697DCK-23-R-00110.pdf

PDF 20 MB Posted

Attached to
Chiller Replacement Project - Reno, NV ATCT Federal contract opportunity
Solicitation number
697DCK23R00110
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This solicitation is for a chiller replacement project at the Reno, NV air traffic control tower. The contractor shall remove and replace two 70-ton air cooled chillers, one at a time, to ensure the facility maintains cooling capabilities. Additional requirements include rigging services, installing new chillers on equipment pads with seismic isolators, replacing associated piping and valves, installing new electrical components, adding insulation, performing startup and testing, integrating the new chillers into the building automation system, and providing owner training. The agency is the Department of Transportation Federal Aviation Administration Southwestern Region. The solicitation includes specifications for the chillers, mechanical, electrical, and controls work required as part of replacing the existing chillers.

View the file

Other files for this federal contract opportunity

Other files attached to Chiller Replacement Project - Reno, NV ATCT, newest first.
File Type Posted
697DCK-23-R-00110 P00001.pdf PDF
697DCK-23-R-00110 FAA Chiller QA.pdf PDF
SOW - Specifications - RNO ATCT Chiller Replacement Project.pdf PDF
Attachment 4 Past Experience Form.pdf PDF
DRAWING - RNO-D-ATCT CHILLER REPLACEMENT PROJECT DRAWINGS.pdf PDF
COVID-19 Contractual Requirement.pdf PDF
Wage Determination - Nevada - Washoe County.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .