Appendix 1- CALCULATION OF SELF PERFORMED-SUBCONTRACTOR WORK__.pdf

PDF 116 KB Posted

Attached to
Z2DA--657-23-108JC, FCA - Repair Air Handler AC-1 (VA-25-00052824) John J. Cochran Veterans Hospital
Solicitation number
36C25525R0049
Issued by

About this file

This document is an Appendix for Calculation of Self-Performed/Subcontracted Work for a construction project (Project #657-23-108JC) at the John J. Cochran Veterans Hospital. The form requires contractors to demonstrate compliance with service-disabled veteran-owned small business (SDVOSB) subcontracting requirements, specifically that no more than 75% of the government-paid amount can be subcontracted to non-certified SDVOSB or VOSB firms. Contractors must provide a detailed breakdown of personnel and material/equipment costs by specification division, including separate lines for each project division, and then calculate total costs by adding profit, home office overhead, and bond expenses. The second page of the document includes a calculation worksheet for determining the percentage of self-performed work, which requires contractors to calculate total personnel costs, subtract non-SDVOSB subcontractor costs, and compute the percentage of work self-performed.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

?.## Appendix 1: CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK, PROJECT # 657-23-108JC

Offerors for Construction (NAICS code 238220) will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service-disabled veteran-owned small business concerns. Contractor shall complete a separate form for each bid item.

Specification Division SDVOB Vendor

(Y or N)

Personnel Cost Material/Equipment Costs

Division 01 $ $

Division 02 $ $

Division 03 $ $

Division 04 $ $

Division 05 $ $

(Add additional lines as necessary for each

Division applicable to this project)

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit $

Home Office Overhead $

Bond $

Grand Total $

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_______________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $_______________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’: $_______________

4. Self-performed work = Line 3/Line 1 x 100 = __________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project

(includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

Signature Date

Printed Name of Authorized Representative Telephone Number

Title of Authorized Representative E-mail Address

File details come from the government source that posted it. Updated .