Drawings 657-23-108JC_Bid Documents 20240308 -61 Sheets r.pdf

PDF 19 MB Posted

Attached to
Z2DA--657-23-108JC, FCA - Repair Air Handler AC-1 (VA-25-00052824) John J. Cochran Veterans Hospital
Solicitation number
36C25525R0049
Issued by

About this file

These are detailed architectural and engineering design drawings for a federal construction project at the John J. Cochran Veterans Hospital in St. Louis, Missouri. The project involves repairing Air Handling Unit AC-1 and associated mechanical systems on the second floor of the main hospital building. Specific scope includes replacing the steam humidifier inside AC-1, fixing duct leakage above room D263, and replacing approximately 70 variable air volume (VAV) boxes, with 68 of those being converted to digital control.

The comprehensive set contains 61 technical drawings spanning multiple disciplines including general, architectural, mechanical, electrical, and plumbing plans. The project is being managed by Romanyk Consulting Corp. for the Department of Veterans Affairs, Network Contracting Office 15, with a project number of 657-23-108JC. The design documents provide detailed specifications for demolition, installation, and renovation work, with specific attention to maintaining hospital operations, infection control protocols, and existing building systems during construction.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1i

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

Ga5xFB1

WALL TYPE

WINDOW TYPE

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

TRUE NORTH

PLAN NORTHNORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

EGRESS ROUTE ID AND

SECTION LENGTH

ROOM

ROOM OCCUPANCY

150 SF

EGRESS : EGRESS ID

Egress Length

ROOM OCCUPANCY & AREA

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

SHEET KEYNOTE

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

INDEX OF DRAWINGS

DISCIPLINE:

G - GENERAL

S - STRUCTURAL

A - ARCHITECTURE

M - MECHANICAL

E - ELECTRICAL

SHEET TYPE

DESIGNATOR

VICINITY MAP

ANNOTATION DRAWING SYMBOLSGENERAL NOTES

BUILDING NUMBER

A101

A101

SHEET NUMBER

WITHIN SERIES

01 - AE 1 0 1

LEVEL:

2 = LEVEL 02

3 = LEVEL 03

ENRIGHT AVE

DELMAR BLVD

G R

A N

D B

L V

D

N S

PRIN

G A

VE

BELL AVE

WINDSOR

5T

1T 08

## = BUILDING №

PROJECT TEAM

BUILDING SUMMARY

PROJECT INFORMATION

THE PROJECT IN BUILDING 01 (MAIN BUILDING) WILL REPLACE THE HUMIDIFIER FOR AC-1, ALONG WITH ITS ASSOCIATED PIPING.

THIS PROJECT WILL CORRECT DEFICIENCIES IN MECHANICAL SYSTEMS TO PROVIDE BETTER HEALTHCARE EXPERIENCE FOR

VETERANS.

THE PROJECT WILL ALSO REPLACE 70± VAV BOXES DOWNSTREAM FROM AC-1 TO INCLUDE CONVERSION OF 68 BOXES TO DIGITAL CONTROL. ADDITIONALLY, THE PROJECT WILL FIX DUCT LEAKAGE ABOVE ROOM D263. LIFE SAFETY, INFECTION CONTROL, PHASING AND CEILING DESIGN CONSIDERATIONS ADDRESSED BY HVAC WORK IMPACTS.

PROJECT NAME: FCA- REPAIR AIR HANDLER AC-1

PROJECT NUMBER: 657-23-108JC

PROJECT LOCATION: 657 - ST. LOUIS, MO

PROJECT PURPOSE/USE: REPAIR EXISTING AIR HANDLING UNIT AC-1 AND ASSOCIATED MECHANICAL DEFICIENCIES.

SCOPE OF WORK SUMMARY:

LEVEL 02:

LEVEL 03:

OVERALL:

BUILDING AREA:

73,900 GSF

68,800 GSF

142,700 GSF

DRAWING LIST

NORTH

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW

ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE DRAWINGS AND THE PROJECT MANUAL.

CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THESE DRAWINGS, THE PROJECT MANUAL, AND IMMEDIATELY

NOTIFY THE DESIGN PROFESSIONAL OF ANY INCONSISTENCIES THAT ARE DISCOVERED.

3. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT.

4. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE

REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.

5. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE

CONTRACTOR'S EXPENSE.

6. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.

7. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND

WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH

RESPECT TO DELIVERY DATE, QUALITY, OR COST.

8. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S

MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.

9. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL

EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.

10. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA

REGULATIONS DURING CONSTRUCTION.

11. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.

12. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE

PROVIDED.

13. THE GC SHALL BE RESPONSIBLE FOR COORDINATING THE INSTALLATION OF NEW UTILITIES WITH EXISTING ADJACENT

UTILITIES.

14. ANY WORK NOT SHOWN ON THE DRAWINGS, BUT CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN A

PROPER MANNER SHALL BE PROVIDED BY THE GC WITHOUT ADDITIONAL CHARGE.

15. WHERE PRESENT WORK IS DAMAGED IN THE EXECUTION OF THE CONTRACT OR WHERE OPENINGS ARE LEFT DUE TO THE REMOVAL OF PIPES, CONDUITS, CABLE TRAYS, EQUIPMENT OR APPARATUS, REPAIR OR CLOSE UP CORRESPONDING MATERIAL FINISH OF THE ADJOINING WORK WHERE DAMAGE IS NOT REPAIRABLE. NEW ITEMS OR EQUIPMENT SHALL BE

PROVIDED.

16. CONTRACTOR TO COORDINATE WITH THE COR FOR QUESTIONS REGARDING SITE ACCESS OF WORKERS, MATERIAL

DISPOSAL AND HOURS OF OPERATION.

17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND VERIFYING DIRECTLY WITH THE COR REGARDING ANY OWNER DESIRED CHANGES TO THE NUMBERING SYSTEM AND/OR NAMING CONVENTION, LABELING AND/OR IDENTIFICATION FOR (OR ON) THE ELECTRICAL PANELS, MECHANICAL EQUIPMENT, FIRE ALARM SYSTEMS/PANELS, SIGNAGE, ETC.

LEVEL 02 SCOPE AREA: 34,000 SF

LEVEL 03 SCOPE AREA: 12,000 SF

OVERALL: 36,000 SF

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

IM

/V

IS

N

S F

C A

R e p la c e A ir H a n d le r A

C -1

/S F

C A

-R e p la c e

A ir H a n d le r

A C

-1

V

.r v t

/2

/2

:2

:2

P

M

RO DC

657-23-108JC

01-GI100

915 North Grand Blvd, St. Louis, MO 63106

MARCH 8, 2024

PROJECT COVER SHEET 100% CONTRACT DOCUMENTS FCA-REPAIR AIR HANDLER AC-1

PROJECT NUMBER - 657-23-108JC

FCA-REPAIR AIR HANDLER AC-1

100% CONTRACT DOCUMENTS ■ MARCH 8, 2024

SHEET # SHEET TITLE

01-MH120B LEVEL 02 - ENLARGED PLAN - AREA 1B - HVAC

01-MH120C LEVEL 02 - ENLARGED PLAN - AREA 1C - HVAC

01-MH120D LEVEL 02 - ENLARGED PLAN - AREA 1D - HVAC

01-MH120E LEVEL 02 - ENLARGED PLAN - AREA 1E - HVAC

01-MH130 LEVEL 03 - HVAC PLAN

01-MH300 HVAC DETAILS

01-MH301 VAV BOX EXISTING CONDITION PHOTOS

01-MH302 VAV BOX EXISTING CONDITION PHOTOS

01-MH303 VAV BOX EXISTING CONDITION PHOTOS

01-MH304 VAV BOX EXISTING CONDITION PHOTOS

01-MM330 LEVEL 03 - ENLARGED MECHANICAL ROOM PLANS - MECHANICAL

01-MP120 LEVEL 02 - ENLARGED PLAN - MECHANICAL PIPING

01-MP120A LEVEL 02 - ENLARGED PLAN - AREA 1A - MECHANICAL PIPING

01-MP120B LEVEL 02 - ENLARGED PLAN - AREA 1B - MECHANICAL PIPING

01-MP120C LEVEL 02 - ENLARGED PLAN - AREA 1C - MECHANICAL PIPING

01-MP120D LEVEL 02 - ENLARGED PLAN - AREA 1D - MECHANICAL PIPING

01-MP120E LEVEL 02 - ENLARGED PLAN - AREA 1E - MECHANICAL PIPING

01-MP130 LEVEL 03 - MECHANICAL PIPING PLAN

01-MP300 PIPING DETAILS

01-MP301 PIPING DETAILS

01-MI100 MECHANICAL CONTROLS

01-MI101 MECHANICAL CONTROLS

01-MI102 MECHANICAL CONTROLS

PLUMBING

01-P-100 PLUMBING SYMBOLS, NOTES, ABBREVIATIONS, AND DEMOLITION PLAN

ELECTRICAL

01-E-001 ELECTRICAL LEGEND, SCHEDULES, AND ABBREVIATIONS

01-ED120 LEVEL 02 - POWER DEMOLITION PLAN

01-ED130 LEVEL 03 - POWER DEMOLITION PLAN

01-ED200 ENLARGED ROOM PLANS - POWER DEMOLITION

01-EP120 LEVEL 02 - POWER PLAN

01-EP130 LEVEL 03 - POWER PLAN

01-EP200 ENLARGED ROOM PLANS - POWER

Grand total: 61

SHEET # SHEET TITLE

GENERAL

01-GI100 PROJECT COVER SHEET

01-GI200 BUILDING ACCESS, CODE, AND CONSTRUCTION GENERAL NOTES

01-GI201 ICRA DETAILS

01-GI202 LEVEL 02 - LIFE SAFETY PLAN

01-GI203 LEVEL 03 - LIFE SAFETY PLAN

01-GI204 LEVEL 02 - CONSTRUCTION AREA GUIDELINES

01-GI205 LEVEL 03 - CONSTRUCTION AREA GUIDELINES

ARCHITECTURAL

01-AC101 LEVEL 02 - REFLECTED CEILING PLAN

01-AC102 LEVEL 03 - REFLECTED CEILING PLAN

MECHANICAL

01-MG100 MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONS

01-MG101 MECHANICAL SCHEDULES

01-MG102 MECHANICAL SCHEDULES

01-MG103 MECHANICAL SCHEDULES

01-MD120 LEVEL 02 - HVAC DEMOLITION PLAN

01-MD120A LEVEL 02 - ENLARGED PLAN - AREA 1A - HVAC DEMOLITION

01-MD120B LEVEL 02 - ENLARGED PLAN - AREA 1B - HVAC DEMOLITION

01-MD120C LEVEL 02 - ENLARGED PLAN - AREA 1C - HVAC DEMOLITION

01-MD120D LEVEL 02 - ENLARGED PLAN - AREA 1D - HVAC DEMOLITION

01-MD120E LEVEL 02 - ENLARGED PLAN - AREA 1E - HVAC DEMOLITION

01-MD130 LEVEL 03 - HVAC DEMOLITION PLAN

01-MD220 LEVEL 02 - MECHANICAL PIPING DEMOLITION PLAN

01-MD220A LEVEL 02 - ENLARGED PLAN - AREA 1A - MECHANICAL PIPING DEMOLITION

01-MD220B LEVEL 02 - ENLARGED PLAN - AREA 1B - MECHANICAL PIPING DEMOLITION

01-MD220C LEVEL 02 - ENLARGED PLAN - AREA 1C - MECHANICAL PIPING DEMOLITION

01-MD220D LEVEL 02 - ENLARGED PLAN - AREA 1D - MECHANICAL PIPING DEMOLITION

01-MD220E LEVEL 02 - ENLARGED PLAN - AREA 1E - MECHANICAL PIPING DEMOLITION

01-MD230 LEVEL 03 - ENLARGED PLAN - MECHANICAL PIPING DEMOLITION

01-MD330 LEVEL 03 - ENLARGED MECHANICAL ROOM PLAN - MECHANICAL DEMOLITION

01-MH120 LEVEL 02 - HVAC PLAN

01-MH120A LEVEL 02 - ENLARGED PLAN - AREA 1A - HVAC

OWNER:

Department of Veterans Affairs - Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth, KS 6604

CONTRACTING OFFICER (CO):

Department of Veterans Affairs - Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth, KS 6604

David Sterrett David.Sterrett@va.gov

913.946.1146 208.816.6619

CONTRACTING OFFICER REP. (COR):

St. Louis VAHCS – John Cochran Division 915 North Grand Blvd.

St. Louis, MO 63106

Walter Staas Walter.Staas@va.gov

314.652.4100 x58723

PROJECT MANAGER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, TX 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

319.721.4986 cell

ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, TX 75093

Rebecca Olson, AIA, ACHA, NCARB, LEED AP rebecca.olson@RomanykConsulting.com

855.424.3838 x302

602.430.1265 cell

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, TX 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

319.721.4986 cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, TX 75093

Yumei Wang, PE, PMP, LEED AP yumei.wang@RomanykConsulting.com

855.424.3838 x311

402.321.3766 cell

Revisions: Date:

CONSTRUCTION GENERAL NOTES

DN

PLAN LEGEND

BUILDING SCHEDULE

1 MAIN HOSPITAL & CLINICAL ADDITION

1A EMERGENCY GENERATOR VAULT

1B EMERGENCY GENERATOR VAULT

EDUCATION, MEDICAL MEDIA,

CHAPEL & RESEARCH

2T METHADONE CLINIC

2T2 OATP CLINIC

3 IRM & RESEARCH

4 NON-VA CARE / AFGE

5T OEF/OIF

6 RESEARCH

6A RESEARCH

7 RESEARCH

7A RESEARCH

8 BOILER PLANT

8A CHILLER PLANT

8B EMERGENCY GENERATOR

10 FLAG POLE

11 GAS METER HOUSE

12 WET SALT STORAGE

14 GARAGE

16 ENGINEERING / TRANSITION CARE TEAM

24 WASTE STORAGE FACILITY

DEC DECON TRAILER

1T MODULAR BUILDING

RESTAURANT VACANT

BLDG.

14 3

DELMAR AVE.

ENRIGHT AVE.

S P

R

IN

G S

T

AMEREN MISSOURI

SUBSTATION

8A 7

8B

7A

6A

BELL AVE.

1A

G R

A N

D B

L V

D

2T

5T

2T2

1T

DEC

1B

CODE SUMMARY

KEYED NOTES

1. PRIOR TO ANY WORK COMMENCEMENT, THE GC IS TO IDENTIFY ALL OVERALL RISKS THE PROJECT WILL CREATE FOR PATIENTS, STAFF, AND CONTRACTORS. THIS DATA IS TO BE UTILIZED BY THE ONSITE VA TEAM

THROUGH COLLABORATIVE CREATION OF A PRE-CONSTRUCTION RISK ASSESSMENT (PCRA).

2. THE PURPOSE OF THE CONSTRUCTION PHASING NOTES AND DRAWINGS IS TO PROVIDE THE GC WITH

GUIDANCE FOR THE CONSTRUCTION SCHEDULE. THE VA IS OPEN TO ALTERNATE PHASING AND

CONSTRUCTION SCHEDULES TO MINIMIZE DISRUPTIONS AND TO MAKE CONSTRUCTION MORE EFFICIENT.

ANY PROPOSALS MUST BE APPROVED BY THE CONTRACTING OFFICERS REPRESENTATIVE (COR) AND AT NO EXTRA COST TO THE GOVERNMENT. GENERAL CONTRACTOR TO COORDINATE WITH VA COR ALL REQUIRED PHASING PLANS TO INCLUDE DURATION OF THE WORK. ALL WORK IN CORRIDORS, AND OTHER AREAS DEEMED CRITICAL BY THE VA COR, TO BE PERFORMED AFTER NORMAL BUSINESS HOURS AND ON WEEKENDS TO MINIMIZE DISRUPTION TO THE FACILITY. GENERAL CONTRACTOR TO COORDINATE WITH THE VA COR ANY REQUIRED INTERIM LIFE SAFETY MEASURES(ILSM) DOCUMENTATION IN ACCORDANCE WITH

FACILITY PROTOCOLS.

3. REGULAR MEDICAL CENTER BUSINESS HOURS ARE 8:00AM - 5:00PM. LABORATORY AREAS FUNCTION 24

HOURS A DAY, 7 DAYS A WEEK.

4. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED CONSTRUCTION, SAFETY, AND ICRA BARRIERS. ANY AND ALL ICRA BARRIERS MAY NEED TO BE CONSTRUCTED OUTSIDE REGULAR MEDICAL CENTER BUSINESS HOURS AT NO EXTRA COST TO THE GOVERNMENT. CONSULT WITH THE COR AND ANY PROPOSALS MUST BE APPROVED BY THE COR. BARRIERS MUST BE COMPLETED AND APPROVED BY COR BEFORE CONSTRUCTION

COMMENCES WITH THE ICRA PERMIT DISPLAYED DURING CONSTRUCTION FOR EACH PHASE.

5. ANY OTHER WORK DONE BEHIND A CONTAINMENT BARRIER MAY BE DONE DURING REGULAR BUSINESS HOURS AND DURING LABORATORY OPERATIONS UNLESS NOTED IN THE PHASING LEGEND. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER ABOVE 85 DECIBELS SHALL BE COORDINATED WITH THE COR. THE COR RESERVES THE RIGHT TO DELAY WORK SHOULD EXCESSIVE NOISE

DISTURB PATIENT CARE PROCEDURES OR LABORATORY PROCEDURES IN PROXIMITY TO THE

CONSTRUCTION CONTAINMENT BARRIER. IF THERE IS ANYTHING THE COR HAS DEEMED EXCESSIVE OR DISRUPTIVE TO PATIENT CARE PROCEDURES, LABORATORY PROCEDURES, OR HOSPITAL OPERATIONS, A PLAN OF ACTION WILL BE IMMEDIATELY PUT IN PLACE TO AVOID DISRUPTIONS TO THE CONSTRUCTION

SCHEDULE.

6. ANY UTILITY SHUTDOWNS WILL REQUIRE 21 CALENDAR DAYS NOTICE AND ANY SHUTDOWNS THAT MAY DISRUPT NORMAL MEDICAL CENTER OPERATIONS MAY NEED TO BE PERFORMED OUTSIDE REGULAR MEDICAL CENTER BUSINESS HOURS AT NO EXTRA COST TO THE GOVERNMENT. MAINTAIN UNINTERRUPTED OPERATION OF THE EXISTING FACILITIES, AND MINIMIZE DISRUPTIONS TO THE MEDICAL CENTER FOR ALL SWITCH-OVER OF UTILITIES. COR RESERVES THE RIGHT TO DETERMINE THE SEVERITY OF THE SHUTDOWN.

7. THE GC SHALL COORDINATE WITH THE COR TO DEVELOP A CRITICAL PATH METHOD (CPM) SCHEDULE, SEQUENCING, COMPLETION DATES FOR RENOVATION AND NEW CONSTRUCTION FOR THE PROJECT. THE

CONSTRUCTION SCHEDULE IS ALLOWED TO SHOW PHASES OVERLAPPING EACH OTHER WITH COR

APPROVAL.

8. THE MEDICAL CENTER MUST REMAIN IN FULL OPERATION DURING CONSTRUCTION WITH MINIMAL INTERRUPTION DUE TO ALL CONSTRUCTION ACTIVITIES FOR THE PROJECT, INCLUDING NOISE, DUST, VIBRATION, ETC., CREATED BY CONSTRUCTION ACTIVITIES RELATED TO THIS PROJECT.

9. THE GC'S SCHEDULES SHOULD INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING:

A. ALL CONSTRUCTION-ACTIVITIES-RELATED ISSUES WHICH MAY AFFECT THE CONTINUAL OPERATIONS OF

THE MEDICAL CENTER,

B. SCHEDULES FOR SHUTTING DOWN EXISTING SYSTEMS OR ACCESS FOR TIE-INS AND/OR REPLACEMENT, C. SCHEDULES FOR AFTER-HOURS CONSTRUCTION ACTIVITIES.

D. BARRIERS AND OTHER PROTECTIVE MEASURES SUCH AS ISOLATING THE HVAC SYSTEM IN AREAS

WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCTS, ETC.

E. IBC (2021) CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION 3302.1 AND 1007.3.5 MAINTAIN REQUIRED

CORRIDOR EGRESS AT TEMPORARY BARRIERS AND PROVIDE SIGNAGE.

F. INVESTIGATE EXISTING FIELD CONDITIONS OF FIRE RESISTANCE PARTITIONS/ASSEMBLIES. IBC (2021)

SECTION 714, PROVIDE UL APPROVED FIRE RESISTANT JOINT SYSTEM PENETRATIONS ABOVE CEILING

LABELED, IBC (2021) SECTION 703.

10. PROVIDE APPROPRIATE BARRIERS AS REQUIRED TO SEPARATE CONSTRUCTION ACTIVITIES FROM PUBLIC AREAS AND AREAS REQUIRING ACCESS DURING CONSTRUCTION. BARRIERS SHOULD BE RELOCATED AS REQUIRED AFTER EACH PORTION OF WORK IS COMPLETED TO ACCOMMODATE ACCESS TO EXISTING

FACILITIES AS CONSTRUCTION PROGRESSES.

11. IF MEDICAL CENTER ACCESS PATHWAYS IDENTIFIED ON THE PHASING PLANS ARE REQUIRED TO BE BLOCKED TEMPORARILY TO ACCOMMODATE CONSTRUCTION, COORDINATE ALTERNATE PATHWAYS WITH THE COR AND PROVIDE TEMPORARY SIGNAGE AND TEMPORARY PROTECTIVE BARRIERS TO CREATE ALTERNATE PATHWAYS AS REQUIRED. REFER TO THE PHASING DIAGRAMS FOR ADDITIONAL NOTES. COORDINATE AND

SCHEDULE ANY DOWNTIME FOR THESE ROUTES WITH THE COR.

12. THE GC SHALL SEEK FINAL APPROVAL OF THE LOCATION OF ANY AND ALL BARRIERS AND CONTRACTOR SITE

ACCESS AND DEBRIS AND MATERIAL HAUL ROUTES WITH THE COR.

13. MAINTAIN ACCESS TO ALL EXISTING BUILDINGS, UTILITIES AND FACILITIES WITHIN THE CONSTRUCTION LIMITS TO ACCESS EQUIPMENT AND TO PROVIDE SERVICE OR MAINTENANCE OF EXISTING FACILITIES AND EQUIPMENT SERVING THE MEDICAL CENTER. ALL ACCESS ROADS ARE SHARED WITH STAFF, PATIENTS, AND

CONTRACTORS.

14. THE GC HAS RESPONSIBILITY IN DETERMINING THE CORRECT PHASING TO MATCH THE REQUIREMENTS OF THE CONSTRUCTION CONTRACT AS WELL AS THE ACTUAL LOCATIONS AND THE METHODS THROUGH WHICH

TO CONSTRUCT THE ICRA-COMPLIANT CONSTRUCTION BARRIERS.

15. THE GC SHALL COORDINATE WITH THE COR TO LOCATE THE SAFETY SIGN AND CONSTRUCTION SIGN.

16. MAINTAIN ALL FIRE BARRIERS AND DUST PARTITIONS AS REQUIRED TO PROVIDE A DUST-FREE AND CLEAN ENVIRONMENT BETWEEN RENOVATED AREAS WITHIN THE HOSPITAL AND AREAS ADJACENT TO RENOVATED

AND NEW CONSTRUCTION.

17. MAINTAIN INSULATED AND WATERTIGHT EXTERIOR ENCLOSURE FOR EXISTING FACILITY AT ALL TIMES.

18. ISOLATE HVAC SYSTEM WHERE WORK IS PERFORMED TO PREVENT CONTAMINATION OF DUCT SYSTEM.

19. ALL PERSONNEL ENTERING RENOVATION AREAS WITHIN OCCUPIED FLOORS OF THE MEDICAL CENTER SHALL WEAR SHOE COVERS, AND THESE MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

PROVIDE ADHESIVE WALK-OFF MATS AT ENTRANCES TO THESE WORK AREAS. IF THERE IS AN ANTEROOM, MAT SHOULD BE WITHIN THIS AREA. REPLACE MATS DAILY OR WHEN THEY NO LONGER ARE ABLE TO CONTAIN DUST AND DIRT. WET MOP AND/OR VACUUM WORK AREA WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREAS. CONTAIN CONSTRUCTION WASTE IN TIGHTLY COVERED CONTAINERS BEFORE TRANSPORTING. REMOVE HVAC ISOLATION FROM SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE THE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

THOROUGHLY CLEANED.

20. PHASING PLAN AND ICRA DEFINES THE AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER PROJECTS, ETC..), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZE OF ICRA BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITES PROVISIONS REQUIRING CONTAINMENT AS NOTED ON SHEET 01-GI102.

21. VERIFY ALL LABORATORY EQUIPMENT LOCATIONS WITH VA BEFORE COMMENCING WORK. ALL LABORATORY EQUIPMENT THAT IS STATIONARY WILL NOT BE MOVED. CONTRACTOR WILL BE EXPECTED TO PROVIDE A BARRIER AND WORK AROUND THIS EQUIPMENT. SINCE THE LABORATORY FUNCTIONS 24 HOURS A DAY, 7 DAYS A WEEK, SOME LABORATORY EQUIPMENT WILL NEED TO STAY OPERATIONAL DURING CONSTRUCTION.

SEE PHASING PLAN FOR ADDITIONAL INFORMATION.

22. SOME NON STATIONARY LABORATORY EQUIPMENT (EQUIPMENT SITTING ON A COUNTERTOP OR MOBILE UNITS) MAY BE MOVED. CONTRACTOR TO IDENTIFY AND REQUEST THE MOVEMENT OF THE EQUIPMENT WITHIN THEIR CONSTRUCTION SCHEDULE. ONLY MEDICAL CENTER LABORATORY PERSONNEL WILL BE

ALLOWED TO MOVE EQUIPMENT.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR MOVING AND STORAGE OF ALL FURNITURE RELATED TO THE PROJECT, INCLUDING BUT NOT LIMITED TO FURNITURE, NON-LABORATORY EQUIPMENT, SIGNAGE, AND

ARTWORK. SEE SPEC.

24. CERTAIN ROOMS AS LISTED ON THE DRAWINGS MAY HAVE DIFFERENT ALLOWABLE CONSTRUCTION TIMES.

SEE THE DRAWINGS FOR LISTED TIMES.

25. ALL LARGE BULKY CONSTRUCTION MATERIAL OR EQUIPMENT DELIVERIES OR DEBRIS REMOVAL MUST BE COMPLETED BY 8:00AM M-F. FOLLOW ALL ICRA GUIDELINES FOR SAFE HANDLING OF MATERIAL AND CLEAN-

UP OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER.

26. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER ABOVE 85 DECIBELS SHALL BE COORDINATED WITH COR. THE COR RESERVES THE RIGHT TO DELAY WORK FOR 1-2 HOURS SHOULD EXCESSIVE NOISE DISTURB PATIENT CARE PROCEDURES OR LABORATORY PROCEDURES IN

PROXIMITY TO THE CONSTRUCTION CONTAINMENT BARRIER.

27. ANYTHING THE COR HAS DEEMED EXCESSIVE OR DISRUPTIVE TO PATIENT CARE PROCEDURES OR LABORATORY PROCEDURES. A PLAN OF ACTION WILL BE IMMEDIATELY PUT IN PLACE TO AVOID DISRUPTIONS

TO THE CONSTRUCTION SCHEDULE.

01-GI202

01-GI203

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

CONTRACTOR ACCESS

PROJECT CODE DATA

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER

915 N GRAND BLVD.

ST. LOUIS, MO 63106

APPLICABLE CODES

2024 NFPA NATIONAL FIRE PROTECTION ASSOCIATION LIFE SAFETY CODE

NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

2021 IBC INTERNATIONAL BUILDING CODE

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

07/01/2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2023 NEC NATIONAL ELECTRIC CODE

2021 IPC INTERNATIONAL PLUMBING CODE

11/01/2023 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG13-18)

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL

CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON

TECHNICAL INFORMATION LIBRARY (TIL) (www.cfm.va.gov/til/)

OCCUPANCY GROUP

IBC OCCUPANCY CLASSIFICATION GROUP B (AMBULATORY CARE FACILITIES) SECTION 304

NFPA 101 CHAPTER 21 EXISTING AMBULATORY HEALTH CARE OCCUPANCY 6.1.6

IBC OCCUPANT LOAD FACTOR TABLE 1004.5 BUSINESS 150 SF, 50 SF CONCENTRATED BUSINESSES

1004.8 50

NFPA 101 TABLE7.3.1.2 OCCUPANT LOAD FACTOR AMBULATORY HEALTH CARE USE 150 SF

BUILDING CONSTRUCTION CLASSIFICATION

NFPA 101 (BLDG. 01 PROJECT SCOPE) TYPE II (000) CHAPTER 21 EXISTING AMBULATORY HEALTH

CARE OCCUPANCIES TABLE 21.1.6.1

IBC II-B TABLE 601.1 (BLDG. 01 PROJECT SCOPE)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS PER IBC TABLE 601

II-B

0 HR. PRIMARY STRUCTURAL FRAME

0 HR. BEARING WALLS - EXTERIOR

0 HR. BEARING WALLS - INTERIOR

NON BEARING WALLS & PARTITIONS TABLE 602

0 HR. NON BEARING WALLS & PARTITIONS - INTERIOR

0 HR. FLOOR CONSTRUCTION & SECONDARY MEMBERS SECTION 202

0 HR. ROOF CONSTRUCTION & ASSOCIATED SECONDARY MEMBERS SECTION 202

BUILDING IS PROTECTED THROUGHOUT BY AN AUTOMATIC SPRINKLER SYSTEM

OCCUPANCY SEPARATION NFPA 101 TABLE 6.1.14.4.1(A)

NFPA 101 TABLE A.7.6 COMMON PATH, DEAD-END AND TRAVEL DISTANCE LIMITS (BY OCCUPANCY)

50 FT. DEAD END LIMIT EXISTING AMBULATORY HEALTH CARE

100 FT. COMMON PATH OF TRAVEL LIMIT EXISTING AMBULATORY HEALTH CARE

200 FT. TRAVEL DISTANCE LIMIT EXISTING AMBULATORY HEALTH CARE

INTERIOR FINISHES PER IBC TABLE 803.13

CLASS B INTERIOR EXIT STAIRWAYS & RAMPS

CLASS C CORRIDORS & ENCLOSURE FOR EXIT ACCESS STAIRWAYS & RAMPS

CLASS C ROOMS & ENCLOSED SPACES

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

B

IM

/V

IS

N

S F

C A

R e p la c e A ir H a n d le r A

C -1

/S F

C A

-R e p la c e

A ir H a n d le r

A C

-1

V

.r v t

/1

/2

:0

:5

P

M

RO DC

657-23-108JC

01-GI200

915 North Grand Blvd, St. Louis, MO 63106

MARCH 8, 2024

BUILDING ACCESS, CODE, AND CONSTRUCTION

GENERAL NOTES

100% CONTRACT DOCUMENTS FCA-REPAIR AIR HANDLER AC-1

1" = 40'-0"

LEVEL 02 - OVERALL PLAN

1" = 40'-0"

LEVEL 03 - OVERALL PLAN

1" = 100'-0"

OVERALL SITE PLAN

1. SITE ACCESS FOR CONTRACTOR PERSONNEL AND MATERIAL DELIVERY /

SUPPLIES.

2. DESIGNATED PARKING FOR CONTRACTOR, TO BE DETERMINED.

3. CONTRACTOR STAGING AREA, TO BE DETERMINED.

4. CONTRACTOR ACCESS TO THE BUILDING.

5. CONTRACTOR BUILDING ELEVATOR ACCESS.

6. USE OF TOILETS FOR CONTRACTOR, TO BE DETERMINED.

INFECTION CONTROL GENERAL NOTES

1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED. ALL AIR VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE

PRESSURE SYSTEMS. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR TO DECK.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES. THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL AREAS MUST BE COMPLETELY TIGHTLY COVERED TO CONTAIN DUST DURING TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE.

ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.

3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH DISINFECTANT DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE. PROVIDE PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND N95 RESPIRATORS REQUIRED

BY THE SAFETY SPECIFICATION.

4. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS..

5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO COORDINATE WITH THE COR PRIOR TO CONSTRUCTION.

6. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT DOCUMENTATION AND THE COR PRIOR TO IMPLEMENTATION.

7. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE CONTAINMENT AREA, IF EXISTING WALLS AND/OR PARTITIONS DO NOT

EXTEND TO THE STRUCTURE ABOVE.

8. COORDINATE WITH MEP/FP.

9. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES

(PATIENT CENSUS, OTHER PROJECTS, ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITE PROVISIONS REQUIRING CONTAINMENT (ANTE ROOM, WALK-OFF MATS, ETC.) AIR-PRESSURIZATION CRITERIA, AND IDENTIFICATION AS NOTED ON SHEET GI-103 TO GI-106.

10. CERTAIN ROOMS AS LISTED ON THE DRAWINGS MAY HAVE DIFFERENT ALLOWABLE CONSTRUCTION TIMES. SEE THE DRAWINGS FOR LISTED

TIMES.

11. ALL LARGE BULKY CONSTRUCTION MATERIAL OR EQUIPMENT DELIVERIES OR DEBRIS REMOVAL MUST BE COMPLETED BY 8:00AM M-F. FOLLOW ALL ICRA GUIDELINES FOR SAFE HANDLING OF MATERIAL AND CLEAN-UP OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER.

12. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER ABOVE 85 DECIBELS SHALL BE COORDINATED WITH COR. THE COR RESERVES THE RIGHT TO DELAY WORK FOR 1-2 HOURS SHOULD EXCESSIVE NOISE DISTURB PATIENT CARE PROCEDURES OR

LABORATORY PROCEDURES IN PROXIMITY TO THE CONSTRUCTION CONTAINMENT BARRIER.

13. ANYTHING THE COR HAS DEEMED EXCESSIVE OR DISRUPTIVE TO PATIENT CARE PROCEDURES OR LABORATORY PROCEDURES. A PLAN OF ACTION WILL BE IMMEDIATELY PUT IN PLACE TO AVOID DISRUPTIONS TO THE CONSTRUCTION SCHEDULE.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

NOT TO SCALE

B

IM

/V

IS

N

S F

C A

R e p la c e A ir H a n d le r A

C -1

/S F

C A

-R e p la c e

A ir H a n d le r

A C

-1

V

.r v t

/1

/2

:0

:5

P

M

RO DC

657-23-108JC

01-GI201

915 North Grand Blvd, St. Louis, MO 63106

MARCH 8, 2024

ICRA DETAILS 100% CONTRACT DOCUMENTS FCA-REPAIR AIR HANDLER AC-1

TYPE B

HIGH RISK

III

Revisions: Date:

VHASTLSTAASW

Text Box ICRA Barrier Additional Notes

ICRA barriers shall not be built during Medical Center business hours 8:00am-4:30pm M-F. Some areas may have additional time restrictions.

ICRA barriers at most rooms shall be Class IV. There must be an ante room.

ICRA barriers at locations that will be active for less than 30 calendar days and have minimal dust generating activity may be allowed to have a plastic zippered door separating the ante room and construction zone. The contractor shall provide a written proposal for VA Infection Prevention personnel to review but must be prepared to provide a more restrictive barrier per ICRA requirements at no cost to the government.

ICRA barriers at some locations may be allowed to be a mobile containment unit or other similar mobile or modular containment system. The contractor shall provide a written proposal for VA Infection Prevention personnel to review but must be prepared to provide a more restrictive barrier per ICRA requirements at no cost to the government.

All gaps in the containment barrier must be taped and sealed. Taping is to be done in a manner as to not be destructive to existing infrastructure or the contractor is responsible for repair. Taping is to be inspected daily and any gaps resealed or retaped to maintain the required negative air pressure. Negative air outlet shall use a piece of hard flat material in the window with a hole in it for the tubing and use a round flange and attach the tubing with a band clamp or similar VA approved method.

Doors into ICRA barriers shall be:

• Metal and wipeable to maintain a dust free clean surface. No wood allowed. ADA compliant threshold, or no threshold.

• Pre-manufactured temporary wall systems are allowed per VA approval.

• Have a door closer. Door must close and latch on its own power while the negative air is operational.

• A door latch and lock compatible with the VA key core.

o CL3357 NZD 626 RH CT6 (LFIC LESS CONST. CORE) (Storeroom function) Lock set for JC Large Format Interchangeable Core.

o A potential supplier - IDN-H Hoffman Inc. 314-692-8391.

VHASTLSTAASW

Image

LIFE SAFETY NOTES

LIFE SAFETY LEGEND

1-A2-A3-A4-A5-A6-A7-A8-A9-A10-A11-A12-A13-A14-A

C-A

D-A

E-A

F-A

G-A

B-A

A.1-A

S-A

R-A

Q-A

P-A

N-A

M-A

CONFERENCE RM.

D215

STORAGE

D214

OFFICE

D213

MICROSCOPE

D216

ANCILLARY TESTING

D263

CHEMICAL STORAGE

D264

OFFICE

D265

STORAGE

D205

VACANT

D206

OFFICE

D204

OFFICE/EXAM

D203

TOILET, FEMALE

D202A

TOILET, MALE

D201A

STAIR 07

S207

STORAGE

C213A

EXAM

C212

TOILET

C213

OFFICE

C211

EXAM

C210

LAB

C207

OFFICE

C206

MOLECULAR DIAG.

C205

OFFICE

C209

EXAM

C204

OFFICE

C203

CLINICAL

C201

ANTE ROOM

D219

ELEC CLOSET

D269A

BULK STORAGE

D269

CORRIDOR

H229

OFFICE

D260 OFFICE

D256

OFFICE

D261

OFFICE

D257

OFFICE

D250

OFFICE

D249

OFFICE

D247

PHARMACY STORAGE

C216

NEUROPATHOLOGY

D207

CORRIDOR

D208

LOCKER, FEMALE

D202

WAITING RM.

C208

EXERCISE LAB

C200

SOILED UTILITY

B203B

OFFICE

C215

MECH.RM.

C215A

OFFICE

C220

CONFERENCE

C217

STORAGE

B203C

BLOOD DRAW

B207A

BLOOD DRAW

B207B

BLOOD DRAW

B207C

BLOOD DRAW

B207

BLOOD DRAW

B207D

COMPUTER RM

C218

OI&T

C218A

OFFICE, SUPER

HEMATOLOGY

D242

OFFICE

D243

OFFICE

D245

BREAK RM.

D244

BREAK RM.

D253

BREAK RM.

D254

OFFICE

D252

HAC

D255

OI&T

C215B

PHARMACY STORAGE

C214

EXG & HOLTER MONITOR

B206

STORAGE

B206B

TOILET

B208

TOILET

B209

WORK AREA

B210

LOUNGE

C219

SUPPLIES

B205A

CONFERENCE RM.

B204B

STORAGE

D238AGAS STORAGE

D238

BLOODBANK

D237

STAIR 6

S206

OFFICE

B211

OFFICE

B212

OFFICE

B213

OFFICE

B214

OFFICE

B215

OFFICE

B216

OFFICE

B216A

STAIR 3

S203

URINE/FECES ANALYSIS

D236

IMMEDIATE RESPONSE

D235

STAT CHEMISTRY

D234PATHOLOGY LAB

D241

HVAC

D239

JANITOR

D240

OI&T

D240A

SECRETARY

D248

HEMO STERILE

D271

STERILIZATION

D270

MICROBIOLOGY

D221

OFFICE

D226

WALK-IN REF

D225

WALK-IN REF

D225A

MECH.RM

D225B

MEDIA PREP

D224

IMMUNOLOGY

D228

MICROBIOLOGY

D223

TRANSFER RM.

D222

TB RM.

D220

ELEC. CLOSET

B217

OI&T

B217A

HAC

B218

HOLTER SCANNER LAB

B205D

OFFICE

B204

TEST RM

B204A

KITCHEN

B202D

OFFICE

B203

STORAGE

C202A

OI&T

B206A

ELEVATOR LOBBY

H223

CORRIDOR

H221

ELEVATOR LOBBY

H222

CORRIDOR

H219

CHUTE

B205C

CORRIDOR

C225

CORRIDOR

H226

CORRIDOR

D246

MAIL HOLDING

D259

CORRIDOR

H231

CORRIDOR

H228

HISTOLOGY LAB

D209

CYTOLOGY LAB

D210CYTOLOGY

D211

DARK RM.

D266

HISTOLOGY LAB

D212

STAIR 09

S209

RSO

B219

DEPUTY RSO

B219A

STAFF WORK.RM

B203A

HAC

B203D

CORR.

H223B

ELEC.

D234A

OFFICE

D267

OFFICE

D268

LOCKER, MALE

D201

M A

T C

H L

IN

E

OFFICE

C202

STAIR 08

S208

CORRIDOR

H217

CONFERENCE

B242

SOILED UTILITY

B243

NUC.MED SUPERVISOR

B229READING

B220

BLOOD DRAW

B210A

1. THE LIFE SAFETY PLANS ARE "DIAGRAMMATIC ONLY". THEIR PURPOSE IS

SOLELY TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT.

THE GENERAL CONTRACTOR SHALL USE THE CONSTRUCTION DOCUMENTS

(NOT THE LIFE SAFETY PLANS) FOR THE IMPLEMENTATION OF THE REQUIRED

LIFE SAFETY COMPONENTS INTO THE PROJECT.

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

EXIT STAIRWELL / PASSAGEWAY

EXIT

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1 HOUR SMOKE COMPARTMENT

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

KEY PLAN

PLAN NORTH

B

IM

/V

IS

N

S F

C A

R e p la c e A ir H a n d le r A

C -1

/S F

C A

-R e p la c e

A ir H a n d le r

A C

-1

V

.r v t

/1

/2

:0

:5

P

M

RO DC

657-23-108JC

01-GI202

915 North Grand Blvd, St. Louis, MO 63106

MARCH 8, 2024

LEVEL 02 - LIFE SAFETY PLAN 100% CONTRACT DOCUMENTS FCA-REPAIR AIR HANDLER AC-1

1" = 10'-0"

LEVEL 02 - LIFE SAFETY PLAN

NOTIFICATION: THIS SHEET TO BE PRINTED IN COLOR

LIFE SAFETY NOTES

LIFE SAFETY LEGEND

1-A2-A3-A4-A5-A6-A7-A8-A9-A10-A11-A12-A13-A14-A

C-A

D-A

E-A

F-A

G-A

B-A

A.1-A

S-A

R-A

Q-A

P-A

N-A

M-A

M A

T C

H L

IN

E

RETAIL STORAGE

C303C

RETAIL STORAGE

C303D

OFFICE

C303A

OFFICE

C303

ELEVATOR LOBBY

H311

STORAGE

C304

OFFICE

B303E

OFFICE

B303F

OFFICE

B303G

CONFERENCE

B303H

STORAGE

C304

CORRIDOR

H312

RETAIL STORE (CANTEEN)

B306

CORRIDOR

H309

DINING RM.

B315

STORAGE

B314A

ELEC

B313A

STAIR 06

S306

STAIR 03

S303

MECH RM.

D302B

MECH. RM

D302C

MECH. RM.

D302A

MECH. RM.

C301

MECH. RM.

D303A

MECH. RM.

D302

STAIR 07

S307

MECH. RM.

C301A

MECH. RM.

C301

ELEV 7

A368

ELEV 8

A369

ELEV 9

A370

STAIR 09

S309

STAIR 08

S308

1. THE LIFE SAFETY PLANS ARE "DIAGRAMMATIC ONLY". THEIR PURPOSE IS

SOLELY TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT.

THE GENERAL CONTRACTOR SHALL USE THE CONSTRUCTION DOCUMENTS

(NOT THE LIFE SAFETY PLANS) FOR THE IMPLEMENTATION OF THE REQUIRED

LIFE SAFETY COMPONENTS INTO THE PROJECT.

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

EXIT STAIRWELL / PASSAGEWAY

EXIT

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1 HOUR SMOKE COMPARTMENT

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

KEY PLAN

PLAN NORTH

B

IM

/V

IS

N

S F

C A

R e p la c e A ir H a n d le r A

C -1

/S F

C A

-R e p la c e

A ir H a n d le r

A C

-1

V

.r v t

/1

/2

:0

:5

P

M

RO DC

657-23-108JC

01-GI203

915 North Grand Blvd, St. Louis, MO 63106

MARCH 8, 2024

LEVEL 03 - LIFE SAFETY PLAN 100% CONTRACT DOCUMENTS FCA-REPAIR AIR HANDLER AC-1

1" = 10'-0"

LEVEL 03 - LIFE SAFETY PLAN

CONSTRUCTION GUIDELINES

KEY NOTES

2-A3-A4-A5-A6-A7-A8-A9-A10-A11-A12-A13-A14-A

C-A

D-A

E-A

F-A

G-A

B-A

A.1-A

S-A

R-A

Q-A

P-A

N-A

M-A

CONFERENCE RM.

D215

STORAGE

D214OFFICE

D213

MICROSCOPE

D216

OFFICE

D267

ANCILLARY TESTING DEPT.

D263

CHEMICAL STORAGE

D264

ANCILLARY TESTING LAB

D265

BREAK ROOM

D205

VACANT

D206

OFFICE

D204

OFFICE/EXAM

D203

TOILET, FEMALE

D202A

LOCKER

D201

STAIR 07

S207

STORAGE

C213A

EXAM

C212

TOILET

C213

OFFICE

C211 EXAM

C210 OFFICE

C207

OFFICE

C206

OFFICE

C205

OFFICE

C209

EXAM

C204

OFFICE

C203

OFFICE

C202

CLINICAL

C201

ANTE ROOM

D219

ELEC CLOSET

D269A

BULK STORAGE

D269

CORRIDOR

H229

OFFICE

D260

OFFICE

D256

OFFICE

D261

OFFICE

D257

OFFICE

D250

OFFICE

D249

OFFICE

D247

PHARMACY CACHE

C216

NEUROPATHOLOGY

D207

CORRIDOR

D208

LOCKER RM. FEMALE

D202

WAITING RM.

C208

EXERCISE LAB

C200

SOILED UTILITY

B203B

OFFICE

C215

MECH.RM.

C215A

OFFICE

C220

CONFERENCE

C217

STORAGE

B203C

BLOOD DRAW

B207A

BLOOD DRAW

B207B

BLOOD DRAW

B207C

BLOOD DRAW

B207

BLOOD DRAW

B207D

COMPUTER RM

C218

OI&T

C218A

OFFICE, SUPER

HEMATOLOGY

D242

OFFICE

D243

OFFICE

D245

BREAK RM.

D244

BREAK RM.

D253

BREAK RM.

D254

OFFICE

D252

HAC

D255

OI & T

C215B

PHARMACY CACHE

C214

EXG & HOLTER MONITOR

B206

STORAGE

B206B

TOILET

B208

STORAGE

B209

WORK AREA

B210

OFFICE

C219

SUPPLIES

B205A

CONFERENCE RM.

B204B

STORAGE

D238AGAS STORAGE

D238

BLOODBANK

D237

STAIR 6

S206

OFFICE

B211

OFFICE

B212

OFFICE

B213

OFFICE

D214

OFFICE

B215

URINE/FECES ANALYSIS

D236

IMMEDIATE RESPONSE

D235

STAT CHEMISTRY

D234

PATHOLOGY LAB

D241

HVAC

D239

HVAC

D240

OIT&T

D240A

SECRETARY

D248

HEMO STERILE

D271

STERILIZATION

D270

MICROBIOLOGY

D221

MICRO SUP. OFFICE

D226

WALK-IN REF

D225

WALK-IN REF

D225A

MECH.RM

D225B

MEDIA PREP

D224

IMMUNOLOGY/ SEROLOGY

D228

MICROBIOLOGY

D223

TRANSFER RM.

D222

TB RM.

D220

STAFF WORK.RM

B203A

KITCHEN

B202D

TEST RM

B204A

OFFICE

B204

HAC

B203D

HOLTER SCANNER LAB

B205D

STRESS LAB

B205B

CORRIDOR

H234

2 2

VAV-1-25 (EX)

VAV-1-26 (EX)

VAV-1-30 (EX)

VAV-1-18 (EX)

VAV-1-23 (EX)

VAV-1-48 (EX)

VAV-1-16 (EX)

VAV-1-17 (EX)

VAV-1-21 (EX)

VAV-1-22 (EX)

VAV-1-20 (EX)

VAV-1-19 (EX)

VAV-1-15 (EX)

VAV-1-12 (EX)

VAV-1-14 (EX)

VAV-1-13 (EX)

VAV-1-47 (EX)

VAV-1-44 (EX)

VAV-1-42 (EX)

VAV-1-41 (EX)

3 3

VAV-1-27 (EX)

VAV-1-74 (EX)

VAV-1-24 (EX)

VAV-1-11 (EX)

VAV-53 (EX)

VAV-47 (EX) VAV-38 (EX)

VAV-46 (EX)

VAV-50 (EX)

VAV-1-10 (EX)

VAV-1-28 (EX)

VAV-1-29 (EX)

VAV-1-32 (EX)

VAV-1-33 (EX)

2 2

VAV-1-35 (EX)

VAV-1-34 (EX)

VAV-1-36 (EX)

VAV-1-45 (EX)

VAV-1-37 (EX)

VAV-1-38 (EX)

VAV-1-31 (EX)

VAV-1-3 (EX)

VAV-1-2 (EX)

VAV-1-1 (EX)

VAV-1-57 (EX)

VAV-1-59 (EX)

VAV-1-58 (EX)

VAV-1-60 (EX)

VAV-1-61 (EX)VAV-1-63 (EX)

VAV-1-64 (EX)

VAV-1-62 (EX)

VAV-74 (EX)

VAV-1-55 (EX)

VAV-1-54 (EX)

VAV-1-4 (EX)

VAV-1-49 (EX)

VAV-1-54 (EX)

VAV-1-66 (EX)

VAV-1-59 (EX)

VAV-1-68 (EX)

VAV-1-67 (EX)

OFFICE

D268

DARK RM

D266

VAV-1-50 (EX)

VAV-1-51 (EX)

VAV-1-52 (EX)

CORR

H223A

BLOOD DRAW

D210A

M A

T C

H L

IN

E

STAIR 3

S203

OFFICE

B216A

OFFICE

B216

Room B223Z

Room B223Y

Room B223X

ELEC. CLOSET

B223U

OI&T

B217A

5 6

5 5

STAIR 08

S208

STAIR 09

S209

PHASE 1. WORK TO BE DONE ON ONE VAV AT A TIME IN THE LAB. STAT WITH

VAV-1-25(EX), VAV-1-26(EX), VAV-1-30(EX). THEN SEQUENCING IS UP TO THE

CONTRACTOR'S APPRVED SCHEDULE. SEE FULL PROPOSED CONSTRUCTION

SCHEDULE ON 01-MG103. (LEGEND NOTES 1, 2, 3, 4)

1. THERE IS A MAXIMUM OF TWO WEEKS TO COMPLETE WORK PER VAV BOX.

2. PERSONNEL IN THE OFFICE WILL RELOCATE DURING CONSTRUCTION.

3. FURNITURE WILL NOT BE MOVED BY THE VA.

4. REFER AND COORDINATE WITH MECHANICAL DOCUMENTS.

5. SEE CONSTRUCTION PHASE IDENTIFICATION MARKER. PHASE 1 SHALL BE

FIRST. PHASES 2-8 SHALL BE DETERMINED BY GC IN CONSULTATION WITH

THE COR.

6. INVESTIGATE EXISTING FIELD CONDITIONS OF FIRE RESISTANCE PARTITIONS

THAT ARE AFFECTED BY WORK SCOPE AND PROVIDE UL APPROVED FIRE-

RESISTANT JOINT SYSTEM PENETRATIONS ABOVE CEILING LABELED, IBC

(2021) SECTION 70 AND SECTION 7.1.1.

7. GC SHALL DETERMINE PROJECT DAILY SCHEDULE AND TIMELINE, AND

COORDINATE WITH COR. TAKE PREVENTATIVE MEASURES SUCH AS

SEALING DOORS IN DAILY PROJECT AREA OR TEMPORARY RELOCATION OF

STAFF AND OR PATIENTS. REFER TO ICRA RISK ASSESSMENT.

REFER TO PHASING NOTES LOCATED ON SHEET 01-GI200

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

VAV LOCATION. SEE MECHANICAL PLANS.

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1 HOUR SMOKE COMPARTMENT

TEMPORARY ICRA BARRIER WALL / CEILING, DUCTS AND

DIFFUSERS AND/OR USE HEPA CART

CONTRACTOR ACCESS

PHASE 2. CONSTRUCTION CAN ONLY HAPPEN IN ONE ROOM AT A TIME.

(LEGEND NOTES 1, 2, 3, 4)

PHASE 3. CONSTRUCTION CAN ONLY HAPPEN IN NO MORE THAN TWO (2)

ROOMS AT A TIME. (LEGEND NOTES 1, 2, 3, 4)

PHASE 4. MAXIMUM TWO (2) WEEKS CLOSED DOWN FOR CONSTRUCTION.

DUCTWORK AND VAV BOXES TO BE COMPLETED DURING THAT TIME FRAME.

(LEGEND NOTES 1, 2, 3, 4)

PHASE 5. MINIMUM EIGHT (8) WEEKS NOTICE FOR SHUTDOWN. CONSTRUCTION

CAN ONLY HAPPEN IN ONE ROOM AT A TIME. (LEGEND NOTES 1, 2, 3, 4)

PHASE 6. RESTRICTED AREA. PHARMACY WILL PROVIDE AN ESCORT IN THE

CACHE AT ALL TIMES DURING CONSTRUCTION. CONSTRUCTION RESTRICTED

TO NORMAL BUSINESS HOURS. (LEGEND NOTES 1, 2, 3, 4)

PHASE 7. MINIMUM EIGHT (8) WEEKS NOTICE FOR SHUTDOWN. WORK SHALL

START IN ROOM C201 OVER A WEEKEND. ROOM C201 CLINICAL WORK MUST

REMAIN OPEN DURING REGULAR BUSINESS HOURS. WORK TO BE PERFORMED

NIGHTS AND WEEKENDS. OTHER ROOMS IN THIS AREA OF CONSTRUCTION

CAN ONLY HAPPEN IN ONE ROOM AT A TIME. (LEGEND NOTES 1, 2, 3, 4)

PHASE 8. REPLACE TERMINAL UNIT OUTSIDE OF NORMAL BUSINESS HOURS.

ALL CONSTRUCTION EQUIPMENT MUST BE REMOVED BY 06:00 AM. (LEGEND

NOTES 1, 2, 3, 4)

VAV LOCATION. SEE MECHANICAL PLANS.

CONSTRUCTION PHASE IDENTIFICATION MARKER#

PLAN NOTES

PHASE 9. WORK SCOPE CAN BE DONE ANYTIME. PER SCHEDULE.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

KEY PLAN

PLAN NORTH

B

IM

/V

IS

N

S F

C A

R e p la c e A ir H a n d le r A

C -1

/S F

C A

-R e p la c e

A ir H a n d le r

A C

-1

V

.r v t

/1

/2

:0

:0

P

M

RO DC

657-23-108JC

01-GI204

915 North Grand Blvd, St. Louis, MO 63106

MARCH 8, 2024

LEVEL 02 - CONSTRUCTION AREA GUIDELINES 100% CONTRACT DOCUMENTS FCA-REPAIR AIR HANDLER AC-1

1" = 10'-0"

LEVEL 02 - CONSTRUCTION AREA GUIDELINES

1 GENERAL CONTRACTOR TO ERECT SCAFOLDING OVER EXISTING EQUIPMENT,

TO ALLOW EQUIPMENT TO BE IN OPERATION AT ALL TIMES.

2 EXISTING VAV BOX IS NOT PART OF THIS PROJECT'S SCOPE OF WORK AND TO

REMAIN AS IS.

3 EXISTING EQUIPMENT IS NOT PART OF THIS PROJECT'S SCOPE OF WORK AND

TO REMAIN AS IS.

4 SOME NON-STATIONARY LABORATORY EQUIPMENT ON THE COUNTERTOP MAY

BE MOVED. CONTRACTOR TO IDENTIFY AND REQUEST LABORATORY

PERSONNEL ONLY TO MOVE EQUIPMENT. DETERMINE BAARRIER WORK SCOPE

EXTENT ON OR AROUND FIXED LABORATORY CASEWORK AND PROTECTION IN

CONSULTATION OF THE COR.

5 PROVIDE BARRIERS AND OR MOBILE CONTAINMENT AS REQUIRED, ISOLATING

HVAC SYSTEM WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCTS IN ACCORDANCE WITH THE INFECTION CONTROL RISK ASSESSMENT

(ICRA).

6 MAINTAIN OCCUPIED BUILDING EGRESS DURING PROJECT SCOPE.

CONSTRUCTION GUIDELINES

KEY NOTES

1-A2-A3-A4-A5-A6-A7-A8-A9-A10-A11-A12-A13-A14-A

C-A

D-A

E-A

F-A

G-A

B-A

A.1-A

S-A

R-A

Q-A

P-A

N-A

M-A

+ 6" A.F.F.+ 6" A.F.F.

+ 6" A.F.F.

+ 6" A.F.F.

+ 6" A.F.F.

+ 6" A.F.F. + 6" A.F.F.

+ 6" A.F.F.+ 6" A.F.F.

+ 6" A.F.F.

+ 6" A.F.F.

+ 6" A.F.F.

+ 6" A.F.F.+ 6" A.F.F.

+ 6" A.F.F.

MECH. RM

D302A

RETAIL STORAGE

C303C

RETAIL STORAGE

C303D

OFFICE

C303A

OFFICE

C303

CORRIDOR

H312

RETAIL STORE

B306

VESTIBULE

C303B

MECH RM.

D302B

MECH RM.

D302C

STAIR 08

S308

MECH. RM.

C301A

MECH RM

C301B

STORAGE

C304

MECH RM.

D302

VAV-82 (EX) VAV-83 (EX)

VAV-81 (EX)

M A

T C

H L

IN

E

STAIR 06

S306

STAIR 03

S303

STAIR 07

S307

STAIR 09

S309

PHASE 1. WORK TO BE DONE ON ONE VAV AT A TIME IN THE LAB. STAT WITH

VAV-1-25(EX), VAV-1-26(EX), VAV-1-30(EX). THEN SEQUENCING IS UP TO THE

CONTRACTOR'S APPRVED SCHEDULE. SEE FULL PROPOSED CONSTRUCTION

SCHEDULE ON 01-MG103. (LEGEND NOTES 1, 2, 3, 4)

1. THERE IS A MAXIMUM OF TWO WEEKS TO COMPLETE WORK PER VAV BOX.

2. PERSONNEL IN THE OFFICE WILL RELOCATE DURING CONSTRUCTION.

3. FURNITURE WILL NOT BE MOVED BY THE VA.

4. REFER AND COORDINATE WITH MECHANICAL DOCUMENTS.

5. SEE CONSTRUCTION PHASE IDENTIFICATION MARKER. PHASE 1 SHALL BE

FIRST. PHASES 2-8 SHALL BE DETERMINED BY GC IN CONSULTATION WITH

THE COR.

6. INVESTIGATE EXISTING FIELD CONDITIONS OF FIRE RESISTANCE PARTITIONS

THAT ARE AFFECTED BY WORK SCOPE AND PROVIDE UL APPROVED FIRE-

RESISTANT JOINT SYSTEM PENETRATIONS ABOVE CEILING LABELED, IBC

(2021) SECTION 70 AND SECTION 7.1.1.

7. GC SHALL DETERMINE PROJECT DAILY SCHEDULE AND TIMELINE, AND

COORDINATE WITH COR. TAKE PREVENTATIVE MEASURES SUCH AS

SEALING DOORS IN DAILY PROJECT AREA OR TEMPORARY RELOCATION OF

STAFF AND OR PATIENTS. REFER TO ICRA RISK ASSESSMENT.

REFER TO PHASING NOTES LOCATED ON SHEET 01-GI200

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

VAV LOCATION. SEE MECHANICAL PLANS.

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1 HOUR SMOKE COMPARTMENT

TEMPORARY ICRA BARRIER WALL / CEILING, DUCTS AND

DIFFUSERS AND/OR USE HEPA CART

CONTRACTOR ACCESS

PHASE 2. CONSTRUCTION CAN ONLY HAPPEN IN ONE ROOM AT A TIME.

(LEGEND NOTES 1, 2, 3, 4)

PHASE 3. CONSTRUCTION CAN ONLY HAPPEN IN NO MORE THAN TWO (2)

ROOMS AT A TIME. (LEGEND NOTES 1, 2, 3, 4)

PHASE 4. MAXIMUM TWO (2) WEEKS CLOSED DOWN FOR CONSTRUCTION.

DUCTWORK AND VAV BOXES TO BE COMPLETED DURING THAT TIME FRAME.

(LEGEND NOTES 1, 2, 3, 4)

PHASE 5. MINIMUM EIGHT (8) WEEKS NOTICE FOR SHUTDOWN. CONSTRUCTION

CAN ONLY HAPPEN IN ONE ROOM AT A TIME. (LEGEND NOTES 1, 2, 3, 4)

PHASE 6. RESTRICTED AREA. PHARMACY WILL PROVIDE AN ESCORT IN THE

CACHE AT ALL TIMES DURING CONSTRUCTION. CONSTRUCTION RESTRICTED

TO NORMAL BUSINESS HOURS. (LEGEND NOTES 1, 2, 3, 4)

PHASE 7. MINIMUM EIGHT (8) WEEKS NOTICE FOR SHUTDOWN. WORK SHALL

START IN ROOM C201 OVER A WEEKEND. ROOM C201 CLINICAL WORK MUST

REMAIN OPEN DURING REGULAR BUSINESS HOURS. WORK TO BE PERFORMED

NIGHTS AND WEEKENDS. OTHER ROOMS IN THIS AREA OF CONSTRUCTION

CAN ONLY HAPPEN IN ONE ROOM AT A TIME. (LEGEND NOTES 1, 2, 3, 4)

PHASE 8. REPLACE TERMINAL UNIT OUTSIDE OF NORMAL BUSINESS HOURS.

ALL CONSTRUCTION EQUIPMENT MUST BE REMOVED BY 06:00 AM. (LEGEND

NOTES 1, 2, 3, 4)

VAV LOCATION. SEE MECHANICAL PLANS.

CONSTRUCTION PHASE IDENTIFICATION MARKER#

PLAN NOTES

PHASE 9. WORK SCOPE CAN BE DONE ANYTIME. PER SCHEDULE.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

KEY PLAN

PLAN NORTH

B

IM

/V

IS

N

S F

C A

R e p la c e A ir H a n d le r A

C -1

/S F

C A

-R e p la c e

A ir H a n d le r

A C

-1

V

.r v t

/1

/2

:0

:0

P

M

RO DC

657-23-108JC

01-GI205

915 North Grand Blvd, St. Louis, MO 63106

MARCH 8, 2024

LEVEL 03 - CONSTRUCTION AREA GUIDELINES 100% CONTRACT DOCUMENTS FCA-REPAIR AIR HANDLER AC-1

1" = 10'-0"

LEVEL 03 - CONSTRUCTION AREA GUIDELINES

1 GENERAL CONTRACTOR TO ERECT SCAFOLDING OVER EXISTING EQUIPMENT,

TO ALLOW EQUIPMENT TO BE IN OPERATION AT ALL TIMES.

2 EXISTING VAV BOX IS NOT PART OF THIS PROJECT'S SCOPE OF WORK AND TO

REMAIN AS IS.

3 EXISTING EQUIPMENT IS NOT PART OF THIS PROJECT'S SCOPE OF WORK AND

TO REMAIN AS IS.

4 SOME NON-STATIONARY LABORATORY EQUIPMENT ON THE COUNTERTOP MAY

BE MOVED. CONTRACTOR TO IDENTIFY AND REQUEST LABORATORY

PERSONNEL ONLY TO MOVE EQUIPMENT. DETERMINE BAARRIER WORK SCOPE

EXTENT ON OR AROUND FIXED LABORATORY CASEWORK AND PROTECTION IN

CONSULTATION OF THE COR.

5 PROVIDE BARRIERS AND OR MOBILE CONTAINMENT AS REQUIRED, ISOLATING

HVAC SYSTEM WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCTS IN ACCORDANCE WITH THE INFECTION CONTROL RISK ASSESSMENT

(ICRA).

6 MAINTAIN OCCUPIED BUILDING EGRESS DURING PROJECT SCOPE.

RCP LEGEND

RCP NOTES

PLAN LEGEND

KEY NOTES

1-A2-A3-A4-A5-A6-A7-A8-A9-A10-A11-A12-A13-A14-A

C-A

D-A

E-A

F-A

G-A

B-A

A.1-A

S-A

R-A

Q-A

P-A

N-A

M-A

D241

PATHOLOGY

LAB

D234

STAT

CHEMISTRY

D237

BLOODBANK

D235

IMMEDIATE

RESPONSE

D228

IMMUNOLOGY

D223

MICROBIOLOGY

D241

PATHOLOGY

LAB

D226

OFFICE

D225A

WALK-IN

REF

D225

WALK-IN

REF

D225B

MECH.RM

D224

MEDIA PREP

D222

TRANSFER

RM. D223

MICROBIOLOGY

D220

TB RM.

D219

ANTE ROOM

D221

MICROBIOLOGY

H228

CORRIDOR

D216

MICROSCOPE

D215

CONFERENCE

RM.

D213

OFFICE D214

STORAGE

D270

STERILIZATION

D271

HEMO

STERILE

H229

CORRIDOR

D259

MAIL

HOLDING

D269

BULK

STORAGE

D269A

ELEC

CLOSET

H231

CORRIDOR

D260

OFFICE

D256

OFFICE

H229

CORRIDOR

D234A

ELEC.

D240

JANITOR

D239

HVAC

D234

STAT

CHEMISTRY

H224

CORR.H226

CORRIDOR

C219

LOUNGE

B210A

BLOOD

DRAW

B210

WORK AREA B209

TOILET

B208

TOILET

B206B

STORAGE

B206

EXG &

HOLTER

MONITOR

H221

CORRIDOR

C218

COMPUTER

RM

C218A

OI&T

B207C

BLOOD

DRAW

B207B

BLOOD

DRAW

B207D

BLOOD

DRAW

B207

BLOOD

DRAW H223

ELEVATOR

LOBBY

H221

CORRIDOR

B205A

SUPPLIES

B204B

CONFERENCE

RM.

B203C

STORAGE

H223B

CORR.

B207A

BLOOD

DRAW

C217

CONFERENCE

C220

OFFICE

H222

ELEVATOR

LOBBY

D254

BREAK RM.

D253

BREAK RM.

D244

BREAK RM.

D246

CORRIDOR

D242

OFFICE,

SUPER

HEMATOLOGY

D243

OFFICE

D252

OFFICE

D245

OFFICE

D250

OFFICE

D261

OFFICE

D257

OFFICE

D249

OFFICE

D248

SECRETARY

D247

OFFICE

D267

OFFICE

D266

DARK RM.

D265

OFFICE

D263

ANCILLARY

TESTING

D264

CHEMICAL

STORAGE

H228

CORRIDOR

D208

CORRIDOR

D206

VACANT

D204

OFFICE

D203

OFFICE/EXAM

H226

CORRIDOR

C216

PHARMACY

STORAGE

H221

CORRIDOR

C215A

MECH.RM.

C215B

OI&T

C214

PHARMACY

STORAGE

C215

OFFICE B203B

SOILED

UTILITY

C200

EXERCISE

LAB

C225

CORRIDOR

C201

CLINICAL

C203

OFFICE

C204

EXAM

C205

MOLECUL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .