DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc3of3.pdf
PDF 11 MB Posted
- Attached to
- ACC Replacement 13 Area Initial Outfitting Project Federal contract opportunity
- Solicitation number
- W9127S21Q6000
About this file
This document provides details on an upcoming federal contract opportunity for initial outfitting work at a replacement medical clinic in Camp Pendleton, California. The U.S. Army Corps of Engineers Little Rock District intends to issue a request for quote in January 2021 seeking offers for the ACC Replacement 13 Area Initial Outfitting Project, with an estimated value between $5-10 million. The requirement will be set aside for Service-Disabled Veteran-Owned Small Businesses. The simplified acquisition procedures of FAR Part 13 will be applied along with the commercial items procedures of FAR Part 12. The notice serves to inform potential contractors in advance of the forthcoming solicitation. Questions regarding the opportunity can be submitted through ProjNet until December 31, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc1of3.pdf | ||
| DRAFT Attachment (014) - Program for Design 13 Area Marine Centered Medical.pdf | ||
| DRAFT 6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs2of2.pdf | ||
| DRAFT Statement of Work.docx | DOCX document | |
| DRAFT X5700 Full Cut Sheet.pdf | ||
| DRAFT P021 AREA 13 MEDICAL CLINIC - Final CID Submittal.pdf | ||
| DRAFT P021 AREA 13 MEDICAL CLINIC - Final SID Submittal.pdf | ||
| DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC - Final Medical Equipment.pdf | ||
| DRAFT 6.7 PRICE SCHEDULE_PN14021_CP_13Area_ACC.xlsx | XLSX spreadsheet | |
| DRAFT 6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs1of2.pdf | ||
| DRAFT X5700 Basis of Design Drawings.pdf | ||
| DRAFT Staging and Area Map.pdf | ||
| DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc2of3.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL DESIGN SUBMITTAL
28 FEBRUARY 2018
P-021
AREA 13 - MEDICAL
CLINIC REPLACEMENT
CAMP PENDLETON
MCB CAMP PENDLETON,
CALIFORNIA
SPECIFICATIONS
VOLUME III
Prepared for:
COMMANDER
NAVAL FACILITIES
ENGINEERING
COMMAND SOUTHWEST
SAN DIEGO, CALIFORNIA
AE CONTRACT NO.
N62470-16-D-6006-FZ01
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
P- 021 AREA 13 MEDI CAL CLI NI C REPLACEMENT 16065
MCB CAMP PENDLETON, CA
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LI ST OF DRAWI NGS
00 22 13. 00 20 SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 17. 00 20 NETWORK ANALYSI S SCHEDULES ( NAS)
01 33 00 SUBMI TTAL PROCEDURES
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 16. 00 50 CUTTI NG AND PATCHI NG PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 20 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 57 19. 01 20 SUPPLEMENTAL TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 PROJECT I DENTI FI CATI ON
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 78 24. 00 20 FACI LI TY ELECTRONI C OPERATI ON AND MAI NTENANCE SUPPORT
I NFORMATI ON ( eOMSI )
01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 82 16. 00 20 ENGI NEERI NG CONTROL OF ASBESTOS CONTAI NI NG MATERI ALS
02 83 13. 00 20 LEAD I N CONSTRUCTI ON
02 84 16 HANDLI NG OF LI GHTI NG BALLASTS AND LAMPS CONTAI NI NG PCBs
AND MERCURY
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOI ST FRAMI NG
05 30 00 STEEL DECKS
05 40 00 COLD- FORMED METAL FRAMI NG
05 43 13. 00 50 SLOTTED CHANNEL EQUI PMENT SUPPORT FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
05 51 33 METAL LADDERS
05 52 00 METAL RAI LI NGS
05 75 00. 00 50 DECORATI VE FORMED METAL
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS
06 61 16 SOLI D SURFACI NG FABRI CATI ONS
06 64 00. 00 50 PLASTI C PANELI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS
07 17 00 BENTONI TE WATERPROOFI NG
07 21 13 BOARD AND BLOCK I NSULATI ON
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 ROOF AND DECK I NSULATI ON
07 27 13. 00 50 MODI FI ED BI TUMI NOUS SHEET AI R BARRI ERS
07 27 26. 00 50 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 42 13 METAL WALL PANELS
07 60 00 FLASHI NG AND SHEET METAL
07 61 15. 00 20 ALUMI NUM STANDI NG SEAM ROOFI NG
07 72 00. 00 50 ROOF ACCESSORI ES
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
07 95 00. 00 50 EXPANSI ON CONTROL
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 13. 00 50 ACCESS DOORS AND FRAMES
08 33 13. 00 50 COI LI NG COUNTER DOORS
08 41 13 ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS
08 42 29. 23 50 SLI DI NG AUTOMATI C ENTRANCE DOORS
08 51 13 ALUMI NUM WI NDOWS
08 56 59. 00 50 SERVI CE WI NDOW UNI TS
08 63 00. 00 50 METAL- FRAMED SKYLI GHTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 TILING
09 51 00 ACOUSTI CAL CEI LI NGS
09 65 00 RESI LI ENT FLOORI NG
09 65 66 RESI LI ENT ATHLETI C FLOORI NG
09 68 00 CARPETING
09 90 00 PAI NTS AND COATI NGS
09 96 00 HI GH- PERFORMANCE COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 10 EXTERI OR SI GNAGE
10 14 00. 20 I NTERI OR SI GNAGE
10 21 13 TOI LET COMPARTMENTS
10 21 23. 16 CUBI CLE TRACK AND HARDWARE
10 22 13 WI RE MESH PARTI TI ONS
PROJECT TABLE OF CONTENTS Page 2
10 26 00 WALL AND DOOR PROTECTI ON
10 28 13 TOI LET ACCESSORI ES
10 44 00. 00 50 FI RE EXTI NGUI SHERS AND CABI NETS
10 71 13. 43 50 BUI LDI NG SUNSCREENS
10 73 26. 00 50 WALKWAY COVER SYSTEM
10 90 00. 00 50 MI SCELLANEOUS SPECI ALTI ES
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WI NDOW SHADES
12 35 70 HEALTHCARE CASEWORK
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 21 48 PREFABRI CATED AUDI OMETRI C ROOMS
13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT
13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL AND PLUMBI NG EQUI PMENT
13 49 19 X- RAY SHI ELDI NG
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13. 00 20 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 70 PLUMBI NG, HEALTHCARE FACI LI TI ES
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND
EQUIPMENT
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 23. 13 20 BACnet DI RECT DI GI TAL CONTROL SYSTEMS FOR HVAC
23 11 25 FACI LI TY GAS PI PI NG
23 52 00 HEATI NG BOI LERS
23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE
23 64 26 HEATI NG HOT WATER AND CHI LLED WATER PI PI NG SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 50 00. 00 20 CYBERSECURI TY OF FACI LI TY- RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 23 01 GENERATOR QUI CK- CONNECT SWI TCHBOARD
26 24 13 SWITCHBOARDS
26 27 14. 00 20 ELECTRI CI TY METERI NG
26 31 00 SOLAR PHOTOVOLTAI C ( PV) COMPONENTS ( BI D OPTI ON)
26 36 23. 00 20 NON- AUTOMATI C TRANSFER SWI TCHES
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
PROJECT TABLE OF CONTENTS Page 3
26 51 00 I NTERI OR LI GHTI NG
26 55 80. 00 20 SURGI CAL LI GHTI NG FI XTURES
26 56 00 EXTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
27 51 16 RADI O AND PUBLI C ADDRESS SYSTEMS
27 52 23. 00 20 NURSE CALL SYSTEM
27 54 00. 00 20 COMMUNI TY ANTENNA TELEVI SI ON ( CATV) SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG
28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM
DI VI SI ON 31 - EARTHWORK
31 11 00 CLEARI NG AND GRUBBI NG
31 23 00. 00 20 EXCAVATI ON AND FI LL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D
PAVEMENTS
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 23 AGGREGATE BASE COURSE FOR CONCRETE BLOCK PAVEMENTS
32 12 10 BI TUMI NOUS TACK COATS
32 12 17 HOT MI X BI TUMI NOUS PAVEMENT
32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT, CURB, CURB AND GUTTER,
AND SI DEWALKS
32 14 15 PERMEABLE PAVEMENT
32 14 16 CELLULAR GRAVEL PAVI NG SYSTEM
32 16 15 CONCRETE BLOCK PAVEMENTS
32 17 23. 00 20 PAVEMENT MARKI NGS
32 31 30. 00 50 DECORATI VE METAL FENCES AND GATES
32 84 24 I RRI GATI ON SPRI NKLER SYSTEMS
32 93 00 EXTERI OR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER DI STRI BUTI ON
33 30 00 SANI TARY SEWERS
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 71 01 OVERHEAD TRANSMI SSI ON AND DI STRI BUTI ON
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
SECTI ON 28 08 10
ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG
05/16
PART 1 GENERAL
1. 1 SUMMARY
Thi s speci f i cat i on def i nes t he pr ocess and pr ocedur es f or i ni t i al accept ance t est i ng of el ect r oni c secur i t y syst ems ( ESS) t o i ncl ude access cont r ol as wel l as associ at ed power and communi cat i ons. Requi r ement s t o pl an, conduct , and document al l t est i ng act i v i t i es ar e cover ed al ong wi t h t he Gover nment r esponsi bi l i t y t o wi t ness t est i ng and r evi ew and appr ove submi t t al s. Dur i ng t he cour se of t he accept ance t est , demonst r at e t hat , wi t hout except i on, t he compl et ed and i nt egr at ed ESS compl i es wi t h t he cont r act r equi r ement s.
1. 2 DEFINITIONS
The Gover nment Repr esent at i ve i s a qual i f i ed i ndi v i dual gi ven speci f i c aut hor i t y t o wi t ness syst em accept ance t est i ng and eval uat e t he r esul t s.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 05 Desi gn Dat a
Test Pl an; G
SD- 06 Test Repor t s
Dr af t Test Repor t
Fi nal Test Repor t ; G
SD- 07 Cer t i f i cat es
Qualifications
1. 4 QUALI TY ASSURANCE
1. 4. 1 Qualifications
1. 4. 1. 1 General
The Test Di r ect or , Oper at or , and Techni c i an must have pr i or exper i ence wi t h t he speci f i c equi pment , har dwar e and sof t war e i nst al l ed under t he cont r act .
SECTI ON 28 08 10 Page 1
1. 4. 1. 2 Test Di r ect or
The Test Di r ect or must have at l east f i ve year s of hands- on ESS exper i ence t o i ncl ude any combi nat i on of desi gn, i nst al l at i on, t est i ng and mai nt enance.
1. 4. 1. 3 Operator
The Oper at or must have at l east t wo year s of hands- on exper i ence i nst al l i ng and mai nt ai ni ng ESS wor kst at i ons t o i ncl ude bot h har dwar e and sof t war e.
The Oper at or must be capabl e of demonst r at i ng al l wor kst at i on f eat ur es and capabilities.
1. 4. 1. 4 Technician
The t echni c i an must have at l east t wo year s of hands- on exper i ence i nst al l i ng and mai nt ai ni ng ESS f i el d equi pment t o i ncl ude sensor s, car d r eader s, camer as, l ocal pr ocessor s, and communi cat i ons equi pment . The Techni c i an must be capabl e of demonst r at i ng al l f eat ur es and capabi l i t i es of ESS f i el d equi pment . Qual i f i cat i ons may be met by t he i ndi v i dual exper i ence of one t echni c i an or by t he combi ned exper i ence of a t eam of technicians.
1. 4. 1. 5 Test I nt r uder
The pur pose of t he t est i nt r uder i s t o act i vat e i nt r usi on sensor s i n a r eal i st i c and r epeat abl e manner . The t est i nt r uder must be bet ween 70 and 72 i nches t al l and wei gh bet ween 175 and 190 pounds. The t est i nt r uder must possess suf f i c i ent physi cal st r engt h, agi l i t y , and endur ance t o per f or m movement s r equi r ed f or i nt r usi on t est i ng. These movement s may i ncl ude, but ar e not l i mi t ed t o, wal k i ng, r unni ng, cr awl i ng, j umpi ng, and climbing.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 TEST PLAN
Cl ear l y est abl i sh t he scope f or ESS t est i ng pr i or t o begi nni ng t est i ng.
Submi t a Test Pl an t hat addr esses t he f ol l owi ng t opi cs:
3. 1. 1 Personnel
I dent i f y t he Test Di r ect or , Oper at or , Techni c i an, Test I nt r uder , and any ot her per sonnel t hat wi l l be per f or mi ng t est act i v i t i es.
3. 1. 2 Equipment
Li st al l equi pment t hat i s r equi r ed t o suppor t t est i ng. St at e t he pur pose of each pi ece of equi pment . Descr i be equi pment t hat wi l l be used t o enabl e voi ce communi cat i ons bet ween t he moni t or i ng l ocat i on and t he f i el d.
3. 1. 3 Procedures
Pr ovi de a st ep- by- st ep pr ocedur e f or conduct i ng each f unct i onal t est .
Descr i be act i ons and expect ed r esul t s. Ensur e t hat f unct i onal t est pr ocedur es addr ess per f or mance st andar ds descr i bed i n cont r act
SECTI ON 28 08 10 Page 2 specifications.
Downl oad exampl e pr ocedur es f r om http://www.wbdg.org/FFC/NAVGRAPH/graphtoc.pdf and r evi ew f or appl i cabi l i t y and compl et eness. Adapt exampl e pr ocedur es t o meet speci f i c pr oj ect r equi r ement s and devel op addi t i onal ones as needed. Fol l ow TEST- MASTERTP0023- 005 f or Ai r For ce pr oj ect s.
3. 1. 4 Speci al Pr ovi s i ons
Di scuss any speci al t est pr ovi s i ons such as f aci l i t y access, saf et y, i nt egr at i on wi t h exi st i ng syst ems, and coor di nat i on wi t h ot her wor k.
3. 1. 5 Test Logs
Pr ovi de l ogs f or r ecor di ng al l dat a f r om f unct i onal t est i ng and bur n- i n testing.
Downl oad exampl e l ogs f r om http://www.wbdg.org/FFC/NAVGRAPH/graphtoc.pdf and r evi ew f or appl i cabi l i t y and compl et eness. Adapt exampl e l ogs t o meet speci f i c pr oj ect r equi r ement s and devel op addi t i onal ones as needed.
