENTATION PROVIDED AND ADVISE THE VA/COR
ON WHAT WAS SUBMITTED.
10. VA APPROVAL ALLOWS SHOP DRAWING PROCESS TO BEGIN
A. PRIOR TO THE CONTRACTOR(S) BEING ALLOWED TO PROCEED WITH SHOP DRAWING
PREPARATION AND THE OFFICIAL SHOP DRAWING SUBMISSION(S) PROCESS, THEY WILL FIRST
NEED TO OBTAIN THE VA/CO APPROVAL(S) ON EACH EQUIVALENT SUBSTITUTION REQUEST
THAT WILL AFFECT THE SHOP DRAWING PROCESS FOR THAT.
11. IMPLEMENTATION OF SUBSTITUTION(S) AND IMPACT(S)
Revisions: Date:
35% SCHEMATIC DESIGN 11/12/2019
50% DESIGN DEVELOPMENT 12/12/2019
75% DESIGN DEVELOPMENT 01/14/2020
75% DESIGN DEVELOPMENT REVISED 02/10/2020
INFECTION CONTROL NOTESINFECTION CONTROL REQUIRED BY CLASSINFECTION CONTROL REQUIRED BY ALL CLASSESADDITIONAL REQUIREMENTS
INFECTION CONTROL RISK ASSESSMENT
Matrix of Precautions for Construction and Renovation STEP ONE: Indentify the Type of construction Project Activity
1. PROJECT IS IDENTIFIED AS HIGHEST PATIENT RISK GROUP, WITH A
CLASS IV(4) LEVEL OF IC PRECUATIONS - REFER TO SPECIFICATIONS.
2. HVAC CONNECTIONS TO EXISTING SYSTEM TO BE DISCONECTED
DURING CONSTRUCTION.
3. G.C. TO SUPPLY A NEGATIVE PRESSURE MACHINE OF SUFFICIENT SIZE &
QUANTITY TO ADEQUATELY HANDLE CONSTRUCTION AREAS.
4. ALL AREAS OF NEGATIVE AIR WILL BE MONITORED BY DIGITAL
MANOMETER PER VA GUIDELINES.
5. CONTRACTOR WILL LOG ON A DAILY BASIS AND VERIFY THROUGH
TESTS NEGATIVE AIR FLOW.
6. CONTRACTOR TO MAINTAIN A NEGATIVE AIR PRESSURE LOG AND HAVE
POSTED DAILY.
7. ALL TEMPORARY CONSTRUCTION DOORS TO BE METAL, 1 HR. FIRE
RATED, W/METAL FRAMES, CLOSERS AND SEALS.
8. ALL TEMPORARY CONSTRUCTION DOORS ACCESSING CONSTRUCTION
WORK ZONE FROM EXISTING HOSPITAL TO BE EQUIPPED WITH VA
GREEN CONSTRUCTION CORE.
9. ALL CONSTRUCTION ENTRANCES TO BE PROPERLY LABELED TO
COMPLY WITH VA AND OSHA REQUIREMENTS.
10. CONTRACTOR TO PROVIDE 24" X 36" WALK OFF MATS AND CHANGE
THEM AS NEEDED AT EACH ENTRANCE POINT.
11. CONTRACTOR TO PROVIDE HAND SANITIZERS AT ALL ENTRANCE
POINTS.
12. CONTRACTOR TO SUPPLY SPILL KIT, TO INCLUDE SHOP VAC, MULTI
PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
13. ALL NEW CONSTRUCTION MATERIALS, TOOLS AND EQUIPMENT PASSING
THROUGH HOSPITAL TO BE COVERED WITH 4 MIL. POLY SHEETS.
14. THE CONTRACTOR SHALL NOT BLOCK OR HINDER THE USE OF THE
BUILDINGS BY PATIENTS, STAFF & VISITORS.
15. ALL MATERIALS AND EQUIPMENT MUST BE PROPERLY STORED IN
DESIGNATED AREAS.
16. ALL DEBRIS AND GARBAGE THAT IS TO BE REMOVED THROUGH THE
HOSPITAL MUST BE CONTAINED IN DUMP CARTS DESIGNED FOR THAT
PURPOSE AND MUST BE COVERED WITH A FULL COVER OR LID.
17. FLAMMABLE MATERIALS MAY NOT BE STORED IN BUILDINGS.
18. COORDINATE DEBRIS REMOVAL W/ POSTED TIMES FOR ELEVATOR
AVAILABILITY. ALL DEBRIS REMOVAL ON DESIGNATED ELEVATOR ONLY.
DURING CONSTRUCTION PROJECT
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING
DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLASTIC, TO
SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART W/PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT)
BEFORE CONSTRUCTION BEGINS. BARRIERS OR BE ERECTED AFTER
6:00PM M-F OR ANYTIME ON WEEKENDS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING
HEPA EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE, OR THEY CAN
WEAR CLOTH OR PAPER OVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR
SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
7. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
8. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID.
9. USE OPERABLE WINDOW WHEN ACCESSIBLE FOR HEPA AIR
EXHAUST. OBTAIN VA C.O.R. APPROVAL FOR EXHAUSTING TO
ADJACENT AREAS.
UPON COMPLETION OF PROJECT
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE COR, VA SAFETY DEPARTMENT AND
INFECTION CONTROL DEPARTMENT, AND THOROUGHLY CLEANED.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS. COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
3. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF
DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. BARRIERS TO BE
REMOVED AFTER 6:00PM M-F OR ANYTIME ON WEEKENDS.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT
6. REMOVE ISOLATION OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .