DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc1of3.pdf

PDF 12 MB Posted

Attached to
ACC Replacement 13 Area Initial Outfitting Project Federal contract opportunity
Solicitation number
W9127S21Q6000
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

This document provides details on an upcoming federal contract opportunity for initial outfitting work at a replacement medical clinic in Camp Pendleton, California. The U.S. Army Corps of Engineers Little Rock District intends to issue a request for quote in January 2021 seeking offers for the project, with an estimated value between $5-10 million. The requirement will be set aside for Service-Disabled Veteran-Owned Small Businesses. The simplified acquisition procedures of FAR Part 13 will be applied along with the commercial items procedures of FAR Part 12. All current documents related to the opportunity should be considered draft materials subject to change. Questions may be submitted through the ProjNet system until December 31, 2020 regarding the upcoming solicitation.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINAL DESIGN SUBMITTAL

28 FEBRUARY 2018

P-021

AREA 13 - MEDICAL

CLINIC REPLACEMENT

CAMP PENDLETON

MCB CAMP PENDLETON,

CALIFORNIA

SPECIFICATIONS

VOLUME I

Prepared for:

COMMANDER

NAVAL FACILITIES

ENGINEERING

COMMAND SOUTHWEST

SAN DIEGO, CALIFORNIA

AE CONTRACT NO.

N62470-16-D-6006-FZ01

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date:

Submitted By: Date:

UNCLASSIFIED/FOR OFFICIAL USE ONLY

P- 021 AREA 13 MEDI CAL CLI NI C REPLACEMENT 16065

MCB CAMP PENDLETON, CA

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LI ST OF DRAWI NGS

00 22 13. 00 20 SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 17. 00 20 NETWORK ANALYSI S SCHEDULES ( NAS)

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 16. 00 50 CUTTI NG AND PATCHI NG PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 20 QUALI TY CONTROL

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 57 19. 01 20 SUPPLEMENTAL TEMPORARY ENVI RONMENTAL CONTROLS

01 58 00 PROJECT I DENTI FI CATI ON

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 78 24. 00 20 FACI LI TY ELECTRONI C OPERATI ON AND MAI NTENANCE SUPPORT

I NFORMATI ON ( eOMSI )

01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 82 16. 00 20 ENGI NEERI NG CONTROL OF ASBESTOS CONTAI NI NG MATERI ALS

02 83 13. 00 20 LEAD I N CONSTRUCTI ON

02 84 16 HANDLI NG OF LI GHTI NG BALLASTS AND LAMPS CONTAI NI NG PCBs

AND MERCURY

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOI ST FRAMI NG

05 30 00 STEEL DECKS

05 40 00 COLD- FORMED METAL FRAMI NG

05 43 13. 00 50 SLOTTED CHANNEL EQUI PMENT SUPPORT FRAMI NG

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

05 51 33 METAL LADDERS

05 52 00 METAL RAI LI NGS

05 75 00. 00 50 DECORATI VE FORMED METAL

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS

06 61 16 SOLI D SURFACI NG FABRI CATI ONS

06 64 00. 00 50 PLASTI C PANELI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS

07 17 00 BENTONI TE WATERPROOFI NG

07 21 13 BOARD AND BLOCK I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 22 00 ROOF AND DECK I NSULATI ON

07 27 13. 00 50 MODI FI ED BI TUMI NOUS SHEET AI R BARRI ERS

07 27 26. 00 50 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS

07 42 13 METAL WALL PANELS

07 60 00 FLASHI NG AND SHEET METAL

07 61 15. 00 20 ALUMI NUM STANDI NG SEAM ROOFI NG

07 72 00. 00 50 ROOF ACCESSORI ES

07 84 00 FIRESTOPPING

07 92 00 JOI NT SEALANTS

07 95 00. 00 50 EXPANSI ON CONTROL

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 13. 00 50 ACCESS DOORS AND FRAMES

08 33 13. 00 50 COI LI NG COUNTER DOORS

08 41 13 ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS

08 42 29. 23 50 SLI DI NG AUTOMATI C ENTRANCE DOORS

08 51 13 ALUMI NUM WI NDOWS

08 56 59. 00 50 SERVI CE WI NDOW UNI TS

08 63 00. 00 50 METAL- FRAMED SKYLI GHTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 TILING

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 65 66 RESI LI ENT ATHLETI C FLOORI NG

09 68 00 CARPETING

09 90 00 PAI NTS AND COATI NGS

09 96 00 HI GH- PERFORMANCE COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00. 10 EXTERI OR SI GNAGE

10 14 00. 20 I NTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 21 23. 16 CUBI CLE TRACK AND HARDWARE

10 22 13 WI RE MESH PARTI TI ONS

PROJECT TABLE OF CONTENTS Page 2

10 26 00 WALL AND DOOR PROTECTI ON

10 28 13 TOI LET ACCESSORI ES

10 44 00. 00 50 FI RE EXTI NGUI SHERS AND CABI NETS

10 71 13. 43 50 BUI LDI NG SUNSCREENS

10 73 26. 00 50 WALKWAY COVER SYSTEM

10 90 00. 00 50 MI SCELLANEOUS SPECI ALTI ES

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WI NDOW SHADES

12 35 70 HEALTHCARE CASEWORK

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 21 48 PREFABRI CATED AUDI OMETRI C ROOMS

13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT

13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL AND PLUMBI NG EQUI PMENT

13 49 19 X- RAY SHI ELDI NG

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13. 00 20 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

DI VI SI ON 22 - PLUMBI NG

22 00 70 PLUMBI NG, HEALTHCARE FACI LI TI ES

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS

23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND

EQUIPMENT

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 09 23. 13 20 BACnet DI RECT DI GI TAL CONTROL SYSTEMS FOR HVAC

23 11 25 FACI LI TY GAS PI PI NG

23 52 00 HEATI NG BOI LERS

23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE

23 64 26 HEATI NG HOT WATER AND CHI LLED WATER PI PI NG SYSTEMS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 50 00. 00 20 CYBERSECURI TY OF FACI LI TY- RELATED CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 23 01 GENERATOR QUI CK- CONNECT SWI TCHBOARD

26 24 13 SWITCHBOARDS

26 27 14. 00 20 ELECTRI CI TY METERI NG

26 31 00 SOLAR PHOTOVOLTAI C ( PV) COMPONENTS ( BI D OPTI ON)

26 36 23. 00 20 NON- AUTOMATI C TRANSFER SWI TCHES

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

PROJECT TABLE OF CONTENTS Page 3

26 51 00 I NTERI OR LI GHTI NG

26 55 80. 00 20 SURGI CAL LI GHTI NG FI XTURES

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

27 51 16 RADI O AND PUBLI C ADDRESS SYSTEMS

27 52 23. 00 20 NURSE CALL SYSTEM

27 54 00. 00 20 COMMUNI TY ANTENNA TELEVI SI ON ( CATV) SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG

28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)

28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM

DI VI SI ON 31 - EARTHWORK

31 11 00 CLEARI NG AND GRUBBI NG

31 23 00. 00 20 EXCAVATI ON AND FI LL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 23 AGGREGATE BASE COURSE FOR CONCRETE BLOCK PAVEMENTS

32 12 10 BI TUMI NOUS TACK COATS

32 12 17 HOT MI X BI TUMI NOUS PAVEMENT

32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT, CURB, CURB AND GUTTER,

AND SI DEWALKS

32 14 15 PERMEABLE PAVEMENT

32 14 16 CELLULAR GRAVEL PAVI NG SYSTEM

32 16 15 CONCRETE BLOCK PAVEMENTS

32 17 23. 00 20 PAVEMENT MARKI NGS

32 31 30. 00 50 DECORATI VE METAL FENCES AND GATES

32 84 24 I RRI GATI ON SPRI NKLER SYSTEMS

32 93 00 EXTERI OR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER DI STRI BUTI ON

33 30 00 SANI TARY SEWERS

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 71 01 OVERHEAD TRANSMI SSI ON AND DI STRI BUTI ON

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

P-021 AREA 13 MEDICAL CLINIC REPLACEMENT RLF 16065

SEALS PAGE FINAL CONSTRUCTION DOCUMENTS

SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

A. Architect David Boldt

B. Civil Engineer C. Allan Bamforth

C. Landscape Architect Karina Veaudry

D. Structural Engineer Justin Trent

E. Electrical Engineer Eric Garner

F. Mechanical Engineer Brad Hughes

G. Interior Designer Debra L Sellers

H. Plumbing Engineer Chris Eversole

I. Fire Protection Engineer Jennifer Lovett

J. Communications Matthew Atkison

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/11

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

DRAWI NG NO. NAVFAC # TI TLE

General

1 GI 000. 1 18267013 COVER SHEET - VOLUME 1

2 GI 001 18267014 I NDEX OF DRAWI NGS - VOLUME 1

3 GI 002 18267015 I NDEX OF DRAWI NGS - VOLUME 1

4 GI 005 18267016 ABBREVI ATI ONS

5 GI 006 18267017 LEGENDS AND SYMBOLS

6 GI 007 18267018 SI TE USE AND STAGI NG AREAS

7 GI 008 18267019 SI TE USE MAPS

8 GI 009 18267020 SI TE USE MAPS

9 GI 010 18267021 SI TE USE MAPS

10 GI 011 18267022 SI TE DEMOLI TI ON - PHASE 1

11 GI 012 18267023 SI TE DEMOLI TI ON - PHASE 2

12 GI 013 18267024 ARCHI TECTURAL SI TE PLAN - PHASE 2

Li f e Saf et y

13 GC001 18267025 LI FE SAFETY CODE SUMMARY

14 GC101 18267026 LI FE SAFETY PLAN - OVERALL

15 GC102 18267027 FI RE DEPARTMENT SI TE ACCESS

Geotechnical

16 B101 18267028 BORI NG LOCATI ON DI AGRAM

17 B102 18267029 SUBSURFACE PROFI LE

18 B103 18267030 BORI NG LOG

19 B104 18267031 BORI NG LOG

20 B105 18267032 BORI NG LOG

21 B106 18267033 BORI NG LOG

22 B107 18267034 BORI NG LOG

23 B108 18267035 BORI NG LOG

24 B109 18267036 BORI NG LOG

25 B110 18267037 BORI NG LOG

26 B111 18267038 BORI NG LOG

27 B112 18267039 BORI NG LOG

28 B113 18267040 BORI NG LOG

29 B114 18267041 BORI NG LOG

30 B115 18267042 BORI NG LOG

31 B116 18267043 BORI NG LOG

32 B117 18267044 BORI NG LOG

33 B118 18267045 BORI NG LOG

34 B119 18267046 BORI NG LOG

DOCUMENT 00 01 15 Page 1

35 B120 18267047 BORI NG LOG

36 B121 18267048 BORI NG LOG

37 B122 18267049 BORI NG LOG

Civil

38 C- 001 18267050 LEGEND AND NOTES

39 C- 002 18267051 EXI STI NG SI TE NOTES, UTI LI TY NOTES AND UTI LI TY

SCHEDULES

40 C- 003 18267052 KEY PLANS

41 C- 004 18267053 OVERALL EXI STI NG CONDI TI ONS PLAN

42 C- 005 18267054 ATFP SETBACK PLAN

43 C- 006 18267055 PHASE 1 - OVERALL DEMOLI TI ON PLAN

44 C- 007 18267056 PHASE 1 - OVERALL SI TE I MPROVEMENT PLAN

45 C- 008 18267057 PHASE 2 - OVERALL DEMOLI TI ON PLAN

46 C- 009 18267058 PHASE 2 - OVERALL SI TE I MPROVEMENT PLAN

47 CD101 18267059 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN

48 CD102 18267060 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN

49 CD103 18267061 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN

50 CD104 18267062 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN

51 CD105 18267063 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN

52 CD106 18267064 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN

53 CS101 18267065 LAYOUT AND UTI LI TY PLAN

54 CS102 18267066 LAYOUT AND UTI LI TY PLAN

55 CS103 18267067 LAYOUT AND UTI LI TY PLAN

56 CS301 18267068 WATER MAI N - PLAN AND PROFI LE

57 CS302 18267069 WATER MAI N - PLAN AND PROFI LE

58 CS303 18267070 WATER MAI N - PLAN AND PROFI LE

59 CS304 18267071 WATER MAI N - PLAN AND PROFI LE

60 CS305 18267072 SANI TARY SEWER - PLAN AND PROFI LE

61 CS306 18267073 PAVEMENT SECTI ONS

62 CS401 18267074 ENLARGED PLANS

63 CS402 18267075 CONCRETE PAVEMENT & ENTRANCE JOI NT DETAI LS

64 CS403 18267076 OPTI ON I TEM #4 SI TE I MPROVEMENT PLAN

65 CS404 18267077 LAYOUT PLAN - COMPOST AMENDED SOI L STRI PS

66 CS601 18267078 SANI TARY SEWER SCHEDULES & LAYOUT CONTROL POI NTS

67 CG101 18267079 GRADI NG AND DRAI NAGE PLAN

68 CG102 18267080 GRADI NG AND DRAI NAGE PLAN

69 CG103 18267081 GRADI NG AND DRAI NAGE PLAN

70 CG301 18267082 STORM SEWER - PLAN AND PROFI LE

71 CG302 18267083 STORM SEWER - PLAN AND PROFI LE

72 CG303 18267084 STORM SEWER - PLAN AND PROFI LE

73 CG304 18267085 STORM SEWER - PLAN AND PROFI LE

74 CG305 18267086 STORM SEWER - PLAN AND PROFI LE

75 CG306 18267087 STORM SEWER - PLAN AND PROFI LE

76 CG307 18267088 STORM SEWER - PLAN AND PROFI LE

77 CG308 18267089 STORM SEWER - PLAN AND PROFI LE

78 CG401 18267090 ENLARGED GRADI NG PLAN

79 CG402 18267091 ENLARGED GRADI NG PLAN

80 CG403 18267092 ENLARGED GRADI NG PLAN

81 CG404 18267093 ENLARGED GRADI NG PLAN

82 CG405 18267094 ENLARGED GRADI NG PLAN

83 CG601 18267095 STORM SEWER SCHEDULES

84 CG602 18267096 STORM SEWER SCHEDULES

85 C- 501 18267097 EROSI ON AND SEDI MENT CONTROL NOTES AND DETAI LS

86 C- 502 18267098 EROSI ON AND SEDI MENT CONTROL DETAI LS

87 C- 503 18267099 DETAI LS

88 C- 504 18267100 DETAI LS

89 C- 505 18267101 DETAI LS

DOCUMENT 00 01 15 Page 2

90 C- 506 18267102 DETAI LS

91 C- 507 18267103 DETAI LS

92 C- 508 18267104 DETAI LS

93 C- 509 18267105 6" FI RE HYDRANT I NSTALLATI ON DETAI LS

94 C- 510 18267106 BACKFLOW PREVENTER DETAI L

95 C- 511 18267107 WATER METER PI PI NG DETAI LS

96 C- 512 18267108 DETAI LS

97 C- 513 18267109 DETAI LS

98 C- 514 18267110 DETAI LS

99 C- 515 18267111 DETAI LS

100 C- 516 18267112 DETAI LS

101 C- 517 18267113 DETAI LS

102 C- 518 18267114 DETAI LS

103 C- 519 18267115 DETAI LS

Landscape

104 LH101 18267116 BASE BI D HARDSCAPE PLAN

105 LH102 18267117 BASE BI D HARDSCAPE PLAN

106 LH103 18267118 BASE BI D HARDSCAPE PLAN

107 LH104 18267119 BASE BI D HARDSCAPE PLAN

108 LH105 18267120 OPTI ON 4 HARDSCAPE PLAN

109 LH501 18267121 BASE BI D COURTYARD LAYOUT

110 LH502 18267122 HARDSCAPE DETAI LS

111 LH503 18267123 EDUCATI ONAL SI GNS

112 LP001 18267124 LANDSCAPE NOTES AND BASE BI D PLANT SCHEDULE

113 LP002 18267125 EXI STI NG TREE PROTECTI ON PLAN

114 LP101 18267126 BASE BI D LANDSCAPE PLAN

115 LP102 18267127 BASE BI D LANDSCAPE PLAN

116 LP103 18267128 BASE BI D LANDSCAPE PLAN

117 LP104 18267129 BASE BI D LANDSCAPE PLAN

118 LP105 18267130 OPTI ON 4 LANDSCAPE PLAN

119 LP501 18267131 LANDSCAPE I NSTALLATI ON DETAI LS

120 LP502 18267132 LANDSCAPE I NSTALLATI ON DETAI LS

121 I P001 18267133 I RRI GATI ON LEGEND AND NOTES

122 I P101 18267134 BASE BI D I RRI GATI ON PLAN

123 I P102 18267135 BASE BI D I RRI GATI ON PLAN

124 I P103 18267136 BASE BI D I RRI GATI ON PLAN

125 I P104 18267137 BASE BI D I RRI GATI ON PLAN

126 I P105 18267138 OPTI ON 4 I RRI GATI ON PLAN

127 I P501 18267139 I RRI GATI ON I NSTALLATI ON DETAI LS

128 I P502 18267140 I RRI GATI ON I NSTALLATI ON DETAI LS

129 I P503 18267141 I RRI GATI ON I NSTALLATI ON DETAI LS

130 I P504 18267142 I RRI GATI ON I NSTALLATI ON DETAI LS

131 I P505 18267143 I RRI GATI ON I NSTALLATI ON DETAI LS

132 I P506 18267144 I RRI GATI ON I NSTALLATI ON DETAI LS

133 I P507 18267145 I RRI GATI ON I NSTALLATI ON DETAI LS

Structual

134 S001 18267146 GENERAL NOTES

135 S002 18267147 GENERAL NOTES, LEGEND & ABBREVI ATI ONS

136 S101- 1 18267148 FOUNDATI ON PLAN - SECTOR 1

137 S101- 2 18267149 FOUNDATI ON PLAN - SECTOR 2

138 S101- 3 18267150 FOUNDATI ON PLAN - SECTOR 3

139 S101- 4 18267151 FOUNDATI ON PLAN - SECTOR 4

140 S101- 5 18267152 FOUNDATI ON PLAN - SECTOR 5

141 S102- 1 18267153 ROOF FRAMI NG PLAN - SECTOR 1

142 S102- 2 18267154 ROOF FRAMI NG PLAN - SECTOR 2

DOCUMENT 00 01 15 Page 3

143 S102- 3 18267155 ROOF FRAMI NG PLAN - SECTOR 3

144 S102- 4 18267156 ROOF FRAMI NG PLAN - SECTOR 4

145 S102- 5 18267157 ROOF FRAMI NG PLAN - SECTOR 5

146 S103 18267158 BI D OPTI ON #1 - CANOPY PLANS, SECTI ONS & NOTES

147 S104 18267159 BI D OPTI ON #3 - PARTI AL ROOF FRAMI NG PLANS & DETAI L

148 S301 18267160 SECTI ONS

149 S302 18267161 SECTI ONS

150 S303 18267162 SECTI ONS

151 S501 18267163 TYPI CAL DETAI LS

152 S502 18267164 TYPI CAL DETAI LS

153 S503 18267165 TYPI CAL DETAI LS

154 S504 18267166 TYPI CAL DETAI LS

155 S505 18267167 TYPI CAL DETAI LS

Architecture

156 AS100 18267168 ARCHI TECTURAL SI TE PLAN

157 AS501 18267169 ARCHI TECTURAL SI TE FEATURES

158 AS502 18267170 ARCHI TECTURAL SI TE FEATURES

159 AD101 18267171 BUI LDI NG 13129 - DEMOLI TI ON PLAN

160 AD901 18267172 EXI STI NG SI TE I MAGES

161 AD902 18267173 EXI STI NG SI TE I MAGES

162 AD903 18267174 EXI STI NG SI TE I MAGES

163 AE101 18267175 COMPOSI TE FLOOR PLAN

164 AE101- 1 18267176 FLOOR PLAN - SECTOR 1

165 AE101- 2 18267177 FLOOR PLAN - SECTOR 2

166 AE101- 3 18267178 FLOOR PLAN - SECTOR 3

167 AE101- 4 18267179 FLOOR PLAN - SECTOR 4

168 AE101- 5 18267180 FLOOR PLAN - SECTOR 5

169 AE104 18267181 COMPOSI TE ROOF PLAN

170 AE105 18267182 OPTI ON I TEM #1 - CANOPY DRAWI NGS

171 AE106 18267183 OPTI ON I TEM #2 - SOLAR ARRAY

172 AE111- 1 18267184 REFLECTED CEI LI NG PLAN - SECTOR 1

173 AE111- 2 18267185 REFLECTED CEI LI NG PLAN - SECTOR 2

174 AE111- 3 18267186 REFLECTED CEI LI NG PLAN - SECTOR 3

175 AE111- 4 18267187 REFLECTED CEI LI NG PLAN - SECTOR 4

176 AE111- 5 18267188 REFLECTED CEI LI NG PLAN - SECTOR 5

177 AE200 18267189 OVERALL BUI LDI NG ELEVATI ONS

178 AE211 18267190 EXTERI OR ELEVATI ONS

179 AE212 18267191 EXTERI OR ELEVATI ONS

180 AE213 18267192 EXTERI OR ELEVATI ONS

181 AE214 18267193 EXTERI OR ELEVATI ONS

182 AE215 18267194 EXTERI OR ELEVATI ONS

183 AE220 18267195 ENLARGED EXTERI OR ELEVATI ONS

184 AE310 18267196 BUI LDI NG SECTI ONS

185 AE311 18267197 BUI LDI NG SECTI ONS

186 AE312 18267198 BUI LDI NG SECTI ONS

187 AE313 18267199 BUI LDI NG SECTI ONS - SKYLI GHT OPTI ON I TEM #3

188 AE320 18267200 WALL SECTI ONS

189 AE321 18267201 WALL SECTI ONS

190 AE322 18267202 WALL SECTI ONS

191 AE323 18267203 WALL SECTI ONS

192 AE324 18267204 WALL SECTI ONS

193 AE325 18267205 WALL SECTI ONS

194 AE330 18267206 I NTERI OR WALL SECTI ONS

195 AE331 18267207 I NTERI OR WALL SECTI ONS

196 AE401 18267208 ENLARGED FLOOR PLANS

197 AE402 18267209 ENLARGED FLOOR PLANS

198 AE403 18267210 ENLARGED FLOOR PLANS

DOCUMENT 00 01 15 Page 4

199 AE404 18267211 ENLARGED FLOOR PLANS

200 AE405 18267212 ENLARGED REFLECTED CEI LI NG PLANS

201 AE406 18267213 ENLARGED REFLECTED CEI LI NG PLAN - SKYLI GHT OPTI ON

I TEM #3

202 AE501 18267214 EXTERI OR PLAN DETAI LS

203 AE502 18267215 EXTERI OR PLAN DETAI LS

204 AE503 18267216 EXPANSI ON JOI NT DETAI LS

205 AE505 18267217 I NTERI OR PLAN DETAI LS

206 AE506 18267218 PLAN DETAI LS

207 AE507 18267219 I NTERI OR DETAI LS - COLUMN COVERS

208 AE511 18267220 TYPI CAL CEI LI NG DETAI LS

209 AE512 18267221 I NTERI OR SECTI ON DETAI LS

210 AE521 18267222 SECTI ON DETAI LS

211 AE522 18267223 SECTI ON DETAI LS

212 AE523 18267224 SECTI ON DETAI LS

213 AE524 18267225 MI SCELLANEOUS DETAI LS

214 AE525 18267226 ROOF & MI SC. DETAI LS

215 AE526 18267227 ROOF DETAI LS

216 AE527 18267228 PRECAST DETAI LS

217 AE601 18267229 DOOR SCHEDULE

218 AE602 18267230 DOOR SCHEDULE

219 AE610 18267231 DOOR & I NTERI OR WI NDOW TYPES

220 AE611 18267232 WI NDOW AND DOOR DETAI LS

221 AE612 18267233 WI NDOW AND LOUVER DETAI LS

222 AE613 18267234 OVERHEAD DOOR DETAI LS

223 AE614 18267235 OVERHEAD DOOR DETAI LS

224 AE615 18267236 OVERHEAD DOOR DETAI LS

225 AE621 18267237 EXTERI OR GLAZI NG ELEVATI ONS

226 AE623 18267238 STOREFRONT DETAI LS

227 AE624 18267239 STOREFRONT DETAI LS

228 AE801 18267240 PARTI TI ON TYPES

229 AE810 18267241 TYPI CAL PARTI TI ON FRAMI NG DETAI LS

230 AE811 18267242 PARTI TI ON DETAI LS

231 AE812 18267243 LEAD LI NI NG DETAI LS

232 AE820 18267244 FI RE RATED PENETRATI ONS

Interiors

233 AF601 18267245 FI NI SH SCHEDULE

234 AF602 18267246 FI NI SH SCHEDULE

235 AF603 18267247 FI NI SH SCHEDULE

236 AF610 18267248 FI NI SH I DENTI FI CATI ON SCHEDULE

237 AF611 18267249 FI NI SH I DENTI FI CATI ON SCHEDULE

238 AG010 18267250 SI TE SI GNAGE PLAN - PHASE 1 DEMOLI TI ON

239 AG011 18267251 SI TE SI GNAGE PLAN - PHASE 2 DEMOLI TI ON

240 AG012 18267252 SI TE SI GNAGE PLAN - PHASE 1&2 DEMOLI TI ON ADDI TI ONAL

PARKING

241 AG100 18267253 SI TE SI GNAGE PLAN

242 AG101- 1 18267254 SI GNAGE PLAN - SECTOR 1

243 AG101- 2 18267255 SI GNAGE PLAN - SECTOR 2

244 AG101- 3 18267256 SI GNAGE PLAN - SECTOR 3

245 AG101- 4 18267257 SI GNAGE PLAN - SECTOR 4

246 AG101- 5 18267258 SI GNAGE PLAN - SECTOR 5

247 AG501 18267259 I NTERI OR SI GN ELEVATI ONS

248 AG502 18267260 I NTERI OR SI GN ELEVATI ONS

249 AG503 18267261 I NTERI OR SI GN ELEVATI ONS

250 AG504 18267262 EXTERI OR SI GNAGE ELEVATI ONS

251 AG505 18267263 EXTERI OR SI GNAGE ELEVATI ONS

252 AG506 18267264 EXTERI OR SI GNAGE ELEVATI ONS

DOCUMENT 00 01 15 Page 5

253 AG507 18267265 EXTERI OR TEMPORARY SI GNAGE ELEVATI ONS

254 AG601 18267266 SI GN MESSAGE SCHEDULE

255 AG602 18267267 SI GN MESSAGE SCHEDULE

256 I N101- 1 18267268 FLOOR PATTERN PLAN - SECTOR 1

257 I N101- 2 18267269 FLOOR PATTERN PLAN - SECTOR 2

258 I N101- 3 18267270 FLOOR PATTERN PLAN - SECTOR 3

259 I N101- 4 18267271 FLOOR PATTERN PLAN - SECTOR 4

260 I N101- 5 18267272 FLOOR PATTERN PLAN - SECTOR 5

261 I N111- 1 18267273 WALL FI NI SH PLAN - SECTOR 1

262 I N111- 2 18267274 WALL FI NI SH PLAN - SECTOR 2

263 I N111- 3 18267275 WALL FI NI SH PLAN - SECTOR 3

264 I N111- 4 18267276 WALL FI NI SH PLAN - SECTOR 4

265 I N111- 5 18267277 WALL FI NI SH PLAN - SECTOR 5

266 I N201 18267278 I NTERI OR ELEVATI ONS

267 I N202 18267279 I NTERI OR ELEVATI ONS

268 I N203 18267280 I NTERI OR TOI LET ELEVATI ONS

269 I N501 18267281 I NTERI OR DETAI LS

Equipment

270 QH101- 1A 18267282 EQUI PMENT PLAN - SECTOR 1A

271 QH101- 1B 18267283 EQUI PMENT PLAN - SECTOR 1B

272 QH101- 1C 18267284 EQUI PMENT PLAN - SECTOR 1C

273 QH101- 1D 18267285 EQUI PMENT PLAN - SECTOR 1D

274 QH101- 2A 18267286 EQUI PMENT PLAN - SECTOR 2A

275 QH101- 2B 18267287 EQUI PMENT PLAN - SECTOR 2B

276 QH101- 3A 18267288 EQUI PMENT PLAN - SECTOR 3A

277 QH101- 3B 18267289 EQUI PMENT PLAN - SECTOR 3B

278 QH101- 4A 18267290 EQUI PMENT PLAN - SECTOR 4A

279 QH101- 4B 18267291 EQUI PMENT PLAN - SECTOR 4B

280 QH101- 5A 18267292 EQUI PMENT PLAN - SECTOR 5A

281 QH101- 5B 18267293 EQUI PMENT PLAN - SECTOR 5B

282 QH101- 5C 18267294 EQUI PMENT PLAN - SECTOR 5C

283 QH101- 5D 18267295 EQUI PMENT PLAN - SECTOR 5D

284 QH200 18267296 TYPI CAL MOUNTI NG HEI GHTS

285 QH201 18267297 EQUI PMENT ELEVATI ONS

286 QH202 18267298 EQUI PMENT ELEVATI ONS

287 QH250 18267299 MI LLWORK ELEVATI ONS

288 QH401 18267300 MI LLWORK DI MENSI ON PLANS

289 QH501 18267301 EQUI PMENT DETAI LS

290 QH502 18267302 EQUI PMENT DETAI LS

291 QH503 18267303 EQUI PMENT DETAI LS

292 QH550 18267304 MI LLWORK SECTI ONS

293 QH551 18267305 MI LLWORK SECTI ONS

294 QH601 18267306 EQUI PMENT AND CASEWORK SCHEDULE

295 GI 000. 2 18267307 COVER SHEET - VOLUME 2

296 GI 003 18267308 I NDEX OF DRAWI NGS - VOLUME 2

297 GI 004 18267309 I NDEX OF DRAWI NGS - VOLUME 2

Fi r e Al ar m

298 FA001 18267310 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM LEGEND AND

SEQUENCE OF OPERATI ON MATRI X

299 FA101- 1 18267311 FI RE ALARM PLAN - SECTOR 1

300 FA101- 2 18267312 FI RE ALARM PLAN - SECTOR 2

301 FA101- 3 18267313 FI RE ALARM PLAN - SECTOR 3

302 FA101- 4 18267314 FI RE ALARM PLAN - SECTOR 4

303 FA101- 5 18267315 FI RE ALARM PLAN - SECTOR 5

304 FA501 18267316 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM WI RI NG

DOCUMENT 00 01 15 Page 6

DI AGRAMS AND DETAI LS

305 FA601 18267317 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM RI SER DI AGRAM

Fi r e Suppr essi on

306 FX001 18267318 FI RE SUPPRESSI ON SYMBOLS AND ABBREVI ATI ONS

307 FX101 18267319 FI RST FLOOR FI RE SUPPRESSI ON

308 FX501 18267320 FI RE SUPPRESSI ON DETAI LS

Plumbing

309 P- 001 18267321 ABBREVI ATI ONS AND LEGEND

310 PW101 18267322 COMPOSI TE BELOW SLAB WASTE PLAN

311 PW101- 1A 18267323 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1A

312 PW101- 1B 18267324 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1B

313 PW101- 1C 18267325 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1C

314 PW101- 1D 18267326 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1D

315 PW101- 2A 18267327 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 2A

316 PW101- 2B 18267328 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 2B

317 PW101- 3A 18267329 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 3A

318 PW101- 3B 18267330 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 3B

319 PW101- 4A 18267331 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 4A

320 PW101- 4B 18267332 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 4B

321 PW101- 5A 18267333 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5A

322 PW101- 5B 18267334 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5B

323 PW101- 5C 18267335 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5C

324 PW101- 5D 18267336 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5D

325 PW201 18267337 COMPOSI TE WASTE PLAN

326 PW201- 1A 18267338 PLUMBI NG WASTE PLAN - SECTOR 1A

