Draft RFP Attachments A1-A9.docx
DOCX document 1 MB Posted
- Solicitation number
- W91CRB23R0005
About this file
This draft solicitation is for environmental remediation services at Rocky Mountain Arsenal. The Army Contracting Command - Aberdeen Proving Ground intends to issue a nine-year IDIQ contract set aside for small businesses, with a three-year base period and two three-year option periods. The contractor shall provide personnel, equipment, facilities and other items to operate and maintain CERCLA/RCRA remediation systems, including groundwater treatment plants, groundwater and surface water sampling and monitoring, landfill and cover maintenance, infrastructure and facility maintenance, regulatory support, program records and reporting, land use controls compliance, and environmental compliance. Interested parties are encouraged to submit comments on this draft RFP by 26 March 2023. The final solicitation will be posted on SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91CRB23R0005 DRAFT RFP 23MAR23.pdf | ||
| Draft RFP RMA ERS Cost Model 2023.xlsx | XLSX spreadsheet | |
| Draft RFP Attachment A15.docx | DOCX document | |
| Draft RFP Attachments A11-A14.docx | DOCX document | |
| Draft RFP Attachment A10.docx | DOCX document | |
| W91CRB23R0005 DRAFT RFP.pdf | ||
| Draft RFP A16 Attachment SUMMARY OF EXPERIENCE FORM.docx | DOCX document | |
| A001-A0048 CDRLs DD 1423.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A1
Other Direct Costs
The Other Direct Costs (ODC) bid item covers all ODCs required to perform the work as described in the PWS. ODCs shall include the cost elements described below.
1. Communications Expenses, including all telephone costs, cell phones, radios, repeaters or other communications expenses.
2. Computer Expenses, including all required hardware, software, software licenses, internet and network expenses, and maintenance costs associated with establishing and maintaining required computer support for Contractor employee computer needs. Computers, software, and licenses required for Contractor operated computer systems (reference section C5.8.1), MP2 computerized maintenance management system, and those integral to water treatment plant operations (RSLogix and FactoryTalk) will be provided and/or reimbursed by the Government.
3. Postage, Express mail, courier and related services. Includes all postage, express mail, courier and related services required by the ERS to perform the work. The ODC rate shall not include the cost of services required to transmit documents on behalf of the Government.
4. Office Supplies and Office Equipment, including the cost of all office supplies and office equipment required to perform the work.
5. Furniture, including all office furniture required for personnel to perform the work. Most of the furniture currently being used in building 132 and in the treatment plants will remain. The ERS contractor may use this remaining furniture and supplement as needed.
6. Printing and Reproduction Services, including all printing services required in the normal conduct of business.
7. Publications, including the cost of publications necessary to perform the work.
8. Substance Abuse Deterrence and Detection, including all testing costs associated with pre-employment candidates, employees dismissed for cause, random screening, and post- rehabilitation follow-up.
9. Training, Seminars and Association Memberships, including costs associated with training, seminars, workshops, certifications and association membership dues.
10. Physicals and Medical Monitoring, including all costs associated with providing required physicals and necessary medical monitoring to meet standard industry and project requirements.
Attachment A2
Small Tools and Consumables
Small tools are defined as those tools required for the execution of the work and having a purchase value of less than $1,000.
Small tools shall include but not be limited to:
1. Hand tools including hammers, pliers, wrenches, knives, shovels, saws, axes, crow bars, conduit and tubing benders, tool and gang boxes, wheelbarrows, chains, cables, clamps, bolt cutters, post hole diggers, soldering iron, ladders, paint tools, measuring tapes, squares, rakes, screw drivers, pipe stands, saw horses, terminating tools, pipe and conduit threaders, cutting torches, sampling equipment and tools, hoisting tools and volt meters.
2. Power tools including drills, saws, fans and blowers, chargers, vacuum cleaners, grinders, welding machines and equipment, air compressors, sanders, conduit and pipe threaders.
Consumables are goods and materials consumed during the performance of the work and shall include, but not be limited to, the following:
1. Extension cords, solder, welding rod, rope, abrasive discs, gases (e.g. oxygen and acetylene), tape, adhesives, bits, batteries, brooms, brushes, fire extinguishers, sand paper, fuses, funnels, gloves, hose and fittings, nails, paint, welding wire, wire, health and safety consumables (Tyvek, hard hats, booties, respirators, high visibility vests, gloves, safety glasses, etc.).
Consumable Supplies shall not include the following:
1. Containers, tools, supplies and equipment associated with sampling activities. These items shall be purchased by the Contractor and reimbursed by the Government.
The Contractor shall leave remaining small tools and consumable inventory on site at the end of the contract.
Attachment A3
Project Vehicles and Trailers
| EQUIP NO. |
| DESCRIPTION |
| MILEAGE |
ON 2/18/21
PLATE NO
SERIAL NO.
In Service Start Date
RMA-VEH-004
1080-006
| 90 IHC dump truck, White 7.3 diesel |
| 44,036 |
| 502-YWP |
1HTSAZRM5LH266686
N/A
| RMA-VEH-024 |
| Superior 16’ flatbed trailer (redevelopment trailer) |
| N/A |
| 374-VNL |
1S9AP1227TC241939
N/A
RMA-VEH-046
1046-0228
| 99 Ford F350, White |
| 56,051 |
| 512-YWP |
1FTWF33S0XEC73833
N/A
| RMA-VEH-049 |
| Brimar Dump Trailer |
| N/A |
| 373-VNL |
43YDC2022YC005309
N/A
| RMA-VEH-061 |
| 2015 RAM 1500, White, Reg cab |
| 28,536 |
| 785-TTQ |
3C6JR7DTXFG683523
20 Dec 2016
| RMA-VEH-062 |
| 2015 RAM 1500, White, Reg cab |
| 43,017 |
| 783-TTQ |
3C6JR7DT3FG683525
20 Dec 2016
| RMA-VEH-063 |
| 2015 RAM 3500, White, Reg cab, Van box |
| 5,283 |
| 835-TTQ |
3C7WRTBJ3FG679258
20 Dec 2016
| RMA-VEH-064 |
| 2015 RAM 1500, White, Reg cab |
| 26,610 |
| 784-TTQ |
3C6JR7DT1FG683524
20 Dec 2016
| RMA-VEH-065 |
| 2015 RAM 2500, White, Reg cab |
| 21,477 |
| 837-TTQ |
3C6MR5AJ5FG710454
20 Dec 2016
| RMA-VEH-066 |
| 2015 RAM 2500, White, Reg cab, Utility box |
| 27,266 |
| QHJ-639 |
3C7WR5AJ9FG710462
20 Dec 2016
| RMA-VEH-067 |
| 2015 RAM 3500, Copper, Reg cab, Plow |
| 2,728 |
| QHF-084 |
3C63R3AJXFG708327
20 Dec 2016
| RMA-VEH-068 |
| 2015 RAM 3500, White, Reg cab, Utility box, Smeal rig |
| 3,379 |
| 876-TTQ |
3C7WRTAJ3FG711322
20 Dec 2016
| RMA-VEH-069 |
| 2016 Ford Explorer, Blue |
| 4,568 |
| 696-ZQS |
1FM5K8B85GGB33965
20 Dec 2016
| RMA-VEH-070 |
| 2016 Ford Explorer, Black |
| 4,160 |
| 697-ZQS |
1FM5K8B8XGGB33962
20 Dec 2016
| RMA-VEH-071 |
| 2016 RAM 1500, White, Quad cab |
| 10,740 |
| QVL-699 |
1C6RR7FT6GS191663
20 Dec 2016
| RMA-VEH-072 |
| 2016 RAM 1500, White, Quad cab |
| 11,817 |
| QVL-700 |
1C6RR7FT8GS191664
20 Dec 2016
| RMA-VEH-073 |
| 2016 RAM 1500, White |
| 15,173 |
| QWP-251 |
3C6JR7DT5GG194951
20 Dec 2016
| RMA-VEH-074 |
| 2016 RAM 1500, Crew cab |
| 10,098 |
| QXC-393 |
3C6RR7KT7GG169166
20 Dec 2016
| RMA-VEH-075 |
| 2016 RAM 1500, White, Quad cab |
| 8,745 |
| QWP-304 |
1C6RR7FTXGS191665
20 Dec 2016
| RMA-VEH-076 |
| 2016 RAM 2500, White, Utility box |
| 12,799 |
| QXC-392 |
3C6LR5AT8GG187302
20 Dec 2016
| RMA-VEH-077 |
| 2016 RAM 1500, White, Quad cab |
| 10,524 |
| EWQ-602 |
1C6RR7FT9GS388410
23 Dec 2016
| RMA-VEH-078 |
| 2016 RAM 1500, White, Quad cab |
| 5,353 |
| ENQ-399 |
1C6RR7FT0GS213544
15 Dec 2016
| RMA-VEH-079 |
| 2017 RAM 2500, White, Utility box |
| 17,415 |
| EWQ-601 |
3C6MR5AJ4HG518588
15 Dec 2016
| RMA-VEH-080 |
| 2016 RAM 3500, White, Utility box |
| 12,678 |
| ENQ-400 |
3C7WRTAL3GG221207
3 Jan 2017
| RMA-VEH-081 |
| Load Trail Tilt Flatbed Trailer |
| N/A |
| IYQ-695 |
4ZETD2022G1115665
N/A
Operation, maintenance, and repair of vehicles and trailers are the responsibility of the Contractor and costs associated with this work shall be included as part of the FFP CLIN 0003.
Offerors are free to meet the requirement for vehicles and trailers however they choose. Possible options for acquisition of vehicles and trailers under this contract include, among others:
1. Purchase or lease from a private source.
2. Purchase or lease through GSA.
3. Purchase of the vehicles and trailers listed in the table above for an administrative cost of $1/vehicle/trailer ($25 total)*
*Vehicles/trailers are available to the Contractor at this price as long as they continue to be used on the RMA project. Should the Contractor subsequently determine that they want to sell a vehicle or trailer or use either on a project other than RMA, the Contractor shall reimburse the Government for the appraised value of the vehicle/trailer at the time it is determined to no longer be needed at RMA.
Attachment A4
Incidental Property
| Item |
| Cost |
| Location |
| PRINTER |
| $5,393.83 |
| BUILDING 129 |
| 23 CU FT FREEZER |
| $1,776.95 |
| B132 - ADDED NEW PURCHASE |
| 23 CU FT FREEZER |
| $1,776.95 |
| B132 - ADDED NEW PURCHASE |
| MODEM |
| $375.00 |
| B132 MECHANICAL ROOM |
| 240 CAPACITY KEY BOX |
| $324.00 |
| 132 COMPUTER ROOM |
| 120C POWER SUPPLY W/REGULATOR AND BATTERY |
| $205.00 |
| B132 - MECH ROOM |
| RF MODEM |
| $280.00 |
| B132 MECH ROOM |
| SOLAR PANEL |
| $390.00 |
| B129(SECTION 36) #2 |
| REFRIGERATOR 21 CU FT |
| $629.00 |
| B132 BACK ROOM |
| PAPER TRIMMER 130 MANUAL |
| $876.00 |
| B129 |
| FILING CABINET 3-DRAWER |
| $50.00 |
| B132 |
| POWER SUPPLY (UPS), APC SMARTUPS, SUA, |
| $430.00 |
| B132 |
| DEFIBRILLATOR, REVIVER AED TRAINER UNIT |
| $500.00 |
| B132 |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM, PN: |
| $1,695.00 |
| B808 - NBCS |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM, PN: DDU-100B |
| $1,695.00 |
| B129 TO THE LEFT INSIDE ENTRY DOOR |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM, PN: DDU-100B |
| $1,695.00 |
| B120 HALLWAY |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM, PN: DDU-100B |
| $1,695.00 |
| B121 |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM |
| $1,695.00 |
| B810 NWBCS |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM |
| $1,695.00 |
| B129 (UP STAIRS) |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM |
| $1,695.00 |
| B383 OLD VISITOR'S CENTER |
| DEFIBRILLATOR, REVIVER AED WITH WALL MOUNT CABINET & ALARM |
| $1,695.00 |
| NEW VISITOR'S CENTER |
| TELEPHONE MODEM/VOICE SYNTHESIZER, |
| $620.00 |
| SECTION 36 LIME BASINS METER BLDG |
| FLAMMABLE, CABINET, STORAGE 5-SHELF |
| $125.00 |
| B132 STORAGE CONTAINER SOUTH SIDE |
DESK
ROOM 1021
2 DRAW FILE CABINET
ROOM 1021
SHELVING UNIT
ROOM 1029
3 PIECE DESK WITH CORNER UNIT
ROOM 1022
FILE DRAWER UNIT FREE STANDING
ROOM 1022
FILE CABINET 5 DRAWER VERTICAL
ROOM 1022
BOOKSHELF 5FT WOOD
COMMON AREA
BOOKSHELF 5FT WOOD
COMMON AREA
BOOKSHELF 42 INFT WOOD
COMMON AREA
BOOKSHELF 52 INFT WOOD
COMMON AREA
SMALL DESK METAL WITH DRAWER
COMMON AREA
MODULAR DESK UNIT
COMMON AREA
RED CLOTH ARM CHAIR
CONFERENCE ROOM
RED CLOTH ARM CHAIR
CONFERENCE ROOM
RED CLOTH ARM CHAIR
CONFERENCE ROOM
RED CLOTH ARM CHAIR
CONFERENCE ROOM
RED CLOTH ARM CHAIR
CONFERENCE ROOM
RED CLOTH ARM CHAIR
CONFERENCE ROOM
RED CLOTH ARM CHAIR
CONFERENCE ROOM
RED CLOTH ARM CHAIR
CONFERENCE ROOM
MINI REFRIGERATOR
ROOM 1026
FILE CABINET 5 DRAWER
ROOM 1026
TABLE
ROOM 1028
DESK WITH DRAWERS
ROOM 1028
| Nomad Scanner (PDA) |
| $1,500.70 |
| BLDG 129 - ARF - ROOM 1011 |
| Nomad Scanner (PDA) |
| $1,500.70 |
| BLDG 129 - ARF - ROOM 1011 |
Monitor stand
BLDG 129 - ARF - ROOM 1007
Monitor stand
BLDG 129 - ARF - ROOM 1007
| File cabinet (4-Drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (4-Drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (4-Drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (4-Drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (4-Drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (4-Drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (4-drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1016 |
| File cabinet (4-drawer) |
| $220.69 |
| BLDG 129 - ARF - ROOM 1018 |
| Rolling storage unit (5-drawer) |
| $109.19 |
| BLDG 129 - ARF - ROOM 1015 |
| Table Office |
| $258.99 |
| BLDG 129 - ARF - ROOM 1006 |
| Table Office |
| $258.99 |
| BLDG 129 - ARF - ROOM 1010 |
| Table Office (Semi-circular) |
| $258.99 |
| BLDG 129 - ARF - ROOM 1012 |
| Table Office |
| $258.99 |
| BLDG 129 - ARF - ROOM 1013 |
| Table Office |
| $258.99 |
| BLDG 129 - ARF - ROOM 1031 |
| Table Office |
| $258.99 |
| BLDG 129 - ARF - ROOM 1031 |
| Label Writer |
| $100.00 |
| BLDG 129 - ARF - ROOM 1007 |
| Label Writer |
| $100.00 |
| BLDG 129 - ARF - ROOM 1018 |
| Label Writer |
| $100.00 |
| BLDG 129 - ARF - ROOM 1017 |
| Binder |
| $143.80 |
| BLDG 129 - ARF - ROOM 1010 |
Telephone
BLDG 129 - ARF - ROOM 1011
Telephone
BLDG 129 - ARF - ROOM 1012
Telephone
BLDG 129 - ARF - ROOM 1015
Telephone
BLDG 129 - ARF - ROOM 1031
Telephone
BLDG 129 - ARF - ROOM 1031
| Bookcase (7-Shelf) |
| $212.64 |
| BLDG 129 - ARF - ROOM 1016 |
| Monitor, Computer |
| $210.00 |
| BLDG 129 - ARF - ROOM 1007 |
| Monitor, Computer |
| $210.00 |
| BLDG 129 - ARF - ROOM 1007 |
| Monitor, Computer |
| $210.00 |
| BLDG 129 - ARF - ROOM 1008 |
| Monitor, Computer |
| $210.00 |
| BLDG 129 - ARF - ROOM 1008 |
| Monitor, Computer |
| $210.00 |
| BLDG 129 - ARF - ROOM 1016 |
| Monitor, Computer |
| $309.99 |
| BLDG 129 - ARF - ROOM 1015 |
| Cart Equipment (Metal) |
| 424.88 |
| BLDG 129 - ARF - ROOM 1031 |
| Cart Book (Red) |
| $108.99 |
| BLDG 129 - ARF - ROOM 1031 |
| Computer Desktop |
| $600.00 |
| BLDG 129 - ARF - ROOM 1016 |
| Map Cutter |
| $1,638.00 |
| BLDG 129 - ARF - ROOM 1016 |
| Computer Laptop |
| $1,909.00 |
| BLDG 129 - ARF - ROOM 1009 |
| Paper shredder |
| $2,035.00 |
| BLDG 129 - ARF - ROOM 1010 |
| Shelving, 4-Shelf |
| $71.99 |
| BLDG 129 - ARF - ROOM 1008 |
| File Cabinet (3-drawer) |
| $254.36 |
| BLDG 129 - ARF - ROOM 1007 |
| File cabinet (3-drawer) |
| $254.36 |
| BLDG 129 - ARF - ROOM 1009 |
| File cabinet (3-drawer) |
| $254.36 |
| BLDG 129 - ARF - ROOM 1012 |
| File cabinet (3-drawer) |
| $254.36 |
| BLDG 129 - ARF - ROOM 1013 |
| File cabinet (3-drawer) |
| $254.36 |
| BLDG 129 - ARF - ROOM 1018 |
| File cabinet (3-drawer) |
| $254.36 |
| BLDG 129 - ARF - ROOM 1018 |
| File cabinet (3-drawer) |
| $254.36 |
| BLDG 129 - ARF - ROOM 1031 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1007 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1008 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1009 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1011 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1012 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1013 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1015 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1015 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1017 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1018 |
| Desk Sit-stand |
| $134.37 |
| BLDG 129 - ARF - ROOM 1031 |
| File Cabinet (4-Drawer) |
| $1,311.00 |
| BLDG 129 - ARF - ROOM 1006 |
| Disk copier |
| $450.00 |
| BLDG 129 - ARF - ROOM 1031 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1007 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1007 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1009 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1011 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1011 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1012 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1013 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1013 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1015 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1007 |
| Computer Laptop |
| $755.00 |
| BLDG 129 - ARF - ROOM 1031 |
| Monitor, Computer |
| $140.00 |
| BLDG 129 - ARF - ROOM 1031 |
| Monitor, Computer |
| $140.00 |
| BLDG 129 - ARF - ROOM 1031 |
Telephone
BLDG 129 - ARF - ROOM 1006
Telephone
BLDG 129 - ARF - ROOM 1007
| Computer Desktop |
| $954.30 |
| BLDG 129 - ARF - ROOM 1018 |
| Computer Desktop |
| $954.30 |
| BLDG 129 - ARF - ROOM 1031 |
| Computer Desktop |
| $954.30 |
| BLDG 129 - ARF - ROOM 1009 |
| Computer Desktop |
| $954.30 |
| BLDG 129 - ARF - ROOM 1011 |
| Computer Desktop |
| $902.00 |
| BLDG 129 - ARF - ROOM 1006 |
| Monitor, Computer |
| $284.00 |
| BLDG 129 - ARF - ROOM 1011 |
| Monitor, Computer |
| $207.29 |
| BLDG 129 - ARF - ROOM 1006 |
| Monitor, Computer |
| $207.29 |
| BLDG 129 - ARF - ROOM 1006 |
| Monitor, Computer |
| $207.29 |
| BLDG 129 - ARF - ROOM 1009 |
| Monitor, Computer |
| $207.29 |
| BLDG 129 - ARF - ROOM 1009 |
| Monitor, Computer |
| $207.29 |
| BLDG 129 - ARF - ROOM 1011 |
| Monitor, Computer |
| $207.29 |
| BLDG 129 - ARF - ROOM 1011 |
| Monitor, Computer |
| $207.29 |
| BLDG 129 - ARF - ROOM 1013 |
| Table Round Coffee |
| $185.91 |
| BLDG 129 - ARF - ROOM 1009 |
| Table Round Coffee |
| $185.91 |
| BLDG 129 - ARF - ROOM 1010 |
| Table Round Coffee |
| $185.91 |
| BLDG 129 - ARF - ROOM 1011 |
Microfilm scanner
BLDG 129 - ARF - ROOM 1016
| Monitor, Computer |
| $230.00 |
| BLDG 129 - ARF - ROOM 1011 |
| Monitor, Computer |
| $300.00 |
| BLDG 129 - ARF - ROOM 1012 |
| Monitor, Computer |
| $217.50 |
| BLDG 129 - ARF - ROOM 1012 |
| Monitor, Computer |
| $217.50 |
| BLDG 129 - ARF - ROOM 1015 |
| Monitor, Computer |
| $217.50 |
| BLDG 129 - ARF - ROOM 1007 |
| Monitor, Computer |
| $217.50 |
| BLDG 129 - ARF - ROOM 1017 |
| Monitor, Computer |
| $217.50 |
| BLDG 129 - ARF - ROOM 1017 |
| Monitor, Computer |
| $217.50 |
| BLDG 129 - ARF - ROOM 1018 |
| Monitor, Computer |
| $217.50 |
| BLDG 129 - ARF - ROOM 1018 |
| Monitor, Computer |
| $229.95 |
| BLDG 129 - ARF - ROOM 1013 |
| Monitor, Computer |
| $229.95 |
| BLDG 129 - ARF - ROOM 1015 |
| Monitor, Computer |
| $229.95 |
| BLDG 129 - ARF - ROOM 1031 |
| Computer Desktop |
| $3,600.00 |
| BLDG 129 - ARF - ROOM 1015 |
| Desk Office (Modular) |
| $2,276.01 |
| BLDG 129 - ARF - ROOM 1006 |
| Bookcase (4-Shelf) |
| $839.12 |
| BLDG 129 - ARF - ROOM 1006 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1006 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1006 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1006 |
Whiteboard
BLDG 129 - ARF - ROOM 1006
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1006 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1006 |
| Desk Office (Modular) |
| $2,276.01 |
| BLDG 129 - ARF - ROOM 1007 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1007 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1007 |
| Bookcase (2-Shelf) |
| $148.45 |
| BLDG 129 - ARF - ROOM 1007 |
| Cabinet Map |
| $6,486.39 |
| BLDG 129 - ARF - ROOM 1007 |
Cork board
BLDG 129 - ARF - ROOM 1007
Dry erase board
BLDG 129 - ARF - ROOM 1007
Dry erase board
BLDG 129 - ARF - ROOM 1007
Standing pad
BLDG 129 - ARF - ROOM 1007
| Desk Office (Modular) |
| $2,276.01 |
| BLDG 129 - ARF - ROOM 1008 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1008 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1008 |
Standing pad
BLDG 129 - ARF - ROOM 1008
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1008 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1008 |
| Bookcase (4-Shelf) |
| $839.12 |
| BLDG 129 - ARF - ROOM 1008 |
| Desk Office (Modular) |
| $2,276.01 |
| BLDG 129 - ARF - ROOM 1009 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1009 |
| Chair Visitor |
| $88.66 |
| BLDG 129 - ARF - ROOM 1009 |
| Bookcase (3-shelf) |
| $177.87 |
| BLDG 129 - ARF - ROOM 1009 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1009 |
| Coat rack |
| $155.94 |
| BLDG 129 - ARF - ROOM 1009 |
| File cabinet (Lateral) (12 Drawers) |
| $1.00 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (Lateral) (12 Drawers) |
| $1.00 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (Lateral) (12 Drawers) |
| $1.00 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (Lateral) (4-Drawer) |
| $955.75 |
| BLDG 129 - ARF - ROOM 1010 |
| File cabinet (Lateral) (4-Drawer) |
| $955.75 |
| BLDG 129 - ARF - ROOM 1010 |
| Cabinet Storage |
| $403.60 |
| BLDG 129 - ARF - ROOM 1010 |
| Cabinet Storage |
| $403.60 |
| BLDG 129 - ARF - ROOM 1010 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1010 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1010 |
| Desk Office (Modular) |
| $2,276.01 |
| BLDG 129 - ARF - ROOM 1011 |
| Chair Office |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1011 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1011 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1011 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1011 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1011 |
Standing pad
BLDG 129 - ARF - ROOM 1011
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1012 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1012 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1012 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1012 |
Standing pad
BLDG 129 - ARF - ROOM 1012
| Bookcase (2-Shelf) |
| $148.45 |
| BLDG 129 - ARF - ROOM 1012 |
| File cabinet (Lateral) (5 drawer) |
| $1,563.75 |
| BLDG 129 - ARF - ROOM 1012 |
Whiteboard
BLDG 129 - ARF - ROOM 1012
Cork board
BLDG 129 - ARF - ROOM 1012
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1013 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1013 |
Standing pad
BLDG 129 - ARF - ROOM 1013
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1015 |
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1015 |
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1015 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1015 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1015 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1015 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1015 |
Dry erase board
BLDG 129 - ARF - ROOM 1015
Dry erase board
BLDG 129 - ARF - ROOM 1015
Standing pad
BLDG 129 - ARF - ROOM 1015
Dry erase board
BLDG 129 - ARF - ROOM 1015
| File cabinet (Lateral) (4-Drawer) |
| $955.75 |
| BLDG 129 - ARF - ROOM 1016 |
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1016 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1016 |
| Cabinet Map |
| $6,486.39 |
| BLDG 129 - ARF - ROOM 1016 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1017 |
| Bookcase (3-shelf) |
| $177.87 |
| BLDG 129 - ARF - ROOM 1017 |
| Bookcase (3-shelf) |
| $177.87 |
| BLDG 129 - ARF - ROOM 1017 |
Standing pad
BLDG 129 - ARF - ROOM 1017
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1017 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1017 |
| Bookcase (3-shelf) |
| $177.87 |
| BLDG 129 - ARF - ROOM 1017 |
| File cabinet (2-drawer) |
| $626.19 |
| BLDG 129 - ARF - ROOM 1017 |
| Desk Office (Modular) |
| $2,276.01 |
| BLDG 129 - ARF - ROOM 1018 |
Standing pad
BLDG 129 - ARF - ROOM 1018
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1018 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1018 |
| Chair Visitor |
| $262.00 |
| BLDG 129 - ARF - ROOM 1018 |
| Bookcase (2-Shelf) |
| $148.45 |
| BLDG 129 - ARF - ROOM 1018 |
| Bookcase (2-Shelf) |
| $148.45 |
| BLDG 129 - ARF - ROOM 1018 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1031 |
| Chair Office |
| $88.66 |
| BLDG 129 - ARF - ROOM 1031 |
| Cabinet Storage |
| $403.60 |
| BLDG 129 - ARF - ROOM 1031 |
| Cabinet Storage |
| $403.60 |
| BLDG 129 - ARF - ROOM 1031 |
Standing pad
BLDG 129 - ARF - ROOM 1031
| Desk Office (Small) |
| $1,032.50 |
| BLDG 129 - ARF - ROOM 1031 |
| Cabinet Storage |
| $403.60 |
| BLDG 129 - ARF - ROOM 1031 |
Attachment A5
Period 1 – Performance Incentive Fee Criteria
Note: The Government will consider circumstances beyond the control of the contractor as a factor in its evaluation.
PART 1 – Quantitative (Objective) Performance Incentive Fee Criteria (52% Total)
Transition Plan Execution 4%
Complete all requirements identified in the Contractor’s Transition Plan (reference C5.13) and assume full contract performance on December 1, 2023.
Baseline Safety Assessment 3%
Within the first four months following notice to proceed, complete an initial baseline safety assessment of all RMA facilities and operations, to include a corrective action plan for any deficiencies.
Injury Prevention 5%
· Zero Recordable Incidents or Days Away Cases during the Period will earn 100%
· One Recordable Incident or Days Away Case during the Period will earn 67%
· More than One Recordable Incident or Days Away Case during the Period will earn 0%
Complete Systems, Programs, & Procedures Integration 5%
Within six-months following Notice to Proceed, Contractor shall complete integration of existing RMA systems, programs, and procedures and fully implement into all site operations.
Retention of Key Personnel 5%
Key personnel (as identified in the Contractor’s proposal) were either retained, or qualified replacement personnel were hired within 1 month of loss of key personnel.
Health & Safety and Quality Control Plans 5%
Contractor’s Health & Safety Plan (HASP) and Quality Control Plan (QCP) were submitted to the COR within 90-days following contract award.
Safety Inspections and Quality Surveillances 5%
A schedule for Contractor Quality Surveillances is submitted to the COR and the first Quality Records Surveillance is completed prior to the end of the performance incentive fee period. A schedule for monthly joint safety inspections (various work areas) with the Army is submitted to the COR and a minimum of three joint safety inspections are conducted prior to the end of the first performance incentive fee period.
No Trigger Events for Consultative Process 5%
During the Performance Incentive Fee Period there were no events within the Contractor’s control that triggered a Regulatory Agencies’ consultative process meeting as defined in the Long-Term Monitoring Plan (LTMP), ICS Long-Term Care Plan (LTCP), HWL, ELF or Basin F Post-Closure Plans (PCPs).
Regulatory Report Deadlines 5%
All reports listed below (TBD) were submitted to the Army in sufficient time to allow the Army to submit them to the Regulatory Agencies by the required deadlines during Performance Incentive Fee Period One:
TBD – Required Reports and deadlines will be established at time of contract award.
Performance Requirements 5%
Contractor achieved all required service performance standards as itemized on the Performance Requirements Summary table (PWS Section C1.21)
No Notices of Violation (NOVs) 5%
There were no NOVs issued to either the Contractor or the Army that were within the control of the Contractor.
PART 2 – Qualitative (Subjective) Performance Incentive Fee Criteria (48% Total)
Safety (7% Total)
Safety 7%
Overall effectiveness, maintenance, and management of the Contractor Health and Safety Program. Responsiveness to safety issues and concerns. Proper incident, near miss, recordable and days away case investigation, reporting, and incorporation of lessons learned. Early notification is provided for injuries that have the potential to become more serious. Appropriate case management is performed for any injuries. Development and implementation of effective safety improvement programs, including such things as employee recognition of positive safety practices, safety inspections, training, and emergency drills. Any recordable, days away, or other significant safety incidents are presented to the RMA Safety Incident Review Committee (SIRC) in accordance with SIRC procedure ES&H.101 (Attachment L48). The SIRC presentation and associated lessons learned is shared with all RMA organizations. Leadership, management involvement, and overall attitude towards the importance of safety by Contractor management, employees, and subcontractors.
Program Implementation (16% total)
Water Treatment Plant O&M 6%
Operation & maintenance of the groundwater treatment plants is performed in an effective and efficient manner. Plant facilities are maintained in good working condition and required preventative maintenance activities are performed. Required documentation is accurately maintained.
Groundwater Well Sampling & Monitoring 4%
Groundwater well sampling and monitoring is performed in an effective, efficient, and accurate manner. Data collection, analysis, and reporting are accurate and timely.
Landfills and Cover Maintenance 3%
Landfills and covers are inspected and maintained in accordance with applicable plans and procedures. Repairs are promptly and correctly made. Documentation and reporting are accurate and timely.
Infrastructure and Facility Maintenance 3%
Buildings and associated facilities, roads, vehicles, equipment, and utilities are effectively maintained. Preventative maintenance is properly performed. Repairs are promptly and correctly performed. Infrastructure and facility maintenance subcontractor(s) are effectively managed and coordinated by the Contractor. Government property is effectively maintained, tracked, and controlled.
Program Management (13% Total)
Personnel 4%
The Contractor provides quality, qualified, and competent personnel to perform the work. Personnel are cooperative and accommodating to the needs of the project and the Government. Personnel are properly trained in the performance of their job requirements. When personnel need to be replaced, their replacement is competent and qualified for the position. There is adequate succession planning in place to ensure seamless performance in the event of the loss of a key personnel employee.
Regulatory Support 2%
The Contractor provides excellent support to the Government in its required interface activities with the Regulatory Agencies.
Partnering 4%
The Contractor communicates candidly and often with the Government staff regarding the program, whether good news or bad. The Contractor works with Government staff in a cooperative and results orientated manner. The Contractor works diligently to resolve program issues and finds innovative and creative solutions where possible. The Contractor assists the Government with “staying on-track” with necessary meetings and deliverables and helps to ensure that any required Government follow-up with Regulatory Agencies is accomplished, important issues are addressed, and appropriate feedback is shared in a timely manner.
Subcontract Management 2%
Subcontracts are effectively managed by the Contractor. Subcontractor change orders and claims are effectively managed. New subcontracts are competitively solicited.
US Fish & Wildlife Service (USFWS) Coordination 1%
The Contractor coordinates with the USFWS on any non-routine or other activities that could impact the USFWS or its visitors to the refuge. The Contractor keeps the USFWS informed of activities that will occur on refuge land. The Contractor works with the USFWS in a cooperative and helpful manner.
Cost and Schedule Control (3% Total)
Cost 2%
Costs are effectively managed, controlled, minimized, and reported through all aspects of the program by the Contractor. Cost forecasts are accurate and current. Significant cost variances are reported promptly to the Government. Opportunities for cost-savings or cost-avoidance are continuously pursued by the Contractor.
Schedule 1%
Accurate schedules for the work are developed and adhered to. Significant variances to schedules are promptly communicated to the Government together with solutions to meet schedule milestones.
Quality & Environmental Compliance (4% Total)
Quality 2%
All work is performed in a quality manner and in accordance with all applicable plans, procedures, and specification requirements. Employees are properly trained to perform their work functions in accordance with quality requirements. Documents and reports are concise and accurate. A system is in place to communicate and incorporate lessons learned. Quality Surveillances are conducted at an appropriate frequency to ensure compliance with requirements.
Environmental Compliance 2%
All work is performed in accordance with project environmental programs, applicable laws, and regulations.
Documentation (4% Total)
Reports and Document Control 2%
Reports are timely, accurate, well organized, and convey the appropriate information. A system is in place and followed which ensures that the most current document is being utilized; documents are organized, revised, maintained, and disposed of properly.
Data Management 2%
Data is collected, organized, and maintained in a manner that meets the needs of the project and in accordance with applicable plans and procedures. Data is readily retrievable.
Community Involvement (1% Total)
Community Involvement 1%
The Contractor is an active member of the local communities. The Contractor acts as a goodwill ambassador for the Rocky Mountain Arsenal. Periodic contact is made and updates are provided to local officials and organizations.
Attachment A6
RMA Site Map
Attachment A7
Well Location Map
Attachment A8
Building 132
Attachment A8
Attachment A9
LIST OF ACRONYMS
| ACHD | Adams County Health Department | |
| ACOR | Alternate Contracting Officer's Representative | |
| AFARS | Army Federal Acquisition Regulation Supplement | |
| AKO | Army Knowledge-On-Line | |
| AMA | Army Maintained Areas | |
| AR | Army Regulation | |
| ARARs | Applicable or Relevant and Appropriate Requirements | |
| Arsenal | Rocky Mountain Arsenal | |
| ATCTS | Army Training and Certification Tracking System | |
| AUP | Acceptable Use Policy | |
| BANS | Basin A Neck System | |
| CAC | Common Access Card | |
| CAMU | Corrective Action Management Unit | |
| CAT | Complex Army Trenches | |
| CCR | Construction Completion Report | |
| CDD | CAMU Designation Document | |
| CDPHE | Colorado Department of Public Health and Environment | |
| CERCLA | Comprehensive Environmental Response Compensation and Liability Act | |
| CFR | Code of Federal Regulations | |
| CMR | Contract Manpower Reporting | |
| CMRA | Contract Manpower Reporting Application | |
| CMMS | Computerized Maintenance Management System | |
| CONUS | Continental United States (excludes Alaska and Hawaii) | |
| COR | Contracting Officer’s Representative | |
| COTR | Contracting Officer's Technical Representative | |
| COTS | Commercial-Off-the-Shelf | |
| CSRGs | Containment System Remediation Goals | |
| CWTP | Consolidated Water Treatment Plant | |
| DA | Department of the Army | |
| DCAA | Defense Contract Audit Agency | |
| DCMA | Defense Contract Management Agency | |
| DD250 | Department of Defense Form 250 (Receiving Report) | |
| DD254 | Department of Defense Contract Security Requirement List | |
| DFARS | Defense Federal Acquisition Regulation Supplement | |
| DMDC | Defense Manpower Data Center | |
| DoD | Department of Defense | |
| DOT | Department of Transportation | |
| DPAS | Defense Property Accounting System | |
| EDTC | Electronic Data Tracking Center | |
| ELF | Enhanced Hazardous Waste Landfill | |
| EM/CP | RMA Emergency Management/Contingency Plan | |
| EMR | Experience Modification Rate | |
| EPA | Environmental Protection Agency | |
| ERS | Environmental Remediation Services | |
| FAR | Federal Acquisition Regulation | |
| FFA | Federal Facility Agreement | |
| FOUO | For Official Use Only | |
| FPR | Final Proposal Revision | |
| GCSS | Global Combat Support System | |
| GFP | Government Furnished Property | |
| GIS | Geographic Information Systems | |
| gpm | gallons per minute | |
| GW | Groundwater | |
| HAZWOPER | Hazardous Waste Operations and Emergency Response | |
| HIPAA | Health Insurance Portability and Accountability Act of 1996 | |
| HWL | Hazardous Waste Landfill | |
| IA | Information Assurance | |
| IAPM | Information Assurance Program Manager | |
| ICs | Institutional Controls | |
| ICS | Integrated Cover System | |
| IJO | Individual Job Order | |
| IRA | Interim Response Action | |
| KO | Contracting Officer | |
| LCS | Leachate Collection System | |
| LDS | Leak Detection System | |
| LTCP | Long-Term Care Plan | |
| LTMP | Long-Term Monitoring Plan | |
| LUC | Land Use Controls | |
| LUCP | Land Use Control Plan | |
| MOA | Memorandum of Agreement | |
| MOU | Memorandum of Understanding | |
| NAC | North Boundary Containment System | |
| NOV | Notice of Violation | |
| NPL | National Priorities List | |
| NPTS | Northern Pathway Treatment System | |
| NWBCS | Northwest Boundary Containment System | |
| OBS | Organization Breakdown Structure | |
| OCI | Organizational Conflict of Interest | |
| OCONUS | Outside Continental United States (includes Alaska and Hawaii) | |
| ODC | Other Direct Costs | |
| OGITS | Off-post Groundwater Intercept and Treatment System | |
| O&F | Operational and Functional | |
| O&M | Operations and Maintenance | |
| OMC | Operations and Maintenance Contract/Contractor | |
| OPSEC | Operations Security | |
| ORC | Operator in Responsible Charge | |
| OSHA | Occupational Safety and Health Administration | |
| OU | Operable Unit | |
| PCP | Post-Closure Plan | |
| PII | Personally Identifiable Information | |
| PIPO | Phase In/Phase Out | |
| PLC | Programmable Logic Control | |
| POC | Point of Contact | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QAP | Quality Assurance Program | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Program | |
| QMP | Quality Management Program | |
| RAOs | Remedial Action Objectives | |
| RCRA | Resource Conservation and Recovery Act | |
| Refuge Act | Rocky Mountain Arsenal National Wildlife Refuge Act | |
| RFP | Request for Proposal | |
| RIR | Recordable Incident Rate | |
| RMAED | Rocky Mountain Arsenal Environmental Database | |
| RMA | Rocky Mountain Arsenal | |
| RMANWR | Rocky Mountain Arsenal National Wildlife Refuge | |
| ROD | Record of Decision | |
| ROWMP | Remediation and Off-Site Waste Management Plan | |
| RTRAC | RMA Transfer File Check | |
| RVO | Remediation Venture Office | |
| RYTS | Railyard Treatment System | |
| SACWSD | South Adams County Water and Sanitation District | |
| SAP | Sampling and Analysis Plan | |
| SDT | Shell Disposal Trenches | |
| Shell | Shell Oil Company | |
| SOs | Service Orders | |
| SOOs | Standing Operating Orders | |
| SQL | Structure Query Language | |
| SSEB | Source Selection Evaluation Board | |
| STC | Small Tools and Consumables | |
| STRACK | Sample Tracking | |
| SW | Surface Water | |
| SWT | Siemens Water Technologies Corporation | |
| TARP | Threat Awareness and Reporting Program | |
| TE | Technical Exhibit | |
| USFWS | U.S. Fish and Wildlife Service | |
| UV | Ultra-violet | |
| WAWF | Wide Area Work Flow | |
| WBS | Work Breakdown Structure | |
| WMP | Water Management Program |
image3.jpg image4.jpg image1.jpg image2.png
File details come from the government source that posted it. Updated .