DRAWING 621-21-115.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24922B0014
About this file
This solicitation is for roof replacement services at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The contractor shall remove approximately 13,400 square feet of existing ballasted roofing systems from Building 204 and replace it with a new insulated 60 mil EPDM roofing system that matches the products, workmanship, and warranty of an earlier phase one project. The period of performance is 150 days from notice to proceed with options for deductive alternates that could reduce the scope and period of performance. The solicitation is set aside for service-disabled veteran-owned small businesses and has a total estimated value between $1 million to $2 million. Bids are due by March 10, 2022 and must include performance and payment bonds, safety records, and E-Verify registration information. The selected contractor must complete a VA privacy training and be subject to security background checks commensurate with the level of facility access required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24922B0014 Amendment 0003.pdf | ||
| 36C24922B0014 Questions and Answers 02.docx | DOCX document | |
| 36C24922B0014 0002.docx | DOCX document | |
| 36C24922B0014_1.pdf | ||
| 36C24922B0014 0001.docx | DOCX document | |
| 36C24922B0014 Purpose.docx | DOCX document | |
| 36C24922B0014_1.docx | DOCX document | |
| Attachment 1- B204 Roof Phase 1.pdf | ||
| Specs - 621-21-115.pdf | ||
| WD TN20220111 dated 01-07-2022.pdf | ||
| Contractor EMR Certification Form.docx | DOCX document | |
| RFI Form.docx | DOCX document | |
| Roof Exist Cond Photos - 621-21-115 Bldg 204.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF PLAN REPLACE BUILDING
204 ROOF PHASE 2
11/03/2021
621-21-115
X-1 1 7
A1
A4
A2
A5
A3
4,000 SF
5,100 SF
600 SF
EXISTING ROOF TO
REMAIN
A6
2,200 SF
EXISTING ROOF TO
BE REPLACED
500 SF1,000 SF
GENERAL NOTES:
1. SEE SHEET X-2 AND X-3 FOR GENERAL
ROOF DETIALS.
2. DEMO EXISTING ROOFING SYSTEEM BACK
TO CONCRETE DECK.
3. REPLACE ROOFING SYSEM IN IT'S
ENTIRERTY DOWN TO ROOF DECK.
INCLUDING ALL FLASHING AND PENETRATIOIN
SEALS.
3. EXISTING E.F.I.S. SYSTEMS TO REMAIN.
4. CONTRACTOR SHALL REPLACE OR REPAIR
ANY DAMAGED THAT ARE CAUSED BY
REMOVAL AND INASTALLATION OF NEW
ROOFING SYSTEM.
5. REPLACE LIGHTNING PROTECTION SYSTEM
ON ALL ROOF SECTIONS. SEE LEGEND BELOW.
SHEET NOTES:
3' DROP TO LOWER ROOF
5" FLASHED CURB BETWEEN
ADJACENT ROOF SECTION
EXISTING BALLASTED ROOFING
SYSTEM TO BE REMOVED AND
REPLACE WITH NEW EPDM
ROOFING SYSTEM.
EXISTING EPDM ROOFING SYSTEM
TO BE REMOVED AND REPLACE
WITH NEW EPDM SYSTEM
3 - 2"X6" CURB UNDER ROOFING
MEMBRANE SEPERATING
EXISTING ROOFING SYSTEM
SECTIONS TO REMAIN FROM
SECTION NOTES AS BEING
REMOVED AND REPLACED.
NEW ROOF MEMBRAIN
CONTINUOUS UP PARAPET WALL.
SYSTEM FOR ROOF
WALKWAY. SEE
DETAIL 5/X-2.
X-5
X-4
X-4
X-4
X-4
X-
1 X-
1 X-
EXISTING ROOF TO REMAIN
X-6
2 X-
X-6
X-7
1 X-
SI
M
X-
ROOF SECTION LEGEND:
A1: BUILDING 204 PARTIAL MAIN ROOF
A2: BUILDING 204 PARTIAL MAIN ROOF
A3: BUILDING 204 UPPER ROOF (ABOVE
STAIRWELL & HALLWAY)
A4: BUILDING 204 PARTIAL LOWER ROOF
(ABOVE HALLWAY)
A5: BUILDING 204 PARTIAL LOWER ROOF
(ABOVE HALLWAY)
A6: BUILDING 204 LOWER ROOF (ABOVE
AMBULANCE BAY)
A7: EXISTING BUILDING 204 ROOF SECTION
COMPLETED AS PHASE 1 IN DECEMBER 2021.
EXISTING ROOF TO REMAIN
X-4
SIM
SIM
SIM
X-6
EXISTING ROOF TO REMAIN
7,000 SF
A7
VHAMOUWALTEC
Text Box
NO LIGHTNING PROTECTION WORK IN THIS AREA.
STEP 1
STEP 2
REPLACE
204 PHASE
X-2
621- -1
NOVEMBER 03,
2021 SHEET _2_ OF _3_
X-3
621- -1
REPLACE
B204 PHASE
SHEET _3_ OF_3_
NOVEMBER 03,
X-4
621-21-115
11-03-2021
REPLACE BUILDING
204 ROOF PHASE 2
X-5
X-4
X-4
DEMO AND REPLACE EXISTING
MEMBRANE ROOF AND
TAPERED INSULATION SYSTEM
DEMO DETIAL - WEST OF CONNECTOR
DEMO AND REPLACE EXISTING MEMBRANE FLASHING
DEMO AND REPLACE EXISTING SEALANT
DEMO AND REPLACE EXISTING
TAPERED INSULATION
DEMO EXISTING BALLAST
DEMO EXISTING MEMRANE
ROOFING
DEMO
4 7
621-21-115
11-03-2021RENOVATE BUILDING
204 ROOF PHASE 2
X-5
X-5
5 7
DWG. 6 7
DWG. 7 7
File details come from the government source that posted it. Updated .