SF30 AMENDMENT No. 4 to RFP-Atterbury_ 00029.doc

DOC document 126 KB Posted

Attached to
Operation of the Atterbury Job Corps Center with Indypendence Career Development Center
Solicitation number
DOLJ10RA00029
Issued by

About this file

Amendment No. 4 to RFP to extend the start date of the contract from 3/1/10 to 6/1/10.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

Page Of Pages

1
3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment No. 04
02/24/10
6. Issued by
CODE
JC005
7. ADMINISTERED BY (If other than Item 6)
CODE
JC005

U.S. Department of Labor

Office of the Secretary for Administration and Management (OASAM)

230 S. Dearborn Street

Suite 1086

Chicago, IL 60604

SAME

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)CODE
(X)
9A. AMENDMENT OF SOLICITATION NO.

DOLJ10RA00029

TO ALL POTENTIAL BIDDERS – FOR THE ATTERBURY JOB CORPS CENTER FOR CENTER OPERATIONS AND SATELLITE INDYPENDENCE CAREER DEVELOPMENT CENTER FOR OUTREACH AND ADMISSIONS
FORMCHECKBOX

FORMCHECKBOX

9B. DATED (SEE ITEM 11)

April 29, 2009

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

FORMCHECKBOX

10B. DATED (SEE ITEM 11)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified

12. ACCOUNTING AND APPROPRIATION DATA (If required)

Not Applicable

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Purpose: To amend the Request for Proposal to extend the Start date of the Contract from March 1, 2010 to June 1, 2010. See attached Page for specific modifications to RFP.

Modification: Changes in Section B. Supplies or Services and Prices/Costs; Section F., Item 2. A. Period of Performance; and Section G., Item 1,B. Summary of Funds Available

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

FORMTEXT

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Sandra Perkins, Contracting Officer

Chicago Regional Office, OASAM

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

1.

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

Pages 3 & 4 – Replace the Table with the following:

ITEM
DESCRIPTION
ESTIMATED COST / Not to Exceed Ceiling
001
Operation of the Atterbury Job Corps Center for the Base 2 year period June 1, 2010 through May 31, 2012.
002
Outreach/Admissions services for the Base 2 year period June 1, 2010 through May 31, 2012.
003
Operation of the Atterbury Job Corps Center for Option Year 1, for the period June 1, 2012 through May 31, 2013.
004
Outreach/Admissions services for Option Year 1, for the period June 1, 2012 through May 31, 2013.
005
Operation of the Atterbury Job Corps Center for Option Year 2, for the period June 1, 2013 through May 31, 2014.
006
Outreach/Admissions services for Option Year 2, for the period June 1, 2013 through May 31, 2014.
007
Operation of the Atterbury Job Corps Center for Option Year 3 June 1, 2014 through May 31, 2015.
008
Outreach/Admissions services for Option Year 3, for the period June 1, 20140 through May 31, 2015.
009
The not to exceed ceiling of ($14,630,405) for Construction Rehabilitation Acquisition (CRA) will apply from June 1, 2010 through May 31, 2015.

$14,630,405

010
The not to exceed ceiling of ($487,500) for Equipment will apply from June 1, 2010 through May 31, 2015.

$487,500

011
The not to exceed ceiling of ($1,029,190) for GSA Vehicle Rental will apply from June 1, 2010 through May 31, 2015.

$1,029,190

012
The not to exceed ceiling of ($1,072,000) for Career Technical Skills Training (CTST or VST) will apply from June 1, 2010 through May 31, 2015.

$1,072,000

2.

SECTION F. DELIVERIES OR PERFORMANCE

F.2 PERIOD OF PERFORMANCE

Page 22 – Replace Paragraph A with the following:

The term of the contract is for a base period of 2 years with three 1-year option periods. The contractor shall operate the Atterbury Job Corps Center located in Edinburgh, Indiana during the period of June 1, 2010 through May 31, 2012, and if appropriate, shall perform necessary functions related to a transition period for assuming responsibility for the operation of the Center for the month of May 2010. In addition, the contractor shall operate the Indypendence Career Development Center located in Indianapolis, Indiana for the same period.

3.

SECTION G. CONTRACT ADMINISTRATION DATA

G.1

FUNDING AND FINANCIAL ADMINISTRATION

B.

Summary of Funds Available Page 26 – Replace the paragraph following the Table with the following:

It is estimated that the above-listed available operations funds shall cover the period June 1, 2010 through June 30, 2010. Construction, rehabilitation, and equipment funds are allotted for the term of this contract. The fixed and incentive fees shall be paid out of the operations, outreach/admissions, and/or career transition services funds.

[End of Amendment No. 4]

File details come from the government source that posted it. Updated .