DRAFT Attachment 13 Seed Project_ASHE 17-1027_CCEBBLNK.pdf

PDF 1 MB Posted

Attached to
MACC AVIANO
Solicitation number
FA568225R0003
Issued by

About this file

This document is a Government Cost Estimate Breakdown for the Sustain Facility 904 project located at Area F, Aviano Air Base in Italy. The comprehensive document details a multi-phase renovation and systems upgrade project spanning demolition, architectural, civil, mechanical, and electrical work. The project involves extensive modifications including removal and replacement of HVAC systems, electrical infrastructure, fire alarm and gas detection systems, lighting, plumbing, and telecommunications systems across four primary work categories. The estimate includes detailed line-by-line breakdowns of material and labor costs, with specific focus on phased implementation across multiple building systems, and uses a currency conversion rate of 1$ = 0.9249€. The project appears to be a comprehensive facility modernization effort with meticulous planning for systematic upgrades and replacements of building infrastructure and technological systems.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

GOVERNMENT COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

A.

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Civil Demolition - Ia Demolizioni Civili

1 DEMOLITION AND DISPOSAL OF EXISTING PAVEMENT (ON TRENCH)

Demolizione e smaltimento di pavimentazione esistente (IN TRACCIA)

IT. No.

Art. n. 1a SM/MQ

2 TRENCH EXCAVATION FOR CONDUITS LAYING

Scavo in trincea per posa nuove condotture

IT. No.

Art. n. 1b CM/MC

DEMOLITION AND DISPOSAL OF EXISTING PAVEMENT, INCLUDING

CONCRETE CURBS OR OTHER PRECAST CONCRETE ELEMENTS

Demolizione e smaltimento di pavimentazione esistente incluse cordonate o altri elementi prefabbricati in calcestruzzo

IT. No.

Art. n. 2a SM/MQ

4 FOUNDATION EXCAVATION

Scavo di fondazione a sezione ristretta

IT. No.

Art. n. 2b CM/MC

5 LARGE SECTION EXCAVATION AND SLOPES FORMATION

Scavo di sbancamento, sagomatura del fondo scavo e formazione delle pendenze

IT. No.

Art. n. 2c CM/MC

DEMOLITION OF EXISTING SIDEWALK CERAMIC TILES PAVEMENTS

INCLUDING SUB-BASE

Demolizione e smaltimento di marciapiedi in piastrelle di ceramica incluso sottofondo

IT. No.

Art. n. 3 SM/MQ

Total Civil Demolition - Totale Demolizioni Civili

Ib Architectural Demolition - Ib Demolizioni Architettoniche

REMOVAL AND DISPOSAL EXISTING FIBER MINERAL PANELS FALSE CEILING,

INCLUDING STRUCTURE AND ANCHORS - PHASE 1

Demolizione e smaltimento di controsoffitti in pannelli di fibra minerale, inclusa struttura di supporto e ancoraggi - FASE 1

IT. No.

Art. n. 1a SM/MQ

REMOVAL AND DISPOSAL EXISTING FIBER MINERAL PANELS FALSE CEILING,

INCLUDING STRUCTURE AND ANCHORS - PHASE 2

Demolizione e smaltimento di controsoffitti in pannelli di fibra minerale, inclusa struttura di supporto e ancoraggi - FASE 2

IT. No.

Art. n. 1b SM/MQ

SUSTAIN WORKS / Lavori di Manutenzione Evolutiva

FOR OFFICIAL USE ONLY Sheet 1 of 41

DRAFT

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

REMOVAL AND DISPOSAL EXISTING FIBER MINERAL PANELS FALSE CEILING,

INCLUDING STRUCTURE AND ANCHORS - PHASE 3

Demolizione e smaltimento di controsoffitti in pannelli di fibra minerale, inclusa struttura di supporto e ancoraggi - FASE 3

IT. No.

Art. n. 1c SM/MQ

REMOVAL AND DISPOSAL EXISTING FIBER MINERAL PANELS FALSE CEILING,

INCLUDING STRUCTURE AND ANCHORS - PHASE 4

Demolizione e smaltimento di controsoffitti in pannelli di fibra minerale, inclusa struttura di supporto e ancoraggi - FASE 4

IT. No.

Art. n. 1d SM/MQ

11 INSTALLERS MASONRY ASSISTANCE (drill, trenches, ecc..)

Assistenze murarie agli impiantisti (carotaggi, tracce ecc..)

IT. No.

Art. n. 2 LS/AC

REMOVAL AND DISPOSAL THE BOILER ROOM'S DAMAGED PLASTER

INCLUDING CERAMIC BASEBOARD

Demolizione di intonaco ammalorato all'interno della centrale termica, compreso battiscopa

IT. No.

Art. n. 3 SM/MQ

REMOVAL AN DISPOSAL OF THE EXISTING "MARINARA"LADDER AND ROOF'S

METAL PARAPETS

Rimozione e smaltimento di scala alla marinara e parapetti in metallo in copertura

IT. No.

Art. n. 4 LS/AC

REMOVAL AND DISPOSAL OF EXISTING BITUMINOUS MEMBRANE AND

FLASHINGS ON FLAT ROOFS

Rimozione e smaltimento di manto di copertura esistente in guaina bituminosa incluse copertine, converse, scossaline ecc...

IT. No.

Art. n. 5a SM/MQ

15 REMOVAL AND DISPOSAL OF EXISTING THERMAL INSULATION PACKAGE

Rimozione e smaltimento di pacchetto isolante esistente

IT. No.

Art. n. 5b SM/MQ

REMOVAL AND DISPOSAL OF EXISTING FLASHING ON FLAT ROOF

Rimozione di lattonerie esistenti su coperture piane e nello specifico converse, mantovane, copertine ..

IT. No.

Art. n. 6a LM/ML

BITUMINOUS MEMBRANE SURFACE CLEANING AND DOWNSPOUTS

MAINTENANCE

Pulizia della superficie in guaina, manutenzione e pulizia pluviali e verifica delle pendenze esistenti con eventuale adeguamento

IT. No.

Art. n. 6b SM/MQ

Total Architectural Demolition - Totale Demolizioni Architettoniche

FOR OFFICIAL USE ONLY Sheet 2 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Id Mechanical Demolitions - Id Demolizioni Meccaniche

REMOVAL OF EXISTING HVAC DUCTWORKS, FITTINGS AND EQUIPMENT IN

THE ENTIRE BUILDING AS SHOWN IN DWGS. FOR 4 DIFFERENT PHASES

Rimozione di canalizzazioni e apparecchiature HVAC nell'intero edificio come mostrato nei disegni, Demolizioni in 4 fasi distinte

IT. No.

Art. n. 1 LS/AC

REMOVAL OF EXISTING HVAC PIPING AND EQUIPMENT IN THE ENTIRE

BUILDING AS SHOWN IN DWGS. FOR 4 DIFFERENT PHASES- PARTIAL

INTERVENTATION ON EXISTING PIPING SYSTEM INCLUDED

Rimozione di tubazioni del sistema HVAC ed equipaggiamenti nell'intero edificio come mostrato nei disegni. Demolizioni in 4 fasi. Inclusi interventi provvisori sugli impianti

IT. No.

Art. n. 2 LS/AC

REMOVAL OF EXISTING HVAC SYSTEM, PIPING, PUMPS, VALVES,

INSULATION AND PUMBLING SYSTEM IN THE MECHANICAL ROOM. CHILLER

AND ROOF TOP REMOVAL

Rimozione dei sistemi HVAC, tubazioni, pompe, valvole, isolamento ed idrico sanitario in centrale termica. Rimozione chiller e roof top

IT. No.

Art. n. 3 LS/AC

REMOVAL OF EXISTING GAS NATURAL SYSTEM FROM DOWNSTREAM THE

PRESSURE REDUCER CABINET UNTIL TO BOILERS IN THE MECHANICAL

ROOM.

Rimozione rete gas a valle della cabina di riduzione pressione fino ai boilers in centrale termica

IT. No.

Art. n. 4 LS/AC

Total Mechanical Demo - Totale Demolizioni Imp. Meccanico

Ie Electrical Demolition - Ie Demolizioni Impianti Elettrici

22 SUPPLY LINES DISCONNECTION.

Scollegamento linee di alimentazione.

IT. No.

Art. n. 1 LS/AC

23 REMOVE SUPPLY LINE FOR METEO TOWER @ FAC 948.

Rimozione linea alimentazione per torre meteo c/o edificio 948.

IT. No.

Art. n. 2 LS/AC

24 REMOVE AND DISPOSE OF THE INTERIOR LIGHTING SYSTEM.

Rimuovere e smaltire l'impianto interno di illuminazione.

IT. No.

Art. n. 3 LS/AC

25 REMOVE AND DISPOSE THE POWER SYSTEM.

Rimuovere e smaltire l'impianto di forza motrice.

IT. No.

Art. n. 4 LS/AC

26 REMOVE AND DISPOSE THE FIRE ALARM SYSTEM.

Rimuovere e smaltire l'impianto di allarme incendio.

IT. No.

Art. n. 5 LS/AC

FOR OFFICIAL USE ONLY Sheet 3 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

27 REMOVE AND DISPOSE THE GAS DETECTION & ALARM SYSTEM.

Rimuovere e smaltire l'impianto di rivelazione ed allarme gas.

IT. No.

Art. n. 6 LS/AC

Total Electrical Demolitions - Totale Demolizioni Elettriche

TOTAL PART I / Totale Parte I

FOR OFFICIAL USE ONLY Sheet 4 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - CIVIL, ARCHITECTURAL AND STRUCTURAL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIa Civil - IIa Civile

LAIYNG NEW PIPES INCLUDIN SAND, BACKFILL AND RESTORATION OF

EXISTING PAVEMENT

Allettamento nuove tubazioni, compreso rinfianco con sabbia mista di cava, reinterro dello scavo con materiale compattato e legato con calce e ripristino della pavimentazione esistente

IT. No.

Art. n. 1 LM/ML

LEAN CONCRETE TYPE C12/15

Getto in opera di calcestruzzo C12/15 non armato per magrone di fondazione

IT. No.

Art. n. 2a CM/MC

30 REINFORCED CONCRETE FOR SLAB/ FOUNDATIONS

Platea/Cordolo di fondazione in getto di calcestruzzo armato. Cassero a perdere

IT. No.

Art. n. 2b CM/MC

31 REINFORCED CONCRETE SLAB DIAM.8/20x20 ELECTROWELDED NET Rete elettrosaldata diam.8/20x20 per armatura massetto

IT. No.

Art. n. 2c KG/KG

STRECHED METAL SHEET H.196cm INCLUDING SUPPORT STRUCTURE AND

DOUBLE GATE LEAF

Lamiera stirata h196Cm inclusa struttura di sostegno e portone a doppia anta

IT. No.

Art. n. 2d LM/ML

33 REALIZE NEW CONCRETE SIDEWALK

Realizzare nuovo marciapiede in calcestruzzo con finitura superficiale al quarzo

IT. No.

Art. n. 3 SM/MQ

34 REALIZE NEW PAVERS PAVEMENT

Formazione di nuova pavimentazione in betonelle, incluso sottofondo

IT. No.

Art. n. 4 SM/MQ

REALIZE CONSDENSATE DRAINAGE, INCLUDING DEMOLITIONS, FITTINGS

AND NEW PITS

Formazione scarichi condense, inclusa fornitura e posa pozzetti, raccordi, demolizioni e ripristini

IT. No.

Art. n. 5 LS/AC

Total Civil - Totale Civile

IIb Architectural - IIb Architettonico

MINERAL FIBER SUSPENDED CEILING 60x60 - PHASE 1 Controsoffitti in pannelli di fibra minerale 60x60, inclusa struttura di supporto e ancoraggi - FASE 1

IT. No.

Art. n. 1a SM/MQ

37 OVERCHARGE FOR MOISTURE RESISTANT PANELS - PHASE 1

Sovrapprezzo per utilizzo pannelli resistenti all'umidità - Fase 1

IT. No.

Art. n. 1b SM/MQ

FOR OFFICIAL USE ONLY Sheet 5 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

MINERAL FIBER SUSPENDED CEILING 60x60 - PHASE 2 Controsoffitti in pannelli di fibra minerale 60x60, inclusa struttura di supporto e ancoraggi - FASE 2

IT. No.

Art. n. 1c SM/MQ

MINERAL FIBER SUSPENDED CEILING 60x60 - PHASE 3 Controsoffitti in pannelli di fibra minerale 60x60, inclusa struttura di supporto e ancoraggi - FASE 3

IT. No.

Art. n. 1d SM/MQ

40 OVERCHARGE FOR MOISTURE RESISTANT PANELS - PHASE 3

Sovrapprezzo per utilizzo pannelli resistenti all'umidità - Fase 3

IT. No.

Art. n. 1e SM/MQ

MINERAL FIBER SUSPENDED CEILING 60x60 - PHASE 4 Controsoffitti in pannelli di fibra minerale 60x60, inclusa struttura di supporto e ancoraggi - FASE 4

IT. No.

Art. n. 1f SM/MQ

42 OVERCHARGE FOR MOISTURE RESISTANT PANELS - PHASE 4

Sovrapprezzo per utilizzo pannelli resistenti all'umidità - Fase 4

IT. No.

Art. n. 1g SM/MQ

43 GYPSUM VEILS OR BOXES

Velette in cartongesso e scatolati

IT. No.

Art. n. 1h LS/AC

INTERNAL WALL AND CEILING (WHERE'S NO SUSPENDED FALSE CEILING)

PAINTING - PHASE 1

Tinteggiature interne delle pareti e dei soffitti (dove non c'è controsoffitto) - fase 1

IT. No.

Art. n. 2a SM/MQ

INTERNAL WALL AND CEILING (WHERE'S NO SUSPENDED FALSE CEILING)

PAINTING - PHASE 2

Tinteggiature interne delle pareti e dei soffitti (dove non c'è controsoffitto) - fase 2

IT. No.

Art. n. 2b SM/MQ

INTERNAL WALL AND CEILING (WHERE'S NO SUSPENDED FALSE CEILING)

PAINTING - PHASE 3

Tinteggiature interne delle pareti e dei soffitti (dove non c'è controsoffitto) - fase 3

IT. No.

Art. n. 2c SM/MQ

INTERNAL WALL AND CEILING (WHERE'S NO SUSPENDED FALSE CEILING)

PAINTING - PHASE 4

Tinteggiature interne delle pareti e dei soffitti (dove non c'è controsoffitto) - fase 4

IT. No.

Art. n. 2d SM/MQ

48 ANTI HUMIDITY TREAT OF THE BOILER ROOM WALLS INCLUDING PAINTING

Trattamento anti umidità muratura centrale termica inclusa tinteggiatura

IT. No.

Art. n. 3 SM/MQ

HIGH PRESSURE HYDRO WASHING OF WALL AND APLLICATION OF

BASECOAT

Idrolavaggio ad alta pressione delle superfici e applicazione di isolante murale solvente

IT. No.

Art. n. 4a SM/MQ

50 ANTI ALGAE/ANTI MOLD TREATMENT

Trattamento anti alga/anti muffa

IT. No.

Art. n. 4b SM/MQ

FOR OFFICIAL USE ONLY Sheet 6 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

EXTERNAL WALL PAINTING WITH TWO COAT OF ACRYLIC PAINT AND

QUARTZ POWDERS

Tinteggiatura pareti esterne con due mani di pittura acrilica e polveri al quarzo

IT. No.

Art. n. 4c SM/MQ

52 REVIEW OF STEP SLOPE ROOF WITH TILES COVERAGE

Ripasso di copertura in pendenza con manto in tegole

IT. No.

Art. n. 5 SM/MQ

DOUBLE WALKABLE WHITE MEMBRANE "DERBIGUM" TYPE (INCLUDING

COAT OF PRIMER VERPRIM PROFESSIONAL TYPE)

Doppia guaina ardesiata colore bianco tipo "derbigum",(compresa stesa di primer fissativo tipo verprim professional)

IT. No.

Art. n. 6a SM/MQ

VAPOR BARRIER + 10cm THICK. THERMAL INSULATION IN PIR FOAM PANELS

COATED BY BITUMEN GLASS LAYER SUITABLE FOR TORCHING

Barriera a vapore + isolamento termico rigido con pannelli in schiuma PIR rivestito con velo di vetro bitumato idoneo per applicazione per sfiammatura (posa a caldo) spessore 10cm

IT. No.

Art. n. 6b SM/MQ

RESTORATION OF EXISTING BITUMINOUS MANTLE BY LIQUID MEMBRANE

Ripristino/reimpermeabilizzazione di manto bituminoso esistente mediante applicazione di guaina liquida

IT. No.

Art. n. 7 SM/MQ

56 SUPPLY AND INSTALL NEW METAL FLASHING

Fornitura e posa in opera di nuove lattonerie

IT. No.

Art. n. 8 LS/AC

57 LIFELINE. INCLUDING DESIGN, CALCULATION AND CERTIFICATION (ROOF)

Linea Vita, compreso progetto, calcolo e certificazione (in copertura)

IT. No.

Art. n. 9 LS/AC

58 MAINTENANCE OF RESTROOMS ACCESS DOORS LOUVERS

Mnutenzione delle griglie di ventilazione delle porte di accesso ai bagni

IT. No.

Art. n. 10 LS/AC

59 INTALLATION OF NEW "ARCHITRAVE"

Installazione di nuovo architrave a protezione nuovo foro per passaggio canali

IT. No.

Art. n. 11 LS/AC

CONSTRUCT NEW GYPSUM COUNTER WALL 75mm+2x12,5mm Formazione di nuova controparete in cartongesso, struttura da75mm + doppia lastra da12,5mm

IT. No.

Art. n. 12 SM/MQ

PREPARATION OF THE PAVED AREA FOR THE INSTALLATION OF

TEMPORARY OFFICES, CLEANING, CLEARING OF ANY CREASES ETC;

CONNECTION OF THE TEMPORARY OFFICES TO THE NETWORKS OF THE

BASE

preparazione dell'area pavimentata per l'installazione degli uffici temporanei, pulizia, sgombero di eventuali cordonate ecc; connessione degli uffici temporanei alle reti della Base

IT. No.

Art. n. 13a LS/AC

HANDLING / TRANSPORT FOR DELIVERY AND COLLECTION, ASSEMBLY,

PREPARATION AND DISASSEMBLY OF TEMPORARY OFFICE MODULES

Movimentazione / trasporto per consegna e ritiro, montaggio, allestimento e smontaggio dei moduli ufficio

IT. No.

Art. n. 13b LS/AC

FOR OFFICIAL USE ONLY Sheet 7 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

63 OFFICE MODULES RENTAL FEE FOR 12 MONTHS

Movimentazione / trasporto per consegna e ritiro dei moduli ufficio

IT. No.

Art. n. 13c EA/NO

Total Architectural - Totale architettonico

TOTAL PART II / Totale Parte II

FOR OFFICIAL USE ONLY Sheet 8 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORKS / Parte III - Lavori Meccanici

IIIa HVAC - IIIa HVAC

AHU - SYSTEM FOR FRESH AIR TREATMENT AND HEAT

RECOVERY. AHU-1

Unità trattamento aria per aria di rinnovo e recupero calore. AHU-1

IT. No.

Art. n. 1 EA/NO

AHU - SYSTEM FOR FRESH AIR TREATMENT AND HEAT

RECOVERY. AHU-2

Unità trattamento aria per aria di rinnovo e recupero calore. AHU-2

IT. No.

Art. n. 2 EA/NO

GALVANIZED STEEL RECTANGULAR DUCT SYSTEM INCLUDED SUPPORT

SYSTEM.

Canalizzazioni in acciaio zincato rettangolari compresi I supporti

IT. No.

Art. n. 3 KG/KG

67 GALVANIZED CIRCULAR STEEL DUCT SYSTEM INCLUDED SUPPORT SYSTEM.

Canalizzazioni circolari in acciaio zincato compresi I supporti

IT. No.

Art. n. 4 KG/KG

INSULATION OF DUCT WITH CLOSED CELL ELASTOMER 24mm WITH

ALUMINUM LAMIN. INCLUDED ACCESSORY

Isolamento canalizzazioni con elastomero a celle chiuse 24mm con lamina di alluminio Trocellen Class Alu inclusi accessori

IT. No.

Art. n. 5 SM/MQ

FIBER GLASS DUCT SYSTEM INSULATION, 50mm, INCLUDED KRAFT

PAPERFIBER. FOR DUCT OUTSIDE THE BUILDING

Isolamento canalizzazioni con lana di vetro 50MM rivestita con carta kraft. Per canali esterni all'edificio

IT. No.

Art. n. 6 SM/MQ

ALLUMINUM JACKET INSULATION FOR EXTERNAL DUCT OUTSIDE THE

BUILDING. THICKNESS 8/10mm. INCLUDED ACCESSORIES Foglio di alluminio per protezione canali esterni all'edificio 8/10mm

IT. No.

Art. n. 7 SM/MQ

71 SOUNDPROOF FLEXIBLE DUCTS (D=125mm) Canalizzazioni flessibili fonoassorbenti (d=125mm)

IT. No.

Art. n. 8a LM/ML

72 SOUNDPROOF FLEXIBLE DUCTS (D=150mm) Canalizzazioni flessibili fonoassorbenti (d=150mm)

IT. No.

Art. n. 8b LM/ML

73 SOUNDPROOF FLEXIBLE DUCTS (D=200mm) Canalizzazioni flessibili fonoassorbenti (d=200mm)

IT. No.

Art. n. 8c LM/ML

74 RETURN GRILLES INCLUDED ACCESSORIES AND INSULATED PLENUM

Griglie di ripresa aria in alluminio compresi accessori ed il plenum isolato

IT. No.

Art. n. 9 EA/NO

75 EXHAUST AIR VALVES INCLUDED ACCESSORIES. D200

Valvole estrazione aria in alluminio compresi accessori. D200

IT. No.

Art. n. 10 EA/NO

FOR OFFICIAL USE ONLY Sheet 9 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

ALUMINUM AIR DIFFUSER (PERFORATED) INCLUDED ACCESSORIES AND

INSULATED PLENUM

Diffusori di mandata in alluminio (perforati) compresi gli accessori ed il plenum isolato

IT. No.

Art. n. 11 EA/NO

HIGH INDUCTION DIFFUSER FOR CIRCULAR DUCT WITH COLLECTING

DAMPER

Diffusori di mandata per canali circolari comprensivo di serranda captatrice

IT. No.

Art. n. 12 EA/NO

PRE-PAINTED GALVANIZED STEEL SHEET TO COVER INTERNAL CIRCULAR

DUCT. WHITE COLORED

Lamiera pre-verniciata di colore bianco a coprire i canali circolari interni

IT. No.

Art. n. 13 EA/NO

MANUAL GALVANIZED STEEL DAMPERS FOR RECTANGULAR OR CIRCULAR

DUCTS WITHIN 0,01SM (10dSM) Serrande di regolazione in acciaio zincato per canali rettangolar o circolari fino a 0,01mq (10dmq)

IT. No.

Art. n. 14a EA/NO

MANUAL GALVANIZED STEEL DAMPERS FOR RECTANGULAR OR CIRCULAR

DUCTS WITHIN 0,01SM (10dSM) Serrande di regolazione in acciaio zincato per canali rettangolar o circolari fino a 0,01mq (10dmq)

IT. No.

Art. n. 14b EA/NO

CASSETTA TYPE FAN COIL UNIT INCLUDED SUPPORTS AND ACCESSORIES.

COOLING AND HEATING CAPACITY AS PER DESIGN. EC MOTOR (INVERTER)

Fan coil cassetta, compresi supporti ed accessori. Potenza riscaldamento e raffrescamento come da progetto. Motore EC (inverter)

IT. No.

Art. n. 15 EA/NO

WALL-MOUNTED FAN COIL INCLUDED ACCESSORIES AND SUPPORTS.

COOLING AND HEATING CAPACITY AS PER DESIGN. EC MOTOR (INVERTER)

Fan coil a parete inclusi accessori e supporti. Capacità riscaldamento e raffrescamento come da progetto. Motore EC (inverter)

IT. No.

Art. n. 16 EA/NO

CEILING-MOUNTED EXPOSED FAN COIL INCLUDED ACCESSORIES AND

SUPPORTS. COOLING AND HEATING CAPACITY AS PER DESIGN. EC MOTOR

(INVERTER)

Fan coil a soffitto a vista inclusi accessori e supporti. Capacità riscaldamento e raffrescamento come da progetto. Motore EC (inverter)

IT. No.

Art. n. 17 EA/NO

FLOOR MOUNTED FCU INCLUDING INCLUDED ACCESSORIES AND

SUPPORTS. COOLING AND HEATING CAPACITY AS PER DESIGN. EC MOTOR

(INVERTER)

Unità fan coil a basamento completa di accessori. Capacità riscaldamento e raffrescamento come da progetto. Motore EC (inverter)

IT. No.

Art. n. 18 EA/NO

FOR OFFICIAL USE ONLY Sheet 10 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FAN COIL SYSTEM ACCESSORIES: n.3 BALL VALVES, Y FILTER, BY-PASS, VENTS, DRAIN VALVES, PICV VALVE (OR 3WAY VALVE) WITH ACTUATOR, TEST PORTS, INCLUDED PIPING AND SUPPORTS FOR CONNECTION, FLEXIBLE STAINLESS STEEL PIPES, INSULATION, FITTINGS. UNTIL 3/4"

Accessori per batteria di fan coil: 3 valvole a sfera, filtro Y, by-pass, sfiati aria, valvole di drenaggio, valvola PICV (o valvola a 3 vie), test port, tubazioni flessibili in acciaio inox, isolamenti, ecc, accessori. Fino a 3/4"

IT. No.

Art. n. 19 EA/NO

HOT WATER TUBOLAR STEEL RADIATORS, WHITE, INCLUDED ACCESSORIES

AND SUPPORT. CAPACITY 352W DT=20°C. RAD-1

Radiatore tubolare in acciaio, bianco, completo di accessori e supporto, potenza

352W DT=20°C. RAD-1

IT. No.

Art. n. 20a EA/NO

HOT WATER TUBOLAR STEEL RADIATORS, WHITE, INCLUDED ACCESSORIES

AND SUPPORT. CAPACITY 702W DT=20°C. RAD-2

Radiatore tubolare in acciaio, bianco, completo di accessori e supporto, potenza

702W DT=20°C. RAD-2

IT. No.

Art. n. 20b EA/NO

RADIATOR CONNECTION, WITH 2 BALL VALVES 1/2", THERMOSTATIC VALVE,

DETENTOR, VENTS, DRAIN VALVES, PICV VALVE, INCLUDED PIPING AND

SUPPORTS FOR CONNECTION

Accessori per impianto di condizionamento: 2 valvole a sfera, valvola termostatica con testa, detentore, sfiati aria, valvole di drenaggio, valvola PICV, test port, ecc, inclusi lavorazione tubi supporti e collegamento

IT. No.

Art. n. 21 EA/NO

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 - PRESSFITTING SYSTEM -

COMPLETE WITH NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM.

DIAMETER DN15

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 completo di raccordi normali e speciali ed ogni tipo di supporto. Diametro

DN15

IT. No.

Art. n. 22a LM/ML

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 - PRESSFITTING SYSTEM -

COMPLETE WITH NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM.

DIAMETER DN20

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 completo di raccordi normali e speciali ed ogni tipo di supporto. Diametro

DN20

IT. No.

Art. n. 22b LM/ML

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 - PRESSFITTING SYSTEM -

COMPLETE WITH NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM.

DIAMETER DN25

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 completo di raccordi normali e speciali ed ogni tipo di supporto. Diametro

DN25

IT. No.

Art. n. 22c LM/ML

FOR OFFICIAL USE ONLY Sheet 11 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 - PRESSFITTING SYSTEM -

COMPLETE WITH NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM.

DIAMETER DN32

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 completo di raccordi normali e speciali ed ogni tipo di supporto. Diametro

DN32

IT. No.

Art. n. 22d LM/ML

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 - PRESSFITTING SYSTEM -

COMPLETE WITH NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM.

DIAMETER DN40

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 completo di raccordi normali e speciali ed ogni tipo di supporto. Diametro

DN40

IT. No.

Art. n. 22e LM/ML

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 - PRESSFITTING SYSTEM -

COMPLETE WITH NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM.

DIAMETER DN50

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 completo di raccordi normali e speciali ed ogni tipo di supporto. Diametro

DN50

IT. No.

Art. n. 22f LM/ML

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 WELDED COMPLETE WITH

NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM. DIAMETER DN65

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 saldato completo di raccordi normali e speciali ed ogni tipo di supporto.

Diametro DN65

IT. No.

Art. n. 23a LM/ML

STAINLESS STEEL (AISI 316-L) PIPING UNI 10217-7 WELDED COMPLETE WITH

NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM. DIAMETER DN100

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio INOX UNI 10217-7 saldato completo di raccordi normali e speciali ed ogni tipo di supporto.

Diametro DN100

IT. No.

Art. n. 23b LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN15

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN15

IT. No.

Art. n. 24a LM/ML

FOR OFFICIAL USE ONLY Sheet 12 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN20

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN20

IT. No.

Art. n. 24b LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN25

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN25

IT. No.

Art. n. 24c LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN32

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN32

IT. No.

Art. n. 24d LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN40

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN40

IT. No.

Art. n. 24d LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN50

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN50

IT. No.

Art. n. 24e LM/ML

FOR OFFICIAL USE ONLY Sheet 13 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN65

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN65

IT. No.

Art. n. 24f LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 19mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN100

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 19mm. Completi in opera. Diametri tubazioni da DN100

IT. No.

Art. n. 24g LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 50mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN32

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 50mm. Completi in opera. Diametri tubazioni da DN32

IT. No.

Art. n. 25a LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 50mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN50

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 50mm. Completi in opera. Diametri tubazioni da DN50

IT. No.

Art. n. 25b LM/ML

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 50mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN65

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 50mm. Completi in opera. Diametri tubazioni da DN65

IT. No.

Art. n. 25c LM/ML

FOR OFFICIAL USE ONLY Sheet 14 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 50mm. INCLUDED

ACCESSORIES. PIPING DIAMETERS FROM DN100

Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C.

Conduttività termica non superiore a 0,040 W/mK. Spessore 50mm. Completi in opera. Diametri tubazioni da DN100

IT. No.

Art. n. 25d LM/ML

AHU-1 SYSTEM ACCESSORIES AND CONNECTION: BALL VALVES, Y FILTER,

BY-PASS, VENTS, DRAIN VALVES, PICV VALVES WITH ACTUATOR 0-10V,

TEST PORTS, INCLUDED PIPING AND SUPPORTS FOR CONNECTION,

INSULATION, FITTINGS.

AHU-1 accessorie connessione: valvole a sfera, filtro Y, by-pass, sfiati aria, valvole di drenaggio, valvole PICV, attuatori 0-10V, test port, incluse tubazioni e supporti, isolamenti, accessori.

IT. No.

Art. n. 26 EA/NO

HEAT PUMP BLUE BOX HP ZETA SKY R7 LN16.4 COOLING CAPACITY 173kW.

INCLUDED ACCESSORIES AND HYDRONIC MODULE (2 INVERTER PUMPS)

Pompa di calore BLUE BOX HP ZETA SKY R7 LN16.4. PIPES HEAT TRACE CABLE INCLUDED. Potenza in raffrescamento 173kW, compresi accessori e modulo idronico (2 pompe inverter) e modulo di controllo. Cavi scaldanti inclusi

IT. No.

Art. n. 27 EA/NO

STORAGE TANK 1000 LT. FOR CHILLED WATER INCLUDED INSULATION

THICKNEES 10CM INCLUDED ACCESSORIES

Serbatoio accumulo acqua refrigerata da 1000 litri con isolamento da spessore 10cm, inclusi accessori.

IT. No.

Art. n. 28 EA/NO

DISINSTALL AND RE-INSTALL THE GAS FIRED BOILER. SUPPLY AND

INSTALLATION OF BOILER SAFETY EQUIPMENT. HEATING BOILER B-1

Disinstallazione e reinstallazione della caldaia a gas. Fornitura ed installazione degli equipaggiamenti di sicurezza della caldaia. Caldaia riscaldamento B-1

IT. No.

Art. n. 29a LS/AC

DISINSTALL AND RE-INSTALL THE GAS FIRED BOILER. SUPPLY AND

INSTALLATION OF BOILER SAFETY EQUIPMENT. DHW BOILER B-2

Disinstallazione e reinstallazione della caldaia a gas. Fornitura ed installazione degli equipaggiamenti di sicurezza della caldaia. Caldaia ACS B-2

IT. No.

Art. n. 29b LS/AC

SUPPLY FAN - BOILER ROOM. IN LINE CENTRIFUGAL FAN, 230 V- 50 Hz, IP44, INSULATION CLASS B, OPERATING TEMP -15 + 40 ° C, INCLUDING SUPPORT

SYSTEM AND WIRING.

Fornitura e posa in opera di ventilatore centrifugo in linea, 230 V- 50 Hz, IP44, classe di isolamento B, con temperature di esercizio -15 + 40 °C, compreso di fasce di fissaggio e cablaggi elettrici.

IT. No.

Art. n. 30 EA/NO

115 ELECTRIC PUMP FOR BOILER CIRCULATION. P-1 and P-2 Elettropompa per ricircolo caldaia. Pompa P-1 e P-2

IT. No.

Art. n. 31 EA/NO

FOR OFFICIAL USE ONLY Sheet 15 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

ELECTRIC PUMP FOR HEATING OF THE DOMESTIC HOT WATER STORAGE.

ACCESSORIES INCLUDED. PUMPS P4A - P4B

Elettropompa per il riscaldamento del bollitore di acqua calda sanitaria e relativo accumulo.Pompe P4A e P-4B

IT. No.

Art. n. 32 EA/NO

ELECTRONIC PUMP FOR HEATING WATER CIRCUIT. SUPPLIED WITH

INVERTER AND PRESSURE CONTROLLER ON BOARD. ACCESSORIES

INCLUDED. CAPACITY 8,26 l/s WITH 210KPA Pompa elettronica per circuito di acqua calda, dotata di inverter e sensore di pressione a bordo. Accessori inclusi. Portata 8,26 l/s con 210 kPa

IT. No.

Art. n. 33 EA/NO

DDC SYSTEM INCLUDING LOCAL REGULATOR TEMPERATURE SENSORS,

REGULATORS, VALVES, ACTUATORS, ECC. INCLUDING FINAL TESTING,

ASSISTANCE TO ADJUSTING/BALANCING AND THE TRAINING FOR THE

MAINTENANCE PERSONNEL

Impianto DDC compresi i sensori locali di temperatura, regolatori, valvole, attuatori, ecc. Comprese le prove finali, l'assistenza a taratura e bilanciamento dell'impianto e il training del personale di manutenzione

IT. No.

Art. n. 34 LS/AC

119 PASSIVE FIRE PROTECTION FOR PIPING

Protezione passiva al fuoco per tubazioni

IT. No.

Art. n. 35 LS/AC

TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS. 4

CONSTRUCTION PHASES MORE FINAL BALANCING

Prove, tarature e bilanciamento impianti HVAC, 4 Fasi più bilanciamento finale

IT. No.

Art. n. 36 LS/AC

121 THREADED BRASS BALL VALVE, DIAMETERS DN15. PN10

Fornitura e posa in opera di impianto valvola a sfera filettata in ottone. PN10, DN15

IT. No.

Art. n. 37a EA/NO

122 THREADED BRASS BALL VALVE, DIAMETERS DN20. PN10

Fornitura e posa in opera di impianto valvola a sfera filettata in ottone. PN10, DN20

IT. No.

Art. n. 37b EA/NO

123 THREADED BRASS BALL VALVE, DIAMETERS DN32. PN10

Fornitura e posa in opera di impianto valvola a sfera filettata in ottone. PN10, DN32

IT. No.

Art. n. 37c EA/NO

124 THREADED BRASS BALL VALVE, DIAMETERS DN65. PN10

Fornitura e posa in opera di impianto valvola a sfera filettata in ottone. PN10, DN65

IT. No.

Art. n. 37d EA/NO

125 BUTTERFLY VALVE, DIAMETERS DN80. PN16

Fornitura e posa in opera di valvola a farfall flangiata PN16, DN80

IT. No.

Art. n. 38a EA/NO

126 BUTTERFLY VALVE, DIAMETERS DN100. PN16

Fornitura e posa in opera di valvola a farfall flangiata PN16, DN100

IT. No.

Art. n. 38b EA/NO

THREADED BRASS CHECK VALVE, DIAMETERS DN15. PN10

Fornitura e posa in opera di impianto valvola di non ritorno filettata in ottone. PN10, DN15

IT. No.

Art. n. 39a EA/NO

FOR OFFICIAL USE ONLY Sheet 16 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

THREADED BRASS CHECK VALVE, DIAMETERS DN25. PN10

Fornitura e posa in opera di impianto valvola di non ritorno filettata in ottone. PN10, DN25

IT. No.

Art. n. 39b EA/NO

THREADED BRASS CHECK VALVE, DIAMETERS DN32. PN10

Fornitura e posa in opera di impianto valvola di non ritorno filettata in ottone. PN10, DN32

IT. No.

Art. n. 39c EA/NO

FLANGED CAST IRON CHECK VALVE, DIAMETERS DN100. PN10

Fornitura e posa in opera di impianto valvola di non ritorno in ghisa flangiata. PN10, DN100

IT. No.

Art. n. 40 EA/NO

131 THREADED MANUAL BALANCING VALVE, DIAMETERS DN32. PN16

Fornitura e posa in opera di valvola di bilanciamento manuale. PN16, DN32

IT. No.

Art. n. 41 EA/NO

FLANGED MANUAL BALANCING VALVE, DIAMETERS DN100. PN10

Fornitura e posa in opera di valvola di bilanciamento manuale flangiata. PN10, DN100

IT. No.

Art. n. 42 EA/NO

THREADED STRAINER FILTER "Y" TYPE, BRASS BODY, INOX BASKET,

DIAMETERS DN32. PN10

Fornitura e posa in opera di filtro Y corpo in ottone cestello in inox. PN10, DN32

IT. No.

Art. n. 43 EA/NO

FLANGED STRAINER FILTER "Y" TYPE, CAST IRON, INOX BASKET,

DIAMETERS DN100. PN16

Fornitura e posa in opera di filtro Y corpo in ghisa cestello in inox flangiato. PN16, DN100

IT. No.

Art. n. 44 EA/NO

135 THREADED ANTIVIBRATION RUBBER JOINT, DIAMETER DN32. PN10

Fornitura e posa in opera di giunto antivibrante in gomma filettato. PN10, DN32

IT. No.

Art. n. 45 EA/NO

136 FLANGED ANTIVIBRATION RUBBER JOINT, DIAMETER DN100. PN10

Fornitura e posa in opera di giunto antivibrante in gomma flangiato. PN10, DN100

IT. No.

Art. n. 46 EA/NO

137 DRAIN VALVE, DIAMETERS UNTIL TO DN20. PN10

Rubinetto di scarico fino a DN20. PN10

IT. No.

Art. n. 47 EA/NO

138 THREADED HEAD SQUARE COCK, DIAMETER DN32. PN10

Rubinetto a testa quadra DN32 filettato. PN10

IT. No.

Art. n. 48 EA/NO

139 THREADED AIR SEPARATOR DIAMETER DN32.

Separatore di aria filettato DN32

IT. No.

Art. n. 49 EA/NO

140 FLANGED AIR SEPARATOR DIAMETER DN80

Separatore di aria flangiato DN80

IT. No.

Art. n. 50 EA/NO

FILTER IN LINE TYPE THERMOCYCLON AND DIRT SEPARATOR. WATER FLOW

0,2mc/h. DHW BOILER CIRCUIT. FCL1 Filtro in linea tipo "Thermocyclon" e defangatore. Flusso 0,2mc/h. Circuito acqua caldaia produzione ACS. FCL1

IT. No.

Art. n. 51 EA/NO

FOR OFFICIAL USE ONLY Sheet 17 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FILTER IN LINE TYPE THERMOCYCLON AND DIRT SEPARATOR. WATER FLOW

0,35mc/h. HEATING AND CHILLED WATER CIRCUIT. INCLUDED PUMP. FCL2 Filtro in linea tipo "Thermocyclon" e defangatore. Flusso 0,35mc/h. Circuito riscaldamento e acqua refrigerata. Pompa inclusa, FCL2

IT. No.

Art. n. 52 EA/NO

143 THREADED DIELECTRIC JOINT, DIAMETERS DN20. PN10

Fornitura e posa in opera di giunto dielettrico filettata in ottone. PN10, DN20

IT. No.

Art. n. 53a EA/NO

144 THREADED DIELECTRIC JOINT, DIAMETERS DN40. PN10

Fornitura e posa in opera di giunto dielettrico filettata in ottone. PN10, DN40

IT. No.

Art. n. 53b EA/NO

145 EXPANSION TANK FOR CHILLED WATER SYSTEM. CAPACITY 50 LITERS

Vaso di espansione per sistema acqua refrigerata. Capacità 50 litri

IT. No.

Art. n. 54a EA/NO

146 EXPANSION TANK FOR HEATING HEATING SYSTEM. CAPACITY 150 LITERS

Vaso di espansione per sistema riscaldamento, capacità 150 litri

IT. No.

Art. n. 54b EA/NO

147 MANOMETER 0-6 bar Manometro 0-6 bar

IT. No.

Art. n. 55 EA/NO

148 THERMOMETER 0-120°C OR -30-50°C

Termometro 0-120°C o -30-50°C

IT. No.

Art. n. 56 EA/NO

149 ENERGY / FLOW METER MAGNETIC TYPE INCLUDED ACCESSORIES. DN32

Fornitura e posa in opera di misuratore energia / portata accessori. DN32

IT. No.

Art. n. 57 EA/NO

150 ENERGY / FLOW METER MAGNETIC TYPE INCLUDED ACCESSORIES. DN100

Fornitura e posa in opera di misuratore energia / portata accessori. DN100

IT. No.

Art. n. 58 EA/NO

3-WAY CONTROL VALVE WITH 24V or 220V ACTUATOR kvs=6,3 AS REQUIRED, SIGNAL 0-10V. SIGNAL FEEDBACK POSITION REQUIRED. FOR DHWG

HEATING

Valvola di regolazione a 3-vie completa di attuatore 24V o 220V segnale 0-10V.

Kvs=6,3. Segnale di posizione richiesto. Per riscaldamento bollitore DHWG

IT. No.

Art. n. 59 EA/NO

2-WAY FLANGED MOTORIZED BUTTERFLY VALVE WITH 24V or 220V

ACTUATOR AS REQUIRED, SIGNAL OPEN / CLOSE. WITH SIGNAL POSITION

FEEDBACK. DN100

Valvola a due vie a farfalla motorizzata flangiata completa di attuatore 24V o 220V segnale aperto / chiuso. Con segnale di posizione per feedback. DN100

IT. No.

Art. n. 60 EA/NO

FOR OFFICIAL USE ONLY Sheet 18 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

HYDRONIC SISTEM IN BOILER ROOM USING AUSTENITIC STAINLESS STEEL

PIPING UNI 10217-7 (AISI 316L), PIPES CLAMP (UNTIL TO DN50), INCLUDED

NORMAL AND SPECIAL FITTINGS AND SUPPORT SYSTEM. PIPES WELDED

FROM DN65 INCLUDED. DIAMETERS FROM DN15 TO DN100. MANIFOLDS

INCLUDED INSULATION.COPPER PIPES UNTIL 22x1,5MM INSTALLED IN THE BOILER ROOM AND FROM BOILER ROOM TO ROOM 49a Sistema idronico in centrale termica con fornitura e posa in opera di impianto di distribuzione in tubi di acciaio austenitico inox (AISI 316L) crimpato fino a DN50 completo di raccordi normali e speciali ed ogni tipo di supporto. Diametri da DN15 a DN100 collettori incluso, connessione di ogni dispositivo ed equipaggiamento.

Tubazioni in rame fino a 22x1,5mm installati in centrale termica e dalla centrale termica al locale 49a

IT. No.

Art. n. 61 LS/AC

INSULATION FOR HVAC PIPING WITH ELASTOMER SLEEVES OR MAT FOR

INSULATION OF CONVEYING PIPING FROM -40 ° C to 105 ° C. THERMAL CONDUCTIVITY NOT MORE THAN 0.040 W / mK. THICKNESS 25mm. INCLUDED

ACCESSORIES. FOR THE PIPING DIAMETERS FROM DN15 TO DN100 IN THE

BOILER ROOM AND MAKE-UP WATER PIPE FROM BOILER ROOM TO ROOM

49a Fornitura e posa in opera di isolamento per tubazioni HVAC in manicotti di elastomero o lastre per isolamento di tubazioni convoglianti fluidi da -40 °C a +105 °C. Conduttività termica non superiore a 0,040 W/mK. Spessore 25mm. Completi in opera. Per tubazioni con diametri da DN15 a DN100 in centrale termica e tubazione di alimentazione idrica locale 49a da centrale termica

IT. No.

Art. n. 62 LS/AC

ALLUMINUM JACKET INSULATION FOR PIPING IN THE MECHANICAL ROOM

AND BOILER ROOM. THICKNESS 6/10mm. INCLUDED ACCESSORIES. F Foglio di alluminio per protezione tubazioni in sala meccanica ed in centrale termica

IT. No.

Art. n. 63 LS/AC

ALLUMINUM JACKET INSULATION FOR PIPING. THICKNESS 6/10mm.

INCLUDED ACCESSORIES. FOR PIPING OTUSIDE THE BUILDING

Foglio di alluminio per protezione tubazioni esternamente all'edificio

IT. No.

Art. n. 64 mq/mq

157 THREADED MAKE UP WATER UNIT DN20.

Make-up water filettato DN20

IT. No.

Art. n. 65 EA/NO

158 THREADED BACKFLOW PREVENTER DN20

Disconnettore filettato DN20

IT. No.

Art. n. 66 EA/NO

159 BURIED PREINSULATED PIPES DN50

Tubazioni preisolate da interro DN50

IT. No.

Art. n. 67 LM/ML

160 DUCT SOUND ATTENUATOR L=1200 600X450mm - SIL-1 Silenziatore da canale L=1200 600x450mm - SIL-1

IT. No.

Art. n. 68a EA/NO

161 DUCT SOUND ATTENUATOR L=1200 450X300mm - SIL-2 Silenziatore da canale L=1200 450x300mm - SIL-2

IT. No.

Art. n. 68b EA/NO

FOR OFFICIAL USE ONLY Sheet 19 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

162 DUCT SOUND ATTENUATOR L=1200 600X600mm - SIL-3 Silenziatore da canale L=1200 600x600mm - SIL-3

IT. No.

Art. n. 68c EA/NO

163 DUCT SOUND ATTENUATOR L=1200 600X750mm - SIL-4 Silenziatore da canale L=1200 600x750mm - SIL-4

IT. No.

Art. n. 68d EA/NO

DX SYSTEM INCLUDING EXTERNAL UNITS, INTERNAL UNIT PIPING,

CONTROLS AND FITTINGS

Sistema ad espansione diretta completo di unità esterna tubazioni, controlli ed accessori

IT. No.

Art. n. 69 EA/NO

Total HVAC - Totale HVAC

IIIb Plumbing - IIIb Idrico sanitario

DISCONNECT AND TEMPORARY CONNECTION FOR THE PLUMBING SYSTEM

TO PROVIDE THE WATER TO THE BUILDING DURING THE WORKS, EVERY

BURDEN INCLUDED

Disconnesione e connessione temporanea the sistema idrico per fornire acqua durante i lavori di costruzione ogni onere incluso

IT. No.

Art. n. 1 LS/AC

PRESSURE REDUCER CABINET 50mc/h FROM 5 BAR TO 20mbar. INCLUDED

PIPES, DEVICES, GAS METER PULSE TYPE, VALVES, STAINLESS STEEL,

CABINET, PRESSURE REDUCECER, DIELECTRIC JOINTS.

Fonritura e posa in opera di stazione di riduzione pressione gas da 5 bar a 20mbar, portata 50mc/h. Comprensivo di tubazioni, valvole, dispositivi, riduttori di pressione, giunti dielettrici, contatore ad impulsi, cabina in acciaio inox

IT. No.

Art. n. 2 LS/AC

SEAMLESS GALVANIZED STEEL PIPING UNI 10225 (ex8863-S), MEDIUM

SERIES. COMPLETE WITH NORMAL AND SPECIAL FITTINGS AND SUPPORT

SYSTEM FOR NATURAL GAS SYSTEM. COMPLETE WITH SHELVES, SEALING,

YELLOW PAINTING. DIAMETERS UNTIL DN65

Fornitura e posa in opera di impianto di distribuzione in tubi di acciaio zincato senza saldatura UNI 10225 (exUNI 8863-S), serie media, verniciati di giallo completo con pezzi speciali, raccordi, supporti di ogni tipo, passaggi e pitturazione. Per sistema gas. Fino a diametro DN65

IT. No.

Art. n. 3 LS/AC

168 FLANGED SOLENOID GAS VALVE WITH MANUAL RESET. DN65

Elettrovalvola gas flangiata a riarmo manuale. DN65

IT. No.

Art. n. 4 EA/NO

169 FLANGED ANTISEISMIC VALVE COMPLIANCE TO ASCE 25-97. DN65

Valvola azionamento sismica flangiata conforme a ASCE 25-97. DN65

IT. No.

Art. n. 5 EA/NO

FOR OFFICIAL USE ONLY Sheet 20 of 41

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN FACILITY 904

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1027 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL MANHOURS

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

170 FLANGED BUTTERFLY VALVE FOR GAS SHUTOFF . DN65

Valvola a farfalla per chiusura rapida gas. DN65

IT. No.

Art. n. 6 EA/NO

GAS INLET SYSTEM FOR BOILER. COMPLETE WITH FILTER, FLEXIBLE PIPE,

FUEL INTERCEPTOR VALVE, MANUAL VALVE. DN50

Rampa gas per caldaia, completa di filtro, tubazione flessibile, valvola intercettazione combustibile, valvola manuale. DN50

IT. No.

Art. n. 7 EA/NO

ELECTRIC PUMP FOR DOMESTIC HOT WATER RECIRCULATION.

ACCESSORIES INCLUDED. CAPACITY 0-2mc/h WITH 50kPa. RP-1A/B Pompa per il ricircolo acqua calda sanitaria. Accessori inclusi. Portata 0-2mc/h con 50 kPa. RP-1A/B

IT. No.

Art. n. 8 EA/NO

DOMESTIC HOT WATER HEATER TANK. INSULATED. 500 LITER, HEAT

EXCHANGER INCLUDED. ACCESSORIES INCLUDED

Sebatoio di accumulo per acqua calda domestica completa di scambiatore di calore.

Isolato capacità di 500 litri inclusi accessori

IT. No.

Art. n. 9 EA/NO

EXPANSION TANK FOR DOMESTIC HOT WATER SYSTEM. CAPACITY 35

LITERS

Vaso di espansione per sistema acqua calda domestica. Capacità 35 litri

IT. No.

Art. n. 10 EA/NO

175 THREADED BACKFLOW PREVENTER, "BA" CONTROLLABLE TYPE, DN50

Disconnettore a pressione controllabile tipo "BA" filettato. DN50

IT. No.

Art. n. 11 EA/NO

176 THREADED PRESSURE REDUCER WITH MANOMETER, DN50

Riduttore di pressione filettato con manometro. DN50

IT. No.

Art. n. 12 EA/NO

FLANGED WATER METER WITH PULSE TRANSMISSION TO DDC SYSTEM.

ACCESSORIES INCLUDED. DN 50

Fornitura e posa in opera di contalitri acqua da collegare al sistema di controllo DDC con trasmissione ad impulsi. Accessori inclusi. DN50

IT. No.

Art. n. 13 EA/NO

THREADED MIXING VALVE WITH THERMAL DISINFECTION FUNCTION,

COMPLETE WITH REGULATOR, BALL VALVE, TEMPERATURE PROBE.

PROGRAMMABLE, DN50

Valvola miscelatrice con funzione di disinfezione termica, completo di regolatore, valvole a sfera, sonde di temperatura, programmabile. Filettato. DN50

IT. No.

Art. n. 14 EA/NO

WATER SOFTNER VOLUMETRIC TYPE. Q=10-17MC/H FROM 29°F TO 0°F,

DOUBLE COLUMN, INCLUDED ACCESSORIES. AWS1

Sistema di addolcimento acqua doppia colonna, tipo volumetrico duttore di pressione filettato con manometro. Q=10-17mc/h da 29°F a 0°F.

This is the start of the file's text. The full file is on GovTribe.