This notice solicits bids for the Saxton House Rehabilitation project at the First Ladies National Historic Site in Canton, OH. Work includes repairs to existing wood windows, replacement of several windows, reinforcement of iron railings, masonry repointing and repairs, replacement of a metal roof system covering porches, replacement of decorative wood porch railings, repairs to decorative architectural trim features, and electrical conduit installation and exterior repainting.
The solicitation number is 140P6423B0001. The project magnitude is between $500,000 to $1,000,000. A firm-fixed price contract will be awarded, subject to Construction Wage Rate Requirements for Stark County, OH. The period of performance is 280 days from notice to proceed. The NAICS code is 238990 with a $16.5 million size standard. The project is set aside 100% for Women Owned Small Businesses. Offerors must register in SAM.gov and have a UEI number to be eligible for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6423B0001_Amd_0003.pdf | ||
| Sol_140P6423B0001_Amd_0002.pdf | ||
| Questions_and_Answers_-_Saxton_House_0001.pdf | ||
| Sol_140P6423B0001_Amd_0001.pdf | ||
| Drawings__1_-_Saxton_House.pdf | ||
| Project_Specifications.pdf | ||
| Bid-Price_Schedule_-_Saxton_House_Rehabilitation.pdf | ||
| Addendum_to_Specifications.pdf | ||
| Submittal_List.pdf | ||
| Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Sol_140P6423B0001.pdf | ||
| Construction_Contract_Administration.pdf | ||
| Drawings__3_-_Saxton_House.pdf | ||
| Wage_Determination.pdf | ||
| Bid_Schedule_-_Saxton_House_Rehabilitation.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
216218 217
NOTE: QUANTITIES ARE FOR ENTIRE NORTH ELEVATION. QUANTITIES ON SHEETS A2.1,
A2.2, AND A2.3 ARE COMBINED.
1. REMOVE DETERIORATION AND EPOXY REPAIR WOOD CORNICE PER
SPECIFICATIONS (16 SQUARE INCHES).
2. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
3. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH
PREP, PRIME, AND PAINT(1 BRACKET).
NORTH ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS.
ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED,
AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :1
P
M A2.3
ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
A2.3
1 TREATMENT NORTH ELEVATION 3 - EAST
A2.3
2 TREATMENT NORTH ELEVATION 3 - WEST
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .3
E le v a ti o n .d w g
NORTH ELEVATION REPAIRS
NOTE: NORTH ELEVATION
CONTINUES ON SHEETS
A2.1 AND A2.2
REBECCA GAEBLER
2118415
2/21/2022
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
115116
NOTE: QUANTITIES ARE FOR ENTIRE WEST ELEVATION. QUANTITIES ON SHEETS A2.4
AND A2.5 ARE COMBINED.
1. REPLACE WOOD SKIRT BOARD IN KIND (17 LINEAR FEET TOTAL X +/-8" HEIGHT).
2. REPLACE FASCIA BOARD SCARF JOINT (23 LINEAR FEET TOTAL X +/-11" HEIGHT -
MULTIPLE LOCATIONS).
3. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH
(1 BRACKET).
4. REMOVE AND REPLACE WOOD FRIEZE BOARD PIECE (THE END PIECE THAT TURNS
BACK TO BRICK) (2 LINEAR FEET).
5. REMOVE EXISTING, UNUSED METAL ACCESSORY (NAIL, SCREW, BOLT, ETC) AND
PATCH WOOD. (2 TOTAL)
6. DUTCHMEN REPAIR WOOD TRIM. MATCH PROFILE, SCALE, AND MATERIAL
(6 LINEAR FEET X +/-10")
7. CLEAN WALL VENT. PREP, PRIME, AND PAINT (2 TOTAL)
8. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
WEST ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS.
ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED,
AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :1
P
M A2.4
NO SCALE
A2.4
1 TREATMENT WEST ELEVATION 1 - UPPER
ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
A2.4
2 TREATMENT WEST ELEVATION 1- LOWER
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .4
E le v a ti o n .d w g
WEST ELEVATION REPAIRS
NOTE: WEST ELEVATION
CONTINUES ON SHEETS
A2.5
REBECCA GAEBLER
SEE DRAWINGS A1.2, A1.3,
A4.0, AND A4.1 FOR PORCH
RAILING WORK.
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
NOTE: QUANTITIES ARE FOR ENTIRE WEST ELEVATION. QUANTITIES ON SHEETS A2.4
AND A2.5 ARE COMBINED.
1. REPLACE WOOD SKIRT BOARD IN KIND (17 LINEAR FEET TOTAL X +/-8" HEIGHT).
2. REPLACE FASCIA BOARD SCARF JOINT (23 LINEAR FEET TOTAL X +/-11" HEIGHT -
MULTIPLE LOCATIONS).
3. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH
(1 BRACKET).
4. REMOVE AND REPLACE WOOD FRIEZE BOARD PIECE (THE END PIECE THAT TURNS
BACK TO BRICK) (2 LINEAR FEET).
5. REMOVE EXISTING, UNUSED METAL ACCESSORY (NAIL, SCREW, BOLT, ETC) AND
PATCH WOOD. (2 TOTAL)
6. DUTCHMEN REPAIR WOOD TRIM. MATCH PROFILE, SCALE, AND MATERIAL
(6 LINEAR FEET X +/-10")
7. CLEAN WALL VENT. PREP, PRIME, AND PAINT (2 TOTAL)
8. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
WEST ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS. ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED, AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :1
P
M A2.5
NO SCALE
A2.5
1 TREATMENT WEST ELEVATION 2-3
ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .5
E le v a ti o n .d w g
WEST ELEVATION REPAIRS
NOTE: WEST ELEVATION
CONTINUES ON SHEETS
A2.4
REBECCA GAEBLER
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
NOTE: QUANTITIES ARE FOR ENTIRE SOUTH ELEVATION. QUANTITIES ON SHEETS A2.6,
A2.7, A2.8, A2.9, AND A2.10 ARE COMBINED.
1. AREA OF DETERIORATED MORTAR. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR, AND COMPRESSIVE STRENGTH (79 LINEAR FEET).
2. REPOINT 100% OF JOINT AROUND KEYSTONE. PER SPECIFICATION. MORTAR TO
MATCH ORIGINAL IN TEXTURE, TOOLING, COLOR AND COMPRESSIVE STRENGTH
(24 LINEAR FEET).
3. REPOINT JOINT AT BASE OF ARCH. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR AND COMPRESSIVE STRENGTH (22 LINEAR FEET).
4. REPOINT AROUND STONE SILL. PER SPECIFICATION. REPOINT 100% OF MASONRY
JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE, TOOLING,
COLOR AND COMPRESSIVE STRENGTH (16 LINEAR FEET).
5. REMOVE DETERIORATION AND EPOXY REPAIR WOOD CORNICE (4 SQUARE FEET).
6. REPLACE WOOD SKIRT BOARD IN KIND (21 LINEAR FEET).
7. REPLACE FASCIA BOARD SCARF JOINT IN KIND. PREP, PRIME, AND PAINT
(12 LINEAR FEET)
8. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
9. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH.
(TOTAL 2).
10. REMOVE AND REPLACE WOOD FRIEZE BOARD PIECE (24 LINEAR FEET).
11. OPTION 1: REMOVE KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR.
REINSTALL KEYSTONE UTILIZING LEAD WEDGE SHIM (FOR FRICTION). REPOINT,
COVER WITH A MINIMUM 1-INCH MORTAR OVER LEAD WEDGE. OPTION 2: REMOVE
KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR. REINSTALL KEYSTONE,
INSTALL STAINLESS STEEL MASONRY ANCHOR. MAY REQUIRE REMOVAL OF
BRICKS ABOVE FOR ANCHOR INSTALLATION. REPOINT PER SPECIFICATIONS. (2
KEYSTONES ).
SOUTH ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS.
ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED,
AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :2
P
M A2.6
NO SCALE
A2.6
1 TREATMENT SOUTH ELEVATION 1 - LOWER
NO SCALE
A2.6
2 TREATMENT SOUTH ELEVATION 1 - UPPER ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .6
E le v a ti o n .d w g
SOUTH ELEVATION REPAIRS
NOTE: SOUTH ELEVATION
CONTINUES ON SHEETS
A2.7 THROUGH A2.10
REBECCA GAEBLER
/-2
'-0
/-2
'-0
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
NOTE: QUANTITIES ARE FOR ENTIRE SOUTH ELEVATION. QUANTITIES ON SHEETS A2.6,
A2.7, A2.8, A2.9, AND A2.10 ARE COMBINED.
1. AREA OF DETERIORATED MORTAR. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR, AND COMPRESSIVE STRENGTH (79 LINEAR FEET).
2. REPOINT 100% OF JOINT AROUND KEYSTONE. PER SPECIFICATION. MORTAR TO
MATCH ORIGINAL IN TEXTURE, TOOLING, COLOR AND COMPRESSIVE STRENGTH
(24 LINEAR FEET).
3. REPOINT JOINT AT BASE OF ARCH. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR AND COMPRESSIVE STRENGTH (22 LINEAR FEET).
4. REPOINT AROUND STONE SILL. PER SPECIFICATION. REPOINT 100% OF MASONRY
JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE, TOOLING,
COLOR AND COMPRESSIVE STRENGTH (16 LINEAR FEET).
5. REMOVE DETERIORATION AND EPOXY REPAIR WOOD CORNICE (4 SQUARE FEET).
6. REPLACE WOOD SKIRT BOARD IN KIND (21 LINEAR FEET).
7. REPLACE FASCIA BOARD SCARF JOINT IN KIND. PREP, PRIME, AND PAINT
(12 LINEAR FEET)
8. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
9. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH.
(TOTAL 2).
10. REMOVE AND REPLACE WOOD FRIEZE BOARD PIECE (24 LINEAR FEET).
11. OPTION 1: REMOVE KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR.
REINSTALL KEYSTONE UTILIZING LEAD WEDGE SHIM (FOR FRICTION). REPOINT,
COVER WITH A MINIMUM 1-INCH MORTAR OVER LEAD WEDGE. OPTION 2: REMOVE
KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR. REINSTALL KEYSTONE,
INSTALL STAINLESS STEEL MASONRY ANCHOR. MAY REQUIRE REMOVAL OF
BRICKS ABOVE FOR ANCHOR INSTALLATION. REPOINT PER SPECIFICATIONS. (2
KEYSTONES ).
SOUTH ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS.
ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED,
AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :2
P
M A2.7
NO SCALE
A2.7
1 TREATMENT SOUTH ELEVATION 2-3
NO SCALE
A2.7
2 TREATMENT SOUTH ELEVATION 4
ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .7
E le v a ti o n .d w g
SOUTH ELEVATION REPAIRS
NOTE: SOUTH ELEVATION
CONTINUES ON SHEETS
A2.6 AND A2.8 THROUGH
A2.10
REBECCA GAEBLER
210 209
SEE DRAWINGS A1.2, A1.3,
A4.0, AND A4.1 FOR PORCH
RAILING WORK.
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
NOTE: QUANTITIES ARE FOR ENTIRE SOUTH ELEVATION. QUANTITIES ON SHEETS A2.6,
A2.7, A2.8, A2.9, AND A2.10 ARE COMBINED.
1. AREA OF DETERIORATED MORTAR. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR, AND COMPRESSIVE STRENGTH (79 LINEAR FEET).
2. REPOINT 100% OF JOINT AROUND KEYSTONE. PER SPECIFICATION. MORTAR TO
MATCH ORIGINAL IN TEXTURE, TOOLING, COLOR AND COMPRESSIVE STRENGTH
(24 LINEAR FEET).
3. REPOINT JOINT AT BASE OF ARCH. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR AND COMPRESSIVE STRENGTH (22 LINEAR FEET).
4. REPOINT AROUND STONE SILL. PER SPECIFICATION. REPOINT 100% OF MASONRY
JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE, TOOLING,
COLOR AND COMPRESSIVE STRENGTH (16 LINEAR FEET).
5. REMOVE DETERIORATION AND EPOXY REPAIR WOOD CORNICE (4 SQUARE FEET).
6. REPLACE WOOD SKIRT BOARD IN KIND (21 LINEAR FEET).
7. REPLACE FASCIA BOARD SCARF JOINT IN KIND. PREP, PRIME, AND PAINT
(12 LINEAR FEET)
8. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
9. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH.
(TOTAL 2).
10. REMOVE AND REPLACE WOOD FRIEZE BOARD PIECE (24 LINEAR FEET).
11. OPTION 1: REMOVE KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR.
REINSTALL KEYSTONE UTILIZING LEAD WEDGE SHIM (FOR FRICTION). REPOINT,
COVER WITH A MINIMUM 1-INCH MORTAR OVER LEAD WEDGE. OPTION 2: REMOVE
KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR. REINSTALL KEYSTONE,
INSTALL STAINLESS STEEL MASONRY ANCHOR. MAY REQUIRE REMOVAL OF
BRICKS ABOVE FOR ANCHOR INSTALLATION. REPOINT PER SPECIFICATIONS. (2
KEYSTONES ).
SOUTH ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS.
ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED,
AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :3
P
M A2.8
NO SCALE
A2.8
1 TREATMENT SOUTH ELEVATION 5
NO SCALE
A2.8
2 TREATMENT SOUTH ELEVATION 6 ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .8
E le v a ti o n .d w g
SOUTH ELEVATION REPAIRS
NOTE: SOUTH ELEVATION
CONTINUES ON SHEETS
A2.6, A2.7, A2.9, A2.10
REBECCA GAEBLER
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
NOTE: QUANTITIES ARE FOR ENTIRE SOUTH ELEVATION. QUANTITIES ON SHEETS A2.6,
A2.7, A2.8, A2.9, AND A2.10 ARE COMBINED.
1. AREA OF DETERIORATED MORTAR. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR, AND COMPRESSIVE STRENGTH (79 LINEAR FEET).
2. REPOINT 100% OF JOINT AROUND KEYSTONE. PER SPECIFICATION. MORTAR TO
MATCH ORIGINAL IN TEXTURE, TOOLING, COLOR AND COMPRESSIVE STRENGTH
(24 LINEAR FEET).
3. REPOINT JOINT AT BASE OF ARCH. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR AND COMPRESSIVE STRENGTH (22 LINEAR FEET).
4. REPOINT AROUND STONE SILL. PER SPECIFICATION. REPOINT 100% OF MASONRY
JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE, TOOLING,
COLOR AND COMPRESSIVE STRENGTH (16 LINEAR FEET).
5. REMOVE DETERIORATION AND EPOXY REPAIR WOOD CORNICE (4 SQUARE FEET).
6. REPLACE WOOD SKIRT BOARD IN KIND (21 LINEAR FEET).
7. REPLACE FASCIA BOARD SCARF JOINT IN KIND. PREP, PRIME, AND PAINT
(12 LINEAR FEET)
8. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
9. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH.
(TOTAL 2).
10. REMOVE AND REPLACE WOOD FRIEZE BOARD PIECE (24 LINEAR FEET).
11. OPTION 1: REMOVE KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR.
REINSTALL KEYSTONE UTILIZING LEAD WEDGE SHIM (FOR FRICTION). REPOINT,
COVER WITH A MINIMUM 1-INCH MORTAR OVER LEAD WEDGE. OPTION 2: REMOVE
KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR. REINSTALL KEYSTONE,
INSTALL STAINLESS STEEL MASONRY ANCHOR. MAY REQUIRE REMOVAL OF
BRICKS ABOVE FOR ANCHOR INSTALLATION. REPOINT PER SPECIFICATIONS. (2
KEYSTONES ).
SOUTH ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS.
ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED,
AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :3
P
M A2.9
NO SCALE
A2.9
1 TREATMENT SOUTH ELEVATION 7
ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
0A2.9
2 TREATMENT SOUTH ELEVATION 8 - LOWER WEST
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .9
E le v a ti o n .d w g
SOUTH ELEVATION REPAIRS
NOTE: SOUTH ELEVATION
CONTINUES ON SHEETS
A2.6 THROUGH A2.8, AND
A2.10
REBECCA GAEBLER
DETERIORATED / STRUCTURALLY
UNSOUND WOOD TO BE REPAIRED
WITH PATCH OR DUTCHMAN
REPLACEMENT, OR REMOVED AND
REPLACE WITH IN-KIND MATERIALS
AREA OF MISSING AND/OR
DETERIORATED MORTAR
ELEVATION DETERIORATION LEGEND
DETERIORATED AND/OR
RUSTED METAL
NOTE: QUANTITIES ARE FOR ENTIRE SOUTH ELEVATION. QUANTITIES ON SHEETS A2.6,
A2.7, A2.8, A2.9, AND A2.10 ARE COMBINED.
1. AREA OF DETERIORATED MORTAR. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR, AND COMPRESSIVE STRENGTH (79 LINEAR FEET).
2. REPOINT 100% OF JOINT AROUND KEYSTONE. PER SPECIFICATION. MORTAR TO
MATCH ORIGINAL IN TEXTURE, TOOLING, COLOR AND COMPRESSIVE STRENGTH
(24 LINEAR FEET).
3. REPOINT JOINT AT BASE OF ARCH. PER SPECIFICATION. REPOINT 100% OF
MASONRY JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE,
TOOLING, COLOR AND COMPRESSIVE STRENGTH (22 LINEAR FEET).
4. REPOINT AROUND STONE SILL. PER SPECIFICATION. REPOINT 100% OF MASONRY
JOINTS IN NOTED AREA. MORTAR TO MATCH ORIGINAL IN TEXTURE, TOOLING,
COLOR AND COMPRESSIVE STRENGTH (16 LINEAR FEET).
5. REMOVE DETERIORATION AND EPOXY REPAIR WOOD CORNICE (4 SQUARE FEET).
6. REPLACE WOOD SKIRT BOARD IN KIND (21 LINEAR FEET).
7. REPLACE FASCIA BOARD SCARF JOINT IN KIND. PREP, PRIME, AND PAINT
(12 LINEAR FEET)
8. REMOVE AND REPLACE ALL QUARTER ROUND TRIM AND BASE TRIM AT THE BASE
OF PORCH COLUMN IN KIND (REFERENCE EAST ELEVATION FOR TOTAL NUMBER
COUNT). SEE DETAIL 1/A4.1.
9. EPOXY REPAIR BRACKET. SAND BASE OF BRACKET TO BE SMOOTH FINISH.
(TOTAL 2).
10. REMOVE AND REPLACE WOOD FRIEZE BOARD PIECE (24 LINEAR FEET).
11. OPTION 1: REMOVE KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR.
REINSTALL KEYSTONE UTILIZING LEAD WEDGE SHIM (FOR FRICTION). REPOINT,
COVER WITH A MINIMUM 1-INCH MORTAR OVER LEAD WEDGE. OPTION 2: REMOVE
KEYSTONE AND FILL VOIDS WITH COMPATIBLE MORTAR. REINSTALL KEYSTONE,
INSTALL STAINLESS STEEL MASONRY ANCHOR. MAY REQUIRE REMOVAL OF
BRICKS ABOVE FOR ANCHOR INSTALLATION. REPOINT PER SPECIFICATIONS. (2
KEYSTONES ).
SOUTH ELEVATIONS TREATMENT KEY NOTES
GENERAL ELEVATION NOTES:
• REFERENCE A1.2, A1.3, A4.0, AND A4.1 FOR PORCH ROOF WORK AT SECOND FLOOR.
• REFERENCE WINDOW SCHEDULE ON SHEETS A3.0 THROUGH A3.3 FOR THE SCOPE
OF WORK FOR EACH WINDOW.
• REFERENCE SPECIFICATIONS.
SEE DRAWINGS A1.2, A1.3,
A4.0, AND A4.1 FOR PORCH
RAILING WORK.
ALL EXTERIOR PAINTED SURFACES SHALL BE PREPPED, PRIMED,
AND PAINTED PER THE SPECIFICATIONS. THIS INCLUDES ALL
METAL AND WOOD AT THE THIRD FLOOR MANSARD ROOF. ALL
WOOD TRIM, BRACKETS, PORCH COMPONENTS, WINDOWS,
STORM WINDOWS, AND PORCH FOUNDATION COMPONENTS,
INCLUDING FOUNDATION GRILLES. EXTERIOR PAINTING TO
CONSIST OF CUSTOM COLORS TO BE APPROVED BY THE COR.
WINDOWS, BRICK MOLDING, AND STORM WINDOWS TO BE C1. ALL
OTHER PAINTED SURFACES TO BE C2.
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :3
P
M A2.10
NO SCALE
A2.10
2 TREATMENT SOUTH ELEVATION 8 & 9 - UPPER
ELEVATION KEY
DOOR NUMBER
WINDOW (###), METAL PANEL (M#). WOOD
PANEL (W#), METAL GRILLE (V#).
DRAWING KEY NOTES#
A2.10
1 TREATMENT SOUTH ELEVATION 8 & 9 - LOWER EAST
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .1
E le v a ti o n .d w g
SOUTH ELEVATION REPAIRS
NOTE: SOUTH ELEVATION
CONTINUES ON SHEETS
A2.6 THROUGH A2.9
REBECCA GAEBLER
W2-1 - ARCHED TOP
1/1 SASHES
EXISTING HISTORIC WINDOW
EXTERIOR WOOD STORM
WINDOW EXISTING
WR2-2 - ARCHED TOP
2/2 SASHES
EXISTING REPLACEMENT WINDOW
W2-2 - ARCHED TOP
2/2 SASHES
EXISTING HISTORIC WINDOW
W3-1 - ARCHED TOP - 3RD FLOOR
1/1 SASHES
EXISTING HISTORIC WINDOW
WR1-2 - ARCHED TOP
2/2 SASHES
EXISTING REPLACEMENT WINDOW
W1-1 - ARCHED TOP
1/1 SASHES
EXISTING HISTORIC WINDOW
WR3-1 - ARCHED TOP - 3RD FLOOR
1/1 SASHES
EXISTING REPLACEMENT WINDOW
CONFIRM IF SQUARE TOP SASH OR
CURVED IN THE FIELD
WR1-1B - ARCHED TOP
1/1 SASHES
EXISTING REPLACEMENT WINDOW
WR1-1A - ARCHED TOP
1/1 SASHES
EXISTING HISTORIC WINDOW
3'-1 3/4" +/- V.I.F.
T
O
V E
R
IF
Y I N
F
IE
L D
2'-11 3/4" +/- V.I.F.
T
O
/4
V
E R
IF
Y
I N
F
IE
L D
T
O
/4
V
E R
IF
Y
I N
F
IE
L D
2'-11 3/4" +/- V.I.F.
/4
T
O
V E
R
IF
Y I N
F
IE
L D
2'-11 3/4" +/- V.I.F.
/4
T
O
V E
R
IF
Y I N
F
IE
L D
2'-11 3/4" +/- V.I.F.
/4
T
O
V E
R
IF
Y I N
F
IE
L D
2'-11 3/4" +/- V.I.F.