327 PW201- 1B 18267339 PLUMBI NG WASTE PLAN - SECTOR 1B

328 PW201- 1C 18267340 PLUMBI NG WASTE PLAN - SECTOR 1C

329 PW201- 1D 18267341 PLUMBI NG WASTE PLAN - SECTOR 1D

330 PW201- 2A 18267342 PLUMBI NG WASTE PLAN - SECTOR 2A

331 PW201- 2B 18267343 PLUMBI NG WASTE PLAN - SECTOR 2B

332 PW201- 3A 18267344 PLUMBI NG WASTE PLAN - SECTOR 3A

333 PW201- 3B 18267345 PLUMBI NG WASTE PLAN - SECTOR 3B

334 PW201- 4A 18267346 PLUMBI NG WASTE PLAN - SECTOR 4A

335 PW201- 4B 18267347 PLUMBI NG WASTE PLAN - SECTOR 4B

336 PW201- 5A 18267348 PLUMBI NG WASTE PLAN - SECTOR 5A

337 PW201- 5B 18267349 PLUMBI NG WASTE PLAN - SECTOR 5B

338 PW201- 5C 18267350 PLUMBI NG WASTE PLAN - SECTOR 5C

339 PW201- 5D 18267351 PLUMBI NG WASTE PLAN - SECTOR 5D

340 PP101 18267352 COMPOSI TE WATER PLAN

341 PP101- 1A 18267353 PLUMBI NG WATER PLAN - SECTOR 1A

342 PP101- 1B 18267354 PLUMBI NG WATER PLAN - SECTOR 1B

343 PP101- 1C 18267355 PLUMBI NG WATER PLAN - SECTOR 1C

344 PP101- 1D 18267356 PLUMBI NG WATER PLAN - SECTOR 1D

345 PP101- 2A 18267357 PLUMBI NG WATER PLAN - SECTOR 2A

346 PP101- 2B 18267358 PLUMBI NG WATER PLAN - SECTOR 2B

347 PP101- 3A 18267359 PLUMBI NG WATER PLAN - SECTOR 3A

348 PP101- 3B 18267360 PLUMBI NG WATER PLAN - SECTOR 3B

349 PP101- 4A 18267361 PLUMBI NG WATER PLAN - SECTOR 4A

350 PP101- 4B 18267362 PLUMBI NG WATER PLAN - SECTOR 4B

351 PP101- 5A 18267363 PLUMBI NG WATER PLAN - SECTOR 5A

352 PP101- 5B 18267364 PLUMBI NG WATER PLAN - SECTOR 5B

353 PP101- 5C 18267365 PLUMBI NG WATER PLAN - SECTOR 5C

354 PP101- 5D 18267366 PLUMBI NG WATER PLAN - SECTOR 5D

355 P- 501 18267367 PLUMBI NG DETAI LS

356 P- 502 18267368 PLUMBI NG DETAI LS

357 P- 503 18267369 PLUMBI NG DETAI LS

358 P- 504 18267370 PLUMBI NG DETAI LS

DOCUMENT 00 01 15 Page 7

359 P- 701 18267371 WASTE RI SER DI AGRAM - NORTH

360 P- 702 18267372 WASTE RI SER DI AGRAM - SOUTH

361 P- 703 18267373 WATER RI SER DI AGRAM - NORTH

362 P- 704 18267374 WATER AND GAS RI SER DI AGRAMS - SOUTH

363 P- 801 18267375 PLUMBI NG SCHEDULES

Mechanical

364 M- 001 18267376 MECHANI CAL ABBREVI ATI ONS, LEGEND & GENERAL NOTES

365 MS001 18267377 NATURAL GAS SPECI FI CATI ONS

366 MS101 18267378 PHASE 1 - NATURAL GAS SI TE PLAN

367 MS102 18267379 PHASE 2 - NATURAL GAS SI TE PLAN

368 MS501 18267380 NATURAL GAS DETAI LS

369 MH101 18267381 COMPOSI TE PLAN - DUCTWORK

370 MH101- 1A 18267382 SECTOR 1A FLOOR PLAN - DUCTWORK

371 MH101- 1B 18267383 SECTOR 1B FLOOR PLAN - DUCTWORK

372 MH101- 1C 18267384 SECTOR 1C FLOOR PLAN - DUCTWORK

373 MH101- 1D 18267385 SECTOR 1D FLOOR PLAN - DUCTWORK

374 MH101- 2A 18267386 SECTOR 2A FLOOR PLAN - DUCTWORK

375 MH101- 2B 18267387 SECTOR 2B FLOOR PLAN - DUCTWORK

376 MH101- 3A 18267388 SECTOR 3A FLOOR PLAN - DUCTWORK

377 MH101- 3B 18267389 SECTOR 3B FLOOR PLAN - DUCTWORK

378 MH101- 4A 18267390 SECTOR 4A FLOOR PLAN - DUCTWORK

379 MH101- 4B 18267391 SECTOR 4B FLOOR PLAN - DUCTWORK

380 MH101- 5A 18267392 SECTOR 5A FLOOR PLAN - DUCTWORK

381 MH101- 5B 18267393 SECTOR 5B FLOOR PLAN - DUCTWORK

382 MH101- 5C 18267394 SECTOR 5C FLOOR PLAN - DUCTWORK

383 MH101- 5D 18267395 SECTOR 5D FLOOR PLAN - DUCTWORK

384 MH201 18267396 MECHANI CAL ROOF PLAN

385 MH401 18267397 ENLARGED SOUTH MECHANI CAL ROOM

386 MH402 18267398 ENLARGED NORTH MECHANI CAL ROOM

387 MP101 18267399 MECHANI CAL PI PI NG COMPOSI TE PLAN

388 MP101- 1A 18267400 SECTOR 1A FLOOR PLAN - PI PI NG

389 MP101- 1B 18267401 SECTOR 1B FLOOR PLAN - PI PI NG

390 MP101- 1C 18267402 SECTOR 1C FLOOR PLAN - PI PI NG

391 MP101- 1D 18267403 SECTOR 1D FLOOR PLAN - PI PI NG

392 MP101- 2A 18267404 SECTOR 2A FLOOR PLAN - PI PI NG

393 MP101- 2B 18267405 SECTOR 2B FLOOR PLAN - PI PI NG

394 MP101- 3A 18267406 SECTOR 3A FLOOR PLAN - PI PI NG

395 MP101- 3B 18267407 SECTOR 3B FLOOR PLAN - PI PI NG

396 MP101- 4A 18267408 SECTOR 4A FLOOR PLAN - PI PI NG

397 MP101- 4B 18267409 SECTOR 4B FLOOR PLAN - PI PI NG

398 MP101- 5A 18267410 SECTOR 5A FLOOR PLAN - PI PI NG

399 MP101- 5B 18267411 SECTOR 5B FLOOR PLAN - PI PI NG

400 MP101- 5C 18267412 SECTOR 5C FLOOR PLAN - PI PI NG

401 MP101- 5D 18267413 SECTOR 5D FLOOR PLAN - PI PI NG

402 M- 301 18267414 SECTI ONS

403 M- 302 18267415 SECTI ONS

404 M- 501 18267416 DETAI LS

405 M- 502 18267417 DETAI LS

406 M- 503 18267418 DETAI LS

407 M- 601 18267419 FLOW DI AGRAMS

408 M- 801 18267420 SCHEDULES

409 M- 802 18267421 SCHEDULES

410 M- 901 18267422 CONTROLS

411 M- 902 18267423 CONTROLS

412 M- 903 18267424 CONTROLS

413 M- 904 18267425 CONTROLS

414 M- 905 18267426 CONTROLS

DOCUMENT 00 01 15 Page 8

415 M- 906 18267427 CONTROLS

Electrical

416 E- 001 18267428 ELECTRI CAL LEGENDS

417 E- 002 18267429 ELECTRI CAL LEGENDS

418 E- 003 18267430 ELECTRI CAL NOTES

419 ES100 18267431 ELECTRI CAL SI TE PLAN - COMPOSI TE - DEMOLI TI ON

420 ES101 18267432 ELECTRI CAL SI TE PLAN - PHASE 1 DEMOLI TI ON

421 ES102 18267433 ELECTRI CAL SI TE PLAN - PHASE 2 DEMOLI TI ON

422 ES200 18267434 ELECTRI CAL SI TE PLAN - COMPOSI TE - NEW WORK

423 ES201 18267435 ELECTRI CAL SI TE PLAN - PHASE 1 LI GHTI NG

424 ES202 18267436 ELECTRI CAL SI TE PLAN - PHASE 2 LI GHTI NG

425 ES203 18267437 ELECTRI CAL SI TE PLAN - PHASE 1 POWER & TELECOM

426 ES204 18267438 ELECTRI CAL SI TE PLAN - PHASE 2 POWER & TELECOM

427 ES205 18267439 ELECTRI CAL OPTI ON I TEM 1 - CANOPY DRAWI NG

428 ES301 18267440 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 1/ PART 1)

429 ES302 18267441 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 1/ PART 2)

430 ES303 18267442 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 2/ PART 1)

431 ES304 18267443 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 2/ PART 2)

432 ES305 18267444 EXI STI NG SI TE CONDI TI ONS - PHOTOS

433 ES401 18267445 ELECTRI CAL SI TE DETAI LS

434 ES402 18267446 ELECTRI CAL SI TE DETAI LS

435 ES403 18267447 ELECTRI CAL SI TE DETAI LS

436 ES404 18267448 ELECTRI CAL SI TE DETAI LS

437 ES405 18267449 PRI MARY RI SER POLE & DETAI LS

438 EL101 18267450 LI GHTI NG FLOOR PLAN - COMPOSI TE - LOW VOLTAGE ZONE

CONTROL SWI TCHI NG

439 EL101- 1A 18267451 LI GHTI NG PLAN - SECTOR 1A

440 EL101- 1B 18267452 LI GHTI NG PLAN - SECTOR 1B

441 EL101- 1C 18267453 LI GHTI NG PLAN - SECTOR 1C

442 EL101- 1D 18267454 LI GHTI NG PLAN - SECTOR 1D

443 EL101- 2A 18267455 LI GHTI NG PLAN - SECTOR 2A

444 EL101- 2B 18267456 LI GHTI NG PLAN - SECTOR 2B

445 EL101- 3A 18267457 LI GHTI NG PLAN - SECTOR 3A

446 EL101- 3B 18267458 LI GHTI NG PLAN - SECTOR 3B

447 EL101- 4A 18267459 LI GHTI NG PLAN - SECTOR 4A

448 EL101- 4B 18267460 LI GHTI NG PLAN - SECTOR 4B

449 EL101- 5A 18267461 LI GHTI NG PLAN - SECTOR 5A

450 EL101- 5B 18267462 LI GHTI NG PLAN - SECTOR 5B

451 EL101- 5C 18267463 LI GHTI NG PLAN - SECTOR 5C

452 EL101- 5D 18267464 LI GHTI NG PLAN - SECTOR 5D

453 EL201 18267465 LI GHT FI XTURE SCHEDULE

454 EL202 18267466 LI GHT FI XTURE DETAI LS

455 EL203 18267467 LI GHT FI XTURE DETAI LS

456 EL204 18267468 LI GHTI NG PLAN ( OPTI ON I TEM 3)

457 EL301 18267469 LI GHTI NG CONTROLS SI NGLE LI NE DI AGRAM

458 EL302 18267470 LI GHTI NG CONTROL PANEL SCHEDULES

459 EL303 18267471 LI GHTI NG CONTROL PANEL SCHEDULES

460 EL304 18267472 LI GHTI NG CONTROL WI RI NG DI AGRAMS

461 EL305 18267473 LI GHTI NG CONTROL WI RI NG DI AGRAMS

462 EL306 18267474 LI GHTI NG CONTROL WI RI NG DI AGRAMS

463 EL307 18267475 LI GHTI NG CONTROL WI RI NG DI AGRAMS

464 EL308 18267476 LI GHTI NG CONTROL WI RI NG DI AGRAMS

465 EL309 18267477 LI GHTI NG CONTROL WI RI NG DI AGRAMS

466 EL310 18267478 LI GHTI NG CONTROL WI RI NG DI AGRAMS

467 EL311 18267479 LI GHTI NG CONTROL WI RI NG DI AGRAMS

468 EP101 18267480 POWER FLOOR PLAN - COMPOSI TE

469 EP101- 1A 18267481 POWER PLAN - SECTOR 1A

DOCUMENT 00 01 15 Page 9

470 EP101- 1B 18267482 POWER PLAN - SECTOR 1B

471 EP101- 1C 18267483 POWER PLAN - SECTOR 1C

472 EP101- 1D 18267484 POWER PLAN - SECTOR 1D

473 EP101- 2A 18267485 POWER PLAN - SECTOR 2A

474 EP101- 2B 18267486 POWER PLAN - SECTOR 2B

475 EP101- 3A 18267487 POWER PLAN - SECTOR 3A

476 EP101- 3B 18267488 POWER PLAN - SECTOR 3B

477 EP101- 4A 18267489 POWER PLAN - SECTOR 4A

478 EP101- 4B 18267490 POWER PLAN - SECTOR 4B

479 EP101- 5A 18267491 POWER PLAN - SECTOR 5A

480 EP101- 5B 18267492 POWER PLAN - SECTOR 5B

481 EP101- 5C 18267493 POWER PLAN - SECTOR 5C

482 EP101- 5D 18267494 POWER PLAN - SECTOR 5D

483 EP104 18267495 POWER ROOF PLAN - COMPOSI TE

484 EP104- 1 18267496 ROOF POWER PLAN - AREA 1

485 EP104- 2 18267497 ROOF POWER PLAN - AREA 2

486 EP104- 3 18267498 ROOF POWER PLAN - AREA 3

487 EP104- 4 18267499 ROOF POWER PLAN - AREA 4

488 EP104- 5 18267500 ROOF POWER PLAN - AREA 5

489 EP104- 6 18267501 BI PV SYSTEM - COMPOSI TE ROOF PLAN - OPTI ON I TEM 2

490 EP104- 7 18267502 BI PV SYSTEM DETAI LS - OPTI ON I TEM 2

491 EP201 18267503 RADI OLOGY ROOM DETAI LS

492 EP202 18267504 ELECTRI CAL DETAI LS

493 EP203 18267505 ELECTRI CAL DETAI LS

494 EP301 18267506 SI NGLE LI NE DI AGRAM - SECONDARY POWER

495 EP302 18267507 SI NGLE LI NE DI AGRAM - SECONDARY POWER

496 EP303 18267508 FEEDER SCHEDULE

497 EP401 18267509 PANELBOARD SCHEDULES

498 EP402 18267510 PANELBOARD SCHEDULES

499 EP403 18267511 PANELBOARD SCHEDULES

500 EP404 18267512 PANELBOARD SCHEDULES

501 EP405 18267513 PANELBOARD SCHEDULES

502 EP406 18267514 PANELBOARD SCHEDULES

503 EP407 18267515 PANELBOARD SCHEDULES

504 EP408 18267516 PANELBOARD SCHEDULES

505 EP409 18267517 PANELBOARD SCHEDULES

506 EP410 18267518 PANELBOARD SCHEDULES

507 EP501 18267519 GROUNDI NG WI RI NG DI AGRAM

508 EP701 18267520 LI GHTNI NG PROTECTI ON PLAN

509 EP702 18267521 LI GHTNI NG PROTECTI ON DETAI LS

Communications

510 EY001 18267522 TELECOMMUNI CATI ONS LEGEND

511 EY002 18267523 TELECOMMUNI CATI ONS NOTES

512 EY101 18267524 TELECOMMUNI CATI ONS COMPOSI TE PLAN

513 EY101- 1A 18267525 TELECOMMUNI CATI ONS PLAN - SECTOR 1A

514 EY101- 1B 18267526 TELECOMMUNI CATI ONS PLAN - SECTOR 1B

515 EY101- 1C 18267527 TELECOMMUNI CATI ONS PLAN - SECTOR 1C

516 EY101- 1D 18267528 TELECOMMUNI CATI ONS PLAN - SECTOR 1D

517 EY101- 2A 18267529 TELECOMMUNI CATI ONS PLAN - SECTOR 2A

518 EY101- 2B 18267530 TELECOMMUNI CATI ONS PLAN - SECTOR 2B

519 EY101- 3A 18267531 TELECOMMUNI CATI ONS PLAN - SECTOR 3A

520 EY101- 3B 18267532 TELECOMMUNI CATI ONS PLAN - SECTOR 3B

521 EY101- 4A 18267533 TELECOMMUNI CATI ONS PLAN - SECTOR 4A

522 EY101- 4B 18267534 TELECOMMUNI CATI ONS PLAN - SECTOR 4B

523 EY101- 5A 18267535 TELECOMMUNI CATI ONS PLAN - SECTOR 5A

524 EY101- 5B 18267536 TELECOMMUNI CATI ONS PLAN - SECTOR 5B

525 EY101- 5C 18267537 TELECOMMUNI CATI ONS PLAN - SECTOR 5C

DOCUMENT 00 01 15 Page 10

526 EY101- 5D 18267538 TELECOMMUNI CATI ONS PLAN - SECTOR 5D

527 EY601 18267539 TELECOMMUNI CATI ONS SI NGLE LI NES

528 EY602 18267540 TELECOMMUNI CATI ONS SI NGLE LI NES

529 EY603 18267541 TELECOMMUNI CATI ONS SI NGLE LI NES

530 EY604 18267542 TELECOMMUNI CATI ONS SI NGLE LI NES

- - End of Document - -

DOCUMENT 00 01 15 Page 11

DOCUMENT 00 22 13. 00 20

SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS

02/14

PART 1 GENERAL

1. 1 CONTRACT LI NE I TEMS

The t er ms Of f er or and Bi dder and ver si ons t her eof ( of f er / bi d) have t he same def i ni t i on as used wi t hi n t hi s cont r act .

Pr ovi de t he Cont r act Li ne I t em ( CLI N) l ump sum pr i ce f or t he f ol l owi ng items:

CLI N 0001 - BASE PRI CE. Pr i ce i ncl udes t he f ol l owi ng:

CLI N 0001AA. Pr i ce f or t he ent i r e wor k f or Faci l i t y i n accor dance wi t h t he dr awi ngs and speci f i cat i ons, but excl udi ng wor k descr i bed i n Cont r act Li ne I t em ( CLI N) 0002, 0003, 0004 and 0005.

CLI N 0002 Opt i on I t em No. 1 - Pr i ce i ncl udes t he f ol l owi ng:

Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng an ent r y canopy syst em, 3 benches and hor i zont al sunscr eens, compl et e i n accor dance wi t h dr awi ngs and speci f i cat i ons.

CLI N 0003 Opt i on I t em No. 2 - Pr i ce i ncl udes t he f ol l owi ng:

Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng 54. 6 kW DC phot o- vol t ai c syst em capabl e of pr oduci ng a mi ni mum annual ener gy gener at i on of 84, 068 kWh/ year , compl et e i n accor dance wi t h dr awi ngs and specifications.

CLI N 0004 Opt i on I t em No. 3 - Pr i ce i ncl udes t he f ol l owi ng:

Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng skyl i ght s and l i ght wel l s, compl et e i n accor dance wi t h dr awi ngs and speci f i cat i ons.

CLI N 0005 Opt i on I t em No. 4 - Pr i ce i ncl udes t he f ol l owi ng:

Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng out door heal i ng gar den consi st i ng of 9 benches, s i dewal ks, exer ci se pat i o, and ext er i or st ai r s at par ki ng l ot , compl et e i n accor dance wi t h dr awi ngs and specifications.

1. 2 GENERAL BI D NOTES

a. Awar d wi l l be made on t he t ot al sum of CLI N 0001AA.

b. The Gover nment r eser ves t he uni l at er al r i ght t o awar d CLI N 0002, CLI N 0003, CLI N 0004 and CLI N 0005 t o t he Cont r act or at t he pr oposed pr i ce wi t hi n 30 cal endar days af t er t he cont r act awar d. A f i r m f i xed pr oposed pr i ce i s r equi r ed f or CLI N 0001, CLI N 0002, CLI N 0003, CLI N 0004 and CLI N 0005. No pr ovi s i on i s made f or economi c pr i ce adj ust ment . I f Opt i ons ar e exer ci sed, t he cont r act compl et i on dat e r emai ns t he same.

DOCUMENT 00 22 13. 00 20 Page 1

c. Eval uat i on of Opt i ons ( JUL 1990) : Except when i t i s det er mi ned i n accor dance wi t h FAR 17. 206 ( b) not t o be i n t he Gover nment ' s best i nt er est , t he Gover nment wi l l eval uat e of f er s f or awar d pur poses by addi ng t he pr i ce f or t he Opt i on( s) t o t he t ot al pr i ce f or CLI N 0001. I n accor dance wi t h FAR 52. 217- 5, eval uat i on of opt i ons wi l l not obl i gat e t he Gover nment t o exer ci se t he Opt i on( s) .

d. The Gover nment may r ej ect an of f er as nonr esponsi ve i f i t i s mat er i al l y unbal anced as t o pr i ces f or t he basi c r equi r ement and t he opt i on quant i t i es. An of f er i s unbal anced when i t i s based on pr i ces s i gni f i cant l y l ess t han cost f or some wor k and pr i ces whi ch ar e s i gni f i cant l y over st at ed f or ot her wor k.

e. I f CLI N 0002, 0003, 0004 and 0005 ar e exer ci sed, addi t i onal bondi ng and consent of sur et y i s r equi r ed. Consequent l y, t he Per f or mance Bond must r ef l ect 100 per cent of t he aggr egat e amount of al l I t ems.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Document - -

DOCUMENT 00 22 13. 00 20 Page 2

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

I NTERNATI ONAL CODE COUNCI L ( I CC)

I CC I BC ( 2015) I nt er nat i onal Bui l di ng Code

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 1- 200- 01 ( 2013) Gener al Bui l di ng Requi r ement s

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Sal vage Pl an; G

1. 3 WORK COVERED BY CONTRACT DOCUMENTS

1. 3. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes const r uct i on of const r uct i ng r epl acement medi cal c l i ni c i n Ar ea 13, Mar i ne Cor ps Base ( MCB) Camp Pendl et on, Cal i f or ni a and i nci dent al r el at ed wor k.

1. 3. 2 Location

The wor k i s l ocat ed at appr oxi mat el y 38 mi l es f r om downt own San Di ego i n Nor t h Count y and 82 mi l es sout h of Los Angel es appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3. 3 Phasing

Pr ovi de wor k i n phases i ndi cat ed on t he dr awi ngs. Al so, see at t ached document ent i t l ed " Phasi ng Node Di agr am Nar r at i ve" f or addi t i onal requirements.

1. 4 I NSPECTI ON AND ACCEPTANCE OF NEW CONNECTI ONS TO EXI STI NG MARI NE

CORPS- OWNED UTI LI TI ES AND NEW UTI LI TY EQUI PMENT

Pr i or t o any const r uct i on of a ut i l i t y connect i on, a Ut i l i t y Ser vi ce Connect i on appl i cat i on; i ncl udi ng a const r uct i on pl an f or t he ut i l i t y ser vi ce connect i on shal l be submi t t ed t o and appr oved by PW Ut i l i t i es Pl an

SECTI ON 01 11 00 Page 1

Revi ewer . Each appl i cat i on shal l i ncl ude t he r el evant const r uct i on pl ans and speci f i cat i ons, f ol l owi ng t he st andar ds of t he appl i cabl e ut i l i t y pr ovi der and r egul at or y agency t hat gover ns t he ut i l i t y wher e t he pr oj ect i s l ocat ed.

a. For al l new/ r epai r ed ut i l i t y connect i ons, FEAD or ot her ut i l i t i es connect i on i nst al l er shal l schedul e a pr e- out age coor di nat i on meet i ng.

Dur i ng t hi s meet i ng t he FEAD wi l l coor di nat e a pr e- connect i on i nspect i on t o be conduct ed af t er t r enchi ng and l ayout i s compl et ed, but bef or e t he pr oposed ser vi ce has been connect ed, and a post - connect i on i nspect i on conduct ed af t er t he connect i on has been made and bef or e t he connect i on i s bur i ed. The pr e- and post - connect i on i nspect i ons wi l l t ypi cal l y be on t he same or consecut i ve days and shal l be schedul ed wi t h t he PW Ut i l i t i es I nspect or 20 wor ki ng days pr i or t o t he pr oposed dat e of t he wor k. The PW Ut i l i t i es I nspect or shal l be pr esent dur i ng t he i nspect i ons. The PW Ut i l i t i es I nspect or wi l l ver i f y t hat al l new connect i ons t o ut i l i t y syst ems ar e made pr oper l y based on appl i cabl e standards.

b. Speci al Sani t ar y Sewer Syst em Requi r ement s. As par t of t he post - connect i on i nspect i on f or al l new or modi f i ed sani t ar y sewer l at er al and mai n connect i ons, t he cont r act or , wi t h t he PW Ut i l i t i es I nspect or obser v i ng, shal l conf i r m t hat each new connect i on i s connect ed t o an exi st i ng sani t ar y sewer mai n. Ver i f y t he sewer connect i on t o t he sewer syst em by per f or mi ng a dye check f r om t he pr oj ect t o t he f i r st manhol e on t he next act i ve sewer br anch mai n downst r eam f r om t he sewer br anch mai n used as t he pr oj ect poi nt of connect i on. Test i ng shal l cont i nue t i l l t he dye v i sual l y conf i r ms t he desi gn connect i on i s appr opr i at e. Dye shal l be a nont oxi c non- st ai ni ng sewer t r aci ng dye. Dur i ng t he t est t he cont r act or shal l moni t or t he st or m dr ai nage syst em downst r eam f r om t he pr oj ect , ei t her manhol es or out f al l s , f or any s i gn of cr oss connect i on.

c. I f def i c i enci es ar e f ound i n t he pr e- connect i on i nspect i on, t he PW Ut i l i t i es i nspect or wi l l pr ovi de a l i s t of def i c i enci es t o t he FEAD r epr esent at i ve. The FEAD r epr esent at i ve wi l l det er mi ne i f t he r equi r ement s ar e wi t hi n t he cont r act . I t ems consi der ed t o be wi t hi n t he cont r act r equi r ement wi l l be gi ven t o t he cont r act or f or cor r ect i on and document ed i n t he cont r act f i l es. Resol ut i on of i t ems consi der ed out s i de of t he cont r act by t he FEAD but deemed r equi r ed by PW Ut i l i t i es shal l be r esol ved pr i or t o cut t i ng i n t he connect i on. ( Thi s s i t uat i on shoul d be avoi ded by havi ng pr i or appr oved PW Ut i l i t i es connect i on appl i cat i ons/ const r uct i on pl ans. )

d. The PW Ut i l i t i es I nspect or shal l be not i f i ed when al l def i c i enci es have been compl et ed t o r eschedul e t he pr e- connect i on i nspect i on. The r epeat ed i nspect i on wi l l onl y cover i t ems not ed i n t he pr evi ous inspection.

e. Af t er post connect i on i nspect i on i s compl et ed, t he PW Ut i l i t i es I nspect or wi l l aut hor i ze t he syst em or equi pment t o be ener gi zed and/ or pl aced i nt o ser v i ce.

f . The Cont r act or shal l pr ovi de as- bui l t ut i l i t y dr awi ngs, pr ef er abl y i n st andar d el ect r oni c f or mat t o FEAD showi ng t he l ocat i on of al l ut i l i t y l i nes, mai ns, l at er al s, and ot her appur t enances r ef er ence t o a known l ocat i on or i n GPS Coor di nat es. The t ype, c l ass, s i ze of al l pi pi ng and val ves shal l be i ndi cat ed on t he as- bui l t s . For new sewer s, as- bui l t i nver t el evat i ons shal l be pr ovi ded st ar t i ng f r om t he bui l di ng

SECTI ON 01 11 00 Page 2 goi ng t o t he f i r st pr e- exi st i ng downst r eam manhol e. The FEAD shal l pr ovi de t hese t o PW Ut i l i t i es as soon as possi bl e. The FEAD shal l f ol l ow t he r equi r ement s of BMS 1. 6. 11 NAVFAC RED ZONE t o pr ovi de t o PW Ut i l i t i es ut i l i t y r ecor d dr awi ngs.

g. Any change( s) t o st or m wat er syst ems shal l be coor di nat ed wi t h i nst al l at i on envi r onment al st af f , i ncl udi ng pr ovi di ng as- bui l t dr awi ngs t o updat e st or m wat er syst em net wor ks f or compl i ance wi t h Nat i onal Pol l ut ant Di schar ge El i mi nat i on Syst em ( NPDES) per mi t s.

h. These gui del i nes ar e not a subst i t ut e f or pr of essi onal j udgment as t o when addi t i onal saf e guar ds ar e needed t o pr event i mpr oper connect i ons t o exi st i ng ut i l i t y syst ems.

1. 5 LOCATI ON OF UNDERGROUND FACI LI TI ES/ UTI LI TI ES

Locat i on of Under gr ound Faci l i t i es/ Ut i l i t i es Scan t he const r uct i on s i t e wi t h el ect r omagnet i c or soni c equi pment , and mar k t he sur f ace of t he gr ound wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound obst r uct i on not i ndi cat ed or speci f i ed t o be r emoved but i ndi cat ed or di scover ed dur i ng scanni ng i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

Coor di nat i on af t er cont r act awar d and pr i or t o commencement of any c l ear i ng and gr ubbi ng, t r enchi ng, bor i ng, ear t hwor k, pi l e dr i v i ng, or ot her oper at i on t hat may damage under gr ound ut i l i t i es, t he Cont r act or shal l pr ovi de hi s own ut i l i t y l ocat or ser vi ces. The Cont r act or shal l r evi ew al l avai l abl e As- bui l t Base Faci l i t y Dr awi ng( s) f or t he ar ea under const r uct i on. These dr awi ngs ar e l ocat ed at t he Faci l i t i es Mai nt enance Of f i ce ( Bui l di ng 2296) ; t el ephone number ( 760) 725- 3638. Request t o r evi ew t hese dr awi ngs must be submi t t ed t o FMD, wi t h a copy f ur ni shed t o t he Cont r act i ng Of f i cer , at l east f i f t een wor ki ng days i n advance of t he dat e when t he Cont r act or desi r es t o r evi ew t hese dr awi ngs. The Cont r act or shal l coor di nat e t he ut i l i t y l ocat i ng ser vi ce wi t h ot her appl i cabl e act i v i t i es and agenci es i nc l udi ng but not l i mi t ed t o Camp Pendl et on Base Communi cat i ons ( Bui l di ng 2459) , t el ephone number ( 760) 725- 3101, FMD t el ephone ( 760) 763- 2030 and DI G ALERT at t el ephone number 1 ( 800) 422- 4133.

Pr ovi de a Ut i l i t y Locat i on Coor di nat i on Repor t . When ut i l i t y l ocat i on i s f ur ni shed; t he Cont r act or shal l submi t a r epor t out l i ni ng t he act i v i t i es and agenci es cont act ed. The DI G ALERT i nqui r y i dent i f i cat i on shal l be pr ovi ded i n t he r epor t . No act i v i t y t hat coul d damage t he under gr ound ut i l i t i es may begi n unt i l t he Cont r act i ng Of f i cer appr oves t he coor di nat i on report.

1. 5. 1 Locat i on of Tel ephone Li nes

The Cont r act or i s r esponsi bl e f or l ocat i ng al l t el ephone l i nes pr i or t o per f or mi ng any excavat i ons. The Cont r act or wi l l pay f or r epai r s t o any t el ephone cabl es damaged dur i ng const r uct i on.

1. 5. 2 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng t o excavat i on wor k.

SECTI ON 01 11 00 Page 3

1. 6 EMERGENCY UTI LI TY REPAI R PLAN

The cont r act or s shal l be r equi r ed t o submi t an Emer gency Ut i l i t y Repai r Pl an pr i or t o bei ng al l owed t o per f or m any excavat i on. Emer gency shal l be def i ned as t he i nt er r upt i on of any and/ or damage of any ut i l i t y ser vi ce.

I ncl udi ng but not l i mi t ed t o t he spi l l , or pot ent i al spi l l of any f uel oi l , gas, pot abl e wat er , sewage ef f l uent , r aw sewage, or st or m wat er out s i de of syst em f aci l i t i es. The Emer gency Ut i l i t y Repai r Pl an shal l i ncl ude t he f ol l owi ng el ement s:

a. Equi pment l i s t of avai l abl e pumps wi t h s i zes, excavat i on equi pment , t ool s, and r epai r mat er i al s t hat ar e avai l abl e onsi t e.

b. Labor f or ce t hat wi l l be avai l abl e as a mi ni mum t o r espond t o emergencies.

c. Si t e- speci f i c pl an f or l ocat i ng, pot hol i ng, pr ot ect i ng, avoi di ng, and r epai r i ng any damage caused t o exi st i ng, or newl y i nst al l ed utilities.

d. I ncl ude t he same l evel of det ai l f or any subcont r act or s t hat wi l l be per f or mi ng wor k i nvol v i ng excavat i on.

e. I ncl ude a descr i pt i on of any pl anned ef f or t t hat woul d i nvol ve br i ngi ng i n a subcont r act or per sonnel t o r espond t o emer genci es.

f . The Pl an shal l be subj ect t o appr oval by t he Cont r act i ng Of f i cer .

The Cont r act or shal l demonst r at e i n hi s Emer gency Ut i l i t y Repai r Pl an t hat t hey ar e capabl e of r espondi ng t o ut i l i t y i nt er r upt i ons t hat coul d be caused by t hei r const r uct i on oper at i ons or i mpact s f r om t hem. I mmedi at el y upon di scover y of t he s i t uat i on, t he Cont r act or shal l r eact i n a way t hat wi l l mi ni mi ze ut i l i t y i nt er r upt i ons, r el eases, spi l l s , i mpact s t o ut i l i t y cust omer s, and pot ent i al f or f i nes or not i ces of v i ol at i ons. I n no case wi l l r epai r s be l ef t t o be r esol ved t he next day wi t hout t he appr oval of t he Cont r act i ng Of f i cer .

The Cont r act or ' s Emer gency Ut i l i t y Repai r Pl an shal l addr ess t he…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .