Draft RFP Attachments A11-A14.docx
DOCX document 89 KB Posted
- Solicitation number
- W91CRB23R0005
About this file
This document contains a draft solicitation for environmental remediation services at Rocky Mountain Arsenal, along with related draft solicitation attachments. The U.S. Army Contracting Command at Aberdeen Proving Ground intends to issue a solicitation for operation and maintenance of Comprehensive Environmental Response, Compensation, and Liability Act and Resource Conservation and Recovery Act remediation systems. The nine-year contract includes one three-year base period and two three-year option periods. Services include operation and maintenance of groundwater treatment plants, sampling and monitoring of groundwater wells and surface water, maintenance of landfills and covers, maintenance of infrastructure and facilities, regulatory interface support, program records and reporting, land use controls compliance, environmental remediation systems optimization, and environmental compliance. The solicitation will be set aside for small businesses with less than 750 employees under NAICS code 562910. Interested parties can provide comments on the draft solicitation by March 26, 2023. The final solicitation will be posted on the System for Award Management website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91CRB23R0005 DRAFT RFP 23MAR23.pdf | ||
| Draft RFP RMA ERS Cost Model 2023.xlsx | XLSX spreadsheet | |
| Draft RFP Attachment A15.docx | DOCX document | |
| Draft RFP Attachments A1-A9.docx | DOCX document | |
| Draft RFP Attachment A10.docx | DOCX document | |
| W91CRB23R0005 DRAFT RFP.pdf | ||
| Draft RFP A16 Attachment SUMMARY OF EXPERIENCE FORM.docx | DOCX document | |
| A001-A0048 CDRLs DD 1423.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A11
RMA ERS Contract Target Cost Re-baselining procedure
As discussed in Section C1.22, the objective of the Incentive Fee Program is to use monetary incentives that encourage the Contractor to align its goals and vision for the long-term operations and maintenance work at the RMA with those of the Government. As part of that incentive, the Government has established the Target Cost Savings program which is described in more detail in Section C1.22 of the contract. The Target Cost is evaluated in three-year periods consistent with the Base and two Option Periods in the contract. For each three-year period, if total costs are under the established Target Cost the Contractor will receive 40% of the documented savings at the end of that period. The initial Target Cost for the three-year Base Period will be established as set forth in Section C1.22.
The Target Cost Savings portion of the Incentive program is not intended to be an area where savings are predictable, expected, or built into the Contractor’s anticipated profit. The base ERS scope at RMA has reached a consistent level of maturity and predictability and achieving additional savings is expected to require significant effort and innovation on the Contractor’s part. To account for any cost changes that are realized during each period, the Target Cost will be Re-Baselined at the beginning of each Option Period. The following sets forth the process for Re-Baselining.
1. The Contractors proposal includes reimbursable costs, fixed price items, and fee.
2. The original Target Cost is established from the Contractor’s proposed costs for the reimbursable CLINs Labor (XX01) and Reimbursable expenses (XX02) for the initial three-year Base Period.
Example: Assume the following was proposed on the bid schedule:
Note: $ values shown in the example bear no relationship to the actual scope and should not be inferred to have any meaning other than to provide a basis to explain how Re-Baselining will occur.
For this example, it is assumed that the Contractor proposed an escalation rate of 2% per year. Each year’s proposed costs are equal to the prior year plus the 2% escalation.
The initial Target cost for the Base Period is set at $4,590,600.
3. Assume the Contractor’s actual cost over the first 3-year base period was as follows:
Base Period Actual Cost
4. The target cost savings is the difference between the established Base Period Target Cost of $4,590,600 minus the actual cost of $4,425,000 or $165,600. The Contractor’s share of the Target Cost savings would be 40% of $165,600 or $66,240 which would be earned in addition to 100% of the Cost Fee Pool.
5. At the beginning of each Option Period the target cost will be Re-Baselined using the average actual cost realized during the prior three-year period. Using the 2% escalation rate discussed in item 2 above each year’s actual cost is escalated to the first year of the current option period as shown in the following example:
6. The New Target Cost for the First Option Period would then be established using the 3-year average above ($1,534,020) for the 1st year of the option period and escalating for each subsequent year as proposed in the Contractor’s original proposal. In this example using the 2% escalation rate described in item 1 above. The Re-Baselined Target Cost for the first Option Period would then be $4,694,714.81 as shown below.
New Target Cost – Option Period 1
7. If a significant change to the base PWS is directed by the Contracting Officer and is not the result of any Contractor efforts to achieve Target Cost savings, the Contracting Officer, at their discretion, may make an equitable adjustment to the existing Incentive Fee Pool and the Target Cost.
Attachment A12 – WBS Matrix
Attachment A13 – Computer Applications Recurring Costs
| Company |
| 2020 |
| 2021 |
| Frequency |
| Renewal |
| DTSearch (Search for DDMS) |
| $350.00 |
| $350.00 |
| Annually |
| March |
| AWS Services (Web Hosting) |
| $1,300.00 |
| $1,300.00 |
| Monthly |
| No Renewal |
Attachment A14 – Commercial Cloud Current Usage Requirements
Current Usage (Amazon Web Services)
| Type of Server |
| CPU |
| RAM (GB) |
| Volume Size (TB) |
| Amazon Type |
| Number of HDD |
| Fileshare |
| 4 |
| 16 |
| 1.87 |
| t2.xlarge |
| 3 |
| Database 1 |
| 4 |
| 16 |
| 0.385 |
| t2.xlarge |
| 5 |
| Database 2 |
| 4 |
| 16 |
| 0.03 |
| t3a.xlarge |
| 1 |
| Webserver |
| 2 |
| 8 |
| 0.26 |
| t2.large |
| 3 |
image6.emf image7.emf image1.emf image2.emf image3.emf image4.emf image5.emf
File details come from the government source that posted it. Updated .