These are engineering plan drawings for the Repair/Rebuild of Route 219 at White Sands Missile Range, New Mexico, prepared by the Directorate of Public Works Engineering Division. The drawings detail a 0.60-mile roadway reconstruction project involving removing existing 18-foot wide asphalt pavement, scarifying and compacting subgrade, installing new base course, and applying a new 24-foot wide Type "SP-IV" asphalt surface with a minimum 3-inch thickness. The project includes installing new roadway markings, traffic signs, and maintaining 24-hour vehicular access throughout construction.
The technical specifications require the contractor to saw-cut existing pavement with straight edges, remove and dispose of existing asphalt surface, compact subgrade to 96%, apply a Type II aggregate base course, apply tack coat, and install new asphalt surface with a performance grade PG 64-22. The project involves coordinating with utility companies (NM Gas, communication lines) and includes specific requirements for pavement marking, sign installation, and traffic control, with all work to be performed in compliance with NMSHTD (New Mexico State Highway and Transportation Department) standards and the Manual on Uniform Traffic Control Devices.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WS-85110-2025-C-G-01
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
Repair/Rebuild Route 219
COVER
REP
REP
Gilbert Bustillos
Robert Lopez III
NONE
REPAIR/REBUILD ROUTE 219
ISSUED FOR
CONSTRUCTION
February 2025
W H
I T E
S ANDS MI SSI L E
R
AN
G E
B I RTHPL ACE
OF
AMERI CA' S MI SSI LE & SPAC
E
AC
TI
V I T
Y
AutoCAD SHX Text
WHITE SANDS MISSILE RANGE, NEW MEXICO
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
ENGINEERING DIVISION
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
GENERAL NOTES
REP
REP
NONE
ISSUED FOR
CONSTRUCTION
Repair/RR 219
WS-85110-2025-C-G-02
Gilbert Bustillos
Robert Lopez III
February 2025
AutoCAD SHX Text
1. Contractor shall coordinate all work with existing conditions and Contractor shall coordinate all work with existing conditions and construction drawings. Contractor shall provide all equipment, material and labor as required for complete functional system. 2. All materials and equipment shall be installed in accordance with All materials and equipment shall be installed in accordance with manufacture's published recommendations, contract documents, industry standards and all federal, state, and local codes and amendments as adopted by the government for service intended by the Contracting Officer (KO). The install of all materials and equipment shall be made by experience and licensed craftsman in a neat workman like manner. All materials, supervision, labor, tool, costs and services necessary to completely install a functional system shall be furnished by the contractor. 3. The term "provide" used in the drawings and scope of work implies The term "provide" used in the drawings and scope of work implies the contractor is to furnish, transport, install, connect, warrant, and start-up, inclusively. 4. The drawings are diagrammatic only but shall be followed as The drawings are diagrammatic only but shall be followed as closely as actual construction conditions and work of other trades permit. 5. Upon completion of work, contractor shall provide within 10 days, Upon completion of work, contractor shall provide within 10 days, manufacture's operating & maintenance manual for all equipment including replacement parts list. 6. Contractor shall report discrepancies between field conditions and Contractor shall report discrepancies between field conditions and new construction drawings to the KO in writing before the RFI deadline during the solicitation phase, prior to providing their bid. 7. Contractor shall coordinate all utility locates with DPW, NM811 and Contractor shall coordinate all utility locates with DPW, NM811 and NM Gas Company. Contractor shall pothole all existing utilities prior to any work being performed per SOW 5.5. Any damage done to utility Any damage done to utility lines shall be corrected at no cost to the government. Contractor shall Contractor shall field verify all quantities. 8. Contractor shall provide a topographic survey site plan with existing Contractor shall provide a topographic survey site plan with existing grading elevations and proposed new grading and drainage plan for approval. Contractor shall cut and fill as necessary to achieve grades specified in the grading and drainage plan. 9. The contractor shall reconstruct Range Road 219 roadway per Details on The contractor shall reconstruct Range Road 219 roadway per Details on Plan Sheet 4. Contractor shall not disturb the 4 existing tank trails located on RR219. Any damage done to the tank trails shall be corrected at no cost to the government. Contractor shall not disturb the existing culverts, any damage to the culvert shall be corrected at no cost to the government. 10. Contractor shall remove and dispose of existing asphalt off-site at Contractor shall remove and dispose of existing asphalt off-site at a permitted location approved to accept construction debris. 11. Contractor shall install a base course layer that conforms to New Contractor shall install a base course layer that conforms to New Mexico Department of Transportation Specification, Graded Crushed Aggregate Base Course. Contractor shall compact base course layer to a uniform minimum compacted thickness of 6 inches to 96% per ASTM D1557. 12. Contractor shall apply tack coat per section 407 (NMSHTD) of the Contractor shall apply tack coat per section 407 (NMSHTD) of the contract specifications. 13. Contractor shall apply a new asphalt mix with an aggregate grading Contractor shall apply a new asphalt mix with an aggregate grading designation of "SP-IV" asphalt surface course that complies with Section 423 (New Mexico Standard Specifications, 2019 Edition) of the contract specifications; performance grade shall be PG 64-22. Asphalt surface shall have a minimum uniform compacted thickness of 3 inches, approximately 8,500SY. 14. Contractor shall apply water for dust control per section 158 of Contractor shall apply water for dust control per section 158 of the Federal Highway Administration (FP-03). Water usage will be reported to the COR monthly. Contractor may utilize water standpipe located at the Main Cantonment (Lat. = 32.3690 Long. = -106.4791). Approximately 7.0 miles west of project. Alternate water source is a fire hydrant located at 32.3758, -106.4788, 6 miles from project. Contractor shall supply backflow prevention for fire hydrant and coordinate with the DPW water department. 15. COR will need to coordinate with Mr. Doug Miller to ensure that COR will need to coordinate with Mr. Doug Miller to ensure that construction crews are not present when explosive operations are occurring. 575-678-7449.
AutoCAD SHX Text
1. All pavement markings & striping shall be 4" wide, white All pavement markings & striping shall be 4" wide, white or yellow as indicated on the details and Plan Sheet 5 and shall conform to the standard highway colors. 2. All pavement markings shall be installed by using Type "H" All pavement markings shall be installed by using Type "H" Type "H" Extruded Thermoplastic pavement marking material with glass beads per Section 634.08 of the FP-03 & Plan Sheet 5 of drawings. Application shall be 12 pounds of . Application shall be 12 pounds of beads per 100 S.F. 3. All specifications for pavement markings shall be per the All specifications for pavement markings shall be per the Manual on Uniform Traffic Control Devices (MUTCD) standard manual, 2009 Edition. 4. Contractor shall prepare road surface prior to applying Contractor shall prepare road surface prior to applying roadway markings per mfg. instructions. instructions.
AutoCAD SHX Text
1. All sign materials and installation shall comply with the latest All sign materials and installation shall comply with the latest edition of the Manual on Uniform Traffic Control Devices, Section 701 of NMSHTD and Plan Sheet 5. 2. All sign panels shall conform to ASTM B 209. Sign panels shall All sign panels shall conform to ASTM B 209. Sign panels shall be constructed of 0.125" Aluminum. 3. All traffic signs shall have 2 - 1.75"x1.75" galvanized square All traffic signs shall have 2 - 1.75"x1.75" galvanized square post conforming to ASTM A 1011, grade 55. 4. All sign sheeting shall comply with ASTM D4956 Type IX Diamond All sign sheeting shall comply with ASTM D4956 Type IX Diamond Grade VIP Sheeting. 5. NCHRP 350 compliant breakaways sleeves shall be required on NCHRP 350 compliant breakaways sleeves shall be required on all sign installations with the exception of delineators. 6. All new traffic signs, specifications and placement distances shall All new traffic signs, specifications and placement distances shall be per sign details and sign distance tables of the "standard highway signs" standard manual, 2009 edition. 7. All new signs shall be installed at designated areas and new All new signs shall be installed at designated areas and new sign posts shall have a "slipbase system" & shall be installed at a safe clear distance from the existing curb or edge of pavement. 8. All traffic signs and posts shall be disposed offsite at a State All traffic signs and posts shall be disposed offsite at a State Licensed Landfill.
AutoCAD SHX Text General Notes:
AutoCAD SHX Text Pavement Marking Notes:
AutoCAD SHX Text Traffic Signs Notes:
AutoCAD SHX Text Traffic Control Plan Notes:
AutoCAD SHX Text
1. Contractor shall develop, and implement a Government approved Contractor shall develop, and implement a Government approved traffic control plan for all elements of work. Traffic control plan shall be developed, implemented and maintained in accordance with the NMSHTD, Sections 618, 702 and Chapter 6 of the Manual on Uniform Traffic Control Devices. All work shall be performed in a manner that provides 24 hour per day, 7 days a week, vehicular access. During working hours contractor shall use mobile operation utilizing certified flagger, per standard drawing 702-01-1/5, to control the flow of traffic through the work zone. Submit traffic control plan and certifications to COR for approval. 2. Contractor shall use 2-Way Radios to maintain communication Contractor shall use 2-Way Radios to maintain communication between flaggers. Contractor shall inform the COR forty eight hours in advance of obtaining and returning the radios. Contractor shall coordinate with WSMR Spectrum Management Services, POC is Shawn Hall 575-678-6547, three (3) Trunked Radios shall be issued to the contractor for the duration of the project. 3. NMDOT Drop Off Policy, per standard drawing 702-01-2/5, shall NMDOT Drop Off Policy, per standard drawing 702-01-2/5, shall be followed in areas of pavement operations within the travel way and adjacent to the existing travel lane, contractor shall assure that no pavement drop-offs are left exposed during non-working hours. Contractor shall initiate corrective measures per New Mexico Department of Transportation Drop-Off Guideline to archive a minimum 3:1 slope adjacent to the existing travel lane with two 11 foot lanes as shown in the detail Sheet 5.
AutoCAD SHX Text Material Testing Notes:
AutoCAD SHX Text
1. During construction, material testing services shall During construction, material testing services shall include but not be limited to compaction of sub-grade, sub-base, base course, asphalt and concrete compressive strength. Testing shall be obtained from an independent certified third party material testing laboratory.
AutoCAD SHX Text Gas line: 1. Contractor shall coordinate with NM Gas Company and Contractor shall coordinate with NM Gas Company and follow all processes and procedures for the two (2) High Pressure gas Lines. 2. Contractor shall extend the concrete (DPW gas line) Contractor shall extend the concrete (DPW gas line) protection to the width of the new roadway, three (3) feet on both sides. 3. Concrete shall be 4000PSI, no reinforcement required.Concrete shall be 4000PSI, no reinforcement required.
17. A borrow pit is available for use. Borrow pit is located North of A borrow pit is available for use. Borrow pit is located North of RR2 LAT: 32.3890, LONG: -106.4732 COR shall be notified at least 5 working days prior to removing any material. Quantities of material removed shall be reported to the COR on a weekly basis. When finished using borrow pit, contractor shall remove any grubbed vegetation and leave side slopes at a 4H:1V or flatter slope. Approximate distance from project site is 30.00 miles southwest of the project. 18. Construction limits extend the entire length of the project area Construction limits extend the entire length of the project area and 50 feet from the road center line on each side of roadway. Contractor shall not disturb or damage any areas outside the construction limits.
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
SITE LOCATION
REP
REP
NONE
BEGIN PROJECT
LAT. = 32.3641
LONG. = -106.4071
END PROJECT AT
GATE
LAT. = 32.3584
LONG. = -106.4151
RR219
PROPOSED
STAGING AREA
LAT. = 32.3590
LONG. = -106.4146
N
SITE PLAN
NO SCALE
ISSUED FOR
CONSTRUCTION
Repair/RR 219
R R
NM GAS
LAT. = 32.3622
LONG. = -106.4097
WSMR GAS
LAT. = 32.3616
LONG. = -106.4106
WSMR SEWER
LINE
LAT. = 32.3591
LONG. = -106.4141
WSMR WATER LINE
LAT. = 32.361548
LONG. = -106.410626
COMMO LINE
LAT. = 32.3639
LONG. = -106.4074
COMMO LINE
LAT. = 32.3621
LONG. = -106.4100
EXISTING CULVERT
LAT. = 32.3622
LONG. = -106.4098
EXISTING CULVERT
LAT. = 32.3626
LONG. = -106.4093
COMMO LINE
LAT. = 32.3618
LONG. = -106.4103
EXISTING CMP
WATER CROSSING
LAT. = 32.3617
LONG. = -106.4104
COMMO AND GAS LINES AT
DRIVEWAYS NO SCALE
GENERAL NOTES:
1. Commo lines run the length of the roadway on both sides approximately 5-7' from the edge of roadway.
2. NM Gas lines run across RR219 at LAT:
32.3622, LONG: -106.4097 also crosses the driveway to the South at LAT: 32.3616, LONG: -106.4100.
3. Contractor shall coordinate all utility locates with DPW, NM811 and NM Gas Company.
Contractor shall pothole all existing utilities prior to any work being performed per SOW
5.5. Any damage done to utility lines shall be
corrected at no cost to the government.
NM GAS
LAT. = 32.3616
LONG. = -106.4100
COMMO LINE
LAT. = 32.3618
LONG. = -106.4101
COMMO LINE
LAT. = 32.3620
LONG. = -106.4101
COMMO LINE
LAT. = 32.3619
LONG. = -106.4103
COMMO LINE
LAT. = 32.3618
LONG. = -106.4103
WS-85110-2025-C-S-03
Gilbert Bustillos
Robert Lopez III
February 2025
Paving limit is 50' from edge of pavement on 219.
RR 219
(WATERLINE RUNS THE ENTIRE LENGTH OF THE ROADWAY APPROXIMATELY 8' FROM EOP)
AutoCAD SHX Text 20'
AutoCAD SHX Text 13'
AutoCAD SHX Text 19'
AutoCAD SHX Text 19'
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text 10'
AutoCAD SHX Text 5'-7'
AutoCAD SHX Text 15'
AutoCAD SHX Text 65'
AutoCAD SHX Text 30'
5'-7'
0.60 Miles
Project Area
(RR219)
NEW TYPE "SP-IV" ASPHALT SURFACE
COMPACTED TO A MINIMUM OF 3 INCH
THICKNESS TACK
COAT
NEW BASE COURSE COMPACTED
TO 96% PER ASTM D1557 TO A
FINAL THICKNESS OF 6 INCHES
SUBBASE - SCARIFTY TO 8
INCHES AND COMPACT TO 96%
PER ASTM D1557
NEW TYPE "SP-IV"
ASPHALT PAVEMENT
SURFACE
TACK
COAT
OVERLAP BASE MIN.
12" FROM EDGE OF
HMAC
NEW BASE COURSE
COMPACTED TO 96% PER
ASTM D1557 TO A FINAL
THICKNESS OF 6 INCHES
NATIVE FILL - 3H:1V MAX
SLOPE. COMPACT TO 96%
PER ASTM D1557
SUBBASE - SCARIFY
TO 8 INCHES AND
COMPACT TO 96%
PER ASTM D1557
Slope 14"/FT
TRAVEL WAY TRAVEL WAY
12' - 0" MIN 12' - 0" MIN
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
NEW WORK
REP
REP
NONE
FINAL ROAD WIDTH:
1. TW = Traveled Way Width = 12 feet.
2. Contractor shall apply new center line to all new paved areas per Section 634.08 of the Federal Highway Administrations (FP-03) and the MUTCD.
ROADWAY CONSTRUCTION NOTES:
1. Contractor shall saw cut existing asphalt pavement with a smooth and straight cut at both ends of the project site.
2. Contractor shall remove asphalt (0.60 miles in length at 18 feet wide) surface course and dispose of off-site at a location permitted to accept construction debris.
3. Contractor shall scarify subgrade 8" and compact to 96%.
4. Contractor shall apply new aggregate base course surface. Base course shall be a Type II and contractor shall comply with Section 303 of NMSHTD (2019 Edition). Gradation of aggregates shall comply with Table 303.2.2:2 of NMSHTD. Compact new base course on roadway and shoulders to a minimum of 6 inches to a maximum density of 96% per ASTM D1557.
5. Contractor shall apply a tack coat per Sections 407 of NMSHTD respectively.
6. Contractor shall apply a new Type "SP IV" asphalt surface course that complies with Section 423 of NMSHTD (2019 Edition) and performance grade shall be PG 64-22. Asphalt surface shall be 24', have a minimum thickness of 3 inches on roadway.
Contractor shall match existing elevation and slopes to provide a smooth transition. Contractor shall backfill edge of pavement.
7. All work shall be performed in a manner that provides 24 hour vehicular access through the entire length of project area and adjacent roads in a safe manner.
CROSS SECTION TYPICAL ASPHALT ROADWAY
NO SCALE
START OF
PROJECT: Saw cut across Route
END OF PROJECT: Saw cut across Route 219
ISSUED FOR
CONSTRUCTION
18'
Project Limits
NO SCALE
Repair/RR 219
Pave to Concrete/Gate
Driveways
NO SCALE
WS-85110-2025-C-NW-04
Gilbert Bustillos
Robert Lopez III
February 2025
AutoCAD SHX Text 50'
AutoCAD SHX Text 25'
AutoCAD SHX Text 50'
AutoCAD SHX Text 25'
AutoCAD SHX Text 50'
AutoCAD SHX Text 10'
AutoCAD SHX Text 13'
AutoCAD SHX Text 19'
AutoCAD SHX Text 19'
AutoCAD SHX Text D3
AutoCAD SHX Text D1
D2
2' min - 6' max 4'-0"
Varies
Color:
Reflectorized Black & Yellow Design.
TYPICAL DELINEATOR
NTS
Edge of Shoulder
3" Dia.
3'-0"
.802"
.182"
2.037"
Y
Y
XX .841"
2' MIN - 12' MAX
3'-0"
VARIES
OBJECT MARKER SIGN
NTS
EDGE OF SHOULDER
1'
2' MIN
3'-0"
VARIES
1'
CL
BOLT
CONFIGURATION
NTS
10'-0" 10'-0"30'-0"
4"
4"
4"
4"
Passing Line or Skip Line
Solid No - Passing Line or Shoulder Stripping
Double Yellow CenterlinePAVEMENT MARKING
TYPICAL SHOULDER/CENTER
STRIPE
DIMENSIONS
NTS
4"
2' MIN - 6' MAX
7'-0"
VARIES
Traffic Sign Notes:
1. All Sign panels shall be constructed of 0.125" Aluminum.
2. See sign schedule for sheeting type.
3. Breakaways required on all sign installations EXCEPT delineators.
TYPICAL TRAFFIC CONTROL SIGN
NTS
EDGE OF SHOULDER
VARIES
6'-0"
Advisory Speed Sign Type W13-1
SIGN POST NOTES:
The weight of each sign/delineator post before punching is 2.27 & 1.12 lbs/ft. The sign/delineator post is punched with 0.375" diameter holes on 1.0" centers full length. First hole and last hole 1.0" from end of post.
MIN. SIGN POST WEIGHTS:
Double Square Post Configuration * 2.27 lbs/ft.
Single Square Post * 2.27 lbs/ft.
U-Channel Delineator * 1.12 lbs/ft.
Object Markers Square Post * 2.27 lbs/ft.
HOLES 1" FOUR SIDES, 1.75" X
1.75" HOT GALVANIZED POST; 12
GAUGE W/NESTED POST
ANCHOR SYSTEM IN
ACCORDANCE WITH ASTM A 653
OR ASTM A 123
ANCHOR SLEEVE
(ONE SIZE LARGER
THAN POST)
BENDING DESIGN
BREAKAWAY
ANCHOR SLEEVE
(ONE SIZE LARGER
THAN POST)
HOLES 1" FOUR SIDES, 1.75" X 1.75" HOT
GALVANIZED POST; 12 GAUGE
W/NESTED POST ANCHOR SYSTEM IN
ACCORDANCE WITH ASTM A 653 OR
ASTM A 123
BENDING DESIGN
BREAKAWAY
2' MIN
11' LANE MIN.
11' LANE MIN.
3:1
6:1 3:1
DROP OFF POLICY
NTS
MILE MARKER
NTS
Edge of Shoulder
10"
MILE
X X
GREEN POWDER COATED
U-CHANNEL POSTS WITH
PREPUNCHED 3 8" MOUNT
HOLES AT 1" CENTERS
HOLE TO HOLE, 2 LBS/FT
2' min - 6' max 4'-0"
Varies
3'-0"
27"
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
ROADWAY SIGN/MARKING DETAIL
REP
REP
NONE
Traffic Sign Notes:
1. All sign materials and installation shall comply with the latest edition of the Manual on Uniform Traffic Control Devices and per Details this Sheet.
2. All sign panels shall conform to ASTM B 209.
Sign panels shall be constructed of 0.125" Aluminum.
3. All sign sheeting shall comply with ASTM D4956 Type IX Diamond Grade VIP Sheeting.
4. Sign Posts shall be 1.75"x1.75" galvanized square post conforming to ASTM A 1011, grade 55.
5. NCHRP 350 compliant breakaways shall be required on all sign installations with the EXCEPTION of delineators. Breakaways shall be 2.0"x2.0"x36" galvanized square post conforming to ASTM A 1011, grade 55.
6. Contractor shall remove all existing traffic signs and delineators within the project area and install new signs per schedule. All signage material(s) shall be disposed of off-site at an approved State Licensed Landfill.
Roadway Markings/Stripe Notes:
1. Contractor shall restripe shoulder and centerline roadway striping on WSMR, RR219 per Details this Sheet.
2. Contractor shall provide white shoulders and yellow center striping.
3. All markings shall be a 4" Type "H" Extruded Thermoplastic Traffic Marking and shall comply with Section 634.08 of the FP-03 and the Manual on Uniform Traffic Control Devices.
4. Prepare road surface and apply per mfg.
instructions.
ISSUED FOR
CONSTRUCTION
Repair/RR 219
WS-85110-2025-C-D-05
Gilbert Bustillos
Robert Lopez III
February 2025
| Sheets and Views |
| REPAIR ROUTE 219_SECTION 1 02.2025-Cover_1 |
| REPAIR ROUTE 219_SECTION 1 02.2025-General Notes_2 |
| REPAIR ROUTE 219_SECTION 1 02.2025-Site Location_3 (2) |
| REPAIR ROUTE 219_SECTION 1 02.2025-New Work_4 |
| REPAIR ROUTE 219_SECTION 1 02.2025-Traffic Marking_Sign_Detail_5 |
File details come from the government source that posted it. Updated .