Draft SOW Temp Facility.pdf
PDF 317 KB Posted
- Attached to
- Temporary Facilities Procurement
- Solicitation number
- N4215826RX6XXX
About this file
This is a Statement of Work for the purchase of two temporary production facilities to support CNO Availabilities at Norfolk Naval Shipyard in Portsmouth, Virginia. The contractor shall deliver one 8-foot by 40-foot Type B stackable, non-combustible shipping container-style docking station and one 24-foot by 40-foot Type B double-wide temporary production facility. These units will support non-nuclear and nuclear testing work and must be delivered to Southgate Annex, Lot 17, 3920 Burton's Point Road, Portsmouth, VA 23709, with a desired delivery date of September 15, 2026. The contractor is responsible for all labor, materials, equipment, tools, transportation, and supervision necessary for delivery. Upon delivery, the units will be inspected for compliance with specifications; if inspection is unsatisfactory, the contractor has 10 business days at its own cost to correct discrepancies or the units will not be accepted by the government.
The contractor must comply with Federal and State OSHA requirements, NNSY OSHE Program Manual (NAVSHIPDNORINST P5090.2), and OSHE Control Manual (OSHECM) Chapter 250, including hazardous energy control procedures per 29 CFR 1915.89. The contractor must notify NNSY Technical Points of Contact and Contracting Officer's Representatives of all hazardous energy control work scopes prior to starting work and inform them of any changes or deviations. HEC locks must have red bodies with name labels identifying the installer and contact information. The government will provide ready access to the job location during standard working hours (7:30 AM to 4:00 PM, weekdays), connect the units to NNSY temporary services (electrical power, phone lines, fiber, CAT 5/CAT 6) upon satisfactory delivery, and cover all additional approved maintenance and repairs not specifically covered under the agreement or warranties. The contractor must reference the temporary production facility specification document for detailed lifting and handling requirements and complete contractor responsibilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft 8ft x 40ft Modified Lego Specs.pdf | ||
| Enclosures_24x40 Type B_Combined.pdf | ||
| 24ft x 40ft TPF Specs.pdf | ||
| Enclosures_8x40 Lego Type B_Combined.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Purchase of One (1) (8-ft x 40-ft) Shipping Container Style Docking Station and One (1) (24-ft x 40-ft)
Double-wide Trailer to Support CNO Availabilities while at Norfolk Naval Shipyard.
Performance: The contractor shall provide one (1) 8-ft x 40-ft (Type B), stackable, non-combustible, shipping container-style docking station and one (1) 24-ft x 40-ft (Type B), double-wide temporary production facilities (TPF’s). The purchase of these TPF’s will be in support of a non-nuclear and nuclear testing work on CNO Availabilities. The TPF’s will be delivered to South Gate at Norfolk Naval Shipyard.
The location of the stand-alone unit will be determined at the start of each CNO availability. The contractor shall provide all labor, materials, equipment, tools, transportation and supervision necessary to deliver these TPF’s. The delivery point of these TPF’s shall be Southgate Annex, Lot 17, 3920 Burton’s point road
Portsmouth, VA 23709.
Period of Performance: The desired delivery date is September 15 2026.
Contractor Responsibilities: “ Per FAR 22.102-1(a) entitle “Safety”, Contractors are hereby informed that their employees or representative present on property under NNSY cognizance must follow Federal and
State OSHA requirements; NNSY OSHE Program Manual, NAVSHIPDNORINST P5090.2 requirements; OSHE
Control Manual (OSHECM) requirements; or safety requirements for site specific location of the contract”
Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under NNSY cognizance must adhere to Federal OSHA requirements for hazardous energy control lAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA's Occupational Safety, Health, and Environment Corporate Manual
(OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or
Contracting Officer's Representatives (CORs) be notified of the HEC scope of work prior to starting work.
Any changes or deviations in the initial scope of HEC work require the NNSY TPOCs and/or CORs to be informed of the change/deviation. Appendix 250.8-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus
Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number.
HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out.
OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
Contractors and NNGA's may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY's public access web site:
http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY
TPOC and/or CORs set forth elsewhere in this award document."
Before any purchased temporary production facility unit will be accepted by the government, an inspection will be performed to ensure that the contractor has provided a product that adheres to the agreed upon specifications in this document. If the inspection is not satisfactory, the contractor has 10 business days to correct the discrepancies (at contractors cost), or the temporary Production facility will not be accepted by the government.
Contractor will deliver all units to their designated location at Norfolk Naval Shipyard. Contractor understands that the customer will need to make modifications to the enclosures in order to support the work that will be done from these units. See trailer specification for a complete listing of contractor responsibilities.
See trailer specifications for a complete listing of contractor responsibilities.
Shipyard Responsibilities: Customer agrees to provide contractor with ready access to the job location during contractor’s working hours (i.e., weekdays between the hours of 7:30 AM and 4:00 PM). Emergent services outside these hours will require customer approval and will be at no cost to the government.
Customer is responsible for the cost of all additional approved or requested maintenance and repairs not specifically covered under this Agreement or any applicable warranties.
The customer agrees to, upon satisfactory delivery, connect the TPF to NNSY temporary services (i.e., electrical power, phone lines, fiber, CAT 5/CAT 6).
Lifting and Handling Requirements: See temporary production facility specification document for a complete detailed description of lifting and handling requirements.
Critical time Constraints: Set up required for workforce prior to beginning of critical work in support of
CNO availability.
Location: South Gate at Norfolk Naval Shipyard in Portsmouth, VA