/4
T
O
V E
R
IF
Y I N
F
IE
L D
2'-11 3/4" +/- V.I.F.
/4
T
O
V E
R
IF
Y I N
F
IE
L D
1'-9 3/4" +/- V.I.F. 2'-6 7/8" +/- V.I.F.
/2
V
E R
IF
Y
I N
F
IE
L D
2'-6 7/8" +/- V.I.F.
/2
V
E R
IF
Y
I N
F
IE
L D
JAMB DETAIL
SILL DETAIL
MEETING RAIL DETAIL
MUNTIN
JAMB DETAIL
SILL DETAIL
MEETING RAIL DETAIL
MUNTIN
EXISTING WINDOW TYPE 'A'
TYPICAL HISTORIC HUNG WINDOW DETAILS (MATCH THESE WINDOW DETAILS
FOR NEW REPLACEMENT WINDOWS, PER THE WINDOW SCHEDULE)
EXISTING 1990'S REPLACEMENT SPIRAL
BALANCE INSERT WINDOW
DETAILS - FOR REPAIRS
/1
/4
/8
1 13/16"
/4
/4
/4
/8
MEETING RAIL EXTENSIONS.
REMOVE AS NOTED ON
WINDOW SCHEDULE.
SOME REPLACEMENT WINDOWS
IN ORIGINAL OPENINGS RETAIN
ORIGINAL BRICK MOLDING AND
WOOD SILLS.
ORIGINAL WEIGHT
EXTERIOR WOOD SILLS MAY BE
ORIGINAL OR REPLACEMENT.
MOST DO NOT HAVE MUCH IF
ANY SLOPE. WHERE SILLS ARE
TO BE REPLACED, PROVIDE
SILL SLOPED APPROXIMATELY
1/4" TO DRAIN.
INTERIOR MAY
HAVE ORIGINAL OR
REPRODUCTION
WOOD TRIM
INTERIOR MAY
HAVE ORIGINAL OR
REPRODUCTION
WOOD TRIM
WINDOWS IN RECONSTRUCTED
WALLS DO NOT HAVE ORIGINAL
WEIGHT POCKETS. REPLACEMENT
WINDOWS IN ORIGINAL WINDOW
OPENINGS RETAIN ORIGINAL
WEIGHT POCKETS.
INTERIOR MAY
HAVE ORIGINAL OR
REPRODUCTION
WOOD TRIM
INTERIOR MAY
HAVE ORIGINAL OR
REPRODUCTION
WOOD TRIM
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :4
P
M A3.0
WINDOW TYPES AND DETAILS
A3.0
2 WINDOW TYPES
A3.0
1 WINDOW DETAILS
3 0
SCALE OF INCHES
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .0
F ir s t
F l.
W in d o w
T y p e s a n d D e ta ils .d w g
REBECCA GAEBLER
FIRST FLOOR WINDOW SCHEDULE
NO.
3'-6 1/4" 8'-10 1/2"
3'-6 1/4" 8'-10 5/8"
3'-6 3/8" 8'-10 5/8"
3'-6 9/16" 8'-11 1/4"
3'-6 1/2" 8'-11 1/8"
3'-6 9/16" 8'-10 7/16"
3'-6 3/16" 8'-10 3/16"
3'-4 7/16" 8'-11 1/16"
3'-6 5/8" 6'-10 5/8"
3'-6 1/16" 6'-8 3/4"
3'-6 5/16" 6'-8 11/16"
3'-6 5/16" 6'-8 11/16"
3'-6 1/2" 8'-10 7/8"
3'-6" 8'-11 1/2"
GOOD
GOOD
GOOD
GOOD
3'-6 1/4" 8'-10 7 1/16"
VERY
POOR
GOOD
VERY
POOR
GOOD
GOOD
GOOD
GOOD
GOOD
REPLACEMENT
REPLACEMENT GOOD
REPLACEMENT GOOD
REPLACEMENT GOOD
REPLACEMENT GOOD
REPLACEMENT GOOD
ORIGINAL BRICK MOLD
REPLACEMENT JAMB
REPLACEMENT SILL
POOR
POOR
GOOD
REPLACEMENT GOOD
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
GOOD
POOR
VERY
POOR
REPLACEMENT BRICK MOLD
REPLACEMENT SILL
FAIR
POOR
GOOD REPLACEMENT GOOD
VERY
POOR
ORIGINAL BRICK MOLD
REPLACEMENT JAMB
REPLACEMENT SILL
GOOD
GOOD
FAIR
ORIGINAL BRICK MOLD
REPLACEMENT JAMB
MAY BE ORIGINAL SILL
101 EXISTING REPLACEMENT UNIT - 2/2 GOOD REPLACEMENT GOOD
GOOD
REPLACEMENT
REPLACEMENT
REPLACEMENTGOOD GOOD
GOOD
GOOD
3'-6 1/4" 8'-10 1/2"
3'-6 1/4" 8'-10 1/2"
WR1-2
WR1-2
WR1-2
WR1-2
WR1-2
WR1-2
WR1-2
WR1-2
WR1-2
WR1-2
WR1-2
WR2-2
WR2-2
WR2-2
WR2-2
WR1-2
WR1-2
1, 6
1, 6
1, 6
1, 6
1, 6
1, 6
3, 4, 5
1, 6
1, 6
1, 6
1, 6
1, 6
1, 6
1, 6
EXISTING SASH CONFIGURATION
AND STORM WINDOW
EXISTING
WINDOW
CONDITION
EXISTING
WINDOW
TYPE
MASONRY OPENING
WIDTH HEIGHT
EXISTING
JAMB / BRICK MOLD /
SILL
EXISTING
CONDITION
INSTALL NEW
REPLACEMENT
WINDOW - TYPE
NEW
STORM
WDO
REPAIR
EXISTING
WDO
KEY NOTES AND REHABILITATION NOTES
ALL GENERAL NOTES APPLY
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
EXISTING REPLACEMENT UNIT - 2/2
WR1-2
WR1-2
WR2-2
WR1-2
STRIP PAINT FROM SILL, INSTALL WOOD CONSOLIDANT, PROVIDE EPOXY
REPAIRS IN AREAS OF MINOR DETERIORATION.
X
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS, STOPS,
AND SILL. PROVIDE AND INSTALL NEW CUSTOM STORM WINDOW;
RETAIN BRICK MOLDING - PROVIDE DUTCHMAN REPAIR BOTTOM 6"
EACH, RIGHT AND LEFT SIDES.
X
X
X
X
X
X
X
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS, STOPS, AND SILL.
PROVIDE AND INSTALL NEW CUSTOM STORM WINDOW;
RETAIN BRICK MOLDING - PROVIDE DUTCHMAN REPAIR BOTTOM 4", RIGHT SIDE.
3, 4, 5
3, 4, 5
3, 4, 5
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS, STOPS, AND SILL.
PROVIDE AND INSTALL NEW CUSTOM STORM WINDOW;
RETAIN BRICK MOLDING.
X
X
X
REPLACE WINDOW UNIT IN ITS ENTIRETY, INCLUDING JAMBS, STOPS, AND SILL.
PROVIDE AND INSTALL NEW CUSTOM STORM WINDOW;
RETAIN BRICK MOLDING - PROVIDE DUTCHMAN REPAIR BOTTOM 18" EACH, LEFT
AND RIGHT SIDES.
X
X
X
X
X
X
GENERAL NOTES:
A. REMOVE ALL SCREWS, NAILS, AND OTHER ATTACHMENTS
FROM THE WINDOW COMPONENTS AND JAMBS THAT ARE NOT
PART OF THE WINDOW OPERATION. PATCH/REPAIR HOLES
WHERE REMOVED, PER SPECIFICATIONS.
B. REMOVE AND INSTALL NEW FASTENERS IF THEY ARE
PROTRUDING FROM THE WINDOW SASHES OR JAMBS, IN KIND,
EXTERIOR-GRADE STAINLESS STEEL FASTENERS ONLY.
C. ON HISTORIC WINDOW SASHES THAT ARE TO RECEIVE NEW
GLAZING PUTTY, PROTECT THE INTERIOR SURFACE OF THE
HISTORIC GLASS DURING HANDLING. THE INTERIOR SURFACE
OF THE GLASS HAS BEEN COATED WITH A UV PROTECTIVE
FILM THAT CAN EASILY BE SCRATCHED.
D. ASSUME ALL PAINT CONTAINS LEAD, UNLESS TESTING BY
CONTRACTOR SHOWS OTHERWISE. TAKE ALL NECESSARY
PRECAUTIONS TO PREVENT LEAD CONTAMINATION, PER EPA
AND OSHA REGULATIONS. ONLY CONTRACTORS CERTIFIED TO
HANDLE LEAD PAINT SHALL PERFORM WORK ON THE
WINDOWS AND SURROUNDING TRIM. DISPOSE OF ALL
LEAD-CONTAINING COMPONENTS, AS REQUIRED BY LAW.
RETAIN DISPOSAL RECORDS FOR COR.
E. BOARD-UP OPENINGS DURING RESTORATION. BOARD-UP
SHOULD BE FABRICATED IN A MANNER ALLOWING IT TO BE
REMOVED AND REINSTALLED, AS NECESSARY DURING
REPLACEMENT EFFORTS. BOARD-UP SHOULD BE SECURED,
WEATHER-TIGHT, NOT ATTACHED TO HISTORIC MILLWORK OR
MASONRY, AND SHOULD ONLY BE ABLE TO BE REMOVED FROM
THE INTERIOR.
KEY NOTES:
1. EXISTING WINDOW SASHES, TRIM, JAMS, AND SILLS - PERFORM
REPAIRS INDICATED ON THE WINDOW SCHEDULE, IF
REQUIRED. REMOVE EXISTING SEALANTS AND INSTALL ALL
NEW SEALANTS. PREP, PRIME (WHERE BARE WOOD EXPOSED),
AND PAINT ALL EXTERIOR COMPONENTS.
2. EXISTING STORM WINDOWS - PERFORM REPAIRS TO THE
EXISTING WOOD STORM WINDOWS AS INDICATED ON THE
WINDOW SCHEDULE. PREP, PRIME (WHERE BARE WOOD
EXPOSED), AND PAINT ALL SIDES (INTERIOR AND EXTERIOR) OF
SASHES. INSTALL NEW STAINLESS STEEL HINGES TO MATCH
EXISTING SIZE ON ALL UNITS. DO NOT PAINT HINGES. PROVIDE
OR REPLACE SHIMS, AS IN EXISTING INSTALLATION.
3. NEW REPLACEMENT WINDOWS -
- REMOVE EXISTING WINDOW UNIT IN ITS ENTIRETY. ENSURE
INTERIOR TRIM IS CAREFULLY REMOVED (ONLY AS NEEDED)
AND REPLACED IN ITS ORIGINAL CONDITION. CONTRACTOR
RESPONSIBLE FOR REPLACEMENT OF ANY DAMAGED TRIM, IN
KIND.
- NEW WINDOW UNITS SHALL BE PER THE SPECIFICATIONS AND
INDIVIDUALLY FIELD MEASURED TO ACCOUNT FOR UNIQUE
FIELD CONDITIONS AT EACH LOCATION. MATCH HISTORIC
WINDOW SQUARED UPPER SASHES WITH ARCHED, COMPOUND
FLAT ARCH GLAZED OPENINGS. THIRD FLOOR UNITS TO BE
HALF-ARCH TO MATCH HISTORIC WINDOW 307. UNITS TO
MATCH THE HISTORIC ORIGINAL WINDOW PROFILES AND
OVERALL DIMENSIONS AND CONFIGURATIONS AS CLOSELY AS
POSSIBLE WITH SIMULATED INSULATED GLASS UNITS. (DO NOT
MATCH THE MODERN REPLACEMENT UNITS). NEW UNITS TO BE
FACTORY FINISHED ON THE EXTERIOR WITH CUSTOM PAINT
COLOR TO BE SELECTED BY THE COR. INTERIOR TO BE
STAINED ON SITE TO MATCH THE SURROUNDING MILLWORK.
COR TO APPROVE SAMPLE TRIM STAIN BEFORE APPLICATION.
4. PROVIDE AND INSTALL NEW REPLICA WOOD STORM WINDOW,
PER SPECIFICATIONS. UNIT SHALL BE PREPPED, PRIMED, AND
PAINTED TO MATCH THE CUSTOM COLOR FOR THE WINDOWS
AND TRIM, AS SELECTED BY THE COR.
5. NEW REPLACEMENT TRIM, WOOD DUTCHMAN PATCHES, AND
SILLS SHALL BE BACK-PRIMED, AND ALL CUTS SHALL BE
PRIMED, PER SPECIFICATIONS.
6. EXISTING WINDOWS TO REMAIN - ADJUST WEATHERSTRIPPING
TO SEAL GAPS. REPLACE, IN KIND, WHERE DAYLIGHT IS VISIBLE
OR WHERE THERE IS NO FULL CONTACT WITH OPPOSING
SURFACE.
7. EXISTING REPLACEMENT WINDOWS - CAREFULLY REMOVE
TACKED-ON MID-RAIL WOOD TRIM EXTENSIONS ON THE
EXTERIOR FACE OF THE WINDOWS. FILL HOLES WITH WOOD
EPOXY, PER SPECIFICATIONS.
X
X
X
X
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
FIRST LADIES NATIONAL HISTORIC SITE
80022
241935
CA/JT
CA/JT
AG
SUITE 100, 1701 OAK STREET
KANSAS CITY, MISSOURI 64108 02.22.20222
/2
/2
:3 :4
P
M A3.1
FIRST FLOOR WINDOW SCHEDULE
C
F
IL
A \2
\C
A D
V D
R A
W
IN
G S
\A R
C H
\A .1
F ir s t
F l.
W in d o w
S c h e d u le
.d w g
REBECCA GAEBLER
File details come from the government source that posted it. Updated .