Drawings 632-19-106 BID 01-02 of 52 GI.pdf

PDF 3 MB Posted

Attached to
Y1DZ--Project Number 632-19-106 Renovate Pharmacy Spaces
Solicitation number
36C24221B0048
Issued by

About this file

This federal solicitation is for renovation and expansion of pharmacy spaces at the Northport VA Medical Center in Northport, New York. The scope of work includes abatement, demolition, construction, alterations, equipment installation, and work in mechanical, electrical, plumbing and other trades. The cost estimate range is $1 million to $5 million. The contract duration is 455 calendar days from notice to proceed. Interested Service-Disabled Veteran Owned Small Businesses should submit capability statements by the response due date, as the solicitation will be released on or around September 30, 2021 as a set-aside. The solicitation number is 36C24221B0048 and responses must be submitted in hard copy by the date specified. All prospective bidders must be registered in SAM.gov, D&B, and VetBiz.gov as an SDVOSB. This is a renovation project for the Department of Veterans Affairs at their Northport, New York medical center.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETAIL_TITLE

DEPARTMENT OF VETERANS AFFAIRS

RENOVATE PHARMACY SPACES

at the NORTHPORT VAMC

GI001

TITLE SHEET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

MPE Consultant:

Project Director

23 MARCH 2021Revisions: Date:

632-19-106

79 MIDDLEVILLE ROAD, NORTHPORT, NY 11768

RENOVATE PHARMACY SPACES

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

NORTHPORT VAMC

Structural Consultant:Asbestos Abatement:

Egan Environmental Consulting, Inc 14 High Street Mahwah, New Jersey 07430 P: 914.320.7924

GEDEON GRC CONSULTING

6901 Jericho Turnpike, Suite 216 Syosset, New York 11791 P: 516.873.7010

MGENGINEERING, D.P.C.

116 W 32nd Street New York, New York 10001 P: 212.643.9055

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

SECTION SHEET NUMBER

AutoCAD SHX Text

INTERIOR ELEVATIONS

AutoCAD SHX Text

BUILDING ELEVATION SHEET NUMBER

AutoCAD SHX Text N

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text

DETAIL SHEET NUMBER

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

DETAIL NUMBER SHEET NUMBER

AutoCAD SHX Text

PARTITION TYPE

AutoCAD SHX Text

XX

AutoCAD SHX Text X

AutoCAD SHX Text

TITLE

AutoCAD SHX Text X

AutoCAD SHX Text

WINDOW TYPE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

ROOM NAME ROOM NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KEYED NOTE

AutoCAD SHX Text

DATUM LINE

AutoCAD SHX Text

DOOR NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SCALE

AutoCAD SHX Text GENERAL: GI001 - TITLE SHEET - TITLE SHEET TITLE SHEET GI002 - ABBREVIATIONS, INFECTION CONTROL, CODE NOTES AND - ABBREVIATIONS, INFECTION CONTROL, CODE NOTES AND ABBREVIATIONS, INFECTION CONTROL, CODE NOTES AND FIRE SAFETY ABATEMENT: 200-HA100 - THIRD & FOURTH FLOOR ASBESTOS ABATEMENT PLANS - THIRD & FOURTH FLOOR ASBESTOS ABATEMENT PLANS THIRD & FOURTH FLOOR ASBESTOS ABATEMENT PLANS 200-HA101 - ROOF ASBESTOS ABATEMENT PLAN - ROOF ASBESTOS ABATEMENT PLAN ROOF ASBESTOS ABATEMENT PLAN 200-HA102 - ASBESTOS DIAGRAMS AND NOTES - ASBESTOS DIAGRAMS AND NOTES ASBESTOS DIAGRAMS AND NOTES ARCHITECTURAL: 200-AP100 - THIRD FLOOR PHASING PART PLANS - THIRD FLOOR PHASING PART PLANS THIRD FLOOR PHASING PART PLANS 200-AD101 - THIRD FLOOR DEMOLITION PLAN - THIRD FLOOR DEMOLITION PLAN THIRD FLOOR DEMOLITION PLAN 200-AD102 - BASEMENT AND 4TH FLOOR DEMOLITION PLANS - BASEMENT AND 4TH FLOOR DEMOLITION PLANS BASEMENT AND 4TH FLOOR DEMOLITION PLANS 200-AS101 - THIRD FLOOR PROPOSED PLAN AND PARTITION TYPES - THIRD FLOOR PROPOSED PLAN AND PARTITION TYPES THIRD FLOOR PROPOSED PLAN AND PARTITION TYPES 200-AS102 - FOURTH FLOOR PLANS - FOURTH FLOOR PLANS FOURTH FLOOR PLANS 200-AS103 - ROOF PLAN AND DETAILS - ROOF PLAN AND DETAILS ROOF PLAN AND DETAILS 200-AS104 - THIRD FLOOR REFLECTED CEILING PLANS AND DETAILS - THIRD FLOOR REFLECTED CEILING PLANS AND DETAILS THIRD FLOOR REFLECTED CEILING PLANS AND DETAILS 200-AS105 - FINISH FLOOR PLANS, SCHEDULE AND DETAILS - FINISH FLOOR PLANS, SCHEDULE AND DETAILS FINISH FLOOR PLANS, SCHEDULE AND DETAILS 200-AS201 - INTERIOR ELEVATIONS - INTERIOR ELEVATIONS INTERIOR ELEVATIONS 200-AS202 - EXTERIOR ELEVATIONS - EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS 200-AS301 - DOOR SCHEDULE AND WALL DETAILS - DOOR SCHEDULE AND WALL DETAILS DOOR SCHEDULE AND WALL DETAILS 200-AS401 - MILLWORK AND MISC DETAILS - MILLWORK AND MISC DETAILS MILLWORK AND MISC DETAILS 200-AS601 - EQUIPMENT SCHEDULE AND PLANS - EQUIPMENT SCHEDULE AND PLANS EQUIPMENT SCHEDULE AND PLANS STRUCTURAL: 200-SS001 - GENERAL NOTES - GENERAL NOTES GENERAL NOTES 200-SS101 - NEW DUNNAGE AND OPENING FRAMING LAYOUT AT 4TH - NEW DUNNAGE AND OPENING FRAMING LAYOUT AT 4TH NEW DUNNAGE AND OPENING FRAMING LAYOUT AT 4TH FLOOR AND ROOF 200-S102 - NEW ROOF DUNNAGE PLAN - NEW ROOF DUNNAGE PLAN NEW ROOF DUNNAGE PLAN 200-S201 - RAILING DETAILS AND SECTION DETAILS - RAILING DETAILS AND SECTION DETAILS RAILING DETAILS AND SECTION DETAILS 200-S202 - CROSSOVER STAIR SECTION DETAILS & ELEVATIONS - CROSSOVER STAIR SECTION DETAILS & ELEVATIONS CROSSOVER STAIR SECTION DETAILS & ELEVATIONS MECHANICAL: 200-MH0001 - SYMBOLS LIST, ABBREVIATIONS AND NOTES - SYMBOLS LIST, ABBREVIATIONS AND NOTES SYMBOLS LIST, ABBREVIATIONS AND NOTES 200-MD1000 - 3RD FLOOR DEMOLITION PART PLANS - 3RD FLOOR DEMOLITION PART PLANS 3RD FLOOR DEMOLITION PART PLANS 200-MH1000 - 3RD FLOOR DUCTWORK PART PLANS AND SCHEDULE - 3RD FLOOR DUCTWORK PART PLANS AND SCHEDULE 3RD FLOOR DUCTWORK PART PLANS AND SCHEDULE 200-MP1000 - 3RD FLOOR PIPING PART PLANS - 3RD FLOOR PIPING PART PLANS 3RD FLOOR PIPING PART PLANS 200-MH2000 - 4TH FLOOR ROOF PART PLAN - 4TH FLOOR ROOF PART PLAN 4TH FLOOR ROOF PART PLAN 200-MH5000 - DETAILS - DETAILS DETAILS 200-MH5001 - DETAILS - DETAILS DETAILS 200-MH5002 - DETAILS - DETAILS DETAILS 200-MH5003 - DETAILS - DETAILS DETAILS 200-MH6000 - SCHEDULES - SCHEDULES SCHEDULES 200-MH6001 - SCHEDULES - SCHEDULES SCHEDULES 200-MH8000 - AUTOMATIC TEMPERATURE CONTROL DIAGRAM - AUTOMATIC TEMPERATURE CONTROL DIAGRAM AUTOMATIC TEMPERATURE CONTROL DIAGRAM 200-MH8001 - AUTOMATIC TEMPERATURE CONTROL DIAGRAMS - AUTOMATIC TEMPERATURE CONTROL DIAGRAMS AUTOMATIC TEMPERATURE CONTROL DIAGRAMS PLUMBING: 200-PL001 - SYMBOLS, ABBREVIATIONS, NOTES, SCHEDULES - SYMBOLS, ABBREVIATIONS, NOTES, SCHEDULES SYMBOLS, ABBREVIATIONS, NOTES, SCHEDULES 200-PD101 - 3RD FLOOR PLAN - PLUMBING DEMOLITION - 3RD FLOOR PLAN - PLUMBING DEMOLITION 3RD FLOOR PLAN - PLUMBING DEMOLITION 200-PL101 - 3RD FLOOR PLAN - PLUMBING NEW WORK - 3RD FLOOR PLAN - PLUMBING NEW WORK 3RD FLOOR PLAN - PLUMBING NEW WORK FIRE PROTECTION: 200-FX001 - SYMBOLS, ABBREVIATIONS, NOTES, SCHEDULES, DETAILS - SYMBOLS, ABBREVIATIONS, NOTES, SCHEDULES, DETAILS SYMBOLS, ABBREVIATIONS, NOTES, SCHEDULES, DETAILS 200-FD101 - 3RD FLOOR PLAN - SPRINKLER DEMOLITION - 3RD FLOOR PLAN - SPRINKLER DEMOLITION 3RD FLOOR PLAN - SPRINKLER DEMOLITION 200-FX101 - 3RD FLOOR PLAN - SPRINKLER NEW WORK - 3RD FLOOR PLAN - SPRINKLER NEW WORK 3RD FLOOR PLAN - SPRINKLER NEW WORK ELECTRICAL 200-E0001 - ELECTRICAL SYMBOL LIST, ABBREVIATIONS AND GENERAL - ELECTRICAL SYMBOL LIST, ABBREVIATIONS AND GENERAL ELECTRICAL SYMBOL LIST, ABBREVIATIONS AND GENERAL NOTES 200-ED1001 - ELECTRICAL 3RD FLOOR PART PLANS DEMOLITION - ELECTRICAL 3RD FLOOR PART PLANS DEMOLITION ELECTRICAL 3RD FLOOR PART PLANS DEMOLITION 200-EL1001 - ELECTRICAL 3RD FLOOR PART PLANS LIGHTING - ELECTRICAL 3RD FLOOR PART PLANS LIGHTING ELECTRICAL 3RD FLOOR PART PLANS LIGHTING 200-EP1001 - ELECTRICAL 3RD FLOOR PART PLANS POWER AND SIGNAL - ELECTRICAL 3RD FLOOR PART PLANS POWER AND SIGNAL ELECTRICAL 3RD FLOOR PART PLANS POWER AND SIGNAL 200-EP1002 - ELECTRICAL ROOF PART PLAN - ELECTRICAL ROOF PART PLAN ELECTRICAL ROOF PART PLAN 200-EP1003 - ELECTRICAL BASEMENT PLANS - ELECTRICAL BASEMENT PLANS ELECTRICAL BASEMENT PLANS 200-E3001 - RISER DIAGRAM - RISER DIAGRAM RISER DIAGRAM 200-E4001 - PANEL SCHEDULES - PANEL SCHEDULES PANEL SCHEDULES 200-E5001 - ELECTRICAL DETAILS - ELECTRICAL DETAILS ELECTRICAL DETAILS 200-FA1001 - FIRE ALARM 3RD FLOOR PART PLANS- FIRE ALARM 3RD FLOOR PART PLANSFIRE ALARM 3RD FLOOR PART PLANS

AutoCAD SHX Text

79 MIDDLEVILLE ROAD, NORTHPORT, NEW YORK 11768

AutoCAD SHX Text PROJECT No. 632-19-106

AutoCAD SHX Text

79 MIDDLEVILLE ROAD NORTHPORT, NEW YORK

AutoCAD SHX Text N

AutoCAD SHX Text

AREA OF WORK

AutoCAD SHX Text

FACILITY MAP

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

SYMBOLS

AutoCAD SHX Text

KEY MAP: BUILDING 200, THIRD FLOOR PLAN

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text N

AutoCAD SHX Text

CAMPUS ENTRANCE

AutoCAD SHX Text

AREA OF THIRD FLOOR PHARMACY

AutoCAD SHX Text

BUILDING 200 NORTHPORT VAMC

AutoCAD SHX Text

BUILDING 200

AutoCAD SHX Text

AERIAL IMAGE FROM BING.COM

AutoCAD SHX Text

DRAWING LIST

AutoCAD SHX Text

BUILDING 17

AutoCAD SHX Text

PARKING LOT "L": CONTRACTOR STAGING AREA

AutoCAD SHX Text

01 OF 52 OF 52 52 02 OF 52OF 5252

AutoCAD SHX Text

03 OF 52 OF 52 52 04 OF 52 OF 52 52 05 OF 52OF 5252

AutoCAD SHX Text 06 OF 52 OF 52 52 07 OF 52 OF 52 52 08 OF 52 OF 52 52 09 OF 52 OF 52 52 10 OF 52 OF 52 52 11 OF 52 OF 52 52 12 OF 52 OF 52 52 13 OF 52 OF 52 52 14 OF 52 OF 52 52 15 OF 52 OF 52 52 16 OF 52 OF 52 52 17 OF 52 OF 52 52 18 OF 52OF 5252

AutoCAD SHX Text 19 OF 52 OF 52 52 20 OF 52 OF 52 52 21 OF 52 OF 52 52 22 OF 52 OF 52 52 23 OF 52OF 5252

AutoCAD SHX Text 24 OF 52 OF 52 52 25 OF 52 OF 52 52 26 OF 52 OF 52 52 27 OF 52 OF 52 52 28 OF 52 OF 52 52 29 OF 52 OF 52 52 30 OF 52 OF 52 52 31 OF 52 OF 52 52 32 OF 52 OF 52 52 33 OF 52 OF 52 52 34 OF 52 OF 52 52 35 OF 52 OF 52 52 36 OF 52OF 5252

AutoCAD SHX Text

37 OF 52 OF 52 52 38 OF 52 OF 52 52 39 OF 52OF 5252

AutoCAD SHX Text

40 OF 52 OF 52 52 41 OF 52 OF 52 52 42 OF 52OF 5252

AutoCAD SHX Text 43 OF 52 OF 52 52 44 OF 52 OF 52 52 45 OF 52 OF 52 52 46 OF 52 OF 52 52 47 OF 52 OF 52 52 48 OF 52 OF 52 52 49 OF 52 OF 52 52 50 OF 52 OF 52 52 51 OF 52 OF 52 52 52 OF 52OF 5252

AutoCAD SHX Text

01 OF 52OF 5252

SAFETY/EGRESS - 3RD FL PARTIAL PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

MPE Consultant:

Project Director

23 MARCH 2021Revisions: Date:

632-19-106

79 MIDDLEVILLE ROAD, NORTHPORT, NY 11768

RENOVATE PHARMACY SPACES

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

NORTHPORT VAMC

Structural Consultant:Asbestos Abatement:

Egan Environmental Consulting, Inc 14 High Street Mahwah, New Jersey 07430 P: 914.320.7924

GEDEON GRC CONSULTING

6901 Jericho Turnpike, Suite 216 Syosset, New York 11791 P: 516.873.7010

MGENGINEERING, D.P.C.

116 W 32nd Street New York, New York 10001 P: 212.643.9055

KEY MAP - BLDG 200, 3RD FLOOR

GI002

AutoCAD SHX Text

EXIST SHAFT W/2HR FIRE RESISTANT RATED FIRE BARRIER

AutoCAD SHX Text

TRAVEL DIST TO EXIT: 115'-0"

AutoCAD SHX Text

COMMON PATH TRAVEL: 48'-0"

AutoCAD SHX Text

COMMON PATH TRAVEL: 53'-6"

AutoCAD SHX Text

TRAVEL DIST TO EXIT: 131'-0"

AutoCAD SHX Text

TRAVEL DIST TO EXIT: 66'-0"

AutoCAD SHX Text

TRAVEL DIST TO EXIT: 35'-6"

AutoCAD SHX Text

COMMON PATH TRAVEL: 40'-0"

AutoCAD SHX Text

TRAVEL DIST TO EXIT: 174'-0"

AutoCAD SHX Text

LINE OF EXIST SMOKE BARRIER

AutoCAD SHX Text

LINE OF EXIST SMOKE BARRIER

AutoCAD SHX Text

EXIST SHAFT W/2HR FIRE RESISTANT RATED FIRE BARRIER

AutoCAD SHX Text

EXIST F.E.

AutoCAD SHX Text

EXIST F.E.

AutoCAD SHX Text

EXIST F.E.

AutoCAD SHX Text

NEW 1HR FIRE RESISTANT RATED FIRE BARRIER

AutoCAD SHX Text

EXIST 2HR FIRE RESISTANT RATED FIRE BARRIER

AutoCAD SHX Text 1 HOUR FIRE RESISTANT RATED SMOKE BARRIER 1 HOUR FIRE RESISTANT RATED FIRE BARRIER 2 HOUR FIRE RESISTANT RATED FIRE BARRIER TRAVEL DISTANCE RENOVATED PHARMACY SPACE TEMPORARY PHARMACY SPACE

AutoCAD SHX Text A LABEL CLASS A DOOR CLASS A DOOR A/C AIR CONDITION AIR CONDITION A/E ARCHITECT/ENGINEER ARCHITECT/ENGINEER ABV ABOVE ABOVE ACT ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE AD AREA DRAIN AREA DRAIN ADH ADHESIVE ADHESIVE ADJ ADJACENT ADJACENT ADMIN ADMINISTRATION ADMINISTRATION AFC ABOVE FINISHED COUNTER ABOVE FINISHED COUNTER AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT AIR HANDLING UNIT ALT ALTERNATE ALTERNATE ALUM ALUMINUM ALUMINUM APPROX APPROXIMATE APPROXIMATE ARCH ARCHITECT ARCHITECT ASB ASBESTOS ASBESTOS ASPH ASPHALT ASPHALT ASSN ASSOCIATION ASSOCIATION AUTO AUTOMATIC AUTOMATIC AUX AUXILIARY AUXILIARY BAT BATTEN BATTEN BD BOARD BOARD BEV BEVEL BEVEL BKG BACKING BACKING BLDG BUILDING BUILDING BOT BOTTOM BOTTOM BTWN BETWEEN BETWEEN C TO C CENTER TO CENTER CENTER TO CENTER CAB CABINET CABINET CONC CONCRETE CONCRETE CIR CIRCLE CIRCLE CL CENTER LINE CENTER LINE CLDG CLADDING CLADDING CLG CEILING CEILING CLG HT CEILING HEIGHT CEILING HEIGHT CLR CLEAR CLEAR CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CNTR COUNTER COUNTER COL COLUMN COLUMN CONC FLR CONCRETE FLOOR CONCRETE FLOOR CONSTR CONSTRUCTION CONSTRUCTION CONT CONTINUE CONTINUE COORD COORDINATE COORDINATE CPT CARPET CARPET CSWK CASEWORK CASEWORK CT CERAMIC TILE CERAMIC TILE CTRL CONTROL CONTROL DAT DATUM DATUM DC DIRECT CURRENT DIRECT CURRENT DEG DEGREE DEGREE DEL DELETE DELETE DEMO DEMOLITION DEMOLITION DEPT DEPARTMENT DEPARTMENT DTL DETAIL DETAIL DIFF DIFFERENCE DIFFERENCE DIM DIMENSION DIMENSION DIR DIRECTION DIRECTION DR DOOR, OR DRAIN DOOR, OR DRAIN DR OPNG DOOR OPENING DOOR OPENING E.J. EXPANSION JOINT EXPANSION JOINT EL ELEVATION ELEVATION ELEC ELECTRIC ELECTRIC ELEV ELEVATOR ELEVATOR EMER EMERGENCY EMERGENCY ENGR ENGINEER ENGINEER EQ EQUAL EQUAL EQUIP EQUIPMENT EQUIPMENT EQUIV EQUIVALENT EQUIVALENT ESP ESPECIALLY ESPECIALLY EXIST EXISTING EXISTING FA FIRE ALARM FIRE ALARM FAS FASCIA FASCIA FD FLOOR DRAIN FLOOR DRAIN FE FIRE EXTINGUISHER FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER CABINET FIN FLR FINISH FLOOR FINISH FLOOR FIXT FIXTURE FIXTURE FLR FLOOR FLOOR FP FIRE PROTECTION OR FIREPROOF FIRE PROTECTION OR FIREPROOF FRT FIRE RETARDANT TREATED FIRE RETARDANT TREATED FRZ FREEZER FREEZER FT FEET OR FOOT FEET OR FOOT FURN FURNISH OR FURNITURE FURNISH OR FURNITURE GA GAGE OR GYPSUM ASSOCIATION GAGE OR GYPSUM ASSOCIATION GAL GALLON GALLON GALV GALVANIC OR GALVANIZED GALVANIC OR GALVANIZED GB GRAB BAR GRAB BAR GC GENERAL CONTRACTOR GENERAL CONTRACTOR GEN GENERAL OR GENERATOR GENERAL OR GENERATOR GL GLASS GLASS GLU LAM GLUED LAMINATED WOOD GLUED LAMINATED WOOD GT GROUT GROUT GYP GYPSUM GYPSUM GYP BD GYPSUM BOARD GYPSUM BOARD HB HOSE BIBB HOSE BIBB HC HOLLOW CORE HOLLOW CORE HDWD HARDWOOD HARDWOOD HM HOLLOW METAL HOLLOW METAL HT HEIGHT HEIGHT HVAC HEATING, VENTILATING, HEATING, VENTILATING, AND AIR CONDITIONING ID IDENTIFICATION IDENTIFICATION ILLUM ILLUMINATION ILLUMINATION INCL INCLUDED INCLUDED INFO INFORMATION INFORMATION INSUL INSULATION INSULATION INT INTERIOR INTERIOR JAN JANITOR JANITOR J-BOX JUNCTION BOX JUNCTION BOX LAB LABORATORY LABORATORY LAM LAMINATE LAMINATE LAV LAVATORY LAVATORY LDR LEADER LEADER LED LIGHT EMITTING DIODE LIGHT EMITTING DIODE LT LIGHT LIGHT LVD LOUVERED LOUVERED LVR LOUVER LOUVER LYR LAYER LAYER

AutoCAD SHX Text MAINT MAINTENANCE MAINTENANCE MATL MATERIAL MATERIAL MAX MAXIMUM MAXIMUM MECH MECHANICAL MECHANICAL MEMO MEMORANDUM MEMORANDUM MEZZ MEZZANINE MEZZANINE MID MIDDLE MIDDLE MIRR MIRROR MIRROR MISC MISCELLANEOUS MISCELLANEOUS MLDG MOLDING (MOULDING) MOLDING (MOULDING) MLWK MILLWORK MILLWORK MO MASONRY OPENING MASONRY OPENING MTL METAL METAL MULL MULLION MULLION NA NOT APPLICABLE NOT APPLICABLE NAT NATURAL NATURAL NIC NOT IN CONTRACT NOT IN CONTRACT NO NUMBER NUMBER NOM NOMINAL NOMINAL NUM NUMERAL NUMERAL OC ON CENTER ON CENTER OCC OCCUPY OCCUPY OFF OFFICE OFFICE OPNG OPENING OPENING OPP OPPOSITE OPPOSITE OSHA OCCUPATIONAL SAFETY AND OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION OZ OUNCE OUNCE PART PARTIAL PARTIAL PAT PATTERN PATTERN PEN PENETRATE PENETRATE PERF PERFORATED PERFORATED PERP PERPENDICULAR PERPENDICULAR PLAS PLASTER OR PLASTIC PLASTER OR PLASTIC PLBG PLUMBING PLUMBING PLYWD PLYWOOD PLYWOOD PNL PANEL PANEL PRCST PRECAST PRECAST PREFAB PREFABRICATE PREFABRICATE PRELIM PRELIMINARY PRELIMINARY PREP PREPARATION PREPARATION PREV PREVIOUS PREVIOUS PROP PROPERTY PROPERTY PTD PAINTED PAINTED PVC POLYVINYL CHLORIDE (PLASTIC) POLYVINYL CHLORIDE (PLASTIC) QA QUALITY ASSURANCE QUALITY ASSURANCE QC QUALITY CONTROL QUALITY CONTROL QT QUARRY TILE QUARRY TILE QTB QUARRY TILE BASE QUARRY TILE BASE QTR QUARTER QUARTER QTY QUANTITY QUANTITY R RADIUS OR RISER RADIUS OR RISER RAD RADIATOR RADIATOR RB RESILIENT BASE OR RUBBER RESILIENT BASE OR RUBBER BASE RBR RUBBER RUBBER RCP REFLECTED CEILING PLAN REFLECTED CEILING PLAN RCVR RECEIVER RECEIVER RD ROAD OR ROOF DRAIN ROAD OR ROOF DRAIN REC RECESSED RECESSED RECT RECTANGLE RECTANGLE REF REFERENCE OR REFRIGERATOR REFERENCE OR REFRIGERATOR REINF REINFORCE REINFORCE REQ REQUIRE REQUIRE REQD REQUIRED REQUIRED RESIL RESILIENT RESILIENT RET RETURN RETURN REV REVISION REVISION RM ROOM ROOM RND ROUND ROUND RO ROUGH OPENING ROUGH OPENING SALV SALVAGE SALVAGE SBSTR SUBSTRATE SUBSTRATE SCHED SCHEDULE SCHEDULE SCHEM SCHEMATIC SCHEMATIC SECT SECTION SECTION SEP SEPARATE SEPARATE SF SQUARE FOOT (FEET) SQUARE FOOT (FEET) SLNT SEALANT SEALANT SMK SMOKE SMOKE SPEC SPECIFICATION SPECIFICATION SPKLR SPRINKLER SPRINKLER SPLY SUPPLY SUPPLY SQ SQUARE SQUARE SS STAINLESS STEEL STAINLESS STEEL STD STANDARD STANDARD STOR STORAGE STORAGE STR STRINGERS STRINGERS STRUCT STRUCTURAL STRUCTURAL SURF SURFACE SURFACE SUSP SUSPEND SUSPEND SYS SYSTEM SYSTEM T&G TONGUE AND GROOVE TONGUE AND GROOVE TECH TECHNICAL TECHNICAL TEL TELEPHONE TELEPHONE TEMP TEMPERATURE OR TEMPORARY TEMPERATURE OR TEMPORARY THK THICKNESS THICKNESS THRU THROUGH THROUGH TMPD TEMPERED TEMPERED TO TOP OF ___ TOP OF ___ TRANS TRANSOM TRANSOM TRTD TREATED TREATED TYP TYPICAL TYPICAL U HEAT TRANSFER COEFFICIENT HEAT TRANSFER COEFFICIENT UPS UNINTERRUPTIBLE POWER UNINTERRUPTIBLE POWER SUPPLY UTIL UTILITY UTILITY UV ULTRAVIOLET ULTRAVIOLET VAC VACUUM VACUUM VAR VARIES VARIES VCT VINYL COMPOSITION TILE VINYL COMPOSITION TILE VENT VENTILATION VENTILATION VERT VERTICAL VERTICAL VEST VESTIBULE VESTIBULE VIF VERIFY IN FIELD VERIFY IN FIELD VOL VOLUME VOLUME W/ WITH WITH W/O WITHOUT WITHOUT WD WOOD WOOD WSCT WAINSCOT WAINSCOT WT WEIGHT WEIGHT

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT

AutoCAD SHX Text A. 1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION 1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURE. a. NFPA 101 LIFE SAFETY CODE, 2018 EDITION b. NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900) c. NATIONAL ELECTRIC CODE (NEC) d. INTERNATIONAL PLUMBING CODE (IPC) e. ASME BOILER AND PRESSURE VESSEL CODE f. ASME CODE FOR PRESSURE PIPING g. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13) h. ENERGY POLICY ACT (EPAct) i. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) j. VA MENTAL HEALTH DESIGN GUIDE k. INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN SPECIFICALLY REFERENCE IN VA DESIGN DOCUMENTS l. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS m. USP 797 & USP 800 2. THE CONSTRUCTION CLASSIFICATION IS TYPE II (222). THE MINIMUM FIRE RATING FOR ALL LOAD-BEARING STRUCTURAL ELEMENTS IS 2HRS. IF DURING CONSTRUCTION, ANY DAMAGE TO EXISTING FIREPROOFING IS OBSERVED OR IF DISCOVERED THAT ANY FIRE PROTECTION IS MISSING, THE CONTRACTOR SHALL REPAIR TO MAINTAIN FULL PROTECTION. 3. THE PHARMACY SUITE AREA TO BE RENOVATED OCCUPIES 1,163 SQUARE FEET OF THE 3RD FLOOR, PLUS 400 SQUARE FEET OF AREA ACROSS THE CORRIDOR. A 470 SQUARE FOOT TEMPORARY SPACE WILL BE CREATED FOR CONSTRUCTION OF THE PHARMACY. TOTAL AREA FOR THE PROJECT: 2,033 SQUARE FEET NFPA 101 REVIEW B. CHAPTER 18 NEW HEALTHCARE OCCUPANCIES CHAPTER 18 NEW HEALTHCARE OCCUPANCIES 1. (18.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO NEW BUILDINGS OR PORTIONS THEREOF USED AS BUSINESS OCCUPANCIES. 2. (18.1.1.3) THE PROVISIONS OF CHAPTER 4 GENERAL (4.6) SHALL APPLY.

AutoCAD SHX Text

CODE NOTES

AutoCAD SHX Text C. MEANS OF EGRESS 1. (18.2.1.1) ALL MEANS OF EGRESS SHALL COMPLY WITH CHAPTER 7 & THIS CHAPTER. (18.2.1.1) ALL MEANS OF EGRESS SHALL COMPLY WITH CHAPTER 7 & THIS CHAPTER. 2. (18.2.3.4) AISLES AND CORRIDORS REQUIRED FOR EXIT ACCESS SHALL NOT BE LESS THAN (18.2.3.4) AISLES AND CORRIDORS REQUIRED FOR EXIT ACCESS SHALL NOT BE LESS THAN 8FT WIDE UNLESS OTHERWISE PERMITTED BY ONE OF THE FOLLOWING: (3)EXIT ACCESS WITHIN A ROOM OR SUITE OF ROOMS COMPLYING WITH 18.2.5 3. (18.2.5.1) ARRANGEMENT OF MEANS OF EGRESS SHALL COMPLY WITH SECTION 7.5; (18.2.5.1) ARRANGEMENT OF MEANS OF EGRESS SHALL COMPLY WITH SECTION 7.5; (7.5.1.3.5) IN EXIST BLDGS, EXITS SHALL BE EXCEPT FROM THE DIAGONAL MEASUREMENT SEPARATION DISTANCE CRITERIA PROVIDED SUCH EXITS ARE LOCATED REMOTELY. 4. (18.2.5.2) DEAD-END CORRIDORS SHALL NOT EXCEED 30 FT. 5. (18.2.5.3) COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FT. 6. (18.3.6.2.2) NO FIRE RESISTANCE RATING SHALL BE REQUIRED FOR CORRIDOR WALLS. D. INTERIOR FINISHES - CHAPTER 18 AND SECTION 10.2 1. (18.4.4.6.3.1) INTERIOR FLOOR FINISH SHALL COMPLY WITH SECTION 10.2.

AutoCAD SHX Text

ABBREVIATIONS, INFECTION CONTROL, CODE NOTES AND FIRE SAFETY

AutoCAD SHX Text

AutoCAD SHX Text G002

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text N

AutoCAD SHX Text THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE CENTER, THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING A PROGRAM TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES. REFER TO PROJECT SPECIFICATIONS.

AutoCAD SHX Text

INFECTION CONTROL NOTES

AutoCAD SHX Text A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNER'S REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING. B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS DOORS (BOTH SIDES OF DOORS) INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY. PROVIDE MANOMETER MONITORS FOR ALL CONSTRUCTION BARRIERS. C. CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00AM OR AFTER 4:00PM UNLESS CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00AM OR AFTER 4:00PM UNLESS ARRANGED WITH THE VA TO DISPOSE OF DURING NORMAL HOURS. USE ROUTE AGREED UPON BY ICRA TEAM AND COTR FOR TRANSPORT OF TRANSPORT CONTAINERS THROUGH THE FACILITY. CONTRACTORS CAN ONLY DEVIATE TO NORMAL HOURS WITH THE APPROVAL OF THE INFECTION CONTROL NURSE AND COR DUE TO PARTICULAR CIRCUMSTANCES THAT MAY OBSTRUCT PROGRESS. A CLEAR PLAN WILL HAVE TO BE SUBMITTED AND PRECAUTIONARY INFECTION CONTROL MEASURES IMPLEMENTED. D. CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS. CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS. E. CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM MULTIPLE TIMES A DAY. F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING. CONTRACTOR TO INCLUDE MONITORING MANOMETER AT ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.

AutoCAD SHX Text

02 OF 52OF 5252

01of52 0-G001
Sheets and Views
Layout1
02of52 0-G002
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .