SOW_Part_1--Door_Change.pdf
PDF 3 MB Posted
- Attached to
- Award for ILAB Renovations Federal contract opportunity
- Solicitation number
- DOL-OPS-16-Q-00033
About this file
Statement of Work attachment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amended_SOW_Part_2.pdf | ||
| Questions_and_Answers_for_Solicitation__DOL-OPS-16-Q-00033_Space_05.24.2016.pdf | ||
| Vendors_List.pdf | ||
| Amended_Solicitation_for_DOL-OPS-16-Q-00033_updated_05.24.2016.pdf | ||
| Past_Performance_Questionnaire-DOL-OPS-16-Q-00033.doc | DOC document | |
| Solicitation__DOL-OPS-16-Q-00033.pdf | ||
| SOW_Part_3--Door_Change.pdf | ||
| SOW_Part_2.pdf | ||
| Davis_Bacon-Wage_Determination.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5th Floor ILAB Renovation
Statement of Work
Offices of the Assistant Secretary of Administrative Management
Department of Labor
Frances Perkins Building
200 Constitution Avenue, N.W.
Washington, DC 20210
January 7, 2016
1.2
Table of Contents
1. Design Narrative
2. Appendix A- Applicable Codes
3. Appendix B- Specifications
4. Appendix C- GSA Fire Shop Short Spec Notes
5. Appendix D- Demountable Partitions Specifications and Design
6. Appendix E- Cut Sheets
7. Appendix F- Schematic Plans
ILAB 5th Floor Renovation Department of Labor, Washington, DC Narrative
ILAB 5TH FLOOR RENOVATION DESIGN NARRATIVE
1 PROJECT OVERVIEW
The ILAB 5th Floor Renovation project will cover roughly 19,000 square feet of existing office space on the 5th floor of the Frances Perkins Building located at 200 Constitution Avenue, NW, Washington, DC.
The construction site will include Rooms C5307, C5305, S5209, S5207, S5205, S5325, S5323, S5321, S5319, S5317, S5315, S5313, S5311, S5309, S5307, S5305, S5303, S5004, and S5006. The scope of the project will include the building out of private offices, conference rooms, support spaces, and an open office space that will house modular workstations/cubicles.
The project will require the renovation of the space be broken up into two (2) separate phases so that the occupying agency only has to relocate half its staff during the construction period. The demising line between the two phases shall align with the existing south wall in Room S5315. The first phase of the project will include all areas north of this wall. Once phase one is complete and the new furniture (NIC) is installed, the contractor will allow five (5) business days for the occupying agency to remove the existing furniture on the south side of the barrier and to relocate its staff to the finished out space on the north side of the barrier before beginning the second phase of construction.
In addition to the construction barrier, the contractor will be required to erect and maintain any other construction barriers needed to protect surrounding spaces that will be occupied during the construction period. The contractor will be responsible for removing all construction barriers and repairing or patching any unfinished area that remains, or any damage its removal may have created, prior to closeout.
The contractor will be responsible for securing the construction site at the end of each work day and for providing adequate safety signage.
Prior to the start of construction, the contractor will be required to deliver a Project Plan, Safety-Health Plan, and Submittal Schedule and a Schedule of Values that is broken down into each phase as outlined in the attached Division 1 Specifications. The project plan must include:
Mobilization to Site Delivery of Materials Completion of Construction Barrier Phase 1 Demolition Complete Phase 1 Carpet Installation Complete Phase 1 Fire Protection Complete Phase 1 Remaining Construction Complete Phase 1 Punch List Complete Phase 2 Demolition Complete Phase 2 Carpet Installation Complete Phase 2 Fire Protection Complete Phase 2 Remaining Construction Complete Phase 2 Punch List Complete Phase 2 Final Clean
Department of Labor, Washington, DC Narrative
Internal DOL staff will be responsible for the removal of existing office furniture, the installation of all telecomm and electrical runs terminated in floor boxes, and coordination with the GSA fire shop. In addition, DOL will be issuing a separate contract for furnishings. The construction contractor will be required to coordinate with the in-house DOL staff and the furniture contractor to make the space available for this work during the construction period. The construction contractor will also be responsible for tracking this work on the project plan.
Availability of the construction site shall be coordinated through the DOL project manager who will, in turn, coordinate with the occupying agency. Heavy construction, the movement of materials to and from the construction site, work in the main corridor, and demolition work shall be limited to after hours: 7:00pm-6:00am, Monday through Friday, unless otherwise coordinated and approved by the DOL project manager. All materials and equipment are required to be unloaded at the DOL loading dock and taken immediately to the construction site. The contractor will be limited to the use of the freight elevators for vertical transport.
The FPB loading dock has a height restriction of 12’-6” and cannot accommodate tractor-trailers. It is equipped with a dock leveler. The Loading dock is open from 6:00 am- 6:00 pm, and is available on a first come first serve. After hour access will need to be coordinated with the DOL Project Manager and DOL Security.
Prospective offerors’ are notified that parking in FPB garages is limited and no parking permits shall be issued for the offeror’s personnel vehicles for parking/access to the FPB garages during working hours (Monday – Friday, 7:00 am – 7:00 pm). Material drop-off and inside delivery will be at the FPB loading dock only.
The contractor is to provide the DOL Project Manager with the names of staff and subcontractors who will require access to the building one week prior to commencement of their work.
The contractor will be responsible for the removal and disposal of all project related trash and debris on a daily basis. Debris should be taken to the DOL loading dock and removed by the contractor. At no time should debris be left on the DOL loading dock for a period of time longer than needed to load. Debris is not to be disposed of in the Government’s dumpsters or waste receptacles. Hazardous material shall be disposed of as outlined in the attached specifications regarding Safety & Health and the handling of potentially hazardous materials.
Contractor will be required to submit Safety Data Sheets (SDSs) and submittals for all products and materials as outlined in the attached Division 1 Specifications.
The Contractor must provide shop drawings as outlined in the attached Division 1 Specifications for any millwork, casework, or elements that require precise location to adhere to the codes outlined in Appendix A.
When certifications are called for in the SOW or Appendices, the Contractor must provide record of such as outlined in the attached Division 1 Specifications.
The contractor will be responsible for holding weekly status meetings as outlined in the attached Division 1 Specifications.
Department of Labor, Washington, DC Narrative
The DOL Interior Designer will be responsible for all finish selections. The contractor will not select a finish without the approval of the Interior Designer. The Contractor must provide physical samples of all finish materials as outlined in the attached Division 1 Specifications.
Attached floorplans are for contractor’s reference only. Contractor is responsible for conducting their own site survey and verifying all dimensions.
The contractor will be required to adhere to all codes listed in Appendix A, and all requirements listed in the specification in Appendix B & C.
The period of performance for this project shall not exceed 160 calendar days.
Department of Labor, Washington, DC Narrative
2 ARCHITECTURAL
2.1 Overview
The Frances Perkins Building is a six story occupied building situated at 200 Constitution Avenue, NW in Washington DC. It spans three (3) city blocks and has over 900,000 useable square feet. This project will renovate roughly 19,000 square feet of existing office space in the south west wing of the 5th floor of the building. The construction site is bordered by the C5300 corridor, S5200 corridor, S5300 corridor, and S5000 corridor. Window walls line three sides of the space.
The space was originally designed for business occupancy and is currently being used as office space.
The renovation will include the demolition of the internal walls that separate suites S5207 and S5205 from the rest of the ILAB suite.
2.2 Function and Space Requirements
The renovated space, once completed, will be used as general office space. It will house the following:
o Projected Occupancy: 130 o 1 12-Seat Conference Room: 320 sq. ft.
o 1 34-Seat Conference Room: 566 sq. ft.
o 2 Teaming Rooms: 216 and 137 sq. ft.
o 1 Quiet Room: 82 sq. ft.
o 1 Pantry: 90 sq. ft.
o 1 Copy/Supply Room: 100 sq. ft.
o 1 Copy Nook: 46 sq. ft.
o 17 Supervisor Offices: 137 sq. ft. each o 4 Director Offices: 173-178 sq. ft. each o 13,327 sq. ft. of open office space to house 102 8’x8’ cubicles and 7 4’x7’ contractor/intern cubicles
2.3 Main Construction Barrier
The project will require the renovation of the space be broken up into two (2) separate phases so that the occupying agency only has to relocate half its staff during the construction period. The demising line between the two phases shall align with the existing south wall in Room S5315. Before construction begins, the contractor will be required to continue this wall so that a gyp board partition that extends from the existing subfloor to the existing drop ceiling continues the width of the space. This wall will serve as a construction barrier during both phases of the project, and must run continuously from the existing architectural wall to the face of the mullion on the west side window wall.
2.4 Demolition
See Appendix F for demolition plan and layout of new walls.
Demolition will include the majority of the interior walls, all existing interior doors, all the existing carpeting and wall base.
The existing carpeting is laid over an existing VCT tile floor, whose tile and mastic may contain asbestos.
The contractor is responsible for removing the existing carpet tile in a manner which will not disturb the
Department of Labor, Washington, DC Narrative existing VCT floor. In addition, the contractor must follow the attached specifications regarding Safety & Health and the handling of potentially hazardous materials.
The contractor will also be responsible for demolishing portions of the main corridor wall to provide openings for three (3) new recessed entrances. These new openings shall be cut to allow a new false ceiling to be installed beneath the existing ceiling grid where the recess is created.
2.5 Walls
See Appendix F for demolition plan and layout of new walls.
The renovation of the ILAB space will include the installation of both architectural gypsum board walls and demountable partitions.
New architectural walls shall be constructed of 25 gauge metal studs, set 16” on center, and finished with one layer 5/8 gypsum board (gyp bd) on each side. The bottom track of the walls shall be secured to the concrete deck, and the top track to the suspended ceiling grid. A ½ white stop bead shall run along ceiling on both sides of the partition to allow for tapered edge gyp bd to slide in for a finished appearance. Run gyp bd vertically so to leave only flat joints. Attach gyp bd using 1 ½” bugle head drywall screws, spaced no more than 16” on center stud and 12” on butt joints.
The walls that separate Conference Room 1 from Office 1, and Office 21 from Copy Room 2 and the pantry shall have sound insulation batting installed between the studs.
Unless otherwise noted, tape and finish all gyp bd construction to a level four finish. Existing walls that require patching must also be finished to level four standards. Apply two coats of Sherwin Williams, Harmony paint (color and finish to be selected by DOL Interior Designer) to all unfinished surfaces, and one coat to finished surfaces unless manufacturer recommends otherwise. When patching is required, contractor is to paint entirety of wall to next break in plane. Contractor shall plan on at least five (5) different colors of wall paint; main corridor paint, interior office paint, interior office accent paint, and two colors of trim paint.
Walls scheduled to receive dry erase wall covering must be finished to a level five finish.
The contractor will also be responsible for the purchase, installation, and coordination of the demountable partitions where shown on the schematic floorplan included in Appendix F. The specification and design basis for the demountable partitions are included in Appendix D.
Conference Room 1 (Rm 01) and Conference Room 2 (Rm 028) will have wall monitors installed as per the drawings in Appendix F. The contractor will be responsible for installing adequate blocking in to support up to a 60” flat panel monitor and its mount where a monitor is specified.
Conference Room 1 (Rm 01), Conference Room 2 (Rm 028), Team Room 1 (Rm 05), and Team Room 2 (Rm 27) will require the installation of dry erase wall covering the length of the wall denoted in the schematic floor plan. The covering shall be 54” wide, and run in a horizontal (railroaded) direction the length of the wall so that there are no seams. The wallcovering shall be installed in a level band 32” above the finished floor and finished on the top and sides with a brushed aluminum rail and the bottom edge with a brushed aluminum tray rail. See Appendix B for specifications and basis of design. Wall
Department of Labor, Washington, DC Narrative covering shall be installed per manufacturer’s instructions, and cut and coordinated with any equipment and/or outlets scheduled to be installed on the wall.
There will be four (4) locations where the contractor will be responsible for supplying fill strips and/or blocking on the columns where the furniture install requires a fill or wall mount. The fill strips shall be constructed of solid lumber and finished and painted to match the columns.
2.6 Flooring
The existing VCT floor in the main corridor and beneath the carpet tile in the project space may contain asbestos in both the tile and the mastic, and will need to stay intact. The contractor is responsible for following the guidelines in the attached specifications regarding Safety & Health and the handling of potentially hazardous materials if tile becomes disturbed during construction.
Rooms 01-28 and the open office area will require the installation of new carpet tile and 4” coved rubber base. New carpeting must match the existing DOL standard, Tandus Centiva Haiku/Bluefin with ER3 backing. New carpet should be applied using pressure sensitive adhesive that allows the carpet to be pulled up and reinstalled without disturbing the existing VCT tile.
The Pantry, Room S5004 will need to have the existing carpeting removed to expose the existing VCT floor beneath. The VCT will need to be cleaned to remove any adhesive left behind from the carpet’s removal and be re-waxed. New 4” coved base shall be installed around the perimeter.
The three (3) new recessed entries will also require the removal of the existing carpeting to expose the existing VCT, which will need to be cleaned to remove any adhesive left behind from the carpet’s removal and be re-waxed. In addition to this work, the contractor may be required to patch the area where the wall was demoed and no tile may exist.
Where changes in flooring material type occur, the contractor must install a rubber transition strip that complies with ADA standards.
2.7 Doors
Three (3) new recessed entryways (Vestibule 1, 2, &3) will need to be installed off the main corridor.
These entrances will include the installation of one (1) new 3’x7’ single leaf solid core, 1/3 hour, walnut veneer fire door; two (2) 6’x7’ double leaf solid core, 1/3 hour, walnut veneer fire door—with the option to change one (1) of these doors to a 6’x7’ double leaf solid core, 1/3 hour, walnut veneer with full lite glass panels during the submittal process. All doors must meet ADA guidelines, and be finished to match the existing building doors with a minimum of two (2) layers of clear protective coating applied to each side. These doors shall be equipped with appropriate panic hardware on the interior side, and an ADA compliant lever style handles that match the existing building hardware on the exterior side. In addition, new lock hardware with Yale GA keyways shall be installed at all three (3) entries.
The new main entry doorway between S5315 and S5313 will require an automatic door opener. See Appendix E for basis of design.
Conference Room 1 (Rm 01), Copy Room 1 (Rm 04), Team Room 1 (Rm 05), Quiet Room (Rm 26), and Team Room 2 (Rm 27), will all require the installation of 7’ tall interior, commercial grade, hollow wood, rotary birch, paint grade doors. Conference Room 2 will require the installation of two (2) doors. Doors shall be finished with two coats of Sherwin Williams, Harmony paint, color and finish to be selected by
Department of Labor, Washington, DC Narrative
DOL Interior Designer. These doors will require the installation of ADA compliant lever style handles that match the existing building hardware on both sides, and locking devices that match and are keyed to the building standard: Yale GA keyway. Contractor may choose to reuse existing locksets and hardware salvaged from the demolition process if it meets the above standards.
All new doorframes must be of 3-piece knock down hollow metal construction and match existing interior building doors. Copy Room 2 (Rm 25) will require the installation of a framed opening. The framed opening must also be of 3-piece knock down hollow metal construction.
The contractor will be responsible for painting all door frames and cased openings with two coats of Sherwin Williams, Harmony paint, color and finish to be selected by DOL Interior Designer.
Doors C5307, S5209, S5325, S5323, S5321, S5319, S5317, S5315, S5313, S5311, S5309, S5307, S5305, S5303, and S5006 will require their existing doorknobs to be removed and replaced with round, brass plate covers. In addition, the doors will need to be fixed in their frames so that they are not operable from either side.
Door S5006 will require the existing knob style hardware be replaced with an ADA compliant lever style handle to match the existing building hardware.
Doors mounted in the demountable partitions must match and be supplied by the demountable partitions manufacturer. Demountable partition doors must meet the design basis and specifications listed in Appendix D. All doors must be full-lite doors with frosted glass as shown in the design basis.
2.8 Ceilings
The existing suspended ceiling in the project space will remain intact and must be protected during construction. The contractor will be responsible for replacing any damaged ceiling tiles that are uncovered during demolition or that require replacement due to the construction requirements.
Replacement ceiling tiles must match the existing tiles.
New ceiling work should be limited to the construction of new, false, gyp board ceilings in the recesses created by the three (3) new entryways. These ceilings shall be limited to the space in between the existing main corridor walls and the new recessed partitions.
2.9 Casework
Copy Room 1 (Rm 04) and the Pantry (Rm S5004) will require built in case work.
The case work in Copy Room 1 will consist of a 30” deep solid surface countertop that extends the length of the south wall. The counter shall be mounted 29” AFF using wall mounted supports that provide enough open space below as to not interfere with the floor monuments shown on the Power Plan in Appendix F. A bead of clear silicon shall be used to close the seams where the counter meets the walls. The counter shall have three (3) grommets equally spaced along its backside. In addition, 6’-6” (78”) of wall cabinet is to be provided above the counter top. The new cabinetry is required to have plastic laminate (PLAM) surfaces with melamine interiors. The upper cabinets shall have aluminum wire pulls and adjustable shelving.
The Pantry will require a 24” solid surface countertop that will extend the length of its south wall. The counter shall be mounted 32” AFF, and supported as to provide enough open space below as possible.
Clear silicon shall be used to close the seams where the counter meets the walls, and three (3)
Department of Labor, Washington, DC Narrative grommets shall be equally spaced along the back of the counter. In addition, 6’ (72”) of wall cabinet is to be provided above the counter top. The new cabinetry is required to have plastic laminate (PLAM) surfaces with melamine interiors. The upper cabinets shall have aluminum wire pulls and adjustable shelving.
2.10 Equipment
The contractor will be required to provide and install the following equipment, see Appendix E for basis of design:
• Quantity 2, 22 Cubic Foot Side-by-Side Refridgerators
• Quantity 2, 1.5 Cubic Foot Countertop Convection/Microwave Oven
• Quantity 1, Wall Mounted Paper Towel Holder
• Quantity 3, Monitor Mounts
2.11 Applicable Codes, Standards and Criteria
See Appendix A.
Department of Labor, Washington, DC Narrative
3 STRUCTURAL
3.1 Overview
There is no structural work in this contract.
3.2 Applicable Codes, Standards and Criteria
Department of Labor, Washington, DC Narrative
4 MECHANICAL/PLUMBING
4.1 Overview
There is no mechanical or plumbing work in this contract.
4.2 Applicable Codes, Standards and Criteria
Department of Labor, Washington, DC Narrative
5 ELECTRICAL
5.1 Overview
The project space is currently lit by fluorescent light fixtures mounted in the suspended ceiling grid.
Existing electrical outlets are either floor mounted monuments which are wired through the existing building floor trench system or wall outlets which are wired back to the panel closets above the suspended ceiling.
The new wall outlets shown on the Power Plan in Appendix F will fall under the scope of the construction contract. The demolition of the existing floor monuments and the installation of new floor monuments will be completed by in-house DOL staff. The contractor will be responsible for coordinating this work with the in-house staff and making the work site available to complete their work.
5.2 Lighting
The project space is currently lit by fluorescent light fixtures mounted in the suspended ceiling grid. The existing lights will remain intact except for twelve (12) of that will need to be relocated, and two which that will need to be demolished completely. See Appendix F for locations.
All the existing lighting will need to be re-switched. The individual offices, copy rooms, teaming rooms, pantry, and quiet room will require an individual switch and occupancy sensor per room located adjacent to the doors on the interior side of the rooms. The conference rooms shall have their lighting divided into two (2) zones that are switched individually with switches located adjacent to the main entrance. The open office area will be divided into five (5) zones; four (4) zones that divide up the work areas and one (1) zone for the circulation paths. The four (4) work area zones shall be on a three-way switch, and the circulation path zone shall be wired to a four-way switch. Location of the switches shall be divided up between the three (3) new recessed entrances.
All rooms shall have a portion of their lighting wired to the building emergency lighting system as required in NFPA101.
5.3 Security Systems
The contractor will be required to install a pathway and termination box with a pull string for the future installation of a badge reader at the three new recessed entrances. The termination boxes shall be finished with a blank aluminum face plate.
5.4 Electrical Outlets
New duplex receptacles shall be installed in the project space as shown on the Power Plan in Appendix F. The duplex receptacles located farthest from the doors in the two (2) copy rooms and the work surface high receptacles in the Pantry shall be wired on individual 120 v 20 amp dedicated circuits. All other outlets shall be wired on shared 120 v 20 amp circuits per code. The contractor will be required to use match the existing circuit breakers in the DOL panel boxes, either GE TED 20A breakers or THQB 20A breakers in all DOL panel boxes.
Duplex convenience receptacles in the demountable partitions must be wired per manufacturer’s instructions to junction boxes above the suspended ceiling.
Department of Labor, Washington, DC Narrative
All electrical wiring shall run in metal clad MC cable, per code, in a pathway above the suspended ceiling back to the panel boxes in the electrical closets in S5005A and S5204.
All new devices shall be specified in a bright white finish with stainless steel face plates. Existing wall outlets will require that their devices be switched out and their face plates replaced to match new stock.
5.5 Applicable Codes, Standards and Criteria
Department of Labor, Washington, DC Narrative
6 FIRE PROTECTION
6.1 Overview
The current fire protection system in the project space includes a wet-pipe sprinkler system, exit signage, and strobe system. The contractor will be required to partner with a NICET Level III or IV Fire Alarm Technician or a Registered Fire Protection Engineer to survey and document the existing system, identify what modifications need to be made to the existing system to meet the codes and requirements in Appendix X and X (Short Spec Notes), and perform required work to make those modifications.
Installation shall be performed by a certified sprinkler contractor or a specialist who is experienced in the design and installation of automatic sprinkler systems (minimum 3 years).
Shop drawings and designs will require the review and approval of the GSA fire shop before work is to begin.
6.2 Applicable Codes, Standards and Criteria
See Appendix A & C.
Department of Labor, Washington, DC Narrative
7 COMMUNICATIONS
7.1 Overview
Current telecommunications wiring and terminations are installed using either the existing building floor trench system, or wall outlets which are wired back to the telecommunication closets through the suspended ceiling.
The pathways for the new wall mounted telecommunication shown on the Power Plan in Appendix F will fall under the scope of the construction contract. The demolition of the existing floor monuments, the installation of new floor monuments, and the running and termination of the telecom cabling will be completed by in-house DOL staff. The contractor will be responsible for coordinating this work with the in-house staff and making the work site available to complete their work.
The pathways and and cable TV ports shown on the Power Plan in Appendix F will fall under the scope of the construction contract.
7.2 New Work
Where a new wall mounted telecom outlet is shown on the Power Plan in Appendix F, the contractor will be required to provide a conduit with a pull string, a gang box, a face plate, and RJ45 connectors for two (2) LAN (Blue) Cat 5E cables, and one (1) Phone (yellow) Cat 5E cable.
There is also the requirement for the installation of six (6) cable TV outlets. The contractor will be responsible for surveying the existing cable TV backbone, and providing any boosting equipment needed to ensure a clear signal. Any boosting equipment shall be located in one of the adjacent telecommunications closet and mounted on the wall.
All new devices shall be specified in a bright white finish with stainless steel face plates.
7.3 Equipment
7.4 Applicable Codes, Standards and Criteria
Appendix A
Applicable Codes
Department of Labor, Washington, DC Applicable Codes
Applicable Codes For th
Floor ILAB Renovation
Design features to the extent possible should follow Executive Order 13123.
This Design Project shall use all applicable national, state and local building codes and practices. Codes listed below shall serve as the general guidelines for this design work, and they shall be supplemented or complimented as required by the designer(s). These codes form a part of the Statement of Work requirements to the extent that they can be applied to this design.
ACI Standards (American Concrete Institute Standards) A.I.A. Guide Specifications, latest revisions 2010 ADA (Americans with Disabilities Act) ANSI A117.1-2003 Standard for Accessibility and Usability ANSI C2 National Electric Safety Code ASHRAE Handbooks, American Society of Heating, Refrigeration and Air Conditioning Engineers, Inc., latest editions for Fundamentals, HVAC Systems and Equipment, HVAC Applications and Refrigeration ICC International Building Code – 2012 Edition, including seismic protection, latest edition International Fire Code ICC International Mechanical Code – 2012 Edition ICC International Plumbing Code – 2012 Edition ICC International Energy Conservation Code – 2009 Edition International Plumbing Code Virginia Department of Transportation:
Road and Bridge Specification, latest edition Road and Bridge Standard, latest edition MICA National Commercial & Industrial Insulation Standards, latest edition NCS Directive 3-10 National Communications System NFPA 3 Standard for the Commissioning and Integrated Testing of Fire Protection and Life Safety Systems NFPA 13 Standard for the Installation of Sprinkler Systems NFPA 13R Standard for the Installation of Sprinkler Systems in Residential Occupancies up to and Including Four Stories in Height NFPA 70 National Electrical Code 2011 NFPA 101 Life Safety Code OSHA Occupational Safety and Health Administration regulations SSA – Category 2 Organization ANSI/TIA-568-C.0 - Generic Communications Cabling for Customer Premises, August, 2012 ANSI/TIA -568-C.1. Commercial Building Telecommunications Cabling Standard. Part 1:
General Requirements, May, 2012 ANSI/TIA/EIA-568-C.2: Commercial Building Telecommunications Cabling Standard, November, 2014 ANSI/TIA/EIA – 569-C, Commercial Building Standard for Telecommunications Pathways and Spaces, March, 2013 ANSI/TIA/EIA – 606 - A, Administration Standard for Telecommunications Infrastructure of Commercial Buildings, March, 2013
Department of Labor, Washington, DC Applicable Codes
ANSI/TIA/EIA- 607-B - Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises, August, 2013 ANSI/ TIA/EIA – 758-A, Customer-Owned Outside Plant Telecommunications Cabling Standard, August, 2004 BICSI - TDMM, Building Industries Consulting Services International, Telecommunications Distribution Methods Manual (TDMM), 13th Edition Infrastructure of Commercial Buildings Underwriter’s Laboratories (UL) – Applicable listings and ratings.
NCSD 3-10 – Requirements for Continuity Communications Capabilities
In addition to the above codes, this design project is located in the District of Columbia, and any additional district and local codes and regulations (for environmental protection, occupational safety, health standards including asbestos and lead abatement, etc.) must be followed.
Appendix B
Specifications
Department of Labor FPB, Washington, DC Table of Contents
Dec 2015 5th Floor ILAB Renovation
SPECIFICATIONS TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
011100 SUMMARY OF WORK
011400 WORK RESTRICTIONS
01310 PROJECT MANAGEMENT AND COORDINATION
01320 CONSTRUCTION DOCUMENTATION
013300 SUBMITTAL PROCEDURES
01400 QUALITY CONTROL PLAN
01420 REFERENCES
015000 TEMPORARY FACILITIES AND CONTROLS
01546 SAFETY AND HEALTH
01595 SAFETY-HEALTH PLAN
016000 PRODUCT REQUIREMENTS
01700 EXECUTION REQUIREMENTS
01731 CUTTING AND PATCHING
01732 SELECTIVE DEMOLITION
01735 FIRE PREVENTION FOR HOT WORK
017419 CONSTRUCTION WASTE MANAGEMENT
01770 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DATA
DIVISION 2 – EXISTING CONDITIONS
02085 ASBESTOS ABATEMENT PROCEDURES
024100 DEMOLITION
DIVISION 8 - OPENINGS
08462 ELECTRONIC DOOR OPENER
DIVISION 9 - FINISHES
097200 DRY ERASE WALL COVERING
Department of Labor FPB, Washington, DC Summary of Work
Dec 2015 5th Floor ILAB Renovation 011100
SECTION 01 11 00-SUMMARY OF WORK SECTION
PART 1 - GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Description
1. The work includes demolition of interior finishes, partitions, portions of the fire protection system, the lighting system, and electrical system; new interior layout and finishes, new lighting system, new sprinkler system and new fire alarm system and incidental related work.
B. LOCATION
1. The work shall be located at the Department of Labor Frances Perkins Building, Washington, DC, approximately as shown. The exact location will be indicated by the Contracting Officer.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
A. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
B. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011100
Department of Labor FPB, Washington, DC Work Restrictions
Dec 2015 5th Floor ILAB Renovation 011400 - 1
SECTION 011400 - WORK RESTRICTIONS
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including other Division 01 Specification Sections, apply to this Section.
B. Comply with requirements in Access Procedures for the Project.
1.2 CONTRACTOR USE OF PREMISES
A. The Contracting Officer or Contracting Officer’s Representative will conduct a pre-construction survey with the Contractor to review and document the existing conditions surrounding the project premises prior to the beginning of any construction activity.
B. Premises will be partially occupied during construction. Refer to Section A “Narrative” for coordination requirements for occupied portions of the premises.
C. Cooperate with the Government's representatives during construction operations to minimize conflicts and disturbance of Government operations. Perform the Work in a manner that does not interfere with these operations.
D. The Contractor shall limit use of the premises to the Work in areas indicated, to allow for Government occupancy and public use.
1. Confine operations at the Site to areas indicated. Do not disturb portions of the site beyond the areas in which Work is indicated.
2. Suspension of Work – Work stoppages due to special events within the work area.
Government has the option for stoppage.
3. Keep driveways and entrances serving the premises clear and available at all times to the Government and for emergency vehicles. Do not use these areas for parking or storage of materials.
4. Schedule deliveries to minimize space and time requirements for storage of material and equipment on site.
5. Maintain existing building in a safe and weather-tight condition throughout the construction period. Repair damage caused by construction operations. Take precautions to protect the building, its occupants and the public during the construction period.
6. Keep public areas, such as hallways, stairs, lobbies and toilet rooms, free from accumulation of waste material, rubbish, construction debris and construction material.
7. A dumpster will not be permitted to be left on site. Coordinate with building manager the removal, from the building, of construction debris and products of demolition. A
Department of Labor FPB, Washington, DC Work Restrictions
Dec 2015 5th Floor ILAB Renovation 011400 - 2 truck may be parked overnight in the parking area to receive debris, but it must leave the parking area no later than 5:00 am. Overnight parking on the loading dock requires approval from DOL security. Contractor is required to provide security for the truck to insure that it is covered and that the public cannot access its contents.
8. Use of the existing loading dock facilities will be shared with Government activities.
9. No parking will be available on site during working hours of the building occupants. The contractor and the contractor’s employees shall make their own arrangements for vehicle parking off site.
10. Comply with local parking restrictions.
11. Government will designate toilets for use of contractor. No other toilet facilities may be used.
12. Contractor will be allowed to store construction materials inside the building, with areas to be used for this purpose to be coordinated with COR. Contractor to observe all floor loading restrictions and job safety regulations. Contractor will not be required to provide overall security for the building during the Project, but will be required to maintain work areas in a secure condition. Contractor will be required to maintain fire detection at work and storage areas.
13. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or designated to be salvaged as Government or other's property, shall become the property of the Contractor and shall be removed from the site. Storage or sale of excess salvageable materials and equipment is not permitted on site.
14. Pollution producing equipment shall not be located near air intakes where airborne smoke or fumes could be drawn into the building.
E. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions, and then only after arranging to provide temporary utility services according to requirements indicated:
1. All utility interruptions are to be coordinated with the Department of Labor (DOL) representative and COR.
2. DOL must be given a minimum of 5 (five) working days advance notice of proposed utility interruptions.
3. Do not proceed with utility interruptions without COR’s written permission.
1.3 ACCESS REQUIREMENTS
A. Access Requests will be initiated by the Contractor and all personnel requiring access to the Frances Perkins Building. Contractor will be required to submit the name, company, and dates they will need to access the site a minimum of 2 (two) working days before they need to access the site.
B. The building is a highly secure environment. All workers will be required to be cleared.
Workers that require badging must allow 14 days from submission of security to receive a badge. See Specification Section 01593.
Department of Labor FPB, Washington, DC Work Restrictions
Dec 2015 5th Floor ILAB Renovation 011400 - 3
1.4 WORKING HOURS
A. Core hours at the Frances Perkins Building (FPB) are 0600 (6 a.m.) to 2000 (8 p.m.), Monday to Friday excluding Federal holidays. Routine construction operations will be restricted to the hours of 0700 (7 a.m.) to 1700 (5 p.m.), however, activities that are likely to expose building occupants to excessive noise, dust, any odors, or involve the potential for release of hazardous building materials, must be performed outside the building’s core hours. Any hours outside normal working hours must be coordinated with COR and will require submission of an After Hours Work Request to the COR.Access to the building will be from the existing front door 6:30 pm to 5:30 am.
1.5 GOVERNMENT OCCUPANCY
A. The Government will occupy the existing building during the entire period of construction. Cooperate with the Government's representatives during construction operations to minimize conflicts and facilitate
Government usage. Perform the Work in a manner that does not interfere with the Government's opera-tions.
B. The Government reserves the right to occupy and to place and install equipment in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. The Government's installation of equipment and partial occupancy shall not constitute ac-ceptance of the total Work.
1. Prior to partial Government occupancy, mechanical and electrical systems for the space shall be fully operational, and required inspections and tests shall be successfully completed. Upon occupan-cy, the Government will operate and maintain mechanical and electrical systems serving the occupied portions of the building.
2. Upon occupancy, the Government will assume responsibility for maintenance and custodial service for the occupied portions of the building.
3. The warranty period for the occupied portion of the building only will commence on the date of occupancy by the Government.
1.6 NOISE CONTROL
A. Local Noise Control Regulations apply. Contractor shall notify COR of operations that may produce noise or other disturbance, such as concrete crushing or similar operations, and obtain approval at least 72 hours before commencing such operations.
1.7 WEATHER DELAYS
A. Weather Delay Definitions.
1. Reasonable Predictable Weather. The number of workdays that one can expect to be lost in any month due to rainfall based on 10-year historical weather data.
Department of Labor FPB, Washington, DC Work Restrictions
Dec 2015 5th Floor ILAB Renovation 011400 - 4
2. Rain Day. A potentially lost workday on which rainfall is equal to or greater than 0.10 inches.
3. Drying Day. A work day(s) immediately following a rainfall equal to or greater than 1.00 inch which is potentially lost because of wet ground conditions.
4. Workday. A day not excluded from work. There are currently no days that exclude the Contractor from working. Normal working days are M-F excluding weekends and holidays. Contractor personnel are permitted to work on weekends and holidays provided that proper coordination is completed.
5. Unusually Severe Weather. When the number of Actual Workdays Lost is greater than the calculated Total Lost Days for the month in question.
B. Reasonably Predictable Weather. Determine Reasonably Predictable Weather for this contract by completing Table 1. Calculate data for Table 1 as follows:
1. Using the last 10 years of historical weather data from the nearest NOAA weather data collection station, compute the average number of workdays lost (rain days plus drying days) for each month and the standard deviation from the average. Add the average number of workdays lost to the standard deviation.
2. The Total number of Lost Days (Average Workdays Lost plus 1 Standard Deviation, rounded to whole days) will be considered normal for each month.
3. Submit a completed Table 1 with the initial construction schedule.
C. Unusually Severe Weather. Under FAR clause 52.249-10, Default (Fixed-Price Construction), the Contractor can request time for delay due to Unusually Severe Weather. The number of Actual Work Days plus the actual Drying Days occurring in the month in question. From this total, deduct any workdays meeting the following conditions:
1. The Rain Day or Drying Day occurred on a non-work weekday such as a holiday.
2. Rainfall occurred at a time when no weather dependent work was in progress or occurred during planned or unplanned shutdowns due to other circumstances such as equipment failure, strikes, material supplies, delays, etc.
3. The Contractor was still working or able to work on weather dependent activities to the extent that less than 50 percent of the workday was lost due to weather.
If the net number of Actual Workdays Lost is greater that the Total Lost Days, then Unusually Severe Weather occurred during the month in question.
D. Time Adjustments for Rain Delays. If the net number of Actual Workdays Lost to rain is less than the total Lost Days for the month in question, no time adjustments will be made. If the net number of Actual Workdays Lost is more, then an excusable time extension may be granted. The Contractor must submit a Weather Time Impact Analysis supporting any alleged delays due to Unusually Severe Weather.
E. Delays Due To Other Weather Conditions. Delays due to other unusually severe weather conditions (snow, extreme cold or heat, high winds, etc.) must be supported with a Weather Time Impact Analysis using historical weather data.
F. Schedule. The contractor shall be required to submit a construction schedule.
1. The progress schedule shall reflect consideration of these anticipated adverse weather delays in all weather dependent activities.
Department of Labor FPB, Washington, DC Work Restrictions
Dec 2015 5th Floor ILAB Renovation 011400 - 5
2. Upon issuance of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor shall record on the Daily Contractor Production Report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delays must prevent work on critical activities for 50 percent or more of the contractor’s scheduled workday.
3. Other Delays. In each instance when the site is closed to Contractor personnel as a result of inclement weather, potentially hazardous conditions, or other special circumstances, the Contractor shall direct its staff as necessary to take actions such as reporting to its home office or taking appropriate leave consistent with its policies. Each instance shall be recorded on the Daily Production Report as a Lost Workday.
Department of Labor FPB, Washington, DC Work Restrictions
Dec 2015 5th Floor ILAB Renovation 011400 - 6
TABLE 1
Project Number: ________________________
Location of NOAA Data Collection Station:__________________________
Data Years (10-year history): 20___ through 20___
REASONABLY PREDICTABLE WEATHER
MONTH
AVERAGE WORKDAYS
LOST
STANDARD
DEVIATION
TOTAL LOST DAYS
January
February
March
April
May
June
July
August
September
October
November
December
Total
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 011400
Department of Labor FPB, Washington, DC Project Management and Coordination
Dec 2015 5th Floor ILAB Renovation 01310 - 1
SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the contract, including general and supplementary conditions and other Division 1 specification sections, apply to this section.
1.2 SUMMARY
A. This section includes administrative provisions for coordinating construction operations on the project including, but not limited to, the following:
1. General project coordination procedures.
2. Conservation.
3. Coordination drawings.
4. Administrative and supervisory personnel.
5. Project meetings.
6. Utility service interruptions
7. Cleaning and protection
B. Related Sections: The following Sections contain requirements that relate to this section:
1. Division 1 section "Closeout Procedures" for coordinating contract closeout.
1.3 COORDINATION
A. Coordination: Coordinate construction operations included in various sections of the specifications to ensure efficient and orderly installation of each part of the work. Coordinate construction operations included in different sections that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in the sequence required to obtain the best results where the installation of one part of the Work depends on installation of other components before or after that part.
2. Coordinate installation of different components to provide maximum accessibility for re-quired maintenance, service, testing and repair.
3. Accommodate items scheduled for later installation.
4. Contractor shall coordinate with contracting officer before any temporary openings are created to either remove or access work.
Department of Labor FPB, Washington, DC Project Management and Coordination
Dec 2015 5th Floor ILAB Renovation 01310 - 2
B. Notification: Where necessary, prepare and distribute memoranda to each party involved, outlining special procedures required for coordination. When applicable, include notices, reports and meeting minutes as part of the memoranda.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Copy of updated schedule posted on job site and delivered to Building Management
Office – CPM schedule Microsoft Project compatible.
D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.
1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the work.
2. Waste Management Plan: Establish a program to maximize recycling of waste materials.
Program shall minimally include the following:
A. Identification of recyclable materials.
B. Identification of available local recycling firms and agencies to receive recyclable materials.
C. Establishment of quantity goals for collection of each recyclable material.
D. Designation of one or more locations on the project site for collection, sorting and temporary storage of recyclable materials.
E. Means and schedule for transporting and delivery of recyclable materials to recycling firms and agencies.
1.4 COORDINATION DRAWINGS
A. Prepare coordination drawings where careful coordination is needed for installation of products and materials fabricated by separate entities, and prepare coordination drawings where limited space availability necessitates maximum utilization of the space for efficient installation of different components.
1. Show the relationship of components shown on separate shop drawings.
2. Indicate required installation sequences.
3. Provide vertical and horizontal dimensions necessary to locate each component and avoid conflicts within the space.
Department of Labor FPB, Washington, DC Project Management and Coordination
Dec 2015 5th Floor ILAB Renovation 01310 - 3
4. Comply with shop drawing requirements for sheet size and submittal methods specified in Division 1 Section "Submittal Procedures."
B. Refer to performance specifications for specific coordination drawing requirements for mechanical and electrical installations.
C. Provide coordination drawings for equipment and system installations in mechanical and electrical rooms and spaces where two or more entities will provide the work and separate shop drawings are insufficient to show coordination.
1.5 SUBMITTALS
A. Coordination Drawings:…
This is the start of the file's text. The full file is on GovTribe.