DRAFT Attachment 0008 - Evaluation of Use of Existing Government-Furnished Property.pdf
PDF 629 KB Posted
- Solicitation number
- 20R0006
About this file
This document provides evaluation criteria for use of existing government-furnished property in response to a solicitation. Offerors must provide a list of requested GFP including acquisition cost, age, and type. For evaluation purposes, monthly rental rates ranging from 0.75-3% will be applied to the acquisition cost of industrial equipment, electronic test equipment, automotive equipment, special tooling, and other property based on age. A 2% rate will apply to property not otherwise classified. Where GFP is used for other work, the evaluation factor will be prorated based on proposed and previously authorized use. Definitions of acquisition cost and property age are also included. The solicitation will add loading and transportation costs for property offered on an as-is basis.
The related opportunity notice announces a draft RFP for CBRN filters and filter assembly components to be issued by the Department of the Army Materiel Command TACOM Life Cycle Management Command. Questions on the draft may be submitted until January 7, 2021, with the RFP expected to be released on SAM in mid-January 2021.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION OF USE OF EXISTING GOVERNMENT-OWNED PROPERTY
(a) Rent-free use of existing facilities, special test equipment, and/or special tooling, title to which is in the
Government or to which the Government has the right to take title (all of which is herein described as property), including rent-free use by prospective subcontractors, will be a consideration in the evaluation of responses to this solicitation. Contractor must provide with their proposal, the list of Government Furnished
Property (GFP), the acquisition cost, age, and type of GFP.
(b) For purposes of evaluation only, the unit evaluation factors for each classification of property, computed as follows, shall be added by the Government to the price or prices offered. The evaluation factors shall be computed by multiplying the acquisition cost of each item of property by the rental rates specified below, and then multiplying the product obtained by the number of months of use proposed. A minimum of one month of use shall be required for purposes of evaluation. Fractional portions of a month shall be counted as a full month. This final product shall then be divided by the total quantity of units to be produced using such property to determine the unit evaluation factors. The factors shall be separately set forth by the offeror under the offered unit prices.
Monthly Rental Rates
(1) For land and land preparation, buildings, building installations, and land installations other than those items specified in (2) below: the prevailing commercial rate.
(2) For industrial plant equipment of the types covered by Federal Supply Classification Code Numbers
3405, 3408, 3410, 3411 through 3419 (machine tools), and 3441 through 3449 (secondary metal forming and cutting machines), the following rates shall apply:
Age of Equipment Monthly Rental Rates
0-2 years 3.00%
Over 2 to 3 years 2.00%
Over 3 to 6 years 1.50%
Over 6 to 10 years 1.00%
Over 10 years 0.75%
(3) For personal property and equipment not covered in (1) and (2) above (including all production equipment not in the Federal Supply Classification Codes set forth above, and including special tooling and special test equipment), the following rates shall apply:
-- Two percent (2.00%) per month for electronic test equipment and automotive equipment;
-- One percent (1.00%) per month for special tooling and for all other property and equipment.
(c) If any item of property is to be used on other work for which use has been authorized during the period such property is requested for use on any contract resulting from this solicitation, the evaluation factors shall be calculated in accordance with the following: the acquisition cost of each item of property shall be multiplied by the rental rates specified for the applicable classification of property set forth above, and the product obtained shall then be multiplied by the number of months of rent-free use requested. The resulting product shall be multiplied by a fraction, the numerator of which is the amount of use of the property proposed under this solicitation, and the denominator of which is the sum of the previously-authorized use of the property during the period of proposed use and the use proposed under this solicitation. The final product shall then be divided by the total quantity of units to determine the unit evaluation factor. The measurement unit for determining the amount of use to be considered in establishing the fraction referred to in the foregoing calculation shall be direct labor hours, sales, hours of use, or any other measurement unit which will result in an equitable apportionment of the factor. The measurement
Attachment 0008 - Evaluation of Use of Existing Government -Furnished Property
DRAFT
unit used and the amount of respective uses in sufficient detail to support the proration shall be set forth for each item of property.
(d) For the purposes of determining the evaluation factors set forth above, the following definitions apply:
(1) The term acquisition cost means the total cost to the Government for an item of property, including the cost of (i) transportation, (ii) installation, (iii) accessories to be used with the item, and (iv) any rebuilding and modernization which has enhanced the original capability of the item;
(2) The age of an item of property shall be based on the year in which it was manufactured, with an annual birthday on 1 January of each year thereafter. On 1 January following the date of manufacture, the item shall be considered one year old; and on each succeeding January 1st, it shall become one year older
(thus, an item manufactured on 15 July 1978 would be one year old on 1 January 1979, and over two years old on and after 1 January 1980).
(e) Where this solicitation provides that the property is offered for use on an as-is basis, F.O.B. loading dock at present location, the Government shall add to the offered price, in addition to the evaluation factors described above, a factor, for purposes of evaluation, which will be composed of the costs to the
Government of making such property available at the F.O.B. point, including the costs of disconnection, preparation for shipment, and placement on the loading dock.
DRAFT
File details come from the government source that posted it. Updated .