3. 1. 6 Schedule
Pr ovi de an over al l schedul e t hat i ncl udes al l t est i ng mi l est ones.
3. 2 PRE- ACCEPTANCE TESTI NG
Conduct a compl et e t est of al l f i el d equi pment , wor kst at i ons, and cent r al syst em har dwar e and sof t war e i n accor dance wi t h t he appr oved Test Pl an.
The Test Di r ect or must be on s i t e t o conduct a pr e- t est i nspect i on and over see al l t est i ng act i v i t i es. Pr i or t o t est i ng, v i sual l y i nspect al l ESS component s and cor r ect wor kmanshi p and neat ness def i c i enci es as needed.
Dur i ng t he pr e- t est i nspect i on, ver i f y t he accur acy of r edl i ne dr awi ngs and updat e dr awi ngs as needed. Conduct t est i ng i n t wo phases - f unct i onal t est i ng f ol l owed by bur n- i n t est i ng.
3. 2. 1 Phased Test i ng
3. 2. 1. 1 Funct i onal Test i ng Phase
Dur i ng t he f unct i onal t est i ng phase, ver i f y syst em per f or mance i n accor dance wi t h appr oved Test Pl an. Recor d r esul t s i n appr oved Test Logs, and pr ovi de a wr i t t en expl anat i on of each f ai l ur e t o i ncl ude cause, cor r ect i ve act i on, and r et est r esul t . Cont i nue f unct i onal t est i ng unt i l al l t est s have been successf ul l y compl et ed wi t h no unr esol ved f ai l ur es.
3. 2. 1. 2 Bur n- I n Test i ng Phase
Begi n bur n- i n t est i ng af t er successf ul compl et i on of al l f unct i onal t est i ng. Dur i ng t he bur n- i n t est i ng phase, pl ace t he ESS i n nor mal oper at i ng mode and eval uat e syst em per f or mance f or a cont i nuous 24- hour per i od.
Dur i ng t hi s t i me, t he ESS must be f ul l y f unct i onal and pr ogr ammed such t hat al l f eat ur es can be exer ci sed and eval uat ed t hr ough nor mal use. Recor d al l syst em anomal i es i n appr oved Test Logs. I ncl ude a descr i pt i on of each anomal y al ong wi t h any act i ons t aken i n r esponse. I mmedi at el y cor r ect mi nor def i c i enci es obser ved dur i ng t he cour se of t est i ng and cont i nue wi t h bur n- i n t est i ng. Det er mi ne t he r oot cause of any f ai l ur es and make necessar y r epai r s or modi f i cat i ons t o r est or e f ul l f unct i onal i t y . Af t er a
SECTI ON 28 08 10 Page 3 f ai l ur e i s cor r ect ed r epeat f unct i onal t est s f or component s and f eat ur es associ at ed wi t h t he f ai l ur e, and r epeat t he ent i r e bur n- i n t est i ng phase .
3. 2. 2 Dr af t Test Repor t
Pr epar e and submi t a Dr af t Test Repor t det ai l i ng t he r esul t s of t he t est i ng. Ref er t o par agr aph FI NAL TEST REPORT f or r equi r ed cont ent .
I ncl ude a cover l et t er s i gned by t he Test Di r ect or st at i ng t hat pr e- accept ance t est i ng has been compl et ed and t hat t he syst em i s r eady f or accept ance t est i ng.
3. 3 SYSTEM ACCEPTANCE
Test t he ESS i n accor dance wi t h t he appr oved Test Pl an i n t he pr esence of t he Gover nment Repr esent at i ve t o cer t i f y accept abl e per f or mance. Ver i f y t hat t he t ot al syst em meet s al l r equi r ement s of t he speci f i cat i on and compl i es wi t h t he speci f i ed st andar ds.
Begi n accept ance t est i ng upon ar r i val of t he Gover nment Repr esent at i ve at t he pr oj ect s i t e. Pl ace t he ESS i n nor mal oper at i ng mode and eval uat e syst em per f or mance dur i ng t he t est i ng per i od. I mmedi at el y r epor t any def i c i enci es obser ved dur i ng t est i ng t o t he Gover nment Repr esent at i ve and di scuss possi bl e causes and cor r ect i ve measur es. Obt ai n Gover nment appr oval pr i or t o maki ng any adj ust ment s, r epai r s or modi f i cat i ons. The Gover nment r et ai ns t he r i ght t o t er mi nat e t est i ng at any t i me t he ESS i s f ound t o be i ncompl et e or f ai l s t o per f or m as speci f i ed. Such t er mi nat i on of accept ance t est i ng const i t ut es a FAI LED syst em accept ance t est .
3. 3. 1 Preparation
Nof i t y t he Cont r act i ng Of f i cer of syst em r eadi ness 15 days pr i or t o t he expect ed st ar t dat e of accept ance t est i ng. Pr i or t o accept ance t est i ng, compl et e al l c l ean- up and pat ch wor k r equi r ement s. Ensur e t hat secur i t y equi pment c l oset s and si mi l ar ar eas ar e f r ee of accumul at i on of wast e mat er i al s or r ubbi sh caused by pr i or i nst al l at i on wor k.
3. 3. 2 Personnel
Ensur e t hat t he f ol l owi ng per sonnel ar e on s i t e t o per f or m t est act i v i t i es: Test Di r ect or , Oper at or , Techni c i an, and Test I nt r uder .
Ensur e t hat t he Qual i t y Cont r ol Manager i s on s i t e dur i ng accept ance testing.
3. 3. 3 Vi sual I nspect i on
Assi st t he Gover nment Repr esent at i ve i n conduct i ng a v i sual i nspect i on of ESS equi pment and wi r i ng. Thi s i nspect i on wi l l f ocus on t he gener al neat ness and qual i t y of wor kmanshi p and compl i ance wi t h appl i cabl e codes and manuf act ur er s ' r ecommended i nst al l at i on met hods. Pr ovi de a compr ehensi ve l i s t i ng of i nst al l ed equi pment and sof t war e al ong wi t h a compl et e set of ESS r ed l i ne dr awi ngs t o be used dur i ng t he i nspect i on.
Document def i c i enci es i dent i f i ed dur i ng t he i nspect i on.
3. 3. 4 Funct i onal Test i ng
Compl y wi t h r equest s f r om t he Gover nment Repr esent at i ve t o r epeat f unct i onal t est s per f or med pr evi ousl y dur i ng pr e- accept ance t est i ng. The Gover nment r eser ves t he r i ght t o r equest t he Cont r act or t o r epeat al l f unct i onal t est s or a r epr esent at i ve sampl i ng t her eof as a means of
SECTI ON 28 08 10 Page 4 per f or mance ver i f i cat i on. Add al l t est r esul t s t o appr oved Test Logs.
3. 3. 5 Syst em Act i v i t y Repor t s
Ret r i eve ar chi ved dat a f r om t he syst em and pr ovi de act i v i t y r epor t s as r equest ed by t he Gover nment Repr esent at i ve. Repor t s may addr ess any t ype of act i v i t y t o i ncl ude al ar ms, por t al t r ansact i ons, and vi deo ar chi ves.
Assi st wi t h anal yzi ng r epor t s t o i dent i f y t r ends and anomal i es.
