Drawings__3_-_Saxton_House.pdf
PDF 6 MB Posted
- Attached to
- Saxton House Rehabilitation Federal contract opportunity
- Solicitation number
- 140P6423B0001
About this file
This solicitation notice seeks bids for exterior painting and repairs to the Saxton House property managed by the National Park Service. Work includes repairs to existing wood windows; replacement of several wood windows; reinforcement of iron railings; masonry repointing and repairs; replacement of the metal roofing system covering the porches; replacement of a decorative wood porch rail; repairs to decorative architectural trim features; electrical conduit installation to existing porch roof lighting; and preparation and repainting of exterior wood features. The project magnitude is estimated between $500,000 and $1,000,000. Bids are due via a firm-fixed price construction contract following the Construction Wage Rate Requirements for Stark County, Ohio. The period of performance is 280 days from the notice to proceed. The NAICS code is 238990 and the size standard is $16.5 million. The project is set aside 100% for Women Owned Small Businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6423B0001_Amd_0003.pdf | ||
| Sol_140P6423B0001_Amd_0002.pdf | ||
| Questions_and_Answers_-_Saxton_House_0001.pdf | ||
| Sol_140P6423B0001_Amd_0001.pdf | ||
| Construction_Contract_Administration.pdf | ||
| Drawings__2_-_Saxton_House.pdf | ||
| Wage_Determination.pdf | ||
| Bid_Schedule_-_Saxton_House_Rehabilitation.xlsx | XLSX spreadsheet | |
| Drawings__1_-_Saxton_House.pdf | ||
| Project_Specifications.pdf | ||
| Bid-Price_Schedule_-_Saxton_House_Rehabilitation.pdf | ||
| Addendum_to_Specifications.pdf | ||
| Submittal_List.pdf | ||
| Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Sol_140P6423B0001.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECOND FLOOR WINDOW SCHEDULE
3'-6 11/16" 7'-10 15/16"
3'-6 1/2" 7'-11 9/16"
2'-4 1/4" 7'-11 7/16"
7'-11 11/16"
3'-6 3/8"
3'-6 1/2" 7'-0 1/2"
3'-6 5/16"
3'-6 3/8"
3'-6 1/4"
3'-6 1/2" 6'-11 1/8"
3'-6" 6'-10 7/8"
3'-6 1/2" 6'-11 1/2"
3'-5 7/8" 6'-10 3/8"
3'-6 1/4" 8'-0 1/16"
3'-6 11/16" 8'-0 1/4"
2'-4 1/4" 7'-11 5/16"
3'-6 1/2" 7'-11 1/4"
3'-6 1/2"
7'-11 3/8"
7'-0 7/16"
NO.
FAIR
GOOD
HISTORIC WINDOW & SASHES - 1/1 FAIR -
REPLACEMENT GOODEXISTING REPLACEMENT UNIT - 2/2 FAIR
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 1/1
REPLACEMENT GOOD
GOOD
POOR
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
GOOD
POOR
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
POOR
POOR
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
GOOD
POOR
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
REPLACEMENT GOOD
MODERN STORM WINDOW POOR
HISTORIC GOOD
REPLACE BOTTOM RAIL & RIGHT STILE; INSTALL NEW GLAZING PUTTY; INSTALL
NEW STAINLESS STEEL HINGES TO MATCH EXISTING
HISTORIC BRICK MOLD
REPLACEMENT SILL
FAIR
POOR
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
GOOD
FAIR
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
GOOD
FAIR
HISTORIC WINDOW & SASHES 1/1 FAIR
MODERN STORM WINDOW POOR
HISTORIC JAMB, SILL, AND
BRICK MOLDING
FAIR INSTALL NEW GLAZING PUTTY ON BOTH SASHES
HISTORIC WINDOW
SASHES & UNIT - 1/1
FAIR
MODERN STORM WINDOW POOR
FAIR
POOR
REPLACE ENTIRE STORM WINDOW TO MATCH THE EXISTING
STORM WINDOW
HISTORIC JAMB, SILL, AND
BRICK MOLDING
REMOVE EXISTING AND INSTALL NEW REPLICA BRICK MOLDING (7 FEET) ON RIGHT
SIDE. PROVIDE REMOVED BRICK MOLDING TO COR FOR RETENTION OF HISTORIC
PAINT SAMPLES FOR PARK CURATOR.
HISTORIC WINDOW
SASHES & UNIT - 2/2
MODERN STORM WINDOW POOR REPLACE ENTIRE STORM WINDOW TO MATCH THE EXISTING
STORM WINDOW
HISTORIC JAMB, SILL, AND
BRICK MOLDING
6'-11 1/8"
FAIR REPLACEMENT BRICK MOLD
REPLACEMENT SILL
GOOD
GOOD
REPLACE WEATHERSTRIPPING IN BOTTOM SASH; REMOVE NAIL FROM SASH AND
REPAIR WITH EPOXY, PER SPECIFICATIONS.
6'-11"
HISTORIC WINDOW
SASHES & UNIT - 2/2
MODERN STORM WINDOW FAIR
HISTORIC JAMB, SILL, AND
BRICK MOLDING
REMOVE EXISTING AND INSTALL NEW GLAZING PUTTY; INSTALL NEW STAINLESS
STEEL HINGES TO MATCH EXISTING.
INSTALL REPLICA SASH LOCK ON OPPOSITE SIDE OF INTERIOR SASHGOOD GOOD
HISTORIC WINDOW
SASHES & UNIT - 2/2
MODERN STORM WINDOW FAIR
HISTORIC JAMB, SILL, AND
BRICK MOLDING
GOOD GOOD
HISTORIC WINDOW
SASHES & UNIT - 2/2
MODERN STORM WINDOW FAIR
HISTORIC JAMB, SILL, AND
BRICK MOLDING
EPOXY REPAIR 4" LEFT BRICK MOLDINGGOOD GOOD
HISTORIC WINDOW
SASHES & UNIT - 2/2
MODERN STORM WINDOW POOR
HISTORIC JAMB, SILL, AND
BRICK MOLDING
GOOD GOOD
HISTORIC WINDOW
SASHES & UNIT - 1/1
MODERN STORM WINDOW FAIR
HISTORIC JAMB, SILL, AND
BRICK MOLDING
GOOD GOOD
HISTORIC WINDOW
SASHES & UNIT - 1/1
MODERN STORM WINDOW POOR
HISTORIC JAMB, SILL, AND
BRICK MOLDING
GOOD DUTCHMAN REPAIR BRICK MOLDING LEFT & RIGHT SIDES 6-FEET IN HEIGHT; RETAIN
HISTORIC BRICK MOLDING FOR PAINT RECORD IN PARK ARCHIVES. PROVIDE
REMOVED BRICK MOLDING TO COR FOR RETENTION OF HISTORIC PAINT SAMPLES
FOR PARK CURATOR.
1, 6, 7WR2-2
WR2-2
WR1-1B
WR1-1B
WR2-2
WR2-2
WR2-2
WR2-2
WR2-2
3, 4, 5
1W2-1
EXISTING
STORM
WR2-2
WR2-2
1, 6, 7
1, 6
2EXISTING
STORM
W2-1
W2-1
1, 6
W2-1 1, 6
WR2-2 1, 6, 7
W2-2 1, 6
W2-2 1, 6
W2-2 1, 6
W2-2 1, 6
W2-1 1, 6
W2-1 1, 6
EXISTING SASH CONFIGURATION
AND STORM WINDOW
EXISTING
WINDOW
CONDITION
EXISTING
WINDOW
TYPE
MASONRY OPENING
WIDTH HEIGHT
EXISTING
JAMB / BRICK MOLD /
SILL
EXISTING
CONDITION
INSTALL NEW
REPLACEMENT
WINDOW - TYPE
NEW
STORM
WDO
REPAIR
EXISTING
WDO
KEY NOTES AND REHABILITATION NOTES
ALL GENERAL NOTES APPLY
1, 6, 7
X
X
X
STRIP PAINT FROM SILL, INSTALL WOOD CONSOLIDANT, PROVIDE EPOXY REPAIRS;
STRIP PAINT FROM SILL, INSTALL WOOD CONSOLIDANT, PROVIDE EPOXY REPAIRS;
VERY
POOR
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS, STOPS, AND SILL.
PROVIDE AND INSTALL NEW CUSTOM STORM WINDOW.
1, 6, 7X STRIP PAINT FROM SILL, INSTALL WOOD CONSOLIDANT, PROVIDE EPOXY REPAIRS;FAIR
FAIR 1, 6, 7X STRIP PAINT FROM SILL, INSTALL WOOD CONSOLIDANT, PROVIDE EPOXY REPAIRS;
POOR 1, 6, 7X SASH REPAIR: STRIP PAINT FROM EXTERIOR OF BOTH SASHES, INSTALL WOOD
CONSOLIDANT; PERFORM EPOXY REPAIRS. REPLACE UPPER SASH LEFT, RIGHT,
AND BOTTOM WOOD GLAZING STOPS. REPLACE LOWER SASH BOTTOM RAIL AND
BOTTOM WOOD GLAZING STOPS. REPLACE BOTTOM SASH EXTERIOR MUNTIN.
REPLACE NORTH PARTING BEAD.
SILL - STRIP PAINT, INSTALL WOOD CONSOLIDANT, PROVIDE EPOXY REPAIRS;
BRICK MOLDING - REPLACE BOTTOM 10" OF LEFT AND RIGHT SIDE BRICK MOLDING.
REPLACE COMPRESSION WEATHERSTRIPPING ON BOTTOM SASH.
1, 6, 7X
X
EXISTING REPLACEMENT UNIT - 1/1
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
WR1-1B
3, 4, 5XVERY
POOR
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS, STOPS, AND SILL.
PROVIDE AND INSTALL NEW CUSTOM STORM WINDOW.
BRICK MOLDING - RETAIN HISTORIC BRICK MOLDING.
- REMOVE LOOSE, FLAKING, AND DETERIORATED PAINT; INSTALL
CONSOLIDANT; EPOXY REPAIR, PER SPECIFICATIONS.
- IF MOLDING REQUIRES COMPLETE PAINT REMOVAL, PROVIDE MINIMUM 4
HISTORIC PAINT SAMPLES TO COR PRIOR TO STRIPPING PAINT. SAMPLES
MAY INCLUDE A THIN LAYER OF WOOD TO CAPTURE ALL LAYERS.
X
X
FAIR REPLACE 2 BOTTOM WOOD GLAZING STOPS ON UPPER SASH, IN KIND;X
FAIR 1, 6, 7 REPLACE 2 BOTTOM WOOD GLAZING STOPS ON UPPER AND LOWER SASHES, IN
KIND;
X
X
REPLACE BOTTOM RAIL & RIGHT STILE; REMOVE EXISTING AND INSTALL NEW
GLAZING PUTTY; INSTALL NEW STAINLESS STEEL HINGES TO MATCH EXISTING
EXISTING
STORM
X
X
FAIR
FAIR
XEXISTING
STORM
BRICK MOLDING - LEFT SIDE OF WINDOW - STRIP PAINT TO INSTALL WOOD
CONSOLIDANT AND EPOXY REPAIRS
EXISTING
STORM
EXISTING REPLACEMENT UNIT - 2/2
X
X
X
X
EXISTING
STORM
REMOVE EXISTING AND INSTALL NEW GLAZING PUTTY; INSTALL NEW STAINLESS
STEEL HINGES TO MATCH EXISTING.
EXISTING
STORM
EXISTING
STORM
REMOVE EXISTING AND INSTALL NEW GLAZING PUTTY; INSTALL NEW STAINLESS
STEEL HINGES TO MATCH EXISTING.
EPOXY REPAIR BOTTOM RAIL; REMOVE EXISTING AND INSTALL NEW GLAZING
PUTTY; INSTALL NEW STAINLESS STEEL HINGES TO MATCH EXISTING.
EXISTING
STORM
EXISTING
STORM
REPLACE BOTTOM RAIL AND RIGHT STILE; REMOVE EXISTING AND INSTALL NEW
GLAZING PUTTY; INSTALL NEW STAINLESS STEEL HINGES TO MATCH EXISTING.
X
X
X
X
X
X
X
X
X
X
X
X REPLACE ENTIRE STORM WINDOW TO MATCH THE EXISTING
STORM WINDOW
FAIR
POOR
GENERAL NOTES:
A. REMOVE ALL SCREWS, NAILS, AND OTHER ATTACHMENTS
FROM THE WINDOW COMPONENTS AND JAMBS THAT ARE NOT
PART OF THE WINDOW OPERATION. PATCH/REPAIR HOLES
WHERE REMOVED, PER SPECIFICATIONS.
B. REMOVE AND INSTALL NEW FASTENERS IF THEY ARE
PROTRUDING FROM THE WINDOW SASHES OR JAMBS, IN KIND,
EXTERIOR-GRADE STAINLESS STEEL FASTENERS ONLY.
C. ON HISTORIC WINDOW SASHES THAT ARE TO RECEIVE NEW
GLAZING PUTTY, PROTECT THE INTERIOR SURFACE OF THE
HISTORIC GLASS DURING HANDLING. THE INTERIOR SURFACE
OF THE GLASS HAS BEEN COATED WITH A UV PROTECTIVE
FILM THAT CAN EASILY BE SCRATCHED.
D. ASSUME ALL PAINT CONTAINS LEAD, UNLESS TESTING BY
CONTRACTOR SHOWS OTHERWISE. TAKE ALL NECESSARY
PRECAUTIONS TO PREVENT LEAD CONTAMINATION, PER EPA
AND OSHA REGULATIONS. ONLY CONTRACTORS CERTIFIED TO
HANDLE LEAD PAINT SHALL PERFORM WORK ON THE
WINDOWS AND SURROUNDING TRIM. DISPOSE OF ALL
LEAD-CONTAINING COMPONENTS, AS REQUIRED BY LAW.
RETAIN DISPOSAL RECORDS FOR COR.
E. BOARD-UP OPENINGS DURING RESTORATION. BOARD-UP
SHOULD BE FABRICATED IN A MANNER ALLOWING IT TO BE
REMOVED AND REINSTALLED, AS NECESSARY DURING
REPLACEMENT EFFORTS. BOARD-UP SHOULD BE SECURED,
WEATHER-TIGHT, NOT ATTACHED TO HISTORIC MILLWORK OR
MASONRY, AND SHOULD ONLY BE ABLE TO BE REMOVED FROM
THE INTERIOR.
KEY NOTES:
1. EXISTING WINDOW SASHES, TRIM, JAMS, AND SILLS - PERFORM
REPAIRS INDICATED ON THE WINDOW SCHEDULE, IF
REQUIRED. REMOVE EXISTING SEALANTS AND INSTALL ALL
NEW SEALANTS. PREP, PRIME (WHERE BARE WOOD EXPOSED),
AND PAINT ALL EXTERIOR COMPONENTS.
2. EXISTING STORM WINDOWS - PERFORM REPAIRS TO THE
EXISTING WOOD STORM WINDOWS AS INDICATED ON THE
WINDOW SCHEDULE. PREP, PRIME (WHERE BARE WOOD
EXPOSED), AND PAINT ALL SIDES (INTERIOR AND EXTERIOR) OF
SASHES. INSTALL NEW STAINLESS STEEL HINGES TO MATCH
EXISTING SIZE ON ALL UNITS. DO NOT PAINT HINGES. PROVIDE
OR REPLACE SHIMS, AS IN EXISTING INSTALLATION.
3. NEW REPLACEMENT WINDOWS -
- REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY. ENSURE
INTERIOR TRIM IS CAREFULLY REMOVED (ONLY AS NEEDED)
AND REPLACED IN ITS ORIGINAL CONDITION. CONTRACTOR
RESPONSIBLE FOR REPLACEMENT OF ANY DAMAGED TRIM, IN
KIND.
- NEW WINDOW UNITS SHALL BE PER THE SPECIFICATIONS AND
INDIVIDUALLY FIELD MEASURED TO ACCOUNT FOR UNIQUE
FIELD CONDITIONS AT EACH LOCATION. MATCH HISTORIC
WINDOW SQUARED UPPER SASHES WITH ARCHED, COMPOUND
FLAT ARCH GLAZED OPENINGS. THIRD FLOOR UNITS TO BE
HALF-ARCH TO MATCH HISTORIC WINDOW 307. UNITS TO
MATCH THE HISTORIC ORIGINAL WINDOW PROFILES AND
OVERALL DIMENSIONS AND CONFIGURATIONS AS CLOSELY AS
POSSIBLE WITH SIMULATED INSULATED GLASS UNITS. (DO NOT
MATCH THE MODERN REPLACEMENT UNITS). NEW UNITS TO BE
FACTORY FINISHED ON THE EXTERIOR WITH CUSTOM PAINT
COLOR TO BE SELECTED BY THE COR. INTERIOR TO BE
STAINED ON SITE TO MATCH THE SURROUNDING MILLWORK.
COR TO APPROVE SAMPLE TRIM STAIN BEFORE APPLICATION.
4. PROVIDE AND INSTALL NEW REPLICA WOOD STORM WINDOW,
PER SPECIFICATIONS. UNIT SHALL BE PREPPED, PRIMED, AND
PAINTED TO MATCH THE CUSTOM COLOR FOR THE WINDOWS
AND TRIM, AS SELECTED BY THE COR.
5. NEW REPLACEMENT TRIM, WOOD DUTCHMAN PATCHES, AND
SILLS SHALL BE BACK-PRIMED, AND ALL CUTS SHALL BE
PRIMED, PER SPECIFICATIONS.
6. EXISTING WINDOWS TO REMAIN - ADJUST WEATHERSTRIPPING
TO SEAL GAPS. REPLACE, IN KIND, WHERE DAYLIGHT IS VISIBLE
OR WHERE THERE IS NO FULL CONTACT WITH OPPOSING
SURFACE.
7. EXISTING REPLACEMENT WINDOWS - CAREFULLY REMOVE
TACKED-ON MID-RAIL WOOD TRIM EXTENSIONS ON THE
EXTERIOR FACE OF THE WINDOWS. FILL HOLES WITH WOOD
EPOXY, PER SPECIFICATIONS.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :4
P
M A3.2
SECOND FLOOR WINDOW SCHEDULE
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .2
S e c o n d F l.
W in d o w
S c h e d u le
.d w g
REBECCA GAEBLER
2118415 2/21/2022
GENERAL NOTES:
A. REMOVE ALL SCREWS, NAILS, AND OTHER ATTACHMENTS FROM THE WINDOW
OPENINGS THAT ARE NOT PART OF THE WINDOW OPERATION. PATCH/REPAIR HOLES
WHERE REMOVED, PER SPECIFICATIONS.
B. REPLACE SEALANT AT JOINT BETWEEN MASONRY OPENING AND BRICK MOLDING ON
ALL WINDOWS. INSTALL CLOSED-CELL BACKER ROD AND SEALANT AND PAINT TO
MATCH WINDOWS.
C. ON HISTORIC WINDOW SASHES THAT ARE TO RECEIVE NEW GLAZING PUTTY, TAKE
CARE TO PROTECT THE INTERIOR SURFACE OF THE HISTORIC GLASS DURING
HANDLING. THE GLASS HAS BEEN COATED WITH A UV PROTECTIVE FILM THAT CAN
EASILY BE SCRATCHED.
KEY NOTES:
1. EXISTING WINDOWS, TRIM, AND SILLS - PERFORM REPAIRS INDICATED ON THE
WINDOW SCHEDULE, IF REQUIRED, PREP AND PAINT ALL EXTERIOR COMPONENTS,
INCLUDING, WINDOW SASHES, JAMBS, BRICK MOLDING, TRIM, AND SILLS.
2. EXISTING STORM WINDOWS - PERFORM REPAIRS INDICATED ON THE WINDOW
SCHEDULE, IF REQUIRED, PREP AND PAINT EXTERIOR AND INTERIOR OF STORM
WINDOWS.
3. NEW WINDOWS. NEW WINDOW UNITS SHALL BE PER SPECIFICATIONS AND
INSTALLED FACTORY PRIMED. FINISH PAINT TO MATCH ALL EXTERIOR TRIM.
4. NEW STORM WINDOWS SHALL BE PRIMED AND PAINTED TO MATCH ALL EXTERIOR
TRIM.
5. NEW TRIM, REPLACEMENT TRIM, AND DUTCHMAN PATCHES SHALL BE BACK-
PRIMED AND ALL CUTS SHALL BE PRIMED, PER SPECIFICATIONS.
6. ALL EXISTING WINDOWS TO REMAIN: ADJUST EXISTING WEATHERSTRIPPING.
REPLACE, WHERE NECESSARY.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :4
P
M A3.3
THIRD FLOOR WINDOW SCHEDULE
THIRD FLOOR WINDOW SCHEDULE
MASONRY OPENING
WIDTH HEIGHTNO.
POOR
POOR
POOR
HISTORIC WINDOW
SASHES & UNIT - 1/1
FAIR - -
REPLACEMENT POORREPLACEMENT UNIT - 1/1 POOR
REPLACEMENT UNIT - 1/1
REPLACEMENT UNIT - 1/1
REPLACEMENT UNIT - 1/1
REPLACEMENT UNIT - 1/1
REPLACEMENT UNIT -1/1
REPLACEMENT JAMB/SILL
HISTORIC BRICK MOLDING
POOR
POOR
POOR
POOR
REPLACEMENT
POORREPLACEMENT
3 REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS
AND SILL;
3 REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS
AND SILL;
POOR POORREPLACEMENT REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS
AND SILL;
POOR POORREPLACEMENT REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS
AND SILL;
REPLACEMENT UNIT - 1/1 REPLACEMENT POOR
1, 3
SASH TYPE
/STORM
HISTORIC JAMB
HISTORIC SILL
GOOD
POOR
1,6 REPLACE BOTTOM RAIL AND DUTCHMAN LEFT STILE AND
TENON ON BOTTOM SASH; INSTALL NEW GLAZING PUTTY ON
BOTH SASHES; INSTALL NEW SILL; INSTALL NEW PARTING
BEADS; STRIP EXTERIOR PAINT AND CONSOLIDATING WOOD;
PROVIDE PARK WITH MULTIPLE PAINT SAMPLES FROM TOP
AND BOTTOM SASHES FOR ARCHIVAL PAINT RECORD PRIOR
TO STRIPPING.
KEY NOTES AND REHABILITATION NOTES
JAMB /
BRICK MOLD / SILL
TYPE
CONDITION CONDITION
ALL GENERAL NOTES APPLY
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS
AND SILL;
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS
AND SILL; STRIP PAINT FROM EXTERIOR HISTORIC BRICK
MOLDING AND CONSOLIDATE AND EPOXY REPAIR.
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS
AND SILL;
2'-6 1/2"+/- 6'-6 1/2" +/-
2'-6 1/2"+/- 6'-6 1/2" +/-
2'-6 1/2"+/- 6'-6 1/2" +/-
2'-6 1/2"+/- 6'-6 1/2" +/-
2'-6 1/2"+/- 6'-6 1/2" +/-
2'-6 1/2"+/- 6'-6 1/2" +/-
2'-6 1/2"+/- 6'-6 1/2" +/- W3-1
WR3-1/WR3-1
WR3-1/WR3-1
WR3-1/WR3-1
WR3-1/WR3-1
WR3-1/WR3-1
WR3-1/WR3-1
WR3-1/WR3-1
WINDOW TYPE
EXISTING/NEW
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .3
T h ir d F l.
W in d o w
S c h e d u le
.d w g
REBECCA GAEBLER
1 WINDOW 100 ELEVATION
EAST ELEVATION, FIRST FLOOR, N.T.S.
A3.4
2 WINDOW 101 ELEVATION
EAST ELEVATION, FIRST FLOOR, N.T.S.
A3.4
3 WINDOW 102 ELEVATION
EAST ELEVATION, FIRST FLOOR, N.T.S.
A3.4
4 WINDOW 103 ELEVATION
EAST ELEVATION, FIRST FLOOR, N.T.S.
A3.4
5 WINDOW 104 ELEVATION
SOUTH ELEVATION, FIRST FLOOR, N.T.S.
A3.4
6 WINDOW 105 ELEVATION
SOUTH ELEVATION, FIRST FLOOR, N.T.S.
A3.4
7 WINDOW 106 ELEVATION
SOUTH ELEVATION, FIRST FLOOR, N.T.S.
A3.4
8 WINDOW 107 ELEVATION
SOUTH ELEVATION, FIRST FLOOR, N.T.S.
A3.4
9 WINDOW 108 ELEVATION
SOUTH ELEVATION, FIRST FLOOR, N.T.S.
A3.4
10 WINDOW 109 ELEVATION
SOUTH ELEVATION, FIRST FLOOR, N.T.S.
A3.4
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :5
P
M A3.4
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .4
W in d o w
In .d w g
WINDOW ELEVATIONS
PHOTOGRAPHS OF WINDOWS FOR
REFERENCE ONLY. REFER TO WINDOW
SCHEDULE FOR WORK AT EACH OPENING
REBECCA GAEBLER
2 WINDOW 111 ELEVATION
WEST ELEVATION, FIRST FLOOR, N.T.S.
A3.5
3 WINDOW 112 ELEVATION
NORTH ELEVATION, FIRST FLOOR, N.T.S.
A3.5
4 WINDOW 113 ELEVATION
NORTH ELEVATION, FIRST FLOOR, N.T.S.
A3.5
5 WINDOW 114 ELEVATION
NORTH ELEVATION, FIRST FLOOR, N.T.S.
A3.5
6 WINDOW 115 ELEVATION
WEST ELEVATION, FIRST FLOOR, N.T.S.
A3.5
7 WINDOW 116 ELEVATION
WEST ELEVATION, FIRST FLOOR, N.T.S.
A3.5
1 WINDOW 110 ELEVATION
WEST ELEVATION, FIRST FLOOR, N.T.S.
A3.5
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :5
P
M A3.5
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .5
W in d o w
In .d w g
WINDOW ELEVATIONS
PHOTOGRAPHS OF WINDOWS FOR
REFERENCE ONLY. REFER TO WINDOW
SCHEDULE FOR WORK AT EACH OPENING
REBECCA GAEBLER
6 WINDOW 205 ELEVATION
EAST ELEVATION, SECOND FLOOR, N.T.S.
A3.6
7 WINDOW 206 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.6
8 WINDOW 207 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.6
9 WINDOW 208 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.6
10 WINDOW 209 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.6
4 WINDOW 203 ELEVATION
EAST ELEVATION, SECOND FLOOR, N.T.S.
A3.6
5 WINDOW 204 ELEVATION
EAST ELEVATION, SECOND FLOOR, N.T.S.
A3.6
1 WINDOW 200 ELEVATION
EAST ELEVATION, SECOND FLOOR, N.T.S.
A3.6
2 WINDOW 201 ELEVATION
EAST ELEVATION, SECOND FLOOR, N.T.S.
A3.6
3 WINDOW 202 ELEVATION
EAST ELEVATION, SECOND FLOOR, N.T.S.
A3.6
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :0
P
M A3.6
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .6
W in d o w
In .d w g
WINDOW ELEVATIONS
PHOTOGRAPHS OF WINDOWS FOR
REFERENCE ONLY. REFER TO WINDOW
SCHEDULE FOR WORK AT EACH OPENING
REBECCA GAEBLER
7 WINDOW 216 ELEVATION
NORTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
8 WINDOW 217 ELEVATION
NORTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
9 WINDOW 218 ELEVATION
NORTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
10 WINDOW 219 ELEVATION
WEST ELEVATION, SECOND FLOOR, N.T.S.
A3.7
11 WINDOW 220 ELEVATION
WEST ELEVATION, SECOND FLOOR, N.T.S.
A3.7
4 WINDOW 213 ELEVATION
WEST ELEVATION, SECOND FLOOR, N.T.S.
A3.7
5 WINDOW 214 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
6 WINDOW 215 ELEVATION
NORTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
1 WINDOW 210 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
2 WINDOW 211 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
3 WINDOW 212 ELEVATION
SOUTH ELEVATION, SECOND FLOOR, N.T.S.
A3.7
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :0
P
M A3.7
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .7
W in d o w
In .d w g
WINDOW ELEVATIONS
PHOTOGRAPHS OF WINDOWS FOR
REFERENCE ONLY. REFER TO WINDOW
SCHEDULE FOR WORK AT EACH OPENINGREBECCA GAEBLER
7 WINDOW 306 ELEVATION
NORTH ELEVATION, THIRD FLOOR, N.T.S.
A3.8
8 WINDOW 307 ELEVATION
NORTH ELEVATION, THIRD FLOOR, N.T.S.
A3.8
4 WINDOW 303 ELEVATION
SOUTH ELEVATION, THIRD FLOOR, N.T.S.
A3.8
5 WINDOW 304 ELEVATION
SOUTH ELEVATION, THIRD FLOOR, N.T.S.
A3.8
6 WINDOW 305 ELEVATION
WEST ELEVATION, THIRD FLOOR, N.T.S.
A3.8
3 WINDOW 302 ELEVATION
EAST ELEVATION, THIRD FLOOR, N.T.S.
A3.8
1 WINDOW 300 ELEVATION
EAST ELEVATION, THIRD FLOOR, N.T.S.
A3.8
2 WINDOW 301 ELEVATION
EAST ELEVATION, THIRD FLOOR, N.T.S.
A3.8
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :1
P
M A3.8
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .8
W in d o w
In .d w g
WINDOW ELEVATIONS
PHOTOGRAPHS OF WINDOWS FOR
REFERENCE ONLY. REFER TO WINDOW
SCHEDULE FOR WORK AT EACH OPENING
REBECCA GAEBLER
OUTSIDE PAINTED
CLADDING
PLYWOOD BACKER
WOOD POST
10 1/2"
EXISTING ROOF POST FLASHED
WITH METAL FLASHING
EXISTING ROOF
PLYWOOD, PAINTED
/2
/4
/4
/4
/4
/8
/2
/2
10 1/2"
6 1/2"
9 3/8"
8 7/8"
8 7/8"
7 1/2"
EXISTING PLAN/SECTION DETAIL
EXISTING PARTIAL ELEVATION EXISTING
RAIL SECTION
3 1/2"
1 3/4"
/8
/4
/4
/4
2 1/4"
1 7/8"
3/4"
3 1/2"
3 3/4"
4"
CUSTOM BASE WRAP
CONSTRUCTED FROM
EXTERIOR GRADE WOOD
EXISTING WOOD POST
10 1/2"
WRAP NEW ROOF COATING MIN.
4" UP POST AND PROVIDE TIGHT
SELF-FLASHING DETAIL.
REPLACEMENT - PLAN/SECTION DETAIL
REPLACEMENT - PARTIAL ELEVATION REPLACEMENT -
SECTION AT POST
3 1/2"
FIELD VERIFY ALL DIMENSIONS AND
MATCH EXISTING, UNLESS NOTED.
REPLICATE EXISTING POST.
REPLICATE EXISTING
ORNAMENTAL DETAIL.
REPLICATE EXISTING POST.
FINIAL CONSTRUCTED FROM
BUILT-UP EXTERIOR GRADE WOOD
AND SHAPED TO MATCH HISTORIC
ORNAMENTAL DETAIL.
5"
REFERENCE
REPLACEMENT RAIL
SECTION
REPLICATE EXISTING POST.
REPLACEMENT -
SECTION AT RAIL
NEW RAIL SHALL INCLUDE ALUMINUM
BAR REINFORCEMENT EMBEDDED IN
MATERIAL TO PREVENT WARPING.
REPLICATE EXISTING WOOD RAIL.
ALUMINUM BAR
REPLICATE EXISTING WOOD RAIL.
BOTTOM CAP SHALL BE INSTALLED
TO BE EASILY REMOVED TO ALLOW
ACCESS TO FUTURE ELECTRICAL
CONDUIT.
POST BEYOND
EXISTING WOOD POST TO BE FULLY
WRAPPED IN SELF-ADHERING ICE
AND WATER SHIELD INCLUDING TOP
AND LAP OVER FLASHING.
EXISTING WOOD POST (REPAIR AS
REQUIRED). NOTIFY COR IF NOT
REUSABLE.
1 1/2"
/2
" INSTALL 3/4" STAINLESS STEEL
THREADED DOWEL BETWEEN
WOOD POST AND SYNTHETIC
POST CAP
/2
DIMENSIONS OF POST CAP HAVE
BEEN ALTERED TO REPLICATE
PROPORTIONS VISIBLE IN
HISTORIC PHOTOGRAPHS
REFERENCE SECOND FLOOR PLAN FOR
APPROXIMATE RAIL LENGTHS
PROVIDE SOLID, EXTERIOR
GRADE HARDWOOD BLOCKING
FOR NAILING & SPACING. DO
NOT USE PLYWOOD FOR
SPACING OR BLOCKING.
REINFORCED
WOOD RAILINGS
CELLULAR PVC
SHEET BOARD
CELLULAR PVC SHEET BOARD FULL
ANCHORED AT TOP AND BOTTOM WITH
CONCEALED ANCHORS
GENERAL NOTES:
• THE EXISTING SECOND FLOOR PORCH RAILING AT MAIN PORCH IS
DETERIORATED AND REQUIRES REPLACEMENT. SOUTH PORCH
RAILING TO REMAIN.
• CIRCULAR PANELS TO BE CONSTRUCTED OF SYNTHETIC SHEET
MATERIAL.
• ALL OTHER COMPONENTS TO BE CONSTRUCTED WITH EXTERIOR
GRADE WOOD, PER THE SPECIFICATIONS. TREAT ALL WOOD
COMPONENTS WITH WOOD PRESERVATIVE PER SPECIFICATION
PRIOR TO PAINTING.
• DO NOT SCALE FROM THE DRAWINGS. ALL DIMENSIONS ARE
APPROXIMATE. ACTUAL FIELD VERIFIED DIMENSIONS SHALL BE
OBTAINED BY THE GENERAL CONTRACTOR OR THE APPLICABLE
SUB-CONTRACTORS BEFORE SUBMITTING SHOP DRAWINGS,
ORDERING MATERIALS, OR THE COMMENCEMENT OF
CONSTRUCTION.
WRAP NEW ROOF COATING
MIN. 4" UP POST AND PROVIDE
TIGHT SELF-FLASHING DETAIL.
1 1/2"
1"
1 1/2"
PROVIDE 3/4" FLEXIBLE GALVANIZED
CONDUIT THROUGH EXISTING POST
TO ALLOW FOR FUTURE ELECTRICAL
WIRING. REFERENCE CONDUIT
ROUTING DETAIL ABOVE
EQ. EQ.
PROVIDE VOID IN NEW WOOD RAIL TO
ALLOW THE INSTALLATION OF FUTURE
ELECTRICAL CONDUIT AND WIRING
FLEXIBLE GALVANIZED
CONDUIT
FLEXIBLE CONDUIT
ROUTING AT CORNER
POSTS
4" MIN. EXTENTION INTO RAIL
FLEXIBLE CONDUIT
ROUTING AT MID POSTS
4" MIN. EXTENTION INTO RAIL
1"
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :1
P
M A4.0
A4.0
4 SECOND FLOOR EXISTING PORCH RAIL DETAILS
NO SCALE
A4.0
NO SCALE
A4.0
NO SCALE
A4.0
12 6 0 12
SCALE OF INCHES
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .0
P o rc h In
.d w g
PORCH ROOF DETAILS
A4.0
5 SECOND FLOOR REPLACEMENT PORCH RAIL DETAILS
TYPICAL SECTION OF EXISTING SECOND FLOOR
PORCH RAIL TO BE REPLACED
TYPICAL SECTION OF EXISTING SECOND FLOOR
PORCH RAIL TO BE REPLACED
TYPICAL SECTION OF EXISTING SECOND FLOOR
PORCH RAIL TO BE REPLACED
REBECCA GAEBLER
/2
8' - 10"
/2
WOOD SILL
PLATE
GRADE
EXISTING STAINED
BEADBOARD
EXISTING WOOD TRIM
EXISTING STONE
LINTEL/KEYSTONE
5"
EXISTING WOOD TONGUE AND
GROOVE FLOORING (COATED)
EXISTING PAINTED (COATED
QUARTER-ROUND)
EXISTING MASONRY WALL
EXISTING STONE SUB SILL
1"
EXISTING BRICK
MOLD (BEYOND)
EXISTING WINDOW
JAMB (BEYOND)
/4
/8
/8
/8
A4.1
A4.1
INSTALL NEW, REINFORCED ELASTOMERIC
COATING SYSTEM OVER ENTIRE EXISTING
METAL ROOF PER SPECIFICATIONS AND
MANUFACTURER'S RECOMMENDATIONS.
REMOVE EXISTING AND INSTALL NEW
REPLICATED COLUMN BASES.
EXISTING DOWNSPOUT
EXISTING ROOF
ELASTOMERIC COATING
BASE AND
REINFORCEMENT
COATING FLASHING
ELASTOMERIC FINISH
COATING
EXISTING DOWNSPOUT OR
POSTS
DETAIL OF FLASHING AT
ROOF PENETRATIONS
FOLLOW MANUFACTURER'S
RECOMMENDATIONS
/2
+/-4 3/4"
/4
INSTALL NEW REINFORCED
ELASTOMERIC COATING
SYSTEM.
+/-1' - 3" +/-2"
/2
+/-1' - 1 1/4"
EXISTING COPPER GUTTER.
GUTTER TO REMAIN WITH
SEAM REPAIRS
EXISTING COPPER GUTTER
EXISTING SEAM BETWEEN EXISTING
COPPER GUTTER AND EXISTING
STAINLESS STEEL ROOF
EXISTING ROOF RAIL
POST
ROOF RAIL POST
REMOVE ALL PREVIOUS
INCOMPATIBLE SEAM REPAIRS. PREP
METAL AND RE-SOLDER JOINTS AS
REQUIRED THROUGHOUT GUTTER.
EXISTING ROOF
SHEATHING
NEW REINFORCED ELASTOMERIC
COATING SYSTEM, WRAP UP
WALL MIN. 4" AND COAT EXISTING
ALL FLASHING TO REMAIN
COPPER 16 OZ
FLASHING
CUT NEW MASONRY REGLET.
INSTALL NEW SEALANT AND
BOND BREAKER
EXISTING MASONRY WALL
EXISTING METAL ROOF
10 1/2"
" 1
/8
1' - 0"
7 1/2"
+/- 1/2"
VERIFY
THICKNESS AND
DIMENSION OF
SKIRT BOARD IN
FIELD.
VERIFY
DIMENSIONS AND
PROFILES OF
COLUMN BASE
WRAP IN THE
FIELD. MATCH
EXISTING.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :1
P
M A4.1
A4.1
1 FIRST FLOOR NORTH PORCH SECTION AT NW BACK DOOR
1 0 1 2
SCALE OF FEET
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .1
P o rc h In
.d w g
PORCH AND PORCH ROOF
DETAILS
2 TYPICAL EXISTING STAINLESS STEEL PORCH ROOF
NO SCALE
A4.1
3 EXISTING STAINLESS STEEL ROOF SEAM TO REMAIN
NO SCALE
A4.1
A4.1
4 PORCH GUTTER DETAIL
A4.1
5 PORCH ROOF MASONRY REGLET
• DO NOT SCALE FROM THE DRAWINGS. ALL DIMENSIONS ARE APPROXIMATE.
ACTUAL FIELD VERIFIED DIMENSIONS SHALL BE OBTAINED BY THE GENERAL
CONTRACTOR OR THE APPLICABLE SUB-CONTRACTORS BEFORE SUBMITTING
SHOP DRAWINGS, ORDERING MATERIALS, OR THE COMMENCEMENT OF
CONSTRUCTION.
GENERAL NOTES
REBECCA GAEBLER
RUST AND DETERIORATED SECTIONS OF METAL
SHALL BE SANDED. ALL LOOSE PAINT TO BE
REMOVED AND THE HANDRAIL SHALL BE
PREPPED, PRIMED, AND PAINTED.
REMOVE EXISTING 6-INCHES OF BASE OF
METAL RAIL SUPPORTS. INSTALL NEW RAIL
BASE SUPPORT TO MATCH EXISTING WITH
INTERIOR STIFFENER WELDED IN PLACE.
PREPPED, PRIMED, PAINTED, AND
REINSTALLED.
INSTALL EXTERIOR GRADE EPOXY FILLER AT THE
BASE OF POST TO HELP FILL CONCRETE HOLE
AND DIRECT WATER AWAY FROM POST. INSTALL
NEW METAL TRIM AT BASE TO MATCH EXISTING.
REMOVE EXISTING 6-INCHES OF BASE OF METAL
RAIL SUPPORTS. INSTALL NEW RAIL BASE
SUPPORT TO MATCH EXISTING WITH INTERIOR
STIFFENER WELDED IN PLACE. PREPPED,
PRIMED, PAINTED, AND REINSTALLED.
REPLACE MISSING BASE
TRIM WITH NEW METAL
TRIM AT BASE TO MATCH
EXISTING TRIM IN VARIOUS
LOCATIONS.
REMOVE EXISTING 6-INCHES OF BASE OF METAL
RAIL SUPPORTS. INSTALL NEW RAIL BASE SUPPORT
TO MATCH EXISTING WITH INTERIOR STIFFENER
WELDED IN PLACE. PREPPED, PRIMED, PAINTED,
AND REINSTALLED.
INSTALL EXTERIOR GRADE EPOXY FILLER AT
THE BASE OF POST TO HELP FILL CONCRETE
HOLE AND DIRECT WATER AWAY FROM POST.
INSTALL NEW METAL TRIM AT BASE TO MATCH
EXISTING.
RUST AND DETERIORATED SECTIONS OF
METAL SHALL BE SANDED DOWN. ALL LOOSE
PAINT TO BE REMOVED AND THE HANDRAIL
SHALL BE PREPPED, PRIMED, AND PAINTED.
RUST AND DETERIORATED SECTIONS OF
METAL SHALL BE SANDED. ALL LOOSE PAINT
TO BE REMOVED AND THE HANDRAIL SHALL
BE PREPPED, PRIMED, AND PAINTED.
RUST AND DETERIORATED SECTIONS OF
METAL SHALL BE SANDED . ALL LOOSE
PAINT TO BE REMOVED AND THE
HANDRAIL SHALL BE PREPPED, PRIMED,
AND PAINTED.
A4.2
Sim
EXISTING PORCH TONGUE AND GROOVE
FLOORING
EXISTING PORCH FLOOR FRAMING
EXISTING PORCH FLOOR JOIST
NEW POST
EXISTING POST
NEW STEEL ANGLE BOLTED TO PORCH
FRAMING AND WELDED TO RAIL POST.
PRIOR TO INSTALL, COAT STEEL ANGEL
WITH RUST INHIBITOR PRIMER AND
TWO COATS OF PAINT.
NEW SECTION OF RAIL POST, PRIME,
PRIME AND PAINT.
EXISTING RAIL POST
INSTALL SOLID STEEL BAR STIFFENER
BETWEEN EXISTING POST AND NEW POST
WELD ALL FOUR SIDES OF
POST, GRIND TO SMOOTH
REMOVE RUSTED STEEL
ANGLE AND ACCESSORIES.
REMOVE DETERIORATED
PORTION OF STEEL POST.
INSTALL CONTINUOUS
PERIMETER SEALANT, EACH SIDE
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :2
P
M A4.2
A4.2
1 EAST (FRONT) PORCH - STAIR HANDRAILS
PORCH RAIL DETAILS
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .2
P o rc h In
.d w g
A4.2
2 EAST (FRONT) PORCH RAIL, POST REPAIR DETAIL
REBECCA GAEBLER
File details come from the government source that posted it. Updated .