Attachment_J-1.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Operation of the Keystone Job Corps Center
Solicitation number
DOL-ETA-15-R-00072
Issued by

About this file

Attachment J-1

View the file

Other files

File Type Posted
Keystone_Vehicle_Log.xls XLS spreadsheet
Keystone_RFP_walkthru_Questions_and_answers.docx DOCX document
Updated_2015_utility_usagecost.xls XLS spreadsheet
Keystone_Residential_Advisors_CBA_2010-2013_signed_(2)_pdf_-_Adobe_Acrobat_Pro.pdf PDF
Keystone_Professionals_CBA_2010-2013_signed_pdf_-_Adobe_Acrobat_Pro.pdf PDF
Keystone_Maintenance_CBA_2009-2012_signed.pdf PDF
Basis_for_Award.docx DOCX document
Attachment_J-2.pdf PDF
Attachment_J-7.docx DOCX document
Attachment_J-13.xlsx XLSX spreadsheet
Attachment_J-4.xlsx XLSX spreadsheet
Attachment_J-10.pdf PDF
Attachment_J-12.pdf PDF
Attachment_J-3.xlsx XLSX spreadsheet
Attachment_J-14.pdf PDF
Attachment_J-6.xlsx XLSX spreadsheet
Attachment_J-9_Volume_II.pdf PDF
Attachment_J-9_Volume_I.pdf PDF
Attachment_J-8.pdf PDF
Attachment_J-11.pdf PDF
KEYSTONE_RFP.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Schedule

LINE ITEM (CLIN)DESCRIPTIONESTIMATED COST
Transition-in – Period of Performance:
1Transition In Period (A)
Base Year– Period of Performance:
2Center Operations (A)
3Center Operations Technical Performance Incentive Fee (A)
4Center Operations Cost Incentive Fee (A)
5Outreach/Admissions (C1)
6Outreach/Admissions Technical Performance Incentive Fee (C1)
7Outreach/Admissions Cost Incentive Fee (C1)
8Career Transition Services (C2)
9Career Transition Services Technical Performance Incentive Fee (C2)
10Career Transition Services Cost Incentive Fee (C2)
11Construction, Rehabilitation, and AcquisitionN/A
(CRA) (B1)
12Equipment (B2)N/A
13Career Technical Skills Training (B4)N/A
14Demonstration Projects – TBDN/A
Option #1 - Period of Performance:
1002Center Operations (A)
1003Center Operations Technical Performance Incentive Fee (A)
1004Center Operations Cost Incentive Fee (A)
1005Outreach/Admissions (C1)
1006Outreach/Admissions Technical Performance Incentive Fee (C1)
1007Outreach/Admissions Cost Incentive Fee (C1)
1008Career Transition Services (C2)
1009Career Transition Services Technical Performance Incentive Fee (C2)
1010Career Transition Services Cost Incentive Fee (C2)
1011Construction, Rehabilitation, and Acquisition(CRA) (B1)N/A
1012Equipment (B2)N/A
1013Career Technical Skills Training (B4)N/A
1014Demonstration Projects – TBDN/A
Option #2 – Period of Performance:
2002Center Operations (A)
2003Center Operations Technical Performance Incentive Fee (A)
2004Center Operations Cost Incentive Fee (A)
2005Outreach/Admissions (C1)
2006Outreach/Admissions Technical Performance Incentive Fee (C1)
2007Outreach/Admissions Cost Incentive Fee (C1)
2008Career Transition Services (C2)
2009Career Transition Services Technical Performance Incentive Fee (C2)
2010Career Transition Services Cost Incentive Fee (C2)
2011Construction, Rehabilitation, and Acquisition (CRA) (B1)N/A
2012Equipment (B2)N/A
2013Career Technical Skills Training (B4)N/A
2014Demonstration Projects – TBDN/A
Option #3 – Period of Performance:
3002Center Operations (A)
3003Center Operations Technical Performance Incentive Fee (A)
3004Center Operations Cost Incentive Fee (A)
3005Outreach/Admissions (C1)
3006Outreach/Admissions Technical Performance Incentive Fee (C1)
3007Outreach/Admissions Cost Incentive Fee (C1)
3008Career Transition Services (C2)
3009Career Transition Services Technical Performance Incentive Fee (C2)
3010Career Transition Services Cost Incentive Fee (C2)
3011Construction, Rehabilitation, and Acquisition (CRA) (B1)N/A
3012Equipment (B2)N/A
3013Career Technical Skills Training (B4)N/A
3014Demonstration Projects – TBDN/A
Transition Out
4001Transition-out
Six Month Option – Period of Performance:
5002Extension of Services

Cost Detail Center

COST DETAIL – CENTER OPERATIONS
Cost Category1st Base Year2nd Base YearBase Period Total Estimated CostOption Year 1Option Year 2Option Year 3Five Year Total Estimated Cost
1Staff Salaries Excluding Fringe
2Fringe Benefits for Staff
3Staff Travel & Per Diem
4Consultants Costs
5Subcontract Costs
6Materials & Supplies
7Communications Costs
8All Other Direct Costs
9Total Estimated Direct Costs
10General and Administrative Costs (____%)
11Total Estimated Direct/Indirect Costs
12Technical Performance Incentive Fee
13Cost Incentive Fee
14Total Estimated Cost Including Technical Performance and Cost Incentive Fees

Cost Detail OACTS

COST DETAIL – OUTREACH AND ADMISSIONS
Cost Category1st Base Year2nd Base YearBase Period Total Estimated CostOption Year 1Option Year 2Option Year 3Five Year Total Estimated Cost
1Staff Salaries Excluding Fringe
2Fringe Benefits for Staff
3Staff Travel & Per Diem
4Consultants Costs
5Subcontract Costs
6Materials & Supplies
7Communications Costs
8All Other Direct Costs
9Total Estimated Direct Costs
10General and Administrative Costs (____%)
11Total Estimated Direct/Indirect Costs
12Technical Performance Incentive Fee
13Cost Incentive Fee
14Total Estimated Cost Including Technical Performance and Cost Incentive Fees
COST DETAIL – CAREER TRANSITION SERVICES
Cost Category1st Base Year2nd Base YearBase Period Total Estimated CostOption Year 1Option Year 2Option Year 3Five Year Total Estimated Cost
1Staff Salaries Excluding Fringe
2Fringe Benefits for Staff
3Staff Travel & Per Diem
4Consultants Costs
5Subcontract Costs
6Materials & Supplies
7Communications Costs
8All Other Direct Costs
9Total Estimated Direct Costs
10General and Administrative Costs (____%)
11Total Estimated Direct/Indirect Costs
12Technical Performance Incentive Fee
13Cost Incentive Fee
14Total Estimated Cost Including Technical Performance and Cost Incentive Fees

Fringe Benefits

FRINGE BENEFITS – CENTER OPERATIONS%1st Year Pay Base (a)2nd Year Pay Base (b)Fringe 1st Year (%*a)Fringe 2nd Year (%*b)OY1 %OY1 Pay BaseFringe OY1OY 2%OY2 Pay BaseFringe OY2OY 3%OY3 Pay BaseFringe OY3
1Unemployment Insurance$$$$$$$$$$
2FICA$$$$$$$$$$
3Worker’s Compensation$$$$$$$$$$
4Health Insurance$$$$$$$$$$
5Dental Insurance$$$$$$$$$$
6Life Insurance$$$$$$$$$$
7Retirement/Pension$$$$$$$$$$
8Other (Specify)$$$$$$$$$$
9Total Costs of Fringe Benefits$$$$$$$
ADDITIONAL INFORMATION
10Estimated Overtime/Holiday Premium Pay$$$$$
11Estimated Night Differential$$$$$
12Number of Staff Paid Holidays
13Estimated Total Number Staff Vacation Days

Indirect Costs

Rate for each Contract Year
Indirect CostBase of Allocation12345
G&AIn accordance with contractor’s negotiated and approved Indirect Cost Rate Agreement, also excluding CRA, equipment, and CTST.
OverheadTotal Direct Salaries and Wages (including/excluding fringe benefits)
Applicable
Not Applicable
Ceiling Indirect Rates or Ceiling Amounts - The Contracting Officer will impose the contractor’s administrative cost limitations (ceilings) regarding the contract based on the documentation received. Please note that these “ceilings” do not exclude your organization from the responsibility of submitting an indirect cost rate proposal(s) for approval.
The contractor’s proposed G&A ceiling rate: ___%

Option to Extend Services

52.217-8, Option to Extend Services
DescriptionMonth 1Month 2Month 3Month 4Month 5Month 6
Center Operations (A)
Center Operations Technical Performance Incentive Fee 2.4%
Center Operations Cost Incentive Fee 3.6%
Outreach/Admissions (C1)
Outreach/ Admissions Technical Performance Incentive Fee 2.4%
Outreach/ Admissions Cost Incentive Fee 3.6%
Career Transition Services (C2)
Career Transition Services Technical Performance Incentive Fee – 2.4%
Career Transition Services Cost Incentive Fee – 3.6%
Total, all costs including fees
In the event that the Government chooses to exercise contract clause 52.217-8, Option to Extend Services, estimated costs for each month of the six month Option are as follows below. Please note that under the Option to Extend Services, the contractor shall receive a technical performance incentive fee and a cost incentive fixed fee on total direct and indirect costs, excluding CRA, equipment, CTST, and demonstration projects:

Liquidated Damages

Period of PerformanceTotal Estimated Cost (excluding OA, CTS, CRA, equipment, and CTST)OBSStudent Per Year Cost (Total Estimated Cost/OBS)Student Per Day Cost (Student Year Cost/365*15%)
Base Year One$
Base Year Two$
Option Year One$
Option Year Two$
Option Year Three$
Average$
The following table shall be used for the purpose of calculating the Student Per Year Cost and Student Per Day Cost, as applied in Section G.8, Liquidated Damages for Failure to Comply with Regulations for Separating Students/Issuing Leaves and Section G.9, Liquated Damages for Ineligible Enrollment

Incentive Fees

CENTER OPERATIONS
Contract YearMinimum Cost Incentive Fee (3.0%)Minimum Technical Performance Incentive Fee (0%)Average Technical Performance Incentive Fee (1.2%)Maximum Performance Incentive Fee -2.4%Maximum Technical Performance Excellence Bonus (.5%)
1
2
3
4
5
OUTREACH AND ADMISSIONS
Contract YearMinimum Cost Incentive Fee (3.0%)Minimum Technical Performance Incentive Fee (0%)Average Technical Performance Incentive Fee (1.2%)Maximum Performance Incentive Fee -2.4%Maximum Technical Performance Excellence Bonus (.5%)
1
2
3
4
5
CAREER TRANSITION SERVICES
Contract YearMinimum Cost Incentive Fee (3.0%)Minimum Technical Performance Incentive Fee (0%)Average Technical Performance Incentive Fee (1.2%)Maximum Performance Incentive Fee -2.4%Maximum Technical Performance Excellence Bonus (.5%)
1
2
3
4
5
The following table shall be used for the purpose of proposing the technical and cost incentives.

Incentive Fee Calculator

TermDefinition of TermCenter OperationsO/ACTS
Target CostContractor’s current contract year’s estimated operations cost (i.e., that contract year’s approved operations budget as shown on form 2181 within FMS), excluding fees, CRA (CLIN 5001), equipment (CLIN 5002), CTST (CLIN 5003), and demonstration projects (5004).Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three:

Actual Cost The actual operations costs incurred by the contract as a result of contract performance (i.e., as shown on form 2110), excluding fees, CRA (CLIN 5001), equipment (CLIN 5002), CTST (CLIN 5003), and demonstration projects (5004) Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three:

Definition of TermCenter OperationsO/ACTS
Minimum Cost Incentive FeeMinimum Cost Incentive Fee = 2.0% of total direct and indirect costs, excluding fees, CRA (CLIN 5001), equipment (CLIN 5002), CTST (CLIN 5003), and demonstration projects (5004).

Please note that the minimum cost incentive fee operates in the same way as a fixed fee and therefore, the dollar amount of the minimum fee does not increase as the contractor’s costs.

Contractor’s minimum cost incentive fee of 2% may be unilaterally reduced to 0% by the Contracting Officer if the contractor’s actual costs exceed the target cost by greater than 10%. Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three:

Maximum Cost Incentive Fee Maximum Cost Incentive Fee Possible = 3.6% of total direct and indirect costs, excluding fees, CRA (CLIN 5001), equipment (CLIN 5002), CTST (CLIN 5003), and demonstration projects (5004). Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three:

Target Cost Incentive fee2.8% of total direct and indirect costs, excluding fees, CRA (CLIN 5001), equipment (CLIN 5002), CTST (CLIN 5003), and demonstration projects (5004).
This is the cost incentive fee that the contractor earns if the contractor’s actual costs are equal to the Target CostBase Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three:

TermDefinition of TermCenter OperationsO/ACTS
Cost Overrun and Cost Underrun variancesA cost overrun variance occurs when actual operations cost is more than the budgeted cost in a given contract year.

A cost underrun variance occurs when actual operations cost is less than the budgeted cost in a given contract year.

The contract year’s variance will be reported on the form 2110.

Fee Adjustment Formula – used to calculate Cost Incentive Fee Earned Cost Sharing Ratio for cost overruns = 20% Government / 80% Contractor Benefit Ratio for cost underruns = 80% Government / 20% Contractor

Calculation of the Final Cost Incentive Fee earned (see Note 2)Final Cost Incentive Fee = Target Cost Incentive Fee + /- (Cost Underrun or Cost Overrun variance * Contractor Share)
(see Note 2)Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three: Base Period One:

Base Period Two:

Option Period One:

Option Period Two:

Option Period Three:

Note 1: In accordance with cost reporting requirements as found in Appendices 502 and 503 of the PRH.
Note 2: The Final Cost Incentive Fee earned will not be less than 2.0% of total direct and indirect costs (minimum cost incentive fee) and not more than 3.6% of total direct and indirect costs (maximum cost incentive fee). Contractor’s minimum cost incentive fee of 2% may be unilaterally reduced to 0% by the Contracting Officer if the contractor’s Actual costs exceed the Target cost by greater than 10%

Sheet1

File details come from the government source that posted it. Updated .