Addendum_to_Specifications.pdf

PDF 76 KB Posted

Attached to
Saxton House Rehabilitation
Solicitation number
140P6423B0001
Issued by

About this file

This document provides details for a federal contract solicitation for exterior painting and repairs of the Saxton House at the First Ladies National Historic Site in Canton, Ohio. The National Park Service, Interior Regions 3/4/5 Ohio Major Acquisition Buying Office is seeking bids for a firm-fixed price contract between $500,000 to $1,000,000. The work will consist of repairs to existing wood windows, replacement of several wood windows, reinforcement of iron railings, masonry repointing and repairs, replacement of the metal roofing system covering the porches, replacement of a decorative wood porch rail, repairs to decorative architectural trim features, electrical conduit installation to existing porch roof lighting, and preparation and repainting of exterior wood features. The period of performance is 280 days from the issuance of the notice to proceed. The North American Industry Classification System code is 238990 and the size standard is $16.5 million. This project is set aside 100% for women-owned small businesses. Bidders must register in the System for Award Management and have a Unique Entity Identifier number to be eligible for award.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDM-1, Page 1

ADDENDUM NO. ADDM-01 National Park Service – Interior Regions 3, 4 5 Facilities, Planning and Infrastructure to the 601 Riverfront Drive Bidding Documents Omaha, NE 68102 for 21 February 2022

FIRST LADIES NATIONAL HISTORIC SITE – EXT PAINTING & REPAIRS OF SAXTON HOUSE

331 Market Ave. S.

Canton, OH 44702 PMIS No. 241935

NOTICE TO BIDDERS: The Specifications and Drawings for the above referenced project are hereby amended as follows:

SPECIFICATIONS – GENERAL

ITEM NO. G-1 SECTION 01 10 00 – DIVISION ONE FRONT END

a. PART 1 – GENERAL, ITEM 1.2 Work covered by the Contract Documents, Part D.

Period of Performance: CHANGE the period of performance from 180 days to 280 days.

END OF ADDENDUM

National Park Service
PRECONSTRUCTION CONFERENCE AGENDA
PROJECT LOCATION & TITLE: Cuyahoga Valley National Park – Railroad Tamping & Crossing

Subcontractors

File details come from the government source that posted it. Updated .