Attachment 19 - Overhead Door Preventive Maintenance checklist.xls
XLS spreadsheet 45 KB Posted
- Solicitation number
- DRAFTW912DY26RA076
About this file
This is a Preventive Maintenance (PM) checklist template for overhead door inspections and servicing at Fort Hood. The checklist provides a standardized format for technicians to document maintenance activities on overhead doors, including the building number, technician name, date, time tracking, and specific bay door identification. The template requires inspection and documentation of critical door components including balance and level alignment, door straightness, roller condition and lubrication, bolts and fasteners, hinges, guides and pulleys, cables and drums, pins and cords, and spring condition. The checklist also mandates inspection of door panels for damage, control switch operation, electrical contacts, safety loops, photocells, limit switches, safety sensors, and warning lights. Additional maintenance tasks include cleaning and lubrication of motors, chains, belts, and gears, weather stripping inspection, and operator functionality verification for open, close, and stop functions. The checklist incorporates CO sensor calibration and testing requirements and provides space for technician comments and Quality Assurance Evaluator (QAE) approval or rejection signatures with dates. This template directly supports the draft Fort Hood overhead door maintenance solicitation (DRAFTW912DY26RA076) issued by the Department of the Army Corps of Engineers Engineering Support Center Huntsville, which requires comprehensive preventive and corrective maintenance services for approximately 3,375 overhead doors across the Fort Hood installation.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 19 - OVERHEAD DOOR PREVENTIVE MAINTENANCE (PM) CHECKLIST |
| BUILDING No. |
| TECHNICIAN NAME: DATE: |
| TIME IN: TIME OUT: TOTAL HOURS: |
| BAY DOOR NUMBER: |
| Balance and Level Doors |
| Inspect and Straighten Doors |
| Inspect, Clean and Lubricate Rollers |
| Inspect Bolts and/or Replace Damaged or Missing Bolts |
| Inspect and Lubricate All Hinges, Door Guides and Pulley's |
| Inspect All Cables and Drums |
| Inspect Pins and Cords |
| Inspect and Adjust Springs |
| Inspect Panels for Damage |
| Inspect Opertion of Control Switches |
| Inspect Operation of Contacts |
| Inspect Operation of Loops |
| Inspect Operation of Photocells |
| Inspect Operation of Limit Switches |
| Inspect Operation of Safety Sensors |
| Inspect Operation of Warning Lights |
| Inspect, Clean and Lubricate Motors |
| Inspect, Clean and Lubricate Chains |
| Inspect, Clean and Lubricate Belts |
| Inspect, Clean and Lubricate Gears |
| Inspect Weather Stripping |
| Inspect Operators: |
| a. Open |
| b. Close |
| c. Stop |
| CO Sensor Calibration & Testing |
| COMMENTS: |
| COMMENTS: |
| QAE Signature: Date: QAE Accept QAE Reject |
&CTE 19 - Page &P&R24 SEP 09
File details come from the government source that posted it. Updated .