Drawings - 506-26-202 Tuckpoint.pdf
PDF 15 MB Posted
- Attached to
- Z1DA--Tuckpointing 506-26-202 Federal contract opportunity
- Solicitation number
- 36C25026B0019
About this file
These are bid documents for a Department of Veterans Affairs (VA) tuckpointing renovation project at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The project number is 506-26-202, and the documents are marked as pre-design construction/bid documents with an issue date of xx/xx/2025, indicating this is a template awaiting finalization.
The scope of work covers masonry brick repointing and tuckpointing for two buildings: Building 1W (a nine-story medical facility with basement, penthouse, and machine room levels) and Building 28 (a four-story residential/care facility with basement). Building 1W requires approximately 2,020 square feet of brick masonry repointing distributed across elevations (665 SF east, 225 SF west, 580 SF north/south combined). Building 28 requires approximately 3,250 square feet of brick masonry repointing (200 SF east, 2,100 SF north, 750 SF south, 200 SF north continuation). The project also includes work on Building 1E (Liberty Building), addressing window head flashing details and insulated metal panel repairs on the fifth floor. Documentation includes comprehensive floor plans for all levels, elevation drawings with marked repointing areas, site plans indicating contractor parking locations in the east parking structure (2 spaces) and dumpster placement in Lot H, and detailed specifications for material preparation, work execution, and building access protocols. The documents reference general design notes requiring compliance with specifications and substitution of comparable products with architect approval.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25026B0019 0003.docx | DOCX document | |
| Drawing 01W-a.201 north - South elevation - amendment 1.pdf | ||
| 506-26-202 Tuckpointing - bid project specification manual R2 2026 02 20.pdf | ||
| Drawing 28-A.201 North - South Elevation - amendment 1.pdf | ||
| Drawing 01W-a.200 East - West elevation - amendment 1.pdf | ||
| 36C25026B0019 0002.docx | DOCX document | |
| S04 506-26-202 Tuckpointing Sign in sheet 2026 02 10.pdf | ||
| S04 Pre-Bid Site Visit Agenda - 506-26-202 Tuckpointing - lrr.pdf | ||
| 36C25026B0019 0001.docx | DOCX document | |
| Wage Determination MI20250100 12.12.2025.pdf | ||
| Contractor EMR Certification Form - 506-26-202.docx | DOCX document | |
| Specifications Manual R1 - 506-26-202 Tuckpointing.pdf | ||
| 36C25026B0019_2.docx | DOCX document | |
| RFI Form - 506-26-202.doc | DOC document | |
| ATTACHMENT VAAR 852.219-75 DEVIATION Jan 2023 LIMITATIONS OF SUBCONTRACTING COMPLIANCE CERTIFICATION.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 EAST1 WEST
BUILDINGBUILDING
BUILDING 1 BUILDING 28
WEST
SD38
SD
SD
SD
SD40
AB15A
AB11
AB10A AB10
AB09E
AB08
AB01
AB03A
AB03
C1
A8B
AB23
AB09Z
AB33J
AB16 AB33I
CB33
AB17
AB15AB09
AB09H
AB09F
AB09A
AB09I
AB09K
AB09L
CB30
CB36AB09N
AB09D
AB09C
AB09B
AB09A
C1 C1 C1 C1 C1 C1
AB09Y AB09X AB09W AB14
AB09M
CB29
AB09A AB09B
AB12
AB12A AB12B
CB31
AB13
AB09Q
AB09R
AB09S
AB09T
AB09U
AB09V
AB15A
AB18
AB20
AB22
AB24
AB30
AB32
CB32
AB26
AB33B
AB28
AB29
AB33F
AB33A
AB33
AB80
AB79
AB95
AB78AB95A
AB65AB66
AB33E
AB33DAB33C
CB35A
ST10
ST10E
AB36B
ST10E-A
AB56
AB90
AB53
AB59
AB91
AB64
AB63
AB61 AB63A
AB68AB66
AB70 AB71
AB74
AB75
AB92 AB73
AB76
AB96
AB77
AB69
AB94
AB67
AB58
AB34
AB51
AB32
AB38
AB72
AB67
AB45
AB27
AB29AB25
C2
AB92
AB92C
AB94A
AB92A
AB94
C2
C3
BB49A
BB49
BB49B
BB49C
AB36
AB36A
AB19
AB33A
CB34
AB119A
CB35
CB37
AB54
AB52
AB50
AB49
BB86
BB87
C3
C3
C3
BB43
C4
A12G
AB55
AB57
AB93
AB60
AB62
AB41
AB40
AB31 AB33
AB37 AB37A
AB39
AB37B
CB28
BB46
BB50
BB54
BB58
BB56
BB57BB55BB53
BB45
C4 C4
EB11
EB01EB02
EB03
EB04
EB05
EB06
EB07
EB09
EB10
DB11
DB13
DB14
DB19 DB20
DB21 DB22
DB23
DB37
DB34
DB47
DB32A
DB35 DB36 DB49
DB48B DB48A DB48 DB48C
DB48D
DB24
DB25B
DB25A
CB20
DB25
DB25C
DB25D
DB40
DB41
DB42
DB43
CB22B
CB-3
S-1
S-2
CB-12
CB12B
CB12D
CB12C
CB07
CB08B
CB06A
CB04
CB05
CB06
CB-7CB-2
CB-6
DB12
CB07A
DB23
DB12A
DB12
DB21B
DB21C
DB12
DB35
DB21A
DB12 DB21D
DB12DB12
FG62
FG64
FG66 FG68 FG70 FG72 FG74
FG76
FG78
FG80
FG82
FG84
FG88
FG86
FG88A
FG34
FG38 FG40 FG42 FG44 FG46
FG47FG45FG43
FG41
FG39FG37FG35
FG33FG31
FG29FG27
FG25
FG23
FG52
FG54
FG56
FG58
FG60
FG36
FG63
FG63A
FG71
FG49
FG51
FG53
FG55
FG85FG57
FG59
FG83
FG81FG61
FG65
FG67 FG69
BB89
BB88
BB80
BB78
BB74
BB72
BB24
BB22
AB91
AB90
BB42
BB44
BB05B
BB05C
BB05A
BB07B
BB07
BB03
BB02
BB08
BB09C
BB09A
BB09B
BB13
BB10
BB06
BB12
BB13B
A21A
AB46
AB48
AB47
AB42
A37C
AB41
BB26C
BB26B
BB26A BB80
FG01
FG02
FG10
FG10D
FG16
FG17
FG14 FG12
FG10C
FG10B
FG10A
FG09FG11
FG08 FG06
FG07
FG01A
FG00
FG01
FG04
FG02
FG05
DB00
DB02
DB03
DB04
DB05
CB-12
DB06
DB07
DB08
DB09
DB16
DB16A
DB16C
DB06D
DB06B
DB10
DB15
DB17
DB18
CB-12
CB-13
EB60
EB60B EB60A
COM.
EB02E EB02F EB02G EB02H
EB04D EB04E EB04F EB04G
EB04H EB04J EB04K EB04L EB04M
EB02K
EB02L
EB02M
DB60
DB39
DB50
DB50
CB08
CB08A
CB10
CB10A
CB11 CB12A
DB50
CB13
CB15
CB16
BB85
BB70
BB68
BB24
BB24a
BB26
BB30
BB30c
BB36 BB30a
BB30b
BB85a
EB60a DB60b
DB61
A22c
DB60 DB60b
EB60a
DB61 EB60B
EB60A
COM.
EB60
ELECTRICAL
MECHANICAL
CORRIDOR
CORRIDOR
OFFICE
CLERICAL
OFFICE
SUPERVISORINVEST
DRUGS/ADMIN
WORK
DRUG INFO
SERV
FEMALE
LOCKERS
MALE
LOCKERS
LLTS
LOUNGE
CONF/
CLASSROOM
STUDY
CHRONICLES
PHAR
LAB
CORRIDOR
OFFICE
CLIN
TEACHING
OFFICE
ASSIST
CHIEF
OFFICE
CHIEF
OFFICE
WAITING
OFFICE
MAN.
ASSIST
CHIEF
ELECTRIC
SHOP
GARDEN
COURTYARD
STAIR 1
HEALING
GARDEN
ELECTRICAL
ELEC.SOILED
UTILITY
HAC
ELEVATOR
MECHANICAL
DIETICIAN
STORAGE
RECREATIONAL
THERAPY
FEMALE
TOILET
MALE
TOILET
PATIENT
LOUNGE
PASSAGE
DINING
ROOM
ELECTRICAL
SHOP
STORAGE
ELECTRICAL
SHOP
HACELEC.
STAFF
OFFICE
SOILED
UTILITY
CLEAN
LINEN
STORAGE
STAFF
OFFICE
STAFF
OFFICE
PANTRYTOILET
GROUND &
TRANSPORTATION
EQUIPMENT
STRUCTUREPASSAGE
EMERFENCY
GENERATORS
EMERGENCY
SWITCHGEAR
PAINT
SHOP
EMS
STORAGE
CLEAN
LINEN
FACILITIES
SIGN SHOP
STAIR 5
MAINTENANCE
SHOP
STORAGE
FLAMMABLE
WASTE
MECH
MORGUE
REFRIGERATOR
AUTOPSY
OFFICE
AUTOPSY
ROOM
NUCLEAR
MEDICINE WASTE
HOLDING
MECHANICAL
CANTEEN
FREEZER
FM
STORAGE
INDUSTRIAL
HYGIENE
STORAGE
CORRIDOR
ELECTRICAL
EQUIPMENT
CANTEEN
SERVICE
STORAGE
BOTTLED
GAS
STORAGE
N & FS
STORAGE
N & FS
FREEZER
FIRE
ALARM
ROOM
CARDIOLOGY
RECORDS
MECHANICAL
NUTRITION
& FOOD
SERVICE
DRY
STORAGE
NUTRITION
& FOOD
SERVICE
FREEZER
LINEN
CARTS
NUTRITION
& FOOD
SERVICE
STORAGE
HOLDING
ROOM
FOR
SHREDDING
MATERIAL
MANAGEMENT
OFFICE
SPD
STORAGE
TEL
CLOS
COMM
CLOS
STAIR 1
HIMS/
DATA
QUALITY
MEDICAL
RECORDS
AREAWAY
CHIEF OF
HIMS
POLICE
STORAGE
FEMALE
TOILET
CHIEF
POLICE
CORRIDOR
STORAGE
KITCHEN
CANTEEN
STORAGE
AREAWAYS
STAIR 4
S-17
PAINT
BOOTH
CLEAN LINEN
EMS STORAGE
STORAGE
STAFF
OFFICE
PATIENT
LOUNGE
STORAGESTORAGE
LAUNDRY
SUPERVISOR
OFFICE
STAFF
BREAKROOM
KITCHEN STAFF
CONFRENCE
TOILET
TOILET
TOILET
TOILET
TOILET TOILET TOILET
TOILET
TOILET
TOILET
TOILET TOILET TOILET
TOILETTOILETTOILET
TOILETTOILET
TOILET
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
PATIENT
ROOM
CIRC
SPACE
OPEN
OFFICES
HAC
CIRC
SPACE
VEST.
ANTE ROOM
SUPPLIES
ONCOLOGY
MIXING
IV
ADMIXTURE
PRIMARY
PICK
RECEIVING/
UNPACKING
EXIST.
VAULT
VEST. EXTEMP.
COMP.
CORRIDOR
STAIR
CORRIDOR CORRIDOR
REPRODUCTIONMAILROOM/
DISTRIBUTION
PAPER/RIBBON
DISTRIBUTION
REPRODUCTION
STAFF
TOILET
TELEPHONE
SWITCH
ROOM
LLTSSTAFF
TOILET
STORAGE
WHEELCHAIR
STORAGE/REPAIR
SERVICE
ELEVATOR
LOBBY
CORRIDOR
DETERGENT
& WATER
CLEAN
CASE CART
STAGING
SPD RME
COORD
OFFICE
SPD ASSIST
CHIEF
OFFICE
SPD CHIEF
OFFICE
FEMALE
STAFF
SHOWER
FEMALE
STAFF
LOCKER
LOCKER
ANTE RM
CORRIDOR
DISPATCH
ANTE RM
FEMALE
STAFF
SHOWER
FEMALE
STAFF
LOCKER
LOCKER
ANTE ROOM
MALE
STAFF
LOCKER
MALE STAFF
SHOWER
CHEMICAL &
SOLVENT STORAGE
DECONTAM
ANTE RMHAC
SOILED
RECEIVING
DECONTAM
HAC
CLEAN PREP
ASSEMBLY &
STERILIZATION
STERILIZERS
SURGERY STERILE
& NON-STERILE
STORAGE
DISPATCH
BREAK OUT
& CLEAN
RECEIVING
BULK
STORAGE
MALE
STAFF
TOILET RM
FEMALE
STAFF
TOILET RM
STAFF
TRAINING
STAFF
LOUNGE
CONFERENCE
CENTRAL
SUPPLY
PURCHASING
GIP
PURCHASING
CHIEF
INVENTORY
MANAGEMENT
CLEAN
STAFF
PASSAGE
CHIEF
CENTRAL
SUPPLY
SUPERVISOR
CENTRAL
SUPPLY
CLEAN
SUPPLY
ANTE ROOM
DISPATCH
BULK
STORAGE
BREAK OUT
CLEAN
RECEIVING
NURSING
UNITS
NON-STERILE
STORAGE
CORRIDOR
PASSAGE
MECHANICAL
CORRIDOR
CORRIDOR
ELEC.
OFFICE
OFFICE
OFFICE
STORAGE
PASSAGE
STAFF
MECHANICAL
CORRIDOR
MENS
TOILET
STAIR 3
CORRIDOR
EMERGENCY
OPERATION
CENTER
POLICE
CORRIDOR
LOCKERS
VOLUNTEERS
CORRIDOR
AUDITORIUM LOBBY
UNISEX
TOILET
PATIENT
TOILET
RECEPTION
EXAM
EXAM
PASSAGE
CORRIDOR
STAFF
TOILET
CORRIDOR
VENDING
STAFF WORK
AREA
PHARMACY
X-RAY
OFFICE
OFFICE
RECEPTION
STORAGE
CORRIDOR
CORRIDOR
MENS
LOCKERS
TOILET
MENS
TOILET
EQUIP.
STOR.
EVS
BREALK
ROOM
CORRIDOR
ELEC
CLOSET
SERVICE
ELEV. LOBBY
VIEWING
ROOM
MORGUE
SCAN/
EQUIP. PREP
OFFICESOILED
LINEN
WAITING
VOLUNTEER
STORAGE
ELECTRICAL
OFFICE
RAMP
CONF./
LOUNGE
VALVE
ROOM
VESTIBULE
BLOCK/
STORAGE
DOSIMETRYPASSAGE
C.T.
CONTROL
ROOM
TOILET
CLOSET
OFFICE OFFICE
TOILETTOILET
SECONDARY
WAITING
CONTROL
ROOM 1
OFFICE
RAMP
OFFICE
CONSULT
PASSAGE
EXAM
ELEVATOR
MECH
UNASSIGNED
FUTURE
ELEVATOR
FUTURE
STAIR
PASSAGE
WOMENS
TOILET
MENS
TOILET
SPRINKLER
RISER RM
ELECTRICAL
MODULATOR
CONTROL
ROOM 2
PASSAGE MODULATOR
EXISTING
PASSAGE
MEGA
VOLTAGELINAC
VAULTLOBBY
WAITING
VESTIBULE
WC
A.O.D.
STORAGE
POLICE
OFFICE
CORRIDOR
MENS
TOILET
WOMENS
TOILET
MENTAL
HEALTH
DIRECTOR
CHIEF
ER NURSE
EDUCATION
TOILET
EXAM 4
EXAM 3
EXAM 2
EXAM 1
TRIAGE 2
TRAUMA 2
TRIAGE 1
EMERGENCY
WAITING
CORRIDOR
REGISTRATION
RECEPTION
TRIAGE
RECEPTION
TRIAGE
LOUNGE
TRAUMA 1
CORRIDOR
NURSE
OBSERVATION 5OBSERVATION 4OBSERVATION 3OBSERVATION 2
CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDOR
TREATMENT 5
TREATMENT 4
TREATMENT 3
TREATMENT 2
NOUR PASSAGE
CORRIDOR
MENTOR
MEDS
CHARTING
PATIENT
TOILET
WORK MD. WORK
NURSE
ANTE-ROOM
SOILED
UTILITY
CORRIDOR
HSKGSTORAGE
I.T.
OBSERVATION 1
ELECTRICAL
ELECTRICAL
CORRIDOR
WOMENS
LOCKERWOMENS
TOILET
EVS
STORAGE
CLEAN UTILITY
TREATMENT 1
DECON/
PROCESSINGDECON
VESTIBULE
ISOLATION
UNIT A
UNIT C
1EFREEDOM BUILDING
1WLIBERTY BUILDING
MALE STAFF LOCKER
MALE STAFF SHOWER
OFFICE CHIEF OFFICE CONFERENCE
RECEPTION OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
OFFICE
SW/ PHARMACIST OFFICE
OFFICE
OFFICE
MECHANICAL
NURSE STATION
OFFICE
SOCIAL
WORKER
MED
ROOM
ELECTRICAL
CLOSET
OFFICEEQUIP STORAGEHAC
TELEPHONE
SWITCH BOARD
TELE SUPERVISOR
IT
STORAGE/WORKROOM
GENERAL
MAINTENANCE
FLEET OFF.
OFFICE TECH FOREMAN
EQUIP STORAGE
COMPRESSOR
STORAGE
ELECTRICAL
TESTING STATION CHIEF OFFICE OFFICE VOLUNTEER SERVICES
OFFICE
OFFICE
OFFICEOFFICEOFFICEOFFICE
EQUIP STORAGE BIOMED
AUDITORIUM
OFFICE
ELECTRICAL
COMM CLOS
AB02
VOLUNTARY SERVICE STORAGE
(CACHE)
ELECTRICAL EQUIPMENT
AB00
GYM
STAIR
STAIR
COM. ELECTRICAL
MECHANICAL
MECHANICAL ELECTRICAL
COM.
MECHANICAL ELECTRICAL MECHANICAL
0 2 4 8 16
GRAPHIC SCALE: FEET
BASEMENT FLOOR PLAN
CL-3
W E
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
RENOVATIONS FOR:
LOCATION MAP
NO SCALE VICINITY MAP
NO SCALE
AREA MAP
NO SCALE
PROJECT LOCATION
N
EW
S
N
EW
S
N
EW
S
LAKE ERIE
GRAND RAPIDS
TRAVERSE CITY
LAKE SUPERIOR
UPPER PENINSULA
MACKINAW CITY
LAKE HURON
ALPENA
PETOSKEY
GAYLORD
GRAYLING
LA
KE
M
IC
H
IG
AN
SAGINAW
ST.JOHNS FLINT
LANSING
JACKSON DETROITKALAMAZOO
ANN ARBOR
CAMPUS MAP
NO SCALE
N
EW
S
PROJECT LOCATION
GENERAL DESIGN NOTES
PRODUCTS LISTED ARE FOR BASIS OF DESIGN ONLY.
SUBJECT TO COMPLIANCE WITH REQUIREMENTS IN
SPECIFICATIONS. PROVIDE PRODUCTS AS SCHEDULED
OR COMPARABLE PRODUCTS BY OTHER
MANUFACTURERS.
PRINT ALL PLANS IN COLOR.
1" = 60'-0"
BUILDING #1W & #28 - TUCKPOINTING
10/10/2025 1W & BLDG 28
G-001
506-26-202
TUCKPOINTING
COVER SHEET
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
TuckPointing
ANN ARBOR, MICHIGAN
ISSUE DATE: xx/xx/2025
ANN ARBOR VA MEDICAL
CENTER
BID DOCUMENTS
506-26-202
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G-001 COVER SHEET
ARCHITECTURAL
01W-A.100 BLDG 1W - BASEMENT FLOOR PLAN
1" = 60'-0"
OVERALL BASEMENT FLOOR PLAN
REVISION SCHEDULE
# DATE DESCRIPTION
10/10/2025 100% Construction/ Bid Documents
01W-A.101 BLDG 1W - FIRST FLOOR PLAN
01W-A.102 BLDG 1W - SECOND FLOOR PLAN
01W-A.103 BLDG 1W - THIRD FLOOR PLAN
01W-A.104 BLDG 1W - FOURTH FLOOR PLAN
01W-A.105 BLDG 1W - FIFTH FLOOR PLAN
01W-A.106 BLDG 1W - SIXTH FLOOR PLAN
01W-A.107 BLDG 1W - SEVENTH FLOOR PLAN
01W-A.108 BLDG 1W - EIGHTH FLOOR PLAN
01W-A.109 BLDG 1W - NINTH FLOOR PLAN
01W-A.110 BLDG 1W - PENTHOUSE FLOOR PLAN
01W-A.111 BLDG 1W - MACHINE ROOM FLOOR PLAN
01W-A.200 BLDG 1W - EAST & WEST ELEVATIONS
01W-A.201 BLDG 1W - NORTH & WEST ELEVATIONS
28-A.100 BLDG 28 - BASEMENT FLOOR PLAN
28-A.101 BLDG 28 - FIRST FLOOR PLAN
28-A.102 BLDG 28 - SECOND FLOOR PLAN
28-A.200 BLDG 28 - EAST & WEST ELEVATIONS
28-A.201 BLDG 28 - NORTH & WEST ELEVATIONS
1E-A.200 BLDG 1E - FIFTH FLOOR & PARTIAL SOUTH ELEVATION
W E
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
BUILDING #1W & #28 - TUCKPOINTING
1W & BLDG 28
G-100
506-26-202
TUCKPOINTING
overall site plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
DUMPSTER
PLACEMENT IN LOT 'H'
CONTRACTOR PARKING IN EAST
PARKING STRUCTURE
(QTY 2)
10/10/2025
10/10/2025 100% Construction/ Bid Documents
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1" = 20'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.100
506-26-202
TUCKPOINTING
Building 1W
BASEMENT FLOOR PLAN
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP UP
UP
UP
UP
UP
UP
UP
UP
UP
DN
UP
DN
UP
DN
DN
UP
UP
1202 SF
LINEAR
ACCELORATOR
AB80
646 SF
LINEAR
ACCELORATOR
AB79
555 SF
CORRIDOR
AB95
88 SF
MODULATOR
AB78
1041 SF
LOBBY
WAITING
AB33
277 SF
CORRIDOR
CB35
201 SF
VEST
AB33A
217 SF
WC
AB33F
837 SF
WAITING
AB13
473 SF
CHECK-IN
AB12B
205 SF
CHECK-IN
AB12A
269 SF
TRIAGE
LOUNGE
AB12
163 SF
OBSERVATION
AB09O
163 SF
OBSERVATION
AB09P
103 SF
CORRIDOR
CB31
147 SF
TRIAGE
AB09Q
149 SF
TRIAGE
AB09R
167 SF
OBSERVATION
AB10
170 SF
A.O.D.
140 SF AB29
CORRIDOR
CB32
50 SF
TOILET -
PATIENT
AB32
50 SF
TOILET -
PATIENT
AB30
100 SF
OFFICE
AB24
146 SF
EXAM
AB09S
150 SF
EXAM
AB09T
110 SF
OFFICE
AB22
118 SF
OFFICE
AB26
94 SF
POLICE
AB33B
52 SF
STORAGE
AB28
289 SF
CORRIDOR
CB37
54 SF
TOILET -
STAFF
AB19A
110 SF
VENDING
AB33A
152 SF
STORAGE/FUTURE
STAIR
ST10
184 SF
VEST
AB11
81 SF
DECON
AB10A
156 SF
OBSERVATION
AB09E
581 SF
CORRIDOR
CB29
202 SF
NURSE
AB09M
158 SF
OBSERVATION
AB09D
52 SF
MEDS
AB09N
146 SF
MENTOR
AB09L
65 SF
CORRIDOR
CB36
42 SF
NOURISHMENT
AB09K
161 SF
OBSERVATION
AB09C
52 SF
TOILET -
PATIENT
AB09G
70 SF
CHARTING
AB09I
111 SF
MD. WORK
81 SF AB09H
WORK
AB09F
151 SF
OBSERVATION
AB09B
143 SF
OBSERVATION
AB09A
1123 SF
NURSE
AB09
280 SF
CORRIDOR
CB28 234 SF
CORRIDOR
CB30
146 SF
EXAM
AB09U
149 SF
EXAM
AB09V
172 SF
ISOLATION
AB15A
116 SF
OFFICE
AB20
105 SF
OFFICE
AB18 238 SF
STAFF WORK
AREA
AB19
46 SF
TOILET
AB15A
67 SF
ANTE
AB15
105 SF
SOILED
UTILITY
AB17
289 SF
CORRIDOR
CB34
1991 SF
ELECTRICAL
EQUIPMENT
AB00
246 SF
CLEAN
UTILITY
1104 SF AB08
STORAGE
AB02
170 SF
OBSERVATION
AB09Z
175 SF
OBSERVATION
AB09Y
175 SF
OBSERVATION
AB09X
200 SF
OBSERVATION
AB09W
175 SF
OBSERVATION
AB14
110 SF
STORAGE
AB16
87 SF
DATA
AB33J
32 SF
HSKP
AB33I
329 SF
CORRIDOR
CB33
395 SF
STORAGE
AB01
183 SF
BATHROOM -
WOMEN
AB03A
324 SF
LOCKERS -
WOMEN
AB03
157 SF
LACTATION
ROOM
AB05
47 SF
DATA
AB07
621 SF
DATA
AB23
111 SF
STAIR 2
329 SF
CORRIDOR
AB130
123 SF
EMS
CHEMICALS
AB121
140 SF
OFFICE
AB92B
272 SF
EMS EQUIP
AB122
280 SF
STORAGE
AB119
65 SF
CHANGING
ROOM
AB118B
485 SF
CORRIDOR
AB120 481 SF
VOLUNTARY
SERVICES
SUPPLY
AB123
264 SF
VOLUNTARY
SERVICES
CLOTHING
ISSUE
AB118A
127 SF
OFFICE
AB117
174 SF
VOLUNTARY
SERVICES
CRAFT
AB124
148 SF
OFFICE
AB116
431 SF
VOLUNTARY
SERVICE
LOUNGE/ WK
AB115
310 SF
OFFICE
AB125
69 SF
STAFF
TRAINING
AB126
115 SF
VOL SERV
CLOTHING
AB127
404 SF
LOCKERS -
MEN
AB94
251 SF
STORAGE
AB92C
195 SF
BATHROOM -
MEN
AB94A
292 SF
CORRIDOR
AB110
44 SF
HSKP
AB114
86 SF
VOL SERV
BOOK
AB113
84 SF
VOL SERV
CLOTHING
AB112
83 SF
VOL SERV
CLOTHING
AB111
364 SF
OFFICE
BB24
123 SF
OFFICE
BB24A
122 SF
OFFICE
BB30A
244 SF
TESTING
STATION
BB30
46 SF
STORAGE
BB30B
Not Enclosed
BREAK
ROOM
BB30C
119 SF
OFFICE
1030 SF
BIOMED
BB30
77 SF
DATA
BB26
75 SF
ELEC
BB68
1082 SF
CORRIDOR
C3
71 SF
TOILET - MEN
BB84
97 SF
TOILET -
WOMEN
BB86
11 SF
HSKP
BB88
128 SF
STORAGE
BB89
92 SF
CORRIDOR
BB100
189 SF
CORRIDOR
BB99
214 SF
CORRIDOR
BB98
366 SF
STORAGE
BB102
66 SF
VEST
483 SF BB101
AUDITORIUM
LOBBY
BB87
816 SF
CONFERENCE
BB71
41 SF
STAIR 3
S-03
46 SF
STORAGE
BB27 105 SF
TOILET - MEN
BB43
255 SF
OFFICE
BB45
89 SF
MECH
BB49D
131 SF
STORAGE
BB49A
104 SF
OFFICE
BB49B
294 SF
OFFICE
BB49 153 SF
OFFICE
BB49C
183 SF
OFFICE
BB53
286 SF
LINEN
BB55
424 SF
PAINT SHOP
BB57
77 SF
STORAGE
BB56
113 SF
CORRIDOR
190 SF BB58
PAINT
BOOTH
BB54
1213 SF
CORRIDOR
C4
107 SF
CORRIDOR
BNA90
968 SF
CLEAN LINEN
BB50
66 SF
HSKP
BB51
148 SF
WASHER
DRYER
BB50B
325 SF
DIRTY LINEN
HOLDING
BB52
983 SF
CLEAN LINEN
BB50A
84 SF
SCALE
ALCOVE
BB95A
189 SF
FREEZER
BB07A
421 SF
STORAGE
BB07
607 SF
FREEZER
618 SF BB07B
STORAGE
BB05A
249 SF
STORAGE
B320H
289 SF
LOCKSMITH
BB44A
21 SF
LOCKSMITH
LOBBY
BB44
53 SF
ROOM
BB43
190 SF
STORAGE
BB42
194 SF
STORAGE
BB05B
283 SF
STORAGE
BB05A
93 SF
MECH
B030A
992 SF
CORRIDOR
BB06
81 SF
STORAGE
AB14
87 SF
FIRE ALARM
ROOM
BB08
116 SF
FREEZER
A016A
142 SF
STORAGE
BB09A
86 SF
VEST
BB09
184 SF
STORAGE
BB09B
232 SF
STORAGE
BB13
1315 SF
STORAGE
BB18
313 SF
MECHANICAL
AB40
105 SF
FREEZER
BB13B
359 SF
STORAGE
AB31
266 SF
ELEC
BB10
70 SF
STORAGE
BB12
316 SF
SERVICE
ELEVATOR
LOBBY
AB27
38 SF
DATA
AB29
262 SF
STORAGE
AB33
57 SF
ELEC
AB35
28 SF
STORAGE
A021B
155 SF
STORAGE
AB37
171 SF
STAIR 5
S-05
78 SF
STORAGE
AB37B
156 SF
FLAMMABLE
WASTE
AB37C
151 SF
EXIT STAIR
BB97
129 SF
VIEWING
ROOM
AB45
86 SF
LAB
28 SF AB39
STORAGE
AB24B
11 SF
STORAGE
AB39A
1346 SF
CORRIDOR
C1
364 SF
AUTOPSY
ROOM
AB46
88 SF
OFFICE
AB44C
157 SF
MORGUE
AB44
130 SF
MORGUE
REFRIGERATOR
AB47
35 SF
MECH
AB42
96 SF
OFFICE
AB40
81 SF
OFFICE
AB38
77 SF
OFFICE
AB39
311 SF
STORAGE
AB34
73 SF
SOILED
LINEN
AB34
432 SF
WAITING
166 SF AB51
RECEPTION
AB50
68 SF
TOILET
AB49
276 SF
PHARMACY
AB36A
428 SF
X-RAY
AB36
236 SF
STORAGE
AB36B
133 SF
EXAM
AB52
131 SF
EXAM
AB54
134 SF
EXAM
AB56 303 SF
CORRIDOR
AB90
229 SF
EXAM
AB53
148 SF
RAMP
AB91
201 SF
ELEC
AB58
90 SF
OFFICE
AB59
73 SF
OFFICE
AB60
100 SF
FUTURE
ELEVATOR
ST10E
54 SF
FUTURE
ELEVATOR
MECH
ST10EA
186 SF
STAFF
AB57
305 SF
MECH
AB55
131 SF
OFFICE
AB81 63 SF
STORAGE
AB62
173 SF
CONTROL
ROOM
AB64
52 SF
TOILET
AB33C
55 SF
TOILET
AB33D
79 SF
CORRIDOR
CB35A 76 SF
SPRINKLER
RISER RM
AB33E
121 SF
ELECTRICAL
MODULATOR
AB66
223 SF
CONTROL
ROOM
AB65
81 SF
CORRIDOR
AB95A
102 SF
OFFICE
AB66
104 SF
OFFICE
AB68
44 SF
HSKP
AB70
33 SF
TOILET
AB71
160 SF
CONTROL
ROOM
AB74
368 SF
C.T. / SIM
AB75
57 SF
TOILET
AB61
57 SF
TOILET
AB63A
423 SF
SECONDARY
WAITING
AB63
359 SF
CORRIDOR
AB93
159 SF
OFFICE
AB67
413 SF
PHYSICS
425 SF AB72
BREAK
ROOM
AB69
185 SF
CORRIDOR
AB92
331 SF
DOSIMETRY
AB73
117 SF
MOLD ROOM
AB76
59 SF
VEST
E113
95 SF
LOCKERS -
PATIENT
AB77
93 SF
BATHROOM
AB43
144 SF
RAMP
AB94
219 SF
STORAGE
BB19
4 SF
FEC
AB22B
117 SF
SERVICE
ELEVATOR
SE-06
911 SF
CORRIDOR
C2
59 SF
ELEC
AB93
611 SF
BREAK
ROOM
AB92
48 SF
TOILET -
STAFF
AB92A
171 SF
STAIR 1
S-01
40 SF
DATA
AB91
21 SF
DATA
AB90
19 SF
ELEC
AB25
41 SF
STAIR 4
S-04
91 SF
CORRIDOR
CB80
33 SF
MECH
BB94
47 SF
STORAGE
BB95
649 SF
CONFERENCE
ROOM #4
BB93
144 SF
STORAGE
BB103
138 SF
DATA
BB94
154 SF
CORRIDOR
BB97
596 SF
CONFERENCE
ROOM #2
BB91
95 SF
ELEVATOR
P-1
81 SF
ELEVATOR
P-2
84 SF
ELEVATOR
P-3
90 SF
ELEVATOR
P-4
94 SF
SERVICE
ELEVATOR
SE-05
205 SF
LOCKERS
BB79
176 SF
OFFICE
BB77
158 SF
OFFICE
BB80
263 SF
POLICE
BB78
40 SF
OFFICE
BB78B
39 SF
OFFICE
BB78A
122 SF
RESTROOM
BB76
138 SF
STORAGE
BB74
136 SF
OFFICE
BB72
141 SF
STORAGE
BB70
783 SF
CONFERENCE
ROOM #1
BB90
748 SF
CONFERENCE
ROOM #3
BB92
Scale: 1" = 20'-0"
BASEMENT FLOOR PLAN
Key Plan
BASEMENT FLOOR PLAN IS ISSUED FOR
REFERENCE ONLY - NO WORK IS NOTED
ON THIS FLOOR LEVEL
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1" = 20'-0"
BUILDING #1W & #28 - TUCKPOINTING
Bldg 1W
01W-A.101
506-26-202
TUCKPOINTING
Building 1W First Floor Plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
UP
DN
DN
302 SF
CORRIDOR
C-107
103 SF
CORRIDOR
C1-3B
64 SF
TOILET
B185A
53 SF
HSKP
B185C
10 SF
ELEC
B139A
41 SF
STORAGE
B139 139 SF
EXAM
B137
142 SF
EXAM
B156
62 SF
TRIAGE
65 SF B155
TRIAGE
B153
172 SF
STAIR 3
S-03
514 SF
CORRIDOR
117 SF
EXAM
B157
106 SF
EXAM
B158
207 SF
MENTORS
B161
431 SF
WAITING
28 SF
STORAGE
B170
978 SF
CORRIDOR
195 SF
PROCEDURE
B172
199 SF
PROCEDURE
B173
106 SF
EXAM
B182
176 SF
PROCEDURE
B180
99 SF
BREAK
ROOM
B179
119 SF
SOILED
UTILITY
B178
98 SF
MECH
B177
163 SF
OFFICE
B176
172 SF
OFFICE
B175
29 SF
RME
B174
191 SF
OFFICE
B170
4 SF
ELEC
4 SF B169
FE
299 SF
WAITING
B167B
134 SF
EXAM
B162
124 SF
EXAM
B160
143 SF
EXAM
B159A
141 SF
EXAM
B159
137 SF
EXAM
B154A
165 SF
EXAM
B154
129 SF
EXAM
B152A
150 SF
EXAM
B152
77 SF
ELEC
B146
29 SF
STORAGE
B141
29 SF
DATA
B143
116 SF
EXAM
B145
139 SF
EXAM
B147
241 SF
EXAM
B149
23 SF
HSKP
B136
160 SF
TOILET
B134
115 SF
EXAM
B140
105 SF
CLEAN
UTILITY
48 SF B142
TOILET
B151
59 SF
BREAK
ROOM
B148A
344 SF
OFFICE
B148
566 SF
WAITING
254 SF
EXAM
B153
570 SF
PATIENT
CONSULT
A161A
209 SF
PATIENT
PICK-UP
A1600
697 SF
WAITING
A160B
1518 SF
PHARMACY
WORKROOM
A162A
138 SF
CORRIDOR
A162B
305 SF
NARCOTICS
VAULT
A162C
132 SF
EXAM
B104
116 SF
EXAM
B103
222 SF
CORRIDOR
B100A
69 SF
ELEC
A145
112 SF
EXAM
B102
213 SF
EXAM
B101
134 SF
TOILET -
WOMEN
A144
167 SF
TOILET - MEN
A143
241 SF
STAIR 1
S-01
36 SF
HSKP
A162F
58 SF
TOILET
A164 151 SF
OFFICE
A162D
120 SF
OFFICE
A162E
161 SF
OFFICE
A166A
99 SF
OFFICE
A166B
74 SF
CORRIDOR
A163
175 SF
BREAK
ROOM
A165
451 SF
CORRIDOR
C1-67
45 SF
DATA
A142
14 SF
DATA
A137A
6 SF
FEC
A141
115 SF
EXAM
A123
131 SF
EXAM
A121
17 SF
ELEC
A125
108 SF
EXAM
A119
119 SF
EXAM
A117
203 SF
PROCEDURE
A115
49 SF
ELEC
A113
173 SF
STAIR 2
S-02
264 SF
BREAK
ROOM
A111
211 SF
OFFICE
A109
132 SF
OFFICE
A101
78 SF
CONTROL
ROOM
A104
84 SF
SOUND
BOOTH
A106
216 SF
PROCEDURE
A110 208 SF
PROCEDURE
A112
145 SF
PROCEDURE
A114
47 SF
HSKP
A116
74 SF
SOILED
UTILITY
A124
122 SF
EXAM
A128
118 SF
EXAM
A130
109 SF
OFFICE
A132
116 SF
OFFICE
A134
109 SF
EXAM
A136
141 SF
EXAM
A138
130 SF
PULMONARY
FUNCTION
TESTING
A137
512 SF
MECH
A140
150 SF
PULMONARY
FUNCTION
TESTING
A131
104 SF
EXAM
A129
113 SF
EXAM
A127
98 SF
NOURISHMENT
A146E
138 SF
EXAM
A146D
257 SF
CLEAN
UTILITY
A146B 156 SF
CHECK-IN
A146A
365 SF
WAITING
A120
177 SF
OPTICAL
SHOP
A120A
289 SF
STAFF
WORKROOM
A150 125 SF
STAFF
WORKROOM
A156
108 SF
BAY
A158
124 SF
BAY
A160
197 SF
BAY
A162
170 SF
BAY
A164
127 SF
BAY
A168
108 SF
BAY
A159
123 SF
BAY
A161
197 SF
BAY
A163
170 SF
BAY
A167
127 SF
BAY
A169
460 SF
INFUSION
A159
61 SF
TOILET
A154
53 SF
TOILET
A156
168 SF
CORRIDOR
A158
130 SF
EXAM
A170
144 SF
OFFICE
A172
112 SF
OFFICE
A174
145 SF
OFFICE
A176
1027 SF
CORRIDOR
38 SF
HSKP
A178
28 SF
ELEC
B177
344 SF
OFFICE
A175
185 SF
OFFICE
A175C
457 SF
WAITING
A173
15 SF
DATA
B173B
16 SF
CLOSET
52 SF B173A
ELEC
A155
60 SF
SOILED
UTILITY
B164A
105 SF
ENTRY
ALCOVE
B170J
700 SF
CORRIDOR
C1-43
211 SF
SERVICE
ELEVATOR
LOBBY
C1-29A
96 SF
EXAM
B130B
60 SF
OFFICE
B130A
39 SF
DATA
B149 75 SF
OFFICE
B130F
100 SF
OFFICE
B135
98 SF
EXAM
B133
B130
270 SF
EXAM
B130C
82 SF
EXAM
B130D
89 SF
EXAM
B130E
149 SF
OFFICE
B128
254 SF
CORRIDOR
B132B 110 SF
EXAM
B131
117 SF
EXAM
B129
114 SF
EXAM
B127
118 SF
EXAM
173 SF B125
EXAM
B126
95 SF
CORRIDOR
B170B
115 SF
CLEAN
UTILITY
B164B
70 SF
ALCOVE
B170H
51 SF
HSKP
B164C
84 SF
TOILET -
PATIENT
B164D
187 SF
CORRIDOR
B170C
159 SF
WAITING
B171H
125 SF
EXAM
B171G
488 SF
CORRIDOR
B170E
125 SF
EXAM
B171F
93 SF
TRIAGE
B168F
96 SF
TRIAGE
B165A
127 SF
EXAM
B165B
127 SF
EXAM
B168E
296 SF
MENTORS
ROOM
B165C
126 SF
EXAM
B171E
125 SF
EXAM
B171D
125 SF
EXAM
B171C
126 SF
EXAM
B171B
121 SF
EXAM
64 SF B171A
ALCOVE
B170G
234 SF
CORRIDOR
B170D
94 SF
TRIAGE
B168B
95 SF
TRIAGE
B165F
69 SF
SOILED
UTILITY
B168C
65 SF
TOILET -
PATIENT
B165E
129 SF
CLEAN
UTILITY
B165D
127 SF
EXAM
B168D
150 SF
EXAM
B162A
151 SF
EXAM
B162B
96 SF
MEDS
B162C
140 SF
EXAM
B162E
141 SF
EXAM
B162F
151 SF
EXAM
B162G
150 SF
EXAM
B162H
416 SF
CORRIDOR
B170A
119 SF
EXAM
B123
118 SF
EXAM
B121
122 SF
EXAM
B119
103 SF
CORRIDOR
B118A
172 SF
EXAM
B118
157 SF
EXAM
B117
176 SF
EXAM
B116
157 SF
EXAM
B115
177 SF
EXAM
B114
156 SF
EXAM
B113
229 SF
TREATMENT
B112
79 SF
STORAGE
108 SF B120A
LASER
224 SF
CORRIDOR
B132A
1039 SF
WAITING
B107
81 SF
RME
B122
208 SF
CHECK-IN
B124
140 SF
PROCEDURE
B109
1179 SF
CORRIDOR
C1-104
847 SF
MECHANICAL
PENTHOUSE
177 SF
STAIR 5
S-05
638 SF
CORRIDOR
C1-101
190 SF
EXAM/PROCEDURE
B199
140 SF
EXAM
B197
152 SF
STAFF
WORKROOM
B195
46 SF
RME/SOILED
UTILITY
B198
52 SF
SOILED
LINEN
B196
74 SF
TOILET-PATIENT
B194
129 SF
EXAM
B193
100 SF
CLEAN
UTILITY
B192
119 SF
EXAM
B191
94 SF
OFFICE
B186
77 SF
TOILET
B185B
303 SF
WAITING
B188
66 SF
LACTATION
ROOM
B189
58 SF
CHECK-IN
B187
132 SF
OFFICE
A103
223 SF
OFFICE
A105
129 SF
OFFICE
A100
134 SF
OFFICE
A102
38 SF
OXYGEN
STORAGE
A135
147 SF
PULMONARY
FUNCTION
TESTING
A139
96 SF
ELEVATOR
P-1
82 SF
ELEVATOR
P-2
78 SF
ELEVATOR
P-3
84 SF
ELEVATOR
P-4
109 SF
SERVICE
ELEVATOR
SE-05
120 SF
SERVICE
ELEVATOR
SE-06 90 SF
OFFICE
A175A
105 SF
OFFICE
A175B
Scale: 1" = 20'-0"
FIRST FLOOR PLAN
Key Plan
FIRST FLOOR PLAN IS ISSUED FOR
REFERENCE ONLY - NO WORK IS NOTED
ON THIS FLOOR LEVEL
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1/16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
Bldg 1W
01W-A.102
506-26-202
TUCKPOINTING
Building 1W Second Floor Plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
102 SF
LAB
B280A
388 SF
LAB
B280
123 SF
OPERATORY
B278
121 SF
OPERATORY
C278A
110 SF
STORAGE
B279
138 SF
OPERATORY
B277
141 SF
OPERATORY
C276
138 SF
OPERATORY
B274
300 SF
STAFF
WORKROOM
B275
131 SF
OPERATORY
B272
155 SF
OFFICE
174 SF B271
OPERATORY
B270
70 SF
STORAGE
B220
78 SF
ELEC
C232 429 SF
CHECK-IN
B250A
172 SF
STAIR 3
S-03
174 SF
OFFICE
B251
129 SF
OFFICE
B253
177 SF
OFFICE
B254
213 SF
OFFICE
B257A
204 SF
OFFICE
B257B 116 SF
EXAM
B258
503 SF
CONFERENCE
B267A
58 SF
STORAGE
B267C
102 SF
MECH
193 SF B266
PROCEDURE
B264
184 SF
PROCEDURE
B263
191 SF
PROCEDURE
B262
188 SF
PROCEDURE
B261
258 SF
OFFICE
B260
175 SF
WAITING
B252A
722 SF
CORRIDOR
B245A
355 SF
CORRIDOR
B265
515 SF
CORRIDOR
B270
1087 SF
CORRIDOR
C208
126 SF
EXAM
B268A
124 SF
EXAM
B268B
126 SF
EXAM
B268C
123 SF
EXAM
B268D
123 SF
EXAM
B268E
126 SF
EXAM
B268F
156 SF
OFFICE
B268G
48 SF
HSKP
B255E
84 SF
TOILET
58 SF B255D
MEDS
B255C
397 SF
CORRIDOR
B245C
117 SF
EXAM
B259A
119 SF
EXAM
B256A
120 SF
EXAM
B259B
120 SF
EXAM
B256B
273 SF
MENTORS
ROOM
B256C
129 SF
CLEAN
UTILITY
B256D
127 SF
EXAM
B259C
69 SF
SOILED
UTILITY
B259D
65 SF
TOILET
B256E
95 SF
CONSULTATION
B256F
93 SF
CONSULTATION
B259E
417 SF
CORRIDOR
B245D
417 SF
CORRIDOR
B245B
110 SF
EXAM
B255B
59 SF
SOILED
EQUIP.
68 SF A255A
CORRIDOR
A245G
51 SF
ELEC
A247
172 SF
STAIR 5
S-05
1915 SF
GYM
A250
241 SF
GYM
A248
284 SF
GYM
A246
49 SF
HSKP
A244
57 SF
TOILET -
PATIENT
A251
702 SF
CORRIDOR
C206
1399 SF
THERAPY
A258
362 SF
EXERCISE
A259
226 SF
THERAPY
A256
188 SF
OFFICE
A240
21 SF
STORAGE
A240A
189 SF
OFFICE
A245
271 SF
OFFICE
A234
182 SF
CORRIDOR
C204
504 SF
OFFICE
A243
109 SF
STORAGE
A239
67 SF
STAFF
LOCKERS
A236
291 SF
STAFF
LOUNGE
A242
200 SF
STORAGE
A241
113 SF
STORAGE
A235
188 SF
SERVICE
ELEVATOR
LOBBY
A233
51 SF
DATA
A237
156 SF
EXAM
B252K
155 SF
EXAM
B252J
145 SF
EXAM
B252H
145 SF
EXAM
B252G
146 SF
EXAM
B252E
143 SF
EXAM
B252D
142 SF
EXAM
B252C
79 SF
TRIAGE
B252B
424 SF
SUPPLY /
MECH
B212
374 SF
STORAGE
B208
88 SF
MECH
B221B
94 SF
CHECK-OUT
A292A
70 SF
OFFICE
A292B
438 SF
GENERAL
X-RAY
A295
60 SF
OFFICE
A294
1016 SF
OFFICE
B200
52 SF
TOILET -
PATIENT
A296
214 SF
EXAM
A291
69 SF
ELEC
A275
134 SF
TOILET -
WOMEN
A274
219 SF
OFFICE
B201
166 SF
TOILET - MEN
A273
997 SF
CORRIDOR
C205
108 SF
STAIR 1
S-01
128 SF
OFFICE
301 SF A276A
OFFICE
A276
17 SF
CLOSET
A238
39 SF
DATA
A270
61 SF
TOILET
A217
221 SF
TREATMENT
A215
457 SF
CORRIDOR
154 SF
OFFICE
A213
276 SF
TREATMENT
A212
117 SF
OFFICE
A223
278 SF
TREATMENT
A225
404 SF
CORRIDOR
A227
670 SF
TREATMENT
A230
90 SF
TOILET -
PATIENT -
TREATMENT
A210
103 SF
OCCUPATIONAL
THERAPY
A224
384 SF
OFFICE
A222
133 SF
TREATMENT
138 SF A218
EXAM
A210
151 SF
EXAM
A208
282 SF
EXAM
A206
879 SF
CORRIDOR
A203
113 SF
OFFICE
A204
124 SF
OFFICE
A202
247 SF
OFFICE
A200
489 SF
OFFICE/STORAGE
A201
459 SF
CONFERENCE
A205
172 SF
STAIR 2
S-07
52 SF
ELEC
A209
246 SF
CORRIDOR
A280B
56 SF
TOILET
A281
189 SF
TREATMENT
A282
91 SF
TOILET -
PATIENT
A283
126 SF
CLEAN
UTILITY
A277
229 SF
CAST ROOM
A278
167 SF
EXAM
A284
165 SF
EXAM
A285
176 SF
EXAM
A286
671 SF
CORRIDOR
A280A
164 SF
EXAM
A287
160 SF
EXAM
A288
116 SF
CONSULTATION
A289
284 SF
CORRIDOR
A290A
35 SF
WAITING
ALCOVE
A290C
28 SF
STRETCHER
ALCOVE
A290B
323 SF
OFFICE
B240
105 SF
OFFICE
B240A
241 SF
OFFICE
B239 145 SF
BREAK
ROOM
B237
109 SF
X-RAY
B235
108 SF
OPERATORY
B233
307 SF
CORRIDOR
C207
115 SF
OFFICE
B238
141 SF
OPERATORY
B236
216 SF
OPERATORY
B234
60 SF
DATA
B231
538 SF
CORRIDOR
C205A
51 SF
DECON
B224A 31 SF
HSKP
B226
113 SF
INSTRUMENT
CLEAN
B224B
51 SF
HSKP
A276B
67 SF
STORAGE
B221C
108 SF
SERVICE
ELEVATOR
SE-6
99 SF
SERVICE
ELEVATOR
SE-5
84 SF
ELEVATOR
P-4
80 SF
ELEVATOR
P-3
82 SF
ELEVATOR
P-2
96 SF
ELEVATOR
P-1
175 SF
CHECK-IN
yyyy
532 SF
WAITING
S-06
115 SF
MSA
B244
196 SF
CORRIDOR -
PATIENT
C1-A
129 SF
EXAM 1
B242
146 SF
EXAM 2
B240
121 SF
EXAM 3 -
PLASTER
B243
122 SF
EXAM 4
B241
121 SF
EXAM 5
B239
332 SF
STORAGE
B238
388 SF
CORRIDOR -
STAFF
C2-A
170 SF
MACHINE
B236B
497 SF
ORTHOTICS
LAB
B236A
122 SF
OFFICE
B237A
124 SF
STORAGE
B237B
Scale: 1/16" = 1'-0"
SECOND FLOOR PLAN
Key Plan
SECOND FLOOR PLAN IS ISSUED FOR
REFERENCE ONLY - NO WORK IS NOTED
ON THIS FLOOR LEVEL
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1/16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
Bldg 1W
01W-A.103
506-26-202
TUCKPOINTING
Building 1W Third Floor Plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
2047 SF
CANTEEN
STORE
B301A
309 SF
CORRIDOR
B312
263 SF
CANTEEN
RECEIVING
B302
76 SF
ELEC
B312
59 SF
DATA
B310B
384 SF
CORRIDOR
C3-2A
4802 SF
CANTEEN
SERVING
AREA
B305
572 SF
CANTEEN
SERVING
LINE
B305A
1517 SF
DINING
B306A
87 SF
COFFE SHOP
B306
601 SF
DINING
B306B
206 SF
OFFICE
B304
133 SF
OFFICE
B312A
370 SF
CORRIDOR
C3-305
168 SF
WALK-IN
B307A
123 SF
WALK-IN
B307C
120 SF
WALK-IN
120 SF B307E
OFFICE
B303
182 SF
OFFICE
B302
172 SF
OFFICE
B300
69 SF
ELEC
A373
138 SF
TOILET -
WOMEN
A372
172 SF
TOILET - MEN
A371
784 SF
CORRIDOR
C3-304
229 SF
STAIR 1
S-01
40 SF
DATA
A370
16 SF
ELEC
A335
2500 SF
OFFICE
A300
242 SF
CONFERENCE
A309
183 SF
TOILET -
WOMEN
A307
17 SF
CLOSET
A305
172 SF
STAIR 2
S-02
52 SF
ELEC
A311
107 SF
OFFICE
A318 60 SF
LACTATION
ROOM
A310
56 SF
HSKP
A312
273 SF
OFFICE
A316
107 SF
OFFICE
A320
116 SF
OFFICE
A322
88 SF
OFFICE
A324
116 SF
OFFICE
A326
89 SF
OFFICE
A328
112 SF
OFFICE
A330
140 SF
OFFICE
A332
252 SF
OFFICE
A329
86 SF
OFFICE
A327
112 SF
OFFICE
A325
85 SF
OFFICE
A323
112 SF
OFFICE
A321
106 SF
OFFICE
A319
555 SF
TELE ICU
A338
A340
52 SF
TOILET -
PATIENT
A42A
123 SF
LOCKERS -
PATIENT
A342 198 SF
OFFICE
A344
50 SF
STORAGE
A362
139 SF
OFFICE
A360
1734 SF
DIALYSIS
CENTER
A363
115 SF
STAFF
LOUNGE
A361
56 SF
HSKP
A364
53 SF
SOILED
UTILITY
A348
257 SF
WATER
SUPPLY
A350
141 SF
EQUIP
CLEAN &
REPAIR
A352
139 SF
ACID ROOM
A354
349 SF
STORAGE
A354A
135 SF
STORAGE
A350A
220 SF
OFFICE
A357
104 SF
OFFICE
A356
118 SF
OFFICE
A355
128 SF
OFFICE
A353
247 SF
STAFF
WORKROOM
A351
50 SF
TOILET -
STAFF
A349A
137 SF
LOCKERS -
STAFF
A349
174 SF
STAIR 5
S-05
52 SF
ELEC
A347
162 SF
WAITING
A345
29 SF
LINEN
B310B
47 SF
HSKP
B310C
389 SF
DISH
WASHING
B310A
171 SF
CART WASH
B310D
464 SF
POT WASH
B310E
585 SF
CORRIDOR
C3-301
930 SF
CORRIDOR
C3-303
35 SF
DATA
B339
202 SF
SERVICE
ELEVATOR
LOBBY
B339
52 SF
STORAGE
B309E
52 SF
STORAGE
B309D
775 SF
FOOD CARTS
B309C
1214 SF
TRAY
MAKE-UP
B309B
1079 SF
FOOD PREP
AREA
B309A
44 SF
HSKP
B301
87 SF
OFFICE
B307F
87 SF
OFFICE
B307D
113 SF
WALK-IN
B307B
363 SF
KITCHEN
RECEIVING
B307
71 SF
STORAGE
B338D
171 SF
STAIR 3
S-03
40 SF
ELEC
B303
107 SF
SERVICE
ELEVATOR
SE-6
99 SF
SERVICE
ELEVATOR
SE-5
100 SF
ELEVATOR
P-4
95 SF
ELEVATOR
P-3
96 SF
ELEVATOR
P-2
109 SF
ELEVATOR
P-1
69 SF
TRIAGE
A313
62 SF
OFFICE
A314
146 SF
OFFICE
A314A
208 SF
OFFICE
A315
59 SF
OFFICE
A317A
193 SF
OFFICE
A317
Scale: 1/16" = 1'-0"
THIRD FLOOR PLAN
Key Plan
Area of masonry brick repointing required
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1/16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.104
506-26-202
TUCKPOINTING
Building #28 Fourth Floor Plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
DN
231 SF
OFFICE
B415
83 SF
OFFICE
B417
170 SF
OFFICE
B419
95 SF
OFFICE
B418
96 SF
OFFICE
B420
89 SF
OFFICE
B422
97 SF
OFFICE
B424
97 SF
OFFICE
B426
96 SF
OFFICE
B428
166 SF
OFFICE
B429
103 SF
OFFICE
B427
82 SF
OFFICE
B425
84 SF
READING
ROOM
B423
533 SF
CONFERENCE
B431
79 SF
STORAGE
B425
50 SF
ROOM
B424
10 SF
ELEC
B423
454 SF
VENT
STORAGE
B452
116 SF
OFFICE
B450
109 SF
OFFICE
B448
113 SF
OFFICE
B446
124 SF
VENT
REPROCESSING
B449
106 SF
SET-UP
B451
41 SF
VENT
HOLDING
B447
72 SF
OFFICE
B444
67 SF
OFFICE
B443
155 SF
OFFICE
B441
290 SF
CORRIDOR
C408
529 SF
MECH
B442
76 SF
ELEC
B434
58 SF
DATA
A432A
S-4-4
66 SF
ELEC
A474
43 SF
HSKP
A477
44 SF
VEST
B400A
37 SF
DATA
A470
16 SF
ELEC
A433
49 SF
ELEC
167 SF
STAIR 2
S-02
45 SF
VEST
A410
42 SF
DATA
A437
AHU-3E
ATS
1W-CP-1
ATS
1W-AH-5 1W-AH-8
EL
EC
S U
BS
TA
TI
O
N
FUTURE
RETURN
AIR FAN
1W-RF-9A
FACILITIES MANAGEMENT
(HVAC FILTER STORAGE)
FACILITIES MANAGEMENT
(GENERAL STORAGE)
FUTURE
1W-AH-9A
1W-AH-1E
1W-RF-7
AUTOMATIC
TRANSFER
SWITCHES
1W-AH-1
1W-AH-7
ELEC SUBSTATION #4 ATS ATS
1W-AH-2E
1W-AH-2
FUTURE
1W-RF-9B
FUTURE
1W-AH-9B
FUTURE
1W-AH-12
PRIMARY
SWITCHES
FUTURE
1W-RF-12
FUTURE
1W-AH-11
FUTURE
1W-RF-11
FACILITIES
MANAGEMENT
(CARPENTRY SHOP
STORAGE)
171 SF
STAIR 3
S-03
223 SF
STAIR 1
S-01
110 SF
SERVICE
ELEVATOR
SE-6
99 SF
SERVICE
ELEVATOR
SE-5
99 SF
ELEVATOR
P-4
95 SF
ELEVATOR
P-3
100 SF
ELEVATOR
P-2
Scale: 1/16" = 1'-0"
FOURTH FLOOR PLAN
Key Plan
Area of masonry brick repointing required
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1/16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.105
506-26-202
TUCKPOINTING
Building 1W Fifth Floor Plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
150 SF
1BR
B548
55 SF
ANTE
B549
151 SF
1BR
B547
52 SF
BATHROOM
B547A
52 SF
BATHROOM
B548A
52 SF
BATHROOM
B546A
51 SF
BATHROOM
B545A
161 SF
1BR
B546
161 SF
1BR
B545
62 SF
BATHROOM
B544A
55 SF
BATHROOM
B543A
258 SF
2BR
B543
207 SF
2BR
B544
143 SF
LOCKERS
B542
117 SF
LINEN
B540
72 SF
ELEC
B520
172 SF
STAIR 3
S-03
2 SF
FEC
B541
53 SF
TOILET
B523 51 SF
MED
B521A
222 SF
NURSE
STATION
1728 SF B521
CORRIDOR
C5-07
140 SF
OFFICE
B519
33 SF
NOURISHMENT
B517
186 SF
2BR
B511
31 SF
DATA
B525A
32 SF
DATA
B525
104 SF
STORAGE
B527
324 SF
2BR
B529
55 SF
BATHROOM
B529A
56 SF
BATHROOM
B531A
152 SF
1BR
B531
160 SF
1BR
B530 55 SF
BATHROOM
B530A
55 SF
BATHROOM
B528A
255 SF
2BR
B528
261 SF
2BR
B526
61 SF
BATHROOM
B26A
165 SF
OFFICE
B512
126 SF
OFFICE
B510
46 SF
SOILED
UTILITY
B508A 58 SF
HSKP
B508
52 SF
TOILET -
STAFF
B500C
51 SF
TOILET -
STAFF
B500B
176 SF
LOCKERS
B500A
177 SF
STAFF
LOUNGE
B500
296 SF
CORRIDOR
C5-09
66 SF
BATHROOM
B511A
61 SF
BATHROOM
B509A
199 SF
2BR
B509
88 SF
OFFICE
B505
170 SF
CONFERENCE
B504
124 SF
OFFICE
B503
129 SF
OFFICE
B502
198 SF
TEAM ROOM
B501
64 SF
ELEC
A578
135 SF
TOILET -
WOMEN
A577
169 SF
TOILET - MEN
A576
248 SF
TEAM ROOM
B501A
296 SF
SERVICE
ELEVATOR
LOBBY
C5-26B
40 SF
DATA
A535
109 SF
ANTE
A539
178 SF
1BR
A541 52 SF
BATHROOM
A541A
224 SF
STAIR 1
S-01
55 SF
BATHROOM
A543A
235 SF
2BR
A543
45 SF
ELEC
A545
172 SF
STAIR 5
S-05 88 SF
CLEAN LINEN
A547
53 SF
BATHROOM
A551A
43 SF
HSKP
A549
213 SF
2BR
A551
156 SF
1BR
A553
56 SF
BATHROOM
A553A
55 SF
BATHROOM
A555A
199 SF
1BR
A555
201 SF
1BR
A554
55 SF
BATHROOM
A554A
55 SF
BATHROOM
A552A
159 SF
1BR
A552
198 SF
2BR
A550
62 SF
BATHROOM
A550A
62 SF
BATHROOM
A548A
202 SF
2BR
A548
44 SF
SOILED
UTILITY
A546
64 SF
TOILET
A559A
143 SF
1BR
A559
253 SF
2BR
A563
54 SF
BATHROOM
A563A
55 SF
BATHROOM
A565A
201 SF
2BR
A565
204 SF
2BR
A566
55 SF
BATHROOM
A566A
54 SF
BATHROOM
A564A
239 SF
2BR
A564
95 SF
CLEAN
UTILITY
A562
84 SF
NOURISHMENT
A560
73 SF
MEDS
A542
294 SF
NURSE
STATION
A544
56 SF
TOILET
A540
1045 SF
CORRIDOR
C5-04
147 SF
BREAK
ROOM
A538
120 SF
OFFICE
A536
138 SF
STORAGE
A534
512 SF
DISCHARGE
LOUNGE
A532
159 SF
BREAK
ROOM
A530
70 SF
OFFICE
A518
76 SF
TOILET
A516
254 SF
NURSE
STATION
A514
81 SF
NOURISHMENT
A519
96 SF
SPB
A521
241 SF
2BR
A523
54 SF
BATHROOM
A523A
55 SF
BATHROOM
A525A
160 SF
2BR
A525
168 SF
2BR
A524
55 SF
BATHROOM
A524A
54 SF
BATHROOM
A522A
259 SF
2BR
A522
147 SF
1BR
A520
68 SF
BATHROOM
A520A
50 SF
SOILED
UTILITY
A512
198 SF
2BR
A506
62 SF
BATHROOM
A506A
62 SF
BATHROOM
198 SF A504A
2BR
156 SF A504
1BR
55 SF A502
BATHROOM
A502A
55 SF
BATHROOM
A500A
160 SF
1BR
A500
159 SF
1BR
A501
56 SF
BATHROOM
A501A
55 SF
BATHROOM
A503A
157 SF
1BR
A503 215 SF
2BR
A505
43 SF
HSKP
A507
53 SF
BATHROOM
A505A 45 SF
TELEMETRY
A509A
90 SF
CLEAN LINEN
A509
175 SF
STAIR 2
45 SF
ELEC
A511
236 SF
2BR
A513
55 SF
BATHROOM
A513A
52 SF
BATHROOM
A515A
184 SF
1BR
A515
109 SF
ANTE
A517
42 SF
DATA
A575
677 SF
CORRIDOR
C5-06
373 SF
CORRIDOR
C5-13
351 SF
CORRIDOR
C5-20
226 SF
CORRIDOR
C5-43
423 SF
CORRIDOR
C5-66
252 SF
CORRIDOR
C5-24
17 SF
ELEC
A527
44 SF
TELEMETRY
A547B
2452 SF
ROOM
XXX
110 SF
SERVICE
ELEVATOR
SE-6
102 SF
SERVICE
ELEVATOR
SE-5
97 SF
ELEVATOR
P-4
93 SF
ELEVATOR
P-3
94 SF
ELEVATOR
P-2
104 SF
ELEVATOR
P-1
Scale: 1/16" = 1'-0"
FIFTH FLOOR PLAN
Key Plan
Area of masonry brick repointing required
Area of masonry brick repointing required
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1/16" - 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.106
506-26-202
TUCKPOINTING
Building 1W Sixth floor plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
237 SF
OFFICE
B650
96 SF
OFFICE
B651
242 SF
OFFICE
B649
114 SF
OFFICE
B647
120 SF
OFFICE
B648
118 SF
OFFICE
B646
110 SF
OFFICE
B645
230 SF
CORRIDOR
C6-07
148 SF
OFFICE
B644
290 SF
OFFICE
B641
170 SF
OFFICE
B642
202 SF
OFFICE
B640
132 SF
CORRIDOR
C6-07
172 SF
STAIR 3
S-03
76 SF
ELEC
B620
29 SF
STORAGE
31 SF B618
DATA
B618A
148 SF
OFFICE
B625
145 SF
OFFICE
B627
77 SF
BATHROOM
B633A
150 SF
2BR
B633
11 SF
STORAGE
B635A
404 SF
LOUNGE -
RESIDENTS
B635
100 SF
1BR
B636
93 SF
1BR
B634
52 SF
BATHROOM
B634A
52 SF
BATHROOM
B630A
99 SF
1BR
B632 107 SF
1BR
B630 217 SF
OFFICE
B626 113 SF
OFFICE
B624
48 SF
TOILET
B616
32 SF
HSKP
B614
168 SF
OFFICE
B615
131 SF
CORRIDOR
C6-08A
856 SF
CORRIDOR
C6-05
154 SF
OFFICE
B617
172 SF
OFFICE
B613
281 SF
CONFERENCE
B611
180 SF
OFFICE
B612
359 SF
TEAM WORK
ROOM
B609
119 SF
VENDING
B610
462 SF
WAITING
AREA
B608
254 SF
STAFF
LOUNGE
B607
177 SF
LOCKER
ROOM
B605
151 SF
CORRIDOR
C6-601
63 SF
ELEC
A678
180 SF
TOILET -
WOMEN
A677
162 SF
TOILET - MEN
A676
251 SF
STORAGE
B601
178 SF
OFFICE
B603
194 SF
SERVICE
ELEVATOR
LOBBY
A633
39 SF
HSKP
A633B
98 SF
SOILED
UTILITY
A633A
37 SF
DATA
A635A
29 SF
CLOSET
A637
44 SF
BATHROOM
A639A 194 SF
1BR
A639
190 SF
1BR
A641
66 SF
BATHROOM
A641A
53 SF
ELEC
A643
172 SF
STAIR 5
S-05
68 SF
BATHROOM
A647A
243 SF
1BR
A647
199 SF
1BR
A649
65 SF
BATHROOM
A649A
49 SF
BATHROOM
A651A
256 SF
1BR
A651
262 SF
1BR
A652
50 SF
BATHROOM
56 SF A652A
BATHROOM
A650A
177 SF
1BR
A650
191 SF
1BR
A648
55 SF
MED.
STATION
A646
51 SF
BATHROOM
A648A
120 SF
NOURISHMENT
A644
43 SF
SOILED
UTILITY
A642
46 SF
BATHROOM
A657A
166 SF
1BR
A657
164 SF
1BR
A659
60 SF
BATHROOM
A659A
42 SF
BATHROOM
A661A
263 SF
1BR
A661
260 SF
1BR
A660
42 SF
BATHROOM
A660A
80 SF
ANTE
A658B
184 SF
ISOLATION
ROOM
A658
52 SF
BATHROOM
A658A
92 SF
LINEN
A656
52 SF
TOILET
A654
49 SF
BATHROOM
A638A
26 SF
HSKP
A640
570 SF
CORRIDOR
C6-05
1020 SF
CORRIDOR
C6-04
203 SF
1BR
A638
109 SF
CLEAN
UTILITY
A636
245 SF
CENTRAL
MONITOR
A634
1705 SF
CORRIDOR
C6-03
342 SF
NURSE
STATION
A632
103 SF
CLEAN
UTILITY
203 SF A630
1BR
A618
19 SF
HSKP
A616
66 SF
BATHROOM
A618A
52 SF
TOILET
A620
90 SF
CLEAN LINEN
A622
53 SF
BATHROOM
A624A
183 SF
ISOLATION
ROOM
A624
81 SF
ANTE
A624B
42 SF
BATHROOM
A626A
259 SF
1BR
A626
256 SF
1BR
A627
42 SF
BATHROOM
A627A
60 SF
BATHROOM
A625A
164 SF
1BR
A625
167 SF
1BR
A623
565 SF
CORRIDOR
A6-06
47 SF
BATHROOM
A623A
45 SF
SOILED
UTILITY
A612
522 SF
CORRIDOR
C6-02
121 SF
NOURISHMENT
A610
50 SF
MED.
STATION
A608
51 SF
BATHROOM
A606A
194 SF
1BR
A606
179 SF
1BR
56 SF A604
BATHROOM
A604A
51 SF
BATHROOM
A600A
262 SF
1BR
A600
259 SF
1BR
A601
50 SF
BATHROOM
A601A
53 SF
BATHROOM
A605A 201 SF
1BR
A605
248 SF
1BR
A607
73 SF
BATHROOM
A607A
172 SF
STAIR 2
S-02
43 SF
ELEC
A613
64 SF
BATHROOM
A615A
511 SF
CORRIDOR
C6-02
194 SF
1BR
A615
190 SF
1BR
A617
46 SF
BATHROOM
A617A
72 SF
STORAGE
A619
226 SF
STAIR 1
S-01
42 SF
DATA
A673
16 SF
ELEC
A631
108 SF
SERVICE
ELEVATOR
SE-6
99 SF
SERVICE
ELEVATOR
SE-5
92 SF
ELEVATOR
P-4
92 SF
ELEVATOR
P-3
94 SF
ELEVATOR
P-2
109 SF
ELEVATOR
P-1
Scale: 1/16" = 1'-0"
SIXTH FLOOR PLAN
Key Plan
Area of masonry brick repointing required
Area of masonry brick repointing required
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1/16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.107
506-26-202
TUCKPOINTING
Building 1W Seventh floor plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UPUP
UP
UP
UP
161 SF
OFFICE
B753
113 SF
OFFICE
B751
114 SF
OFFICE
B749
115 SF
OFFICE
B747
278 SF
OFFICE
B752
113 SF
OFFICE
B748
116 SF
OFFICE
B746
143 SF
OFFICE
B744
141 SF
OFFICE
B742
53 SF
TOILET -
STAFF
B745
91 SF
OFFICE
B743
182 SF
STORAGE
B741
1141 SF
CORRIDOR
C7-2
137 SF
OFFICE
B740
97 SF
OFFICE
B721
120 SF
TRIAGE
B719
9 SF
ELEC
B720
75 SF
ELEC
B724
30 SF
STORAGE
B722B
33 SF
DATA
B722A
171 SF
STAIR 3
S-03
109 SF
EXAM
B727
116 SF
EXAM
B729
114 SF
EXAM
B731
14 SF
STORAGE
B729A
14 SF
STORAGE
B733A
120 SF
OFFICE
B737
115 SF
EXAM
B735
118 SF
EXAM
B733
14 SF
STORAGE
B735A
211 SF
MENTOR
WORKROOM
B736
120 SF
EXAM
B734
117 SF
EXAM
B732
112 SF
EXAM
B730
114 SF
EXAM
B728
15 SF
STORAGE
B732A
15 SF
STORAGE
B732B
109 SF
EXAM
B726
90 SF
STORAGE
B720
54 SF
STORAGE
B718
202 SF
CHECK-IN
B717
181 SF
WAITING
B715
32 SF
HSKP
B716
140 SF
OFFICE
B713
140 SF
OFFICE
B711
173 SF
OFFICE
B714
348 SF
TEAM ROOM
B709
161 SF
OFFICE
B712
225 SF
OFFICE
B710
212 SF
OFFICE
B708
660 SF
WAITING
B707
165 SF
TOILET -
WOMEN
A704
69 SF
ELEC
A706
1078 SF
CORRIDOR
C7-10
403 SF
CHECK-IN
B708B
167 SF
TOILET - MEN
A702
193 SF
STAIR 1
S-01
203 SF
SERVICE
ELEVATOR
LOBBY
A751 193 SF
VESTIBULE
A7xx
22 SF
ELEC
A753
26 SF
DATA
A703
15 SF
ELEC
A720A
139 SF
TOILET - MEN
A713
139 SF
TOILET -
WOMEN
A715
82 SF
WORK ROOM
A717
150 SF
OFFICE
A719
175 SF
OFFICE
A729
45 SF
ELEC
A731
163 SF
EXAM
158 SF A735
OFFICE
A737
169 SF
STAIR 2
S-02
146 SF
OFFICE
A739
125 SF
OFFICE
A741
160 SF
OFFICE
A743
309 SF
CONFERENCE
A745
240 SF
OFFICE
A744 128 SF
OFFICE
A742
130 SF
OFFICE
A740
130 SF
OFFICE
A738
138 SF
OFFICE
A751
58 SF
MEDS
A734
222 SF
CONFERENCE
A722
24 SF
HSKP
A730
117 SF
OFFICE
A720
13 SF
STORAGE
A718
124 SF
OFFICE
A716
117 SF
OFFICE
A722
125 SF
OFFICE
A724
247 SF
CONFERENCE
A726
131 SF
OFFICE
A723
125 SF
OFFICE
A725
250 SF
CONFERENCE
A727
692 SF
CONFERENCE
A758
344 SF
CORRIDOR
C7-50
140 SF
OFFICE
A714
139 SF
OFFICE
A712
124 SF
OFFICE
A746
124 SF
OFFICE
A747
123 SF
OFFICE
A748
125 SF
OFFICE
A749
123 SF
OFFICE
A750
124 SF
OFFICE
A752
120 SF
OFFICE
A754
126 SF
OFFICE
A756
92 SF
OFFICE
A758
21 SF
STORAGE
A760
54 SF
TOILET -
STAFF
A781C
440 SF
CORRIDOR
C7-60
109 SF
OFFICE
A762
113 SF
OFFICE
A783 109 SF
OFFICE
A780
113 SF
OFFICE
A786
129 SF
OFFICE
A788
113 SF
OFFICE
A785
129 SF
OFFICE
A767
128 SF
OFFICE
127 SF A790
OFFICE
A789
111 SF
OFFICE
A791
112 SF
OFFICE
A792
183 SF
OFFICE
A794
177 SF
OFFICE
A793
18 SF
WC SCALE
A730D
642 SF
CORRIDOR
C7-30
149 SF
EXAM
A764
153 SF
OFFICE
A766
127 SF
OFFICE
A768
129 SF
OFFICE
A770
128 SF
OFFICE
A772
127 SF
OFFICE
A774
109 SF
OFFICE
A776
184 SF
OFFICE
A778
184 SF
OFFICE
97 SF A779
OFFICE
A777
117 SF
OFFICE
A775
123 SF
OFFICE
A773
141 SF
OFFICE
A771
144 SF
OFFICE
A769
175 SF
OFFICE
A767
357 SF
CORRIDOR
C7-80
166 SF
OFFICE
A761
56 SF
ELEC
A763 171 SF
STAIR 5
S-05
241 SF
BREAK
ROOM
A759
189 SF
CHECK-OUT
A757
1275 SF
CORRIDOR
349 SF C7-20
CORRIDOR
C7-40
4 SF
FEC
A710C
375 SF
CORRIDOR
C7-06
3 SF
FEC
110 SF
SERVICE
ELEVATOR
SE6
99 SF
SERVICE
ELEVATOR
SE-5
92 SF
ELEVATOR
P-4
92 SF
ELEVATOR
P-3
94 SF
ELEVATOR
P-2
108 SF
ELEVATOR
P-1
Scale: 1/16" = 1'-0"
SEVENTH FLOOR PLAN
Key Plan
SEVENTH FLOOR PLAN IS ISSUED FOR
REFERENCE ONLY - NO WORK IS NOTED
ON THIS FLOOR LEVEL
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
1/16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.108
506-26-202
TUCKPOINTING
Building 1W Eighth floor plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
371 SF
OFFICE
B818
96 SF
KITCHENETTE
B816
317 SF
TEAM ROOM
B815
208 SF
OFFICE
B814
131 SF
CORRIDOR
C8-19
179 SF
OFFICE
B821
104 SF
OFFICE
B820
76 SF
ELEC
B813
62 SF
DATA
B812
124 SF
CORRIDOR
C8-08
838 SF
CORRIDOR
C8-23
12 SF
ELEC
B817
171 SF
STAIR 3
S-03
416 SF
CONFERENCE
B810
346 SF
OFFICE
B807 68 SF
STAFF
WORKROOM
B806
32 SF
HSKP
B805
120 SF
OFFICE
B822
130 SF
OFFICE
B822A
108 SF
OFFICE
B825
111 SF
OFFICE
B824
137 SF
OFFICE
B804
114 SF
OFFICE
B803
130 SF
OFFICE
B802
115 SF
OFFICE
B826
109 SF
OFFICE
B827
138 SF
OFFICE
B801
149 SF
OFFICE
B800
103 SF
OFFICE
B828 169 SF
OFFICE
B829
109 SF
OFFICE
A837
151 SF
OFFICE
A838
162 SF
CORRIDOR
C8-20
178 SF
OFFICE
A831A
71 SF
ELEC
A831
425 SF
WEST
ELEVATOR
LOBBY
C8-03
535 SF
OFFICE
A839
198 SF
BREAK
ROOM
A843B
139 SF
TOILET -
WOMEN
A830A
166 SF
TOILET - MEN
A830
169 SF
SERVICE
ELEVATOR
LOBBY
A843
15 SF
STORAGE
A828B
25 SF
STORAGE
A828C
29 SF
HSKP
A827B
193 SF
STAIR 1
S-01
26 SF
HSKP
A828
15 SF
DATA
A827A
16 SF
ELEC
A827
91 SF
OFFICE
A825A
92 SF
OFFICE
A825B
41 SF
DATA
A843A
355 SF
OFFICE
A841
149 SF
OFFICE
A842
139 SF
OFFICE
A844
151 SF
OFFICE
A845
50 SF
ELEC
A844C 172 SF
STAIR 5
S-05
915 SF
OFFICE
A846 144 SF
OFFICE
A846A
23 SF
ELEC
A847
147 SF
OFFICE
A848
44 SF
TOILET -
STAFF
A850B
6 SF
ELEC
A850
223 SF
CONFERENCE
A851L
110 SF
OFFICE
A851K
114 SF
OFFICE
A851J
130 SF
OFFICE
A851I
125 SF
OFFICE
A851H
139 SF
OFFICE
A851G
138 SF
OFFICE
A851F
128 SF
CONFERENCE
A851E
130 SF
OFFICE
A851D
478 SF
CORRIDOR
C8-20
117 SF
OFFICE
A851C
135 SF
OFFICE
A851B
149 SF
OFFICE -
OPEN
A851
195 SF
OFFICE
A851A
36 SF
STORAGE
A853
127 SF
OFFICE
A854
145 SF
OFFICE
A855
207 SF
OFFICE -
OPEN
A801B
723 SF
CORRIDOR
C8-04
344 SF
CONFERENCE
A801
183 SF
BREAK
ROOM
A802
124 SF
OFFICE
A803
150 SF
OFFICE
60 SF A805
ELEC
A804
58 SF
TOILET
A806
825 SF
OFFICE -
OPEN
A807
129 SF
OFFICE
A808
131 SF
OFFICE
A809
167 SF
OFFICE
A810
164 SF
OFFICE
A811
167 SF
OFFICE
A812
115 SF
OFFICE
A813
117 SF
OFFICE
A814A
76 SF
OFFICE
A814
140 SF
OFFICE
A815
48 SF
TOILET
A816
305 SF
OFFICE -
OPEN
A817
1352 SF
CONFERENCE
A818
102 SF
STORAGE
A818A
136 SF
STORAGE
A819
170 SF
STAIR 2
S-02
51 SF
ELEC
A823
186 SF
OFFICE
A821
185 SF
OFFICE
A824
120 SF
OFFICE
A825
2 SF
FEC
3 SF
FEC
110 SF
SERVICE
SE-6
99 SF
SERVICE
ELEVATOR
SE-5
92 SF
ELEVATOR
P-4
93 SF
ELEVATOR
P-3
94 SF
ELEVATOR
P-2
107 SF
ELEVATOR
P-1
Scale: 1/16" = 1'-0"
EIGHTH FLOOR PLAN
Key Plan
Area of masonry brick repointing required
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.109
506-26-202
TUCKPOINTING
Building 1W Ninth floor plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
488 SF
OFFICE -
OPEN
A926A
180 SF
STAIR 5
S-05
55 SF
ROOM
A926
241 SF
CONFERENCE
A926A
115 SF
OFFICE
A926C
50 SF
STORAGE
A926D
185 SF
OFFICE
A926B
134 SF
OFFICE
A927
110 SF
OFFICE
A928
12 SF
DATA
929A
133 SF
OFFICE
A929
97 SF
COPY ROOM
A930
118 SF
OFFICE
A931
56 SF
ELEC
A924
252 SF
OFFICE
A923
172 SF
OFFICE
A922A
147 SF
OFFICE
A922
153 SF
OFFICE
A921
133 SF
OFFICE
A932
170 SF
OFFICE
A933
142 SF
OFFICE
A934
149 SF
OFFICE
A935
803 SF
CORRIDOR
C9-02
103 SF
LIFT
42 SF
DATA
A921A
161 SF
SERVICE
ELEVATOR
LOBBY
C9-4
230 SF
STAIR 1
S-01
20 SF
STORAGE
A918
19 SF
HSKP
43 SF A919
MECH
A905
147 SF
OFFICE
A936
156 SF
OFFICE
A937
261 SF
OFFICE
A901
352 SF
OFFICE
A902A
126 SF
KITCHENETTE
A902B
291 SF
OFFICE
A902D
278 SF
OFFICE
A902F
345 SF
OFFICE
A902J
309 SF
OFFICE
A902I
191 SF
OFFICE
A902H
178 SF
STAIR 2
S-02
191 SF
OFFICE
A902G
46 SF
ELEC
A902E
4 SF
15 SF FEC
CLOSET
542 SF
OFFICE -
OPEN
A902C
16 SF
ELEC
A903
699 SF
CORRIDOR
A902
762 SF
WEST
ELEVATOR
LOBBY
C9-03
663 SF
CONFERENCE
A917
172 SF
TOILET - MEN
A909
136 SF
TOILET -
WOMEN
A910
70 SF
ELEC
A910A
350 SF
TRAINING
B902
624 SF
OFFICE -
OPEN
B901
269 SF
OFFICE
B905
285 SF
TRAINING
B902
295 SF
TRAINING
B902
151 SF
STORAGE
B901A
213 SF
CONTROL
ROOM
B904A
332 SF
CONFERENCE
B904B
497 SF
LAB -
SIMULATION
B904
172 SF
STORAGE
B904C
5 SF
ELEC
3 SF
FEC
107 SF
SERVICE
ELEVATOR
SE-6
99 SF
SERVICE
ELEVATOR
SE-5
97 SF
ELEVATOR
P-4
93 SF
ELEVATOR
P-3
94 SF
ELEVATOR
P-2
108 SF
ELEVATOR
P-1
Scale: 1/16" = 1'-0"
NINTH FLOOR PLAN
Key Plan
NINTH FLOOR PLAN IS ISSUED FOR
REFERENCE ONLY - NO WORK IS NOTED
ON THIS FLOOR LEVEL
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.110
506-26-202
TUCKPOINTING
Building 1W Penthouse floor plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
UP
3176 SF
FAN ROOM
SPA1001
51 SF
LIFT
196 SF
STAIR
S-10
Scale: 1/16" = 1'-0"
PENTHOUSE FLOOR PLAN
Key Plan
PENTHOUSE PLAN IS ISSUED FOR
REFERENCE ONLY - NO WORK IS NOTED
ON THIS FLOOR LEVEL
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.111
506-26-202
TUCKPOINTING
Building 1W Machine room floor plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
DN
DN
1289 SF
MACHINE
ROOM
A1102
673 SF
TANK ROOM
87 SF
OFFICE
Scale: 1/16" = 1'-0"
MACHINE ROOM FLOOR PLAN
Key Plan
MACHINE ROOM FLOOR PLAN IS ISSUED
FOR REFERENCE ONLY - NO WORK IS
NOTED ON THIS FLOOR LEVEL
GENERAL NOTES:
1. REFER TO SHEETS 01W-A.200 & 01W-A.201 FOR ADDITIONAL CLARIFICATION ON THE LOCATION OF THE REPAIR LOCATIONS.
2. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.200
506-26-202
TUCKPOINTING
Building 1W East & West elevations
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
1W - SECOND
FLOOR
839' - 2"
1W - FIRST FLOOR
827' - 3"
1W - BASEMENT
816' - 3"
1W - THIRD FLOOR
850' - 2"
1W - FOURTH
FLOOR
861' - 2"
1W - FIFTH FLOOR
873' - 9 1/4"
1W -
SUBBASEMENT
810' - 3"
1W - SIXTH FLOOR
885' - 8 1/4"
1W - SEVENTH
FLOOR
896' - 8 1/4"
1W - EIGHTH
FLOOR
908' - 7 1/4"
1W - NINTH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
1W - SECOND
FLOOR
839' - 2"
1W - FIRST FLOOR
827' - 3"
1W - BASEMENT
816' - 3"
1W - THIRD FLOOR
850' - 2"
1W - FOURTH
FLOOR
861' - 2"
1W - FIFTH FLOOR
873' - 9 1/4"
1W -SUBBASEMENT
810' - 3"
1W - SIXTH FLOOR
885' - 8 1/4"
1W - SEVENTH
FLOOR
896' - 8 1/4"
1W - EIGHTH
FLOOR
908' - 7 1/4"
1W - NINTH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
Scale: 1/16" = 1'-0"
EAST ELEVATION
Scale: 1/16" = 1'-0"
WEST ELEVATION
APPROXIMATELY 665 S.F.
OF BRICK MASONRY REPOINTING
APPROXIMATELY 225 S.F.
OF BRICK MASONRY REPOINTING
APPROXIMATELY 650 S.F.
OF BRICK MASONRY REPOINTING
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
16" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 1W
01W-A.201
506-26-202
TUCKPOINTING
Building 1W North & South Elevations
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
1W - SECOND
FLOOR
839' - 2"
1W - FIRST FLOOR
827' - 3"
1W - BASEMENT
816' - 3"
1W - THIRD FLOOR
850' - 2"
1W - FOURTH
FLOOR
861' - 2"
1W - FIFTH FLOOR
873' - 9 1/4"
1W - SUBBASEMENT
810' - 3"
1W - SIXTH FLOOR
885' - 8 1/4"
1W - SEVENTH
FLOOR
896' - 8 1/4"
1W - EIGHTH
FLOOR
908' - 7 1/4"
1W - NINTH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
1W - SECOND
FLOOR
839' - 2"
1W - FIRST FLOOR
827' - 3"
1W - BASEMENT
816' - 3"
1W - THIRD FLOOR
850' - 2"
1W - FOURTH
FLOOR
861' - 2"
1W - FIFTH FLOOR
873' - 9 1/4"
1W -SUBBASEMENT
810' - 3"
1W - SIXTH FLOOR
885' - 8 1/4"
1W - SEVENTH
FLOOR
896' - 8 1/4"
1W - EIGHTH
FLOOR
908' - 7 1/4"
1W - NINTH FLOOR
920' - 0 3/4"
1W - PENTHOUSE
931' - 0 3/4"
1W - MACHINE
ROOM SLAB
945' - 6"
1W - ROOF SLAB
956' - 8 3/4"
Scale: 1/16" = 1'-0"
NORTH ELEVATION
Scale: 1/16" = 1'-0"
SOUTH ELEVATION
APPROXIMATELY 580 S.F.
OF BRICK MASONRY REPOINTING
APPROXIMATELY 580 S.F.
OF BRICK MASONRY
REPOINTING
GENERAL NOTES:
1. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
GG
PROJECT:
BUILDING NUMBER: PLOT SCALE:
VA PROJECT NUMBER:
DATE:
DRAWING NUMBER:
DRAWING TITLE:
DE
PA
RT
M
EN
T
OF
VE
TE
RA
NS
A
FF
AI
RS
A/E PROJECT NUMBER:
VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:
3/32" = 1'-0"
BUILDING #1W & #28 - TUCKPOINTING
BLDG 28
28-A.100
506-26-202
TUCKPOINTING
Building #28 Basement floor plan
PR
E-
D
ES
IG
N
D O
C U
M
EN
TS
REVISION SCHEDULE
# DATE DESCRIPTION
UP
UP
UP
UP
232 SF
1BR
FG76
65 SF
BATHROOM
FG74A
163 SF
1BR
235 SF FG70C
1BR
FG70B
65 SF
BATHROOM
FG70A
163 SF
1BR
FG70
235 SF
1BR
FG68
158 SF
1BR
FG66
65 SF
BATHROOM
FG66A
STAIR 3
610 SF
CORRIDOR
D154
49 SF
ELEC
FG67
47 SF
HSKP
FG69
64 SF
OFFICE
FG71
26 SF
STORAGE
FG63A
135 SF
OFFICE
FG65
219 SF
2BR
FG78
67 SF
BATHROOM
FG80A
194 SF
2BR
FG80
217 SF
2BR
FG82
65 SF
BATHROOM
FG84A
189 SF
2BR
FG84
47 SF
TOILET
80 SF FG88A
ELEC
FG86
336 SF
BREAK
ROOM
FG88
152 SF
OFFICE
FG34
264 SF
2BR
FG38
277 SF
2BR
FG40
278 SF
2BR
FG42
280 SF
2BR
FG44
28 SF
ELEC
FG36
80 SF
BATHROOM
FG38A
100 SF
BATHROOM
FG42A
100 SF
BATHROOM
FG46A
271 SF
2BR
FG46
STAIR 2
693 SF
CORRIDOR
D107
285 SF
2BR
FG47
274 SF
2BR
FG45
277 SF
CONFERENCE
FG43
278 SF
KITCHEN
FG41
100 SF
BATHROOM
FG47A
100 SF
BATHROOM
FG43A
100 SF
BATHROOM
FG39A
272 SF
2BR
FG39
282 SF
2BR
FG37
324 SF
2BR
FG35
102 SF
STORAGE
FG33
68 SF
BATHROOM
FG35A
68…
This is the start of the file's text. The full file is on GovTribe.