Drawings - 506-26-202 Tuckpoint.pdf

PDF 15 MB Posted

Attached to
Z1DA--Tuckpointing 506-26-202 Federal contract opportunity
Solicitation number
36C25026B0019
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

These are bid documents for a Department of Veterans Affairs (VA) tuckpointing renovation project at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The project number is 506-26-202, and the documents are marked as pre-design construction/bid documents with an issue date of xx/xx/2025, indicating this is a template awaiting finalization.

The scope of work covers masonry brick repointing and tuckpointing for two buildings: Building 1W (a nine-story medical facility with basement, penthouse, and machine room levels) and Building 28 (a four-story residential/care facility with basement). Building 1W requires approximately 2,020 square feet of brick masonry repointing distributed across elevations (665 SF east, 225 SF west, 580 SF north/south combined). Building 28 requires approximately 3,250 square feet of brick masonry repointing (200 SF east, 2,100 SF north, 750 SF south, 200 SF north continuation). The project also includes work on Building 1E (Liberty Building), addressing window head flashing details and insulated metal panel repairs on the fifth floor. Documentation includes comprehensive floor plans for all levels, elevation drawings with marked repointing areas, site plans indicating contractor parking locations in the east parking structure (2 spaces) and dumpster placement in Lot H, and detailed specifications for material preparation, work execution, and building access protocols. The documents reference general design notes requiring compliance with specifications and substitution of comparable products with architect approval.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 EAST1 WEST

BUILDINGBUILDING

BUILDING 1 BUILDING 28

WEST

SD38

SD

SD

SD

SD40

AB15A

AB11

AB10A AB10

AB09E

AB08

AB01

AB03A

AB03

C1

A8B

AB23

AB09Z

AB33J

AB16 AB33I

CB33

AB17

AB15AB09

AB09H

AB09F

AB09A

AB09I

AB09K

AB09L

CB30

CB36AB09N

AB09D

AB09C

AB09B

AB09A

C1 C1 C1 C1 C1 C1

AB09Y AB09X AB09W AB14

AB09M

CB29

AB09A AB09B

AB12

AB12A AB12B

CB31

AB13

AB09Q

AB09R

AB09S

AB09T

AB09U

AB09V

AB15A

AB18

AB20

AB22

AB24

AB30

AB32

CB32

AB26

AB33B

AB28

AB29

AB33F

AB33A

AB33

AB80

AB79

AB95

AB78AB95A

AB65AB66

AB33E

AB33DAB33C

CB35A

ST10

ST10E

AB36B

ST10E-A

AB56

AB90

AB53

AB59

AB91

AB64

AB63

AB61 AB63A

AB68AB66

AB70 AB71

AB74

AB75

AB92 AB73

AB76

AB96

AB77

AB69

AB94

AB67

AB58

AB34

AB51

AB32

AB38

AB72

AB67

AB45

AB27

AB29AB25

C2

AB92

AB92C

AB94A

AB92A

AB94

C2

C3

BB49A

BB49

BB49B

BB49C

AB36

AB36A

AB19

AB33A

CB34

AB119A

CB35

CB37

AB54

AB52

AB50

AB49

BB86

BB87

C3

C3

C3

BB43

C4

A12G

AB55

AB57

AB93

AB60

AB62

AB41

AB40

AB31 AB33

AB37 AB37A

AB39

AB37B

CB28

BB46

BB50

BB54

BB58

BB56

BB57BB55BB53

BB45

C4 C4

EB11

EB01EB02

EB03

EB04

EB05

EB06

EB07

EB09

EB10

DB11

DB13

DB14

DB19 DB20

DB21 DB22

DB23

DB37

DB34

DB47

DB32A

DB35 DB36 DB49

DB48B DB48A DB48 DB48C

DB48D

DB24

DB25B

DB25A

CB20

DB25

DB25C

DB25D

DB40

DB41

DB42

DB43

CB22B

CB-3

S-1

S-2

CB-12

CB12B

CB12D

CB12C

CB07

CB08B

CB06A

CB04

CB05

CB06

CB-7CB-2

CB-6

DB12

CB07A

DB23

DB12A

DB12

DB21B

DB21C

DB12

DB35

DB21A

DB12 DB21D

DB12DB12

FG62

FG64

FG66 FG68 FG70 FG72 FG74

FG76

FG78

FG80

FG82

FG84

FG88

FG86

FG88A

FG34

FG38 FG40 FG42 FG44 FG46

FG47FG45FG43

FG41

FG39FG37FG35

FG33FG31

FG29FG27

FG25

FG23

FG52

FG54

FG56

FG58

FG60

FG36

FG63

FG63A

FG71

FG49

FG51

FG53

FG55

FG85FG57

FG59

FG83

FG81FG61

FG65

FG67 FG69

BB89

BB88

BB80

BB78

BB74

BB72

BB24

BB22

AB91

AB90

BB42

BB44

BB05B

BB05C

BB05A

BB07B

BB07

BB03

BB02

BB08

BB09C

BB09A

BB09B

BB13

BB10

BB06

BB12

BB13B

A21A

AB46

AB48

AB47

AB42

A37C

AB41

BB26C

BB26B

BB26A BB80

FG01

FG02

FG10

FG10D

FG16

FG17

FG14 FG12

FG10C

FG10B

FG10A

FG09FG11

FG08 FG06

FG07

FG01A

FG00

FG01

FG04

FG02

FG05

DB00

DB02

DB03

DB04

DB05

CB-12

DB06

DB07

DB08

DB09

DB16

DB16A

DB16C

DB06D

DB06B

DB10

DB15

DB17

DB18

CB-12

CB-13

EB60

EB60B EB60A

COM.

EB02E EB02F EB02G EB02H

EB04D EB04E EB04F EB04G

EB04H EB04J EB04K EB04L EB04M

EB02K

EB02L

EB02M

DB60

DB39

DB50

DB50

CB08

CB08A

CB10

CB10A

CB11 CB12A

DB50

CB13

CB15

CB16

BB85

BB70

BB68

BB24

BB24a

BB26

BB30

BB30c

BB36 BB30a

BB30b

BB85a

EB60a DB60b

DB61

A22c

DB60 DB60b

EB60a

DB61 EB60B

EB60A

COM.

EB60

ELECTRICAL

MECHANICAL

CORRIDOR

CORRIDOR

OFFICE

CLERICAL

OFFICE

SUPERVISORINVEST

DRUGS/ADMIN

WORK

DRUG INFO

SERV

FEMALE

LOCKERS

MALE

LOCKERS

LLTS

LOUNGE

CONF/

CLASSROOM

STUDY

CHRONICLES

PHAR

LAB

CORRIDOR

OFFICE

CLIN

TEACHING

OFFICE

ASSIST

CHIEF

OFFICE

CHIEF

OFFICE

WAITING

OFFICE

MAN.

ASSIST

CHIEF

ELECTRIC

SHOP

GARDEN

COURTYARD

STAIR 1

HEALING

GARDEN

ELECTRICAL

ELEC.SOILED

UTILITY

HAC

ELEVATOR

MECHANICAL

DIETICIAN

STORAGE

RECREATIONAL

THERAPY

FEMALE

TOILET

MALE

TOILET

PATIENT

LOUNGE

PASSAGE

DINING

ROOM

ELECTRICAL

SHOP

STORAGE

ELECTRICAL

SHOP

HACELEC.

STAFF

OFFICE

SOILED

UTILITY

CLEAN

LINEN

STORAGE

STAFF

OFFICE

STAFF

OFFICE

PANTRYTOILET

GROUND &

TRANSPORTATION

EQUIPMENT

STRUCTUREPASSAGE

EMERFENCY

GENERATORS

EMERGENCY

SWITCHGEAR

PAINT

SHOP

EMS

STORAGE

CLEAN

LINEN

FACILITIES

SIGN SHOP

STAIR 5

MAINTENANCE

SHOP

STORAGE

FLAMMABLE

WASTE

MECH

MORGUE

REFRIGERATOR

AUTOPSY

OFFICE

AUTOPSY

ROOM

NUCLEAR

MEDICINE WASTE

HOLDING

MECHANICAL

CANTEEN

FREEZER

FM

STORAGE

INDUSTRIAL

HYGIENE

STORAGE

CORRIDOR

ELECTRICAL

EQUIPMENT

CANTEEN

SERVICE

STORAGE

BOTTLED

GAS

STORAGE

N & FS

STORAGE

N & FS

FREEZER

FIRE

ALARM

ROOM

CARDIOLOGY

RECORDS

MECHANICAL

NUTRITION

& FOOD

SERVICE

DRY

STORAGE

NUTRITION

& FOOD

SERVICE

FREEZER

LINEN

CARTS

NUTRITION

& FOOD

SERVICE

STORAGE

HOLDING

ROOM

FOR

SHREDDING

MATERIAL

MANAGEMENT

OFFICE

SPD

STORAGE

TEL

CLOS

COMM

CLOS

STAIR 1

HIMS/

DATA

QUALITY

MEDICAL

RECORDS

AREAWAY

CHIEF OF

HIMS

POLICE

STORAGE

FEMALE

TOILET

CHIEF

POLICE

CORRIDOR

STORAGE

KITCHEN

CANTEEN

STORAGE

AREAWAYS

STAIR 4

S-17

PAINT

BOOTH

CLEAN LINEN

EMS STORAGE

STORAGE

STAFF

OFFICE

PATIENT

LOUNGE

STORAGESTORAGE

LAUNDRY

SUPERVISOR

OFFICE

STAFF

BREAKROOM

KITCHEN STAFF

CONFRENCE

TOILET

TOILET

TOILET

TOILET

TOILET TOILET TOILET

TOILET

TOILET

TOILET

TOILET TOILET TOILET

TOILETTOILETTOILET

TOILETTOILET

TOILET

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

CIRC

SPACE

OPEN

OFFICES

HAC

CIRC

SPACE

VEST.

ANTE ROOM

SUPPLIES

ONCOLOGY

MIXING

IV

ADMIXTURE

PRIMARY

PICK

RECEIVING/

UNPACKING

EXIST.

VAULT

VEST. EXTEMP.

COMP.

CORRIDOR

STAIR

CORRIDOR CORRIDOR

REPRODUCTIONMAILROOM/

DISTRIBUTION

PAPER/RIBBON

DISTRIBUTION

REPRODUCTION

STAFF

TOILET

TELEPHONE

SWITCH

ROOM

LLTSSTAFF

TOILET

STORAGE

WHEELCHAIR

STORAGE/REPAIR

SERVICE

ELEVATOR

LOBBY

CORRIDOR

DETERGENT

& WATER

CLEAN

CASE CART

STAGING

SPD RME

COORD

OFFICE

SPD ASSIST

CHIEF

OFFICE

SPD CHIEF

OFFICE

FEMALE

STAFF

SHOWER

FEMALE

STAFF

LOCKER

LOCKER

ANTE RM

CORRIDOR

DISPATCH

ANTE RM

FEMALE

STAFF

SHOWER

FEMALE

STAFF

LOCKER

LOCKER

ANTE ROOM

MALE

STAFF

LOCKER

MALE STAFF

SHOWER

CHEMICAL &

SOLVENT STORAGE

DECONTAM

ANTE RMHAC

SOILED

RECEIVING

DECONTAM

HAC

CLEAN PREP

ASSEMBLY &

STERILIZATION

STERILIZERS

SURGERY STERILE

& NON-STERILE

STORAGE

DISPATCH

BREAK OUT

& CLEAN

RECEIVING

BULK

STORAGE

MALE

STAFF

TOILET RM

FEMALE

STAFF

TOILET RM

STAFF

TRAINING

STAFF

LOUNGE

CONFERENCE

CENTRAL

SUPPLY

PURCHASING

GIP

PURCHASING

CHIEF

INVENTORY

MANAGEMENT

CLEAN

STAFF

PASSAGE

CHIEF

CENTRAL

SUPPLY

SUPERVISOR

CENTRAL

SUPPLY

CLEAN

SUPPLY

ANTE ROOM

DISPATCH

BULK

STORAGE

BREAK OUT

CLEAN

RECEIVING

NURSING

UNITS

NON-STERILE

STORAGE

CORRIDOR

PASSAGE

MECHANICAL

CORRIDOR

CORRIDOR

ELEC.

OFFICE

OFFICE

OFFICE

STORAGE

PASSAGE

STAFF

MECHANICAL

CORRIDOR

MENS

TOILET

STAIR 3

CORRIDOR

EMERGENCY

OPERATION

CENTER

POLICE

CORRIDOR

LOCKERS

VOLUNTEERS

CORRIDOR

AUDITORIUM LOBBY

UNISEX

TOILET

PATIENT

TOILET

RECEPTION

EXAM

EXAM

PASSAGE

CORRIDOR

STAFF

TOILET

CORRIDOR

VENDING

STAFF WORK

AREA

PHARMACY

X-RAY

OFFICE

OFFICE

RECEPTION

STORAGE

CORRIDOR

CORRIDOR

MENS

LOCKERS

TOILET

MENS

TOILET

EQUIP.

STOR.

EVS

BREALK

ROOM

CORRIDOR

ELEC

CLOSET

SERVICE

ELEV. LOBBY

VIEWING

ROOM

MORGUE

SCAN/

EQUIP. PREP

OFFICESOILED

LINEN

WAITING

VOLUNTEER

STORAGE

ELECTRICAL

OFFICE

RAMP

CONF./

LOUNGE

VALVE

ROOM

VESTIBULE

BLOCK/

STORAGE

DOSIMETRYPASSAGE

C.T.

CONTROL

ROOM

TOILET

CLOSET

OFFICE OFFICE

TOILETTOILET

SECONDARY

WAITING

CONTROL

ROOM 1

OFFICE

RAMP

OFFICE

CONSULT

PASSAGE

EXAM

ELEVATOR

MECH

UNASSIGNED

FUTURE

ELEVATOR

FUTURE

STAIR

PASSAGE

WOMENS

TOILET

MENS

TOILET

SPRINKLER

RISER RM

ELECTRICAL

MODULATOR

CONTROL

ROOM 2

PASSAGE MODULATOR

EXISTING

PASSAGE

MEGA

VOLTAGELINAC

VAULTLOBBY

WAITING

VESTIBULE

WC

A.O.D.

STORAGE

POLICE

OFFICE

CORRIDOR

MENS

TOILET

WOMENS

TOILET

MENTAL

HEALTH

DIRECTOR

CHIEF

ER NURSE

EDUCATION

TOILET

EXAM 4

EXAM 3

EXAM 2

EXAM 1

TRIAGE 2

TRAUMA 2

TRIAGE 1

EMERGENCY

WAITING

CORRIDOR

REGISTRATION

RECEPTION

TRIAGE

RECEPTION

TRIAGE

LOUNGE

TRAUMA 1

CORRIDOR

NURSE

OBSERVATION 5OBSERVATION 4OBSERVATION 3OBSERVATION 2

CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDOR

TREATMENT 5

TREATMENT 4

TREATMENT 3

TREATMENT 2

NOUR PASSAGE

CORRIDOR

MENTOR

MEDS

CHARTING

PATIENT

TOILET

WORK MD. WORK

NURSE

ANTE-ROOM

SOILED

UTILITY

CORRIDOR

HSKGSTORAGE

I.T.

OBSERVATION 1

ELECTRICAL

ELECTRICAL

CORRIDOR

WOMENS

LOCKERWOMENS

TOILET

EVS

STORAGE

CLEAN UTILITY

TREATMENT 1

DECON/

PROCESSINGDECON

VESTIBULE

ISOLATION

UNIT A

UNIT C

1EFREEDOM BUILDING

1WLIBERTY BUILDING

MALE STAFF LOCKER

MALE STAFF SHOWER

OFFICE CHIEF OFFICE CONFERENCE

RECEPTION OFFICE OFFICE OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE

SW/ PHARMACIST OFFICE

OFFICE

OFFICE

MECHANICAL

NURSE STATION

OFFICE

SOCIAL

WORKER

MED

ROOM

ELECTRICAL

CLOSET

OFFICEEQUIP STORAGEHAC

TELEPHONE

SWITCH BOARD

TELE SUPERVISOR

IT

STORAGE/WORKROOM

GENERAL

MAINTENANCE

FLEET OFF.

OFFICE TECH FOREMAN

EQUIP STORAGE

COMPRESSOR

STORAGE

ELECTRICAL

TESTING STATION CHIEF OFFICE OFFICE VOLUNTEER SERVICES

OFFICE

OFFICE

OFFICEOFFICEOFFICEOFFICE

EQUIP STORAGE BIOMED

AUDITORIUM

OFFICE

ELECTRICAL

COMM CLOS

AB02

VOLUNTARY SERVICE STORAGE

(CACHE)

ELECTRICAL EQUIPMENT

AB00

GYM

STAIR

STAIR

COM. ELECTRICAL

MECHANICAL

MECHANICAL ELECTRICAL

COM.

MECHANICAL ELECTRICAL MECHANICAL

0 2 4 8 16

GRAPHIC SCALE: FEET

BASEMENT FLOOR PLAN

CL-3

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

RENOVATIONS FOR:

LOCATION MAP

NO SCALE VICINITY MAP

NO SCALE

AREA MAP

NO SCALE

PROJECT LOCATION

N

EW

S

N

EW

S

N

EW

S

LAKE ERIE

GRAND RAPIDS

TRAVERSE CITY

LAKE SUPERIOR

UPPER PENINSULA

MACKINAW CITY

LAKE HURON

ALPENA

PETOSKEY

GAYLORD

GRAYLING

LA

KE

M

IC

H

IG

AN

SAGINAW

ST.JOHNS FLINT

LANSING

JACKSON DETROITKALAMAZOO

ANN ARBOR

CAMPUS MAP

NO SCALE

N

EW

S

PROJECT LOCATION

GENERAL DESIGN NOTES

PRODUCTS LISTED ARE FOR BASIS OF DESIGN ONLY.

SUBJECT TO COMPLIANCE WITH REQUIREMENTS IN

SPECIFICATIONS. PROVIDE PRODUCTS AS SCHEDULED

OR COMPARABLE PRODUCTS BY OTHER

MANUFACTURERS.

PRINT ALL PLANS IN COLOR.

1" = 60'-0"

BUILDING #1W & #28 - TUCKPOINTING

10/10/2025 1W & BLDG 28

G-001

506-26-202

TUCKPOINTING

COVER SHEET

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

TuckPointing

ANN ARBOR, MICHIGAN

ISSUE DATE: xx/xx/2025

ANN ARBOR VA MEDICAL

CENTER

BID DOCUMENTS

506-26-202

DRAWING INDEX

SHEET # SHEET NAME

GENERAL

G-001 COVER SHEET

ARCHITECTURAL

01W-A.100 BLDG 1W - BASEMENT FLOOR PLAN

1" = 60'-0"

OVERALL BASEMENT FLOOR PLAN

REVISION SCHEDULE

# DATE DESCRIPTION

10/10/2025 100% Construction/ Bid Documents

01W-A.101 BLDG 1W - FIRST FLOOR PLAN

01W-A.102 BLDG 1W - SECOND FLOOR PLAN

01W-A.103 BLDG 1W - THIRD FLOOR PLAN

01W-A.104 BLDG 1W - FOURTH FLOOR PLAN

01W-A.105 BLDG 1W - FIFTH FLOOR PLAN

01W-A.106 BLDG 1W - SIXTH FLOOR PLAN

01W-A.107 BLDG 1W - SEVENTH FLOOR PLAN

01W-A.108 BLDG 1W - EIGHTH FLOOR PLAN

01W-A.109 BLDG 1W - NINTH FLOOR PLAN

01W-A.110 BLDG 1W - PENTHOUSE FLOOR PLAN

01W-A.111 BLDG 1W - MACHINE ROOM FLOOR PLAN

01W-A.200 BLDG 1W - EAST & WEST ELEVATIONS

01W-A.201 BLDG 1W - NORTH & WEST ELEVATIONS

28-A.100 BLDG 28 - BASEMENT FLOOR PLAN

28-A.101 BLDG 28 - FIRST FLOOR PLAN

28-A.102 BLDG 28 - SECOND FLOOR PLAN

28-A.200 BLDG 28 - EAST & WEST ELEVATIONS

28-A.201 BLDG 28 - NORTH & WEST ELEVATIONS

1E-A.200 BLDG 1E - FIFTH FLOOR & PARTIAL SOUTH ELEVATION

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

BUILDING #1W & #28 - TUCKPOINTING

1W & BLDG 28

G-100

506-26-202

TUCKPOINTING

overall site plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

DUMPSTER

PLACEMENT IN LOT 'H'

CONTRACTOR PARKING IN EAST

PARKING STRUCTURE

(QTY 2)

10/10/2025

10/10/2025 100% Construction/ Bid Documents

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1" = 20'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.100

506-26-202

TUCKPOINTING

Building 1W

BASEMENT FLOOR PLAN

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP UP

UP

UP

UP

UP

UP

UP

UP

UP

DN

UP

DN

UP

DN

DN

UP

UP

1202 SF

LINEAR

ACCELORATOR

AB80

646 SF

LINEAR

ACCELORATOR

AB79

555 SF

CORRIDOR

AB95

88 SF

MODULATOR

AB78

1041 SF

LOBBY

WAITING

AB33

277 SF

CORRIDOR

CB35

201 SF

VEST

AB33A

217 SF

WC

AB33F

837 SF

WAITING

AB13

473 SF

CHECK-IN

AB12B

205 SF

CHECK-IN

AB12A

269 SF

TRIAGE

LOUNGE

AB12

163 SF

OBSERVATION

AB09O

163 SF

OBSERVATION

AB09P

103 SF

CORRIDOR

CB31

147 SF

TRIAGE

AB09Q

149 SF

TRIAGE

AB09R

167 SF

OBSERVATION

AB10

170 SF

A.O.D.

140 SF AB29

CORRIDOR

CB32

50 SF

TOILET -

PATIENT

AB32

50 SF

TOILET -

PATIENT

AB30

100 SF

OFFICE

AB24

146 SF

EXAM

AB09S

150 SF

EXAM

AB09T

110 SF

OFFICE

AB22

118 SF

OFFICE

AB26

94 SF

POLICE

AB33B

52 SF

STORAGE

AB28

289 SF

CORRIDOR

CB37

54 SF

TOILET -

STAFF

AB19A

110 SF

VENDING

AB33A

152 SF

STORAGE/FUTURE

STAIR

ST10

184 SF

VEST

AB11

81 SF

DECON

AB10A

156 SF

OBSERVATION

AB09E

581 SF

CORRIDOR

CB29

202 SF

NURSE

AB09M

158 SF

OBSERVATION

AB09D

52 SF

MEDS

AB09N

146 SF

MENTOR

AB09L

65 SF

CORRIDOR

CB36

42 SF

NOURISHMENT

AB09K

161 SF

OBSERVATION

AB09C

52 SF

TOILET -

PATIENT

AB09G

70 SF

CHARTING

AB09I

111 SF

MD. WORK

81 SF AB09H

WORK

AB09F

151 SF

OBSERVATION

AB09B

143 SF

OBSERVATION

AB09A

1123 SF

NURSE

AB09

280 SF

CORRIDOR

CB28 234 SF

CORRIDOR

CB30

146 SF

EXAM

AB09U

149 SF

EXAM

AB09V

172 SF

ISOLATION

AB15A

116 SF

OFFICE

AB20

105 SF

OFFICE

AB18 238 SF

STAFF WORK

AREA

AB19

46 SF

TOILET

AB15A

67 SF

ANTE

AB15

105 SF

SOILED

UTILITY

AB17

289 SF

CORRIDOR

CB34

1991 SF

ELECTRICAL

EQUIPMENT

AB00

246 SF

CLEAN

UTILITY

1104 SF AB08

STORAGE

AB02

170 SF

OBSERVATION

AB09Z

175 SF

OBSERVATION

AB09Y

175 SF

OBSERVATION

AB09X

200 SF

OBSERVATION

AB09W

175 SF

OBSERVATION

AB14

110 SF

STORAGE

AB16

87 SF

DATA

AB33J

32 SF

HSKP

AB33I

329 SF

CORRIDOR

CB33

395 SF

STORAGE

AB01

183 SF

BATHROOM -

WOMEN

AB03A

324 SF

LOCKERS -

WOMEN

AB03

157 SF

LACTATION

ROOM

AB05

47 SF

DATA

AB07

621 SF

DATA

AB23

111 SF

STAIR 2

329 SF

CORRIDOR

AB130

123 SF

EMS

CHEMICALS

AB121

140 SF

OFFICE

AB92B

272 SF

EMS EQUIP

AB122

280 SF

STORAGE

AB119

65 SF

CHANGING

ROOM

AB118B

485 SF

CORRIDOR

AB120 481 SF

VOLUNTARY

SERVICES

SUPPLY

AB123

264 SF

VOLUNTARY

SERVICES

CLOTHING

ISSUE

AB118A

127 SF

OFFICE

AB117

174 SF

VOLUNTARY

SERVICES

CRAFT

AB124

148 SF

OFFICE

AB116

431 SF

VOLUNTARY

SERVICE

LOUNGE/ WK

AB115

310 SF

OFFICE

AB125

69 SF

STAFF

TRAINING

AB126

115 SF

VOL SERV

CLOTHING

AB127

404 SF

LOCKERS -

MEN

AB94

251 SF

STORAGE

AB92C

195 SF

BATHROOM -

MEN

AB94A

292 SF

CORRIDOR

AB110

44 SF

HSKP

AB114

86 SF

VOL SERV

BOOK

AB113

84 SF

VOL SERV

CLOTHING

AB112

83 SF

VOL SERV

CLOTHING

AB111

364 SF

OFFICE

BB24

123 SF

OFFICE

BB24A

122 SF

OFFICE

BB30A

244 SF

TESTING

STATION

BB30

46 SF

STORAGE

BB30B

Not Enclosed

BREAK

ROOM

BB30C

119 SF

OFFICE

1030 SF

BIOMED

BB30

77 SF

DATA

BB26

75 SF

ELEC

BB68

1082 SF

CORRIDOR

C3

71 SF

TOILET - MEN

BB84

97 SF

TOILET -

WOMEN

BB86

11 SF

HSKP

BB88

128 SF

STORAGE

BB89

92 SF

CORRIDOR

BB100

189 SF

CORRIDOR

BB99

214 SF

CORRIDOR

BB98

366 SF

STORAGE

BB102

66 SF

VEST

483 SF BB101

AUDITORIUM

LOBBY

BB87

816 SF

CONFERENCE

BB71

41 SF

STAIR 3

S-03

46 SF

STORAGE

BB27 105 SF

TOILET - MEN

BB43

255 SF

OFFICE

BB45

89 SF

MECH

BB49D

131 SF

STORAGE

BB49A

104 SF

OFFICE

BB49B

294 SF

OFFICE

BB49 153 SF

OFFICE

BB49C

183 SF

OFFICE

BB53

286 SF

LINEN

BB55

424 SF

PAINT SHOP

BB57

77 SF

STORAGE

BB56

113 SF

CORRIDOR

190 SF BB58

PAINT

BOOTH

BB54

1213 SF

CORRIDOR

C4

107 SF

CORRIDOR

BNA90

968 SF

CLEAN LINEN

BB50

66 SF

HSKP

BB51

148 SF

WASHER

DRYER

BB50B

325 SF

DIRTY LINEN

HOLDING

BB52

983 SF

CLEAN LINEN

BB50A

84 SF

SCALE

ALCOVE

BB95A

189 SF

FREEZER

BB07A

421 SF

STORAGE

BB07

607 SF

FREEZER

618 SF BB07B

STORAGE

BB05A

249 SF

STORAGE

B320H

289 SF

LOCKSMITH

BB44A

21 SF

LOCKSMITH

LOBBY

BB44

53 SF

ROOM

BB43

190 SF

STORAGE

BB42

194 SF

STORAGE

BB05B

283 SF

STORAGE

BB05A

93 SF

MECH

B030A

992 SF

CORRIDOR

BB06

81 SF

STORAGE

AB14

87 SF

FIRE ALARM

ROOM

BB08

116 SF

FREEZER

A016A

142 SF

STORAGE

BB09A

86 SF

VEST

BB09

184 SF

STORAGE

BB09B

232 SF

STORAGE

BB13

1315 SF

STORAGE

BB18

313 SF

MECHANICAL

AB40

105 SF

FREEZER

BB13B

359 SF

STORAGE

AB31

266 SF

ELEC

BB10

70 SF

STORAGE

BB12

316 SF

SERVICE

ELEVATOR

LOBBY

AB27

38 SF

DATA

AB29

262 SF

STORAGE

AB33

57 SF

ELEC

AB35

28 SF

STORAGE

A021B

155 SF

STORAGE

AB37

171 SF

STAIR 5

S-05

78 SF

STORAGE

AB37B

156 SF

FLAMMABLE

WASTE

AB37C

151 SF

EXIT STAIR

BB97

129 SF

VIEWING

ROOM

AB45

86 SF

LAB

28 SF AB39

STORAGE

AB24B

11 SF

STORAGE

AB39A

1346 SF

CORRIDOR

C1

364 SF

AUTOPSY

ROOM

AB46

88 SF

OFFICE

AB44C

157 SF

MORGUE

AB44

130 SF

MORGUE

REFRIGERATOR

AB47

35 SF

MECH

AB42

96 SF

OFFICE

AB40

81 SF

OFFICE

AB38

77 SF

OFFICE

AB39

311 SF

STORAGE

AB34

73 SF

SOILED

LINEN

AB34

432 SF

WAITING

166 SF AB51

RECEPTION

AB50

68 SF

TOILET

AB49

276 SF

PHARMACY

AB36A

428 SF

X-RAY

AB36

236 SF

STORAGE

AB36B

133 SF

EXAM

AB52

131 SF

EXAM

AB54

134 SF

EXAM

AB56 303 SF

CORRIDOR

AB90

229 SF

EXAM

AB53

148 SF

RAMP

AB91

201 SF

ELEC

AB58

90 SF

OFFICE

AB59

73 SF

OFFICE

AB60

100 SF

FUTURE

ELEVATOR

ST10E

54 SF

FUTURE

ELEVATOR

MECH

ST10EA

186 SF

STAFF

AB57

305 SF

MECH

AB55

131 SF

OFFICE

AB81 63 SF

STORAGE

AB62

173 SF

CONTROL

ROOM

AB64

52 SF

TOILET

AB33C

55 SF

TOILET

AB33D

79 SF

CORRIDOR

CB35A 76 SF

SPRINKLER

RISER RM

AB33E

121 SF

ELECTRICAL

MODULATOR

AB66

223 SF

CONTROL

ROOM

AB65

81 SF

CORRIDOR

AB95A

102 SF

OFFICE

AB66

104 SF

OFFICE

AB68

44 SF

HSKP

AB70

33 SF

TOILET

AB71

160 SF

CONTROL

ROOM

AB74

368 SF

C.T. / SIM

AB75

57 SF

TOILET

AB61

57 SF

TOILET

AB63A

423 SF

SECONDARY

WAITING

AB63

359 SF

CORRIDOR

AB93

159 SF

OFFICE

AB67

413 SF

PHYSICS

425 SF AB72

BREAK

ROOM

AB69

185 SF

CORRIDOR

AB92

331 SF

DOSIMETRY

AB73

117 SF

MOLD ROOM

AB76

59 SF

VEST

E113

95 SF

LOCKERS -

PATIENT

AB77

93 SF

BATHROOM

AB43

144 SF

RAMP

AB94

219 SF

STORAGE

BB19

4 SF

FEC

AB22B

117 SF

SERVICE

ELEVATOR

SE-06

911 SF

CORRIDOR

C2

59 SF

ELEC

AB93

611 SF

BREAK

ROOM

AB92

48 SF

TOILET -

STAFF

AB92A

171 SF

STAIR 1

S-01

40 SF

DATA

AB91

21 SF

DATA

AB90

19 SF

ELEC

AB25

41 SF

STAIR 4

S-04

91 SF

CORRIDOR

CB80

33 SF

MECH

BB94

47 SF

STORAGE

BB95

649 SF

CONFERENCE

ROOM #4

BB93

144 SF

STORAGE

BB103

138 SF

DATA

BB94

154 SF

CORRIDOR

BB97

596 SF

CONFERENCE

ROOM #2

BB91

95 SF

ELEVATOR

P-1

81 SF

ELEVATOR

P-2

84 SF

ELEVATOR

P-3

90 SF

ELEVATOR

P-4

94 SF

SERVICE

ELEVATOR

SE-05

205 SF

LOCKERS

BB79

176 SF

OFFICE

BB77

158 SF

OFFICE

BB80

263 SF

POLICE

BB78

40 SF

OFFICE

BB78B

39 SF

OFFICE

BB78A

122 SF

RESTROOM

BB76

138 SF

STORAGE

BB74

136 SF

OFFICE

BB72

141 SF

STORAGE

BB70

783 SF

CONFERENCE

ROOM #1

BB90

748 SF

CONFERENCE

ROOM #3

BB92

Scale: 1" = 20'-0"

BASEMENT FLOOR PLAN

Key Plan

BASEMENT FLOOR PLAN IS ISSUED FOR

REFERENCE ONLY - NO WORK IS NOTED

ON THIS FLOOR LEVEL

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1" = 20'-0"

BUILDING #1W & #28 - TUCKPOINTING

Bldg 1W

01W-A.101

506-26-202

TUCKPOINTING

Building 1W First Floor Plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

UP

DN

DN

302 SF

CORRIDOR

C-107

103 SF

CORRIDOR

C1-3B

64 SF

TOILET

B185A

53 SF

HSKP

B185C

10 SF

ELEC

B139A

41 SF

STORAGE

B139 139 SF

EXAM

B137

142 SF

EXAM

B156

62 SF

TRIAGE

65 SF B155

TRIAGE

B153

172 SF

STAIR 3

S-03

514 SF

CORRIDOR

117 SF

EXAM

B157

106 SF

EXAM

B158

207 SF

MENTORS

B161

431 SF

WAITING

28 SF

STORAGE

B170

978 SF

CORRIDOR

195 SF

PROCEDURE

B172

199 SF

PROCEDURE

B173

106 SF

EXAM

B182

176 SF

PROCEDURE

B180

99 SF

BREAK

ROOM

B179

119 SF

SOILED

UTILITY

B178

98 SF

MECH

B177

163 SF

OFFICE

B176

172 SF

OFFICE

B175

29 SF

RME

B174

191 SF

OFFICE

B170

4 SF

ELEC

4 SF B169

FE

299 SF

WAITING

B167B

134 SF

EXAM

B162

124 SF

EXAM

B160

143 SF

EXAM

B159A

141 SF

EXAM

B159

137 SF

EXAM

B154A

165 SF

EXAM

B154

129 SF

EXAM

B152A

150 SF

EXAM

B152

77 SF

ELEC

B146

29 SF

STORAGE

B141

29 SF

DATA

B143

116 SF

EXAM

B145

139 SF

EXAM

B147

241 SF

EXAM

B149

23 SF

HSKP

B136

160 SF

TOILET

B134

115 SF

EXAM

B140

105 SF

CLEAN

UTILITY

48 SF B142

TOILET

B151

59 SF

BREAK

ROOM

B148A

344 SF

OFFICE

B148

566 SF

WAITING

254 SF

EXAM

B153

570 SF

PATIENT

CONSULT

A161A

209 SF

PATIENT

PICK-UP

A1600

697 SF

WAITING

A160B

1518 SF

PHARMACY

WORKROOM

A162A

138 SF

CORRIDOR

A162B

305 SF

NARCOTICS

VAULT

A162C

132 SF

EXAM

B104

116 SF

EXAM

B103

222 SF

CORRIDOR

B100A

69 SF

ELEC

A145

112 SF

EXAM

B102

213 SF

EXAM

B101

134 SF

TOILET -

WOMEN

A144

167 SF

TOILET - MEN

A143

241 SF

STAIR 1

S-01

36 SF

HSKP

A162F

58 SF

TOILET

A164 151 SF

OFFICE

A162D

120 SF

OFFICE

A162E

161 SF

OFFICE

A166A

99 SF

OFFICE

A166B

74 SF

CORRIDOR

A163

175 SF

BREAK

ROOM

A165

451 SF

CORRIDOR

C1-67

45 SF

DATA

A142

14 SF

DATA

A137A

6 SF

FEC

A141

115 SF

EXAM

A123

131 SF

EXAM

A121

17 SF

ELEC

A125

108 SF

EXAM

A119

119 SF

EXAM

A117

203 SF

PROCEDURE

A115

49 SF

ELEC

A113

173 SF

STAIR 2

S-02

264 SF

BREAK

ROOM

A111

211 SF

OFFICE

A109

132 SF

OFFICE

A101

78 SF

CONTROL

ROOM

A104

84 SF

SOUND

BOOTH

A106

216 SF

PROCEDURE

A110 208 SF

PROCEDURE

A112

145 SF

PROCEDURE

A114

47 SF

HSKP

A116

74 SF

SOILED

UTILITY

A124

122 SF

EXAM

A128

118 SF

EXAM

A130

109 SF

OFFICE

A132

116 SF

OFFICE

A134

109 SF

EXAM

A136

141 SF

EXAM

A138

130 SF

PULMONARY

FUNCTION

TESTING

A137

512 SF

MECH

A140

150 SF

PULMONARY

FUNCTION

TESTING

A131

104 SF

EXAM

A129

113 SF

EXAM

A127

98 SF

NOURISHMENT

A146E

138 SF

EXAM

A146D

257 SF

CLEAN

UTILITY

A146B 156 SF

CHECK-IN

A146A

365 SF

WAITING

A120

177 SF

OPTICAL

SHOP

A120A

289 SF

STAFF

WORKROOM

A150 125 SF

STAFF

WORKROOM

A156

108 SF

BAY

A158

124 SF

BAY

A160

197 SF

BAY

A162

170 SF

BAY

A164

127 SF

BAY

A168

108 SF

BAY

A159

123 SF

BAY

A161

197 SF

BAY

A163

170 SF

BAY

A167

127 SF

BAY

A169

460 SF

INFUSION

A159

61 SF

TOILET

A154

53 SF

TOILET

A156

168 SF

CORRIDOR

A158

130 SF

EXAM

A170

144 SF

OFFICE

A172

112 SF

OFFICE

A174

145 SF

OFFICE

A176

1027 SF

CORRIDOR

38 SF

HSKP

A178

28 SF

ELEC

B177

344 SF

OFFICE

A175

185 SF

OFFICE

A175C

457 SF

WAITING

A173

15 SF

DATA

B173B

16 SF

CLOSET

52 SF B173A

ELEC

A155

60 SF

SOILED

UTILITY

B164A

105 SF

ENTRY

ALCOVE

B170J

700 SF

CORRIDOR

C1-43

211 SF

SERVICE

ELEVATOR

LOBBY

C1-29A

96 SF

EXAM

B130B

60 SF

OFFICE

B130A

39 SF

DATA

B149 75 SF

OFFICE

B130F

100 SF

OFFICE

B135

98 SF

EXAM

B133

B130

270 SF

EXAM

B130C

82 SF

EXAM

B130D

89 SF

EXAM

B130E

149 SF

OFFICE

B128

254 SF

CORRIDOR

B132B 110 SF

EXAM

B131

117 SF

EXAM

B129

114 SF

EXAM

B127

118 SF

EXAM

173 SF B125

EXAM

B126

95 SF

CORRIDOR

B170B

115 SF

CLEAN

UTILITY

B164B

70 SF

ALCOVE

B170H

51 SF

HSKP

B164C

84 SF

TOILET -

PATIENT

B164D

187 SF

CORRIDOR

B170C

159 SF

WAITING

B171H

125 SF

EXAM

B171G

488 SF

CORRIDOR

B170E

125 SF

EXAM

B171F

93 SF

TRIAGE

B168F

96 SF

TRIAGE

B165A

127 SF

EXAM

B165B

127 SF

EXAM

B168E

296 SF

MENTORS

ROOM

B165C

126 SF

EXAM

B171E

125 SF

EXAM

B171D

125 SF

EXAM

B171C

126 SF

EXAM

B171B

121 SF

EXAM

64 SF B171A

ALCOVE

B170G

234 SF

CORRIDOR

B170D

94 SF

TRIAGE

B168B

95 SF

TRIAGE

B165F

69 SF

SOILED

UTILITY

B168C

65 SF

TOILET -

PATIENT

B165E

129 SF

CLEAN

UTILITY

B165D

127 SF

EXAM

B168D

150 SF

EXAM

B162A

151 SF

EXAM

B162B

96 SF

MEDS

B162C

140 SF

EXAM

B162E

141 SF

EXAM

B162F

151 SF

EXAM

B162G

150 SF

EXAM

B162H

416 SF

CORRIDOR

B170A

119 SF

EXAM

B123

118 SF

EXAM

B121

122 SF

EXAM

B119

103 SF

CORRIDOR

B118A

172 SF

EXAM

B118

157 SF

EXAM

B117

176 SF

EXAM

B116

157 SF

EXAM

B115

177 SF

EXAM

B114

156 SF

EXAM

B113

229 SF

TREATMENT

B112

79 SF

STORAGE

108 SF B120A

LASER

224 SF

CORRIDOR

B132A

1039 SF

WAITING

B107

81 SF

RME

B122

208 SF

CHECK-IN

B124

140 SF

PROCEDURE

B109

1179 SF

CORRIDOR

C1-104

847 SF

MECHANICAL

PENTHOUSE

177 SF

STAIR 5

S-05

638 SF

CORRIDOR

C1-101

190 SF

EXAM/PROCEDURE

B199

140 SF

EXAM

B197

152 SF

STAFF

WORKROOM

B195

46 SF

RME/SOILED

UTILITY

B198

52 SF

SOILED

LINEN

B196

74 SF

TOILET-PATIENT

B194

129 SF

EXAM

B193

100 SF

CLEAN

UTILITY

B192

119 SF

EXAM

B191

94 SF

OFFICE

B186

77 SF

TOILET

B185B

303 SF

WAITING

B188

66 SF

LACTATION

ROOM

B189

58 SF

CHECK-IN

B187

132 SF

OFFICE

A103

223 SF

OFFICE

A105

129 SF

OFFICE

A100

134 SF

OFFICE

A102

38 SF

OXYGEN

STORAGE

A135

147 SF

PULMONARY

FUNCTION

TESTING

A139

96 SF

ELEVATOR

P-1

82 SF

ELEVATOR

P-2

78 SF

ELEVATOR

P-3

84 SF

ELEVATOR

P-4

109 SF

SERVICE

ELEVATOR

SE-05

120 SF

SERVICE

ELEVATOR

SE-06 90 SF

OFFICE

A175A

105 SF

OFFICE

A175B

Scale: 1" = 20'-0"

FIRST FLOOR PLAN

Key Plan

FIRST FLOOR PLAN IS ISSUED FOR

REFERENCE ONLY - NO WORK IS NOTED

ON THIS FLOOR LEVEL

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1/16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

Bldg 1W

01W-A.102

506-26-202

TUCKPOINTING

Building 1W Second Floor Plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

102 SF

LAB

B280A

388 SF

LAB

B280

123 SF

OPERATORY

B278

121 SF

OPERATORY

C278A

110 SF

STORAGE

B279

138 SF

OPERATORY

B277

141 SF

OPERATORY

C276

138 SF

OPERATORY

B274

300 SF

STAFF

WORKROOM

B275

131 SF

OPERATORY

B272

155 SF

OFFICE

174 SF B271

OPERATORY

B270

70 SF

STORAGE

B220

78 SF

ELEC

C232 429 SF

CHECK-IN

B250A

172 SF

STAIR 3

S-03

174 SF

OFFICE

B251

129 SF

OFFICE

B253

177 SF

OFFICE

B254

213 SF

OFFICE

B257A

204 SF

OFFICE

B257B 116 SF

EXAM

B258

503 SF

CONFERENCE

B267A

58 SF

STORAGE

B267C

102 SF

MECH

193 SF B266

PROCEDURE

B264

184 SF

PROCEDURE

B263

191 SF

PROCEDURE

B262

188 SF

PROCEDURE

B261

258 SF

OFFICE

B260

175 SF

WAITING

B252A

722 SF

CORRIDOR

B245A

355 SF

CORRIDOR

B265

515 SF

CORRIDOR

B270

1087 SF

CORRIDOR

C208

126 SF

EXAM

B268A

124 SF

EXAM

B268B

126 SF

EXAM

B268C

123 SF

EXAM

B268D

123 SF

EXAM

B268E

126 SF

EXAM

B268F

156 SF

OFFICE

B268G

48 SF

HSKP

B255E

84 SF

TOILET

58 SF B255D

MEDS

B255C

397 SF

CORRIDOR

B245C

117 SF

EXAM

B259A

119 SF

EXAM

B256A

120 SF

EXAM

B259B

120 SF

EXAM

B256B

273 SF

MENTORS

ROOM

B256C

129 SF

CLEAN

UTILITY

B256D

127 SF

EXAM

B259C

69 SF

SOILED

UTILITY

B259D

65 SF

TOILET

B256E

95 SF

CONSULTATION

B256F

93 SF

CONSULTATION

B259E

417 SF

CORRIDOR

B245D

417 SF

CORRIDOR

B245B

110 SF

EXAM

B255B

59 SF

SOILED

EQUIP.

68 SF A255A

CORRIDOR

A245G

51 SF

ELEC

A247

172 SF

STAIR 5

S-05

1915 SF

GYM

A250

241 SF

GYM

A248

284 SF

GYM

A246

49 SF

HSKP

A244

57 SF

TOILET -

PATIENT

A251

702 SF

CORRIDOR

C206

1399 SF

THERAPY

A258

362 SF

EXERCISE

A259

226 SF

THERAPY

A256

188 SF

OFFICE

A240

21 SF

STORAGE

A240A

189 SF

OFFICE

A245

271 SF

OFFICE

A234

182 SF

CORRIDOR

C204

504 SF

OFFICE

A243

109 SF

STORAGE

A239

67 SF

STAFF

LOCKERS

A236

291 SF

STAFF

LOUNGE

A242

200 SF

STORAGE

A241

113 SF

STORAGE

A235

188 SF

SERVICE

ELEVATOR

LOBBY

A233

51 SF

DATA

A237

156 SF

EXAM

B252K

155 SF

EXAM

B252J

145 SF

EXAM

B252H

145 SF

EXAM

B252G

146 SF

EXAM

B252E

143 SF

EXAM

B252D

142 SF

EXAM

B252C

79 SF

TRIAGE

B252B

424 SF

SUPPLY /

MECH

B212

374 SF

STORAGE

B208

88 SF

MECH

B221B

94 SF

CHECK-OUT

A292A

70 SF

OFFICE

A292B

438 SF

GENERAL

X-RAY

A295

60 SF

OFFICE

A294

1016 SF

OFFICE

B200

52 SF

TOILET -

PATIENT

A296

214 SF

EXAM

A291

69 SF

ELEC

A275

134 SF

TOILET -

WOMEN

A274

219 SF

OFFICE

B201

166 SF

TOILET - MEN

A273

997 SF

CORRIDOR

C205

108 SF

STAIR 1

S-01

128 SF

OFFICE

301 SF A276A

OFFICE

A276

17 SF

CLOSET

A238

39 SF

DATA

A270

61 SF

TOILET

A217

221 SF

TREATMENT

A215

457 SF

CORRIDOR

154 SF

OFFICE

A213

276 SF

TREATMENT

A212

117 SF

OFFICE

A223

278 SF

TREATMENT

A225

404 SF

CORRIDOR

A227

670 SF

TREATMENT

A230

90 SF

TOILET -

PATIENT -

TREATMENT

A210

103 SF

OCCUPATIONAL

THERAPY

A224

384 SF

OFFICE

A222

133 SF

TREATMENT

138 SF A218

EXAM

A210

151 SF

EXAM

A208

282 SF

EXAM

A206

879 SF

CORRIDOR

A203

113 SF

OFFICE

A204

124 SF

OFFICE

A202

247 SF

OFFICE

A200

489 SF

OFFICE/STORAGE

A201

459 SF

CONFERENCE

A205

172 SF

STAIR 2

S-07

52 SF

ELEC

A209

246 SF

CORRIDOR

A280B

56 SF

TOILET

A281

189 SF

TREATMENT

A282

91 SF

TOILET -

PATIENT

A283

126 SF

CLEAN

UTILITY

A277

229 SF

CAST ROOM

A278

167 SF

EXAM

A284

165 SF

EXAM

A285

176 SF

EXAM

A286

671 SF

CORRIDOR

A280A

164 SF

EXAM

A287

160 SF

EXAM

A288

116 SF

CONSULTATION

A289

284 SF

CORRIDOR

A290A

35 SF

WAITING

ALCOVE

A290C

28 SF

STRETCHER

ALCOVE

A290B

323 SF

OFFICE

B240

105 SF

OFFICE

B240A

241 SF

OFFICE

B239 145 SF

BREAK

ROOM

B237

109 SF

X-RAY

B235

108 SF

OPERATORY

B233

307 SF

CORRIDOR

C207

115 SF

OFFICE

B238

141 SF

OPERATORY

B236

216 SF

OPERATORY

B234

60 SF

DATA

B231

538 SF

CORRIDOR

C205A

51 SF

DECON

B224A 31 SF

HSKP

B226

113 SF

INSTRUMENT

CLEAN

B224B

51 SF

HSKP

A276B

67 SF

STORAGE

B221C

108 SF

SERVICE

ELEVATOR

SE-6

99 SF

SERVICE

ELEVATOR

SE-5

84 SF

ELEVATOR

P-4

80 SF

ELEVATOR

P-3

82 SF

ELEVATOR

P-2

96 SF

ELEVATOR

P-1

175 SF

CHECK-IN

yyyy

532 SF

WAITING

S-06

115 SF

MSA

B244

196 SF

CORRIDOR -

PATIENT

C1-A

129 SF

EXAM 1

B242

146 SF

EXAM 2

B240

121 SF

EXAM 3 -

PLASTER

B243

122 SF

EXAM 4

B241

121 SF

EXAM 5

B239

332 SF

STORAGE

B238

388 SF

CORRIDOR -

STAFF

C2-A

170 SF

MACHINE

B236B

497 SF

ORTHOTICS

LAB

B236A

122 SF

OFFICE

B237A

124 SF

STORAGE

B237B

Scale: 1/16" = 1'-0"

SECOND FLOOR PLAN

Key Plan

SECOND FLOOR PLAN IS ISSUED FOR

REFERENCE ONLY - NO WORK IS NOTED

ON THIS FLOOR LEVEL

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1/16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

Bldg 1W

01W-A.103

506-26-202

TUCKPOINTING

Building 1W Third Floor Plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

2047 SF

CANTEEN

STORE

B301A

309 SF

CORRIDOR

B312

263 SF

CANTEEN

RECEIVING

B302

76 SF

ELEC

B312

59 SF

DATA

B310B

384 SF

CORRIDOR

C3-2A

4802 SF

CANTEEN

SERVING

AREA

B305

572 SF

CANTEEN

SERVING

LINE

B305A

1517 SF

DINING

B306A

87 SF

COFFE SHOP

B306

601 SF

DINING

B306B

206 SF

OFFICE

B304

133 SF

OFFICE

B312A

370 SF

CORRIDOR

C3-305

168 SF

WALK-IN

B307A

123 SF

WALK-IN

B307C

120 SF

WALK-IN

120 SF B307E

OFFICE

B303

182 SF

OFFICE

B302

172 SF

OFFICE

B300

69 SF

ELEC

A373

138 SF

TOILET -

WOMEN

A372

172 SF

TOILET - MEN

A371

784 SF

CORRIDOR

C3-304

229 SF

STAIR 1

S-01

40 SF

DATA

A370

16 SF

ELEC

A335

2500 SF

OFFICE

A300

242 SF

CONFERENCE

A309

183 SF

TOILET -

WOMEN

A307

17 SF

CLOSET

A305

172 SF

STAIR 2

S-02

52 SF

ELEC

A311

107 SF

OFFICE

A318 60 SF

LACTATION

ROOM

A310

56 SF

HSKP

A312

273 SF

OFFICE

A316

107 SF

OFFICE

A320

116 SF

OFFICE

A322

88 SF

OFFICE

A324

116 SF

OFFICE

A326

89 SF

OFFICE

A328

112 SF

OFFICE

A330

140 SF

OFFICE

A332

252 SF

OFFICE

A329

86 SF

OFFICE

A327

112 SF

OFFICE

A325

85 SF

OFFICE

A323

112 SF

OFFICE

A321

106 SF

OFFICE

A319

555 SF

TELE ICU

A338

A340

52 SF

TOILET -

PATIENT

A42A

123 SF

LOCKERS -

PATIENT

A342 198 SF

OFFICE

A344

50 SF

STORAGE

A362

139 SF

OFFICE

A360

1734 SF

DIALYSIS

CENTER

A363

115 SF

STAFF

LOUNGE

A361

56 SF

HSKP

A364

53 SF

SOILED

UTILITY

A348

257 SF

WATER

SUPPLY

A350

141 SF

EQUIP

CLEAN &

REPAIR

A352

139 SF

ACID ROOM

A354

349 SF

STORAGE

A354A

135 SF

STORAGE

A350A

220 SF

OFFICE

A357

104 SF

OFFICE

A356

118 SF

OFFICE

A355

128 SF

OFFICE

A353

247 SF

STAFF

WORKROOM

A351

50 SF

TOILET -

STAFF

A349A

137 SF

LOCKERS -

STAFF

A349

174 SF

STAIR 5

S-05

52 SF

ELEC

A347

162 SF

WAITING

A345

29 SF

LINEN

B310B

47 SF

HSKP

B310C

389 SF

DISH

WASHING

B310A

171 SF

CART WASH

B310D

464 SF

POT WASH

B310E

585 SF

CORRIDOR

C3-301

930 SF

CORRIDOR

C3-303

35 SF

DATA

B339

202 SF

SERVICE

ELEVATOR

LOBBY

B339

52 SF

STORAGE

B309E

52 SF

STORAGE

B309D

775 SF

FOOD CARTS

B309C

1214 SF

TRAY

MAKE-UP

B309B

1079 SF

FOOD PREP

AREA

B309A

44 SF

HSKP

B301

87 SF

OFFICE

B307F

87 SF

OFFICE

B307D

113 SF

WALK-IN

B307B

363 SF

KITCHEN

RECEIVING

B307

71 SF

STORAGE

B338D

171 SF

STAIR 3

S-03

40 SF

ELEC

B303

107 SF

SERVICE

ELEVATOR

SE-6

99 SF

SERVICE

ELEVATOR

SE-5

100 SF

ELEVATOR

P-4

95 SF

ELEVATOR

P-3

96 SF

ELEVATOR

P-2

109 SF

ELEVATOR

P-1

69 SF

TRIAGE

A313

62 SF

OFFICE

A314

146 SF

OFFICE

A314A

208 SF

OFFICE

A315

59 SF

OFFICE

A317A

193 SF

OFFICE

A317

Scale: 1/16" = 1'-0"

THIRD FLOOR PLAN

Key Plan

Area of masonry brick repointing required

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1/16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.104

506-26-202

TUCKPOINTING

Building #28 Fourth Floor Plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

DN

231 SF

OFFICE

B415

83 SF

OFFICE

B417

170 SF

OFFICE

B419

95 SF

OFFICE

B418

96 SF

OFFICE

B420

89 SF

OFFICE

B422

97 SF

OFFICE

B424

97 SF

OFFICE

B426

96 SF

OFFICE

B428

166 SF

OFFICE

B429

103 SF

OFFICE

B427

82 SF

OFFICE

B425

84 SF

READING

ROOM

B423

533 SF

CONFERENCE

B431

79 SF

STORAGE

B425

50 SF

ROOM

B424

10 SF

ELEC

B423

454 SF

VENT

STORAGE

B452

116 SF

OFFICE

B450

109 SF

OFFICE

B448

113 SF

OFFICE

B446

124 SF

VENT

REPROCESSING

B449

106 SF

SET-UP

B451

41 SF

VENT

HOLDING

B447

72 SF

OFFICE

B444

67 SF

OFFICE

B443

155 SF

OFFICE

B441

290 SF

CORRIDOR

C408

529 SF

MECH

B442

76 SF

ELEC

B434

58 SF

DATA

A432A

S-4-4

66 SF

ELEC

A474

43 SF

HSKP

A477

44 SF

VEST

B400A

37 SF

DATA

A470

16 SF

ELEC

A433

49 SF

ELEC

167 SF

STAIR 2

S-02

45 SF

VEST

A410

42 SF

DATA

A437

AHU-3E

ATS

1W-CP-1

ATS

1W-AH-5 1W-AH-8

EL

EC

S U

BS

TA

TI

O

N

FUTURE

RETURN

AIR FAN

1W-RF-9A

FACILITIES MANAGEMENT

(HVAC FILTER STORAGE)

FACILITIES MANAGEMENT

(GENERAL STORAGE)

FUTURE

1W-AH-9A

1W-AH-1E

1W-RF-7

AUTOMATIC

TRANSFER

SWITCHES

1W-AH-1

1W-AH-7

ELEC SUBSTATION #4 ATS ATS

1W-AH-2E

1W-AH-2

FUTURE

1W-RF-9B

FUTURE

1W-AH-9B

FUTURE

1W-AH-12

PRIMARY

SWITCHES

FUTURE

1W-RF-12

FUTURE

1W-AH-11

FUTURE

1W-RF-11

FACILITIES

MANAGEMENT

(CARPENTRY SHOP

STORAGE)

171 SF

STAIR 3

S-03

223 SF

STAIR 1

S-01

110 SF

SERVICE

ELEVATOR

SE-6

99 SF

SERVICE

ELEVATOR

SE-5

99 SF

ELEVATOR

P-4

95 SF

ELEVATOR

P-3

100 SF

ELEVATOR

P-2

Scale: 1/16" = 1'-0"

FOURTH FLOOR PLAN

Key Plan

Area of masonry brick repointing required

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1/16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.105

506-26-202

TUCKPOINTING

Building 1W Fifth Floor Plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

150 SF

1BR

B548

55 SF

ANTE

B549

151 SF

1BR

B547

52 SF

BATHROOM

B547A

52 SF

BATHROOM

B548A

52 SF

BATHROOM

B546A

51 SF

BATHROOM

B545A

161 SF

1BR

B546

161 SF

1BR

B545

62 SF

BATHROOM

B544A

55 SF

BATHROOM

B543A

258 SF

2BR

B543

207 SF

2BR

B544

143 SF

LOCKERS

B542

117 SF

LINEN

B540

72 SF

ELEC

B520

172 SF

STAIR 3

S-03

2 SF

FEC

B541

53 SF

TOILET

B523 51 SF

MED

B521A

222 SF

NURSE

STATION

1728 SF B521

CORRIDOR

C5-07

140 SF

OFFICE

B519

33 SF

NOURISHMENT

B517

186 SF

2BR

B511

31 SF

DATA

B525A

32 SF

DATA

B525

104 SF

STORAGE

B527

324 SF

2BR

B529

55 SF

BATHROOM

B529A

56 SF

BATHROOM

B531A

152 SF

1BR

B531

160 SF

1BR

B530 55 SF

BATHROOM

B530A

55 SF

BATHROOM

B528A

255 SF

2BR

B528

261 SF

2BR

B526

61 SF

BATHROOM

B26A

165 SF

OFFICE

B512

126 SF

OFFICE

B510

46 SF

SOILED

UTILITY

B508A 58 SF

HSKP

B508

52 SF

TOILET -

STAFF

B500C

51 SF

TOILET -

STAFF

B500B

176 SF

LOCKERS

B500A

177 SF

STAFF

LOUNGE

B500

296 SF

CORRIDOR

C5-09

66 SF

BATHROOM

B511A

61 SF

BATHROOM

B509A

199 SF

2BR

B509

88 SF

OFFICE

B505

170 SF

CONFERENCE

B504

124 SF

OFFICE

B503

129 SF

OFFICE

B502

198 SF

TEAM ROOM

B501

64 SF

ELEC

A578

135 SF

TOILET -

WOMEN

A577

169 SF

TOILET - MEN

A576

248 SF

TEAM ROOM

B501A

296 SF

SERVICE

ELEVATOR

LOBBY

C5-26B

40 SF

DATA

A535

109 SF

ANTE

A539

178 SF

1BR

A541 52 SF

BATHROOM

A541A

224 SF

STAIR 1

S-01

55 SF

BATHROOM

A543A

235 SF

2BR

A543

45 SF

ELEC

A545

172 SF

STAIR 5

S-05 88 SF

CLEAN LINEN

A547

53 SF

BATHROOM

A551A

43 SF

HSKP

A549

213 SF

2BR

A551

156 SF

1BR

A553

56 SF

BATHROOM

A553A

55 SF

BATHROOM

A555A

199 SF

1BR

A555

201 SF

1BR

A554

55 SF

BATHROOM

A554A

55 SF

BATHROOM

A552A

159 SF

1BR

A552

198 SF

2BR

A550

62 SF

BATHROOM

A550A

62 SF

BATHROOM

A548A

202 SF

2BR

A548

44 SF

SOILED

UTILITY

A546

64 SF

TOILET

A559A

143 SF

1BR

A559

253 SF

2BR

A563

54 SF

BATHROOM

A563A

55 SF

BATHROOM

A565A

201 SF

2BR

A565

204 SF

2BR

A566

55 SF

BATHROOM

A566A

54 SF

BATHROOM

A564A

239 SF

2BR

A564

95 SF

CLEAN

UTILITY

A562

84 SF

NOURISHMENT

A560

73 SF

MEDS

A542

294 SF

NURSE

STATION

A544

56 SF

TOILET

A540

1045 SF

CORRIDOR

C5-04

147 SF

BREAK

ROOM

A538

120 SF

OFFICE

A536

138 SF

STORAGE

A534

512 SF

DISCHARGE

LOUNGE

A532

159 SF

BREAK

ROOM

A530

70 SF

OFFICE

A518

76 SF

TOILET

A516

254 SF

NURSE

STATION

A514

81 SF

NOURISHMENT

A519

96 SF

SPB

A521

241 SF

2BR

A523

54 SF

BATHROOM

A523A

55 SF

BATHROOM

A525A

160 SF

2BR

A525

168 SF

2BR

A524

55 SF

BATHROOM

A524A

54 SF

BATHROOM

A522A

259 SF

2BR

A522

147 SF

1BR

A520

68 SF

BATHROOM

A520A

50 SF

SOILED

UTILITY

A512

198 SF

2BR

A506

62 SF

BATHROOM

A506A

62 SF

BATHROOM

198 SF A504A

2BR

156 SF A504

1BR

55 SF A502

BATHROOM

A502A

55 SF

BATHROOM

A500A

160 SF

1BR

A500

159 SF

1BR

A501

56 SF

BATHROOM

A501A

55 SF

BATHROOM

A503A

157 SF

1BR

A503 215 SF

2BR

A505

43 SF

HSKP

A507

53 SF

BATHROOM

A505A 45 SF

TELEMETRY

A509A

90 SF

CLEAN LINEN

A509

175 SF

STAIR 2

45 SF

ELEC

A511

236 SF

2BR

A513

55 SF

BATHROOM

A513A

52 SF

BATHROOM

A515A

184 SF

1BR

A515

109 SF

ANTE

A517

42 SF

DATA

A575

677 SF

CORRIDOR

C5-06

373 SF

CORRIDOR

C5-13

351 SF

CORRIDOR

C5-20

226 SF

CORRIDOR

C5-43

423 SF

CORRIDOR

C5-66

252 SF

CORRIDOR

C5-24

17 SF

ELEC

A527

44 SF

TELEMETRY

A547B

2452 SF

ROOM

XXX

110 SF

SERVICE

ELEVATOR

SE-6

102 SF

SERVICE

ELEVATOR

SE-5

97 SF

ELEVATOR

P-4

93 SF

ELEVATOR

P-3

94 SF

ELEVATOR

P-2

104 SF

ELEVATOR

P-1

Scale: 1/16" = 1'-0"

FIFTH FLOOR PLAN

Key Plan

Area of masonry brick repointing required

Area of masonry brick repointing required

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1/16" - 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.106

506-26-202

TUCKPOINTING

Building 1W Sixth floor plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

237 SF

OFFICE

B650

96 SF

OFFICE

B651

242 SF

OFFICE

B649

114 SF

OFFICE

B647

120 SF

OFFICE

B648

118 SF

OFFICE

B646

110 SF

OFFICE

B645

230 SF

CORRIDOR

C6-07

148 SF

OFFICE

B644

290 SF

OFFICE

B641

170 SF

OFFICE

B642

202 SF

OFFICE

B640

132 SF

CORRIDOR

C6-07

172 SF

STAIR 3

S-03

76 SF

ELEC

B620

29 SF

STORAGE

31 SF B618

DATA

B618A

148 SF

OFFICE

B625

145 SF

OFFICE

B627

77 SF

BATHROOM

B633A

150 SF

2BR

B633

11 SF

STORAGE

B635A

404 SF

LOUNGE -

RESIDENTS

B635

100 SF

1BR

B636

93 SF

1BR

B634

52 SF

BATHROOM

B634A

52 SF

BATHROOM

B630A

99 SF

1BR

B632 107 SF

1BR

B630 217 SF

OFFICE

B626 113 SF

OFFICE

B624

48 SF

TOILET

B616

32 SF

HSKP

B614

168 SF

OFFICE

B615

131 SF

CORRIDOR

C6-08A

856 SF

CORRIDOR

C6-05

154 SF

OFFICE

B617

172 SF

OFFICE

B613

281 SF

CONFERENCE

B611

180 SF

OFFICE

B612

359 SF

TEAM WORK

ROOM

B609

119 SF

VENDING

B610

462 SF

WAITING

AREA

B608

254 SF

STAFF

LOUNGE

B607

177 SF

LOCKER

ROOM

B605

151 SF

CORRIDOR

C6-601

63 SF

ELEC

A678

180 SF

TOILET -

WOMEN

A677

162 SF

TOILET - MEN

A676

251 SF

STORAGE

B601

178 SF

OFFICE

B603

194 SF

SERVICE

ELEVATOR

LOBBY

A633

39 SF

HSKP

A633B

98 SF

SOILED

UTILITY

A633A

37 SF

DATA

A635A

29 SF

CLOSET

A637

44 SF

BATHROOM

A639A 194 SF

1BR

A639

190 SF

1BR

A641

66 SF

BATHROOM

A641A

53 SF

ELEC

A643

172 SF

STAIR 5

S-05

68 SF

BATHROOM

A647A

243 SF

1BR

A647

199 SF

1BR

A649

65 SF

BATHROOM

A649A

49 SF

BATHROOM

A651A

256 SF

1BR

A651

262 SF

1BR

A652

50 SF

BATHROOM

56 SF A652A

BATHROOM

A650A

177 SF

1BR

A650

191 SF

1BR

A648

55 SF

MED.

STATION

A646

51 SF

BATHROOM

A648A

120 SF

NOURISHMENT

A644

43 SF

SOILED

UTILITY

A642

46 SF

BATHROOM

A657A

166 SF

1BR

A657

164 SF

1BR

A659

60 SF

BATHROOM

A659A

42 SF

BATHROOM

A661A

263 SF

1BR

A661

260 SF

1BR

A660

42 SF

BATHROOM

A660A

80 SF

ANTE

A658B

184 SF

ISOLATION

ROOM

A658

52 SF

BATHROOM

A658A

92 SF

LINEN

A656

52 SF

TOILET

A654

49 SF

BATHROOM

A638A

26 SF

HSKP

A640

570 SF

CORRIDOR

C6-05

1020 SF

CORRIDOR

C6-04

203 SF

1BR

A638

109 SF

CLEAN

UTILITY

A636

245 SF

CENTRAL

MONITOR

A634

1705 SF

CORRIDOR

C6-03

342 SF

NURSE

STATION

A632

103 SF

CLEAN

UTILITY

203 SF A630

1BR

A618

19 SF

HSKP

A616

66 SF

BATHROOM

A618A

52 SF

TOILET

A620

90 SF

CLEAN LINEN

A622

53 SF

BATHROOM

A624A

183 SF

ISOLATION

ROOM

A624

81 SF

ANTE

A624B

42 SF

BATHROOM

A626A

259 SF

1BR

A626

256 SF

1BR

A627

42 SF

BATHROOM

A627A

60 SF

BATHROOM

A625A

164 SF

1BR

A625

167 SF

1BR

A623

565 SF

CORRIDOR

A6-06

47 SF

BATHROOM

A623A

45 SF

SOILED

UTILITY

A612

522 SF

CORRIDOR

C6-02

121 SF

NOURISHMENT

A610

50 SF

MED.

STATION

A608

51 SF

BATHROOM

A606A

194 SF

1BR

A606

179 SF

1BR

56 SF A604

BATHROOM

A604A

51 SF

BATHROOM

A600A

262 SF

1BR

A600

259 SF

1BR

A601

50 SF

BATHROOM

A601A

53 SF

BATHROOM

A605A 201 SF

1BR

A605

248 SF

1BR

A607

73 SF

BATHROOM

A607A

172 SF

STAIR 2

S-02

43 SF

ELEC

A613

64 SF

BATHROOM

A615A

511 SF

CORRIDOR

C6-02

194 SF

1BR

A615

190 SF

1BR

A617

46 SF

BATHROOM

A617A

72 SF

STORAGE

A619

226 SF

STAIR 1

S-01

42 SF

DATA

A673

16 SF

ELEC

A631

108 SF

SERVICE

ELEVATOR

SE-6

99 SF

SERVICE

ELEVATOR

SE-5

92 SF

ELEVATOR

P-4

92 SF

ELEVATOR

P-3

94 SF

ELEVATOR

P-2

109 SF

ELEVATOR

P-1

Scale: 1/16" = 1'-0"

SIXTH FLOOR PLAN

Key Plan

Area of masonry brick repointing required

Area of masonry brick repointing required

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1/16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.107

506-26-202

TUCKPOINTING

Building 1W Seventh floor plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UPUP

UP

UP

UP

161 SF

OFFICE

B753

113 SF

OFFICE

B751

114 SF

OFFICE

B749

115 SF

OFFICE

B747

278 SF

OFFICE

B752

113 SF

OFFICE

B748

116 SF

OFFICE

B746

143 SF

OFFICE

B744

141 SF

OFFICE

B742

53 SF

TOILET -

STAFF

B745

91 SF

OFFICE

B743

182 SF

STORAGE

B741

1141 SF

CORRIDOR

C7-2

137 SF

OFFICE

B740

97 SF

OFFICE

B721

120 SF

TRIAGE

B719

9 SF

ELEC

B720

75 SF

ELEC

B724

30 SF

STORAGE

B722B

33 SF

DATA

B722A

171 SF

STAIR 3

S-03

109 SF

EXAM

B727

116 SF

EXAM

B729

114 SF

EXAM

B731

14 SF

STORAGE

B729A

14 SF

STORAGE

B733A

120 SF

OFFICE

B737

115 SF

EXAM

B735

118 SF

EXAM

B733

14 SF

STORAGE

B735A

211 SF

MENTOR

WORKROOM

B736

120 SF

EXAM

B734

117 SF

EXAM

B732

112 SF

EXAM

B730

114 SF

EXAM

B728

15 SF

STORAGE

B732A

15 SF

STORAGE

B732B

109 SF

EXAM

B726

90 SF

STORAGE

B720

54 SF

STORAGE

B718

202 SF

CHECK-IN

B717

181 SF

WAITING

B715

32 SF

HSKP

B716

140 SF

OFFICE

B713

140 SF

OFFICE

B711

173 SF

OFFICE

B714

348 SF

TEAM ROOM

B709

161 SF

OFFICE

B712

225 SF

OFFICE

B710

212 SF

OFFICE

B708

660 SF

WAITING

B707

165 SF

TOILET -

WOMEN

A704

69 SF

ELEC

A706

1078 SF

CORRIDOR

C7-10

403 SF

CHECK-IN

B708B

167 SF

TOILET - MEN

A702

193 SF

STAIR 1

S-01

203 SF

SERVICE

ELEVATOR

LOBBY

A751 193 SF

VESTIBULE

A7xx

22 SF

ELEC

A753

26 SF

DATA

A703

15 SF

ELEC

A720A

139 SF

TOILET - MEN

A713

139 SF

TOILET -

WOMEN

A715

82 SF

WORK ROOM

A717

150 SF

OFFICE

A719

175 SF

OFFICE

A729

45 SF

ELEC

A731

163 SF

EXAM

158 SF A735

OFFICE

A737

169 SF

STAIR 2

S-02

146 SF

OFFICE

A739

125 SF

OFFICE

A741

160 SF

OFFICE

A743

309 SF

CONFERENCE

A745

240 SF

OFFICE

A744 128 SF

OFFICE

A742

130 SF

OFFICE

A740

130 SF

OFFICE

A738

138 SF

OFFICE

A751

58 SF

MEDS

A734

222 SF

CONFERENCE

A722

24 SF

HSKP

A730

117 SF

OFFICE

A720

13 SF

STORAGE

A718

124 SF

OFFICE

A716

117 SF

OFFICE

A722

125 SF

OFFICE

A724

247 SF

CONFERENCE

A726

131 SF

OFFICE

A723

125 SF

OFFICE

A725

250 SF

CONFERENCE

A727

692 SF

CONFERENCE

A758

344 SF

CORRIDOR

C7-50

140 SF

OFFICE

A714

139 SF

OFFICE

A712

124 SF

OFFICE

A746

124 SF

OFFICE

A747

123 SF

OFFICE

A748

125 SF

OFFICE

A749

123 SF

OFFICE

A750

124 SF

OFFICE

A752

120 SF

OFFICE

A754

126 SF

OFFICE

A756

92 SF

OFFICE

A758

21 SF

STORAGE

A760

54 SF

TOILET -

STAFF

A781C

440 SF

CORRIDOR

C7-60

109 SF

OFFICE

A762

113 SF

OFFICE

A783 109 SF

OFFICE

A780

113 SF

OFFICE

A786

129 SF

OFFICE

A788

113 SF

OFFICE

A785

129 SF

OFFICE

A767

128 SF

OFFICE

127 SF A790

OFFICE

A789

111 SF

OFFICE

A791

112 SF

OFFICE

A792

183 SF

OFFICE

A794

177 SF

OFFICE

A793

18 SF

WC SCALE

A730D

642 SF

CORRIDOR

C7-30

149 SF

EXAM

A764

153 SF

OFFICE

A766

127 SF

OFFICE

A768

129 SF

OFFICE

A770

128 SF

OFFICE

A772

127 SF

OFFICE

A774

109 SF

OFFICE

A776

184 SF

OFFICE

A778

184 SF

OFFICE

97 SF A779

OFFICE

A777

117 SF

OFFICE

A775

123 SF

OFFICE

A773

141 SF

OFFICE

A771

144 SF

OFFICE

A769

175 SF

OFFICE

A767

357 SF

CORRIDOR

C7-80

166 SF

OFFICE

A761

56 SF

ELEC

A763 171 SF

STAIR 5

S-05

241 SF

BREAK

ROOM

A759

189 SF

CHECK-OUT

A757

1275 SF

CORRIDOR

349 SF C7-20

CORRIDOR

C7-40

4 SF

FEC

A710C

375 SF

CORRIDOR

C7-06

3 SF

FEC

110 SF

SERVICE

ELEVATOR

SE6

99 SF

SERVICE

ELEVATOR

SE-5

92 SF

ELEVATOR

P-4

92 SF

ELEVATOR

P-3

94 SF

ELEVATOR

P-2

108 SF

ELEVATOR

P-1

Scale: 1/16" = 1'-0"

SEVENTH FLOOR PLAN

Key Plan

SEVENTH FLOOR PLAN IS ISSUED FOR

REFERENCE ONLY - NO WORK IS NOTED

ON THIS FLOOR LEVEL

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

1/16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.108

506-26-202

TUCKPOINTING

Building 1W Eighth floor plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

371 SF

OFFICE

B818

96 SF

KITCHENETTE

B816

317 SF

TEAM ROOM

B815

208 SF

OFFICE

B814

131 SF

CORRIDOR

C8-19

179 SF

OFFICE

B821

104 SF

OFFICE

B820

76 SF

ELEC

B813

62 SF

DATA

B812

124 SF

CORRIDOR

C8-08

838 SF

CORRIDOR

C8-23

12 SF

ELEC

B817

171 SF

STAIR 3

S-03

416 SF

CONFERENCE

B810

346 SF

OFFICE

B807 68 SF

STAFF

WORKROOM

B806

32 SF

HSKP

B805

120 SF

OFFICE

B822

130 SF

OFFICE

B822A

108 SF

OFFICE

B825

111 SF

OFFICE

B824

137 SF

OFFICE

B804

114 SF

OFFICE

B803

130 SF

OFFICE

B802

115 SF

OFFICE

B826

109 SF

OFFICE

B827

138 SF

OFFICE

B801

149 SF

OFFICE

B800

103 SF

OFFICE

B828 169 SF

OFFICE

B829

109 SF

OFFICE

A837

151 SF

OFFICE

A838

162 SF

CORRIDOR

C8-20

178 SF

OFFICE

A831A

71 SF

ELEC

A831

425 SF

WEST

ELEVATOR

LOBBY

C8-03

535 SF

OFFICE

A839

198 SF

BREAK

ROOM

A843B

139 SF

TOILET -

WOMEN

A830A

166 SF

TOILET - MEN

A830

169 SF

SERVICE

ELEVATOR

LOBBY

A843

15 SF

STORAGE

A828B

25 SF

STORAGE

A828C

29 SF

HSKP

A827B

193 SF

STAIR 1

S-01

26 SF

HSKP

A828

15 SF

DATA

A827A

16 SF

ELEC

A827

91 SF

OFFICE

A825A

92 SF

OFFICE

A825B

41 SF

DATA

A843A

355 SF

OFFICE

A841

149 SF

OFFICE

A842

139 SF

OFFICE

A844

151 SF

OFFICE

A845

50 SF

ELEC

A844C 172 SF

STAIR 5

S-05

915 SF

OFFICE

A846 144 SF

OFFICE

A846A

23 SF

ELEC

A847

147 SF

OFFICE

A848

44 SF

TOILET -

STAFF

A850B

6 SF

ELEC

A850

223 SF

CONFERENCE

A851L

110 SF

OFFICE

A851K

114 SF

OFFICE

A851J

130 SF

OFFICE

A851I

125 SF

OFFICE

A851H

139 SF

OFFICE

A851G

138 SF

OFFICE

A851F

128 SF

CONFERENCE

A851E

130 SF

OFFICE

A851D

478 SF

CORRIDOR

C8-20

117 SF

OFFICE

A851C

135 SF

OFFICE

A851B

149 SF

OFFICE -

OPEN

A851

195 SF

OFFICE

A851A

36 SF

STORAGE

A853

127 SF

OFFICE

A854

145 SF

OFFICE

A855

207 SF

OFFICE -

OPEN

A801B

723 SF

CORRIDOR

C8-04

344 SF

CONFERENCE

A801

183 SF

BREAK

ROOM

A802

124 SF

OFFICE

A803

150 SF

OFFICE

60 SF A805

ELEC

A804

58 SF

TOILET

A806

825 SF

OFFICE -

OPEN

A807

129 SF

OFFICE

A808

131 SF

OFFICE

A809

167 SF

OFFICE

A810

164 SF

OFFICE

A811

167 SF

OFFICE

A812

115 SF

OFFICE

A813

117 SF

OFFICE

A814A

76 SF

OFFICE

A814

140 SF

OFFICE

A815

48 SF

TOILET

A816

305 SF

OFFICE -

OPEN

A817

1352 SF

CONFERENCE

A818

102 SF

STORAGE

A818A

136 SF

STORAGE

A819

170 SF

STAIR 2

S-02

51 SF

ELEC

A823

186 SF

OFFICE

A821

185 SF

OFFICE

A824

120 SF

OFFICE

A825

2 SF

FEC

3 SF

FEC

110 SF

SERVICE

SE-6

99 SF

SERVICE

ELEVATOR

SE-5

92 SF

ELEVATOR

P-4

93 SF

ELEVATOR

P-3

94 SF

ELEVATOR

P-2

107 SF

ELEVATOR

P-1

Scale: 1/16" = 1'-0"

EIGHTH FLOOR PLAN

Key Plan

Area of masonry brick repointing required

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.109

506-26-202

TUCKPOINTING

Building 1W Ninth floor plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

488 SF

OFFICE -

OPEN

A926A

180 SF

STAIR 5

S-05

55 SF

ROOM

A926

241 SF

CONFERENCE

A926A

115 SF

OFFICE

A926C

50 SF

STORAGE

A926D

185 SF

OFFICE

A926B

134 SF

OFFICE

A927

110 SF

OFFICE

A928

12 SF

DATA

929A

133 SF

OFFICE

A929

97 SF

COPY ROOM

A930

118 SF

OFFICE

A931

56 SF

ELEC

A924

252 SF

OFFICE

A923

172 SF

OFFICE

A922A

147 SF

OFFICE

A922

153 SF

OFFICE

A921

133 SF

OFFICE

A932

170 SF

OFFICE

A933

142 SF

OFFICE

A934

149 SF

OFFICE

A935

803 SF

CORRIDOR

C9-02

103 SF

LIFT

42 SF

DATA

A921A

161 SF

SERVICE

ELEVATOR

LOBBY

C9-4

230 SF

STAIR 1

S-01

20 SF

STORAGE

A918

19 SF

HSKP

43 SF A919

MECH

A905

147 SF

OFFICE

A936

156 SF

OFFICE

A937

261 SF

OFFICE

A901

352 SF

OFFICE

A902A

126 SF

KITCHENETTE

A902B

291 SF

OFFICE

A902D

278 SF

OFFICE

A902F

345 SF

OFFICE

A902J

309 SF

OFFICE

A902I

191 SF

OFFICE

A902H

178 SF

STAIR 2

S-02

191 SF

OFFICE

A902G

46 SF

ELEC

A902E

4 SF

15 SF FEC

CLOSET

542 SF

OFFICE -

OPEN

A902C

16 SF

ELEC

A903

699 SF

CORRIDOR

A902

762 SF

WEST

ELEVATOR

LOBBY

C9-03

663 SF

CONFERENCE

A917

172 SF

TOILET - MEN

A909

136 SF

TOILET -

WOMEN

A910

70 SF

ELEC

A910A

350 SF

TRAINING

B902

624 SF

OFFICE -

OPEN

B901

269 SF

OFFICE

B905

285 SF

TRAINING

B902

295 SF

TRAINING

B902

151 SF

STORAGE

B901A

213 SF

CONTROL

ROOM

B904A

332 SF

CONFERENCE

B904B

497 SF

LAB -

SIMULATION

B904

172 SF

STORAGE

B904C

5 SF

ELEC

3 SF

FEC

107 SF

SERVICE

ELEVATOR

SE-6

99 SF

SERVICE

ELEVATOR

SE-5

97 SF

ELEVATOR

P-4

93 SF

ELEVATOR

P-3

94 SF

ELEVATOR

P-2

108 SF

ELEVATOR

P-1

Scale: 1/16" = 1'-0"

NINTH FLOOR PLAN

Key Plan

NINTH FLOOR PLAN IS ISSUED FOR

REFERENCE ONLY - NO WORK IS NOTED

ON THIS FLOOR LEVEL

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.110

506-26-202

TUCKPOINTING

Building 1W Penthouse floor plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

UP

3176 SF

FAN ROOM

SPA1001

51 SF

LIFT

196 SF

STAIR

S-10

Scale: 1/16" = 1'-0"

PENTHOUSE FLOOR PLAN

Key Plan

PENTHOUSE PLAN IS ISSUED FOR

REFERENCE ONLY - NO WORK IS NOTED

ON THIS FLOOR LEVEL

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.111

506-26-202

TUCKPOINTING

Building 1W Machine room floor plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

DN

DN

1289 SF

MACHINE

ROOM

A1102

673 SF

TANK ROOM

87 SF

OFFICE

Scale: 1/16" = 1'-0"

MACHINE ROOM FLOOR PLAN

Key Plan

MACHINE ROOM FLOOR PLAN IS ISSUED

FOR REFERENCE ONLY - NO WORK IS

NOTED ON THIS FLOOR LEVEL

GENERAL NOTES:

1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.

2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.200

506-26-202

TUCKPOINTING

Building 1W East & West elevations

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

1W - SECOND

FLOOR

839' - 2"

1W - FIRST FLOOR

827' - 3"

1W - BASEMENT

816' - 3"

1W - THIRD FLOOR

850' - 2"

1W - FOURTH

FLOOR

861' - 2"

1W - FIFTH FLOOR

873' - 9 1/4"

1W -

SUBBASEMENT

810' - 3"

1W - SIXTH FLOOR

885' - 8 1/4"

1W - SEVENTH

FLOOR

896' - 8 1/4"

1W - EIGHTH

FLOOR

908' - 7 1/4"

1W - NINTH FLOOR

920' - 0 3/4"

1W - PENTHOUSE

931' - 0 3/4"

1W - MACHINE

ROOM SLAB

945' - 6"

1W - ROOF SLAB

956' - 8 3/4"

1W - SECOND

FLOOR

839' - 2"

1W - FIRST FLOOR

827' - 3"

1W - BASEMENT

816' - 3"

1W - THIRD FLOOR

850' - 2"

1W - FOURTH

FLOOR

861' - 2"

1W - FIFTH FLOOR

873' - 9 1/4"

1W -SUBBASEMENT

810' - 3"

1W - SIXTH FLOOR

885' - 8 1/4"

1W - SEVENTH

FLOOR

896' - 8 1/4"

1W - EIGHTH

FLOOR

908' - 7 1/4"

1W - NINTH FLOOR

920' - 0 3/4"

1W - PENTHOUSE

931' - 0 3/4"

1W - MACHINE

ROOM SLAB

945' - 6"

1W - ROOF SLAB

956' - 8 3/4"

Scale: 1/16" = 1'-0"

EAST ELEVATION

Scale: 1/16" = 1'-0"

WEST ELEVATION

APPROXIMATELY 665 S.F.

OF BRICK MASONRY REPOINTING

APPROXIMATELY 225 S.F.

OF BRICK MASONRY REPOINTING

APPROXIMATELY 650 S.F.

OF BRICK MASONRY REPOINTING

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.201

506-26-202

TUCKPOINTING

Building 1W North & South Elevations

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

1W - SECOND

FLOOR

839' - 2"

1W - FIRST FLOOR

827' - 3"

1W - BASEMENT

816' - 3"

1W - THIRD FLOOR

850' - 2"

1W - FOURTH

FLOOR

861' - 2"

1W - FIFTH FLOOR

873' - 9 1/4"

1W - SUBBASEMENT

810' - 3"

1W - SIXTH FLOOR

885' - 8 1/4"

1W - SEVENTH

FLOOR

896' - 8 1/4"

1W - EIGHTH

FLOOR

908' - 7 1/4"

1W - NINTH FLOOR

920' - 0 3/4"

1W - PENTHOUSE

931' - 0 3/4"

1W - MACHINE

ROOM SLAB

945' - 6"

1W - ROOF SLAB

956' - 8 3/4"

1W - SECOND

FLOOR

839' - 2"

1W - FIRST FLOOR

827' - 3"

1W - BASEMENT

816' - 3"

1W - THIRD FLOOR

850' - 2"

1W - FOURTH

FLOOR

861' - 2"

1W - FIFTH FLOOR

873' - 9 1/4"

1W -SUBBASEMENT

810' - 3"

1W - SIXTH FLOOR

885' - 8 1/4"

1W - SEVENTH

FLOOR

896' - 8 1/4"

1W - EIGHTH

FLOOR

908' - 7 1/4"

1W - NINTH FLOOR

920' - 0 3/4"

1W - PENTHOUSE

931' - 0 3/4"

1W - MACHINE

ROOM SLAB

945' - 6"

1W - ROOF SLAB

956' - 8 3/4"

Scale: 1/16" = 1'-0"

NORTH ELEVATION

Scale: 1/16" = 1'-0"

SOUTH ELEVATION

APPROXIMATELY 580 S.F.

OF BRICK MASONRY REPOINTING

APPROXIMATELY 580 S.F.

OF BRICK MASONRY

REPOINTING

GENERAL NOTES:

1. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

3/32" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 28

28-A.100

506-26-202

TUCKPOINTING

Building #28 Basement floor plan

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

UP

UP

UP

UP

232 SF

1BR

FG76

65 SF

BATHROOM

FG74A

163 SF

1BR

235 SF FG70C

1BR

FG70B

65 SF

BATHROOM

FG70A

163 SF

1BR

FG70

235 SF

1BR

FG68

158 SF

1BR

FG66

65 SF

BATHROOM

FG66A

STAIR 3

610 SF

CORRIDOR

D154

49 SF

ELEC

FG67

47 SF

HSKP

FG69

64 SF

OFFICE

FG71

26 SF

STORAGE

FG63A

135 SF

OFFICE

FG65

219 SF

2BR

FG78

67 SF

BATHROOM

FG80A

194 SF

2BR

FG80

217 SF

2BR

FG82

65 SF

BATHROOM

FG84A

189 SF

2BR

FG84

47 SF

TOILET

80 SF FG88A

ELEC

FG86

336 SF

BREAK

ROOM

FG88

152 SF

OFFICE

FG34

264 SF

2BR

FG38

277 SF

2BR

FG40

278 SF

2BR

FG42

280 SF

2BR

FG44

28 SF

ELEC

FG36

80 SF

BATHROOM

FG38A

100 SF

BATHROOM

FG42A

100 SF

BATHROOM

FG46A

271 SF

2BR

FG46

STAIR 2

693 SF

CORRIDOR

D107

285 SF

2BR

FG47

274 SF

2BR

FG45

277 SF

CONFERENCE

FG43

278 SF

KITCHEN

FG41

100 SF

BATHROOM

FG47A

100 SF

BATHROOM

FG43A

100 SF

BATHROOM

FG39A

272 SF

2BR

FG39

282 SF

2BR

FG37

324 SF

2BR

FG35

102 SF

STORAGE

FG33

68 SF

BATHROOM

FG35A

68…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .