DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc1of3.pdf
PDF 12 MB Posted
- Attached to
- ACC Replacement 13 Area Initial Outfitting Project Federal contract opportunity
- Solicitation number
- W9127S21Q6000
About this file
This document provides details on an upcoming federal contract opportunity for initial outfitting work at a replacement medical clinic in Camp Pendleton, California. The U.S. Army Corps of Engineers Little Rock District intends to issue a request for quote in January 2021 seeking offers for the project, with an estimated value between $5-10 million. The requirement will be set aside for Service-Disabled Veteran-Owned Small Businesses. The simplified acquisition procedures of FAR Part 13 will be applied along with the commercial items procedures of FAR Part 12. All current documents related to the opportunity should be considered draft materials subject to change. Questions may be submitted through the ProjNet system until December 31, 2020 regarding the upcoming solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT Attachment (014) - Program for Design 13 Area Marine Centered Medical.pdf | ||
| DRAFT 6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs2of2.pdf | ||
| DRAFT X5700 Basis of Design Drawings.pdf | ||
| DRAFT Staging and Area Map.pdf | ||
| DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc3of3.pdf | ||
| DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC-spc2of3.pdf | ||
| DRAFT Statement of Work.docx | DOCX document | |
| DRAFT X5700 Full Cut Sheet.pdf | ||
| DRAFT P021 AREA 13 MEDICAL CLINIC - Final CID Submittal.pdf | ||
| DRAFT P021 AREA 13 MEDICAL CLINIC - Final SID Submittal.pdf | ||
| DRAFT 6.8.1 PN14021 AREA 13 MEDICAL CLINIC - Final Medical Equipment.pdf | ||
| DRAFT 6.7 PRICE SCHEDULE_PN14021_CP_13Area_ACC.xlsx | XLSX spreadsheet | |
| DRAFT 6.4.1 PN14021 AREA 13 MEDICAL CLINIC-dwgs1of2.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL DESIGN SUBMITTAL
28 FEBRUARY 2018
P-021
AREA 13 - MEDICAL
CLINIC REPLACEMENT
CAMP PENDLETON
MCB CAMP PENDLETON,
CALIFORNIA
SPECIFICATIONS
VOLUME I
Prepared for:
COMMANDER
NAVAL FACILITIES
ENGINEERING
COMMAND SOUTHWEST
SAN DIEGO, CALIFORNIA
AE CONTRACT NO.
N62470-16-D-6006-FZ01
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
P- 021 AREA 13 MEDI CAL CLI NI C REPLACEMENT 16065
MCB CAMP PENDLETON, CA
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LI ST OF DRAWI NGS
00 22 13. 00 20 SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 17. 00 20 NETWORK ANALYSI S SCHEDULES ( NAS)
01 33 00 SUBMI TTAL PROCEDURES
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 16. 00 50 CUTTI NG AND PATCHI NG PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 20 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 57 19. 01 20 SUPPLEMENTAL TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 PROJECT I DENTI FI CATI ON
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 78 24. 00 20 FACI LI TY ELECTRONI C OPERATI ON AND MAI NTENANCE SUPPORT
I NFORMATI ON ( eOMSI )
01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 82 16. 00 20 ENGI NEERI NG CONTROL OF ASBESTOS CONTAI NI NG MATERI ALS
02 83 13. 00 20 LEAD I N CONSTRUCTI ON
02 84 16 HANDLI NG OF LI GHTI NG BALLASTS AND LAMPS CONTAI NI NG PCBs
AND MERCURY
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOI ST FRAMI NG
05 30 00 STEEL DECKS
05 40 00 COLD- FORMED METAL FRAMI NG
05 43 13. 00 50 SLOTTED CHANNEL EQUI PMENT SUPPORT FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
05 51 33 METAL LADDERS
05 52 00 METAL RAI LI NGS
05 75 00. 00 50 DECORATI VE FORMED METAL
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS
06 61 16 SOLI D SURFACI NG FABRI CATI ONS
06 64 00. 00 50 PLASTI C PANELI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS
07 17 00 BENTONI TE WATERPROOFI NG
07 21 13 BOARD AND BLOCK I NSULATI ON
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 ROOF AND DECK I NSULATI ON
07 27 13. 00 50 MODI FI ED BI TUMI NOUS SHEET AI R BARRI ERS
07 27 26. 00 50 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 42 13 METAL WALL PANELS
07 60 00 FLASHI NG AND SHEET METAL
07 61 15. 00 20 ALUMI NUM STANDI NG SEAM ROOFI NG
07 72 00. 00 50 ROOF ACCESSORI ES
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
07 95 00. 00 50 EXPANSI ON CONTROL
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 13. 00 50 ACCESS DOORS AND FRAMES
08 33 13. 00 50 COI LI NG COUNTER DOORS
08 41 13 ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS
08 42 29. 23 50 SLI DI NG AUTOMATI C ENTRANCE DOORS
08 51 13 ALUMI NUM WI NDOWS
08 56 59. 00 50 SERVI CE WI NDOW UNI TS
08 63 00. 00 50 METAL- FRAMED SKYLI GHTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 TILING
09 51 00 ACOUSTI CAL CEI LI NGS
09 65 00 RESI LI ENT FLOORI NG
09 65 66 RESI LI ENT ATHLETI C FLOORI NG
09 68 00 CARPETING
09 90 00 PAI NTS AND COATI NGS
09 96 00 HI GH- PERFORMANCE COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 10 EXTERI OR SI GNAGE
10 14 00. 20 I NTERI OR SI GNAGE
10 21 13 TOI LET COMPARTMENTS
10 21 23. 16 CUBI CLE TRACK AND HARDWARE
10 22 13 WI RE MESH PARTI TI ONS
PROJECT TABLE OF CONTENTS Page 2
10 26 00 WALL AND DOOR PROTECTI ON
10 28 13 TOI LET ACCESSORI ES
10 44 00. 00 50 FI RE EXTI NGUI SHERS AND CABI NETS
10 71 13. 43 50 BUI LDI NG SUNSCREENS
10 73 26. 00 50 WALKWAY COVER SYSTEM
10 90 00. 00 50 MI SCELLANEOUS SPECI ALTI ES
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WI NDOW SHADES
12 35 70 HEALTHCARE CASEWORK
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 21 48 PREFABRI CATED AUDI OMETRI C ROOMS
13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT
13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL AND PLUMBI NG EQUI PMENT
13 49 19 X- RAY SHI ELDI NG
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13. 00 20 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 70 PLUMBI NG, HEALTHCARE FACI LI TI ES
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND
EQUIPMENT
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 23. 13 20 BACnet DI RECT DI GI TAL CONTROL SYSTEMS FOR HVAC
23 11 25 FACI LI TY GAS PI PI NG
23 52 00 HEATI NG BOI LERS
23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE
23 64 26 HEATI NG HOT WATER AND CHI LLED WATER PI PI NG SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 50 00. 00 20 CYBERSECURI TY OF FACI LI TY- RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 23 01 GENERATOR QUI CK- CONNECT SWI TCHBOARD
26 24 13 SWITCHBOARDS
26 27 14. 00 20 ELECTRI CI TY METERI NG
26 31 00 SOLAR PHOTOVOLTAI C ( PV) COMPONENTS ( BI D OPTI ON)
26 36 23. 00 20 NON- AUTOMATI C TRANSFER SWI TCHES
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
PROJECT TABLE OF CONTENTS Page 3
26 51 00 I NTERI OR LI GHTI NG
26 55 80. 00 20 SURGI CAL LI GHTI NG FI XTURES
26 56 00 EXTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
27 51 16 RADI O AND PUBLI C ADDRESS SYSTEMS
27 52 23. 00 20 NURSE CALL SYSTEM
27 54 00. 00 20 COMMUNI TY ANTENNA TELEVI SI ON ( CATV) SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 ELECTRONI C SECURI TY SYSTEM ACCEPTANCE TESTI NG
28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM
DI VI SI ON 31 - EARTHWORK
31 11 00 CLEARI NG AND GRUBBI NG
31 23 00. 00 20 EXCAVATI ON AND FI LL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D
PAVEMENTS
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 23 AGGREGATE BASE COURSE FOR CONCRETE BLOCK PAVEMENTS
32 12 10 BI TUMI NOUS TACK COATS
32 12 17 HOT MI X BI TUMI NOUS PAVEMENT
32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT, CURB, CURB AND GUTTER,
AND SI DEWALKS
32 14 15 PERMEABLE PAVEMENT
32 14 16 CELLULAR GRAVEL PAVI NG SYSTEM
32 16 15 CONCRETE BLOCK PAVEMENTS
32 17 23. 00 20 PAVEMENT MARKI NGS
32 31 30. 00 50 DECORATI VE METAL FENCES AND GATES
32 84 24 I RRI GATI ON SPRI NKLER SYSTEMS
32 93 00 EXTERI OR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER DI STRI BUTI ON
33 30 00 SANI TARY SEWERS
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 71 01 OVERHEAD TRANSMI SSI ON AND DI STRI BUTI ON
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
P-021 AREA 13 MEDICAL CLINIC REPLACEMENT RLF 16065
SEALS PAGE FINAL CONSTRUCTION DOCUMENTS
SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
A. Architect David Boldt
B. Civil Engineer C. Allan Bamforth
C. Landscape Architect Karina Veaudry
D. Structural Engineer Justin Trent
E. Electrical Engineer Eric Garner
F. Mechanical Engineer Brad Hughes
G. Interior Designer Debra L Sellers
H. Plumbing Engineer Chris Eversole
I. Fire Protection Engineer Jennifer Lovett
J. Communications Matthew Atkison
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/11
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
DRAWI NG NO. NAVFAC # TI TLE
General
1 GI 000. 1 18267013 COVER SHEET - VOLUME 1
2 GI 001 18267014 I NDEX OF DRAWI NGS - VOLUME 1
3 GI 002 18267015 I NDEX OF DRAWI NGS - VOLUME 1
4 GI 005 18267016 ABBREVI ATI ONS
5 GI 006 18267017 LEGENDS AND SYMBOLS
6 GI 007 18267018 SI TE USE AND STAGI NG AREAS
7 GI 008 18267019 SI TE USE MAPS
8 GI 009 18267020 SI TE USE MAPS
9 GI 010 18267021 SI TE USE MAPS
10 GI 011 18267022 SI TE DEMOLI TI ON - PHASE 1
11 GI 012 18267023 SI TE DEMOLI TI ON - PHASE 2
12 GI 013 18267024 ARCHI TECTURAL SI TE PLAN - PHASE 2
Li f e Saf et y
13 GC001 18267025 LI FE SAFETY CODE SUMMARY
14 GC101 18267026 LI FE SAFETY PLAN - OVERALL
15 GC102 18267027 FI RE DEPARTMENT SI TE ACCESS
Geotechnical
16 B101 18267028 BORI NG LOCATI ON DI AGRAM
17 B102 18267029 SUBSURFACE PROFI LE
18 B103 18267030 BORI NG LOG
19 B104 18267031 BORI NG LOG
20 B105 18267032 BORI NG LOG
21 B106 18267033 BORI NG LOG
22 B107 18267034 BORI NG LOG
23 B108 18267035 BORI NG LOG
24 B109 18267036 BORI NG LOG
25 B110 18267037 BORI NG LOG
26 B111 18267038 BORI NG LOG
27 B112 18267039 BORI NG LOG
28 B113 18267040 BORI NG LOG
29 B114 18267041 BORI NG LOG
30 B115 18267042 BORI NG LOG
31 B116 18267043 BORI NG LOG
32 B117 18267044 BORI NG LOG
33 B118 18267045 BORI NG LOG
34 B119 18267046 BORI NG LOG
DOCUMENT 00 01 15 Page 1
35 B120 18267047 BORI NG LOG
36 B121 18267048 BORI NG LOG
37 B122 18267049 BORI NG LOG
Civil
38 C- 001 18267050 LEGEND AND NOTES
39 C- 002 18267051 EXI STI NG SI TE NOTES, UTI LI TY NOTES AND UTI LI TY
SCHEDULES
40 C- 003 18267052 KEY PLANS
41 C- 004 18267053 OVERALL EXI STI NG CONDI TI ONS PLAN
42 C- 005 18267054 ATFP SETBACK PLAN
43 C- 006 18267055 PHASE 1 - OVERALL DEMOLI TI ON PLAN
44 C- 007 18267056 PHASE 1 - OVERALL SI TE I MPROVEMENT PLAN
45 C- 008 18267057 PHASE 2 - OVERALL DEMOLI TI ON PLAN
46 C- 009 18267058 PHASE 2 - OVERALL SI TE I MPROVEMENT PLAN
47 CD101 18267059 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN
48 CD102 18267060 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN
49 CD103 18267061 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN
50 CD104 18267062 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN
51 CD105 18267063 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN
52 CD106 18267064 EXI STI NG CONDI TI ONS / DEMOLI TI ON PLAN
53 CS101 18267065 LAYOUT AND UTI LI TY PLAN
54 CS102 18267066 LAYOUT AND UTI LI TY PLAN
55 CS103 18267067 LAYOUT AND UTI LI TY PLAN
56 CS301 18267068 WATER MAI N - PLAN AND PROFI LE
57 CS302 18267069 WATER MAI N - PLAN AND PROFI LE
58 CS303 18267070 WATER MAI N - PLAN AND PROFI LE
59 CS304 18267071 WATER MAI N - PLAN AND PROFI LE
60 CS305 18267072 SANI TARY SEWER - PLAN AND PROFI LE
61 CS306 18267073 PAVEMENT SECTI ONS
62 CS401 18267074 ENLARGED PLANS
63 CS402 18267075 CONCRETE PAVEMENT & ENTRANCE JOI NT DETAI LS
64 CS403 18267076 OPTI ON I TEM #4 SI TE I MPROVEMENT PLAN
65 CS404 18267077 LAYOUT PLAN - COMPOST AMENDED SOI L STRI PS
66 CS601 18267078 SANI TARY SEWER SCHEDULES & LAYOUT CONTROL POI NTS
67 CG101 18267079 GRADI NG AND DRAI NAGE PLAN
68 CG102 18267080 GRADI NG AND DRAI NAGE PLAN
69 CG103 18267081 GRADI NG AND DRAI NAGE PLAN
70 CG301 18267082 STORM SEWER - PLAN AND PROFI LE
71 CG302 18267083 STORM SEWER - PLAN AND PROFI LE
72 CG303 18267084 STORM SEWER - PLAN AND PROFI LE
73 CG304 18267085 STORM SEWER - PLAN AND PROFI LE
74 CG305 18267086 STORM SEWER - PLAN AND PROFI LE
75 CG306 18267087 STORM SEWER - PLAN AND PROFI LE
76 CG307 18267088 STORM SEWER - PLAN AND PROFI LE
77 CG308 18267089 STORM SEWER - PLAN AND PROFI LE
78 CG401 18267090 ENLARGED GRADI NG PLAN
79 CG402 18267091 ENLARGED GRADI NG PLAN
80 CG403 18267092 ENLARGED GRADI NG PLAN
81 CG404 18267093 ENLARGED GRADI NG PLAN
82 CG405 18267094 ENLARGED GRADI NG PLAN
83 CG601 18267095 STORM SEWER SCHEDULES
84 CG602 18267096 STORM SEWER SCHEDULES
85 C- 501 18267097 EROSI ON AND SEDI MENT CONTROL NOTES AND DETAI LS
86 C- 502 18267098 EROSI ON AND SEDI MENT CONTROL DETAI LS
87 C- 503 18267099 DETAI LS
88 C- 504 18267100 DETAI LS
89 C- 505 18267101 DETAI LS
DOCUMENT 00 01 15 Page 2
90 C- 506 18267102 DETAI LS
91 C- 507 18267103 DETAI LS
92 C- 508 18267104 DETAI LS
93 C- 509 18267105 6" FI RE HYDRANT I NSTALLATI ON DETAI LS
94 C- 510 18267106 BACKFLOW PREVENTER DETAI L
95 C- 511 18267107 WATER METER PI PI NG DETAI LS
96 C- 512 18267108 DETAI LS
97 C- 513 18267109 DETAI LS
98 C- 514 18267110 DETAI LS
99 C- 515 18267111 DETAI LS
100 C- 516 18267112 DETAI LS
101 C- 517 18267113 DETAI LS
102 C- 518 18267114 DETAI LS
103 C- 519 18267115 DETAI LS
Landscape
104 LH101 18267116 BASE BI D HARDSCAPE PLAN
105 LH102 18267117 BASE BI D HARDSCAPE PLAN
106 LH103 18267118 BASE BI D HARDSCAPE PLAN
107 LH104 18267119 BASE BI D HARDSCAPE PLAN
108 LH105 18267120 OPTI ON 4 HARDSCAPE PLAN
109 LH501 18267121 BASE BI D COURTYARD LAYOUT
110 LH502 18267122 HARDSCAPE DETAI LS
111 LH503 18267123 EDUCATI ONAL SI GNS
112 LP001 18267124 LANDSCAPE NOTES AND BASE BI D PLANT SCHEDULE
113 LP002 18267125 EXI STI NG TREE PROTECTI ON PLAN
114 LP101 18267126 BASE BI D LANDSCAPE PLAN
115 LP102 18267127 BASE BI D LANDSCAPE PLAN
116 LP103 18267128 BASE BI D LANDSCAPE PLAN
117 LP104 18267129 BASE BI D LANDSCAPE PLAN
118 LP105 18267130 OPTI ON 4 LANDSCAPE PLAN
119 LP501 18267131 LANDSCAPE I NSTALLATI ON DETAI LS
120 LP502 18267132 LANDSCAPE I NSTALLATI ON DETAI LS
121 I P001 18267133 I RRI GATI ON LEGEND AND NOTES
122 I P101 18267134 BASE BI D I RRI GATI ON PLAN
123 I P102 18267135 BASE BI D I RRI GATI ON PLAN
124 I P103 18267136 BASE BI D I RRI GATI ON PLAN
125 I P104 18267137 BASE BI D I RRI GATI ON PLAN
126 I P105 18267138 OPTI ON 4 I RRI GATI ON PLAN
127 I P501 18267139 I RRI GATI ON I NSTALLATI ON DETAI LS
128 I P502 18267140 I RRI GATI ON I NSTALLATI ON DETAI LS
129 I P503 18267141 I RRI GATI ON I NSTALLATI ON DETAI LS
130 I P504 18267142 I RRI GATI ON I NSTALLATI ON DETAI LS
131 I P505 18267143 I RRI GATI ON I NSTALLATI ON DETAI LS
132 I P506 18267144 I RRI GATI ON I NSTALLATI ON DETAI LS
133 I P507 18267145 I RRI GATI ON I NSTALLATI ON DETAI LS
Structual
134 S001 18267146 GENERAL NOTES
135 S002 18267147 GENERAL NOTES, LEGEND & ABBREVI ATI ONS
136 S101- 1 18267148 FOUNDATI ON PLAN - SECTOR 1
137 S101- 2 18267149 FOUNDATI ON PLAN - SECTOR 2
138 S101- 3 18267150 FOUNDATI ON PLAN - SECTOR 3
139 S101- 4 18267151 FOUNDATI ON PLAN - SECTOR 4
140 S101- 5 18267152 FOUNDATI ON PLAN - SECTOR 5
141 S102- 1 18267153 ROOF FRAMI NG PLAN - SECTOR 1
142 S102- 2 18267154 ROOF FRAMI NG PLAN - SECTOR 2
DOCUMENT 00 01 15 Page 3
143 S102- 3 18267155 ROOF FRAMI NG PLAN - SECTOR 3
144 S102- 4 18267156 ROOF FRAMI NG PLAN - SECTOR 4
145 S102- 5 18267157 ROOF FRAMI NG PLAN - SECTOR 5
146 S103 18267158 BI D OPTI ON #1 - CANOPY PLANS, SECTI ONS & NOTES
147 S104 18267159 BI D OPTI ON #3 - PARTI AL ROOF FRAMI NG PLANS & DETAI L
148 S301 18267160 SECTI ONS
149 S302 18267161 SECTI ONS
150 S303 18267162 SECTI ONS
151 S501 18267163 TYPI CAL DETAI LS
152 S502 18267164 TYPI CAL DETAI LS
153 S503 18267165 TYPI CAL DETAI LS
154 S504 18267166 TYPI CAL DETAI LS
155 S505 18267167 TYPI CAL DETAI LS
Architecture
156 AS100 18267168 ARCHI TECTURAL SI TE PLAN
157 AS501 18267169 ARCHI TECTURAL SI TE FEATURES
158 AS502 18267170 ARCHI TECTURAL SI TE FEATURES
159 AD101 18267171 BUI LDI NG 13129 - DEMOLI TI ON PLAN
160 AD901 18267172 EXI STI NG SI TE I MAGES
161 AD902 18267173 EXI STI NG SI TE I MAGES
162 AD903 18267174 EXI STI NG SI TE I MAGES
163 AE101 18267175 COMPOSI TE FLOOR PLAN
164 AE101- 1 18267176 FLOOR PLAN - SECTOR 1
165 AE101- 2 18267177 FLOOR PLAN - SECTOR 2
166 AE101- 3 18267178 FLOOR PLAN - SECTOR 3
167 AE101- 4 18267179 FLOOR PLAN - SECTOR 4
168 AE101- 5 18267180 FLOOR PLAN - SECTOR 5
169 AE104 18267181 COMPOSI TE ROOF PLAN
170 AE105 18267182 OPTI ON I TEM #1 - CANOPY DRAWI NGS
171 AE106 18267183 OPTI ON I TEM #2 - SOLAR ARRAY
172 AE111- 1 18267184 REFLECTED CEI LI NG PLAN - SECTOR 1
173 AE111- 2 18267185 REFLECTED CEI LI NG PLAN - SECTOR 2
174 AE111- 3 18267186 REFLECTED CEI LI NG PLAN - SECTOR 3
175 AE111- 4 18267187 REFLECTED CEI LI NG PLAN - SECTOR 4
176 AE111- 5 18267188 REFLECTED CEI LI NG PLAN - SECTOR 5
177 AE200 18267189 OVERALL BUI LDI NG ELEVATI ONS
178 AE211 18267190 EXTERI OR ELEVATI ONS
179 AE212 18267191 EXTERI OR ELEVATI ONS
180 AE213 18267192 EXTERI OR ELEVATI ONS
181 AE214 18267193 EXTERI OR ELEVATI ONS
182 AE215 18267194 EXTERI OR ELEVATI ONS
183 AE220 18267195 ENLARGED EXTERI OR ELEVATI ONS
184 AE310 18267196 BUI LDI NG SECTI ONS
185 AE311 18267197 BUI LDI NG SECTI ONS
186 AE312 18267198 BUI LDI NG SECTI ONS
187 AE313 18267199 BUI LDI NG SECTI ONS - SKYLI GHT OPTI ON I TEM #3
188 AE320 18267200 WALL SECTI ONS
189 AE321 18267201 WALL SECTI ONS
190 AE322 18267202 WALL SECTI ONS
191 AE323 18267203 WALL SECTI ONS
192 AE324 18267204 WALL SECTI ONS
193 AE325 18267205 WALL SECTI ONS
194 AE330 18267206 I NTERI OR WALL SECTI ONS
195 AE331 18267207 I NTERI OR WALL SECTI ONS
196 AE401 18267208 ENLARGED FLOOR PLANS
197 AE402 18267209 ENLARGED FLOOR PLANS
198 AE403 18267210 ENLARGED FLOOR PLANS
DOCUMENT 00 01 15 Page 4
199 AE404 18267211 ENLARGED FLOOR PLANS
200 AE405 18267212 ENLARGED REFLECTED CEI LI NG PLANS
201 AE406 18267213 ENLARGED REFLECTED CEI LI NG PLAN - SKYLI GHT OPTI ON
I TEM #3
202 AE501 18267214 EXTERI OR PLAN DETAI LS
203 AE502 18267215 EXTERI OR PLAN DETAI LS
204 AE503 18267216 EXPANSI ON JOI NT DETAI LS
205 AE505 18267217 I NTERI OR PLAN DETAI LS
206 AE506 18267218 PLAN DETAI LS
207 AE507 18267219 I NTERI OR DETAI LS - COLUMN COVERS
208 AE511 18267220 TYPI CAL CEI LI NG DETAI LS
209 AE512 18267221 I NTERI OR SECTI ON DETAI LS
210 AE521 18267222 SECTI ON DETAI LS
211 AE522 18267223 SECTI ON DETAI LS
212 AE523 18267224 SECTI ON DETAI LS
213 AE524 18267225 MI SCELLANEOUS DETAI LS
214 AE525 18267226 ROOF & MI SC. DETAI LS
215 AE526 18267227 ROOF DETAI LS
216 AE527 18267228 PRECAST DETAI LS
217 AE601 18267229 DOOR SCHEDULE
218 AE602 18267230 DOOR SCHEDULE
219 AE610 18267231 DOOR & I NTERI OR WI NDOW TYPES
220 AE611 18267232 WI NDOW AND DOOR DETAI LS
221 AE612 18267233 WI NDOW AND LOUVER DETAI LS
222 AE613 18267234 OVERHEAD DOOR DETAI LS
223 AE614 18267235 OVERHEAD DOOR DETAI LS
224 AE615 18267236 OVERHEAD DOOR DETAI LS
225 AE621 18267237 EXTERI OR GLAZI NG ELEVATI ONS
226 AE623 18267238 STOREFRONT DETAI LS
227 AE624 18267239 STOREFRONT DETAI LS
228 AE801 18267240 PARTI TI ON TYPES
229 AE810 18267241 TYPI CAL PARTI TI ON FRAMI NG DETAI LS
230 AE811 18267242 PARTI TI ON DETAI LS
231 AE812 18267243 LEAD LI NI NG DETAI LS
232 AE820 18267244 FI RE RATED PENETRATI ONS
Interiors
233 AF601 18267245 FI NI SH SCHEDULE
234 AF602 18267246 FI NI SH SCHEDULE
235 AF603 18267247 FI NI SH SCHEDULE
236 AF610 18267248 FI NI SH I DENTI FI CATI ON SCHEDULE
237 AF611 18267249 FI NI SH I DENTI FI CATI ON SCHEDULE
238 AG010 18267250 SI TE SI GNAGE PLAN - PHASE 1 DEMOLI TI ON
239 AG011 18267251 SI TE SI GNAGE PLAN - PHASE 2 DEMOLI TI ON
240 AG012 18267252 SI TE SI GNAGE PLAN - PHASE 1&2 DEMOLI TI ON ADDI TI ONAL
PARKING
241 AG100 18267253 SI TE SI GNAGE PLAN
242 AG101- 1 18267254 SI GNAGE PLAN - SECTOR 1
243 AG101- 2 18267255 SI GNAGE PLAN - SECTOR 2
244 AG101- 3 18267256 SI GNAGE PLAN - SECTOR 3
245 AG101- 4 18267257 SI GNAGE PLAN - SECTOR 4
246 AG101- 5 18267258 SI GNAGE PLAN - SECTOR 5
247 AG501 18267259 I NTERI OR SI GN ELEVATI ONS
248 AG502 18267260 I NTERI OR SI GN ELEVATI ONS
249 AG503 18267261 I NTERI OR SI GN ELEVATI ONS
250 AG504 18267262 EXTERI OR SI GNAGE ELEVATI ONS
251 AG505 18267263 EXTERI OR SI GNAGE ELEVATI ONS
252 AG506 18267264 EXTERI OR SI GNAGE ELEVATI ONS
DOCUMENT 00 01 15 Page 5
253 AG507 18267265 EXTERI OR TEMPORARY SI GNAGE ELEVATI ONS
254 AG601 18267266 SI GN MESSAGE SCHEDULE
255 AG602 18267267 SI GN MESSAGE SCHEDULE
256 I N101- 1 18267268 FLOOR PATTERN PLAN - SECTOR 1
257 I N101- 2 18267269 FLOOR PATTERN PLAN - SECTOR 2
258 I N101- 3 18267270 FLOOR PATTERN PLAN - SECTOR 3
259 I N101- 4 18267271 FLOOR PATTERN PLAN - SECTOR 4
260 I N101- 5 18267272 FLOOR PATTERN PLAN - SECTOR 5
261 I N111- 1 18267273 WALL FI NI SH PLAN - SECTOR 1
262 I N111- 2 18267274 WALL FI NI SH PLAN - SECTOR 2
263 I N111- 3 18267275 WALL FI NI SH PLAN - SECTOR 3
264 I N111- 4 18267276 WALL FI NI SH PLAN - SECTOR 4
265 I N111- 5 18267277 WALL FI NI SH PLAN - SECTOR 5
266 I N201 18267278 I NTERI OR ELEVATI ONS
267 I N202 18267279 I NTERI OR ELEVATI ONS
268 I N203 18267280 I NTERI OR TOI LET ELEVATI ONS
269 I N501 18267281 I NTERI OR DETAI LS
Equipment
270 QH101- 1A 18267282 EQUI PMENT PLAN - SECTOR 1A
271 QH101- 1B 18267283 EQUI PMENT PLAN - SECTOR 1B
272 QH101- 1C 18267284 EQUI PMENT PLAN - SECTOR 1C
273 QH101- 1D 18267285 EQUI PMENT PLAN - SECTOR 1D
274 QH101- 2A 18267286 EQUI PMENT PLAN - SECTOR 2A
275 QH101- 2B 18267287 EQUI PMENT PLAN - SECTOR 2B
276 QH101- 3A 18267288 EQUI PMENT PLAN - SECTOR 3A
277 QH101- 3B 18267289 EQUI PMENT PLAN - SECTOR 3B
278 QH101- 4A 18267290 EQUI PMENT PLAN - SECTOR 4A
279 QH101- 4B 18267291 EQUI PMENT PLAN - SECTOR 4B
280 QH101- 5A 18267292 EQUI PMENT PLAN - SECTOR 5A
281 QH101- 5B 18267293 EQUI PMENT PLAN - SECTOR 5B
282 QH101- 5C 18267294 EQUI PMENT PLAN - SECTOR 5C
283 QH101- 5D 18267295 EQUI PMENT PLAN - SECTOR 5D
284 QH200 18267296 TYPI CAL MOUNTI NG HEI GHTS
285 QH201 18267297 EQUI PMENT ELEVATI ONS
286 QH202 18267298 EQUI PMENT ELEVATI ONS
287 QH250 18267299 MI LLWORK ELEVATI ONS
288 QH401 18267300 MI LLWORK DI MENSI ON PLANS
289 QH501 18267301 EQUI PMENT DETAI LS
290 QH502 18267302 EQUI PMENT DETAI LS
291 QH503 18267303 EQUI PMENT DETAI LS
292 QH550 18267304 MI LLWORK SECTI ONS
293 QH551 18267305 MI LLWORK SECTI ONS
294 QH601 18267306 EQUI PMENT AND CASEWORK SCHEDULE
295 GI 000. 2 18267307 COVER SHEET - VOLUME 2
296 GI 003 18267308 I NDEX OF DRAWI NGS - VOLUME 2
297 GI 004 18267309 I NDEX OF DRAWI NGS - VOLUME 2
Fi r e Al ar m
298 FA001 18267310 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM LEGEND AND
SEQUENCE OF OPERATI ON MATRI X
299 FA101- 1 18267311 FI RE ALARM PLAN - SECTOR 1
300 FA101- 2 18267312 FI RE ALARM PLAN - SECTOR 2
301 FA101- 3 18267313 FI RE ALARM PLAN - SECTOR 3
302 FA101- 4 18267314 FI RE ALARM PLAN - SECTOR 4
303 FA101- 5 18267315 FI RE ALARM PLAN - SECTOR 5
304 FA501 18267316 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM WI RI NG
DOCUMENT 00 01 15 Page 6
DI AGRAMS AND DETAI LS
305 FA601 18267317 FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM RI SER DI AGRAM
Fi r e Suppr essi on
306 FX001 18267318 FI RE SUPPRESSI ON SYMBOLS AND ABBREVI ATI ONS
307 FX101 18267319 FI RST FLOOR FI RE SUPPRESSI ON
308 FX501 18267320 FI RE SUPPRESSI ON DETAI LS
Plumbing
309 P- 001 18267321 ABBREVI ATI ONS AND LEGEND
310 PW101 18267322 COMPOSI TE BELOW SLAB WASTE PLAN
311 PW101- 1A 18267323 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1A
312 PW101- 1B 18267324 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1B
313 PW101- 1C 18267325 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1C
314 PW101- 1D 18267326 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 1D
315 PW101- 2A 18267327 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 2A
316 PW101- 2B 18267328 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 2B
317 PW101- 3A 18267329 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 3A
318 PW101- 3B 18267330 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 3B
319 PW101- 4A 18267331 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 4A
320 PW101- 4B 18267332 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 4B
321 PW101- 5A 18267333 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5A
322 PW101- 5B 18267334 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5B
323 PW101- 5C 18267335 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5C
324 PW101- 5D 18267336 PLUMBI NG BELOW SLAB WASTE PLAN - SECTOR 5D
325 PW201 18267337 COMPOSI TE WASTE PLAN
326 PW201- 1A 18267338 PLUMBI NG WASTE PLAN - SECTOR 1A
327 PW201- 1B 18267339 PLUMBI NG WASTE PLAN - SECTOR 1B
328 PW201- 1C 18267340 PLUMBI NG WASTE PLAN - SECTOR 1C
329 PW201- 1D 18267341 PLUMBI NG WASTE PLAN - SECTOR 1D
330 PW201- 2A 18267342 PLUMBI NG WASTE PLAN - SECTOR 2A
331 PW201- 2B 18267343 PLUMBI NG WASTE PLAN - SECTOR 2B
332 PW201- 3A 18267344 PLUMBI NG WASTE PLAN - SECTOR 3A
333 PW201- 3B 18267345 PLUMBI NG WASTE PLAN - SECTOR 3B
334 PW201- 4A 18267346 PLUMBI NG WASTE PLAN - SECTOR 4A
335 PW201- 4B 18267347 PLUMBI NG WASTE PLAN - SECTOR 4B
336 PW201- 5A 18267348 PLUMBI NG WASTE PLAN - SECTOR 5A
337 PW201- 5B 18267349 PLUMBI NG WASTE PLAN - SECTOR 5B
338 PW201- 5C 18267350 PLUMBI NG WASTE PLAN - SECTOR 5C
339 PW201- 5D 18267351 PLUMBI NG WASTE PLAN - SECTOR 5D
340 PP101 18267352 COMPOSI TE WATER PLAN
341 PP101- 1A 18267353 PLUMBI NG WATER PLAN - SECTOR 1A
342 PP101- 1B 18267354 PLUMBI NG WATER PLAN - SECTOR 1B
343 PP101- 1C 18267355 PLUMBI NG WATER PLAN - SECTOR 1C
344 PP101- 1D 18267356 PLUMBI NG WATER PLAN - SECTOR 1D
345 PP101- 2A 18267357 PLUMBI NG WATER PLAN - SECTOR 2A
346 PP101- 2B 18267358 PLUMBI NG WATER PLAN - SECTOR 2B
347 PP101- 3A 18267359 PLUMBI NG WATER PLAN - SECTOR 3A
348 PP101- 3B 18267360 PLUMBI NG WATER PLAN - SECTOR 3B
349 PP101- 4A 18267361 PLUMBI NG WATER PLAN - SECTOR 4A
350 PP101- 4B 18267362 PLUMBI NG WATER PLAN - SECTOR 4B
351 PP101- 5A 18267363 PLUMBI NG WATER PLAN - SECTOR 5A
352 PP101- 5B 18267364 PLUMBI NG WATER PLAN - SECTOR 5B
353 PP101- 5C 18267365 PLUMBI NG WATER PLAN - SECTOR 5C
354 PP101- 5D 18267366 PLUMBI NG WATER PLAN - SECTOR 5D
355 P- 501 18267367 PLUMBI NG DETAI LS
356 P- 502 18267368 PLUMBI NG DETAI LS
357 P- 503 18267369 PLUMBI NG DETAI LS
358 P- 504 18267370 PLUMBI NG DETAI LS
DOCUMENT 00 01 15 Page 7
359 P- 701 18267371 WASTE RI SER DI AGRAM - NORTH
360 P- 702 18267372 WASTE RI SER DI AGRAM - SOUTH
361 P- 703 18267373 WATER RI SER DI AGRAM - NORTH
362 P- 704 18267374 WATER AND GAS RI SER DI AGRAMS - SOUTH
363 P- 801 18267375 PLUMBI NG SCHEDULES
Mechanical
364 M- 001 18267376 MECHANI CAL ABBREVI ATI ONS, LEGEND & GENERAL NOTES
365 MS001 18267377 NATURAL GAS SPECI FI CATI ONS
366 MS101 18267378 PHASE 1 - NATURAL GAS SI TE PLAN
367 MS102 18267379 PHASE 2 - NATURAL GAS SI TE PLAN
368 MS501 18267380 NATURAL GAS DETAI LS
369 MH101 18267381 COMPOSI TE PLAN - DUCTWORK
370 MH101- 1A 18267382 SECTOR 1A FLOOR PLAN - DUCTWORK
371 MH101- 1B 18267383 SECTOR 1B FLOOR PLAN - DUCTWORK
372 MH101- 1C 18267384 SECTOR 1C FLOOR PLAN - DUCTWORK
373 MH101- 1D 18267385 SECTOR 1D FLOOR PLAN - DUCTWORK
374 MH101- 2A 18267386 SECTOR 2A FLOOR PLAN - DUCTWORK
375 MH101- 2B 18267387 SECTOR 2B FLOOR PLAN - DUCTWORK
376 MH101- 3A 18267388 SECTOR 3A FLOOR PLAN - DUCTWORK
377 MH101- 3B 18267389 SECTOR 3B FLOOR PLAN - DUCTWORK
378 MH101- 4A 18267390 SECTOR 4A FLOOR PLAN - DUCTWORK
379 MH101- 4B 18267391 SECTOR 4B FLOOR PLAN - DUCTWORK
380 MH101- 5A 18267392 SECTOR 5A FLOOR PLAN - DUCTWORK
381 MH101- 5B 18267393 SECTOR 5B FLOOR PLAN - DUCTWORK
382 MH101- 5C 18267394 SECTOR 5C FLOOR PLAN - DUCTWORK
383 MH101- 5D 18267395 SECTOR 5D FLOOR PLAN - DUCTWORK
384 MH201 18267396 MECHANI CAL ROOF PLAN
385 MH401 18267397 ENLARGED SOUTH MECHANI CAL ROOM
386 MH402 18267398 ENLARGED NORTH MECHANI CAL ROOM
387 MP101 18267399 MECHANI CAL PI PI NG COMPOSI TE PLAN
388 MP101- 1A 18267400 SECTOR 1A FLOOR PLAN - PI PI NG
389 MP101- 1B 18267401 SECTOR 1B FLOOR PLAN - PI PI NG
390 MP101- 1C 18267402 SECTOR 1C FLOOR PLAN - PI PI NG
391 MP101- 1D 18267403 SECTOR 1D FLOOR PLAN - PI PI NG
392 MP101- 2A 18267404 SECTOR 2A FLOOR PLAN - PI PI NG
393 MP101- 2B 18267405 SECTOR 2B FLOOR PLAN - PI PI NG
394 MP101- 3A 18267406 SECTOR 3A FLOOR PLAN - PI PI NG
395 MP101- 3B 18267407 SECTOR 3B FLOOR PLAN - PI PI NG
396 MP101- 4A 18267408 SECTOR 4A FLOOR PLAN - PI PI NG
397 MP101- 4B 18267409 SECTOR 4B FLOOR PLAN - PI PI NG
398 MP101- 5A 18267410 SECTOR 5A FLOOR PLAN - PI PI NG
399 MP101- 5B 18267411 SECTOR 5B FLOOR PLAN - PI PI NG
400 MP101- 5C 18267412 SECTOR 5C FLOOR PLAN - PI PI NG
401 MP101- 5D 18267413 SECTOR 5D FLOOR PLAN - PI PI NG
402 M- 301 18267414 SECTI ONS
403 M- 302 18267415 SECTI ONS
404 M- 501 18267416 DETAI LS
405 M- 502 18267417 DETAI LS
406 M- 503 18267418 DETAI LS
407 M- 601 18267419 FLOW DI AGRAMS
408 M- 801 18267420 SCHEDULES
409 M- 802 18267421 SCHEDULES
410 M- 901 18267422 CONTROLS
411 M- 902 18267423 CONTROLS
412 M- 903 18267424 CONTROLS
413 M- 904 18267425 CONTROLS
414 M- 905 18267426 CONTROLS
DOCUMENT 00 01 15 Page 8
415 M- 906 18267427 CONTROLS
Electrical
416 E- 001 18267428 ELECTRI CAL LEGENDS
417 E- 002 18267429 ELECTRI CAL LEGENDS
418 E- 003 18267430 ELECTRI CAL NOTES
419 ES100 18267431 ELECTRI CAL SI TE PLAN - COMPOSI TE - DEMOLI TI ON
420 ES101 18267432 ELECTRI CAL SI TE PLAN - PHASE 1 DEMOLI TI ON
421 ES102 18267433 ELECTRI CAL SI TE PLAN - PHASE 2 DEMOLI TI ON
422 ES200 18267434 ELECTRI CAL SI TE PLAN - COMPOSI TE - NEW WORK
423 ES201 18267435 ELECTRI CAL SI TE PLAN - PHASE 1 LI GHTI NG
424 ES202 18267436 ELECTRI CAL SI TE PLAN - PHASE 2 LI GHTI NG
425 ES203 18267437 ELECTRI CAL SI TE PLAN - PHASE 1 POWER & TELECOM
426 ES204 18267438 ELECTRI CAL SI TE PLAN - PHASE 2 POWER & TELECOM
427 ES205 18267439 ELECTRI CAL OPTI ON I TEM 1 - CANOPY DRAWI NG
428 ES301 18267440 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 1/ PART 1)
429 ES302 18267441 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 1/ PART 2)
430 ES303 18267442 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 2/ PART 1)
431 ES304 18267443 SI NGLE LI NE DI AGRAM - PRI MARY POWER ( PHASE 2/ PART 2)
432 ES305 18267444 EXI STI NG SI TE CONDI TI ONS - PHOTOS
433 ES401 18267445 ELECTRI CAL SI TE DETAI LS
434 ES402 18267446 ELECTRI CAL SI TE DETAI LS
435 ES403 18267447 ELECTRI CAL SI TE DETAI LS
436 ES404 18267448 ELECTRI CAL SI TE DETAI LS
437 ES405 18267449 PRI MARY RI SER POLE & DETAI LS
438 EL101 18267450 LI GHTI NG FLOOR PLAN - COMPOSI TE - LOW VOLTAGE ZONE
CONTROL SWI TCHI NG
439 EL101- 1A 18267451 LI GHTI NG PLAN - SECTOR 1A
440 EL101- 1B 18267452 LI GHTI NG PLAN - SECTOR 1B
441 EL101- 1C 18267453 LI GHTI NG PLAN - SECTOR 1C
442 EL101- 1D 18267454 LI GHTI NG PLAN - SECTOR 1D
443 EL101- 2A 18267455 LI GHTI NG PLAN - SECTOR 2A
444 EL101- 2B 18267456 LI GHTI NG PLAN - SECTOR 2B
445 EL101- 3A 18267457 LI GHTI NG PLAN - SECTOR 3A
446 EL101- 3B 18267458 LI GHTI NG PLAN - SECTOR 3B
447 EL101- 4A 18267459 LI GHTI NG PLAN - SECTOR 4A
448 EL101- 4B 18267460 LI GHTI NG PLAN - SECTOR 4B
449 EL101- 5A 18267461 LI GHTI NG PLAN - SECTOR 5A
450 EL101- 5B 18267462 LI GHTI NG PLAN - SECTOR 5B
451 EL101- 5C 18267463 LI GHTI NG PLAN - SECTOR 5C
452 EL101- 5D 18267464 LI GHTI NG PLAN - SECTOR 5D
453 EL201 18267465 LI GHT FI XTURE SCHEDULE
454 EL202 18267466 LI GHT FI XTURE DETAI LS
455 EL203 18267467 LI GHT FI XTURE DETAI LS
456 EL204 18267468 LI GHTI NG PLAN ( OPTI ON I TEM 3)
457 EL301 18267469 LI GHTI NG CONTROLS SI NGLE LI NE DI AGRAM
458 EL302 18267470 LI GHTI NG CONTROL PANEL SCHEDULES
459 EL303 18267471 LI GHTI NG CONTROL PANEL SCHEDULES
460 EL304 18267472 LI GHTI NG CONTROL WI RI NG DI AGRAMS
461 EL305 18267473 LI GHTI NG CONTROL WI RI NG DI AGRAMS
462 EL306 18267474 LI GHTI NG CONTROL WI RI NG DI AGRAMS
463 EL307 18267475 LI GHTI NG CONTROL WI RI NG DI AGRAMS
464 EL308 18267476 LI GHTI NG CONTROL WI RI NG DI AGRAMS
465 EL309 18267477 LI GHTI NG CONTROL WI RI NG DI AGRAMS
466 EL310 18267478 LI GHTI NG CONTROL WI RI NG DI AGRAMS
467 EL311 18267479 LI GHTI NG CONTROL WI RI NG DI AGRAMS
468 EP101 18267480 POWER FLOOR PLAN - COMPOSI TE
469 EP101- 1A 18267481 POWER PLAN - SECTOR 1A
DOCUMENT 00 01 15 Page 9
470 EP101- 1B 18267482 POWER PLAN - SECTOR 1B
471 EP101- 1C 18267483 POWER PLAN - SECTOR 1C
472 EP101- 1D 18267484 POWER PLAN - SECTOR 1D
473 EP101- 2A 18267485 POWER PLAN - SECTOR 2A
474 EP101- 2B 18267486 POWER PLAN - SECTOR 2B
475 EP101- 3A 18267487 POWER PLAN - SECTOR 3A
476 EP101- 3B 18267488 POWER PLAN - SECTOR 3B
477 EP101- 4A 18267489 POWER PLAN - SECTOR 4A
478 EP101- 4B 18267490 POWER PLAN - SECTOR 4B
479 EP101- 5A 18267491 POWER PLAN - SECTOR 5A
480 EP101- 5B 18267492 POWER PLAN - SECTOR 5B
481 EP101- 5C 18267493 POWER PLAN - SECTOR 5C
482 EP101- 5D 18267494 POWER PLAN - SECTOR 5D
483 EP104 18267495 POWER ROOF PLAN - COMPOSI TE
484 EP104- 1 18267496 ROOF POWER PLAN - AREA 1
485 EP104- 2 18267497 ROOF POWER PLAN - AREA 2
486 EP104- 3 18267498 ROOF POWER PLAN - AREA 3
487 EP104- 4 18267499 ROOF POWER PLAN - AREA 4
488 EP104- 5 18267500 ROOF POWER PLAN - AREA 5
489 EP104- 6 18267501 BI PV SYSTEM - COMPOSI TE ROOF PLAN - OPTI ON I TEM 2
490 EP104- 7 18267502 BI PV SYSTEM DETAI LS - OPTI ON I TEM 2
491 EP201 18267503 RADI OLOGY ROOM DETAI LS
492 EP202 18267504 ELECTRI CAL DETAI LS
493 EP203 18267505 ELECTRI CAL DETAI LS
494 EP301 18267506 SI NGLE LI NE DI AGRAM - SECONDARY POWER
495 EP302 18267507 SI NGLE LI NE DI AGRAM - SECONDARY POWER
496 EP303 18267508 FEEDER SCHEDULE
497 EP401 18267509 PANELBOARD SCHEDULES
498 EP402 18267510 PANELBOARD SCHEDULES
499 EP403 18267511 PANELBOARD SCHEDULES
500 EP404 18267512 PANELBOARD SCHEDULES
501 EP405 18267513 PANELBOARD SCHEDULES
502 EP406 18267514 PANELBOARD SCHEDULES
503 EP407 18267515 PANELBOARD SCHEDULES
504 EP408 18267516 PANELBOARD SCHEDULES
505 EP409 18267517 PANELBOARD SCHEDULES
506 EP410 18267518 PANELBOARD SCHEDULES
507 EP501 18267519 GROUNDI NG WI RI NG DI AGRAM
508 EP701 18267520 LI GHTNI NG PROTECTI ON PLAN
509 EP702 18267521 LI GHTNI NG PROTECTI ON DETAI LS
Communications
510 EY001 18267522 TELECOMMUNI CATI ONS LEGEND
511 EY002 18267523 TELECOMMUNI CATI ONS NOTES
512 EY101 18267524 TELECOMMUNI CATI ONS COMPOSI TE PLAN
513 EY101- 1A 18267525 TELECOMMUNI CATI ONS PLAN - SECTOR 1A
514 EY101- 1B 18267526 TELECOMMUNI CATI ONS PLAN - SECTOR 1B
515 EY101- 1C 18267527 TELECOMMUNI CATI ONS PLAN - SECTOR 1C
516 EY101- 1D 18267528 TELECOMMUNI CATI ONS PLAN - SECTOR 1D
517 EY101- 2A 18267529 TELECOMMUNI CATI ONS PLAN - SECTOR 2A
518 EY101- 2B 18267530 TELECOMMUNI CATI ONS PLAN - SECTOR 2B
519 EY101- 3A 18267531 TELECOMMUNI CATI ONS PLAN - SECTOR 3A
520 EY101- 3B 18267532 TELECOMMUNI CATI ONS PLAN - SECTOR 3B
521 EY101- 4A 18267533 TELECOMMUNI CATI ONS PLAN - SECTOR 4A
522 EY101- 4B 18267534 TELECOMMUNI CATI ONS PLAN - SECTOR 4B
523 EY101- 5A 18267535 TELECOMMUNI CATI ONS PLAN - SECTOR 5A
524 EY101- 5B 18267536 TELECOMMUNI CATI ONS PLAN - SECTOR 5B
525 EY101- 5C 18267537 TELECOMMUNI CATI ONS PLAN - SECTOR 5C
DOCUMENT 00 01 15 Page 10
526 EY101- 5D 18267538 TELECOMMUNI CATI ONS PLAN - SECTOR 5D
527 EY601 18267539 TELECOMMUNI CATI ONS SI NGLE LI NES
528 EY602 18267540 TELECOMMUNI CATI ONS SI NGLE LI NES
529 EY603 18267541 TELECOMMUNI CATI ONS SI NGLE LI NES
530 EY604 18267542 TELECOMMUNI CATI ONS SI NGLE LI NES
- - End of Document - -
DOCUMENT 00 01 15 Page 11
DOCUMENT 00 22 13. 00 20
SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
02/14
PART 1 GENERAL
1. 1 CONTRACT LI NE I TEMS
The t er ms Of f er or and Bi dder and ver si ons t her eof ( of f er / bi d) have t he same def i ni t i on as used wi t hi n t hi s cont r act .
Pr ovi de t he Cont r act Li ne I t em ( CLI N) l ump sum pr i ce f or t he f ol l owi ng items:
CLI N 0001 - BASE PRI CE. Pr i ce i ncl udes t he f ol l owi ng:
CLI N 0001AA. Pr i ce f or t he ent i r e wor k f or Faci l i t y i n accor dance wi t h t he dr awi ngs and speci f i cat i ons, but excl udi ng wor k descr i bed i n Cont r act Li ne I t em ( CLI N) 0002, 0003, 0004 and 0005.
CLI N 0002 Opt i on I t em No. 1 - Pr i ce i ncl udes t he f ol l owi ng:
Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng an ent r y canopy syst em, 3 benches and hor i zont al sunscr eens, compl et e i n accor dance wi t h dr awi ngs and speci f i cat i ons.
CLI N 0003 Opt i on I t em No. 2 - Pr i ce i ncl udes t he f ol l owi ng:
Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng 54. 6 kW DC phot o- vol t ai c syst em capabl e of pr oduci ng a mi ni mum annual ener gy gener at i on of 84, 068 kWh/ year , compl et e i n accor dance wi t h dr awi ngs and specifications.
CLI N 0004 Opt i on I t em No. 3 - Pr i ce i ncl udes t he f ol l owi ng:
Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng skyl i ght s and l i ght wel l s, compl et e i n accor dance wi t h dr awi ngs and speci f i cat i ons.
CLI N 0005 Opt i on I t em No. 4 - Pr i ce i ncl udes t he f ol l owi ng:
Pr i ce f or addi ng wor k i n connect i on wi t h pr ovi di ng out door heal i ng gar den consi st i ng of 9 benches, s i dewal ks, exer ci se pat i o, and ext er i or st ai r s at par ki ng l ot , compl et e i n accor dance wi t h dr awi ngs and specifications.
1. 2 GENERAL BI D NOTES
a. Awar d wi l l be made on t he t ot al sum of CLI N 0001AA.
b. The Gover nment r eser ves t he uni l at er al r i ght t o awar d CLI N 0002, CLI N 0003, CLI N 0004 and CLI N 0005 t o t he Cont r act or at t he pr oposed pr i ce wi t hi n 30 cal endar days af t er t he cont r act awar d. A f i r m f i xed pr oposed pr i ce i s r equi r ed f or CLI N 0001, CLI N 0002, CLI N 0003, CLI N 0004 and CLI N 0005. No pr ovi s i on i s made f or economi c pr i ce adj ust ment . I f Opt i ons ar e exer ci sed, t he cont r act compl et i on dat e r emai ns t he same.
DOCUMENT 00 22 13. 00 20 Page 1
c. Eval uat i on of Opt i ons ( JUL 1990) : Except when i t i s det er mi ned i n accor dance wi t h FAR 17. 206 ( b) not t o be i n t he Gover nment ' s best i nt er est , t he Gover nment wi l l eval uat e of f er s f or awar d pur poses by addi ng t he pr i ce f or t he Opt i on( s) t o t he t ot al pr i ce f or CLI N 0001. I n accor dance wi t h FAR 52. 217- 5, eval uat i on of opt i ons wi l l not obl i gat e t he Gover nment t o exer ci se t he Opt i on( s) .
d. The Gover nment may r ej ect an of f er as nonr esponsi ve i f i t i s mat er i al l y unbal anced as t o pr i ces f or t he basi c r equi r ement and t he opt i on quant i t i es. An of f er i s unbal anced when i t i s based on pr i ces s i gni f i cant l y l ess t han cost f or some wor k and pr i ces whi ch ar e s i gni f i cant l y over st at ed f or ot her wor k.
e. I f CLI N 0002, 0003, 0004 and 0005 ar e exer ci sed, addi t i onal bondi ng and consent of sur et y i s r equi r ed. Consequent l y, t he Per f or mance Bond must r ef l ect 100 per cent of t he aggr egat e amount of al l I t ems.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Document - -
DOCUMENT 00 22 13. 00 20 Page 2
SECTI ON 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
I NTERNATI ONAL CODE COUNCI L ( I CC)
I CC I BC ( 2015) I nt er nat i onal Bui l di ng Code
U. S. DEPARTMENT OF DEFENSE ( DOD)
UFC 1- 200- 01 ( 2013) Gener al Bui l di ng Requi r ement s
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Sal vage Pl an; G
1. 3 WORK COVERED BY CONTRACT DOCUMENTS
1. 3. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes const r uct i on of const r uct i ng r epl acement medi cal c l i ni c i n Ar ea 13, Mar i ne Cor ps Base ( MCB) Camp Pendl et on, Cal i f or ni a and i nci dent al r el at ed wor k.
1. 3. 2 Location
The wor k i s l ocat ed at appr oxi mat el y 38 mi l es f r om downt own San Di ego i n Nor t h Count y and 82 mi l es sout h of Los Angel es appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 3. 3 Phasing
Pr ovi de wor k i n phases i ndi cat ed on t he dr awi ngs. Al so, see at t ached document ent i t l ed " Phasi ng Node Di agr am Nar r at i ve" f or addi t i onal requirements.
1. 4 I NSPECTI ON AND ACCEPTANCE OF NEW CONNECTI ONS TO EXI STI NG MARI NE
CORPS- OWNED UTI LI TI ES AND NEW UTI LI TY EQUI PMENT
Pr i or t o any const r uct i on of a ut i l i t y connect i on, a Ut i l i t y Ser vi ce Connect i on appl i cat i on; i ncl udi ng a const r uct i on pl an f or t he ut i l i t y ser vi ce connect i on shal l be submi t t ed t o and appr oved by PW Ut i l i t i es Pl an
SECTI ON 01 11 00 Page 1
Revi ewer . Each appl i cat i on shal l i ncl ude t he r el evant const r uct i on pl ans and speci f i cat i ons, f ol l owi ng t he st andar ds of t he appl i cabl e ut i l i t y pr ovi der and r egul at or y agency t hat gover ns t he ut i l i t y wher e t he pr oj ect i s l ocat ed.
a. For al l new/ r epai r ed ut i l i t y connect i ons, FEAD or ot her ut i l i t i es connect i on i nst al l er shal l schedul e a pr e- out age coor di nat i on meet i ng.
Dur i ng t hi s meet i ng t he FEAD wi l l coor di nat e a pr e- connect i on i nspect i on t o be conduct ed af t er t r enchi ng and l ayout i s compl et ed, but bef or e t he pr oposed ser vi ce has been connect ed, and a post - connect i on i nspect i on conduct ed af t er t he connect i on has been made and bef or e t he connect i on i s bur i ed. The pr e- and post - connect i on i nspect i ons wi l l t ypi cal l y be on t he same or consecut i ve days and shal l be schedul ed wi t h t he PW Ut i l i t i es I nspect or 20 wor ki ng days pr i or t o t he pr oposed dat e of t he wor k. The PW Ut i l i t i es I nspect or shal l be pr esent dur i ng t he i nspect i ons. The PW Ut i l i t i es I nspect or wi l l ver i f y t hat al l new connect i ons t o ut i l i t y syst ems ar e made pr oper l y based on appl i cabl e standards.
b. Speci al Sani t ar y Sewer Syst em Requi r ement s. As par t of t he post - connect i on i nspect i on f or al l new or modi f i ed sani t ar y sewer l at er al and mai n connect i ons, t he cont r act or , wi t h t he PW Ut i l i t i es I nspect or obser v i ng, shal l conf i r m t hat each new connect i on i s connect ed t o an exi st i ng sani t ar y sewer mai n. Ver i f y t he sewer connect i on t o t he sewer syst em by per f or mi ng a dye check f r om t he pr oj ect t o t he f i r st manhol e on t he next act i ve sewer br anch mai n downst r eam f r om t he sewer br anch mai n used as t he pr oj ect poi nt of connect i on. Test i ng shal l cont i nue t i l l t he dye v i sual l y conf i r ms t he desi gn connect i on i s appr opr i at e. Dye shal l be a nont oxi c non- st ai ni ng sewer t r aci ng dye. Dur i ng t he t est t he cont r act or shal l moni t or t he st or m dr ai nage syst em downst r eam f r om t he pr oj ect , ei t her manhol es or out f al l s , f or any s i gn of cr oss connect i on.
c. I f def i c i enci es ar e f ound i n t he pr e- connect i on i nspect i on, t he PW Ut i l i t i es i nspect or wi l l pr ovi de a l i s t of def i c i enci es t o t he FEAD r epr esent at i ve. The FEAD r epr esent at i ve wi l l det er mi ne i f t he r equi r ement s ar e wi t hi n t he cont r act . I t ems consi der ed t o be wi t hi n t he cont r act r equi r ement wi l l be gi ven t o t he cont r act or f or cor r ect i on and document ed i n t he cont r act f i l es. Resol ut i on of i t ems consi der ed out s i de of t he cont r act by t he FEAD but deemed r equi r ed by PW Ut i l i t i es shal l be r esol ved pr i or t o cut t i ng i n t he connect i on. ( Thi s s i t uat i on shoul d be avoi ded by havi ng pr i or appr oved PW Ut i l i t i es connect i on appl i cat i ons/ const r uct i on pl ans. )
d. The PW Ut i l i t i es I nspect or shal l be not i f i ed when al l def i c i enci es have been compl et ed t o r eschedul e t he pr e- connect i on i nspect i on. The r epeat ed i nspect i on wi l l onl y cover i t ems not ed i n t he pr evi ous inspection.
e. Af t er post connect i on i nspect i on i s compl et ed, t he PW Ut i l i t i es I nspect or wi l l aut hor i ze t he syst em or equi pment t o be ener gi zed and/ or pl aced i nt o ser v i ce.
f . The Cont r act or shal l pr ovi de as- bui l t ut i l i t y dr awi ngs, pr ef er abl y i n st andar d el ect r oni c f or mat t o FEAD showi ng t he l ocat i on of al l ut i l i t y l i nes, mai ns, l at er al s, and ot her appur t enances r ef er ence t o a known l ocat i on or i n GPS Coor di nat es. The t ype, c l ass, s i ze of al l pi pi ng and val ves shal l be i ndi cat ed on t he as- bui l t s . For new sewer s, as- bui l t i nver t el evat i ons shal l be pr ovi ded st ar t i ng f r om t he bui l di ng
SECTI ON 01 11 00 Page 2 goi ng t o t he f i r st pr e- exi st i ng downst r eam manhol e. The FEAD shal l pr ovi de t hese t o PW Ut i l i t i es as soon as possi bl e. The FEAD shal l f ol l ow t he r equi r ement s of BMS 1. 6. 11 NAVFAC RED ZONE t o pr ovi de t o PW Ut i l i t i es ut i l i t y r ecor d dr awi ngs.
g. Any change( s) t o st or m wat er syst ems shal l be coor di nat ed wi t h i nst al l at i on envi r onment al st af f , i ncl udi ng pr ovi di ng as- bui l t dr awi ngs t o updat e st or m wat er syst em net wor ks f or compl i ance wi t h Nat i onal Pol l ut ant Di schar ge El i mi nat i on Syst em ( NPDES) per mi t s.
h. These gui del i nes ar e not a subst i t ut e f or pr of essi onal j udgment as t o when addi t i onal saf e guar ds ar e needed t o pr event i mpr oper connect i ons t o exi st i ng ut i l i t y syst ems.
1. 5 LOCATI ON OF UNDERGROUND FACI LI TI ES/ UTI LI TI ES
Locat i on of Under gr ound Faci l i t i es/ Ut i l i t i es Scan t he const r uct i on s i t e wi t h el ect r omagnet i c or soni c equi pment , and mar k t he sur f ace of t he gr ound wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound obst r uct i on not i ndi cat ed or speci f i ed t o be r emoved but i ndi cat ed or di scover ed dur i ng scanni ng i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
Coor di nat i on af t er cont r act awar d and pr i or t o commencement of any c l ear i ng and gr ubbi ng, t r enchi ng, bor i ng, ear t hwor k, pi l e dr i v i ng, or ot her oper at i on t hat may damage under gr ound ut i l i t i es, t he Cont r act or shal l pr ovi de hi s own ut i l i t y l ocat or ser vi ces. The Cont r act or shal l r evi ew al l avai l abl e As- bui l t Base Faci l i t y Dr awi ng( s) f or t he ar ea under const r uct i on. These dr awi ngs ar e l ocat ed at t he Faci l i t i es Mai nt enance Of f i ce ( Bui l di ng 2296) ; t el ephone number ( 760) 725- 3638. Request t o r evi ew t hese dr awi ngs must be submi t t ed t o FMD, wi t h a copy f ur ni shed t o t he Cont r act i ng Of f i cer , at l east f i f t een wor ki ng days i n advance of t he dat e when t he Cont r act or desi r es t o r evi ew t hese dr awi ngs. The Cont r act or shal l coor di nat e t he ut i l i t y l ocat i ng ser vi ce wi t h ot her appl i cabl e act i v i t i es and agenci es i nc l udi ng but not l i mi t ed t o Camp Pendl et on Base Communi cat i ons ( Bui l di ng 2459) , t el ephone number ( 760) 725- 3101, FMD t el ephone ( 760) 763- 2030 and DI G ALERT at t el ephone number 1 ( 800) 422- 4133.
Pr ovi de a Ut i l i t y Locat i on Coor di nat i on Repor t . When ut i l i t y l ocat i on i s f ur ni shed; t he Cont r act or shal l submi t a r epor t out l i ni ng t he act i v i t i es and agenci es cont act ed. The DI G ALERT i nqui r y i dent i f i cat i on shal l be pr ovi ded i n t he r epor t . No act i v i t y t hat coul d damage t he under gr ound ut i l i t i es may begi n unt i l t he Cont r act i ng Of f i cer appr oves t he coor di nat i on report.
1. 5. 1 Locat i on of Tel ephone Li nes
The Cont r act or i s r esponsi bl e f or l ocat i ng al l t el ephone l i nes pr i or t o per f or mi ng any excavat i ons. The Cont r act or wi l l pay f or r epai r s t o any t el ephone cabl es damaged dur i ng const r uct i on.
1. 5. 2 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng t o excavat i on wor k.
SECTI ON 01 11 00 Page 3
1. 6 EMERGENCY UTI LI TY REPAI R PLAN
The cont r act or s shal l be r equi r ed t o submi t an Emer gency Ut i l i t y Repai r Pl an pr i or t o bei ng al l owed t o per f or m any excavat i on. Emer gency shal l be def i ned as t he i nt er r upt i on of any and/ or damage of any ut i l i t y ser vi ce.
I ncl udi ng but not l i mi t ed t o t he spi l l , or pot ent i al spi l l of any f uel oi l , gas, pot abl e wat er , sewage ef f l uent , r aw sewage, or st or m wat er out s i de of syst em f aci l i t i es. The Emer gency Ut i l i t y Repai r Pl an shal l i ncl ude t he f ol l owi ng el ement s:
a. Equi pment l i s t of avai l abl e pumps wi t h s i zes, excavat i on equi pment , t ool s, and r epai r mat er i al s t hat ar e avai l abl e onsi t e.
b. Labor f or ce t hat wi l l be avai l abl e as a mi ni mum t o r espond t o emergencies.
c. Si t e- speci f i c pl an f or l ocat i ng, pot hol i ng, pr ot ect i ng, avoi di ng, and r epai r i ng any damage caused t o exi st i ng, or newl y i nst al l ed utilities.
d. I ncl ude t he same l evel of det ai l f or any subcont r act or s t hat wi l l be per f or mi ng wor k i nvol v i ng excavat i on.
e. I ncl ude a descr i pt i on of any pl anned ef f or t t hat woul d i nvol ve br i ngi ng i n a subcont r act or per sonnel t o r espond t o emer genci es.
f . The Pl an shal l be subj ect t o appr oval by t he Cont r act i ng Of f i cer .
The Cont r act or shal l demonst r at e i n hi s Emer gency Ut i l i t y Repai r Pl an t hat t hey ar e capabl e of r espondi ng t o ut i l i t y i nt er r upt i ons t hat coul d be caused by t hei r const r uct i on oper at i ons or i mpact s f r om t hem. I mmedi at el y upon di scover y of t he s i t uat i on, t he Cont r act or shal l r eact i n a way t hat wi l l mi ni mi ze ut i l i t y i nt er r upt i ons, r el eases, spi l l s , i mpact s t o ut i l i t y cust omer s, and pot ent i al f or f i nes or not i ces of v i ol at i ons. I n no case wi l l r epai r s be l ef t t o be r esol ved t he next day wi t hout t he appr oval of t he Cont r act i ng Of f i cer .
The Cont r act or ' s Emer gency Ut i l i t y Repai r Pl an shal l addr ess t he…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .