J-8_Blue_Ridge_Facility_Survey_Vol._1_September_2015.pdf
PDF 1 MB Posted
- Attached to
- Blue Ridge JCC Operations
- Solicitation number
- DOL-ETA-16-R-00116
About this file
Attachment J-8 Facility Survey Vol. I
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Blue_Ridge_16-R-00116_Amend_01.pdf | ||
| J-10_Blue_Ridge_Utilities_Usage_and_Cost_Form.xls | XLS spreadsheet | |
| J-9_Blue_Ridge_Master_Property_List_20160316.pdf | ||
| J-8_Blue_Ridge_Facility_Survey_Vol._2_September_2015.pdf | ||
| Blue_Ridge_Synopsized_RFP_16-R-00116.pdf | ||
| J-11_Blue_Ridge_Vehicle_Log.xls | XLS spreadsheet | |
| J-3_ETA_Form_2110.docx | DOCX document | |
| J-4_Staffing_Chart.docx | DOCX document | |
| J-6_Past_Performance_Questionnaire.docx | DOCX document | |
| J-2_Statement_of_Financlial_Capability.docx | DOCX document | |
| J-7_SF_1413.docx | DOCX document | |
| J-1_Cost_Details.docx | DOCX document | |
| J-5_Subcontracting_Summary.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLUE RIDGE
Job Corps Center Marion, VA
Facility Planning Report Volume I
Planning Strategy
Final September 2015
Department of Labor/ Office of Job Corps
BLUE RIDGE
Job Corps Center Marion, VA
Facility Planning Report Volume I
Planning Strategy
Final September 2015
Main Building 1 (Aleshire)
VOLUME I - PLANNING STRATEGY
1.0 INTRODUCTION and EXECUTIVE SUMMARY
• Introduction
• Executive Summary
• Existing Site Plan
• Center Statistics
• Facility Survey Assessment Results and Recommendations
2.0 EXISTING CONDITIONS
• Background
• Ownership
• General Site Conditions
• General Building Conditions
• Roofi ng Issues
• Preventive Maintenance
• Facility Assessment by Function
• Environmental Management
• Resource Use/Conservation
• Sustainability
• Accessibility Standards
• Historic Preservation Issues
• Completed and Current Projects Since the Last Survey
• Health and Life Safety Issues
3.0 PLANNING ANALYSIS
• Space Utilization Chart
• Federal Real Property Asset Management Performance Measures
• Funded But Not Corrected Defi ciencies by Classifi cation
• Unfunded Defi ciencies by Classifi cation
• Facility Condition Summary Report
• Building Condition by Function
• Planning Analysis Results and Concluusions
4.0 RECOMMENDATIONS
• Status of Previous Plan
• Proposed Plan
• Funded Not Corrected (FNC) Defi ciencies
• Summary of Proposed Projects
• Proposed Site Plan
• Implementation Plan
• Summary of National Projects
• Project Data Sheet
1.0 - Introduction and Executive Summary
Main Building 1 (Aleshire) South Corner
Gymnasium Interior Building 13
Building 11 Medical
Administration Building 6
A team of Engineering Support Contractor (ESC) architect and engineers completed a facility survey for Blue Ridge JCC the week of March 2, 2015. The results, conclusions and recommendations of this survey are documented in two volumes: Volume I Planning Strategy and Volume II Supporting Data
Objective and Scope
The objective and scope of the survey were to:
Document existing conditions
– Building and structures
– Barrier-free accessibility
– Operations and maintenance
– Programmatic characteristics (e.g., size of functional areas, operational layout, and functional amenities)
– Energy, water, and waste management plans and actions
– Environmental management plans and practices and associated regulatory compliance
Identify new deficiencies and status previously documented deficiencies
– Documentation and categorization of new deficiencies identified during the survey
– Status of previously identified and funded deficiencies to determine if corrective actions were taken
– Submission of funding requests to DOL for life safety deficiencies that may pose a risk to the
Center’s staff and students if not corrected immediately Develop a Long Range Plan
– Plan and implementation strategy based on National, Center, and Regional participation
– Strategy would positively impact Center operations and the overall living and learning environment
– Prioritized facility-specific actions consistent with Center’s mission, educational goals, and
National goals and funding
Report Contents
Volume I includes the information and basis for the recommendations for long range planning. The following sections:
Section 2.0 Existing Site Conditions. In this section, the status of the site and building is presented in terms of general conditions, functionality, resource use and intensities (i.e., energy, water, and waste), sustainability, and accessibility. The status of funded projects is noted and current and prior deficiencies are summarized.
Section 3.0 Planning Analysis. The proposed plan is presented in this section and is based on the existing site conditions and functions, Center mission, both near and long term. National, Regional, and Center engagement is pivotal to the presentation of a plan that can be implemented.
Section 4.0 Recommendations. The recommendations for proposed projects and revised site plan are presented and are prefaced by summarizing the previous plans for the Center and findings documented during this program year survey.
1.0 INTRODUCTION
This report documents the results, conclusions and recommendations for the facility survey completed at the Blue Ridge Job Corps Center (JCC) the week of March 2, 2015. The U.S.
Department of Labor Engineering Support Contractor (ESC) team completed the survey on behalf of the Job Corps facilities program.
