DRAFT_SOW_N6426726Q5012.pdf

PDF 385 KB Posted

Attached to
AV Equipment Upgrade for Split Conference Rooms
Solicitation number
N6426726Q5012
Issued by

About this file

This is a Statement of Work (SOW) for installing audio-visual (AV) and collaborative web conferencing systems in two new Team Submarine TANC Split conference rooms at Naval Sea Systems Command Washington Navy Yard headquarters. The contractor must design, install, configure, and functionally test independent AV and conferencing systems in two collocated conference rooms separated by a sound-rated security curtain. The work includes providing contractor-furnished equipment (CFE) such as large-screen displays, rack cabinets, AV switching and control systems, web conferencing equipment, installation hardware packages, and integrating government-furnished secure KVM equipment (GFE). Specific brand-name items required include two Crestron DMPS3-4K-350-C presentation switchers, two Crestron TS-1070-GV-B-S tabletop touch screens, and two Crestron UC-SB1-CAM web conferencing devices. Additional brand-name or equivalent items include eight JBL Control 26CT ceiling speakers, two Surge X SEQ-1U AC power sequencers, two Samsung QB85N-N 85-inch displays, and two Samsung QB65N-N 65-inch displays.

The contractor must provide AV cross-connects between the two independent systems, ensure all equipment is housed in interchangeable mobile 19-inch half-racks, deliver CAD as-built documentation, provide annotated AV control system source code, supply operating instructions with touch panel screen images, and install independent remotely controlled "Unclassified Meeting in Progress" and "Classified Meeting in Progress" signage readable at 45 feet. A licensed District of Columbia electrician must handle all 120 VAC 1-phase 20-amp wiring modifications. The contract includes a one-year warranty on workmanship, materials, hardware, and software. The period of performance runs from October 1, 2026, through February 28, 2027, with work to be performed at 614 Sicard Street SE, Washington Navy Yard, DC 20376. The single deliverable is CDRL A002—CAD as-built engineering documentation drawings for both rooms.

View the file

Other files

File Type Posted
DRAFT_CDRL_N6426726Q5012_Redacted.pdf PDF
DRAFT_Attachment_1.pdf PDF
DRAFT_Attachment_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW TANC Split Rooms Rev 21 06092026 I-O BNE.docx Page | 1

STATEMENT OF WORK

NAVSEA Team Submarine AV and Collaboration Equipment Upgrade for TANC Split

Conference Rooms

1. INTRODUCTION

The Naval Sea Systems Command has a requirement for installing AV and collaborative web conferencing systems in two new collocated conference rooms.

2. BACKGROUND

The Naval Sea Systems Command Washington Navy Yard HQ, Team Submarine Directorate, is upgrading Audio Visual equipment and web conferencing systems in two (2) new Team

Submarine TANC Split conference rooms by installing a combination of new CFE large screen display, rack cabinets, AV switching and control, web conferencing equipment and new GFE secure KVM equipment. These two conference rooms are formed by drawing a sound-rated security curtain through the center of a larger room. Independent AV and collaborative conferencing systems are to be installed in each room.

3. SCOPE

3.1 The contractor shall design, install, configure, and functionally test AV and collaborative conferencing systems using a combination of new Contractor Furnished display, rack cabinet, AV switch and control, Installation Hardware Package, and web conferencing Equipment (CFE) and new Government Furnished secure KVM Equipment (GFE) in accordance with Attachment

1 found in Section J of this announcement.

3.1.1 The Installation Hardware Package of Attachment 1 found in Section J shall include but not be limited to: Cable, connectors, cable adapters, custom cable assemblies, custom interface panels, labels, video scalers and splitters, display and other equipment mounting devices, and miscellaneous electrical and networking devices.

3.1.2 System Cross-connects. The contractor shall provide AV cross-connects between the two independent but collocated AV systems to allow an AV source connected to a single system to be displayed by both systems.

3.1.3 GFE SKVM. Each GFE Secure KVM (SKVM) and its remote control shall be contained in the associated system’s equipment rack and serve, inter alia, to isolate a single Crestron

DMPS3 AV output sharing display hardware in an unrelated system.

Page | 2

3.1.4 All AV switching and control system, power control, SKVM, and local repeater, scaler, converter equipment shall be contained in a mobile, lockable 19” half-rack. Equipment half-racks shall be interchangeable across all current Team Sub AV System Upgrade wave (CY25 and forward) conference rooms for casualty resolution, repurposing of office space, and the move of organization to other locations with only minor I/O changes for type and number of input and output devices.

3.1.5 Conference table-mounted support electronics. Due to the fluid nature of conference table placement and the rather large number of smaller, mobile tables in each room, conference table-mounted support electronics should be mounted on a single table in each room, thereafter, designated as the ‘Communications Table’, with the intent to position the ‘Communications

Table’ near the central floor-mounted I/O’s for power, network, display, and Web cam access.

All these services shall be passed through the Communications Tables per Table 3, Attachment

2, Section J.

3.1.6. For those conference table arrangements where a ‘Communications Table’ cannot access

I/O services, the contractor shall provide one side wall location in each room with stationary support electronics associated with the hard disconnect panels required in Table 3, Attachment 2, Section J, that allows direct power, network, HDMI, and USB connections.

3.2 Not used.

3.3 Attachment 2 found in Section J of this announcement provides the architectural floor and wall penetration groupings for both rooms. The contractor shall provide custom interface panels with appropriate connectors to transition signals through floors and walls as required in Table 3.

3.4 Damaged areas of ceiling, walls and floors rising from this installation shall be restored to original condition.

3.5 Skill in Crestron AV control and switching system programing and setup is required to complete this installation. The contractor shall provide examples of previous AMX, Crestron or equal, AV control system programing and setup experience.

3.6 The contractor shall provide CAD documentation of installed systems in the As-built condition for each room, including a reference to any connection points in existing, unmodified systems. These drawings shall be delivered in accordance with (IAW) Exhibit A (CDRL A002) found in Section J of this announcement.

3.7 The contractor shall provide a digital copy of AV control system source code, annotated, generated in a recognized source code text editor, delivered on USB Flash Drive and on CD-

R/DVD-R media or file transfer via e-mail or website download for installed systems, however the contractor deems appropriate.

Page | 3

3.8 The Contractor shall provide an Integrator's Summary Operating Instructions with Touch

Panel Screen Images for reference.

3.9 The contractor shall provide independent, remotely controlled, white LED, electrically lighted “Unclassified Meeting in Progress” and “Classified Meeting in Progress” signage for the exterior of each room. Signage shall be readable at 45’ on the perpendicular to ± 22.5⁰ to the perpendicular.

3.10 The contractor shall provide an electrician licensed in the District of Columbia to make changes in the local 120 VAC 1 Phase 20 Amp convenience wiring, in way of removing existing equipment not to be reused, reinstalling existing equipment to be reused, and installing new equipment. This will involve, non-inclusively, terminating existing wiring at removed and not to be reused equipment locations according to local electrical code and moving and/or extending and terminating existing wiring for the reinstallation of existing equipment and the installation of new equipment according to local electrical code.

3.11 The contractor shall provide a one-year warrantee on workmanship, materials, hardware and software supplied under this contract.

3.12 Required qualifications for Contractor’s employees to gain access to DoD base and designated workspace: valid government-issued photo ID, proof of liability insurance for vehicle

(if applicable), disclosure of country of citizenship and status. All base visitors will undergo a routine background check before entry is granted.

4. APPLICABLE DOCUMENTS

N/A

5. REQUIREMENTS

5.1 The contractor shall provide the following brand name items as a part of this requirement:

PART # DESCRIPTION QTY

DMPS3-4K-350-C Crestron 3-Series 4K DM Presentation Switcher 2

TS-1070-GV-B-S Crestron Tabletop Touch Screen 10” 2

UC-SB1-CAM Crestron Web Conferencing Device 2

Page | 4

5.2 The contractor shall provide the following brand name or equivalent (BNE) items as a part of this requirement, in accordance with FAR 52.211-6:

PART

NUMBER

BRAND

NAME

DESCRIPTION QUANTITY

Control 26CT JBL

Ceiling Speakers 70.7 V Salient Characteristics:

75 Hz – 20 kHz

75 Watts Continuous Pink Noise 107 dB SPL @ 1 m (3.3 ft)

Transformer Taps 70V: 60W, 30W, 15W & 7.5W taps

SEQ-1U Surge X

AC Power Sequencer

Salient Characteristics:

120 VAC 20 Amp

Eight 15 Amp outlets with two independently programmable time sequenced groups plus one group always on.

QB85N-N

Samsung

Professional Large Screen Display 85” Class

Salient Characteristics:

4K, No Tuner, No Wi Fi, No Blue Tooth, I/O:

USB (1.0 Amp), RS-232C In, HDMI (ARC), HDMI, RJ45 (LAN)

QB65N-N

Samsung

Professional Large Screen

Display 65” Class Salient Characteristics:

4K, No Tuner, No Wi Fi, No Blue Tooth, I/O:

USB (1.0 Amp), RS-232C In, HDMI (ARC), HDMI, RJ45 (LAN)

6. GOVERNMENT FURNISHED PROPERTY

6.1 Government Furnished Material

N/A

6.2 Government Furnished Equipment

See Attachment 1 found in Section J of this announcement of this requirement where it references “GFE,” otherwise known as Government Furnished Equipment (GFE). These items are not considered Government Furnished Property (GFP) as the items will always remain at the

Government’s facility and will be included as part of the work to be performed under Paragraph

3.0, of this Statement of Work (SOW).

Page | 5

6.3 Government Furnished Information

N/A

7. DELIVERABLES

NUMBER NAME

CDRL A002

ENGINEERING DOCUMENTATION PRODUCT DRAWINGS (RE-

PROCUREMENT) - CAD Drawings, as built

Page | 6

ADDITIONAL INFORMATION

A. PERIOD OF PERFORMANCE / REQUIRED DELIVERY DATES

Period of performance: 01 Oct ’26-28 Feb ‘27

B. PLACE OF PERFORMANCE

614 Sicard ST SE

Washington Navy Yard, DC 20376

C. SHIPPING ADDRESS

Commander, Naval Sea Systems Command

Attn: TBD

1333 Isaac Hull Ave SE

Washington Navy Yard, DC 20376

D. INSPECTION AND ACCEPTANCE

TBD

E. TECHNICAL POINT OF CONTACT

TBD

Page | 7

Section J - List of Documents, Exhibits and Other Attachments

ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this contract:

DOCUMENT /

EXHIBIT /

ATTACHMENT

TITLE DESCRIPTION

EXHIBIT A 7. CDRL A002 Contract Data Requirements List (CDRL) A002 –

Engineering Documentation Product Drawings (Re-procurement) – CAD Drawings, as built

ATTACHMENT 1 Table 1. PEO CLB

TANC Split GFE-CFE

Lists and Summary of

Upgrades Rev 13

082720025.xlsx/pdf

GFE-CFE Lists and Summary of Upgrades

ATTACHMENT 2 Table 3. CLB TANC Split AFSM Load Rev 10 12232024.xlsx/pdf

AFSM Load

File details come from the government source that posted it. Updated .