3. 3. 6 Cor r ect i ve Act i ons
Cor r ect any def i c i enci es i n coor di nat i on wi t h t he Gover nment Repr esent at i ve. Mai nt ai n a punch l i s t and r evi ew st at us at t he end of each day. Wor k di l i gent l y t o compl et e cor r ect i ve act i ons t he same day t hat def i c i enci es ar e obser ved. Add def i c i enci es not cor r ect ed on t he same day t o t he r ewor k i t ems l i s t mai nt ai ned by t he Qual i t y Cont r ol Manager .
Fai l ur e t o r esol ve punch l i s t i t ems t o t he sat i sf act i on of t he Gover nment const i t ut es a FAI LED syst em accept ance t est .
3. 4 FI NAL TEST REPORT
Submi t a Fi nal Test Repor t f ol l owi ng t he successf ul compl et i on of accept ance t est i ng t o i ncl ude r esol ut i on of al l punch l i s t i t ems. Addr ess t he f ol l owi ng t opi cs i n t he Fi nal Test Repor t :
3. 4. 1 Summary
Pr ovi de a chr onol ogi cal summar y of al l t est i ng. Descr i be t est act i v i t i es and r esul t s i n nar r at i ve f or m.
3. 4. 2 Personnel
Pr ovi de a l i s t of al l Cont r act or and Gover nment per sonnel who par t i c i pat ed i n t he t est i ng.
3. 4. 3 Test Logs
Pr ovi de al l compl et ed t est l ogs al ong wi t h a t est l og ver i f i cat i on s i gned by t he Test Di r ect or .
- - End of Sect i on - -
SECTI ON 28 08 10 Page 5
SECTI ON 28 10 05
ELECTRONI C SECURI TY SYSTEMS ( ESS)
05/16
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM A123/ A123M ( 2015) St andar d Speci f i cat i on f or Zi nc ( Hot - Di p Gal vani zed) Coat i ngs on I r on and St eel Pr oduct s
ASTM B32 ( 2008; R 2014) St andar d Speci f i cat i on f or Sol der Met al
ASTM D709 ( 2016) St andar d Speci f i cat i on f or Lami nat ed Ther moset t i ng Mat er i al s
I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)
I EEE C2 ( 2017) Nat i onal El ect r i cal Saf et y Code
I NTELLI GENCE COMMUNI TY STANDARD ( I CS)
I CS 705- 1 ( 2010) Physi cal and Techni cal Secur i t y St andar d f or Sensi t i ve Compar t ment ed I nf or mat i on Faci l i t i es
I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)
ANSI I SO/ I EC 7816 ( R 2009) I dent i f i cat i on Car ds - I nt egr at ed Ci r cui t Car ds
NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)
NEMA 250 ( 2014) Encl osur es f or El ect r i cal Equi pment ( 1000 Vol t s Maxi mum)
NEMA I CS 1 ( 2000; R 2015) St andar d f or I ndust r i al Cont r ol and Syst ems: Gener al Requi r ement s
NEMA I CS 2 ( 2000; R 2005; Er r at a 2008) I ndust r i al Cont r ol and Syst ems Cont r ol l er s, Cont act or s, and Over l oad Rel ays Rat ed 600 V
NEMA I CS 6 ( 1993; R 2011) I ndust r i al Cont r ol and Syst ems: Encl osur es
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 70 ( 2017) Nat i onal El ect r i cal Code
SECTI ON 28 10 05 Page 1
NATI ONAL I NSTI TUTE OF STANDARDS AND TECHNOLOGY ( NI ST)
NI ST FI PS 201- 2 ( 2013) Per sonal I dent i t y Ver i f i cat i on ( PI V) of Feder al Empl oyees and Cont r act or s
U. S. DEPARTMENT OF DEFENSE ( DOD)
DODI 8500. 01 ( 2014) Cyber secur i t y
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
47 CFR 15 Radi o Fr equency Devi ces
UNDERWRI TERS LABORATORI ES ( UL)
UL 1037 ( 2016) UL St andar d f or Saf et y Ant i t hef t Al ar ms and Devi ces
UL 1076 ( 1995; Repr i nt Mar 2015) Pr opr i et ar y Bur gl ar Al ar m Uni t s and Syst ems
UL 1610 ( 2016) UL St andar d f or Saf et y Cent r al - St at i on Bur gl ar - Al ar m Uni t s
UL 294 ( 2013; Repr i nt Feb 2015) Access Cont r ol Syst em Uni t s
UL 437 ( 2013) Key Locks
UL 636 ( 1996; Repr i nt Jan 2013) Hol dup Al ar m Uni t s and Syst ems
UL 681 ( 2014) I nst al l at i on and Cl assi f i cat i on of Bur gl ar and Hol dup Al ar m Syst ems
UL 796 ( 2016) UL St andar d f or Saf et y Pr i nt ed- Wi r i ng Boar ds
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 02 Shop Dr awi ngs
ESS Component s; G
Over al l Syst em Schemat i c; G
SD- 03 Pr oduct Dat a
Pr emi se Cont r ol Uni t ; G
SECTI ON 28 10 05 Page 2
Det ect i on Sensor s; G
Access Cont r ol Uni t ; G
Access Cont r ol Devi ces; G
Camer as; G
Camer a Lenses; G
Camer a Housi ng and Mount s; G
Ther mal I magi ng Syst em; G
Vi deo Recor di ng; G
Pr i nt er s; G
Communi cat i ons I nt er f ace Devi ces; G
Radi o Fr equency Li nk; G
Net wor k Swi t ch; G
Vi deo and ESS Tr ansmi ssi on; G
I nf ant Pr ot ect i on Al ar m Syst em ( I PAS) ; G
Uni nt er r upt i bl e Power Suppl y ( UPS) ; G
Bat t er i es; G
Component Encl osur e; G
Equi pment Rack; G
SD- 05 Desi gn Dat a
Backup Bat t er y Capaci t y Cal cul at i ons; G
Access Cont r ol Thr oughput Rat es; G
CCTV St or age Cal cul at i ons
SD- 07 Cer t i f i cat es
Cont r act or Qual i f i cat i ons; G
I nst r uct or Qual i f i cat i ons; G
Dat a Encr ypt i on; G
SD- 09 Manuf act ur er ' s Fi el d Repor t s
Cyber secur i t y Hygi ene Checkl i st
SD- 10 Oper at i on and Mai nt enance Dat a
Tr ai ni ng Pl an; G
SECTI ON 28 10 05 Page 3
Tr ai ni ng Cont ent ; G
ESS Component s and ESS Sof t war e: Dat a Package 4; G
ESS Sof t war e and ESS Component s: Dat a Package 4; G
Submi t dat a package i n accor dance wi t h Sect i on 01 78 23
OPERATI ON AND MAI NTENANCE DATA
SD- 11 Cl oseout Submi t t al s
As- Bui l t Dr awi ngs; G
1. 3 QUALI TY ASSURANCE
1. 3. 1 Regul at or y Requi r ement s
The advi sor y pr ovi s i ons i n each of t he publ i cat i ons r ef er r ed t o i n t hi s speci f i cat i on ar e mandat or y. I nt er pr et t hese publ i cat i ons as t hough t he wor d " must " has been subst i t ut ed f or " shoul d" wher ever i t appear s.
I nt er pr et r ef er ences i n t hese publ i cat i ons t o t he " aut hor i t y havi ng j ur i sdi ct i on, " or wor ds of s i mi l ar meani ng, t o mean t he Cont r act i ng Of f i cer .
Equi pment , mat er i al s, i nst al l at i on, and wor kmanshi p must be i n accor dance wi t h t he mandat or y and advi sor y pr ovi s i ons of NFPA 70 unl ess mor e st r i ngent r equi r ement s ar e speci f i ed or i ndi cat ed.
1. 3. 2 St andar d Pr oduct s
Pr ovi de mat er i al s and equi pment t hat ar e pr oduct s of manuf act ur er s r egul ar l y engaged i n t he pr oduct i on of such pr oduct s whi ch ar e of equal mat er i al , desi gn and wor kmanshi p and:
a. Have been i n sat i sf act or y commer ci al or i ndust r i al use f or 2 year s pr i or t o bi d openi ng, and have been ut i l i zed i n appl i cat i ons of equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze.
b. Have been avai l abl e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er s ' cat al ogs, or br ochur es dur i ng t he 2- year per i od.
c. Wher e t wo or mor e i t ems of t he same cl ass of equi pment ar e r equi r ed, pr ovi de pr oduct s of a s i ngl e manuf act ur er .
d. Pr ovi de commer ci al of f - t he- shel f ( COTS) pr oduct s i n whi ch t he manuf act ur er al l ows a net wor k of qual i f i ed di st r i but or s t o sel l , i nst al l , i nt egr at e, mai nt ai n, and r epai r t he har dwar e and sof t war e pr oduct s t hat make up t he syst em.
1. 3. 2. 1 Al t er nat i ve Qual i f i cat i ons
Pr oduct s havi ng l ess t han a 2 year f i el d ser vi ce r ecor d wi l l be accept abl e i f a cer t i f i ed r ecor d of sat i sf act or y f i el d oper at i on f or not l ess t han 6000 hour s, excl usi ve of t he manuf act ur er s ' f act or y or l abor at or y t est s, i s furnished.
1. 3. 2. 2 Mat er i al and Equi pment Manuf act ur i ng Dat e
Pr oduct s manuf act ur ed mor e t han one year pr i or t o dat e of del i ver y t o t he
SECTI ON 28 10 05 Page 4 si t e ar e not accept abl e.
1. 3. 2. 3 Pr oduct Saf et y
Syst em component s ar e t o conf or m t o appl i cabl e r ul es and r equi r ement s of NFPA 70. Equi p syst em component s wi t h i nst r uct i on st i cker s i ncl udi ng war ni ngs and caut i ons descr i bi ng physi cal saf et y, and speci al or i mpor t ant pr ocedur es t o be f ol l owed i n oper at i ng and ser vi c i ng syst em equi pment .
1. 3. 3 Shop Dr awi ngs
1. 3. 3. 1 ESS Component s
Submi t t he ESS Component s, Dat a Package 4 wi t h t he ESS Sof t war e submi t t al package i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA. Submi t dr awi ngs t hat c l ear l y and compl et el y i ndi cat e each ESS component f unct i on t hat i ncl udes:
a. Ter mi nat i on devi ce poi nt s
b. I nt er connect i ons r equi r ed f or syst em oper at i on
c. I nt er connect i ons bet ween modul es and devi ces
d. Pr oposed wi r eway or condui t syst ems t o be used i ncl udi ng:
( 1) Locat i ons
( 2) Si zes
( 3) Types
e. Dr awi ngs showi ng:
( 1) Devi ce l ocat i ons and spaci ng
( 2) Mount i ng and posi t i oni ng det ai l s
( 3) Ri ser Di agr ams wi t h cabl e s i zes and t ypes
( 4) Bi l l of Mat er i al s ( Devi ce make, model and quant i t i es)
( 5) Al ar m and access cont r ol zones
( 6) CCTV and sensor cover age ar eas
( 7) Spar e capaci t y
1. 3. 3. 2 Over al l Syst em Schemat i c
I ndi cat e t he r el at i onshi p of i nt egr at ed component s on one- l i ne di agr am and show:
a. Power sour ce
b. Syst em cont r ol s
c. I mpedance mat ches
SECTI ON 28 10 05 Page 5
d. I nt er connect i ng wi r e dat a i nc l udi ng:
( 1) Number
( 2) Si ze
( 3) I dent i f i cat i on
( 4) Maxi mum l engt hs
1. 3. 4 Evi dence of Exper i ence and Qual i f i cat i ons
1. 3. 4. 1 Cont r act or Qual i f i cat i ons
Submi t exper i ence and cer t i f i ed qual i f i cat i ons dat a pr i or t o i nst al l at i on.
Show t hat speci f i c i nst al l er s who wi l l per f or m t he wor k have a mi ni mum of 2 year s of exper i ence successf ul l y i nst al l i ng ESS of t he same t ype and si mi l ar desi gn as speci f i ed. I nc l ude t he names, l ocat i ons, and poi nt s of cont act of at l east t wo i nst al l at i ons of s i mi l ar t ype and desi gn as speci f i ed i n t hi s document wher e t he i nst al l er has i nst al l ed such syst ems.
I ndi cat e t he t ype of each syst em i nst al l ed. Cer t i f y t hat each syst em has per f or med sat i sf act or i l y i n t he manner i nt ended f or a per i od of at l east 12 months.
1. 3. 4. 2 I nst r uct or Qual i f i cat i ons
Submi t t he i nst r uct or ' s exper i ence and cer t i f i ed qual i f i cat i ons dat a pr i or t o i nst al l at i on. Show t hat t he i nst r uct or has r ecei ved a mi ni mum of 24 hour s of ESS t r ai ni ng f r om a t echni cal or gani zat i on such as t he Nat i onal Bur gl ar and Fi r e Al ar m Associ at i on, and 2 year s exper i ence i n i nst al l i ng t he speci f i ed ESS t ype.
PART 2 PRODUCTS
2. 1 SYSTEM DESCRI PTI ON
Pr ovi de a compl et e and i nt egr at ed el ect r oni c secur i t y syst em ( ESS) . ESS must be compat i bl e wi t h t he I nst al l at i on' s cent r al moni t or i ng syst em and moni t or ed wi t hi n t he secur e/ pr ot ect ed ar ea. ESS consi st i ng of t he f ol l owi ng subsyst ems and f eat ur es:
a. Access Cont r ol Syst em ( ACS)
I ncl ude mat er i al s not nor mal l y f ur ni shed by t he manuf act ur er wi t h t he ESS equi pment as speci f i ed i n:
a. Sect i on 33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
b. Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
2. 2 PERFORMANCE REQUI REMENTS
I nt egr at e t he i nst al l ed and oper at i ng subsyst ems i nt o t he over al l ESS syst em t o cont r ol access and per f or m as an ent i t y , as speci f i ed bel ow.
Pr ovi de el ect r oni c equi pment t hat compl i es wi t h 47 CFR 15 and ar e sui t abl e f or t he envi r onment wher e t hey wi l l be i nst al l ed.
SECTI ON 28 10 05 Page 6
2. 2. 1 Gr owt h Capabi l i t y
Pr ovi de capabi l i t y f or modul ar ESS expansi on of i nput s, out put s, car d r eader s, and r emot e cont r ol st at i ons wi t h mi ni mal equi pment modi f i cat i on.
Sof t war e must be abl e t o handl e desi gn r equi r ement s pl us 25 per cent spar e capaci t y. Gr owt h capabi l i t y i s not t o be l i mi t ed by t he pr ovi ded pr oduct s.
2. 2. 2 Net wor k Cer t i f i cat i on
Cer t i f y al l Pl at f or m I nf or mat i on Technol ogy ( PI T) i n accor dance wi t h DODI 8500. 01 and t he i ndi v i dual ser vi ce i mpl ement at i on pol i cy.
2. 2. 3 Maintainability
Pr ovi de component s t hat can be mai nt ai ned usi ng commer ci al l y avai l abl e t ool s and equi pment . Ar r ange and assembl e component s t o be r eadi l y accessi bl e t o mai nt enance per sonnel wi t hout compr omi si ng syst em def eat r esi st ance and wi t h no degr adat i on i n t amper pr ot ect i on, st r uct ur al i nt egr i t y, EMI or RFI at t enuat i on, or l i ne super vi s i on af t er mai nt enance when i t i s per f or med i n accor dance wi t h manuf act ur er ' s i nst r uct i ons.
2. 2. 4 Availablity
Pr ovi de component s r at ed f or cont i nuous oper at i on. Pr ovi de sol i d- st at e el ect r oni c component s mount ed on pr i nt ed c i r cui t boar ds, conf or mi ng t o UL 796. Pr ovi de boar ds t hat ar e pl ug- i n, qui ck- di sconnect t ype. Do not i mpede mai nt enance wi t h densel y packed ci r cui t r y. Pr ovi de power - di ssi pat i ng component s wi t h saf et y mar gi ns of not l ess t han 25 per cent wi t h r espect t o di ssi pat i on r at i ngs, maxi mum vol t ages, and cur r ent - car r y i ng capaci t y. Pr ovi de sol i d- st at e t ype or hemet i cal l y seal ed el ect r omechani cal t ype l i ght dut y r el ays and si mi l ar swi t chi ng devi ces.
2. 2. 5 Fai l - Saf e Capabi l i t y
Pr ovi de f ai l - saf e capabi l i t y i n cr i t i cal el ement s of t he ESS i ncl udi ng, but not be l i mi t ed t o, t he capabi l i t y t o moni t or communi cat i on l i nk i nt egr i t y and t o pr ovi de sel f - t est . Pr ovi de f aul t annunci at i on when di mi ni shed f unct i onal capabi l i t i es ar e det ect ed. Annunci at e f ai l - saf e al ar ms t o c l ear l y di st i ngui sh f r om ot her t ypes of al ar ms.
2. 2. 6 Li ne Super vi s i on
Pr ovi de t he same geogr aphi c r esol ut i on f or f aul t i sol at i on at t he syst ems l evel as pr ovi ded f or i nt r usi on det ect i on. Pr ovi de ei t her a st at i c or dynanmi c syst em wi t h act i ve mode f or l i ne super vi s i on of communi cat i on l i nks of t he ESS.
a. The st at i c syst em must r epr esent " no- al ar m" al ways by t he same si gnal , whi ch i s di f f er ent t han t he or i gi nal l y t r ansmi t t ed s i gnal .
b. The dynami c syst em must r epr esent " no- al ar m" wi t h a s i gnal whi ch cont i nual l y changes wi t h t i me.
2. 2. 7 Power Loss Det ect i on
Det ect AC and DC power l oss and gener at e an al ar m when a cr i t i cal component of t he syst em exper i ences t empor ar y or per manent l oss of power . Annunci at e t he al ar m i n t he Secur ed Ar ea t o c l ear l y i dent i f y t he component exper i enci ng power l oss.
SECTI ON 28 10 05 Page 7
2. 2. 8 Cont r ol s and Desi gnat i ons
Pr ovi de cont r ol s and desi gnat i ons as speci f i ed i n NEMA I CS 1.
2. 2. 9 Speci al Test Equi pment
Pr ovi de al l speci al t est equi pment , speci al har dwar e, sof t war e, t ool s, and pr ogr ammi ng or i ni t i al i zat i on equi pment needed t o st ar t or mai nt ai n any par t of t he syst em and i t s component s. Speci al t est equi pment i s def i ned as any t est equi pment not nor mal l y used i n an el ect r oni cs mai nt enance facility.
2. 2. 10 El ect r omagnet i c I nt er f er ence ( EMI )
Conf i gur e and pr ovi de ESS component s empl oyi ng el ect r omagnet i c r adi at i on const r uct ed t o pr ovi de mi ni mal vul ner abi l i t y t o el ect r oni c count er measur es.
2. 2. 11 El ect r omagnet i c Radi at i on ( EMR)
Pr ovi de onl y ESS communi cat i on component s whi ch ar e Feder al Communi cat i ons Commi ssi on ( FCC) l i censed and appr oved. Pr ovi de syst em component s whi ch ar e el ect r omagnet i cal l y compat i bl e.
2. 2. 12 Interchangeability
Use of f - t he- shel f component s whi ch ar e physi cal l y , el ect r i cal l y , and f unct i onal l y i nt er changeabl e wi t h equi val ent component s as compl et e i t ems.
Equi val ent , r epl acement component s must not r equi r e new or ot her component modi f i cat i on. Do not use cust om desi gned or one- of - a- k i nd i t ems.
I nt er changeabl e component s or modul es must not r equi r e t r i al and er r or mat chi ng i n or der t o meet i nt egr at ed syst em r equi r ement s, syst em accur acy, or r est or e compl et e syst em f unct i onal i t y .
2. 3 I NTRUSI ON DETECTI ON SYSTEM ( I DS)
2. 3. 1 Det ect i on Sensor s
2. 3. 1. 1 Dur ess Al ar ms ( Hol d Up Swi t ch)
UL 636. Dur ess al ar m swi t ches must pr ovi de t he means f or an i ndi v i dual t o cover t l y not i f y t he al ar m annunci at i on syst em t hat a dur ess s i t uat i on exi st s wi t h no v i s i bl e or audi bl e s i gnal i n t he secur e ar ea.
2. 3. 1. 1. 1 Wi r el ess Dur ess Al ar ms
Wi r el ess dur ess al ar m swi t ches t o consi st of por t abl e al ar m t r ansmi t t er s easi l y wor n on t he body or c l ot hi ng. Al ar m act i vat i on i s t o be by hand- oper at ed swi t ch pr ot ect ed f r om acci dent al act i vat i on, yet easi l y act i vat ed by hand when wor n at t he wai st on body or c l ot hi ng whi ch t r ansmi t s a uni que i dent i f i cat i on code t o one or mor e r ecei ver s l ocat ed wi t hi n a pr ot ect ed zone. The r ecei ver s, i n- t ur n, ar e t o t r ansmi t an al ar m si gnal t o t he ESS syst em.
Pr ovi de swi t ches r at ed f or a mi ni mum l i f et i me of 50, 000 oper at i ons and have a r ange of at l east 2500 f eet . Wi r el ess swi t ches must be f ul l y super vi sed, wher e t he t r ansmi t t er aut omat i cal l y t r ansmi t s ( checks i n) t o t he r ecei ver on a r egul ar basi s t o t est t he syst em f or l ow bat t er y, t amper , and i nact i ve status.
SECTI ON 28 10 05 Page 8
2. 4 ACCESS CONTROL SYSTEM ( ACS)
Pr ovi de an access cont r ol syst em based upon a modul ar di st r i but ed mi cr opr ocessor ar chi t ect ur e compl et e wi t h access cont r ol car ds and r eady f or oper at i on.
a. The ACS car d cr edent i al s ar e r equi r ed t o be Common Access Car ds ( CAC) , and CAC car ds ar e bei ng pr ovi ded by t he Gover nment . Pr ovi de ACS t hat meet s t he communi cat i ons r equi r ement s of UL 1076 and UL 294 and has t he capabi l i t y of cont r ol l i ng up t o 8 car d r eader s and keypads per car d r eader cont r ol l er , 256 al ar m i nput s, or 256 r el ay out put s or any component s combi nat i on.
b. Syst em i s t o gr ant or deny access or exi t based upon:
( 1) Keypad i dent i f i cat i on dat a
( 2) CAC or PI V car d i dent i f i cat i on dat a
( 3) Bi omet r i c r eader i dent i f i cat i on dat a
( 4) Smar t car d i dent i f i cat i on dat a
( 5) I dent i f i cat i on t echnol ogi es combi nat i on
( 6) I nput t hr ough t he access cont r ol devi ces compar ed t o dat a st or ed wi t hi n t he syst em
( 7) Ti me of day, day of week, and speci al day and hol i day schedul i ng wi t h car d val i dat i on over r i de.
c. Deci s i on t o gr ant or deny access or exi t i s t o be based upon aut hor i zat i on f or such dat a t o be i nput at a speci f i c l ocat i on f or t he cur r ent t i me per i od. Access deci s i ons f or hi gh secur i t y ar eas ar e t o be based upon t wo i dent i f i cat i on t echnol ogy combi nat i ons: car d and keypad or car d and bi omet r i c.
d. Pr ovi de ACS t hat suppor t s t he conf i gur at i on and si mul t aneous moni t or i ng of mul t i pl e access cont r ol devi ces when TCP/ I P communi cat i on i nt er f aces ar e used bet ween t he ESS and t he pr i mar y Access Cont r ol Uni t ( ACU) .
The event s of t he ACS ar e t o be v i ewabl e as separ at e or as a combi ned l i s t of al l ESS event s. Pr ovi de over al l cont r ol of t he ACS, al ar m moni t or i ng, and phot o i dent i f i cat i on t hr ough sof t war e cont r ol of t he
ESS.
e. Access cont r ol , phot o i magi ng, and pr ogr ammi ng dat a must r esi de on a s i ngl e dat abase and i nst ant l y accessi bl e t o ever y net wor ked PC wor kst at i on connect ed t o t he ESS.
f . Pr ovi de bot h super vi sed and non- super vi sed al ar m poi nt moni t or i ng.
g. Pr ovi de t he capabi l i t y t o ar m or di sar m al ar m poi nt s bot h manual l y and aut omat i cal l y by t i me of day, day of week or by oper at or command and t he capabi l i t y t o di sar m al ar m poi nt s based on a val i d access event .
h. When used f or el evat or cont r ol , t he ACS i s t o gr ant access t o el evat or f l oor s based on a val i d cr edent i al , or by schedul e.
SECTI ON 28 10 05 Page 9 i . Pr ovi de pr ogr ammabl e ' del ay ' set t i ng f or al l al ar m poi nt s. The al ar m poi nt s ar e not t o r epor t an ENTRY t ype al ar m unt i l t he del ay set t i ng has expi r ed and not r epor t a dwel l t ype al ar m condi t i on unt i l t he al ar m has been act i ve f or t he f ul l del ay per i od.
j . Pr ovi de t he capabi l i t y t o pl ace ACU( s) i n an of f - l i ne mode. I n t he of f - l i ne mode, t he ACU( s) must r et ai n a hi st or i cal summar y of al l ACU act i v i t y t r ansact i ons, up t o t he maxi mum capaci t y of t he ACU memor y buf f er . Pr ovi de t he abi l i t y f or manual oper at or cont r ol of syst em out put r el ays wi t h t he manual f unct i ons t o ener gi ze, de- ener gi ze, enabl e or di sabl e.
2. 4. 1 ACS Pr ogr ammi ng
Pr ovi de sof t war e capabl e of , but not l i mi t ed t o, t he f ol l owi ng pr ogr ammi ng:
2. 4. 1. 1 Ti me Schedul es
Pr ovi de up t o 256 user - def i nabl e t i me schedul es. These t i me schedul es ar e t o det er mi ne t he day( s) and t i mes t hat access wi l l be gr ant ed or a schedul ed event i s t o occur . Any and al l of t he t i me schedul es ar e t o be avai l abl e f or def i ni ng access pr i v i l eges and schedul ed event s. Pr ovi de ALWAYS and NEVER schedul es t hat cannot be al t er ed or r emoved f r om t he syst em. Each user - def i ned t i me schedul e must have t he opt i on of r eact i ng or not r eact i ng t o user - def i ned speci al days, wi t h t he abi l i t y t o r eact uni quel y t o each t ype of speci al day.
2. 4. 1. 2 Speci al Days
Pr ovi de an unl i mi t ed number of user def i nabl e speci al days t o be used f or conf i gur i ng except i ons t o t he nor mal oper at i ng r ul es, t ypi cal l y f or speci f y i ng hol i day oper at i ng r ul es. Al l ow f or each speci al day t o be assi gned t o a user - def i ned t ype.
2. 4. 1. 3 ACU Dayl i ght Savi ngs Ti me Adj ust ment
Pr ovi de a sof t war e- conf i gur abl e, user def i ned adj ust ment f or Dayl i ght Savi ngs Ti me. The ACU must not need t o be connect ed t o a PC wor kst at i on i n or der f or t he adj ust ment t o occur .
2. 4. 1. 4 Schedul ed Event s
Any access cont r ol l ed r eader i s t o be capabl e of schedul ed unl ock per i ods t o al l ow f or car d- f r ee access. The access cont r ol l ed r eader i s t o al so be capabl e of r equi r i ng one val i d access event bef or e begi nni ng a schedul ed unl ock per i od.
Any access cont r ol poi nt i s t o be capabl e of r equi r i ng a val i d car d as wel l as a PI N code vi a keypad on a schedul ed basi s f or hi gh secur i t y ar eas. The use of PI N vi a keypad f unct i ons must not r educe t he number of car d r eader s or al ar m poi nt s avai l abl e i n t he ACU( s) . Any desi gnat ed al ar m i nput must be abl e t o be schedul ed Ar med and Di sar med. Any r el ay out put must be capabl e of schedul ed ON and OFF per i ods t o al l ow f or aut omat i c i nput and out put syst em cont r ol .
2. 4. 1. 5 Maxi mum User Capabi l i t y
Up t o 64, 000 i ndi v i dual user s may be gi ven access car ds or codes and have t hei r access cont r ol l ed and r ecor ded.
SECTI ON 28 10 05 Page 10
2. 4. 1. 6 Access Gr oups
Each syst em user must be assi gnabl e t o a maxi mum of 4 of 256 possi bl e access gr oups. An access gr oup i s def i ned as one or mor e peopl e who ar e al l owed access t o t he same ar eas at t he same days and t i me per i ods.
2. 4. 1. 7 Act i ve and Expi r e Dat es
Any car d or user may be conf i gur ed wi t h act i vat i on and expi r at i on dat es.
The car d can be assi gned t o any val i d access gr oup and wi l l be act i vat ed and expi r ed accor di ng t o t he speci f i ed dat es.
2. 4. 1. 8 Maxi mum Use Set t i ngs
Any car d or user may be conf i gur ed wi t h maxi mum number of uses f or t hat car d. The car d can be assi gned t o any val i d access gr oup and wi l l be expi r ed accor di ng t o t he speci f i ed number of car d uses.
2. 4. 1. 9 Door Out put s
Pr ovi de each access cont r ol r eader wi t h t wo dedi cat ed r el ay out put s. Bot h r el ays ar e t o pr ovi de Nor mal l y Open and Nor mal l y Cl osed cont act s. Use t he f i r st r el ay f or el ect r i c l ock cont r ol whi l e t he second i s sof t war e conf i gur abl e t o act i vat e f or door f or ced open, door l ef t open t oo l ong, dur ess, passback v i ol at i ons, i nval i d access at t empt s and val i d unl ock condi t i ons. Al l ow f or bot h r el ays t o be separ at el y pr ogr ammabl e f or ener gi ze t i mes f r om 1 second t o 10 mi nut es. The second r el ay must al l ow a del ay t i me t o be speci f i ed, causi ng i t s act i vat i on t o be del ayed af t er an act i vat i ng condi t i on occur s.
2. 4. 1. 10 Anti-Passback
Pr ovi de gl obal ant i - passback capabi l i t y . Any door on t he syst em can be l i nked t o one of 256 user def i ned passback ar eas or t wo 2 pr e- def i ned ar eas. Each door may be set up t o aut omat i cal l y f or gi ve passback ent r i es at one of t he f ol l owi ng i nt er val s:
( 1) Never
( 2) Mi dni ght
( 3) Ever y 12 hour s ( Mi dni ght and Noon)
( 4) Ever y 6 hour s
( 5) Ever y 2 hour s
( 6) Each hour
( 7) Ever y 30 mi nut es
Each door can be conf i gur ed t o deny or gr ant access f or passback v i ol at i ons and i ndi v i dual user s can be exempt t o t he passback r ul es. The ant i - passback f eat ur es must be a gl obal f unct i on and oper at e compl et el y i ndependent of t he ACS sof t war e, except conf i gur i ng t he passback r ul es.
Addi t i onal l y, t he oper at or i s t o have t he abi l i t y t o manual l y f or gi ve an i ndi v i dual user or al l user s by command f r om t he ACS.
SECTI ON 28 10 05 Page 11
2. 4. 1. 11 Two Per son Rul e
Any access cont r ol r eader on t he syst em i s t o have t he abi l i t y v i a sof t war e pr ogr ammi ng t o r equi r e t wo val i d car ds f or access. Any access cont r ol r eader on t he syst em t hat i ncl udes a keypad i s t o al so have t he abi l i t y t o r equi r e a val i d PI N number associ at ed wi t h each of t he t wo val i d car ds.
2. 4. 1. 12 User Li st or Who' s I n ( Must er Repor t s)
Pr ovi de t he capabi l i t y t o gener at e dynami c l i s t s of user s i n cer t ai n access- cont r ol l ed ar eas, based ei t her upon sel ect ed user s or sel ect ed ar eas. The l i s t s must have t he opt i on of aut omat i cal l y r ef r eshi ng af t er a user - sel ect ed i nt er val of t i me.
2. 4. 1. 13 Cr i s i s Mode
Pr ovi de suppor t f or a " cr i s i s mode" , i n whi ch user - sel ect ed al ar m poi nt act i vat i ons cause changes t o user access pr i v i l eges. The changes t o user access pr i v i l eges must be conf i gur abl e t o r est r i c t nor mal access t o no access or l i mi t ed access.
2. 4. 1. 14 Door Gr oups
Al l ow up t o 256 door gr oups t o be conf i gur ed. Door s bel ongi ng t o t he same gr oup ar e be abl e t o be l ocked, unl ocked, di sabl ed, and enabl ed on command f r om t he ACS.
2. 4. 1. 15 Door I nt er l ocki ng
Al l ow a gr oup of door s t o be sof t war e conf i gur ed so t hat i f any door i n t he gr oup i s unsecur e, al l ot her door s ar e aut omat i cal l y di sabl ed. Thi s f eat ur e i s al so known as a " mant r ap" conf i gur at i on. The i nt er l ocki ng f eat ur es must not r equi r e t he ACS t o be on- l i ne f or pr oper oper at i on.
2. 4. 1. 16 PI N Requi r ed
Pr ovi de suppor t f or t he r equi r ed use of a keypad code, i n addi t i on t o a val i d cr edent i al dur i ng user - sel ect ed schedul es.
2. 4. 1. 17 Remot e Door Cont r ol
Pr ovi de t he ESS oper at or t he capabi l i t y of manual l y cont r ol l i ng any access poi nt by i ssui ng a s i mpl e command f r om t he ACS. Pr ovi de t he oper at or t he abi l i t y t o l ock, unl ock, enabl e, and di sabl e any door or Door Gr oup i n t hi s manner . Thi s act i v i t y i s t o cause an ent r y t o be l ogged di spl ayi ng t he door name, number and t i me t hat i t was per f or med.
2. 4. 1. 18 Key Cont r ol
When i nt er f aced wi t h an appr oved key- cont r ol syst em, t he syst em i s t o al l ow user s t o deny access t o cer t ai n door s f or any user s who have keys i n t hei r possession.
2. 4. 1. 19 Guar d Tour
Pr ovi de suppor t f or user - def i ned guar d t our s conf i gur abl e i n a set pat t er n of t our poi nt s, or f ol l owi ng a mode i n whi ch al l t our poi nt s can be v i s i t ed i n any or der wi t hi n an al l ot t ed t i me. Al l ow f or a t our t o be st ar t ed by ACS command, by use of a sel ect ed car d at a sel ect ed r eader , or by use of a
SECTI ON 28 10 05 Page 12 sel ect ed keypad code at a sel ect ed keypad. Det ect guar d l at e- t o- poi nt , poi nt mi ssed, and poi nt out - of - sequence event s. Gener at e a r epor t at t our completion.
2. 4. 1. 20 Reader Di sabl e
Pr ovi de suppor t f or di sabl i ng r eader s i n r eact i on t o a user - sel ect ed number of i nval i d access at t empt s.
2. 4. 1. 21 Di sabl e Event Messages
Al l ow user s t o di sabl e user - sel ect ed event messages ( Door For ced Open, Door Open Too Long, Door Cl osed, Request t o Exi t ) f or user - sel ect ed door s.
Al l ow user s t o di sabl e cer t ai n messages ( Door For ced Open, Door Open Too Long) accor di ng t o a user - sel ect ed schedul e.
2. 4. 1. 22 I nput and Out put Gr oups
Al l ow f or up t o 256 user - def i ned ( i nput and out put ) gr oups t o be def i ned.
Each I nput devi ce i s t o be abl e t o be l i nked t o t hese gr oups f or ar mi ng, di sar mi ng, shunt i ng and unshunt i ng as wel l as out put cont r ol .
2. 4. 1. 23 Delays
Each al ar m devi ce must al l ow a del ay t o be speci f i ed whi ch i s ei t her an ent r y t ype or a dwel l t ype.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .