DOL-ETA-16-R-00023_Amend_0006.pdf
PDF 259 KB Posted
- Attached to
- Operation of the Roswell Job Corps Center
- Solicitation number
- DOL-ETA-16-R-00023
About this file
Amendment 0006
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DOL-ETA-16-R-00023
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ETA/OJC TX OCM ADMIN
DALLAS TX 75202
ROOM 406
525 S. GRIFFIN ST.
US DEPARTMENT OF LABOR
Washington DC 20210
ETA OCM JOB CORPS
Room N-4643 200 Constitution Ave, NW Division of Job Corps Procurement US Department of Labor
03/16/2016000006
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/03/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. Amendment
The purpose of this amendment is to update the solicitation and to respond to questions from industry.
ITEM 0001: The table in section L is hereby deleted in its entirety and is replaced with the attached:
Period of Performance: 10/01/2016 to 10/31/2022
Attachment 1: Questions and Answers
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Sheryl Algee
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Sheryl Algee 5/2/2016
Proposal Section Written Oral
Presentation Page/Slide Limitation
Number of Copies
Technical Approach
White Paper/Executive Summary on the technical approach used in the presentation NTE 25 pages and Copy of Final Version of Slides
Presentation Slides – Time allotted for oral presentations is 2 hours
White Paper NTE 25 Pages Oral Presentation NTE 60 slides
Two (2) hard copies and one
(1) CD
Staff Resources Copy of Final Version of Slides
Presentation Slides – Time allotted for oral presentations is 30 minutes
Oral Presentation NTE 15 Slides
Two (2) hard copies and one
(1) CD
Offeror’s Relevant Experience
Copy of Final Version of Slides
Presentation Slides – Time allotted for oral presentations is 30 minutes.
Oral Presentation NTE 10 Slides
Two (2) hard copies and one
(1) CD
Past Performance
Chart of Past Performance containing at a minimum the information required to complete section A of attachment J- 7 NTE 20 pages
None Written Proposal NTE 20 Pages
Two (2) hard copies and one
(1) CD
Business Management Proposal
BMP IAW Section L and M None
Written Proposal Unlimited Pages
Two (2) hard copies and one
(1) CD
Attachment 1: Questions and Answers
1. Reference SF33 Comment The SF 33 indicates that the submittal is to be received in
Washington, DC. Is that correct, rather than in the Dallas, TX. office
Question Government Response
This is correct all documentation is to be mailed to the Washington, D.C. Office
2. Reference Staff Resources Proposal Comment Page Limits Question On page 10 of Amendment #5, does the Staff Resources
Proposal still have a NTE 15 page written along with the 15 slides?
Government Response
See Amendment 0006
3. Reference Past Performance Proposal Comment Page Limits Question On page 10 of Amendment #5, does the Past Performance
Proposal still have a NTE 20 page written Government Response
See Amendment 0006
4. Reference Amendment 0005 page 1; Amendment 0005 page 12 Comment Due date page 1 states May 23, 2016 @ 5:00PM Et
Due date page 12 states May 24, 2016 by 12:00 (Noon) EST Question Please clarify the due date and time for submission Government Response
The Due date is May 23, 2016 @ 5:00 ET the offeror is to contact the person listed in the solicitation in the event the offeror does not receive a read/delivery receipt by May 24, 2016 @ 12:00 ET
5. Reference L.6.I Written Proposal Format
Comment Staff Resources – 15 slides, Final version of planned presentation Offeror’s Relevant Experience – 5 Slides, Final Version of planned presentation Past Performance – Chart of Past Contract performance containing at a minimum the information required to complete section A of attachment J-7
Question 1. Is there a written document required for each of these three sections?
2. If yes, is there a page limit for each of these three sections?
Government Response
There is no written requirement for staff resources and relevant experience. Past performance will be a written proposal NTE 20 pages
6. Reference L.6.I Written Proposal Format Comment Technical Approach – Final Version of planned presentation
Staff Resources – Final Version of planned presentation Offeror’s Relevant Experience – Final Version of planned presentation
Question Please clarify what this submitted material consists of. Does the Government require the script of our oral presentation for each section in addition to the slides?
Government Response
Submitted material consists of a white paper for technical approach, the final version of slides for technical, staff resources, and relevant experience. Scripts of the oral presentation are not required.
7. Reference Written Proposal – Staff Resources Comment Format Question Requirements for the Staff Resources section include a
Written portion and presentation slides. Can the Government please specify: what are the page limitations for the written portion of the Staff Resources section?
Government Response
See Amendment 0006
8. Reference Written Proposal – Past Performance Comment Page Limits Question Is there a page limitation to the Past Performance section?
Government Response
See Amendment 0006
9. Reference Written Proposal – White Paper Comment Format Question Can the Government please clarify what information is to be included in the White Paper?
Government Response
The white paper is to be an executive summary of the offerors technical proposal NTE 25 pages.
10. Reference Licensing Comment Clarification Question Is it the Government’s expectation that each offeror must be licensed to operate in the state of New Mexico prior to contract award?
Government Response
Offerors must be licensed in the state of New Mexico after contract award.
11. Reference Facility Use Comment Question Is the Roswell Center operator required to provide office space for any other Job Corps contract (e.g. Admissions Counselors or CTS Specialists permanently located on center)? If so, please provide details.
Government Response
The use of the facility office space is between the offeror and the vendor providing OA and CTS n
File details come from the government source that posted it. Updated .