About this file

Solicitation DOL-OPS-16-00033

View the file

Other files for this federal contract opportunity

Other files attached to Award for ILAB Renovations, newest first.
File Type Posted
amended_SOW_Part_2.pdf PDF
Questions_and_Answers_for_Solicitation__DOL-OPS-16-Q-00033_Space_05.24.2016.pdf PDF
Vendors_List.pdf PDF
Amended_Solicitation_for_DOL-OPS-16-Q-00033_updated_05.24.2016.pdf PDF
Past_Performance_Questionnaire-DOL-OPS-16-Q-00033.doc DOC document
SOW_Part_2.pdf PDF
Davis_Bacon-Wage_Determination.docx DOCX document
SOW_Part_1--Door_Change.pdf PDF
SOW_Part_3--Door_Change.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

16-ILAB-ODS-NAT-0008

US Department of Labor

Office of Procurement Services

200 Constitution Ave, NW S-4307

OPS

Washington DC 20210

Please submit responses via electronic mail to Valerie Pickard pickard.valerie.s@dol.gov

VALERIE PICKARD 202-693-4591

104/06/2016

DOL-OPS-16-Q-00033

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The Department of Labor (DOL)on behalf of Office of the Labor's Bureau of

International Labor Affairs (ILAB) Office Space Renovation in accordance with the

Statement Of Work

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 160 calendar days and complete it within ________________ ________________ calendar days after receiving

05/06/2016

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

US Department of Labor Office of Procurment Services

200 Constitution Ave, NW S4307

OPS

Washington DC 20210

Wanda Maddox

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 25

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DOL-OPS-16-Q-00033

This Request for Quote (RFQ) is for the

Department of Labor (DOL) Office of the Assistant

Secretary for Administration and Management

Office of Procurement Services for Office Space

Renovation in support of the DOL Office of the

Labor's Bureau of International Labor Affairs

(ILAB)in accordance with the attached Statement of Work (SOW).

The Government intends to award a firm fixed price construction contract.

The North American Industry Classification System

(NAICS) Code for this requirement is 236220 -

Commercial and Institutional Building

Construction. The Small Business Size Standard for NAICS Code 236220 is $36.5M. The Product

Service Code (PSC) for the requirement is Z2AA, Repair or Alteration of Office Buildings.

This requirement for Office Space Renovation shall be a 100% Small Business set-aside.

The period of performance shall be 160 days from the Notice To Proceed (NTP).

The magnitude of the requirement is estimated as follows: Between $500,000 and $1,000,000.00

A site visit has been scheduled for 2:00 PM EST, Wednesday, April 22, 2016, at the Department of

Labor 200 Constitution Avenue N.W. Washington, DC

20210.Please submit a list of attendees via electronic mail by 12:00pm EST, Monday April 19, 2016 to Valerie Pickard at pickard.valerie.s@dol.gov.

Please submit clarifying questions regarding this

RFQ via electronic mail by 12:00pm EST, Tuesday, April 26, 2016, to Valerie Pickard at pickard.valerie.s@dol.gov.

Please submit responses via electronic mail by

12:00pm EST, Friday, May 06, 2016, to Valerie

Pickard at pickard.valerie.s@dol.gov.

FOB: Destination

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 25

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DOL-OPS-16-Q-00033

0001 Office Space Renovation: Mobilization/supervision and clean up

0002 Demolition

0003 Office Space Renovation: Walls

0004 Office Space Renovation:Flooring

0005 Office Space Renovation:Doors

0006 Office Space Renovation: Case Work

0007 Office Space Renovation:Equipment

0008 Office Space Renovation:Fire Protection/Fire

Alarm System

0009 Lighting System and electrical

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION C - STATEMENT OF WORK

1. See Attachment 1, 2, and 3 for the overall Statement of Work

1.1 PROJECT OVERVIEW

The ILAB 5 th

Floor Renovation project will cover roughly 19,000 square feet of existing office space on the 5 th floor of the Frances Perkins Building located at 200 Constitution Avenue, NW, Washington, DC. The construction site will include Rooms C5307, C5305, S5209, S5207, S5205, S5325, S5323, S5321, S5319, S5317, S5315, S5313, S5311, S5309, S5307, S5305, S5303, S5004, and S5006. The scope of the project will include the building out of private offices, conference rooms, support spaces, and an open office space that will house modular workstations/cubicles.

The project will require the renovation of the space be broken up into two (2) separate phases so that the occupying agency only has to relocate half its staff during the construction period. The demising line between the two phases shall align with the existing south wall in Room S5315. The first phase of the project will include all areas north of this wall. Once phase one is complete and the new furniture (NIC) is installed, the contractor will allow five (5) business days for the occupying agency to remove the existing furniture on the south side of the barrier and to relocate its staff to the finished out space on the north side of the barrier before beginning the second phase of construction.

In addition to the construction barrier, the contractor will be required to erect and maintain any other construction barriers needed to protect surrounding spaces that will be occupied during the construction period. The contractor will be responsible for removing all construction barriers and repairing or patching any unfinished area that remains, or any damage its removal may have created, prior to closeout.

The contractor will be responsible for securing the construction site at the end of each work day and for providing adequate safety signage.

Prior to the start of construction, the contractor will be required to deliver a Project Plan, Safety-Health Plan, and

Submittal Schedule and a Schedule of Values that is broken down into each phase as outlined in the attached

Division 1 Specifications. The project plan must include:

Mobilization to Site

Delivery of Materials

Completion of Construction Barrier

Phase 1 Demolition Complete

Phase 1 Carpet Installation Complete

Phase 1 Fire Protection Complete

Phase 1 Remaining Construction Complete

Phase 1 Punch List Complete

Phase 2 Demolition Complete

Phase 2 Carpet Installation Complete

Phase 2 Fire Protection Complete

Phase 2 Remaining Construction Complete

Phase 2 Punch List Complete

Phase 2 Final Clean

Internal DOL staff will be responsible for the removal of existing office furniture, the installation of all telecomm and electrical runs terminated in floor boxes, and coordination with the GSA fire shop. In addition, DOL will be issuing a separate contract for furnishings. The construction contractor will be required to coordinate with the in-house DOL staff and the furniture contractor to make the space available for this work during the construction period. The construction contractor will also be responsible for tracking this work on the project plan.

Availability of the construction site shall be coordinated through the DOL project manager who will, in turn, coordinate with the occupying agency. Heavy construction, the movement of materials to and from the construction site, work in the main corridor, and demolition work shall be limited to after hours: 7:00pm-6:00am, Monday through Friday, unless otherwise coordinated and approved by the DOL project manager. All materials and equipment are required to be unloaded at the DOL loading dock and taken immediately to the construction site. The contractor will be limited to the use of the freight elevators for vertical transport.

The FPB loading dock has a height restriction of 12’-6” and cannot accommodate tractor-trailers. It is equipped with a dock leveler. The Loading dock is open from 6:00 am- 6:00 pm, and is available on a first come first serve. After hour access will need to be coordinated with the DOL Project Manager and DOL Security.

Prospective offerors’ are notified that parking in FPB garages is limited and no parking permits shall be issued for the offeror’s personnel vehicles for parking/access to the FPB garages during working hours (Monday – Friday, 7:00 am – 7:00 pm). Material drop-off and inside delivery will be at the FPB loading dock only.

The contractor is to provide the DOL Project Manager with the names of staff and subcontractors who will require access to the building one week prior to commencement of their work.

The contractor will be responsible for the removal and disposal of all project related trash and debris on a daily basis.

Debris should be taken to the DOL loading dock and removed by the contractor. At no time should debris be left on the DOL loading dock for a period of time longer than needed to load. Debris is not to be disposed of in the

Government’s dumpsters or waste receptacles. Hazardous material shall be disposed of as outlined in the attached specifications regarding Safety & Health and the handling of potentially hazardous materials.

Contractor will be required to submit Safety Data Sheets (SDSs) and submittals for all products and materials as outlined in the attached Division 1 Specifications.

The Contractor must provide shop drawings as outlined in the attached Division 1 Specifications for any millwork, casework, or elements that require precise location to adhere to the codes outlined in Appendix A.

When certifications are called for in the SOW or Appendices, the Contractor must provide record of such as outlined in the attached Division 1 Specifications.

The contractor will be responsible for holding weekly status meetings as outlined in the attached Division 1

Specifications.

The DOL Interior Designer will be responsible for all finish selections. The contractor will not select a finish without the approval of the Interior Designer. The Contractor must provide physical samples of all finish materials as outlined in the attached Division 1 Specifications.

Attached floorplans are for contractor’s reference only. Contractor is responsible for conducting their own site survey and verifying all dimensions.

The contractor will be required to adhere to all codes listed in Appendix A, and all requirements listed in the specification in Appendix B & C.

The period of performance for this project shall not exceed 160 calendar days.

ARCHITECTURAL

2.1 Overview

The Frances Perkins Building is a six story occupied building situated at 200 Constitution Avenue, NW in

Washington DC. It spans three (3) city blocks and has over 900,000 useable square feet. This project will renovate roughly 19,000 square feet of existing office space in the south west wing of the 5 th floor of the building. The construction site is bordered by the C5300 corridor, S5200 corridor, S5300 corridor, and S5000 corridor. Window walls line three sides of the space.

The space was originally designed for business occupancy and is currently being used as office space. The renovation will include the demolition of the internal walls that separate suites S5207 and S5205 from the rest of the ILAB suite.

2.2 Function and Space Requirements

The renovated space, once completed, will be used as general office space. It will house the following:

o Projected Occupancy: 130 o 1 12-Seat Conference Room: 320 sq. ft.

o 1 34-Seat Conference Room: 566 sq. ft.

o 2 Teaming Rooms: 216 and 137 sq. ft.

o 1 Quiet Room: 82 sq. ft.

o 1 Pantry: 90 sq. ft.

o 1 Copy/Supply Room: 100 sq. ft.

o 1 Copy Nook: 46 sq. ft.

o 17 Supervisor Offices: 137 sq. ft. each o 4 Director Offices: 173-178 sq. ft. each o 13,327 sq. ft. of open office space to house 102 8’x8’ cubicles and 7 4’x7’ contractor/intern cubicles

2.2 Main Construction Barrier

The project will require the renovation of the space be broken up into two (2) separate phases so that the occupying agency only has to relocate half its staff during the construction period. The demising line between the two phases shall align with the existing south wall in Room S5315. Before construction begins, the contractor will be required to continue this wall so that a gyp board partition that extends from the existing subfloor to the existing drop ceiling continues the width of the space. This wall will serve as a construction barrier during both phases of the project, and must run continuously from the existing architectural wall to the face of the mullion on the west side window wall.

2.3 Demolition

See Appendix F for demolition plan and layout of new walls.

Demolition will include the majority of the interior walls, all existing interior doors, all the existing carpeting and wall base.

The existing carpeting is laid over an existing VCT tile floor, whose tile and mastic may contain asbestos. The contractor is responsible for removing the existing carpet tile in a manner which will not disturb the existing VCT floor. In addition, the contractor must follow the attached specifications regarding Safety & Health and the handling of potentially hazardous materials.

The contractor will also be responsible for demolishing portions of the main corridor wall to provide openings for three (3) new recessed entrances. These new openings shall be cut to allow a new false ceiling to be installed beneath the existing ceiling grid where the recess is created.

2.4 Walls

See Appendix F for demolition plan and layout of new walls.

The renovation of the ILAB space will include the installation of both architectural gypsum board walls and demountable partitions.

New architectural walls shall be constructed of 25 gauge metal studs, set 16” on center, and finished with one layer

5/8 gypsum board (gyp bd) on each side. The bottom track of the walls shall be secured to the concrete deck, and the top track to the suspended ceiling grid. A ½ white stop bead shall run along ceiling on both sides of the partition to allow for tapered edge gyp bd to slide in for a finished appearance. Run gyp bd vertically so to leave only flat joints.

Attach gyp bd using 1 ½” bugle head drywall screws, spaced no more than 16” on center stud and 12” on butt joints.

The walls that separate Conference Room 1 from Office 1, and Office 21 from Copy Room 2 and the pantry shall have sound insulation batting installed between the studs.

Unless otherwise noted, tape and finish all gyp bd construction to a level four finish. Existing walls that require patching must also be finished to level four standards. Apply two coats of Sherwin Williams, Harmony paint (color and finish to be selected by DOL Interior Designer) to all unfinished surfaces, and one coat to finished surfaces unless manufacturer recommends otherwise. When patching is required, contractor is to paint entirety of wall to next break in plane. Contractor shall plan on at least five (5) different colors of wall paint; main corridor paint, interior office paint, interior office accent paint, and two colors of trim paint.

Walls scheduled to receive dry erase wall covering must be finished to a level five finish.

The contractor will also be responsible for the purchase, installation, and coordination of the demountable partitions where shown on the schematic floorplan included in Appendix F. The specification and design basis for the demountable partitions are included in Appendix D.

Conference Room 1 (Rm 01) and Conference Room 2 (Rm 028) will have wall monitors installed as per the drawings in Appendix F. The contractor will be responsible for installing adequate blocking in to support up to a 60” flat panel monitor and its mount where a monitor is specified.

Conference Room 1 (Rm 01), Conference Room 2 (Rm 028), Team Room 1 (Rm 05), and Team Room 2 (Rm 27) will require the installation of dry erase wall covering the length of the wall denoted in the schematic floor plan. The covering shall be 54” wide, and run in a horizontal (railroaded) direction the length of the wall so that there are no seams. The wallcovering shall be installed in a level band 32” above the finished floor and finished on the top and sides with a brushed aluminum rail and the bottom edge with a brushed aluminum tray rail. See Appendix B for specifications and basis of design. Wall covering shall be installed per manufacturer’s instructions, and cut and coordinated with any equipment and/or outlets scheduled to be installed on the wall.

There will be four (4) locations where the contractor will be responsible for supplying fill strips and/or blocking on the columns where the furniture install requires a fill or wall mount. The fill strips shall be constructed of solid lumber and finished and painted to match the columns.

2.5 Flooring

The existing VCT floor in the main corridor and beneath the carpet tile in the project space may contain asbestos in both the tile and the mastic, and will need to stay intact. The contractor is responsible for following the guidelines in the attached specifications regarding Safety & Health and the handling of potentially hazardous materials if tile becomes disturbed during construction.

Rooms 01-28 and the open office area will require the installation of new carpet tile and 4” coved rubber base. New carpeting must match the existing DOL standard, Tandus Centiva Haiku/Bluefin with ER3 backing. New carpet should be applied using pressure sensitive adhesive that allows the carpet to be pulled up and reinstalled without disturbing the existing VCT tile.

The Pantry, Room S5004 will need to have the existing carpeting removed to expose the existing VCT floor beneath.

The VCT will need to be cleaned to remove any adhesive left behind from the carpet’s removal and be re-waxed.

New 4” coved base shall be installed around the perimeter.

The three (3) new recessed entries will also require the removal of the existing carpeting to expose the existing VCT, which will need to be cleaned to remove any adhesive left behind from the carpet’s removal and be re-waxed. In addition to this work, the contractor may be required to patch the area where the wall was demoed and no tile may exist.

Where changes in flooring material type occur, the contractor must install a rubber transition strip that complies with

ADA standards.

2.6 Doors

Three (3) new recessed entryways (Vestibule 1, 2, &3) will need to be installed off the main corridor. These entrances will include the installation of one (1) new 3’x7’ single leaf solid core, 1/3 hour, walnut veneer fire door;

two (2) 6’x7’ double leaf solid core, 1/3 hour, walnut veneer fire door—with the option to change one (1) of these doors to a 6’x7’ double leaf solid core, 1/3 hour, walnut veneer with full lite glass panels during the submittal process. All doors must meet ADA guidelines, and be finished to match the existing building doors with a minimum of two (2) layers of clear protective coating applied to each side. These doors shall be equipped with appropriate panic hardware on the interior side, and an ADA compliant lever style handles that match the existing building hardware on the exterior side. In addition, new lock hardware with Yale GA keyways shall be installed at all three (3) entries.

The new main entry doorway between S5315 and S5313 will require an automatic door opener. See Appendix E for basis of design.

Conference Room 1 (Rm 01), Copy Room 1 (Rm 04), Team Room 1 (Rm 05), Quiet Room (Rm 26), and Team

Room 2 (Rm 27), will all require the installation of 7’ tall interior, commercial grade, hollow wood, rotary birch, paint grade doors. Conference Room 2 will require the installation of two (2) doors. Doors shall be finished with two coats of Sherwin Williams, Harmony paint, color and finish to be selected by DOL Interior Designer. These doors will require the installation of ADA compliant lever style handles that match the existing building hardware on both sides, and locking devices that match and are keyed to the building standard: Yale GA keyway. Contractor may choose to reuse existing locksets and hardware salvaged from the demolition process if it meets the above standards.

All new doorframes must be of 3-piece knock down hollow metal construction and match existing interior building doors. Copy Room 2 (Rm 25) will require the installation of a framed opening. The framed opening must also be of

3-piece knock down hollow metal construction.

The contractor will be responsible for painting all door frames and cased openings with two coats of Sherwin

Williams, Harmony paint, color and finish to be selected by DOL Interior Designer.

Doors C5307, S5209, S5325, S5323, S5321, S5319, S5317, S5315, S5313, S5311, S5309, S5307, S5305, S5303, and

S5006 will require their existing doorknobs to be removed and replaced with round, brass plate covers. In addition, the doors will need to be fixed in their frames so that they are not operable from either side.

Door S5006 will require the existing knob style hardware be replaced with an ADA compliant lever style handle to match the existing building hardware.

Doors mounted in the demountable partitions must match and be supplied by the demountable partitions manufacturer. Demountable partition doors must meet the design basis and specifications listed in Appendix D. All doors must be full-lite doors with frosted glass as shown in the design basis.

2.7 Ceilings

The existing suspended ceiling in the project space will remain intact and must be protected during construction. The contractor will be responsible for replacing any damaged ceiling tiles that are uncovered during demolition or that require replacement due to the construction requirements. Replacement ceiling tiles must match the existing tiles.

New ceiling work should be limited to the construction of new, false, gyp board ceilings in the recesses created by the three (3) new entryways. These ceilings shall be limited to the space in between the existing main corridor walls and the new recessed partitions.

2.8 Casework

Copy Room 1 (Rm 04) and the Pantry (Rm S5004) will require built in case work.

The case work in Copy Room 1 will consist of a 30” deep solid surface countertop that extends the length of the south wall. The counter shall be mounted 29” AFF using wall mounted supports that provide enough open space below as to not interfere with the floor monuments shown on the Power Plan in Appendix F. A bead of clear silicon shall be used to close the seams where the counter meets the walls. The counter shall have three (3) grommets equally spaced along its backside. In addition, 6’-6” (78”) of wall cabinet is to be provided above the counter top.

The new cabinetry is required to have plastic laminate (PLAM) surfaces with melamine interiors. The upper cabinets shall have aluminum wire pulls and adjustable shelving.

The Pantry will require a 24” solid surface countertop that will extend the length of its south wall. The counter shall be mounted 32” AFF, and supported as to provide enough open space below as possible. Clear silicon shall be used to close the seams where the counter meets the walls, and three (3) grommets shall be equally spaced along the back of the counter. In addition, 6’ (72”) of wall cabinet is to be provided above the counter top. The new cabinetry is required to have plastic laminate (PLAM) surfaces with melamine interiors. The upper cabinets shall have aluminum wire pulls and adjustable shelving.

2.9 Equipment

The contractor will be required to provide and install the following equipment, see Appendix E for basis of design:

Quantity 2, 22 Cubic Foot Side-by-Side Refridgerators

Quantity 2, 1.5 Cubic Foot Countertop Convection/Microwave Oven

Quantity 1, Wall Mounted Paper Towel Holder

Quantity 3, Monitor Mounts

2.10 Applicable Codes, Standards and Criteria

See Appendix A.

3. STRUCTURAL

3.1 Overview

There is no structural work in this contract.

3.2 Applicable Codes, Standards and Criteria

4. MECHANICAL/PLUMBING

4.1 Overview

There is no mechanical or plumbing work in this contract.

4.2 Applicable Codes, Standards and Criteria

5. ELECTRICAL

5.1 Overview

The project space is currently lit by fluorescent light fixtures mounted in the suspended ceiling grid. Existing electrical outlets are either floor mounted monuments which are wired through the existing building floor trench system or wall outlets which are wired back to the panel closets above the suspended ceiling.

The new wall outlets shown on the Power Plan in Appendix F will fall under the scope of the construction contract.

The demolition of the existing floor monuments and the installation of new floor monuments will be completed by in-house DOL staff. The contractor will be responsible for coordinating this work with the in-house staff and making the work site available to complete their work.

5.2 Lighting

The project space is currently lit by fluorescent light fixtures mounted in the suspended ceiling grid. The existing lights will remain intact except for twelve (12) of that will need to be relocated, and two which that will need to be demolished completely. See Appendix F for locations.

All the existing lighting will need to be re-switched. The individual offices, copy rooms, teaming rooms, pantry, and quiet room will require an individual switch and occupancy sensor per room located adjacent to the doors on the interior side of the rooms. The conference rooms shall have their lighting divided into two (2) zones that are switched individually with switches located adjacent to the main entrance. The open office area will be divided into five (5) zones; four (4) zones that divide up the work areas and one (1) zone for the circulation paths. The four (4) work area zones shall be on a three-way switch, and the circulation path zone shall be wired to a four-way switch. Location of the switches shall be divided up between the three (3) new recessed entrances.

All rooms shall have a portion of their lighting wired to the building emergency lighting system as required in

NFPA101.

5.3 Security Systems

The contractor will be required to install a pathway and termination box with a pull string for the future installation of a badge reader at the three new recessed entrances. The termination boxes shall be finished with a blank aluminum face plate.

5.4 Electrical Outlets

New duplex receptacles shall be installed in the project space as shown on the Power Plan in Appendix F. The duplex receptacles located farthest from the doors in the two (2) copy rooms and the work surface high receptacles in the Pantry shall be wired on individual 120 v 20 amp dedicated circuits. All other outlets shall be wired on shared

120 v 20 amp circuits per code. The contractor will be required to use match the existing circuit breakers in the DOL panel boxes, either GE TED 20A breakers or THQB 20A breakers in all DOL panel boxes.

Duplex convenience receptacles in the demountable partitions must be wired per manufacturer’s instructions to junction boxes above the suspended ceiling.

All electrical wiring shall run in metal clad MC cable, per code, in a pathway above the suspended ceiling back to the panel boxes in the electrical closets in S5005A and S5204.

All new devices shall be specified in a bright white finish with stainless steel face plates. Existing wall outlets will require that their devices be switched out and their face plates replaced to match new stock.

5.5 Applicable Codes, Standards and Criteria

6. FIRE PROTECTION

6.1 Overview

The current fire protection system in the project space includes a wet-pipe sprinkler system, exit signage, and strobe system. The contractor will be required to partner with a NICET Level III or IV Fire Alarm Technician or a

Registered Fire Protection Engineer to survey and document the existing system, identify what modifications need to be made to the existing system to meet the codes and requirements in Appendix X and X (Short Spec Notes), and perform required work to make those modifications.

Installation shall be performed by a certified sprinkler contractor or a specialist who is experienced in the design and installation of automatic sprinkler systems (minimum 3 years).

Shop drawings and designs will require the review and approval of the GSA fire shop before work is to begin.

6.2 Applicable Codes, Standards and Criteria

See Appendix A & C.

7. COMMUNICATIONS

7.1 Overview

Current telecommunications wiring and terminations are installed using either the existing building floor trench system, or wall outlets which are wired back to the telecommunication closets through the suspended ceiling.

The pathways for the new wall mounted telecommunication shown on the Power Plan in Appendix F will fall under the scope of the construction contract. The demolition of the existing floor monuments, the installation of new floor monuments, and the running and termination of the telecom cabling will be completed by in-house DOL staff. The contractor will be responsible for coordinating this work with the in-house staff and making the work site available to complete their work.

The pathways and and cable TV ports shown on the Power Plan in Appendix F will fall under the scope of the construction contract.

7.2 New Work

Where a new wall mounted telecom outlet is shown on the Power Plan in Appendix F, the contractor will be required to provide a conduit with a pull string, a gang box, a face plate, and RJ45 connectors for two (2) LAN (Blue) Cat 5E cables, and one (1) Phone (yellow) Cat 5E cable.

There is also the requirement for the installation of six (6) cable TV outlets. The contractor will be responsible for surveying the existing cable TV backbone, and providing any boosting equipment needed to ensure a clear signal.

Any boosting equipment shall be located in one of the adjacent telecommunications closet and mounted on the wall.

All new devices shall be specified in a bright white finish with stainless steel face plates.

7.3 Equipment

7.4 Applicable Codes, Standards and Criteria

SECTION D -PACKAGING AND MARKING

INTENTIONALLY LEFT BLANK

SECTION E -INSPECTION AND ACCEPTANCE

SECTION F -DELIVERIES OR PERFORMANCE

SEE SECTION B - SUPPLIES/SERVICES

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 DOLAR 2952.201-70 Contracting Officer’s Representative (COR) (May 2004)

(a) TBD is hereby designated to act as contracting officer's representative (COR) under this contract.

(b) The COR is responsible, as applicable, for: receiving all deliverables; inspecting and accepting the supplies or services provided hereunder in accordance with the terms and conditions of this contract; providing direction to the contractor which clarifies the contract effort, fills in details or otherwise serves to accomplish the contractual scope of work;

evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payment.

(c) The COR does not have the authority to alter the contractor's obligations under the contract, and/or modify any of the expressed terms, conditions, specifications, or cost of the agreement. If, as a result of technical discussions, it is desirable to alter/change contractual obligations or the scope of work, the contracting officer must issue such changes.

G.2 INVOICING PROCEDURES:

ELECTRONIC SUBMISSION OF PAYMENT REQUESTS CLAUSE (FEBRUARY 2014)

(a) Definitions. As used in this clause-

(1) Contract financing payment has the meaning given in FAR 32.001.

(2) Invoice payment has the meaning given in FAR 32.001.

(3) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.

(b) Electronic Payment Requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this clause, and therefore no additional electronic invoice submission is required.

(c) Data Transmission. A contractor must ensure that the data transmission method and format comply with the following provisions:

(1) The contractor shall:

a. Address the invoice to the appropriate e-mail address specified in the contract.

b. Submit the invoice via attachment in PDF or TIFF format.

c. Submit only one invoice per electronic submittal.

d. Enter specific information in the subject line of the e-mail in the following format:

<Contractor Name>, DOL Agency, <Contract Number, BPA Call or Order Number>, Invoice

Number, <Invoice Amount>

Example: ABC Co, OASAM, DOL00-00-X0000/X0000, Invoice Number AB-1298433, $15,000.00.

e. Submit a copy of the email with the attached invoice to the contracting officer’s representative

(COR) at the COR email address specified in the contract.

f. Before sending another e-mail with the same invoice attachment, confirm whether DOL has already responded and/or whether you have received a success or failure response to your submission.

(2) The contractor MUST NOT:

a. Submit an invoice that exceeds the size limit of 16 megabytes (approximately 400-500 pages).

However, if the invoice exceed this limit, a summary invoice attachment of less than 16 megabytes should be e-mailed to the payment e-mail address above; while the detailed invoice, including any supplemental information, shall be sent to the COR or other representative at the address.

b. Submit an invoice that is heavy in shading or color.

https://www.acquisition.gov/far/current/html/Subpart%2032_1.html#wp1024838 https://www.acquisition.gov/far/current/html/Subpart%2032_1.html#wp1024838

1. An e-mailed PDF image cannot have any text that has a background with any color other than white. If the image has a shaded background, it will be converted to black, and the text will be illegible.

2. An emailed TIFF image must be black and white.

c. Submit more than one attachment, as subsequent attachments will not be recognized.

d. Submit more than one invoice in a single attachment.

e. Attempt to use the “Recall or Resend” email message feature.

(d) General Information. Payment due dates will be calculated only from the date that invoices are received in the electronic invoicing e-mail box and determined to be proper invoices.

Inquiries regarding invoices should be e-mailed to XXXInvoiceInquiries@dol.gov. The relevant invoice must be attached to the inquiry e-mail and the subject line of the e-mail must state “INQUIRY,” followed by the information described in paragraph (1) d. above.

Example: INQUIRY: <Contractor Name>, DOL Agency, <Contract Number, BPA Call or Order

Number>, Invoice Number, <Invoice Amount>

Do NOT use the electronic invoicing e-mail address for inquiries about the invoice.

(e) Invoice requirements. Invoices shall comply with FAR 32.905.

(f) Exceptions. Paper invoices should only be faxed or mailed through U.S. mail when electronic mail cannot be accomplished.

When invoices must be faxed due to e-mail size limitations, fax them to: 202-693-4830.

When paper invoices must be mailed due to e-mail size limitations, mail them to the following address:

U.S. Department of Labor

Office of Financial Management Operations

Room S-5526, Attn: Charleetta Smithers

200 Constitution Avenue, NW

Washington, DC 20210

(End of clause)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

mailto:InvoiceInquiries@dol.gov https://www.acquisition.gov/far/current/html/Subpart%2032_9.html#wp1032997

SECTION I - CONTRACT CLAUSES

II .1 CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation

Number, Title, and Date) in accordance with the clause at FAR "52.252-2 Clauses Incorporated By Reference" in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of

Whistleblower Rights (APR 2014)

52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013)

52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debannent (Aug 2013)

52.211-17, Delivery of Excess Quantities (Sep 1989) (Applies to fixed-price supplies).

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)

52.219-28 Post-Award Small Business Program Re-representation (JUL 2013)

52.222-6, Construction Wage Rate Requirements (MAY 2014)

52.222-3, Convict Labor (June 2003)

52.222-7, Withholding of Funds (MAY 2014)

52.222-8, Payrolls and Basic Records (MAY 2014)

52.222-9, Apprentices and Trainees (JUL 2005)

52.222-10, Compliance with Copeland Act Requirements (FEB 1988)

52.222-11, Subcontracts (Labor Standards) (MAY 2014)

52.222-12, Contract Termination-Debarment (MAY 2014)

52.222-13, Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014)

52.222-14, Disputes Concerning Labor Standards (FEB 1988)

52.222-15, Certification of Eligibility (MAY 2014)

52.222-19, Child Labor-Cooperation with Authorities and Remedies

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014)

52.222-21, Prohibition of Segregated Facilities (Apr 2015)

52.222-26, Equal Opportunity (Apr 2015)

52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)

52.222-50, Combating Trafficking in Persons (Mar 2015)

52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)

52.225-1, Buy American -Supplies (May 2014)

52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

52.228-11 Pledges of Assets (JAN 2012)

52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)

52.228-13 Alternative Payment Protections (JUL 2000)

52.228-14 Irrevocable Letter of Credit (NOV 2014)

52.232-1, Payments (Apr 1984)

52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014)

52.232-8, Discounts for Prompt Payment

52.232-11, Extras (Apr 1984)

52.232-25, Prompt Payment (Jul 2013)

52.232-27 Prompt Payment for Construction Contracts (MAY 2014)

52.232-33, Payment by Electronic Funds Transfer- System for Award Management (Jul 2013) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award

Management (SAM) database as its source of EFT information.)

52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013)

52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)

52.233-1, Disputes (May 2014)

52.233-3, Protest After Award (Aug 1996)

52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004)

52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-8 Other Contracts (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991)

52.236-26 Preconstruction Conference (FEB 1995)

52.242-14 Suspension of Work (APR 1984)

52.243-5 Changes and Changed Conditions (APR 1984)

52.244-6, Subcontracts for Commercial Items (Apr 2015)

52.253-1, Computer Generated Forms (Jan 1991)

52.249-2 - Termination for Convenience of the Government (Fixed-Price). (APR 2012)

52.249-2A*1 - Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP

1996)

52.249-10 Default (Fixed-Price Construction) - Alt I (APR 1984)

52.249-14 - Excusable Delays. (APR 1984)

52.225-9 Buy American -- Construction Materials (MAY 2014)

(a) Definitions. As used in this clause--

"Commercially available off-the-shelf (COTS) item"-

(1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Component" means an article, material, or supply incorporated directly into a construction material.

"Construction material" means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

"Cost of components" means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

"Domestic construction material" means-

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non availability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

"Foreign construction material" means a construction material other than a domestic construction material. "United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy

American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)).

The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None.

(3) The Contracting Officer may add other foreign construction material to the list in paragraph

(b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United

States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(l)

(i) Any Contractor request to use foreign construction material in accordance with paragraph

(b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following infonnation and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

I Construction material description Unit of measure II Quantity Price (dollars) * I !Item 1 II

!Foreign construction material II

!Domestic construction material I

!Item 2

!Foreign…

This is the start of the file's text. The full file is on GovTribe.