Career Technical Training Report Card.pdf

PDF 9 MB Posted

Attached to
Continued Operation and Career Transition Services for the Los Angeles Job Corps
Solicitation number
DOLJ11SA00003
Issued by

View the file

Other files

File Type Posted
Amendment 2.pdf PDF
Amendment 1.pdf PDF
Facility Survey —
Description of Pre-proposal Conference Walk-thru.doc DOC document
Map for Walk-through.pdf PDF
Inventory Estimate.doc DOC document
Regional Career Pathway Plan.doc DOC document
National Staff Compensation Report.pdf PDF
Site Map and Utilities.pdf PDF
Computerized Property Management Listing.pdf PDF
Monthly Center Summary Report.pdf PDF
Educational Attainment Report.pdf PDF
Center Report Card.pdf PDF
Career Transition Services Report Card.pdf PDF
Solicitation.doc DOC document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01/05/11 11:34 Outcome Measurement System

Career Technical Training Report (CTT-10)

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 22/14 14/8 12/10 10/10 10/7 6/5 4/3

NR Electrician NR Basic CTT 100.0% 30.8% 100.0% $10.40 100.0% $10.40 50.0% 100.0% $707.32 166.4% 80.0% 110.7% N/A N/A N/A

IF Facilities Mainte IF Basic CTT 63.6% 57.1% 83.3% $10.77 100.0% $10.77 70.0% 83.3% $420.00 98.8% 75.0% 89.6% N/A N/A N/A

CA Carpentry CA OLD Basic CTT 100.0% 0.0% 62.5% $11.92 100.0% $11.92 25.0% 100.0% $411.70 96.9% 60.0% 94.2% N/A N/A N/A

Pool/Credit 5/5 5/0 8/5 5/5 4/1 4/4 5/3

YC Carpentry YC Basic CTT 46.2% 66.7% 100.0% $10.99 83.3% $11.49 60.0% 0.0% $0.00 0.0% 0.0% 88.2%++ N/A N/A N/A

Pool/Credit 13/6 6/4 6/6 6/5 5/3 0/0 0/0

Pool/Credit 14/6 6/2 8/7 8/6 8/5 5/4 6/5

Pool/Credit 13/13 13/4 11/11 10/10 8/4 6/6 5/4

UB Plumbing UB Basic CTT 42.9% 33.3% 87.5% $12.19 75.0% $11.83 62.5% 80.0% $941.55 221.5% 83.3% 104.0% N/A N/A N/A

06 Home Builders Institute (HBI)

Pool/Credit 38/27 27/6 16/16 17/16 15/8 10/6 4/2

XM Emergency Medical Te Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 3/0 1/0 0/0 0/0 0/0 0/0 0/0

UC Culinary Arts Basic CTT 71.1% 22.2% 100.0% $9.26 94.1% $9.35 53.3% 60.0% $394.42 92.8% 50.0% 85.1% N/A N/A N/A

Pool/Credit 31/16 16/9 17/9 8/6 9/6 12/9 10/4

HK Security Protective Basic CTT 51.6% 56.3% 52.9% $9.05 75.0% $8.87 66.7% 75.0% $460.17 108.3% 40.0% 73.5% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 2/1

MO** Med Office Suppo OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 50.0% N/A N/A N/A N/A

Pool/Credit 42/38 38/16 51/33 22/16 30/19 22/17 24/15

AZ Clinical Med Assist Basic CTT 90.5% 42.1% 64.7% $11.86 72.7% $13.92 63.3% 77.3% $489.54 115.2% 62.5% 89.6% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/0

FO** Food Service FO OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 59/52 52/25 43/33 26/18 27/19 25/18 17/13

OS Medical Office Suppo Basic CTT 88.1% 48.1% 76.7% $11.80 69.2% $10.84 70.4% 72.0% $525.09 123.6% 76.5% 90.5% N/A N/A N/A

SA Human Ser Wk(RA) OLD Advanced CTT 92.3% 0.0% 100.0% $11.36 100.0% $11.36 81.8% 90.9% $503.84 118.6% 100.0% 103.5% N/A N/A N/A

Pool/Credit 13/12 12/0 11/11 11/11 11/9 11/10 7/7

NA Nurse Assis H Hlth A Basic CTT 86.4% 39.2% 62.8% $12.05 76.2% $13.84 63.6% 76.2% $527.35 124.1% 66.7% 90.6% N/A N/A N/A

Pool/Credit 59/51 51/20 43/27 21/16 22/14 21/16 15/10

Pool/Credit 23/15 15/3 12/10 9/8 9/3 8/5 1/1

OA** Office Admini OA OLD Basic CTT 65.2% 20.0% 83.3% $8.92 88.9% $8.38 33.3% 62.5% $375.88 88.4% 100.0% N/A N/A N/A N/A

01 Center Training Program

Grafton Job Corps Center Totals 76.1% 0.4% 0.7% $11.11 0.8% $11.33 0.6% 0.8% $511.22 120.3% 67.3% 89.7% N/A

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010100 Grafton Job Corps Center Contractor: C00300 ADAMS AND

ASSOCIATES

National Goals 70.0% 50.0% 90.0% $9.15 70.0% $9.70 80.0% 70.0% $425.00 70.0%

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool / Credit 335/255 256/97 238/178 153/127 158/98 130/100 101/68

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

IF Facilities Mainte IF Basic CTT 61.9% 7.7% 66.7% $10.59 91.7% $10.65 83.3% 50.0% $469.00 110.4% 100.0% 82.5% N/A N/A N/A

Pool/Credit 21/13 13/1 18/12 12/11 12/10 4/2 3/3

06 Home Builders Institute (HBI)

UC Culinary Arts Basic CTT 69.7% 21.7% 91.7% $8.97 85.0% $8.87 47.1% 35.7% $311.50 73.3% 55.6% 75.0% N/A N/A N/A

Pool/Credit 33/23 23/5 24/22 20/17 17/8 14/5 9/5

OH Office Administra OH Basic CTT 100.0% 12.5% 100.0% $8.15 100.0% $8.15 0.0% 0.0% $0.00 0.0% 0.0% 97.1%++ N/A N/A N/A

Pool/Credit 8/8 8/1 1/1 1/1 1/0 0/0 0/0

WG Welding WG Basic CTT 90.5% 31.6% 77.8% $12.09 81.8% $13.02 81.8% 66.7% $453.80 106.8% 66.7% 90.7% N/A N/A N/A

Pool/Credit 21/19 19/6 18/14 11/9 11/9 12/8 9/6

WE** Welding WE OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/1

Pool/Credit 32/25 25/0 22/18 18/15 17/7 14/8 8/6

AU** Auto Body Repair OLD Basic CTT 0.0% 0.0% 100.0% $8.50 50.0% $0.00 0.0% 100.0% $235.00 55.3% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 1/1 2/1 1/0 3/3 2/2

AY Automobile Techni AY Basic CTT 55.6% 0.0% 88.9% $9.54 66.7% $10.00 66.7% 100.0% $625.00 147.1% 0.0% 93.5% N/A N/A N/A

Pool/Credit 26/16 16/2 13/11 7/3 6/4 9/5 2/2

AB** Automobile Te AB OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 2/2

AI Collision Repair Ref Basic CTT 61.5% 12.5% 84.6% $8.71 42.9% $8.38 66.7% 55.6% $300.91 70.8% 100.0% 70.3% N/A N/A N/A

Pool/Credit 18/10 10/0 9/8 6/4 6/4 2/2 1/0

NA Nurse Assis H Hlth A Basic CTT 69.1% 28.6% 86.7% $10.88 82.1% $11.19 76.5% 75.0% $433.49 102.0% 81.8% 88.3% N/A N/A N/A

Pool/Credit 18/11 11/0 9/9 9/9 8/8 7/6 5/4

OA Office Admini OA OLD Basic CTT 78.1% 0.0% 81.8% $9.17 83.3% $9.10 41.2% 57.1% $363.66 85.6% 75.0% 80.4% N/A N/A N/A

Pool/Credit 81/56 56/16 45/39 39/32 34/26 24/18 11/9

LU Urban Forestry LU Basic CTT 61.1% 0.0% 100.0% $13.00 100.0% $13.00 100.0% 85.7% $553.56 130.2% 80.0% 101.4% N/A N/A N/A

Pool/Credit 15/4 4/2 1/1 1/1 1/1 1/1 0/0

CY Carpentry CY Basic CTT 26.7% 50.0% 100.0% $14.67 100.0% $14.67 100.0% 100.0% $650.00 152.9% 0.0% 105.8%

N/A N/A N/A

01 Center Training Program

Pool / Credit 273/185 185/33 161/136 126/103 114/77 90/58 53/40

Northlands Job Corps Center Totals 67.8% 0.2% 0.8% $10.38 0.8% $10.68 0.7% 0.6% $423.61 99.7% 75.5% 84.6%++ N/A

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010200 Northlands Job Corps Center Contractor: C11500 ALUTIIQ

PROFESSIONAL SERVICES

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

YC Carpentry YC Basic CTT 78.6% 0.0% 100.0% $9.98 61.5% $11.20 75.0% 100.0% $370.24 87.1% 50.0% 88.3% N/A N/A N/A

Pool/Credit 14/11 11/0 13/13 13/8 12/9 6/6 6/3

06 Home Builders Institute (HBI)

UC Culinary Arts Basic CTT 65.9% 0.0% 69.2% $8.39 97.0% $8.42 16.1% 56.3% $336.96 79.3% 57.1% 75.0% N/A N/A N/A

Pool/Credit 3/3 3/0 3/2 2/2 2/1 1/1 1/0

OS** Medical Office Suppo Basic CTT 100.0% 0.0% 66.7% $8.88 100.0% $8.88 50.0% 100.0% $315.40 74.2% 0.0% N/A N/A N/A N/A

Pool/Credit 36/26 26/0 23/19 18/13 18/13 12/7 7/6

WG Welding WG Basic CTT 72.2% 0.0% 82.6% $10.45 72.2% $11.33 72.2% 58.3% $544.97 128.2% 85.7% 87.7% N/A N/A N/A

Pool/Credit 91/60 60/0 52/36 33/32 31/5 16/9 14/8

Pool/Credit 21/10 10/0 8/8 4/4 3/1 1/0 2/2

Pool/Credit 1/1 1/0 1/1 1/1 0/0 1/0 2/1

BZ** Business Technol OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

BU** Facilities Mt BU OLD Basic CTT 100.0% 0.0% 100.0% $0.00 100.0% $0.00 0.0% 0.0% $0.00 0.0% 50.0% N/A N/A N/A N/A

BG Facilities Mainte BG Basic CTT 61.8% 1.5% 81.3% $10.04 77.1% $10.24 50.0% 43.8% $303.83 71.5% 71.4% 74.2% N/A N/A N/A

Pool/Credit 110/68 68/1 48/39 35/27 36/18 16/7 7/5

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/0 0/0

Pool/Credit 186/127 127/0 128/106 104/75 103/41 65/44 51/31

OA Office Admini OA OLD Basic CTT 47.6% 0.0% 100.0% $12.31 100.0% $12.31 33.3% 0.0% $0.00 0.0% 100.0% 95.6% N/A N/A N/A

NA Nurse Assis H Hlth A Basic CTT 68.3% 0.0% 82.8% $9.38 72.1% $9.74 39.8% 67.7% $402.58 94.7% 60.8% 80.3% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/1

HZ** Health Occupatio OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

01 Center Training Program

Penobscot Job Corps Center Totals 66.2% 0.0% 0.8% $9.51 0.8% $9.80 0.4% 0.6% $393.26 92.5% 62.6% 79.5% N/A

Pool / Credit 462/306 306/1 276/224 210/162 205/88 119/74 91/57

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010300 Penobscot Job Corps Center Contractor: C02900 CAREER

SYSTEMS DEVELOPMENT

CORPORATION

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 34/29 29/0 22/18 16/16 16/8 9/4 2/2

OS Medical Office Suppo Basic CTT 85.3% 0.0% 81.8% $9.58 100.0% $9.68 50.0% 44.4% $526.88 124.0% 100.0% 89.9% N/A N/A N/A

PF** Pharmacy Tech OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

PY Pharmacy Technician Basic CTT 56.3% 0.0% 68.4% $9.11 50.0% $9.28 23.1% 81.8% $423.90 99.7% 66.7% 75.0% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 2/2

OA Office Admini OA OLD Basic CTT 71.4% 0.0% 87.5% $8.94 89.5% $8.95 43.8% 57.1% $323.84 76.2% 33.3% 77.6% N/A N/A N/A

Pool/Credit 49/35 35/0 24/21 19/17 16/7 7/4 6/2

Pool/Credit 6/4 4/0 1/1 1/1 1/1 0/0 0/0

OH Office Administra OH Basic CTT 66.7% 0.0% 100.0% $10.00 100.0% $10.00 100.0% 0.0% $0.00 0.0% 0.0% 94.0%++ N/A N/A N/A

Pool/Credit 28/21 21/0 16/13 10/10 9/7 6/4 2/1

WG Welding WG Basic CTT 75.0% 0.0% 81.3% $11.08 100.0% $11.08 77.8% 66.7% $434.63 102.3% 50.0% 88.1% N/A N/A N/A

XK Computer Technici XK Basic CTT 66.7% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

UC Culinary Arts Basic CTT 72.0% 0.0% 73.0% $9.25 87.0% $9.57 44.4% 63.6% $350.25 82.4% 60.0% 78.4% N/A N/A N/A

Pool/Credit 32/18 18/0 19/13 12/6 13/3 11/9 6/4

Pool/Credit 50/36 36/0 37/27 23/20 18/8 11/7 5/3

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/0

WE** Welding WE OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

BZ** Business Technol OLD Basic CTT 0.0% 0.0% 0.0% $9.50 100.0% $9.50 0.0% 50.0% $287.50 67.6% 100.0% N/A N/A N/A N/A

Pool/Credit 78/58 58/0 56/41 38/29 34/15 19/11 14/8

CV** Computer Sev Tec OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 1/1 1/0 2/1 3/3

AB** Automobile Te AB OLD Basic CTT 0.0% 0.0% 0.0% $9.50 100.0% $9.50 100.0% 100.0% $368.25 86.6% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 1/1 1/1 0/0 2/1 1/1

AY Automobile Techni AY Basic CTT 74.4% 0.0% 73.2% $8.96 76.3% $8.91 44.1% 57.9% $382.97 90.1% 57.1% 76.7% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 1/1 1/1 2/2 0/0

NA Nurse Assis H Hlth A Basic CTT 76.2% 0.0% 87.5% $10.17 72.5% $10.30 50.0% 82.8% $406.54 95.7% 76.5% 86.8% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 0/0

NC** Network Cble Inst NC Basic CTT 0.0% 0.0% 100.0% $0.00 100.0% $0.00 0.0% 50.0% $480.00 112.9% 100.0% N/A N/A N/A N/A

Pool/Credit 84/64 64/0 48/42 40/29 34/17 29/24 17/13

FO** Food Service FO OLD Basic CTT 0.0% 0.0% 0.0% $0.00 100.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/0

HZ** Health Occupatio OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $737.00 173.4% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 1/1 0/0 0/0 0/0

01 Center Training Program

Region: 01 Boston Center: 010400 Westover Job Corps Center Contractor: C01500 MANAGEMENT

TRAINING CORPORATION

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 28/15 16/0 16/12 12/9 6/2 12/7 8/4

PC Plastering Basic CTT 53.6% 0.0% 75.0% $9.06 75.0% $9.49 33.3% 58.3% $362.00 85.2% 50.0% 73.1% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/1

PK** Plasterer OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

09 Plasterers/CementMason(OPCMIA)

NR Electrician NR Basic CTT 40.9% 0.0% 91.7% $11.60 81.8% $11.67 60.0% 70.0% $591.29 139.1% 83.3% 91.0% N/A N/A N/A

Pool/Credit 22/9 10/0 12/11 11/9 10/6 10/7 6/5

IF Facilities Mainte IF Basic CTT 44.0% 0.0% 80.0% $10.62 100.0% $10.62 50.0% 80.0% $532.10 125.2% 100.0% 90.5% N/A N/A N/A

Pool/Credit 25/11 11/0 15/12 11/11 10/5 10/8 5/5

UB Plumbing UB Basic CTT 43.5% 0.0% 100.0% $8.95 60.0% $9.42 80.0% 100.0% $421.50 99.2% 71.4% 83.6% N/A N/A N/A

Pool/Credit 23/10 10/0 7/7 5/3 5/4 6/6 7/5

PL** Plumber OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/0 0/0

EK** Electrician EK OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $165.00 38.8% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 1/1

06 Home Builders Institute (HBI)

Pool/Credit 8/0 0/0 2/0 1/1 1/1 3/3 5/4

CA Carpentry CA OLD Basic CTT 0.0% 0.0% 0.0% $14.67 100.0% $14.67 100.0% 100.0% $495.60 116.6% 80.0% 75.1% N/A N/A N/A

Pool/Credit 20/18 18/0 19/17 16/14 13/8 9/5 2/2

ZA Const-Carpty Pre-App Basic CTT 90.0% 0.0% 89.5% $10.00 87.5% $10.35 61.5% 55.6% $329.13 77.4% 100.0% 85.7% N/A N/A N/A

04 United Brotherhood Carpt.(UBC)

Pool/Credit 15/4 4/0 5/3 3/2 3/1 5/4 6/4

BR Bricklayer BR OLD Basic CTT 26.7% 0.0% 60.0% $10.00 66.7% $11.00 33.3% 80.0% $501.17 117.9% 66.7% 75.6% N/A N/A N/A

Pool/Credit 8/8 8/0 6/6 6/5 6/4 3/3 0/0

NB Bricklaying NB Basic CTT 100.0% 0.0% 100.0% $11.53 83.3% $12.23 66.7% 100.0% $507.00 119.3% 0.0% 104.5%

N/A N/A N/A

03 Intrnatl. Masonry Inst. (IMI)

ZN Computer Tech ZN OLD Basic CTT 79.4% 7.4% 85.0% $8.69 81.8% $8.35 42.9% 50.0% $354.18 83.3% 40.0% 77.0% N/A N/A N/A

Pool/Credit 3/2 2/0 0/0 0/0 0/0 0/0 0/0

Pool/Credit 34/27 27/2 20/17 11/9 7/3 8/4 5/2

Westover Job Corps Center Totals 67.5% 0.0% 0.8% $9.74 0.8% $9.93 0.5% 0.7% $425.24 100.1% 67.9% 83.0%++ N/A

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010400 Westover Job Corps Center Contractor: C01500 MANAGEMENT

TRAINING CORPORATION

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool / Credit 547/369 371/2 326/262 239/195 204/101 167/116 106/72

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

ST** Stationary Engineer Basic CTT 100.0% 0.0% 80.0% $11.06 25.0% $19.00 50.0% 40.0% $236.88 55.7% 40.0% N/A N/A N/A N/A

Pool/Credit 1/1 1/0 5/4 4/1 4/2 5/2 5/2

07 Operating Engineers (IUOE)

Pool/Credit 0/0 0/0 2/0 0/0 0/0 0/0 1/1

BU** Facilities Mt BU OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 16/10 10/4 11/8 8/7 7/3 2/1 1/1

IF Facilities Mainte IF Basic CTT 62.5% 40.0% 72.7% $9.65 87.5% $10.05 42.9% 50.0% $265.00 62.4% 100.0% 74.7% N/A N/A N/A

06 Home Builders Institute (HBI)

ZA Const-Carpty Pre-App Basic CTT 100.0% 100.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 4/4 4/4 0/0 0/0 0/0 0/0 0/0

Pool/Credit 13/12 12/0 12/8 8/7 7/4 7/5 6/4

CA Carpentry CA OLD Basic CTT 92.3% 0.0% 66.7% $11.40 87.5% $11.97 57.1% 71.4% $470.96 110.8% 66.7% 89.6% N/A N/A N/A

04 United Brotherhood Carpt.(UBC)

FO** Food Service FO OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

NA Nurse Assis H Hlth A Basic CTT 82.5% 7.7% 84.9% $9.80 53.7% $11.40 63.9% 65.4% $416.40 98.0% 42.1% 80.6% N/A N/A N/A

Pool/Credit 63/52 52/4 53/45 41/22 36/23 26/17 19/8

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/0 3/0

HZ** Health Occupatio OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 66.7% $437.50 102.9% 66.7% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 3/2 3/2

Pool/Credit 30/28 28/4 19/18 16/15 11/6 8/4 6/2

XM Emergency Medical Te Basic CTT 90.9% 10.0% 100.0% $13.01 100.0% $12.96 100.0% 0.0% $0.00 0.0% 0.0% 107.0%

N/A N/A N/A

Pool/Credit 11/10 10/1 8/8 6/6 7/7 0/0 0/0

UC Culinary Arts Basic CTT 93.3% 14.3% 94.7% $10.67 93.8% $9.77 54.5% 50.0% $201.75 47.5% 33.3% 80.0% N/A N/A N/A

UC Culinary Arts Advanced CTT 100.0% 10.0% 100.0% $8.86 85.7% $8.74 42.9% 50.0% $316.35 74.4% 0.0% 85.0% N/A N/A N/A

Pool/Credit 10/10 10/1 7/7 7/6 7/3 2/1 2/0

01 Center Training Program

New Haven Job Corps Center Totals 85.8% 0.1% 0.8% $10.32 0.7% $11.04 0.6% 0.6% $377.93 88.9% 43.5% 81.6% N/A

Pool / Credit 148/127 127/18 117/98 90/64 79/48 54/32 46/20

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010500 New Haven Job Corps Center Contractor: C02900 CAREER

SYSTEMS DEVELOPMENT

CORPORATION

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/0 1/1

NP Painting NP Basic CTT 50.0% 0.0% 100.0% $7.50 0.0% $0.00 100.0% 0.0% $0.00 0.0% 0.0% 54.9%++ N/A N/A N/A

EK** Electrician EK OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

CA Carpentry CA OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 1/0 0/0 0/0 0/0 0/0 0/0 1/1

Pool/Credit 2/1 1/0 1/1 1/0 1/1 0/0 0/0

06 Home Builders Institute (HBI)

Pool/Credit 62/53 53/1 47/31 29/22 27/12 24/11 12/9

OS Medical Office Suppo Basic CTT 58.5% 0.0% 78.9% $8.71 73.0% $8.63 33.3% 50.0% $353.10 83.1% 50.0% 72.0% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 3/2

NA Nurse Assis H Hlth A Basic CTT 85.5% 1.9% 66.0% $9.90 75.9% $9.70 44.4% 45.8% $458.37 107.9% 75.0% 80.0% N/A N/A N/A

Pool/Credit 118/69 69/0 57/45 37/27 39/13 24/12 10/5

YA Computer Networking Basic CTT 57.7% 0.0% 79.3% $9.57 62.5% $10.20 47.1% 62.5% $396.19 93.2% 66.7% 76.3% N/A N/A N/A

Pool/Credit 52/30 30/0 29/23 24/15 17/8 16/10 3/2

UC Culinary Arts Basic CTT 59.5% 4.5% 92.3% $8.99 81.8% $9.02 70.0% 71.4% $313.08 73.7% 33.3% 77.5% N/A N/A N/A

Pool/Credit 37/22 22/1 13/12 11/9 10/7 7/5 6/2

AZ Clinical Med Assist Basic CTT 17.1% 33.3% 50.0% $7.50 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% 36.8%++ N/A N/A N/A

Pool/Credit 35/6 6/2 2/1 1/0 1/0 0/0 1/1

CK** Computer Ntw/Cis OLD Basic CTT 100.0% 0.0% 100.0% $0.00 100.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 49/26 26/0 23/16 16/11 14/11 8/5 10/7

AB** Automobile Te AB OLD Basic CTT 0.0% 0.0% 0.0% $11.63 50.0% $11.00 100.0% 100.0% $468.00 110.1% 60.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 3/0 2/1 2/2 1/1 5/3

AY Automobile Techni AY Basic CTT 53.1% 0.0% 69.6% $9.58 68.8% $9.46 78.6% 62.5% $550.96 129.6% 70.0% 79.8% N/A N/A N/A

Pool/Credit 1/1 1/0 2/2 2/2 0/0 2/0 4/4

HZ** Health Occupatio OLD Basic CTT 100.0% 0.0% 100.0% $0.00 100.0% $0.00 0.0% 0.0% $0.00 0.0% 50.0% N/A N/A N/A N/A

Pool/Credit 1/1 1/0 1/1 1/1 0/0 0/0 2/1

MO** Med Office Suppo OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 66.7% N/A N/A N/A N/A

Pool/Credit 38/25 25/4 14/13 12/7 15/11 10/8 14/9

CP** Computer Sup Speclst Basic CTT 0.0% 0.0% 100.0% $0.00 100.0% $0.00 0.0% 50.0% $0.00 0.0% 50.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 1/1 1/1 0/0 2/1 2/1

HU Heavy Trck Drving-HU Basic CTT 65.8% 16.0% 92.9% $10.46 58.3% $11.45 73.3% 80.0% $450.10 105.9% 64.3% 85.6% N/A N/A N/A

01 Center Training Program

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010600 Loring Job Corps Center Contractor: C02900 CAREER

SYSTEMS DEVELOPMENT

CORPORATION

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 18/12 12/1 6/5 4/4 4/3 6/4 6/3

CB Cement Mason CB Basic CTT 66.7% 8.3% 83.3% $9.23 100.0% $9.23 75.0% 66.7% $594.83 140.0% 50.0% 90.0% N/A N/A N/A

09 Plasterers/CementMason(OPCMIA)

Pool/Credit 17/8 8/0 12/10 10/9 9/7 8/7 9/8

PA Painter PA OLD Basic CTT 47.1% 0.0% 83.3% $9.32 90.0% $9.54 77.8% 87.5% $406.96 95.8% 88.9% 84.3% N/A N/A N/A

NR Electrician NR Basic CTT 47.8% 0.0% 80.0% $8.71 88.9% $8.79 57.1% 71.4% $294.00 69.2% 50.0% 74.2% N/A N/A N/A

Pool/Credit 23/11 11/0 10/8 9/8 7/4 7/5 4/2

Pool/Credit 18/8 8/1 9/7 7/7 7/5 4/4 7/5

YC Carpentry YC Basic CTT 44.4% 12.5% 77.8% $9.76 100.0% $9.76 71.4% 100.0% $600.00 141.2% 71.4% 92.7% N/A N/A N/A

Pool / Credit 472/273 273/10 230/176 167/124 153/84 120/73 100/66

Loring Job Corps Center Totals 57.8% 0.0% 0.8% $9.40 0.7% $9.46 0.5% 0.6% $428.89 100.9% 66.0% 77.8% N/A

Region: 01 Boston Center: 010600 Loring Job Corps Center Contractor: C02900 CAREER

SYSTEMS DEVELOPMENT

CORPORATION

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 7/2 2/0 6/3 3/2 3/1 4/1 4/1

CA Carpentry CA OLD Basic CTT 28.6% 0.0% 50.0% $10.67 66.7% $11.63 33.3% 25.0% $700.00 164.7% 25.0% 71.6% N/A N/A N/A

04 United Brotherhood Carpt.(UBC)

CL Clerical Occupations Advanced CTT 65.2% 0.0% 73.5% $11.95 80.0% $12.45 72.0% 96.0% $525.29 123.6% 100.0% 93.9% N/A N/A N/A

Pool/Credit 46/30 30/0 34/25 25/20 25/18 25/24 15/15

02 Trnsport-Comm Int Union (TCU)

Pool/Credit 3/3 3/3 2/2 2/2 2/2 0/0 0/0

UC Culinary Arts Basic CTT 58.6% 5.9% 93.3% $8.44 80.0% $8.38 46.2% 62.5% $288.22 67.8% 46.7% 74.9% N/A N/A N/A

Pool/Credit 26/16 16/6 23/14 13/8 12/6 15/13 10/5

OH Office Administra OH Basic CTT 100.0% 100.0% 100.0% $10.75 100.0% $10.75 100.0% 0.0% $0.00 0.0% 0.0% 103.5%

N/A N/A N/A

Pool/Credit 29/17 17/1 15/14 15/12 13/6 16/10 15/7

ZN Computer Tech ZN OLD Basic CTT 74.2% 13.0% 72.4% $12.15 60.0% $15.04 50.0% 70.0% $558.95 131.5% 100.0% 90.8% N/A N/A N/A

Pool/Credit 31/23 23/3 29/21 20/12 20/10 20/14 5/5

XC Computer Systems Adm Advanced CTT 92.3% 8.3% 80.0% $13.41 81.8% $14.92 66.7% 88.9% $601.15 141.4% 75.0% 102.7% N/A N/A N/A

Pool/Credit 13/12 12/1 15/12 11/9 12/8 9/8 4/3

BZ** Business Technol OLD Basic CTT 0.0% 0.0% 50.0% $20.00 0.0% $0.00 100.0% 100.0% $800.00 188.2% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 2/1 0/0 1/1 1/1 0/0

CP** Computer Sup Speclst Advanced CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 31/20 20/0 19/17 13/9 13/7 8/8 6/3

AB** Automobile Te AB OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/0 1/0

AY Automobile Techni AY Basic CTT 64.5% 0.0% 89.5% $10.84 69.2% $9.88 53.8% 100.0% $522.89 123.0% 50.0% 90.9% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 3/3

NA Nurse Assis H Hlth A Basic CTT 67.6% 8.0% 90.9% $10.14 75.0% $10.77 50.0% 68.2% $448.68 105.6% 71.4% 85.8% N/A N/A N/A

Pool/Credit 37/25 25/2 22/20 20/15 18/9 22/15 14/10

OA Office Admini OA OLD Basic CTT 61.5% 37.5% 60.9% $9.25 61.5% $8.83 50.0% 86.7% $303.44 71.4% 50.0% 71.5% N/A N/A N/A

Pool/Credit 48/38 38/7 29/23 25/14 25/12 20/16 5/4

CV** Computer Sev Tec OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $673.08 158.4% 50.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 2/1

HK Security Protective Basic CTT 79.2% 18.4% 79.3% $10.44 56.0% $10.90 48.0% 80.0% $426.22 100.3% 80.0% 84.2% N/A N/A N/A

01 Center Training Program

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010700 Shriver Job Corps Center Contractor: C00300 ADAMS AND

ASSOCIATES

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 10/5 5/1 4/3 3/2 3/2 3/2 3/1

CB Cement Mason CB Basic CTT 50.0% 20.0% 75.0% $11.50 66.7% $13.25 66.7% 66.7% $425.00 100.0% 33.3% 78.5% N/A N/A N/A

09 Plasterers/CementMason(OPCMIA)

Pool/Credit 4/2 2/0 2/2 2/2 2/2 1/0 0/0

NE Painting - NE Basic CTT 50.0% 0.0% 100.0% $11.50 100.0% $11.50 100.0% 0.0% $0.00 0.0% 0.0% 93.8%++ N/A N/A N/A

PA Painter PA OLD Basic CTT 72.7% 0.0% 90.0% $9.04 71.4% $9.88 42.9% 100.0% $334.79 78.8% 85.7% 85.7% N/A N/A N/A

Pool/Credit 11/8 8/0 10/9 7/5 7/3 7/7 7/6

08 Painters & AlliedTrades(IUPAT)

ZA Const-Carpty Pre-App Basic CTT 91.7% 18.2% 100.0% $12.20 66.7% $12.98 57.1% 100.0% $168.00 39.5% 0.0% 89.1%++ N/A N/A N/A

Pool/Credit 12/11 11/2 7/7 6/4 7/4 1/1 0/0

Pool / Credit 308/212 212/26 219/173 165/116 163/91 154/121 94/64

Shriver Job Corps Center Totals 68.8% 0.1% 0.8% $10.97 0.7% $11.61 0.6% 0.8% $457.32 107.6% 68.1% 85.9% N/A

Region: 01 Boston Center: 010700 Shriver Job Corps Center Contractor: C00300 ADAMS AND

ASSOCIATES

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

YC Carpentry YC Basic CTT 62.1% 22.2% 87.5% $8.95 85.7% $9.03 71.4% 60.0% $263.70 62.0% 40.0% 74.4% N/A N/A N/A

Pool/Credit 29/18 18/4 16/14 14/12 14/10 10/6 5/2

06 Home Builders Institute (HBI)

Pool/Credit 23/21 21/3 17/12 7/3 12/5 14/11 1/0

UC Culinary Arts Basic CTT 84.8% 46.4% 85.0% $8.59 92.9% $8.64 38.5% 70.0% $320.26 75.4% 66.7% 82.6% N/A N/A N/A

OS Medical Office Suppo Basic CTT 91.3% 14.3% 70.6% $8.53 42.9% $8.00 41.7% 78.6% $329.86 77.6% 0.0% 74.8% N/A N/A N/A

OH Office Administra OH Basic CTT 100.0% 100.0% 100.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 1/1 1/1 1/1 0/0 0/0 0/0 0/0

ZN Computer Tech ZN OLD Basic CTT 92.9% 23.1% 90.9% $10.25 100.0% $10.88 50.0% 63.6% $426.21 100.3% 75.0% 92.2% N/A N/A N/A

Pool/Credit 14/13 13/3 11/10 4/4 6/3 11/7 4/3

Pool/Credit 19/14 14/5 15/12 10/8 10/7 3/3 2/1

Pool/Credit 33/28 28/13 20/17 14/13 13/5 10/7 9/6

WG Welding WG Basic CTT 73.7% 35.7% 80.0% $11.39 80.0% $12.06 70.0% 100.0% $362.00 85.2% 50.0% 88.0% N/A N/A N/A

Pool/Credit 1/1 1/0 4/3 5/1 5/0 3/3 0/0

CV** Computer Sev Tec OLD Basic CTT 0.0% 0.0% 0.0% $9.38 0.0% $0.00 0.0% 100.0% $560.00 131.8% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 1/0 1/0 1/1 1/1

HL Hotel and Lodging Basic CTT 100.0% 40.0% 57.1% $8.30 100.0% $8.30 33.3% 55.6% $291.30 68.5% 50.0% 75.9% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 1/0 1/0 2/2 1/1

AZ** Clinical Med Assist Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $559.00 131.5% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 1/0 0/0 0/0 1/1 1/1

BZ** Business Technol OLD Basic CTT 0.0% 0.0% 0.0% $9.38 0.0% $0.00 0.0% 100.0% $390.50 91.9% 100.0% N/A N/A N/A N/A

Pool/Credit 5/5 5/2 7/4 3/3 3/1 9/5 4/2

OA Office Admini OA OLD Basic CTT 76.6% 10.5% 85.3% $8.79 41.4% $8.78 37.9% 66.7% $362.87 85.4% 60.0% 74.7% N/A N/A N/A

OB** Accounting Sv OB OLD Basic CTT 100.0% 0.0% 75.0% $8.21 20.0% $8.00 0.0% 100.0% $287.08 67.5% 0.0% N/A N/A N/A N/A

Pool/Credit 47/36 38/4 34/29 29/12 29/11 18/12 10/6

Pool/Credit 43/27 27/14 34/26 25/21 25/12 31/30 11/9

Pool/Credit 11/9 9/3 8/6 4/4 4/3 8/3 3/3

MN Manufacturing Basic CTT 81.8% 33.3% 75.0% $10.29 100.0% $10.29 75.0% 37.5% $432.65 101.8% 100.0% 84.7% N/A N/A N/A

NA Nurse Assis H Hlth A Basic CTT 62.8% 51.9% 76.5% $9.55 84.0% $9.94 48.0% 96.8% $410.78 96.7% 81.8% 86.0% N/A N/A N/A

01 Center Training Program

Exeter Job Corps Center Totals 76.5% 0.3% 0.8% $9.22 0.7% $9.55 0.5% 0.8% $370.36 87.1% 67.3% 80.5% N/A

Pool / Credit 226/173 175/52 168/134 117/81 123/57 121/91 52/35

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010800 Exeter Job Corps Center Contractor: C00300 ADAMS AND

ASSOCIATES

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 84/78 78/25 44/41 37/20 33/15 15/11 4/2

NA Nurse Assis H Hlth A Basic CTT 92.9% 32.1% 93.2% $10.35 54.1% $11.58 45.5% 73.3% $350.27 82.4% 50.0% 83.8% N/A N/A N/A

Pool/Credit 2/2 2/1 0/0 0/0 0/0 0/0 0/0

XF Insurance & Financia Basic CTT 100.0% 50.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

12 Other

Pool/Credit 40/22 22/10 13/12 12/10 8/3 7/3 2/2

NA Nurse Assis H Hlth A Basic CTT 37.9% 27.3% 47.3% $8.94 54.5% $9.45 55.6% 57.6% $361.28 85.0% 72.4% 63.0% N/A N/A N/A

Pool/Credit 58/22 22/6 55/26 22/12 18/10 33/19 29/21

HZ** Health Occupatio OLD Basic CTT 100.0% 0.0% 100.0% $8.25 100.0% $8.25 100.0% 100.0% $330.00 77.6% 0.0% N/A N/A N/A N/A

Pool/Credit 1/1 1/0 1/1 1/1 1/1 1/1 0/0

MN Manufacturing Basic CTT 55.0% 45.5% 92.3% $10.02 83.3% $10.32 37.5% 42.9% $345.00 81.2% 100.0% 79.1% N/A N/A N/A

Pool/Credit 22/18 18/2 33/19 19/17 14/5 17/10 12/7

XF Insurance & Financia Basic CTT 29.4% 30.0% 100.0% $10.98 100.0% $10.98 0.0% 100.0% $345.00 81.2% 0.0% 88.7%++ N/A N/A N/A

OA Office Admini OA OLD Basic CTT 81.8% 11.1% 57.6% $8.99 89.5% $8.81 35.7% 58.8% $423.95 99.8% 58.3% 78.3% N/A N/A N/A

Pool/Credit 34/10 10/3 5/5 4/4 1/0 1/1 0/0

01 Center Training Program

Pool / Credit 241/153 153/47 151/104 95/64 75/34 74/45 47/32

Hartford Job Corps Center Totals 63.5% 0.3% 0.7% $9.70 0.7% $10.18 0.5% 0.6% $370.83 87.3% 68.1% 74.9%++ N/A

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 010900 Hartford Job Corps Center Contractor: C11600 EDUCATION AND

TRAINING RESOURCES

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

AE Industrial Engineer Basic CTT 50.0% 0.0% 100.0% $7.25 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% 54.5%++ N/A N/A N/A

Pool/Credit 2/1 1/0 1/1 1/0 1/0 0/0 0/0

Pool/Credit 5/2 2/0 2/2 2/0 2/1 2/2 0/0

Pool/Credit 4/2 2/0 1/1 1/1 1/1 0/0 0/0

AD Mechanical Engineer Basic CTT 40.0% 0.0% 100.0% $7.25 0.0% $0.00 50.0% 100.0% $803.75 189.1% 0.0% 81.4%++ N/A N/A N/A

PY Pharmacy Technician Basic CTT 100.0% 0.0% 100.0% $7.25 0.0% $0.00 100.0% 100.0% $181.25 42.6% 0.0% 67.7%++ N/A N/A N/A

RG Registered Nurse Basic CTT 50.0% 0.0% 100.0% $11.54 100.0% $11.54 100.0% 0.0% $0.00 0.0% 0.0% 93.9%++ N/A N/A N/A

Pool/Credit 1/1 1/0 1/1 1/0 1/1 1/1 0/0

RT Respiratory Therapy Basic CTT 100.0% 0.0% 50.0% $7.25 0.0% $0.00 0.0% 100.0% $166.75 39.2% 100.0% 58.8% N/A N/A N/A

12 Other

Pool/Credit 4/0 0/0 0/0 0/0 0/0 0/0 0/0

OH Office Administra OH Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

RZ Retail Sales Basic CTT 89.1% 49.0% 90.9% $7.20 92.5% $7.38 31.3% 64.7% $222.81 52.4% 33.3% 76.3% N/A N/A N/A

Pool/Credit 28/23 23/11 21/16 17/14 8/3 15/9 18/6

Pool/Credit 55/49 49/24 44/40 40/37 16/5 34/22 21/7

OA Office Admini OA OLD Basic CTT 82.1% 47.8% 76.2% $7.07 82.4% $6.85 37.5% 60.0% $222.69 52.4% 33.3% 69.7% N/A N/A N/A

PV Licen Prac/Voc Nurse Basic CTT 63.2% 41.7% 100.0% $7.80 90.0% $7.85 88.9% 89.5% $331.23 77.9% 76.9% 84.5% N/A N/A N/A

Pool/Credit 38/24 24/10 20/20 20/18 18/16 19/17 13/10

BG Facilities Mainte BG Basic CTT 72.3% 38.2% 94.4% $7.04 79.4% $7.32 45.8% 61.5% $292.42 68.8% 26.7% 73.9% N/A N/A N/A

Pool/Credit 47/34 34/13 36/34 34/27 24/11 26/16 15/4

BZ** Business Technol OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 3/1

AI** Collision Repair Ref Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $0.00 0.0% 50.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 2/1

AU** Auto Body Repair OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 33.3% N/A N/A N/A N/A

Pool/Credit 27/16 16/4 16/15 16/7 10/4 6/5 7/5

LN** Lic Pract Nurse OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $336.00 79.1% 75.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 4/3

EC Electrical Basic CTT 59.3% 25.0% 93.8% $7.58 43.8% $7.25 40.0% 83.3% $385.18 90.6% 71.4% 75.9% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/0

EC Electrical EC Basic CTT 59.3% 25.0% 93.8% $7.58 43.8% $7.25 40.0% 83.3% $385.18 90.6% 71.4% 75.9% N/A N/A N/A

Pool/Credit 27/16 16/4 16/15 16/7 10/4 6/5 7/5

01 Center Training Program

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 020100 Arecibo Job Corps Center Contractor: C02500 RES CARE INC.

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 1/1 1/0 2/1 1/0 1/0 1/1 1/1

Arecibo Job Corps Center Totals 70.7% 0.4% 0.9% $7.37 0.7% $7.53 0.5% 0.7% $303.13 71.3% 44.7% 76.2% N/A

Pool / Credit 239/169 169/66 160/146 149/111 92/46 112/80 92/43

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 020100 Arecibo Job Corps Center Contractor: C02500 RES CARE INC.

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

OA Office Admini OA OLD Basic CTT 78.1% 0.0% 100.0% $6.89 87.0% $7.11 7.1% 65.4% $263.06 61.9% 36.8% 76.9% N/A N/A N/A

Pool/Credit 32/25 25/0 23/23 23/20 14/1 26/17 19/7

PV Licen Prac/Voc Nurse Basic CTT 73.3% 4.5% 96.2% $7.14 72.0% $7.42 42.9% 66.7% $261.25 61.5% 16.7% 72.7% N/A N/A N/A

Pool/Credit 23/13 13/4 17/14 14/10 12/6 15/12 9/6

LN** Lic Pract Nurse OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/0

MD Cement Masonry Basic CTT 56.5% 30.8% 82.4% $7.64 71.4% $7.19 50.0% 80.0% $271.13 63.8% 66.7% 72.6% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/0

XM Emergency Medical Te Basic CTT 50.0% 22.2% 100.0% $7.43 0.0% $0.00 66.7% 0.0% $0.00 0.0% 0.0% 54.8%++ N/A N/A N/A

Pool/Credit 18/9 9/2 3/3 3/0 3/2 0/0 0/0

SE** Security Officer OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 30/22 22/1 26/25 25/18 21/9 18/12 6/1

RZ Retail Sales Basic CTT 63.6% 85.7% 90.9% $7.15 90.0% $7.30 25.0% 64.7% $215.13 50.6% 41.7% 72.2% N/A N/A N/A

Pool/Credit 33/21 21/18 22/20 20/18 12/3 17/11 12/5

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 2/1

BZ** Business Technol OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 50.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/1

CE** Cement Mason CE OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 32/20 20/8 15/14 15/10 14/7 15/10 13/5

BG Facilities Mainte BG Basic CTT 62.5% 40.0% 93.3% $7.50 66.7% $7.25 50.0% 66.7% $252.88 59.5% 38.5% 70.8% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 3/2

BU** Facilities Mt BU OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 66.7% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 4/1

FU** Furniture Uphlst OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 25.0% N/A N/A N/A N/A

HK Security Protective Basic CTT 65.5% 15.8% 92.9% $6.71 69.2% $6.83 0.0% 30.8% $261.00 61.4% 40.0% 65.5% N/A N/A N/A

Pool/Credit 29/19 19/3 14/13 13/9 7/0 13/4 10/4

EC Electrical Basic CTT 67.6% 17.4% 90.5% $7.20 77.8% $7.18 30.8% 63.6% $244.50 57.5% 30.8% 71.2% N/A N/A N/A

Pool/Credit 34/23 23/4 21/19 18/14 13/4 22/14 13/4

Pool/Credit 34/23 23/4 21/19 18/14 13/4 22/14 13/4

EC Electrical EC Basic CTT 67.6% 17.4% 90.5% $7.20 77.8% $7.18 30.8% 63.6% $244.50 57.5% 30.8% 71.2% N/A N/A N/A

01 Center Training Program

Barranquitas Job Corps Center Totals 66.0% 0.3% 0.9% $7.21 0.8% $7.24 0.3% 0.6% $252.20 59.3% 39.4% 71.8% N/A

Pool / Credit 265/175 175/44 162/150 149/113 109/36 148/94 107/41

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 020200 Barranquitas Job Corps Center Contractor: C02500 RES CARE INC.

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 16/6 6/2 4/4 4/4 4/3 2/2 0/0

NR Electrician NR Basic CTT 63.2% 91.7% 83.3% $10.99 90.0% $10.57 60.0% 55.6% $406.06 95.5% 85.7% 84.0% N/A N/A N/A

Pool/Credit 19/12 12/11 12/10 10/9 10/6 9/5 7/6

EK** Electrician EK OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $200.00 47.1% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 0/0

NP Painting NP Basic CTT 37.5% 33.3% 100.0% $8.90 100.0% $8.90 75.0% 100.0% $519.88 122.3% 0.0% 92.9%++ N/A N/A N/A

Pool/Credit 25/17 17/9 17/16 14/13 13/8 5/4 4/4

YC Carpentry YC Basic CTT 57.9% 90.9% 80.0% $9.54 77.8% $8.57 50.0% 71.4% $414.35 97.5% 100.0% 81.5% N/A N/A N/A

Pool/Credit 19/11 11/10 10/8 9/7 8/4 7/5 4/4

PA Painter PA OLD Basic CTT 75.0% 11.1% 90.0% $9.84 90.0% $9.96 60.0% 85.7% $629.55 148.1% 100.0% 98.7% N/A N/A N/A

Pool/Credit 12/9 9/1 10/9 10/9 10/6 7/6 2/2

UB Plumbing UB Basic CTT 68.0% 52.9% 94.1% $9.38 92.9% $9.41 61.5% 80.0% $665.47 156.6% 100.0% 98.6% N/A N/A N/A

06 Home Builders Institute (HBI)

Pool/Credit 121/99 99/56 94/81 79/68 66/42 52/37 31/21

NA Nurse Assis H Hlth A Basic CTT 81.8% 56.6% 86.2% $10.31 86.1% $10.08 63.6% 71.2% $420.27 98.9% 67.7% 87.7% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 1/1

PF** Pharmacy Tech OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $427.50 100.6% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 1/0 0/0 0/0 0/0 0/0

FO** Food Service FO OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 4/3 3/2 3/1 3/3 7/6

HZ** Health Occupatio OLD Basic CTT 0.0% 0.0% 75.0% $10.36 66.7% $10.54 33.3% 100.0% $393.12 92.5% 85.7% N/A N/A N/A N/A

Pool/Credit 33/25 25/14 22/22 21/14 21/13 14/13 7/6

PY Pharmacy Technician Basic CTT 75.8% 56.0% 100.0% $9.34 66.7% $9.20 61.9% 92.9% $374.98 88.2% 85.7% 87.7% N/A N/A N/A

UC Culinary Arts Basic CTT 66.7% 72.7% 87.5% $8.29 93.3% $8.24 73.3% 100.0% $287.68 67.7% 50.0% 82.5% N/A N/A N/A

Pool/Credit 33/22 22/16 16/14 15/14 15/11 6/6 2/1

PV Licen Prac/Voc Nurse Basic CTT 77.8% 100.0% 88.9% $11.06 73.3% $11.80 26.7% 85.7% $561.34 132.1% 80.0% 95.3% N/A N/A N/A

Pool/Credit 18/14 14/14 18/16 15/11 15/4 7/6 5/4

Pool/Credit 4/4 4/4 1/1 1/0 1/0 0/0 0/0

PV Licen Prac/Voc Nurse Advanced CTT 100.0% 100.0% 100.0% $10.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% 70.6%++ N/A N/A N/A

01 Center Training Program

Cassadaga Job Corps Center Totals 73.0% 0.6% 0.9% $9.94 0.8% $9.80 0.6% 0.8% $437.09 102.8% 78.6% 88.0%++ N/A

Pool / Credit 300/219 219/137 209/184 181/151 166/98 114/89 70/55

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 020300 Cassadaga Job Corps Center Contractor: C02900 CAREER

SYSTEMS DEVELOPMENT

CORPORATION

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

NR Electrician NR Basic CTT 57.6% 10.5% 95.2% $11.42 90.5% $11.82 68.4% 100.0% $423.34 99.6% 75.0% 93.5% N/A N/A N/A

06 Home Builders Institute (HBI)

MC** Material Handler OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/1

OA Office Admini OA OLD Basic CTT 54.1% 0.0% 74.4% $8.28 83.3% $8.25 37.5% 69.2% $299.93 70.6% 58.3% 72.7% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 1/1 0/0

Pool/Credit 0/0 0/0 0/0 2/1 2/1 2/2 1/1

Pool/Credit 27/15 15/1 12/10 9/8 8/2 5/1 3/0

HO** Hotel Clerk OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 100.0% $200.00 47.1% 0.0% N/A N/A N/A N/A

Pool/Credit 61/33 33/0 43/32 30/25 24/9 26/18 24/14

UC Culinary Arts Basic CTT 61.5% 12.5% 100.0% $8.69 85.7% $8.93 66.7% 62.5% $331.32 78.0% 40.0% 79.2% N/A N/A N/A

Pool/Credit 26/16 16/2 10/10 7/6 6/4 8/5 5/2

ZN** Computer Tech ZN OLD Basic CTT 0.0% 0.0% 0.0% $9.00 50.0% $10.75 50.0% 100.0% $340.28 80.1% 100.0% N/A N/A N/A N/A

Pool/Credit 47/40 40/4 31/28 22/14 14/5 12/5 5/4

OH Office Administra OH Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 2/0 0/0 0/0 0/0 0/0 0/0 0/0

OS Medical Office Suppo Basic CTT 85.1% 10.0% 90.3% $8.42 63.6% $8.68 35.7% 41.7% $274.02 64.5% 80.0% 74.0% N/A N/A N/A

Pool/Credit 112/84 84/25 58/43 37/34 25/13 35/23 25/19

Pool/Credit 1/1 1/0 0/0 1/1 1/1 1/0 0/0

BG Facilities Mainte BG Basic CTT 69.2% 0.0% 71.4% $9.55 70.0% $10.15 33.3% 37.5% $191.00 44.9% 66.7% 66.5% N/A N/A N/A

Pool/Credit 39/27 27/0 14/10 10/7 9/3 8/3 3/2

AY** Automobile Techni AY Basic CTT 100.0% 0.0% 0.0% $9.00 100.0% $9.00 100.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

HM Mater & Dis O HM OLD Basic CTT 55.6% 6.7% 83.3% $11.35 88.9% $11.93 25.0% 20.0% $411.00 96.7% 0.0% 78.3% N/A N/A N/A

AB** Automobile Te AB OLD Basic CTT 0.0% 0.0% 0.0% $8.63 100.0% $8.63 100.0% 100.0% $345.00 81.2% 100.0% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 2/2 2/2 2/2 1/1

HK Security Protective Basic CTT 87.7% 18.0% 71.8% $9.71 74.1% $10.39 52.2% 66.7% $427.62 100.6% 73.3% 83.3% N/A N/A N/A

Pool/Credit 57/50 50/9 39/28 27/20 23/12 18/12 15/11

HL Hotel and Lodging Basic CTT 75.0% 29.8% 74.1% $9.61 91.9% $9.88 52.0% 65.7% $326.83 76.9% 76.0% 80.6% N/A N/A N/A

Pool/Credit 6/4 4/3 0/0 0/0 0/0 0/0 0/0

CY Carpentry CY Basic CTT 53.2% 36.0% 61.9% $9.47 90.9% $9.69 54.5% 60.0% $577.50 135.9% 40.0% 80.7% N/A N/A N/A

Pool/Credit 47/25 25/9 21/13 11/10 11/6 5/3 5/2

HJ Materl Hd & Di Op HJ Basic CTT 66.7% 75.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

01 Center Training Program

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 020400 Delaware Valley Job Corps Center Contractor: C01500 MANAGEMENT

TRAINING CORPORATION

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

Pool/Credit 33/19 19/2 21/20 21/19 19/13 13/13 4/3

Delaware Valley Job Corps Center Totals 68.6% 0.2% 0.8% $9.54 0.8% $9.97 0.5% 0.6% $354.66 83.4% 65.2% 79.2% N/A

Pool / Credit 458/314 314/55 249/194 179/147 144/71 136/88 92/60

Region: 01 Boston Center: 020400 Delaware Valley Job Corps Center Contractor: C01500 MANAGEMENT

TRAINING CORPORATION

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

SE** Security Officer OLD Basic CTT 100.0% 0.0% 100.0% $10.00 100.0% $10.00 100.0% 100.0% $334.50 78.7% 0.0% N/A N/A N/A N/A

Pool/Credit 39/28 28/14 3/3 3/3 3/0 0/0 0/0

UC Culinary Arts Basic CTT 68.3% 73.2% 77.6% $9.06 71.8% $9.38 54.1% 82.4% $272.79 64.2% 66.7% 76.6% N/A N/A N/A

Pool/Credit 1/1 1/0 1/1 1/1 1/1 3/3 1/0

OH Office Administra OH Basic CTT 71.8% 50.0% 100.0% $8.58 100.0% $8.58 0.0% 0.0% $0.00 0.0% 0.0% 91.6%++ N/A N/A N/A

Pool/Credit 4/4 4/2 4/4 4/3 4/1 1/1 0/0

OB** Accounting Sv OB OLD Basic CTT 100.0% 50.0% 100.0% $7.96 75.0% $7.86 25.0% 100.0% $272.00 64.0% 0.0% N/A N/A N/A N/A

Pool/Credit 2/2 2/2 0/0 0/0 0/0 0/0 0/0

OG Accounting Servi OG Basic CTT 100.0% 100.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 0.0% N/A N/A N/A N/A

Pool/Credit 18/13 13/13 7/7 7/5 7/4 0/0 0/0

XM Emergency Medical Te Basic CTT 72.2% 100.0% 100.0% $13.68 71.4% $15.80 57.1% 0.0% $0.00 0.0% 0.0% 99.4%++ N/A N/A N/A

XR Adv Plumb RotoRooter Advanced CTT 84.6% 27.3% 75.0% $12.78 75.0% $13.30 62.5% 40.0% $756.18 177.9% 33.3% 94.1% N/A N/A N/A

Pool/Credit 39/34 34/32 28/26 25/18 22/18 7/6 2/0

XA** AAMCO Transmi Repair Advanced CTT 33.3% 0.0% 75.0% $8.08 66.7% $8.13 100.0% 33.3% $518.00 121.9% 100.0% N/A N/A N/A N/A

Pool/Credit 82/56 56/41 49/38 39/28 37/20 17/14 3/2

XE Advanced A+ MCSE Advanced CTT 87.2% 94.1% 92.9% $11.86 72.0% $13.13 81.8% 85.7% $404.62 95.2% 0.0% 94.0% N/A N/A N/A

Pool/Credit 3/1 1/0 4/3 3/2 3/3 3/1 2/2

Pool/Credit 4/4 4/0 5/4 4/4 2/1 5/5 3/2

BZ** Business Technol OLD Basic CTT 100.0% 0.0% 80.0% $9.65 100.0% $9.65 50.0% 100.0% $366.92 86.3% 66.7% N/A N/A N/A N/A

Pool/Credit 4/4 4/0 6/6 5/5 5/4 8/7 11/10

CZ** Com Ser Tec Mcse OLD Advanced CTT 100.0% 0.0% 100.0% $13.23 100.0% $13.67 80.0% 87.5% $547.95 128.9% 90.9% N/A N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 1/1 1/1 1/1 0/0

AB** Automobile Te AB OLD Basic CTT 0.0% 0.0% 0.0% $12.00 100.0% $12.00 100.0% 100.0% $500.00 117.6% 0.0% N/A N/A N/A N/A

Pool/Credit 20/12 11/0 13/10 11/10 10/6 7/7 4/4

AY Automobile Techni AY Basic CTT 60.0% 0.0% 76.9% $9.63 90.9% $9.50 60.0% 100.0% $348.65 82.0% 100.0% 85.7% N/A N/A N/A

Pool/Credit 105/79 79/57 58/48 45/27 41/25 24/15 20/8

NA Nurse Assis H Hlth A Basic CTT 75.2% 72.2% 82.8% $10.03 60.0% $11.29 61.0% 62.5% $458.63 107.9% 40.0% 81.2% N/A N/A N/A

Pool/Credit 223/158 158/109 142/113 102/82 86/38 86/53 50/26

OA Office Admini OA OLD Basic CTT 70.9% 69.0% 79.6% $9.55 80.4% $9.34 44.2% 61.6% $339.95 80.0% 52.0% 77.7% N/A N/A N/A

Pool/Credit 0/0 0/0 2/0 1/1 1/1 2/2 1/1

FO** Food Service FO OLD Basic CTT 0.0% 0.0% 0.0% $14.67 100.0% $14.67 100.0% 100.0% $420.00 98.8% 100.0% N/A N/A N/A N/A

Pool/Credit 37/31 31/24 47/38 37/16 34/12 24/16 11/4

HK** Security Protective Basic CTT 83.8% 77.4% 80.9% $9.32 43.2% $9.07 35.3% 66.7% $416.24 97.9% 36.4% N/A N/A N/A N/A

01 Center Training Program

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 020500 Edison Job Corps Center Contractor: C02500 RES CARE INC.

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the overall rating.

UA Adv Auto Diesel/Col Advanced CTT 94.1% 0.0% 100.0% $9.63 85.7% $10.03 28.6% 0.0% $0.00 0.0% 0.0% 96.4%++ N/A N/A N/A

Pool/Credit 17/16 16/0 7/7 7/6 7/2 0/0 0/0

11 United Auto Workers (UAW)

Pool/Credit 8/5 5/4 1/1 1/1 1/0 0/0 0/0

NP Painting NP Basic CTT 62.5% 80.0% 100.0% $7.25 100.0% $7.25 0.0% 0.0% $0.00 0.0% 0.0% 86.2%++ N/A N/A N/A

Pool/Credit 17/11 11/10 7/7 8/8 8/5 3/1 2/2

NR Electrician NR Basic CTT 85.0% 82.4% 86.7% $10.81 88.9% $11.25 77.8% 85.7% $519.57 122.3% 85.7% 96.5% N/A N/A N/A

Pool/Credit 13/1 1/1 8/6 5/4 5/4 8/4 4/2

PA** Painter PA OLD Basic CTT 7.7% 100.0% 75.0% $9.20 80.0% $9.50 80.0% 50.0% $371.44 87.4% 50.0% N/A N/A N/A N/A

Pool/Credit 20/17 17/14 15/13 9/8 9/7 7/6 7/6

IF Facilities Mainte IF Basic CTT 64.7% 90.9% 100.0% $10.14 100.0% $10.14 62.5% 33.3% $640.00 150.6% 100.0% 93.6% N/A N/A N/A

06 Home Builders Institute (HBI)

Pool/Credit 3/1 1/0 4/3 3/2 3/1 5/3 7/4

CA Carpentry CA OLD Basic CTT 33.3% 0.0% 75.0% $9.75 66.7% $11.00 33.3% 60.0% $534.83 125.8% 57.1% 77.1% N/A N/A N/A

Pool/Credit 34/27 27/16 17/17 17/13 17/5 6/4 0/0

ZA Const-Carpty Pre-App Basic CTT 79.4% 59.3% 100.0% $9.54 76.5% $9.97 29.4% 66.7% $661.14 155.6% 0.0% 97.1%++ N/A N/A N/A

04 United Brotherhood Carpt.(UBC)

NB Bricklaying NB Basic CTT 52.6% 90.0% 100.0% $9.50 100.0% $9.50 100.0% 100.0% $255.00 60.0% 0.0% 86.5%++ N/A N/A N/A

Pool/Credit 2/2 2/0 3/2 2/1 2/1 4/3 9/6

BR Bricklayer BR OLD Basic CTT 100.0% 0.0% 66.7% $7.25 50.0% $7.25 50.0% 75.0% $229.75 54.1% 66.7% 70.2% N/A N/A N/A

Pool/Credit 0/0 0/0 0/0 0/0 0/0 0/0 1/1

TI** Tile Setter TI OLD Basic CTT 0.0% 0.0% 0.0% $0.00 0.0% $0.00 0.0% 0.0% $0.00 0.0% 100.0% N/A N/A N/A N/A

Pool/Credit 19/10 10/9 5/5 5/5 4/4 1/1 0/0

03 Intrnatl. Masonry Inst. (IMI)

Pool/Credit 13/11 11/3 8/6 8/6 8/5 5/2 3/1

Edison Job Corps Center Totals 72.6% 0.7% 0.8% $9.93 0.7% $10.28 0.5% 0.7% $401.11 94.4% 57.4% 82.0%++ N/A

Pool / Credit 727/528 527/351 444/368 353/260 321/169 227/155 141/81

CTT

Initial JTM/PSC CTT F/T 6 Mo. Follow-Up 12 Mo.

Follow-Up

Overall Prev Overall Rate

Region: 01 Boston Center: 020500 Edison Job Corps Center Contractor: C02500 RES CARE INC.

Completions Crdntl Plcmt AvgWage Plcmt AvgWage Plcmt Plcmt AvgEarn Rating Plcmt Rate Grade Rate Grade

Report Period: 1/1/2010 - 12/31/2010

FOR OFFICIAL USE ONLY

**:Trade is no longer offered at this center

++: Data for 6 Month and/or 12 Month measures have not been included in the calculation of the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .