DRAWING 621-21-115.pdf

PDF 5 MB Posted

Attached to
Z1DA--621-21-115 - Replace Bldg. 204 Roof Phase 2
Solicitation number
36C24922B0014
Issued by

About this file

This solicitation is for roof replacement services at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The contractor shall remove approximately 13,400 square feet of existing ballasted roofing systems from Building 204 and replace it with a new insulated 60 mil EPDM roofing system that matches the products, workmanship, and warranty of an earlier phase one project. The period of performance is 150 days from notice to proceed with options for deductive alternates that could reduce the scope and period of performance. The solicitation is set aside for service-disabled veteran-owned small businesses and has a total estimated value between $1 million to $2 million. Bids are due by March 10, 2022 and must include performance and payment bonds, safety records, and E-Verify registration information. The selected contractor must complete a VA privacy training and be subject to security background checks commensurate with the level of facility access required.

View the file

Other files

File Type Posted
36C24922B0014 Amendment 0003.pdf PDF
36C24922B0014 Questions and Answers 02.docx DOCX document
36C24922B0014 0002.docx DOCX document
36C24922B0014_1.pdf PDF
36C24922B0014 0001.docx DOCX document
36C24922B0014 Purpose.docx DOCX document
36C24922B0014_1.docx DOCX document
Attachment 1- B204 Roof Phase 1.pdf PDF
Specs - 621-21-115.pdf PDF
WD TN20220111 dated 01-07-2022.pdf PDF
Contractor EMR Certification Form.docx DOCX document
RFI Form.docx DOCX document
Roof Exist Cond Photos - 621-21-115 Bldg 204.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF PLAN REPLACE BUILDING

204 ROOF PHASE 2

11/03/2021

621-21-115

X-1 1 7

A1

A4

A2

A5

A3

4,000 SF

5,100 SF

600 SF

EXISTING ROOF TO

REMAIN

A6

2,200 SF

EXISTING ROOF TO

BE REPLACED

500 SF1,000 SF

GENERAL NOTES:

1. SEE SHEET X-2 AND X-3 FOR GENERAL

ROOF DETIALS.

2. DEMO EXISTING ROOFING SYSTEEM BACK

TO CONCRETE DECK.

3. REPLACE ROOFING SYSEM IN IT'S

ENTIRERTY DOWN TO ROOF DECK.

INCLUDING ALL FLASHING AND PENETRATIOIN

SEALS.

3. EXISTING E.F.I.S. SYSTEMS TO REMAIN.

4. CONTRACTOR SHALL REPLACE OR REPAIR

ANY DAMAGED THAT ARE CAUSED BY

REMOVAL AND INASTALLATION OF NEW

ROOFING SYSTEM.

5. REPLACE LIGHTNING PROTECTION SYSTEM

ON ALL ROOF SECTIONS. SEE LEGEND BELOW.

SHEET NOTES:

3' DROP TO LOWER ROOF

5" FLASHED CURB BETWEEN

ADJACENT ROOF SECTION

EXISTING BALLASTED ROOFING

SYSTEM TO BE REMOVED AND

REPLACE WITH NEW EPDM

ROOFING SYSTEM.

EXISTING EPDM ROOFING SYSTEM

TO BE REMOVED AND REPLACE

WITH NEW EPDM SYSTEM

3 - 2"X6" CURB UNDER ROOFING

MEMBRANE SEPERATING

EXISTING ROOFING SYSTEM

SECTIONS TO REMAIN FROM

SECTION NOTES AS BEING

REMOVED AND REPLACED.

NEW ROOF MEMBRAIN

CONTINUOUS UP PARAPET WALL.

SYSTEM FOR ROOF

WALKWAY. SEE

DETAIL 5/X-2.

X-5

X-4

X-4

X-4

X-4

X-

1 X-

1 X-

EXISTING ROOF TO REMAIN

X-6

2 X-

X-6

X-7

1 X-

SI

M

X-

ROOF SECTION LEGEND:

A1: BUILDING 204 PARTIAL MAIN ROOF

A2: BUILDING 204 PARTIAL MAIN ROOF

A3: BUILDING 204 UPPER ROOF (ABOVE

STAIRWELL & HALLWAY)

A4: BUILDING 204 PARTIAL LOWER ROOF

(ABOVE HALLWAY)

A5: BUILDING 204 PARTIAL LOWER ROOF

(ABOVE HALLWAY)

A6: BUILDING 204 LOWER ROOF (ABOVE

AMBULANCE BAY)

A7: EXISTING BUILDING 204 ROOF SECTION

COMPLETED AS PHASE 1 IN DECEMBER 2021.

EXISTING ROOF TO REMAIN

X-4

SIM

SIM

SIM

X-6

EXISTING ROOF TO REMAIN

7,000 SF

A7

VHAMOUWALTEC

Text Box

NO LIGHTNING PROTECTION WORK IN THIS AREA.

STEP 1

STEP 2

REPLACE

204 PHASE

X-2

621- -1

NOVEMBER 03,

2021 SHEET _2_ OF _3_

X-3

621- -1

REPLACE

B204 PHASE

SHEET _3_ OF_3_

NOVEMBER 03,

X-4

621-21-115

11-03-2021

REPLACE BUILDING

204 ROOF PHASE 2

X-5

X-4

X-4

DEMO AND REPLACE EXISTING

MEMBRANE ROOF AND

TAPERED INSULATION SYSTEM

DEMO DETIAL - WEST OF CONNECTOR

DEMO AND REPLACE EXISTING MEMBRANE FLASHING

DEMO AND REPLACE EXISTING SEALANT

DEMO AND REPLACE EXISTING

TAPERED INSULATION

DEMO EXISTING BALLAST

DEMO EXISTING MEMRANE

ROOFING

DEMO

4 7

621-21-115

11-03-2021RENOVATE BUILDING

204 ROOF PHASE 2

X-5

X-5

5 7

DWG. 6 7

DWG. 7 7

File details come from the government source that posted it. Updated .