DRAFT_Attachment_1.pdf

PDF 563 KB Posted

Attached to
AV Equipment Upgrade for Split Conference Rooms
Solicitation number
N6426726Q5012
Issued by

About this file

This is a Government Furnished Equipment (GFE) and Contractor Furnished Equipment (CFE) list for Team Submarine Conference Room upgrades managed by PEO CLB TANC (Program Executive Office Combat Logistics Branch Tactical Air Navigation Center).

The document specifies upgrades for two conference rooms (4W-334 and 4W-333) in Building 201 at the WNY facility. Both rooms require installation of integrated conference systems utilizing the NGEN/Leidos x015AX Dual 65" Self-contained Classified IP VTC platform with Crestron UC-SB1-CAM web camera support. GFE components to be retained and reused include Samsung QB85N-N 85" LSD displays and Belkin F1DN104MOD-BA-4 KVM switches with associated cables. CFE components to be procured include Samsung QB65N-N 65" LSD displays, Crestron DMPS3-4K-350-C switchers, Crestron TS-1070-GV-B-S touch panels, Crestron UC-SB1-CAM cameras, 19" half-rack equipment cabinets (21 RU), three JBL Control 26CT speakers, Surge X SEQ-1U power conditioning units, installation hardware packages, and custom "Meeting in Progress" signage. Integrators are responsible for complete installation and integration of all equipment per SOW sections 3.1.1 and 3.9. The document is identified as Revision 16, dated 06052026, and is currently in DRAFT status.

View the file

Other files

File Type Posted
DRAFT_SOW_N6426726Q5012.pdf PDF
DRAFT_CDRL_N6426726Q5012_Redacted.pdf PDF
DRAFT_Attachment_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1. Team Submarine Conference Room Upgrades - PEO CLB TANC Split GFE-CFE Lists and Summary of Upgrades Rev 16

Room Count

WNY

Building

Room VTC/Web Conferencing

Support Reused Equipment (GFE) List New Equipment (CFE) List Summary of Integrator Upgrades

1 201 4W-334

NGEN/Leidos x015AX Dual 65" Self-contained Classified

IP VTC. Crestron UC-SB1- CAM Web Cam.

1 - Samsung QB85N-N 85" LSD (BNE), 1 - Belkin F1DN104MOD-BA-

4 with host and console cables

1 - Samsung QB65N-N 65" LSD (BNE) 1 - Crestron DMPS3-4K-350-C (BN) 1 - Crestron TS-1070-GV-B-S (BN) 1 - Crestron UC-SB1-CAM (BN) 1 - 19" Half-rack equipment cabinet, 21 RU 3 - JBL Control 26CT (BNE) 1 - Surge X SEQ-1U (BNE) 1 - Installation Hardware Package (SOW 3.1.1) 1 - Custom "Meeting in Progress" signage (SOW 3.9)

Integrator: Install integrated conference room including Crestron DMPS3 and TS-1070, Surge X SEQ-1U, 19" Half-rack equipment cabinet 21 RU, JBL Control 26CT, 65" and 85" class large screen displays, Crestron UC-SB1-CAM above 85" class LSD, and Custom "Meeting in Progress" signage using the Installation Hardware Package. Retain and reuse one Belkin F1DN104MOD-BA-4 with host and console cables.

2 201 4W-333

NGEN/Leidos x015AX Dual 65" Self-contained Classified

IP VTC. Crestron UC-SB1- CAM Web Cam.

1 - Samsung QB85N-N 85" LSD (BNE), 1 - Belkin F1DN104MOD-BA-4 with host and console cables

1 - Samsung QB65N-N 65" LSD (BNE) 1 - Crestron DMPS3-4K-350-C (BN) 1 - Crestron TS-1070-GV-B-S (BN) 1 - Crestron UC-SB1-CAM (BN) 1 - 19" Half-rack equipment cabinet, 21 RU 3 - JBL Control 26CT (BNE) 1 - Surge X SEQ-1U (BNE) 1 - Installation Hardware Package (SOW 3.1.1) 1 - Custom "Meeting in Progress" signage (SOW 3.9)

Integrator: Install integrated conference room including Crestron DMPS3 and TS-1070, one Surge X SEQ-1U, 19" Half-rack equipment cabinet 21 RU, JBL Control 26CT, 65" and 85" class large screen displays, Crestron UC-SB1-CAM above 85" class LSD, and Custom "Meeting in Progress" signage using the Installation Hardware Package. Retain and reuse one Belkin F1DN104MOD-BA-4 with host and console cables.

Table 1. PEO CLB TANC Split GFE-CFE Lists and Summary of Upgrades Rev 16 06052026.xlsx

DRAFT

Sheet1