This is a pre-design architectural drawing for a Department of Veterans Affairs facility tuckpointing/repointing project. The drawing depicts the North and South elevations of Building 1W at the VA facility, with a scale of 1/16" = 1'-0". The project involves 580 square feet of brick masonry repointing and tuckpointing work on the building's exterior.

The document includes floor elevation references ranging from the subbasement at 810'-3" to the roof slab at 956'-8 3/4", spanning nine floors plus penthouse and mechanical spaces. The revision schedule indicates the drawing was prepared on 10/10/2025 at 100% Construction/Bid Documents stage, with a supplemental requirement dated 02/20/2026. General notes direct referencing sheet 01W-A.200 for additional details on the repointing and tuckpointing work specifications. The drawing is identified as sheet 01W-A.201, part of VA Project Number 506-26-202.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W E

R

EC

YC

LE

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

GG

PROJECT:

BUILDING NUMBER: PLOT SCALE:

VA PROJECT NUMBER:

DATE:

DRAWING NUMBER:

DRAWING TITLE:

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

A/E PROJECT NUMBER:

VA PROJECT NAME:CONSULTANTS: ARCHITECT/ENGINEERS:

16" = 1'-0"

BUILDING #1W & #28 - TUCKPOINTING

BLDG 1W

01W-A.201

506-26-202

TUCKPOINTING

Building 1W North & South Elevations

PR

E-

D

ES

IG

N

D O

C U

M

EN

TS

REVISION SCHEDULE

# DATE DESCRIPTION

1W - SECOND

FLOOR

839' - 2"

1W - FIRST FLOOR

827' - 3"

1W - BASEMENT

816' - 3"

1W - THIRD FLOOR

850' - 2"

1W - FOURTH

FLOOR

861' - 2"

1W - FIFTH FLOOR

873' - 9 1/4"

1W - SUBBASEMENT

810' - 3"

1W - SIXTH FLOOR

885' - 8 1/4"

1W - SEVENTH

FLOOR

896' - 8 1/4"

1W - EIGHTH

FLOOR

908' - 7 1/4"

1W - NINTH FLOOR

920' - 0 3/4"

1W - PENTHOUSE

931' - 0 3/4"

1W - MACHINE

ROOM SLAB

945' - 6"

1W - ROOF SLAB

956' - 8 3/4"

1W - SECOND

FLOOR

839' - 2"

1W - FIRST FLOOR

827' - 3"

1W - BASEMENT

816' - 3"

1W - THIRD FLOOR

850' - 2"

1W - FOURTH

FLOOR

861' - 2"

1W - FIFTH FLOOR

873' - 9 1/4"

1W -SUBBASEMENT

810' - 3"

1W - SIXTH FLOOR

885' - 8 1/4"

1W - SEVENTH

FLOOR

896' - 8 1/4"

1W - EIGHTH

FLOOR

908' - 7 1/4"

1W - NINTH FLOOR

920' - 0 3/4"

1W - PENTHOUSE

931' - 0 3/4"

1W - MACHINE

ROOM SLAB

945' - 6"

1W - ROOF SLAB

956' - 8 3/4"

Scale: 1/16" = 1'-0"

NORTH ELEVATION

Scale: 1/16" = 1'-0"

SOUTH ELEVATION

580 S.F. OF BRICK

MASONRY REPOINTING

580 S.F. OF BRICK

MASONRY REPOINTING

GENERAL NOTES:

1. REFER TO SHEET 01W-A.200 FOR GENERAL NOTES FOR THE REPOINTING/ TUCKPOINTING WORK.

10/10/2025

10/10/2025 100% Construction/ Bid Documents 02/20/2026 Supplemental requirement

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .