This Addendum Number One, issued by HNA Engineering on May 6, 2026, modifies the original bidding documents for the Alcorn State University Tennis Lighting project in Lorman, Mississippi, dated April 10, 2026. The addendum revises the bid submission deadline from Tuesday, May 12, 2026, at 2:30 p.m. to Tuesday, May 19, 2026, at 2:30 p.m. Key project modifications include contractor responsibility for removing demolition materials off-site, prohibition of work on home football game days, elimination of construction fence requirements due to existing general construction fencing, and designation of the grass area east of the tennis courts as the lay-down area. The electrical specifications and drawings have been updated to clarify scope and technical requirements.
The addendum provides substantial revisions to electrical specifications and construction drawings. Sheet E001 (Schedules and Pole Details) and Sheet E002 (Schedules and Details) are replaced in their entirety with updated versions that clarify pole base details reflecting two site-discussed conditions, establish light pole details as Alternate #1, and coordinate conduit rough-ins with the electrical contractor project. Sheet E002 additionally clarifies demolition scope, specifies the panel breaker as 100% rated, and requires all exposed conduits, electrical frames, and H-Frame pipes to be painted with two coats of Sherwin-Williams Pro Industrial Multi-Surface Acrylic (B66-1500 Series). Bidders must acknowledge receipt of this addendum on the proposal form and submit acknowledgment to Major Design Studio via fax at 662.798.0839 or email at rashford@majordesignstudio.com to avoid disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADVERTISEMENT FOR BIDDING-TENNIS LIGHTING.docx | DOCX document | |
| download (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HNA – 26010 ASU Tennis Lighting 10 April 2026 Alcorn State University
Lorman, Mississippi
ADDENDUM NUMBER ONE
DATE: 06 May 2026
FROM: HNA ENGINEERING
5411 Haynes Road Arlington, TN 38002
901.290.6377 office
TO: PROSPECTIVE BIDDERS
SUBJECT: Tennis Lighting (ASU), Lorman, Mississippi
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents, dated 10 April 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the proposal form. Failure to do so may subject the Bidder to disqualification.
A. GENERAL
Item 1.01 Contractor demolition materials to be moved off site.
Item 1.02 No working on the day of home football games.
Item 1.03 Construction Fence will not be required since the general construction project has it already.
Item 1.04 Lay down area to be the grass area East of the tennis courts.
B. SPECIFICATIONS
Item 1.05 SECTION 00000 AVERTISEMENT FOR BIDS: Change bid date from Tuesday, May 12, 2026, at 2:30 p.m. to Tuesday, May 19, 2026 at 2:30 p.m.
C. DRAWINGS
Item 1.06 Sheet E001 Schedules and Pole Details: Replace sheet E001 in its entirety with this updated E001 sheet. - Clarified pole base details to show the two conditions discussed on site. Light pole details to be Alternate # 1. Coordinate the conduit rough-ins with the Electrical contractor project.
Item 1.07 Sheet E002 Schedules and Details:
1. Replace sheet E002 in its entirety with this updated E002 sheet. - Provided clarification on the scope of work of demolition.
2. Clarified that panel breaker is to be 100% rated.
3. Paint all exposed conduits, electrical frames, and pipes (H-Frame).-
Two Coats. S-W Pro Industrial Multi-Surface Acrylic, B66-1500 Series.
HNA – 26010 ASU Tennis Lighting 10 April 2026 Alcorn State University Lorman, Mississippi
END OF ADDENDUM NUMBER ONE
By: Joshua Holtgrewe
Upon receipt of this addendum your acknowledgement should be noted below and immediately faxed to Major Design Studio at 662.798.0839 or emailed to rashford@majordesignstudio.com
Signature Name of Company
NONE1 Schedules
5411 Hayes Rd.
Arlington, TN 38002
901.290.6377 www.hnaengineering.com
COPYRIGHT - HNA Engineering, pllc; 2019
This document is proprietary to HNA Engineering, pllc and shall not be reproduced or used by others without prior written consent.
DO NOT SCALE DRAWINGS.
Use given dimensions only. If not shown, verify correct dimensions with Engineer.
Contractor shall check and verify all dimensions and conditions at job site.
Revision Number
Project No.
Date
Scale
Description
Issued For
Sheet
Project
Sheet Name
Consultants
Permit Set
26010
April 10, 2026
AS INDICATED
Alcorn State Tennis Lighting
Addendum 1 - 5/06/26
E001
Schedules - Electrical
NONE2 Light Pole Base Detail
IPPISSISSIMFO
ETAT
S
RE
G
IST
ERED PROFESSIONAL
ENGINEER
19770
ERGTLOHD.
JO
SH
UA
W E
1/2" RIGID METAL OR
SCH 80 CONDUIT
FOR GROUND
WIRE PROTECTION
CONCRETE
3" RIGID OR SCHD 80
CONDUIT. COORDINATE WITH UTILITY.
METAL CONDUIT
MUST BE GROUNDED
NEW
PANEL
A
NEMA 3R
NEW METER
BY UTILITY
PROVIDE 1" SPARE CONDUIT
TO UTILITY POLE AS DIRECTED
BY UTILITY
(2) QUAD WP RECEPETACLE
TO PANEL, CIRCUITS A-18, A-20
GALVANIZED PIPES
2" MINIMUM
(4) LIGHTING CONTACTORS
ONE CONTACTOR PER LIGHTING ZONE
(TYP FOR 4)
NONE1 One Line Diagram
NONE2 Feeder Schedule
5411 Hayes Rd.
Arlington, TN 38002
901.290.6377 www.hnaengineering.com
COPYRIGHT - HNA Engineering, pllc; 2019
This document is proprietary to HNA Engineering, pllc and shall not be reproduced or used by others without prior written consent.
DO NOT SCALE DRAWINGS.
Use given dimensions only. If not shown, verify correct dimensions with Engineer.
Contractor shall check and verify all dimensions and conditions at job site.
Revision Number
Project No.
Date
Scale
Description
Issued For
Sheet
Project
Sheet Name
Consultants
Permit Set
26010
April 10, 2026
AS INDICATED
Alcorn State Tennis Lighting
Addendum 1 - 5/06/26
E002
One Line Diagram - Electrical
NONE3 H-Frame Detail
IPPISSISSIMFO
ETAT
S
RE
G
IST
ERED PROFESSIONAL
ENGINEER
19770
ERGTLOHD.
JO
SH
UA
W E
| Addendum 1 |
| E Sheets (8) |
| Sheets and Views |
| E001-E001 |
| E001-E002 |
File details come from the government source that posted it. Updated .