The facility assessment is a comprehensive process that provides objective and subjective analysis of existing and projected future condition of facilities. The facility assessment is a key component in understanding the life cycle, condition, and costs of buildings, structures, building systems, and assets within the Center. Specific objectives of this assessment include:
Provide an assessment of all facilities and identify related deficiencies Assess maintenance requirements Define renewal and replacement projects Identify potentially damaging or unsafe conditions Identify sustainability opportunities (e.g., waste recycling and energy and water conservation measures) Inventory accessibility in accordance with Architectural Barriers Act (ABA) Accessibility Standard Develop cost estimates and schedules for new or replacement projects and correction of deficiencies
EXECUTIVE SUMMARY
Center Statistics Date: 09/30/2015
Federally Owned (DOL) 1967Activation Date:
Ownership Status:
Site & Utilities
Water Source:
Sanitary Sewer:
Electrical Service:
Gas Type:
Telephone Service:
Public Water Authority
Publicly Owned Treatment Works
Appalachian Power
Natural
No. of Vacant Buildings:
Gross Sq. Footage:
Net Sq. Footage:
Net / Gross (%):
Building Age > 50 yrs:
Building Age 20-50yrs:
Building Age 10-20yrs:
Building Age < 10 yrs:
90,786
Bldgs with Asbestos:
Asbestos Survey Date
Bldgs with Radon:
02/14/1990
Site Access: No
3Buildings with Access:
Regulated:
Non-Regulated:
Above Ground Tanks:
Sewage Treatment:
Publicly Owned Treatment Works
Air Pollution Sources: Minor Source - Permitted
Suzan Widener
(276)783-7221Phone No.:
Center Director:
Education Management CorporationOperating Contractor:
Contract Strength: Resident Men: Resident Women: Non-residents:
Nursing Assistant 60 Medical Assistant 40 Medical Office Specialist 30 LPN 20 OCT 15 ACT (Off-Ctr) 11
No. Of Buildings:
192 0 160 32
Real Estate Management
Buildings
Program
JCC# 302 BLUE RIDGE 245 W. Main Street, Marion, VA 24354
Accessibility
Environmental Site Area (Acres):
Bldg to Site Coverage: 20%
0Building Age Unknown :
(276)783-1751Fax No.:
Under Ground Tanks: 0
Vacant (NSF):
Energy Actual - BTU/GSF/YR: 53,048
Energy Audit Done: Yes
Status of ECM: Implemented
1,040
73%
66,276
Buildings with Access to Services: 3
2Buildings with Accessible Restrooms:
Buildings with Other Accessible Features: 2
2Buildings in Total Compliance:
67,336
GSF
9,250 10 14,200 16
Average Building Age: 86
Vocations (176):
Radon Surveys Reqd: 4
Age Distribution
Mitigated: 0
Historic Status Buildings on National List:
Eligible Buildings:
Candidate Buildings:
BLUE RIDGE JCC
CenturyLinks
5.00
07/01/2014Start / End Dates: 06/30/2019/
302 Blue Ridge Job Corps Center PY15 Facility Survey Assessment Site Conditions, Deficiencies, and OMB Score Card
Site Condition Roads and Pavement
Good Power Good Natural Gas Good Central Plant Good Water Supply Good Sewage Good Exception: Municipal back up at Building 7
Student Housing Good Education Good Exception: Building 7 Food Service Fair Recreation Good Medical/ Dental Good Administration Good Storage Support Good
Available Deficiency Funding and Execution Life Safety
Deficiencies Non-Life Safety Deficiencies
Recently Funded 13 $103,985 7 $31,470
Prior Funded 1 $5,000 6 $338,325
O&M 24 Non-CRA Funded 14 Non-CRA Funded
Unfunded 0 $0 43 $950,041
OMB Score Card Metrics Current Goal Blue Ridge JCC Recommendations
EO13423 FY 2014
GOAL
KBTU/GSF/YR
85.4 95,272
O&M Costs $/
GSF/YR
5.10 5.01
% MC 58 96.19
% MDNC 37 3.81
% NMD 5 1.53
%Utilization
Office 97 100
Housing 98 100 Warehouse 96
FCI 0.919 0.95
%FCI < 0.90 15.2
Green= Meets or Exceeds Goals, Yellow = Within 10% of Goal, Red = Below 10% of Goal
2.0 - Existing Conditions
The existing conditions of the Center are presented in this section with specific focus on the following:
Background – An overview of the Center is presented on the campus layout and buildings, student population, and vocations.
Ownership – The ownership of the property (leased versus owned) and any related conditions affecting operations and maintenance of the property are highlighted.
General Site Conditions – The site conditions (roadways, stormwater system, and utilities) are summarized based on the findings of this survey.
General Building Conditions – The status of buildings physical conditions is noted with special emphasis on those buildings with repair needs.
Preventive Maintenance – The Center’s practices for systematic inspection, detection, and correction of potential failures either before they occur or develop into major defects are documented.
Facility Assessment by Function – The evaluation of the Center’s functions (e.g., education, housing, recreation, medical/ , storage/support) is presented and cross referenced to building/structures on the campus.
Resource Use – Energy and water use and intensities are indicated and trends noted as well as waste management practices. The Center’s contributions toward the Executive Order goals for 2015 also are summarized.
Sustainability – This section documents if the Center is proactive and has in place active energy and water use reduction programs; a waste prevention/recycling program; School Dude or CMMS for Preventative Maintenance practices; and green purchasing policies and practices.
Accessibility Standards – The accessibility to buildings and to services and functions within buildings in accordance with the Architectural Barriers Act (ABA) Standard for Federal Facilities is documented.
Completed and Current Projects – The status of National, Regional, Center, and Career Technical Skill Training (CTST) projects by deficiency number is shown in tabular format.
Deficiency Summary – A summary of the number and dollar value (if applicable) of all deficiencies (recently funded, prior funded, operations and maintenance, and unfunded deficiencies) is provided.
The deficiency analysis presented in Section 3.0 of this volume, includes additional details on these deficiencies.
2.0 EXISTING CONDITIONS
Background
Blue Ridge Job Corps Center is located on 5 acres of land withone off-site building within walking distance, in downtown Marion, Virginia. The Center is federally owned by The Department of Labor (DOL). Main Building 1 (Aleshire), formerly Marion College, was built in 1904 and is a candidate for listing on the National Registry of Historic Places. Building 1 comprises 57% of the Center’s gross square footage.
The Center currently has 90,786 GSF in eleven buildings. Blue Ridge Job Corps Center provides residential living, academic education, recreation and vocational training for 160 resident female students, 30 non-resident females and 2 non-resident males. The total 66,276 NSF at the Center is above the DOL suggested space guideline range of 48,500 to 62,200 NSF for a Center of this student population. At the time of the survey there was 1,040 NSF of vacant space.
Ownership
The Blue Ridge Job Corps Center was purchased in part by DOL from the Trustees of Roanoke College for $250,000.00 on July 18, 1978. The purchase conveyed 4.96 acres of land. Later, the Department of Labor purchased an additional 0.1381 acres from Joseph F. Ellis, Jr. and Suzanne Gibbs for $217,450.00 on April 6, 1995 for Building 7. The Government is responsible for the repair and maintenance of all buildings at this federally owned campus.
General Site Conditions
The Center is located at approximately 36°N latitude and 81°W longitude at about 2,100 feet above sea level. The average temperature for January ranges from a low of 21°F to a high of 43°F and the average temperature for July ranges from a low of 59°F to a high of 83°F . The average annual precipitation is 44 inches which includes an average annual snowfall of 5”.
This is a two level campus with a 14’ high slope that bisects the Center and clearly defines upper and lower levels. Main Building 1 (Aleshire) occupies the high point of the site. Several buildings to the west of the main building are built into the ridge with entrances at multiple levels. Medical Building 11 and Gymnasium Building 13 are on the lower level.
A flight of outdoor stairs leads from the Building 1 on-site parking area to the lower level entrance of Building 2, where the classrooms are located. This is the principal student path to the lower level. It is also possible to reach that level without using the steps by going around the Center using the sidewalks from Funk and North Streets. There is a concrete retaining wall along the east side of Funk Street as it descends to North Street. Funk Street is elevated two to five feet above campus grade elevations.
The wall has some stone deterioration and uneven settlement. Administration Office Building 6 and Maintenance Storage Building 4A are across Funk Street at the upper level of the campus.
Campus as seen from Main Street
Building 1 from the lower field
Building 7 is located off-center, about three blocks east of Main Building 1 (Aleshire). It houses nursing and medical vocations. This building is a former auto garage, built in 1920, which was later converted to a restaurant, then purchased by DOL. This building is deteriorated. Students must also walk back and forth to the main campus two or three times a day, which raises safety, security and logistical concerns.
Auto and service access to the campus is via the main entrance located on West Main Street with limited parking available on the west side of Building 1. Staff parking is accessed off North Street on the north side of the campus. Service access to the campus is limited to the parking lots just west of Building 1, a small service entry at Buildings 4 and 4A, and the parking lot on North Street.
There is truck access to the dumpster area behind Building 1 through the parking lot. There is also parking used by staff behind the fire station, not owned by the Center, just to the northeast.
Natural gas is provided to the Center by the Atmos Company and the service is adequate. Gas is metered at each building and is used for cooking in the cafeteria and building heating. Water is provided by the Town of Marion and there are six meters for eleven buildings (including Building 7). The water pressure and flow are adequate both for the domestic use and fire hydrants. The fire department is located in front of the main building, adjacent to the site. Sewer treatment service is also provided by the Town of Marion.
Primary overhead electrical power enters the Center from the west at two locations from utility-owned primary power overhead distribution lines along College Street. This service feeds pole-mounted step-down transformers with corresponding exterior building-mounted secondary utility meters for each individual building. 120/240V, 1-phase, 3-wire secondary service is utilized.
Perimeter site lighting is owned and maintained by the city. Electrical power is provided by Appalachian Power.
Main Building 1 (Aleshire) is utilized as the main service entrance and demarcation point for the main and off-center telephone system. It is where the main communication data closets are located.
The off-center location has dedicated phone service from the main campus. Separate data service entries point/demark and data cabinets are located at the off-center location. The internet and long distance communication system is a VoIP system implemented and managed by the Job Corps Data Center (JCDC). The local calls are managed by Century Links (formerly Embarq). The data communication system hardware is manufactured by Cisco. Each main campus building has Cisco switches and CAT 5e network to connect nodes with the computers. Only the routers in the main data closet are UPS-protected. The Center maintains five trunk lines and 15 dedicated phone lines.
Cable TV service is provided by XFinity/Comcast in the dormitories and recreation facilities. The main campus fire alarm is centrally monitored in Building 1. There is a separate fire and ADT security system in Building 7, the off-center facility. The telephone system has limited public address capabilities.
, when the
General Building Conditions
There are 10 buildings on campus and one off campus. Main Building 1 (Aleshire) was built in 1904; Buildings 3 and 4 in 1912, Buildings 5, 6 and 7 in the 1920s; Building 2 in 1970; and the rest of the Center’s buildings were built in the 1990s. Main Building 1(Aleshire) is a mixed use building.
It includes housing, education, food service, recreation, administration and storage and support functions. Many windows in the building do not function, there are gaps between the units and the frames, and they have no screens. The building is a candidate for the National Registry of Historic
Places. Academic/Recreation (Russell) Building 2 is a two story building with steel structure and metal roof. Buildings 3, 4, 5 and 6, previously residences, were renovated to their present function.
Nursing/Medical Assistance Building 7 is located off-campus. Its roof is framed with steel trusses supported by load bearing masonry walls. TEAP Classroom Building 8 and Medical Building 11 are wood structures. Gymnasium Building 13 has a steel structure and metal roof supported by load bearing masonry walls. Generally, with the exception of Building 7, the Center’s buildings are in good condition and function well.
Roofing Condition Issues
The Center has two buildings with roofing issues. The upper floors and wings of Main Building 1 are roofed with a 25 year old rolled roofing system. The Center is reporting minor leaks. Also, the gutter and downspout system is of residential quality and is damaged in places.
The second roofing issue is the single ply TPO membrane over Building 7, which is also 25 years old, and leaking at downspout locations.
Preventive Maintenance
Preventive maintenance practices at the Center appear good. The Center uses a computer based maintenance management system (CMMS) and only a few operations and maintenance deficiencies were identified during the survey. It has a comprehensive written Maintenance Plan.
Facility Assessment by Function
Student Housing
The Center provides housing for 160 resident women. The housing facilities are located in Main (Aleshire) Building 1 and Transitional Living (Warren House) Building 5.
The majority of bedrooms are located on the two upper floors of Main Building 1 (Aleshire) and are generally in good condition.
The upper levels of the building have three wings forming a “U” shape. Most of the bedrooms align along the central corridors of each wing. The toilet/showers, RA offices, lounges, storage and the rest of the bedrooms are located along the central corridor that connects the two wings. Thirty bedrooms have two beds per room with a total of 60 student capacity. Twenty-nine bedrooms have three students each with a total of 87 students. The four larger bedrooms have four students each with a total of 16 students. The three-bed bedrooms contain at least one bunk bed, and one bedroom on each floor has been converted to a small lounge. The building has four floors but no elevator. The dormitory layout is adequate and functions well.
Transitional Living (Warren House) Building 5 houses 11 students. Formerly a two story residence, the house has been renovated for transitional living. There are five one-bed, and three two-bed bedrooms. Each bedroom has a private bathroom. On the first floor there are a large living/dining room, a kitchen, three bedrooms and laundry room. On the upper floor there are five bedrooms. The foundation wall in the basement has cracks and leaks, which is being addressed by a funded deficiency. Otherwise, the building is in good condition and functions well.
Transitional Living, Building 5
Education
Education functions are located in several buildings on campus and the one off-campus, Building 7.
Academic classrooms are located in the lower level of Academics/Recreation (Russell) Building 2.
Restrooms in this building are deteriorated, and there is only one small toilet on the ground floor.
Otherwise, the building is in good condition. The academic classrooms layout functions well.
CPP classrooms were created in Building 1 and function well. The TEAP classroom is located in Building 8, which is next to Medical Building 11. The building is in fair condition and functions well except it lacks an accessible entrance.
Medical Office Support and Medical Assistant vocations, the learning resource center and several counselors’ offices are located on the ground floor of Building 1. The vocation space is in fair condition and functions well. During heavy rains, water infiltrates the southwest wall and floods the CMA classroom, as well as the adjacent restroom.
Licensed Practical Nurse and Certified Nursing Assistant vocations are located in Nursing/Medical Assistant Building 7, three blocks east, away from the main campus boundary (see photo). This creates security, safety and logistical problems since students need to travel to and from this building two or three times a day on a public street that lacks sidewalks. A post Facility Survey effluent flooding of the building by the Marion sewer system is also a current problem. It has necessitated the LPN and CNA vocations to be temporarily located in the seldom used auditorium in Building 1. The Center and Region reports concerns by the Board of Nursing on the condition of the Building 7 learning environment.
Food Service
Food Service facilities are mostly located on the first floor of Main (Aleshire) Building1, with dry food and equipment storage areas awkwardly located on the ground floor down a covered exterior stair. A small dumb waiter somewhat assists in moving dry storage between levels. The facilities are in good condition but are reported as very congested and students frequently must wait for seating. The salad bar is defective and poorly located.
Recreation
Recreation functions are located in Gymnasium Building 13, the upper second level of Academic/Recreation (Russell) Building 2, the upper level of Building 3, and an assembly hall in Main (Aleshire) Building
1. The gymnasium is in good condition, and functions well. The recreation room located on the upper level of Academic/Recreation
Building 2 contains a weight-lifting area, TV lounge and table
Nursing/Medical Assistant Building 7
Damaged Insulation Under Roof Deck of Building 2
The cafeteria is about 1,000 SF below DOL recommended size.
games. The roof was recently replaced, however the vinyl-faced insulation just below the roof deck is partially missing, deteriorated and damaged. The assembly hall in Main (Aleshire) Building 1 is in good condition but is now being used by HOT vocations due to flooding in Building 7.
Arts & Crafts is located in a former culinary arts kitchen in Arts and Crafts/Transportation Building
3. The arts and crafts room is confined due to existing kitchen equipment that was never removed, and the interior is worn and finishes are faded. The lower level of this building is vacant and deteriorated. There is a student library on the 4th floor of Main (Aleshire) Building 1 under the cupola. This limits use of the space for the male non-resident students, who can only access the space through the stairs that connect and are open to the female dormitories. There is one non-resident lounge, but the male non-resident students are not allowed access to the lounges in the female-only dormitories. Having recreation spaces dispersed in different buildings increases the need for supervision.
The outdoor recreation facilities include a small field and a pavilion, which are adequate, although the field is too small for ball games.
Administration
Administration functions are located on the first floor of Main (Aleshire) Building 1 and in Administration Office Building 6. Both locations are adequate and function well.
Medical
The medical function is located in Medical Building 11, which is in good condition and functions well. There is no dental facility and the Center contracts dental services off-site.
Storage/ Support
The former gymnasium located in Main (Aleshire) Building 1 is now used as a warehouse. The warehouse is in good condition and functions well. Maintenance and maintenance storage are located in Maintenance Shop Building 4 and Maintenance Storage Building 4A, respectively. Both buildings are in good condition and function well.
Environmental Management
There is limited encapsulated asbestos tank and pipe insulation in Building 1 (Aleshire) and Building
5. Older flooring in Buildings 1, 2, 3 and 5 has non friable asbestos. Buildings 7, 11 and 13 have not had radon tests.
Resource Use/Conservation
Energy and Water Conservation
Energy and water use and associated trends are summarized below for the Blue Ridge JCC.
Background: Table 1 has current energy and water consumption and cost. The Blue Ridge JCC electricity cost is lower than Job Corps averages, while natural gas and water costs are higher.
Table 1: Energy and Water Statistics – FY2014 Energy Consumption Cost Unit Cost Average Cost in
Job Corps Electricity 1,032,366 kWh $78,364.42 $0.076/kWh $0.114/kWh Natural Gas 49,728 CCF $45,279.06 $0.911/CCF $0.881/CCF Water 3,013 kgal $31,930.44 $10.599/kgal $7.686/kgal Total $155,573.92
This analysis is based on the latest energy information available. FY2014 data are the latest entire year available for analysis.
Energy and Water Data Issues:
The following data issues have been identified from the Center supplied data:
The electricity consumption for November FY2009 is much higher than the average consumption for the same month in other years.
The natural gas consumption for December and February FY2009, and June FY2014 is much lower than the average consumption for the same months in other years.
The water consumption for October through March FY2009, and July FY2010 is much lower than the average consumption for the same months in other years.
The data issues identified above should be verified and corrected as necessary by the Center on Energy Watchdog.
Benchmarking: Table 2 is based on the EO13423 goals of 3% annual energy reduction since the FY2003 baseline and 2% annual water reduction since the FY2007 baseline.
Table 2: Energy and Water Benchmarking Category Year Current
Consumption Baseline
Consumption
FY 2014
Target
Difference from
Target Energy FY2014 95,272 BTU/GSF 116,984
BTU/GSF
85,399
BTU/GSF
11.6%
Water FY2014 33.2 gal/GSF 35.2 gal/GSF 30.2 gal/GSF 9.7% Green – meeting target. Red – not meeting target.
The energy and water consumption reported by the Center does not meet the energy and water conservation targets. The Center is very close to meeting these targets. Figure 1 documents the annual energy intensity in BTU/GSF compared to the baseline from FY2003 to FY2014. Energy intensity is the amount of energy used per gross square foot at the Center. Figure 2 indicates the water intensity compared to the annual targets for the years FY2007 to FY2014. Water intensity is the amount of water used per gross square foot at the Center.
Figure 1: Energy Intensity Compared to FY2003 Baseline and Annual Targets.
Figure 2: Annual Water Intensity Compared to FY2007 Baseline and Annual Targets.
Electricity: Electricity consumption at the Blue Ridge JCC is slightly higher during the cooling season. Figure 3 tracks the monthly electricity consumption since FY2010.
25.0
30.0
35.0
40.0
45.0
50.0
FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014
G al
./G
SF
Water Intensity At Blue Ridge JCC
Water Intensity Reduction Goal
Figure 3: Monthly Electricity Consumption
Figure 4 shows the average electricity consumption per month and potential reductions of 5% and 10% below the average for the years FY2010 to FY2014. The 5% and 10% lines can be used as targets for energy reduction.
Figure 4: Average Electricity Consumption, And 5% And 10% Below The Average.
Natural Gas: Natural gas is used for heating and domestic water heating at the Blue Ridge JCC.
Natural gas consumption is highly related to heating needs at the Center. The monthly consumption since FY2010 is shown in Figure 5.
50,000 60,000
70,000 80,000 90,000
100,000 110,000 120,000
130,000 kW h
Electricity Use At Blue Ridge JCC
FY2010 FY2011 FY2012 FY2013 FY2014
60,000 65,000 70,000 75,000 80,000 85,000 90,000 95,000
100,000 105,000 kW h
Electricity Use At Blue Ridge JCC
Average 5% Below Average 10% Below Average
Figure 5: Monthly Natural Gas Consumption
Figure 6 shows the average natural gas consumption per month and potential reductions of 5% and 10% below the average for the years FY2010 to FY2014. The 5% and 10% lines can be used as targets for energy reduction.
Figure 6: Average Natural Gas Consumption, And 5% And 10% Below The Average.
Natural gas use covers a very large percentage of the total energy used at the Blue Ridge JCC and accounts for 37% of the total energy cost.
2,000
4,000
6,000
8,000
10,000
12,000 C
C F
Natural Gas Use At Blue Ridge JCC
FY2010 FY2011 FY2012 FY2013 FY2014
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
October November December January February March April
C C
F
Natural Gas Use At Blue Ridge JCC
Water: The monthly consumption since FY2010 is shown in Figure 7. The Center’s water consumption has been steady for the last couple of years.
Figure 7: Monthly Water Consumption
Figure 8 shows the average water consumption per month and potential reductions of 5% and 10% below the average for the years FY2010 to FY2014. The 5% and 10% lines can be used as targets for even greater water use reduction.
Figure 8: Average Water Consumption, And 5% And 10% Below The Average.
100,000
200,000
300,000
400,000
500,000
600,000
G al lo ns
Water Use At Blue Ridge JCC
FY2010 FY2011 FY2012 FY2013 FY2014
100,000
150,000
200,000
250,000
300,000
350,000
400,000
G al lo ns
Water Use At Blue Ridge JCC
Sustainability
DOL is committed to implementing initiatives in accordance with Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade. As a result, Job Corps centers have been adopting practices aimed at reducing energy, water, and waste. Centers have also been implementing other measures such as enhancement of indoor environmental quality, storm water management, reduction of environmental impact of materials, green cleaning practices, environmentally preferred purchasing, integrated pest management and recycling. Furthermore, new construction shall comply with the latest version of the Job Corps Handbook (JCH) 814 which specifies sustainable design criteria.
In response to these goals, Blue Ridge JCC has implemented no initiatives:
The Center does not appear to have a recycle program, and waste reporting is inconclusive The Center does not have a Green Purchasing Policy The Center does not appear to practice green cleaning measures Center does not have a chartered Green Committee
A list of nine specific sustainability indicators for the Center is located in the Site Descriptions section of Volume II.
Accessibility Standards
The survey included an accessibility assessment for this center. Because of the two-level campus site plan and the age of the main Center buildings, the upper level of the Center is largely not accessible to persons with physical disabilities. The recently constructed Medical Building 11 and Gymnasium Building 13 on the lower level do meet accessibility standards.
Compliance will be incorporated as major renovation projects are developed and new buildings are constructed. All future projects at the Center will be in conformance with the GSA's Architectural Barriers Act (ABA) Accessibility Standard for Federal Facilities and will include provisions for full accessibility. All areas of newly constructed buildings, facilities and altered or leased buildings/facilities as well as the existing buildings and structures, shall comply with ABA to provide reasonable accommodation as required by federal disability and non-discrimination laws. All future projects at the Center will include provisions for full accessibility. These corrective actions could be accomplished by the Center forces and Centers funding (O&M) or by qualified contractor and Regional/National/Lessor funding.
The survey team has identified IIC deficiencies related to the accessibility of buildings as defined by GSA’s ABA Accessibility Standard for Federal Facilities. Funding for immediate and annual accessibility projects will be based on the identification of priorities, funding availability and DOL policy and directions.
Historic Preservation Issues The Blue Ridge Job Corps Center campus site was originally the Marion Junior College, established in 1873 as a women’s college. Main Building 1 is a handsome Greek Revival landmark built in 1904 and is a candidate for the National Registry of Historic Places.
Completed and Current Projects Since the Last Survey
The following is a list of completed and current projects since the previous survey:
Completed Projects Deficiency /Project # Description Responsibility 104377 Repair of Building 1 Dumb Waiter Region 75877 Building 2 retaining wall repair Region 89892 Energy Recovery Ventilator Region 78782 Main Street retaining wall repair Region
Current Projects Deficiency /Project # Description Responsibility 89726 Pigeon netting installation Building 1 fire escapes Region 89973 Key system replacement, Main Building 1 Region 89723 Window replacement, Main Building 1 Region 89724 Window screen replacement, Main Building 1 Region 89718 Dormitory shower room renovation, Main Building 1 Region 89731 Building 2 toilet replacements Region
Health and Life Safety Issues
A summary of deficiencies identified or validated during this survey can be found on Table ES-2 – (Facility Survey Assessment Results and Recommendations). The table identifies all Health and Life Safety Deficiencies funded subsequent to, or as a result of the survey visit, as well as previous deficiencies that were validated during this survey. Life Safety and Non-Life Safety Deficiencies are summarized in four categories each:
Recently PY Funded Deficiencies Prior Funded Deficiencies O&M (These deficiencies are not funded by CRA funding) Unfunded Deficiencies
3.0 - Planning Analysis
The purpose of this section is to present objectives, assumptions and specific space, and cost data considered during the planning process. This information is considered with specific existing condition issues in the development of a long range plan. The goal is to provide the Job Corps Program with the best living and learning environment at the best value.
The objectives of this analysis include the following:
To provide adequate space for all functions to maximize effective day to day operations.
To develop current and new space to enhance the living and learning environment.
To remove or reutilize excess space that is inappropriate for long range Center user.
To utilize existing buildings effectively.
To consolidate and cluster like functions to: minimize daily pedestrian travel by students, instructors and administrators, and better zone daytime and nighttime activities to assist security operations and increase site safety.
To develop a campus style setting with the inclusion of small and large (green) gathering spaces which promote formal and/or informal activities and interaction between students, instructors and administrators.
To develop an implementation strategy to minimize the impact on center operations.
To provide phased development to reduce impacts on Job Corps National Construction Budget.
To create a center which fits the Job Corps model.
The analysis typically is based on the following assumptions:
1. The contract size at the time of the facility survey is used for square footage analysis and long range planning.
2. The vocational program at the time of the facility survey is applied for long range planning.
Any additional assumptions made during the development of the long range plan are presented in the Section 4.0 Recommendations of this report. Figure 1 outlines the long range planning process for the Job Corps Program.
3.0 PLANNING ANALYSIS
27 Space Utilization Chart Blue Ridge (00302) Date: 09/30/2015Center :
Page: 1 of 1
0001 - MAIN (ALESHIRE)
0002 - ACADEMICS/REC (RUSSELL)
0003 - ARTS AND CRAFTS
0004 - MAINTENANCE SHOP
0004A - MAINTENANCE STORAGE
0005 - TRANSITIONAL LIVING (WARREN HO
0006 - ADMINISTRATION OFFICE
0007 - NURSING/MEDICAL ASSISTANT
0008 - TEAP CLASSROOM
0011 - MEDICAL
0013 - GYMNASIUM
Buildings
15,826
2,541
Education
3,673
Food
2,930 3,575
9,080
Recreation
1,775
Medical
3,695
Admin
4,469
1,115
Storage Support
Student Housing
Actual Net Area 18,367 972 3,673 16,330 1,775 4,720 6,284
Area (SQ FT) Gross
52,100 8,100 2,476 1,630
4,130 1,060 5,940
3,020
11,180
Suggested Net Area
Actual Net less Suggested Net
Vacant Net
37,202 6,723 2,100 1,115
2,541
3,980
1,775 9,080
Ratio Net/Gross
1,040
71% 83% 85% 68% 91% 62% 67% 67% 92% 59% 81%
1,040 66,276 90,786 73%
17,280 2,000 3,456 8,480 1,255 3,840 3,840
1,087 (1,028) 217 7,850 520 880 2,444
28,800 3,077 5,317 12,114 2,092 5,908 4,518 Suggested Gross Area
Non-AcadAcademic Voc/Theo
3,243 2,176
6,309
2,000 4,309
3,077
3,366
3,440
6,806
6,100
9,385
48,251
18,025
This chart provides net square feet (NSF) by individual buildings (rows), NSF by Job Corps functions (columns), gross square feet (GSF) for each building, and the suggested NSF for each function. Further NSF breakdowns of functional categories into subcategories may be found in Section D under Descriptions. Section D is typically included in Volume II.
Federal Real Property Asset Management Performance Measures
Center: BLUE RIDGE (00302) Page: 1 of
Date: 09/30/2015
$468,283.00
0001 - MAIN (ALESHIRE)
0002 - ACADEMICS/REC (RUSSELL)
0003 - ARTS AND CRAFTS
0004 - MAINTENANCE SHOP
0004A - MAINTENANCE STORAGE
0005 - TRANSITIONAL LIVING (WARREN
HOUSE)
0006 - ADMINISTRATION OFFICE
0007 - NURSING/MEDICAL ASSISTANT
0008 - TEAP CLASSROOM
0011 - MEDICAL
0013 - GYMNASIUM
0014 - PICNIC SHELTER (16Ft x 32Ft) 0015 - COVERED WALKWAY (6Ft X 60Ft)
BLUE RIDGE JCC (LAND)
Name
0030200002 0030200003 0030200004 0030200005 0030200008 0030200006
0030200007 0030200012 0030200009 0030200013 0030200014 0030208110 0030208111 0030208108
Asset Number
Building Building Building Building Building Building
Building Building Building Building Building Structure Structure Land
Type
Owned Owned Owned Owned Owned Owned
Owned Owned Owned Owned Owned Owned Owned Owned
Own/ Lease
52,100 8,100 2,476 1,630
4,130
1,060 5,940
3,020
11,180
Size
100%
100%
100%
Utilization Percent
$288,109.70 $33,949.06 $10,372.34
$2,185.68 $1,029.62
$22,840.56
$4,931.35 $30,079.20
$1,929.52 $15,470.85 $46,852.23
$689.91 $477.32
$9,365.66
Annual Op Cost
94% 94% 90% 99%
100% 97%
98% 91%
100% 100% 100% 100% 100%
0%
FCI
MC
MC
MC
MDNC
MDNC
MC
MDNC
MC
MC
MC
MC
MDNC
MDNC
MC
Mission Dependency Restrictions
Totals:
29 Federal Real Property Asset Management Performance Measures
Center: BLUE RIDGE (00302) Page: 2 of
Date: 09/30/2015
Building Mission Dependency Summary
Buildings Mission Critical
Buildings Mission Dependent Not Critical
Buildings Not Mission Dependent
GSF Mission Critical
GSF Mission Dependent Not Critical
GSF Not Mission Dependent of of of
87,326
3,460
(72.7%)
(27.3%)
(0%)
(96.2%)
(3.8%)
Facilities Not Meeting Facility Condition Index (FCI) Target (90%)
0 of 11 Buildings FCI < 90% (0%)
0 of 2 Structures FCI < 90% (0%)
GSF FCI < 90% (%)
Funded But Not Corrected Deficiencies by Classification Blue Ridge (00302)Center:
1Page:
09/30/2015Date:
of 2
Site Steep concrete steps without rails.106765 2014 $5,307
Building
0001 - Main (Aleshire) Shower stalls are damaged and deteriorated Windows are deteriorated Windows have no screens Pigeons roost on fire escapes Dormitory keying system is inadequate Six pan electric boilerless convection steamer has failed Deep fryer has a leak that has been deemed unrepairable.
Exit signage inadequate for egress path Receptacles for the washer/dryer machines are not GFCI type Sprinklers not functional Vestibule sprinklers not functional Walk and steps uneven in egress route Emergency repair for replacement of the water heater booster Garbage disposal has failed Cafeteria water heater has failed
89718 89723 89724 89726 89973 105702
106245
106715 106716
106745 106747 106764 107382
107452 107583
$34,217 $203,113
$24,505 $5,252
$15,159
$2,543
$1,895 $1,350
$10,725 $5,578
$455 $2,679
$5,811 $2,861 $4,929
Deficiency Total Costs by Classification
Deficiency Description ProjPY Yr Fund IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R
R R R R R R
R
R R
R R R R
R R
Summary
Site Total: $5,307 $5,307
$288,034 $16,303 $16,735 $321,072Subtotal:
$39,326 $348,547 $69,659 $0 $16,303 $0 $0 $473,835
Deficiency Total Numbers by Classification 6 8 0 9 2 0 0 25
IIC
$0
31 Funded But Not Corrected Deficiencies by Classification Blue Ridge (00302)Center:
2Page:
09/30/2015Date:
of 2
Building
0002 - Academics/Rec (Russell)
0005 - Transitional Living (Warren House)
0007 - Nursing/Medical Assistant
0011 - Medical
Toilets are deteriorated Troubleshoot 9 fire dampers and return them to operating condition
Inspector's valve not properly located Sprinkler pipe not adequately protected from freezing Guard rail is too low, stairs lack rail
Sewer backup into building and roof leaks Replace equipment contaminated by sewer back up (see def 107693)
Pull down stair to attic is broken Emergency light fixtures not operational
89731 104093
106744 106748
106766
107693 108686
106687 106727
$5,000
$1,599
$467
$25,422
$1,531
$60,513
$7,503
$45,000
$421
Deficiency Description ProjPY Yr Fund IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R R
R R
R
R R
R R
$34,019 $348,547 $16,303 $69,659 $468,528Totals by Classification:
$5,000
$2,066
$25,422
$1,531
$60,513
$7,503
$45,000
$421
$65,513
$9,569
$70,422
$1,952
Subtotal:
Subtotal:
Subtotal:
Subtotal:
IIC
Unfunded Deficiencies by Classification Blue Ridge (00302)Center:
1Page:
09/30/2015Date:
of 4
Site Deteriorated pavement at College St. parking lot
Concrete sidewalk floods during rain
Runoff is eroding slope
42974
89716
107353
$1,462
$16,250
$1,935
Deficiency Total Costs by Classification
Deficiency Description Proj IDID Year IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R
R
R
Summary
Site Total: $1,462 $18,185 $19,647
$0 $0 $0 $7,109 $479,967 $0
$0 $0 $17,186 $119,764 $0 $0
$543,821
$476,113 Cost of Deficiencies Linked to National (or Major Agency) Projects
Cost of Deficiencies not Linked to Projects
$2,472
$272,174
$0 $126,873 $0 $17,186 $274,646 $479,967 $0 $1,019,934
Deficiency Total Numbers by Classification 0 0 10 13 7 3 0 43
IIC
54273
$66,989
$121,262
33 Unfunded Deficiencies by Classification
2Page:
09/30/2015Date:
of 4
Building
0001 - MAIN (ALESHIRE)
0002 - ACADEMICS/REC (RUSSELL)
Entrances to building are not handicap accessible Restrooms are not handicap accessible No pedestrian walkways at building perimeter Cafeteria salad bar is defective and poorly located Gas shutoff interlock not provided in dryer exhaust system Medical vocations are dispersed The building has four floors and does not have an elevator Roofing and gutters are deteriorating and near end of service life New Camera system is needed Domestic hot water pipes not insulated Heating not provided Domestic hot water piping inadequately supported Clothes dryer exhaust/makeup running at all times Water heater out of service Temperature is excessive in computer equipment room Ice is sliding off roof, gutters are damaged
Bathrooms lack minimum entry width to toilet stalls.
The lower level of the building is not accessible The restrooms are not handicap accessible Door and frame are deteriorated Vinyl-faced insulation is deteriorated Fire alarm control panel not protected Domestic hot water pipes not insulated
53785 53787 89727 89729
89880
90763 90764
106731
107039 107046 107047 107048
107049 107050 107051
107350
42093
53788 53789 75876 89730
106718 107052
$1,012
$6,623
$341 $1,173
$7,109
$11,029
$3,167 $2,594
$13,689
$3,259 $5,554
$2,472
$187,213
$58,176
$5,146
$11,051
$284,424 $184,492
Deficiency Description Proj IDID Year IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
N N N N
N
N N
R
R R R R
R R R
R
R
R R R R R R
$7,635
$1,514
$37,588
$8,814
$253,008 $479,967 $817,844
$59,962
Subtotal:
Subtotal:
IIC
$25,460 $14,186
$16,297
$16,314 $17,023
$39,646
$49,634
Unfunded Deficiencies by Classification Blue Ridge (00302)Center:
3Page:
09/30/2015Date:
of 4
Building
0003 - ARTS AND CRAFTS
0004 - MAINTENANCE SHOP
0005 - TRANSITIONAL LIVING (WARREN HOUSE)
0006 - ADMINISTRATION OFFICE
0007 - NURSING/MEDICAL ASSISTANT
0011 - MEDICAL
Open railings at stairs are hazardous Basement fills with water during rain
Clothes dryer is not exhausted outside the building A retaining wall is collapsing into the doorway Domestic hot water pipes not insulated
Building is not handicap accessible There are no handicap accessible bathrooms Heating pipes not insulated
The building is not handicap accessible Restroom is not handicap accessible Attic is not vented and has no access
There is no pull down ladder for access to the attic Restrooms are not handicap accessible Building has not been tested for radon Roofing at drain head is leaking, Building has not been tested for radon
106684 106733
89886
106735 107053
53790 53791
107054
53792 53793
106680
53781
53794 53984
106976
53985
$6,140
$582
$576
$246
$246
$9,519
$2,165
$1,599
$2,614
$63,113
$3,454
Deficiency Description Proj IDID Year IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R R
R
R R
R R R
N N R
R
R R R
R
$6,140
$1,158
$246
$246
$9,519
$2,165
$1,599
$65,727
$3,454
$15,659
$3,322
$16,079
$16,226
$70,702
$246
Subtotal:
Subtotal:
Subtotal:
Subtotal:
Subtotal:
Subtotal:
IIC
$9,788 $2,837
$10,876 $3,751
$4,729
$12,626
$14,627
$4,729
35 Unfunded Deficiencies by Classification
4Page:
09/30/2015Date:
of 4
Building
0013 - GYMNASIUM
Building has not been tested for radon53986 2004 $246
Deficiency Description Proj IDID Year IA IIA IIB IIIA IIIB IVA IVB TotalsDef ID Off.
R
$17,186 $125,411 $256,461 $479,967 $1,000,287Totals by Classification:
$246 $246Subtotal:
IIC
$121,262
FACILITY CONDITION SUMMARY REPORT 1
09/30/2015
Page:
00302 BLUE RIDGE
of
Date:
0001 - MAIN (ALESHIRE)
0002 - ACADEMICS/REC (RUSSELL)
0003 - ARTS AND CRAFTS
0004 - MAINTENANCE SHOP
0004A - MAINTENANCE STORAGE
0005 - TRANSITIONAL LIVING (WAR
0006 - ADMINISTRATION OFFICE
0007 - NURSING/MEDICAL ASSISTA
0008 - TEAP CLASSROOM
0011 - MEDICAL
0013 - GYMNASIUM
0014 - PICNIC SHELTER (16Ft x 32Ft 0015 - COVERED WALKWAY (6Ft X
Name
Building Building Building Building Building Building Building Building Building Building Building Structure Structure
Type
52,100 8,100 2,476 1,630
4,130 1,060 5,940
3,020
11,180
GSF
Built
Good Good Fair Good Good Good Good Good Good Good Good Good Good
Condition
Good Good Good Good Good Good Good Good Good Good Good Good Good
Structure
Good Good Fair Good Good Good Good Good Good Good Good Good Good
Exterior
Good Good Fair Good Good Good Good Good Good Good Good Good Good
Interior
Good Good Good Good Good Good Good Good Good Good Good N/A Good
Mechanical
Good Good Good Good Good Good Good Good Good Good Good N/A Good
Electrical
94% 94% 90% 99%
100% 97% 98% 91%
100% 100% 100% 100% 100%
FCIAsset Number
0030200002 0030200003 0030200004 0030200005 0030200008 0030200006 0030200007 0030200012 0030200009 0030200013 0030200014 0030208110 0030208111
Facility Condition Elements General Potent Impair
DOL
Resp Deter
DOL
Building Condition by Function
09/30/2015Date :
Page : 1 of Center: BLUE RIDGE (00302)
HOUSING
EDUCATION
FOOD SERVICE
RECREATION
18,367
14,087
3,673
0001 - MAIN (ALESHIRE)
0005 - TRANSITIONAL LIVING
(WARREN HOUSE)
0001 - MAIN (ALESHIRE)
0002 - ACADEMICS/REC (RUSSELL)
0007 - NURSING/MEDICAL ASSISTANT
0008 - TEAP CLASSROOM
0001 - MAIN (ALESHIRE)
0001 - MAIN (ALESHIRE)
0002 - ACADEMICS/REC (RUSSELL)
0003 - ARTS AND CRAFTS
0013 - GYMNASIUM
Building
Building
Building
Building
15,826
2,541
6,609
3,148
3,980
3,673
2,930
3,575
9,080
Functional Area
(NSF)
Functional Area
(NSF)
Functional Area
(NSF)
Functional Area
(NSF)
Good
Good
Good
Good
Good
Good
Good
Good
Good
Fair
Good
Condition
Condition
Condition
Condition
Foundation walls leak at the ground floor; interior finishes are deteriorated on both floors.
Comments
Comments
Comments
Comments
Total:
Total:
Total:
Each building has been assigned a building condition based on the physical condition of the building and the impact of that condition on the functional use of the facility.
Assignment of the condition “good” means that the facility condition is not impacting the functional use of the facility. A facility can have deficiencies of a minor nature and still be considered good.
Assignment of the condition “fair” means that the facility condition IS impacting the functional use of the facility and that the deficiencies are limited to less than 30% of the replacement value. Correction of the identified deficiencies should allow the building to return to “good” status.
Assignment of the condition “poor” means that the facility condition IS SIGNIFICANTLY impacting the functional use of the facility and/or that the identified deficiencies represent more than 30% of the replacement value. Generally, a “poor” rating would mean that “gut renovation” or replacement/demolition is the envisioned solution.
Building Condition by Function
09/30/2015Date :
Page : 2 of Center: BLUE RIDGE (00302)
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
STORAGE/SUPPORT
VACANT
SITE
16,330
1,775
4,720
6,284
1,040
0011 - MEDICAL
0001 - MAIN (ALESHIRE)
0003 - ARTS AND CRAFTS
0006 - ADMINISTRATION OFFICE
0001 - MAIN (ALESHIRE)
0004 - MAINTENANCE SHOP
0004A - MAINTENANCE STORAGE
0003 - ARTS AND CRAFTS
SITE
Building
Building
Building
Building
Building
Building
1,775
3,695
4,469
1,115
1,040
Functional Area
(NSF)
Functional Area
(NSF)
Functional Area
(NSF)
Functional Area
(NSF)
Functional Area
(NSF)
Good
Good
Fair
Good
Good
Good
Good
Fair
Good
Condition
Condition
Condition
Condition
Condition
Condition
Foundation walls leak at the ground floor; interior finishes are deteriorated on both floors.
Foundation walls leak at the ground floor; interior finishes are deteriorated on both floors.
Comments
Comments
Comments
Comments
Comments
Comments
Total:
Total:
Total:
Total:
Total:
Site Area (Acres)
The Center reports that the dining area and kitchen are too small
Planning Analysis Results and Conclusions
Significant Issues
Significant issues impacting operations and/or the learning/living environment at the Center identified during the March, 2015 Facility Survey are as follows:
Issues being addressed Correcting a pigeon roosting…