This document includes a solicitation for a construction project and a related presolicitation notice. The solicitation is for Project Number 632-19-106 to renovate and expand pharmacy spaces at the Northport VA Medical Center in Northport, New York. The estimated cost range for the project is between $1,000,000 to $5,000,000. The scope of work involves abatement, demolition, construction, alterations and installation of mechanical, electrical and fire protection systems to expand and renovate existing pharmacy spaces. The contract duration is 455 calendar days from receipt of the notice to proceed. The solicitation will be released on or around September 30, 2021 via SAM.gov and responses must be submitted in hard copy by the date specified in the solicitation. The project has an SDVOSB set-aside and is being conducted by the Department of Veterans Affairs Veterans Health Administration VISN 2.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A32A
A32
A32
A3-25A3-23A3-21
A3-24 A3-22
A3-2A
A3-2B
A3-2
A3-25A3-23A3-21
A3-24 A3-22
A425 A432A
THIRD & FOURTH FLOOR ASBESTOS
ABATEMENT PLANS
PHASE TWO 3RD FLOOR, ASBESTOS ABATEMENT
PHASE ONE 3RD FLOOR, ASBESTOS ABATEMENT
PHASE TWO 4TH FLOOR, ASBESTOS ABATEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
23 MAR 2021Revisions: Date:
632-19-106
79 MIDDLEVILLE ROAD, NORTHPORT, NY 11768
RENOVATE PHARMACY SPACES
THINKFORM DESIGN ARCHITECT LLC
38 EAST BROAD STREET
HOPEWELL, NJ 08525
T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1
NORTHPORT VAMC
Egan Environmental Consulting, Inc.
BID DOCUMENTS
KEY MAP - BLDG 200, 3RD & 4TH FLOOR
Drawing 03 of 52
200-HA100
TGE EDS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DECON UNIT
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text
TEMPORARY CONSTRUCTION BARRIER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text
ELECTRICAL GFCI LOCATION
AutoCAD SHX Text
WATER LOCATION
AutoCAD SHX Text
2ND FLOOR CEILING PLUMBING DISCONNECTS
AutoCAD SHX Text
2ND FLOOR CEILING PLUMBING DISCONNECTS
AutoCAD SHX Text
TEMPORARY CONSTRUCTION BARRIER
AutoCAD SHX Text
TEMPORARY CONSTRUCTION BARRIER
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text ASBESTOS ABATEMENT LEGEND: PIPE FITTING INSULATION TO BE REMOVED. FLOOR TILE & MASTIC TO BE REMOVED (MULTIPLE LAYERS). COVE BASE AND ADHESIVE TO BE REMOVED. ROOF FLASHING TO BE REMOVED. PATH OF WASTE OUTSIDE OF BUILDING. HEPA - FILTERED NEGATIVE AIR MACHINE. AIR LOCK TENT ENCLOSURE
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Asbestos-Containing Materials Quantity Table
AutoCAD SHX Text Location
AutoCAD SHX Text Material
AutoCAD SHX Text Quantity
AutoCAD SHX Text
3RD FLOOR - ROOM A3-21
AutoCAD SHX Text
FLOOR TILE & MASTIC (MULTIPLE LAYERS)
AutoCAD SHX Text 130 S.F.
AutoCAD SHX Text
2ND FLOOR - ABOVE CEILING PLUMBING DISCONNECTS
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
10 EACH <4"
AutoCAD SHX Text
3RD FLOOR - ROOM A3-21
AutoCAD SHX Text
COVEBASE & ADHESIVE
AutoCAD SHX Text 45 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-21
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
5 EACH <4"
AutoCAD SHX Text
3RD FLOOR - ROOM A3-22
AutoCAD SHX Text
FLOOR TILE & MASTIC (MULTIPLE LAYERS)
AutoCAD SHX Text 650 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-22
AutoCAD SHX Text
COVEBASE & ADHESIVE
AutoCAD SHX Text 300 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-22
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
10 EACH <4"
AutoCAD SHX Text
3RD FLOOR - ROOM A3-23
AutoCAD SHX Text
FLOOR TILE & MASTIC (MULTIPLE LAYERS)
AutoCAD SHX Text 130 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-23
AutoCAD SHX Text
COVEBASE & ADHESIVE
AutoCAD SHX Text 45 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-23
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
10 EACH <4"
AutoCAD SHX Text
3RD FLOOR - ROOM A3-24
AutoCAD SHX Text
FLOOR TILE & MASTIC (MULTIPLE LAYERS)
AutoCAD SHX Text 600 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-24
AutoCAD SHX Text
COVEBASE & ADHESIVE
AutoCAD SHX Text 250 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-24
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
20 EACH <4"
AutoCAD SHX Text
3RD FLOOR - ROOM A3-25
AutoCAD SHX Text
FLOOR TILE & MASTIC (MULTIPLE LAYERS)
AutoCAD SHX Text 130 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-25
AutoCAD SHX Text
COVEBASE & ADHESIVE
AutoCAD SHX Text 45 S.F.
AutoCAD SHX Text
3RD FLOOR - ROOM A3-25
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
10 EACH <4"
AutoCAD SHX Text
3RD FLOOR - ROOM A32
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
5 EACH <4"
AutoCAD SHX Text
3RD FLOOR - ROOM A32A
AutoCAD SHX Text
PIPE FITTING INSULATION
AutoCAD SHX Text
10 EACH <4"
AutoCAD SHX Text
4TH FLOOR - ROOM A425
AutoCAD SHX Text
FLOOR TILE & MASTIC (MULTIPLE LAYERS)
AutoCAD SHX Text 20 S.F.
AutoCAD SHX Text
4TH FLOOR - ROOM A432A
AutoCAD SHX Text
FLOOR TILE & MASTIC (MULTIPLE LAYERS)
AutoCAD SHX Text 20 S.F.
AutoCAD SHX Text
AutoCAD SHX Text
AP100
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AP100
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AP100
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text ASBESTOS ABATEMENT CONSULTANT: 14 HIGH STREET MAHWAH, NEW JERSEY 07430 Tel: (914) 320-7924 Email: tom_egan2@yahoo.com
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text N
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PARTIAL ASBESTOS ABATEMENT ROOF PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Asbestos Abatement Consultants:
Project Director
23 MAR 2021Revisions: Date:
632-19-106
79 MIDDLEVILLE ROAD, NORTHPORT, NY 11768
RENOVATE PHARMACY SPACES
THINKFORM DESIGN ARCHITECT LLC
38 EAST BROAD STREET
HOPEWELL, NJ 08525
T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1
NORTHPORT VAMC
TGE EDS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
632-19-106
79 MIDDLEVILLE ROAD, NORTHPORT, NY 11768
RENOVATE PHARMACY SPACES
THINKFORM DESIGN ARCHITECT LLC
38 EAST BROAD STREET
HOPEWELL, NJ 08525
T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1
NORTHPORT VAMC
TGE EDS
Egan Environmental Consulting, Inc.
BID DOCUMENTS
KEY MAP - BLDG 200 ROOF
Drawing 04 of 52
AutoCAD SHX Text
PENTHOUSE
AutoCAD SHX Text
PH-01
AutoCAD SHX Text
SVC ELEV
AutoCAD SHX Text
MACHINE RM
AutoCAD SHX Text
PH-03
AutoCAD SHX Text
PASS ELEV
AutoCAD SHX Text
MACHINE RM
AutoCAD SHX Text
PH-02
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text ASBESTOS ABATEMENT LEGEND: PIPE FITTING INSULATION TO BE REMOVED. FLOOR TILE & MASTIC TO BE REMOVED (MULTIPLE LAYERS). COVE BASE AND ADHESIVE TO BE REMOVED. ROOF FLASHING TO BE REMOVED. PATH OF WASTE OUTSIDE OF BUILDING. HEPA - FILTERED NEGATIVE AIR MACHINE. AIR LOCK TENT ENCLOSURE AREA OF WORK. AREA OF WORK HATCH
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
200-HA101
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AS103
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text ASBESTOS ABATEMENT CONSULTANT: 14 HIGH STREET MAHWAH, NEW JERSEY 07430 Tel: (914) 320-7924 Email: tom_egan2@yahoo.com
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text N
AutoCAD SHX Text
4 ROOF NW TOWER
AutoCAD SHX Text
4 ROOF NE TOWER
AutoCAD SHX Text
4 ROOF SW TOWER
AutoCAD SHX Text
4 ROOF SE TOWER
AutoCAD SHX Text
PENTHOUSE ROOF
AutoCAD SHX Text
1 ROOF
AutoCAD SHX Text
1 ROOF
AutoCAD SHX Text
1 ROOF
AutoCAD SHX Text
1 ROOF
ROOF ASBESTOS ABATEMENT PLAN
ASBESTOS ABATEMENT NOTES:
1. ALL ASBESTOS REMOVAL AREAS INDICATED ON THE PLANS AND SPECIFICATIONS
IS FOR INFORMATIONAL ASSISTANCE TO THE CONTRACTOR. ALL WORK AREAS
HAVING ASBESTOS CONTAINING MATERIALS MUST BE FIELD MEASURED AND
VERIFIED FOR ACTUAL LOCATIONS, SIZE AND QUANTITIES. ADDITIONAL PIPING
OR EQUIPMENT WHICH MAY HAVE ASBESTOS CONTAINING INSULATION MAY BE
PRESENT. THE CONTRACTOR MUST REMOVE ALL ASBESTOS CONTAINING
MATERIALS FROM ALL SPECIFIED AREAS WHETHER OR NOT SHOWN OR
ACCURATELY INDICATED. THESE SPECIFICATIONS SHALL BE USED AS A GUIDE,
AND DO NOT LIMIT THE CONTACTOR'S RESPONSIBILITY TO SEEK AND REMOVE ALL
ASBESTOS CONTAINING MATERIAL AS SPECIFIED.
2. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT
PROCEDURES. CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS
FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR
MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA,
TRANSPORTATION ROUTES, ETC. THROUGHOUT THE BUILDINGS.
3. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT OR OTHER COMPONENTS OF
THIS BUILDING WHICH ARE DAMAGED OR IN ANY WAY DISRUPTED AS A RESULT OF
THE EXECUTION OF THIS CONTRACT SHALL BE REPLACED OR RESTORED TO
ORIGINAL CONDITION.
4. CONTRACTOR SHALL PROVIDE AS MANY SHIFTS OF LABORERS AS NECESSARY TO
COMPLETE THE PROJECT IN THE AMOUNT OF TIME SPECIFIED IN THE CONTRACT
DOCUMENTS AT NO EXTRA COST.
5. ALL ASBESTOS REMOVAL SHALL BE PREFORMED IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE AND LOCAL LAWS, GUIDELINES, REGULATIONS,
ORDERS AND DIRECTIVES, INCLUDING WITHOUT LIMITATIONS THOSE OF THE
RESPONSIBLE NEW YORK STATE AGENCIES; U.S. ENVIRONMENTAL PROTECTION
AGENCY (EPA), THE U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA), NATIONAL INSTITUTE OF OCCUPATIONAL
SAFETY AND HEALTH (NIOSH), THE NEW YORK STATE DEPARTMENT OF LABOR
(NYS DOL).
6. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD
PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND
SAFEGUARDS FOR ASBESTOS EXPOSURE TO THE WORKERS, EMPLOYEES,
GENERAL PUBLIC AND THE ENVIRONMENT.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ANY LIGHT FIXURES,
SUSPENDED CEILINGS, WALLS, DUCTWORK, OR ANY OBSTRUCTIONS NECESSARY
FOR THE SUCCESSFUL COMPLETION OF THE PROJECT. CONTRACTOR SHALL
CAREFULLY REMOVE, DECONTAMINATE AND REINSTALL ALL REMOVED FIXTURES,
SUPPORTING GRIDS OR ANY OTHER BUILDING STRUCTURE REMOVED BY THE
CONTRACTOR TO ACCESS ASBESTOS CONTAINING MATERIAL.
8. AIR FILTRATION DEVICE (AFD) UNITS SHALL BE EQUIPPED WITH SMOKE/HEAT
SENSOR SYSTEMS THAT WILL SHUT DOWN THE UNIT WITHIN 30 SECONDS AFTER
FIRE OR SMOKE DETECTION. AFD SENSOR UNITS MUST COMPLY WITH AMERICAN
NATIONAL STANDARDS NFPA LIFE SAFTEY CODE 101.
9. ASBESTOS REMOVAL DRAWINGS WERE PREPARED FROM EXISTING DRAWINGS
SUPPLIED BY THE OWNER AND ARE PROVIDED FOR INFORMATION ONLY. THE
CONSULTANT MAKES NO CLAIMS AS TO THEIR ACCURACY OR FOR QUANTITIES
DERIVED THROUGH THEIR USE.
10. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING, LADDERS, PLYWOOD, ETC., AS
REQUIRED AND/OR AS NECESSARY TO COMPLETE ALL WORK REQUIRED BY THE
CONTRACT DOCUMENTS.
11. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS AND POSTED
INSTRUCTIONS THAT ARE NECESSARY TO PROTECT, INFORM AND WARN PEOPLE
OF THE HAZARD FROM ASBESTOS EXPOSURE.
12. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR THE
WORKERS, A COPY OF THE LATEST APPLICABLE REGULATIONS FORM OSHA, EPA,
NIOSH AND NYS DOL.
13. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING,
ELECTRICAL PANELS, EQUIPMENT, ETC. WITHIN THE WORK AREAS.
14. THE VAMC AND THE ASBESTOS ABATEMENT CONTRACTOR SHALL MUTUALLY
AGREE UPON THE LOCATION OF THE DECONTAMINATION UNITS FOR EACH PHASE
DURING THE PRECONSTRUCTION MEETING UNLESS SHOWN ON THE
DRAWINGS.
15. SUBMIT ASBESTOS ABATEMENT PLAN IN ACCORDANCE WITH NYS
REGULATIONS AND PROJECT SPECIFICATIONS SHOWING
LOCATION AND NUMBER OF HEPA FILTERED NEGATIVE AIR
MACHINES, AIRLOCKS AND DECONTAMINATION CHAMBERS.
SUBMIT CALCULATIONS SHOWING NUMBER OF AIR CHANGES FOR
EACH CONTAINMENT AREA.
16. AS REQUIRED BY NYS CODES AND REGULATIONS, ALL ASBESTOS
REMOVALS, WITH THE EXCEPTION OF THE ROOF ABATEMENT,
SHALL BE PERFORMED WITHIN A HEPA-FILTERED NEGATIVE AIR
PRESSURE ENCLOSURE. PIPE INSULATION WORK SHALL BE
PERFORMED USING THE TENT/GLOVEBAG METHOD.
CONTRACTOR TO POST SIGNAGE IN ADVANCE IN ACCORDANCE
WITH NYS REGULATIONS AND CODES.
17. Specific areas on the 2nd floor, 3rd floor, 4th floor and roof of Building 200 will require asbestos abatement to allow for the Pharmacy renovation project. Asbestos-containing materials (ACM's) must be removed to allow for the renovation. ACM's include but are not limited to pipe fitting insulation on fiberglass insulated pipes, cove base adhesive, floor tile, mastic and roof flashing. Only the roof flashing in areas of disturbance or penetration shall be removed by the asbestos abatement contractor.
Coordinate all locations with the general contractor.
18. Scheduling of work shall be coordinated with the V.A. to avoid interruptions to the normal activities of the V.A. Asbestos Abatement for interior work will be performed off-duty hours ahall to be coordinated with COR for both Phase I and Phase II because the decontamination units will be located in the corridor. Work will begin at 5pm on a Friday and be completed by 3am Monday including clearance air testing and breakdown.
Contractor shall show activity over a weekend on the construction schedule.
19. The contractor shall prepare the Phase I and II work areas for asbestos removal using a HEPA-filtered negative air pressure tent containment in accordance with this specification and applicable codes, rules and regulations. Ceiling tiles can be removed from the work area before asbestos abatement by the general contractor.
20. The contractor shall erect isolation barriers that separate the work areas from the remainder of the building. The barriers shall be constructed of a fire retardant sheathing material of at least 5/8" thickness on the work side of the studs. The isolation barrier shall be plasticized with two (2) layers of 6-mil fire retardant plastic sheeting. The isolation barriers shall be caulked at the sheathing seams and where the sheathing meets the floor, walls and ceiling. The isolation barrier shall be constructed using fire retardant 2"x4" framing, 16 inches center-to-center, and caulked at all seams.
21. All utilities and piping shall be locked out and tagged before the contractor is to begin abatement activities.
22. All asbestos-containing materials within the contract limits must be removed and disposed of as asbestos-contaminated waste unless specifically excluded in these specifications or on the drawings.
23. The black iron supporting the drop ceilings is to remain intact throughout asbestos abatement activities.
24. All work area decontamination units (personal and waste) shall be fully framed and sheathed with fire retardant wood because they will be located in areas of public access.
25. All utilities, mechanical systems and piping shall be locked out and tagged before the contractor is to begin abatement activities.
26. All asbestos-containing materials within the contract limits must be removed and disposed of as asbestos-contaminated waste unless specifically excluded in these specifications or on the drawings.
27. The black iron supporting the drop ceilings is to remain intact throughout asbestos abatement activities.
28. All work area decontamination units (personal and waste) shall be fully framed and sheathed with fire retardant wood because they will be located in areas of public access.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
23 MAR 2021Revisions: Date:
632-19-106
79 MIDDLEVILLE ROAD, NORTHPORT, NY 11768
RENOVATE PHARMACY SPACES
THINKFORM DESIGN ARCHITECT LLC
38 EAST BROAD STREET
HOPEWELL, NJ 08525
T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1
NORTHPORT VAMC
Egan Environmental Consulting, Inc.
BID DOCUMENTSASBESTOS DIAGRAMS AND NOTES
632-19-106RENOVATE PHARMACY SPACES
NORTHPORT VAMC
KEY MAP - BLDG 200, 3RD FLOOR
Drawing 05 of 52
200-HA102
TGE EDS
Egan Environmental Consulting, Inc.
AutoCAD SHX Text
10' MIN
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
12' MIN
AutoCAD SHX Text
CLEAN ROOM
AutoCAD SHX Text
4'MIN
AutoCAD SHX Text
SHOWER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
8" MAX
AutoCAD SHX Text
CURTAINED DOORWAY
AutoCAD SHX Text
(3 LAYERS OF 6 MIL
AutoCAD SHX Text
POLY SHEETING WITH
AutoCAD SHX Text
WEIGHTED FLAPS)
AutoCAD SHX Text
(TYP @ AT ENTRANCE
AutoCAD SHX Text
AND EXIT)
AutoCAD SHX Text
2"X4" STUDS
AutoCAD SHX Text
2"X4" STUDS
AutoCAD SHX Text @ 48 O.C
AutoCAD SHX Text
4' MIN
AutoCAD SHX Text
AIRLOCK OF 36" MIN
AutoCAD SHX Text
WITH CURTAINED DOORWAY
AutoCAD SHX Text
CLEAN ROOM
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text @ 48 O.C
AutoCAD SHX Text
2"X4" STUDS
AutoCAD SHX Text
CONSTRUCTION OF A TEMPORARY SOLID BARRIER
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
10. Puts on any additional
AutoCAD SHX Text clothing -deck shoes, hard hat
AutoCAD SHX Text
11. Collects necessary tools
AutoCAD SHX Text proceeds to work area
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
1. Enters clean room
AutoCAD SHX Text
2. removes street clothing, places in locker
AutoCAD SHX Text
3. Puts on nylon swim suit (optional)
AutoCAD SHX Text
4. Puts on clean overalls
AutoCAD SHX Text
5. If separate disposable foot covering are
AutoCAD SHX Text used, these are put on
AutoCAD SHX Text
6. Applies tape around ankles, wrists, etc.
AutoCAD SHX Text
7. Inspects respirator, puts it on, checks fit
AutoCAD SHX Text
8. Puts on hood over respirator headstraps
AutoCAD SHX Text
9. proceeds to equipment room
AutoCAD SHX Text
21. Dries off, dresses in clean
AutoCAD SHX Text coveralls or street clothing
AutoCAD SHX Text
22. Cleans and dries respirator, AutoCAD SHX Text replaces filter (if applicable)
AutoCAD SHX Text
WORKER
AutoCAD SHX Text filters (without removing)
AutoCAD SHX Text with soap and water
AutoCAD SHX Text
19. Washes swim suit
AutoCAD SHX Text
20. Thoroughly washes body
AutoCAD SHX Text and hair
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
13. Removes all clothing
AutoCAD SHX Text except respirator
AutoCAD SHX Text
14. places disposable
AutoCAD SHX Text protective clothing
AutoCAD SHX Text in a bag or bin
AutoCAD SHX Text
15. Stores any other
AutoCAD SHX Text contaminated articles
AutoCAD SHX Text
16. Proceeds to shower
AutoCAD SHX Text
NOTE: INSIDE WORK AREA WORKERS SHALL EXIT TO OUTSIDE THOUGH
AutoCAD SHX Text
DECONTAMINATION FACILITIES ONLY. ALL WORKERS TO WEAR
AutoCAD SHX Text
WORKER
AutoCAD SHX Text
12. Brushes off
AutoCAD SHX Text contamination
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text
AIRLOCK
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
AIRLOCK
AutoCAD SHX Text
AIRLOCK
AutoCAD SHX Text
CLEAN ROOM
AutoCAD SHX Text
SHOWER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
ALL ASBESTOS CONTAINING MATERIALS SHALL BE
AutoCAD SHX Text
PACKED IN APPROVED CONTAINERS PRIOR TO
AutoCAD SHX Text
MOVING TO BAG STORAGE
AutoCAD SHX Text
BAGGING CHAMBER
AutoCAD SHX Text
EQUIPMENT/ WASTE
AutoCAD SHX Text
WASH ROOM
AutoCAD SHX Text
SHOWER ROOM
AutoCAD SHX Text
CLEAN ROOM
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text
CLEAN AREA
AutoCAD SHX Text
AIRLOCK
AutoCAD SHX Text
AIRLOCK
AutoCAD SHX Text
AIRLOCK
AutoCAD SHX Text
AIRLOCK
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text
AIR LOCK
AutoCAD SHX Text
SHOWER/WASH ROOM
AutoCAD SHX Text
CLEAN ROOM
AutoCAD SHX Text
AIR LOCK
AutoCAD SHX Text
CLEAN AREA
AutoCAD SHX Text
CEILING/DECKING
AutoCAD SHX Text
CAULKING
AutoCAD SHX Text
2 LAYERS OF 6 MIL
AutoCAD SHX Text
WALLS AND FLOOR
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text
CLEAN SIDE
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
3/8" PLYWOOD SHEET
AutoCAD SHX Text
ON WORK AREA
AutoCAD SHX Text
CEILING DECKING
AutoCAD SHX Text 2"x4" @ 16" O.C(TYP.)
AutoCAD SHX Text
CONTINUOUS CAULKING
AutoCAD SHX Text
@ EDGES & SEAMS OF
AutoCAD SHX Text
PLYWOOD SHEETS
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
USE OF GLOVE BAG ENCLOSURE FOR PIPE INSULATION ABATEMENT
AutoCAD SHX Text Staple and tape securely to insure that
AutoCAD SHX Text containment bag will not break as a result
AutoCAD SHX Text of vacuum and/or weight of debris within.
AutoCAD SHX Text Tape seal tightly around
AutoCAD SHX Text the pipe at both sides
AutoCAD SHX Text
WETTING
AutoCAD SHX Text
AGENT
AutoCAD SHX Text
SIDE
AutoCAD SHX Text
PORT
AutoCAD SHX Text
GLOVE
AutoCAD SHX Text
ARMS
AutoCAD SHX Text
TOOL
AutoCAD SHX Text
BAG
AutoCAD SHX Text Hepa vacuum (secure & seal nozzle
AutoCAD SHX Text w/tape after inserting into side
AutoCAD SHX Text port of containment bag)
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
CENTER AFD EXHAUST TUBE.
AutoCAD SHX Text
FIRE RETARDENT PLYWOOD
AutoCAD SHX Text
BLASTGATE MANIFOLD AND ATTACH
AutoCAD SHX Text
FLEXIBLE AFD
AutoCAD SHX Text
EXHAUST DUCT
AutoCAD SHX Text
AFD
AutoCAD SHX Text
UNIT
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
TO ADDITIONAL
AutoCAD SHX Text
AFD UNIT
AutoCAD SHX Text
DUCT TAPE
AutoCAD SHX Text
DUCT TAPE
AutoCAD SHX Text
APPLY TWO LAYERS
AutoCAD SHX Text
OF SIX MIL PLASTIC
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
CLEAN AREA
AutoCAD SHX Text
CAUTION SIGN SHALL BE PLACED
AutoCAD SHX Text
ON THE CLEAN SIDE OF THE DOOR
AutoCAD SHX Text
CAUTION LABELING SHALL IN
AutoCAD SHX Text
ACCORDANCE WITH EPA FEDERAL
AutoCAD SHX Text
REGULATIONS
AutoCAD SHX Text
APPLY TWO SHEETS
AutoCAD SHX Text
OF SIX MILL POLY
AutoCAD SHX Text
AS REQUIRED
AutoCAD SHX Text
EXISTING DOOR
AutoCAD SHX Text
BUCK
AutoCAD SHX Text
APPLY AND SECURE
AutoCAD SHX Text
SHEETS OF POLY
AutoCAD SHX Text
WITH DUCT TAPE
AutoCAD SHX Text
EXISTING DOOR TO
AutoCAD SHX Text
BE CLOSED AND SEALED
AutoCAD SHX Text
AN EMERGENCY EXIT SIGN IS TO
AutoCAD SHX Text
BE PLACED ON THE CONTAMINATED
AutoCAD SHX Text
SIDE AT ALL SPECIFIED LOCATIONS
AutoCAD SHX Text
EXISTING DOOR
AutoCAD SHX Text
THE PERIMETER OF THE DOOR IS TO
AutoCAD SHX Text
BE SEALED WITH DUCT TAPE ON THE
AutoCAD SHX Text
CONTAMINATED SIDE PRIOR TO APPLYING
AutoCAD SHX Text
THE TWO LAYERS OF POLY
AutoCAD SHX Text
APPLY AND SECURE SHEETS
AutoCAD SHX Text
OF POLY WITH DUCT TAPE
AutoCAD SHX Text
AS REQUIRED
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
APPLY TWO SHEETS
AutoCAD SHX Text
OF SIX MIL POLY
AutoCAD SHX Text
EMERGENCY CRITICAL BARRIER AT DOOR
AutoCAD SHX Text
CONTAMINATED SIDE
AutoCAD SHX Text
CONSTRUCTION OF PERSONNEL DECONTAMINATION SYSTEM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
POLY SHEETING ON
AutoCAD SHX Text
PARALLEL PERSONNEL AND WASTE DECON. ENCLOSURE SYSTEMS
AutoCAD SHX Text
PERSONNEL DECONTAMINATION SYSTEM
AutoCAD SHX Text
WINDOW AIR FILTRATION DEVICE EXHAUST
AutoCAD SHX Text
RESPIRATORS AND FULLY PROTECTIVE CLOTHING INSIDE THE
AutoCAD SHX Text
WORK AREA (INCLUDING HEAD AND FOOT WEAR)
AutoCAD SHX Text
17. Washes respirator and soaks
AutoCAD SHX Text
18. Removes respirator, washes
AutoCAD SHX Text
WASTE DECONTAMINATION ENCLOSURE SYSTEM
AutoCAD SHX Text
USING ADJUSTABLE CLAMP AND
AutoCAD SHX Text
DUCT TAPE. SEAL AIRTIGHT.
AutoCAD SHX Text
HOSE BEAD
AutoCAD SHX Text
BLASTGATE MANIFOLD AND AJUSTABLE CLAMP FOR WINDOW
AutoCAD SHX Text
ADJUSTABLE CLAMP WITH INTERNAL GASKET
AutoCAD SHX Text
12" I.D. GALVANIZED METAL
AutoCAD SHX Text
GALVANIZED METAL
AutoCAD SHX Text
GALVANIZED METAL
AutoCAD SHX Text
GALVANIZED METAL
AutoCAD SHX Text ASBESTOS ABATEMENT CONSULTANT: 14 HIGH STREET MAHWAH, NEW JERSEY 07430 Tel: (914) 320-7924 Email: tom_egan2@yahoo.com
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text N
ASBESTOS ABATEMENT CONSULTANT: 14 HIGH STREET MAHWAH, NEW JERSEY 07430 Tel: (914) 320-7924 Email: tom_egan2@yahoo.com
| 03of52 200-HA100 |
| Sheets and Views |
| HA100 |
| 04of52 200-HA101 |
| Sheets and Views |
| 200HA101 |
| 05of52 200-HA102 |
| Sheets and Views |
| HA 102 |