DRAWING - RNO-D-ATCT CHILLER REPLACEMENT PROJECT DRAWINGS.pdf

PDF 957 KB Posted

Attached to
Chiller Replacement Project - Reno, NV ATCT Federal contract opportunity
Solicitation number
697DCK23R00110
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document package includes drawings and specifications for the Chiller Replacement Project at the Reno, Nevada air traffic control tower (ATCT), as well as the corresponding federal contract opportunity solicitation. The project involves replacing two 70-ton air cooled chillers and associated mechanical, water piping, electrical, and controls work. Services required include removing and rigging the existing chillers, installing new Carrier or equal chillers on equipment pads with seismic isolators, replacing associated piping and insulation, adding the new chillers to the building automation system, and providing factory startup assistance and owner training. The solicitation was issued by the Department of Transportation Federal Aviation Administration seeking a contractor to furnish all labor, materials, equipment, and transportation for the installation work in accordance with the specifications and drawings provided. The response is due by the date listed on the solicitation under the contract number given.

View the file

Other files for this federal contract opportunity

Other files attached to Chiller Replacement Project - Reno, NV ATCT, newest first.
File Type Posted
697DCK-23-R-00110 P00001.pdf PDF
697DCK-23-R-00110 FAA Chiller QA.pdf PDF
697DCK-23-R-00110.pdf PDF
Attachment 4 Past Experience Form.pdf PDF
COVID-19 Contractual Requirement.pdf PDF
Wage Determination - Nevada - Washoe County.pdf PDF
SOW - Specifications - RNO ATCT Chiller Replacement Project.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

G

F

E

D

C

B

A

7 6

U.S. DEPARTMENT OF

FEDERAL AVIATION

TRANSPORTATION

ADMINISTRATION

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

RENO NEVADA

RENO INTERNATIONAL AIRPORT

AIR TRAFFIC CONTROL

CHILLER REPLACEMENT

TOWER

PROJECT

DRAWING INDEX

DRAWING NUMBER TITLE

GENERAL

RNO-D-ATCT-G012 TITLE SHEET, DRAWING INDEX AND VICINITY MAP

DEMOLITION

RNO-D-ATCT-D001 DEMOLITION CHILLER SITE PLAN

MECHANICAL

RNO-D-ATCT-M046 EQUIPMENT SCHEDULE

RNO-D-ATCT-M04 7 CILLER SITE PLAN

RNO-D-ATCT-M048 CHILLER PIPING DETAIL AND SECTION

RNO-D-ATCT-M049 EXISTING CONTROLS DIAGRAM AND SEQUENCE OF OPERATION

ELECTIRCAL

RNO-D-ATCT-E085 ELECTICAL SINGLE LINE

GENERAL NOTES:

1. RENO AIR TRAFFIC CONTROL TOWER IS A 24 HOURS.., 365 DAYS OPERATING FACILITY.

ALL WORK SHALL BE ACCOMPLISHED TO NOT INTERUP I ANY CHILLED WATER SERVICE

TO THE FACILITY THROUGHOUT THE DURATION OF CONSTRUCTION.

2. CHILLER REPLACEMENT SHALL BE ACCOMPLISHED ONE AT A TIME. EACH CHILLER SYSTEM

SHALL BE FULLY OPERATIONAL AND RUN TESTED FOR AT LEAST ONE DAY BEFORE

REPACEMENT OF THE NEXT CHILLER.

3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO ANY PURCHASE OR

FABRICATION OF ANY EQUIPMENT AND MATERIALS. THERE MAY BE FIELD CONDITIONS

THAT DIFFER FROM DRAWINGS. ANY DEVIATIONS SHALL BE BROUGHT TO ATTENSION

OF FAA RESIDENT ENGINEER FOR A RESOLUTION PRIOR TO CONSTRUCTION,

FABRICATION OR EQUIPMENT /MATERIAL PURCHASE.

I 7 I 6 I 5

4 3

+ 4 I 3

Lu ....J I

VASSAR , :::;;

z ....J

Lu ....J a::

Lu I-

Cl -a::

::c a::

Cl

Lu ....J m m

FAA

BLDG.

AIR

::c a::

c., Lu ....J Lu I-

I

NEV. 0

)395 ��� I 1

C 1--....;;G

UAR

D _ W"-A_Y--.--� .__ _ _, LJ

\....._ __ _:□ "----RNO ATCT

....J Lu V) Cl Lu

VICINITY MAP

SCALE= NONE

I QCAIIQN:

'(...__ _____ __, CJ �-------

I I I I

RNO ATCT ADDRESS: 755 S. ROCK BL VD, RENO, NEVADA, 89502

LAT /LONG: 39° 29'57.6"N, 119° 45'46.3"W

ELEVATION: 4,500 FEET

A

REV APPROVED

DATE

CONSTRUCTION 18061150

DESCRIPTION JCN

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

REDLINE APVD DATE

H

G

F

E

D

C z

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

1E

ATCT

CHILLER REPLACEMENT PROJECT

TITLE SHEET, DRAWING INDEX AND VICINITY MAP

RENO

REVIEWED BY SUBMITTED BY APPROVED BY

MATTHEW TAEUBEL KHANHTRAN

NV

1- (/J z

D w

PROJECT ENGINEER MGR: OPERATIONS SUPPORT Ag f

DESIGNED ISSUED BY

MT

ENGINEERING SERVICES DRAWN

MT OPERATIONS

CHECKED

MT

I 2 I

DATE

DRAWING NO

12/13/2021

I JCN

18061150

REV

A E

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

rno-d-atct-g012
rno-d-atct-d001
rno-d-atct-m046
rno-d-atct-m047
rno-d-atct-m048
rno-d-atct-m049
rno-d-atct-e085

File details come from the government source that posted it. Updated .