ATTACHMENT J-17

(Page 1 of 137)

General Decision Number: OH140011 01/03/2014 OH11

Superseded General Decision Number: OH20130011

State: Ohio

Construction Types: Heavy Water Well Drilling

Counties: Clark, Greene, Miami and Montgomery Counties in

Ohio.

WATER WELL DRILLING

Modification Number Publication Date

0 01/03/2014

SUOH1996-003 05/23/1996

Rates Fringes

Pump Technician................$ 10.82 3.04

Water Well Driller.............$ 13.72 3.14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular

(Page 2 of 137) rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

(Page 3 of 137)

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

(Page 4 of 137)

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(Page 5 of 137)

General Decision Number: OH140016 05/02/2014 OH16

Superseded General Decision Number: OH20130016

State: Ohio

Construction Type: Building

Counties: Adams, Allen, Ashland, Auglaize, Belmont, Brown, Butler, Clermont, Clinton, Coshocton, Crawford, Delaware, Erie, Fairfield, Fayette, Franklin, Greene, Guernsey, Hancock, Harrison, Highland, Hocking, Holmes, Huron, Jackson, Jefferson, Knox, Licking, Madison, Miami, Monroe, Montgomery, Morgan, Morrow, Muskingum, Noble, Ottawa, Perry, Pickaway, Pike, Preble, Richland, Ross, Sandusky, Scioto, Seneca, Tuscarawas, Vinton, Warren, Washington, Wayne, Wood and Wyandot Counties in

Ohio.

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including four (4) stories)

Modification Number Publication Date

0 01/03/2014

1 01/17/2014

2 01/31/2014

3 02/14/2014

4 04/04/2014

5 04/18/2014

6 04/25/2014

7 05/02/2014

ASBE0003-001 08/01/2013

ERIE (to Sandusky city limits) & HURON

Asbestos Workers/Insulator

(Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 37.18 18.40

ASBE0008-001 07/01/2013

(Page 6 of 137)

ADAMS, BROWN, BUTLER (Including Fairfield, Hanover, Liberty, Milford, Morgan, Oxford, Ripley, Ross, St. Clair, Union & Wayne

Townships), CLERMONT, HIGHLAND & WARREN (Including Deerfield, Hamilton, Harlan, Salem, Union & Washington Townships) insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 29.05 13.47

ASBE0041-003 03/01/2014

ALLEN

insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 29.43 14.60

ASBE0045-001 07/01/2013

ERIE (City limits of Sandusky & Townships of Groton, Margaretta, Oxford & Perkins), HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 29.56 22.54

ASBE0050-001 07/01/2013

(Page 7 of 137)

CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY,

HOCKING, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM,

NOBLE, PERRY, PICKAWAY, ROSS, and VINTON COUNTIES

Asbestos Worker/Insulator insulating materials, protective coverings, coatings & finisings to all types of mechanical systems).....$ 27.53 12.94

ASBE0050-002 07/01/2013

AUGLAIZE, BUTLER (Lemon & Madison Townships), CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE, and WARREN (Clear Creek, Franklin, Massie, Turtle Creek & Wayne Townships)

Asbestos Worker/Insulator insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 25.05 12.60

ASBE0080-004 03/04/2013

JACKSON, PIKE, SCIOTO, and WASHINGTON COUNTIES

Insulator/asbestos worker

(SCOPE OF WORK, includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems and

Hazardous Material Handler)......$ 31.04 18.33

ASBE0084-001 07/01/2013

(Page 8 of 137)

ASHLAND, COSHOCTON, HARRISON, HOLMES, RICHLAND, TUSCARAWAS &

WAYNE

ASBESTOS WORKER/INSULATOR

insulating materials, protective coverings coatings

& finishings to all types of mechanical systems)..............$ 29.07 16.55

ASBE0207-004 06/01/2012

ALLEN

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scraping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 21.15 12.20

ASBE0207-006 07/01/2013

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)

ADAMS, BROWN, BUTLER

(Townships of Fairfield, Hanover, Liberty, Milford, Morgan, Oxford, Ripley, Ross, St. Clair, Union &

Wayne), CLERMONT, HIGHLAND

(Page 9 of 137)

& WARREN (Townships of

Deerfield, Hamilton, Harlan, Salem, Union &

Washington) COUNTIES........$ 24.50 12.45

ASHLAND, COSHOCTON, ERIE

(Post Offices & Townships of: Berlin, Berlin

Heights, Birmingham, Florence, Huron, Milan, Shinrock & Vermilion), HARRISON & HURON COUNTIES...$ 24.50 12.45

AUGLAIZE, BUTLER

(Townships of Lemon &

Madison), CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE

& WARREN (Townships of

Clear Creek, Franklin, Massie, Turtle Creek &

Wayne) COUNTIES.............$ 24.50 12.45

CRAWFORD, DELAWARE,

FAIRFIELD, FAYETTE,

FRANKLIN, GUERNSEY,

HOCKING, KNOX, LICKING,

MADISON, MORGAN, MORROW,

MUSKINGUM, NOBLE, PERRY,

PICKAWAY, ROSS & VINTON

COUNTIES....................$ 24.50 12.45

ERIE (Portion covered by the city limits of

Sandusky, Ohio & by the

Townships of Groton, Margaretta, Oxford &

Perkins), HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD &

WYANDOT COUNTIES............$ 25.20 10.30

HOLMES, RICHLAND,

TUSCARAWAS & WAYNE COUNTIES.$ 24.50 12.45

BOIL0085-001 07/01/2013

ALLEN, ASHLAND, AUGLAIZE, CRAWFORD, DELAWARE, ERIE, HANCOCK,

HURON, KNOX, MORROW, OTTAWA, RICHLAND, SANDUSKY, SENECA, WOOD &

WYANDOT

(Page 10 of 137)

BOILERMAKER......................$ 32.60 23.70

BOIL0105-001 01/01/2013

ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, FAIRFIELD, FAYETTE,

FRANKLIN, GREENE, GUERNSEY, HIGHLAND, HOCKING, JACKSON,

LICKING, MADISON, MIAMI, MONTGOMERY, MORGAN, MUSKINGUM, NOBLE,

PERRY, PICKAWAY, PIKE, PREBLE, ROSS, SCIOTO, VINTON, and

WARREN

BOILERMAKER......................$ 33.76 24.45

BOIL0154-005 01/01/2013

JEFFERSON

BOILERMAKER......................$ 42.67 24.55

BOIL0667-002 01/01/2013

BELMONT, MONROE & WASHINGTON

BOILERMAKER......................$ 35.98 22.23

BOIL0744-005 01/01/2013

COSHOCTON, HARRISON, HOLMES, TUSCARAWAS & WAYNE

BOILERMAKER......................$ 34.00 25.02

BROH0003-001 07/01/2011

WOOD COUNTY (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson &

Grand Rapids)

(Page 11 of 137)

Bricklayer, Stonemason...........$ 28.38 15.78

BROH0003-004 07/01/2013

WOOD COUNTY (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson &

Grand Rapids)

FINISHER.........................$ 24.85 16.36

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 29.48 10.55

BROH0005-005 05/01/2011

ASHLAND, ERIE, HURON & RICHLAND

Marble Setter Finisher/Tile

Setter Finisher..................$ 26.30 10.23

Terrazzo Worker Finisher.........$ 26.00 10.61

BROH0006-001 05/01/2013

TUSCARAWAS

Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 26.10 11.43

BROH0006-002 05/01/2013

FINISHER.........................$ 21.46 9.94

Worker, Terrazzo Grinder &

Tile Setter......................$ 24.07 9.94

(Page 12 of 137)

BROH0006-004 05/01/2013

Cement Mason/Plasterer...........$ 26.10 11.43

BROH0008-004 07/01/2013

Marble Setter

Finisher/Terrazzo Worker

Finisher

COSHOCTON, HARRISON,

HOLMES, JEFFERSON & WAYNE

(Excluding Milton &

Chippewa Townships)

COUNTIES....................$ 25.71 4.35

Tile setter finisher

COSHOCTON, HOLMES,

JEFFERSON (Townships of

Mt. Pleasant, Warren, Salineville & the Village of Dillonvale), & WAYNE

(Excluding Milton &

Chippewa Townships)

COUNTIES....................$ 25.71 4.35

BROH0009-001 07/01/2013

BELMONT & MONROE COUNTIES and the Townships of Warren & Mt.

Pleasant and the Village of Dillonvale in JEFFERSON COUNTY

Bricklayer, Stonemason...........$ 25.52 17.14

Worker & Tile Setter.............$ 25.52 17.14

Refractory.......................$ 30.24 17.14

BROH0010-001 07/01/2013

JEFFERSON COUNTY (Brush Creek & Saline Townships)

(Page 13 of 137)

BRICKLAYER

BRICKLAYERS; CAULKERS;

CLEANERS; CEMENT

BLOCKLAYERS; MARBLE

SETTERS; POINTERS;

STONEMASONS & TERRAZZO

WORKERS.....................$ 26.95 15.66

TILE FINISHER....................$ 21.95 15.66

TILE SETTER......................$ 24.95 15.66

BROH0014-001 07/01/2013

HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale)

Tile setter finisher.............$ 21.95 15.66

BROH0018-001 06/01/2011

BROWN, BUTLER, CLERMONT, PREBLE Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN

Pointer & Stonemason.............$ 26.32 10.26

Refractory.......................$ 26.97 10.26

BROH0018-004 09/01/2013

BROWN, BUTLER, CLERMONT, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) and WARREN COUNTIES

Worker & Tile Setter.............$ 27.15 10.78

BROH0018-006 09/01/2011

(Page 14 of 137)

ADAMS, BROWN, BUTLER, CLERMONT, FAYETTE, JACKSON, PIKE, ROSS,

SCIOTO, VINTON, WARREN and WASHINGTON COUNTIES

Marble, terrazzo and tile finisher

Finishers...................$ 22.72 10.08

Marble Sanders, Polishers, Waxers & Sawyers............$ 22.37 10.08

Terrazzo Base Grinders

(while operating base grinding machine)...........$ 22.31 10.08

BROH0022-001 06/01/2013

CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships)

COUNTIES

Pointer & Stonemason.............$ 25.63 11.20

BROH0022-002 07/01/2013

CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships)

Worker & Tile Setter.............$ 23.93 9.82

BROH0022-003 07/01/2013

AUGLAIZE, CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE

Base Machine Men.................$ 22.92 5.41

FINISHER.........................$ 22.42 5.41

(Page 15 of 137)

BROH0035-001 07/01/2013

ALLEN and AUGLAIZE COUNTIES

Bricklayer, Caulkler, Cleaner, Pointer, Stonemason

& Tile Setter....................$ 25.76 12.21

BROH0039-001 06/01/2013

ADAMS & SCIOTO

BRICKLAYERS; CAULKERS;

CLEANERS; MARBLE SETTERS;

POINTERS; STONEMASONS;

TERRAZZO WORKERS; & TILE

SETTERS.....................$ 30.69 16.01

BROH0040-001 06/01/2013

ASHLAND, CRAWFORD, HOLMES, MORROW, RICHLAND, WAYNE and WYANDOT

(Except Crawford, Ridge, Richland & Tymochtee Townships)

BLOCKLAYERS; CAULKERS;

CLEANERS; MARBLE SETTERS;

POINTERS; STONEMASONS;

TERRAZZO WORKERS & TILE

SETTERS.....................$ 27.56 17.35

FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

"Hot" work: $2.50 above journeyman rate.

(Page 16 of 137)

BROH0044-001 06/01/2013

COSHOCTON, FAIRFIELD,

GUERNSEY, HOCKING, KNOX,

LICKING, MORGAN,

MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne

Townships) & PERRY COUNTIES

BRICKLAYERS; CAULKERS;

CLEANERS; POINTERS; &

STONEMASONS................$ 25.96 12.94

Cement Mason/Plasterer

COSHOCTON & GUERNSEY

COUNTIES

CEMENT MASONS & PLASTERERS.$ 25.96 12.94

BROH0045-001 06/01/2013

FAYETTE, JACKSON, PIKE, ROSS and VINTON COUNTIES

Bricklayer, Caulker, Cement

Mason, Cleaner, Pointer &

Stonemason.......................$ 29.55 12.69

BROH0046-001 06/01/2013

BRICKLAYER (CAULKERS; CEMENT

BLOCK LAYERS; CLEANERS;

GUNNITE MASONS; MARBLE

SETTERS; POINTERS; REFRACTORY

MASONS; STONEMASONS;

TERRAZZO WORKERS & TILE

SETTERS)

ERIE, HANCOCK, HURON,

OTTAWA, SANDUSKY, SENECA,

WOOD (Perry & Bloom

Townships) and WYANDOT

(Tymochtee, Crawford, (Page 17 of 137)

Ridge & Richland

Townships) COUNTIES & the

Islands of Lake Erie north of Sandusky.................$ 28.59 16.36

Cement Mason and plasterer

ERIE, HURON, OTTAWA,

SANDUSKY, SENECA, WOOD

(Perry & Bloom Townships) and WYANDOT (Tymochtee, Crawford, Ridge & Richland

Townships) COUNTIES & the

Islands of Lake Erie north of Sandusky.................$ 28.59 16.36

Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher

HANCOCK, OTTAWA, SANDUSKY,

SENECA, WOOD (Perry &

Bloom Townships) and

WYANDOT (Tymochtee, Crawford, Ridge & Richland

Townships) COUNTIES & the

Islands of Lake Erie north of Sandusky.................$ 24.85 16.36

FOOTNOTE: Colored or shake floors and epoxy floors: $.75 per hour above journeyman rate.

Layout Man and Sawman; Premium topping materials (emery, iron, etc.): $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Vertical slip forms, jump forms or continuous forming of any kind up to 50 feet; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

Vertical slip forms, jump forms or continuous forming of any kind above 50 feet: 1 1/2 times journeyman rate.

"Hot" work: $2.50 above journeyman rate.

BROH0052-002 06/01/2013

NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) and WASHINGTON COUNTIES

(Page 18 of 137)

Blocklayer, Caulker, Cleaner, Marble Setter, Pointer, Stonemason, Terrazzo Worker & Tile

Setter......................$ 27.21 14.87

BROH0055-001 06/01/2013

DELAWARE, FRANKLIN, MADISON and PICKAWAY COUNTIES

Pointer & Stonemason.............$ 27.95 14.56

BROH0055-002 06/01/2011

COSHOCTON, FAIRFIELD, GUERNSEY, HOCKING, KNOX, LICKING,

MORGAN, MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne

Townships), & PERRY

Marble & Tile Setter.............$ 25.16 10.53

TERRAZZO WORKER..................$ 25.41 10.53

BROH0055-004 06/01/2013

BELMONT, DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, HOCKING,

KNOX, LICKING, MADISON, MONROE, MORGAN, MORROW, MUSKINGUM,

NOBLE, PERRY & PICKAWAY

Marble & Tile Finisher...........$ 25.71 4.35

TERRAZZO FINISHER................$ 25.96 4.35

CARP0069-001 06/01/2013

TUSCARAWAS & WAYNE

(Page 19 of 137)

Carpenter & Soft Floor Layer.....$ 25.44 12.80

CARP0069-005 06/01/2013

COSHOCTON, HOLMES, KNOX & MORROW

Carpenter & Soft Floor Layer.....$ 23.65 12.18

CARP0171-001 06/01/2013

BELMONT, HARRISON, JEFFERSON & MONROE

Carpenter & Soft Floor Layer.....$ 25.89 14.62

CARP0200-001 06/01/2011

DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, LICKING, MADISON,

MORGAN, MUSKINGUM, NOBLE, PERRY and PICKAWAY COUNTIES

Carpenter & Soft Floor Layer.....$ 24.89 11.05

PILEDRIVERMAN....................$ 25.57 11.05

CARP0248-002 07/01/2008

HANCOCK & WOOD

FLOOR LAYER: Carpet.............$ 26.35 14.78

CARP0248-003 07/01/2008

HANCOCK

Carpenter/Lather.................$ 23.71 13.28

CARP0356-001 06/01/2011

(Page 20 of 137)

HOCKING, VINTON and WASHINGTON

CARPENTER........................$ 26.26 14.40

FLOOR LAYER: Carpet.............$ 25.63 13.95

PILEDRIVERMAN....................$ 26.56 14.40

CARP0372-001 07/01/2008

ALLEN & AUGLAIZE

Carpenter/Lather.................$ 23.18 13.28

CARP0437-001 06/01/2011

ADAMS, FAYETTE, HIGHLAND, JACKSON, PIKE, ROSS & SCIOTO COUNTIES

CARPENTER........................$ 25.33 14.90

PILEDRIVERMAN....................$ 28.61 14.90

CARP0735-001 06/01/2013

Carpenter & Soft Floor Layer.....$ 24.76 12.42

CARP1066-001 09/01/2009

BROWN, BUTLER, CLERMONT, CLINTON & WARREN

MILLWRIGHT.......................$ 27.55 15.39

CARP1066-002 09/01/2009

GREENE, MIAMI, MONTGOMERY & PREBLE

(Page 21 of 137)

MILLWRIGHT.......................$ 26.95 15.39

CARP1241-001 06/01/2011

DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, LICKING, MADISON,

MORGAN, MUSKINGUM, NOBLE, PERRY and PICKAWAY COUNTIES

MILLWRIGHT.......................$ 28.00 14.92

CARP1311-002 06/01/2008

Carpenter & Piledrivermen

(Does not include Walls &

Ceiling Work)....................$ 23.85 9.67

CARP1311-004 06/01/2009

Carpenter & Piledrivermen

(Does not include Acoustic

Ceiling Installers, Drywall

Hangers or Metal Stud Framers)...$ 23.60 10.92

CARP1311-007 06/01/2008

Carpenter/Lather (Walls &

Ceiling Work only)...............$ 23.85 9.67

CARP1311-014 09/01/2006

(Page 22 of 137)

FLOOR LAYER: Carpet.............$ 21.79 8.83

CARP1311-015 06/01/2009

Acoustic Ceiling Installer, Drywall Hanger, Lather &

Metal Stud Framer................$ 23.60 10.92

CARP1393-001 07/01/2008

CRAWFORD, HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD

Millwright/Piledriverman.........$ 27.30 16.05

CARP1393-004 07/01/2008

ALLEN, AUGLAIZE & WYANDOT

Millwright/Piledriverman.........$ 25.15 15.92

CARP1519-002 06/01/2011

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PIKE, ROSS, SCIOTO

and VINTON COUNTIES

MILLWRIGHT.......................$ 26.66 15.76

CARP1755-002 12/01/2011

WASHINGTON COUNTY

MILLWRIGHT.......................$ 32.06 16.54

(Page 23 of 137)

CARP1871-001 06/01/2013

MILLWRIGHT.......................$ 29.43 15.49

CARP1871-002 06/01/2013

PILEDRIVERMAN....................$ 29.48 15.49

CARP1871-003 06/01/2013

BELMONT, HARRISON, & MONROE

PILEDRIVERMAN....................$ 31.38 13.92

CARP1871-004 06/01/2013

PILEDRIVERMAN....................$ 24.35 12.96

CARP1871-005 06/01/2013

BELMONT, HARRISON, JEFFERSON & MONROE

MILLWRIGHT.......................$ 30.38 13.92

CARP1871-011 06/01/2013

MILLWRIGHT.......................$ 24.30 12.96

(Page 24 of 137)

CARP1871-012 06/01/2013

MILLWRIGHT.......................$ 25.13 13.81

CARP1871-013 06/01/2013

PILEDRIVERMAN....................$ 24.93 13.81

CARP2239-001 07/01/2008

CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT

CARPENTER........................$ 23.71 13.28

ELEC0008-001 05/27/2013

HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD

CABLE SPLICER....................$ 37.62 18.52

ELECTRICIAN......................$ 35.83 18.52

ELEC0032-001 06/01/2013

ALLEN, AUGLAIZE & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships)

ELECTRICIAN......................$ 27.77 15.02

ELEC0032-002 06/01/1998

ALLEN & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, (Page 25 of 137)

Richland, Ridge & Salem Townships)

Line Construction

Equipment Operator..........$ 20.27 4.12+a

Groundman Truck Driver......$ 14.43 3.63+a

Lineman.....................$ 22.52 4.31+a

FOOTNOTE: a. Half a day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day

ELEC0071-002 10/01/2013

ASHLAND, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE,

FRANKLIN, GUERNSEY, HIGHLAND, HOCKING, JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships), and

WASHINGTON COUNTIES

Linemen & Cable Splicers....$ 33.50 12.05

ELEC0071-003 10/01/2013

AUGLAIZE, CLINTON, GREENE, MIAMI, MONTGOMERY, and PREBLE

Equipment Operator..........$ 30.15 11.53

Groundman...................$ 21.78 9.57

Lineman & Cable Splicers....$ 33.50 12.05

ELEC0071-011 10/01/2013

(Page 26 of 137)

BELMONT, HARRISON, HOLMES, JEFFERSON, and WAYNE COUTIES

Equipment Operator..........$ 30.15 11.33

Groundman...................$ 21.78 9.57

Lineman & Cable Splicers....$ 33.50 12.05

ELEC0071-012 10/01/2013

BROWN, BUTLER, CLERMONT, and WARREN COUNTIES

Equipment Operator..........$ 30.15 11.33

Groundman...................$ 21.78 9.57

Lineman & Cable Splicers....$ 33.50 12.05

ELEC0082-001 12/02/2013

CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships)

ELECTRICIAN......................$ 27.20 17.07

ELEC0082-005 07/01/2013

CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships)

Sound & Communication

Technician

Cable Puller................$ 9.14 4.91

Installer/Technician........$ 22.50 9.51

ELEC0129-004 03/01/2010

ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, (Page 27 of 137)

Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships)

ELECTRICIAN......................$ 31.00 13.80

ELEC0141-003 09/01/2013

BELMONT COUNTY

CABLE SPLICER....................$ 31.25 22.63

ELECTRICIAN......................$ 31.00 22.63

ELEC0212-001 06/03/2013

BROWN and CLERMONT COUNTIES

ELECTRICIAN......................$ 26.35 16.09

ELEC0212-002 07/01/2013

BROWN & CLERMONT

Technician.......................$ 22.50 9.51

ELEC0245-001 08/26/2013

HANCOCK, OTTAWA, SANDUSKY, SENECA, and WOOD COUTIES

Cable Splicer...............$ 39.72 24.77%+$5.00+a

Groundman/Truck Driver......$ 15.11 24.77%+$5.00+a

Heli-arc Welding............$ 34.84 24.77%+$5.00+a

Lineman.....................$ 34.54 24.77%+$5.00+a

Operator - Class 1..........$ 27.63 24.77%+$5.00+a

Operator - Class 2..........$ 24.18 24.77%+$5.00+a

(Page 28 of 137)

Traffic Signal & Lighting

Technician..................$ 31.09 24.77%+$5.00+a

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial

Day; Independence Day; Labor Day; Thanksgiving Day; &

Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

ELEC0245-004 08/26/2013

ERIE COUNTY

Cable Splicer...............$ 39.72 24.77%+$5.00+a

Groundman/Truck Driver......$ 15.11 24.77%+$5.00+a

Lineman.....................$ 34.54 24.77%+$5.00+a

Operator - Class 1..........$ 27.63 24.77%+$5.00+a

Operator - Class 2..........$ 24.18 24.77%+$5.00+a

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial

Day; Independence Day; Labor Day; Thanksgiving Day; &

Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

ELEC0246-001 10/28/2013

HARRISON and JEFFERSON COUNTIES

ELECTRICIAN......................$ 33.00 27.81+a

FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.

ELEC0306-004 05/27/2013

WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton & Wayne Townships)

(Page 29 of 137)

CABLE SPLICER....................$ 36.87 5%+14.01

ELECTRICIAN......................$ 34.14 5%+14.01

ELEC0317-007 06/01/1998

ADAMS, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO &

VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships)

Cable Splicers..............$ 23.66 8.48

Equipment Operators.........$ 17.14 8.25

Groundmen...................$ 13.92 8.14

Linemen.....................$ 21.42 8.40

ELEC0540-001 01/01/2014

HOLMES, TUSCARAWAS (North of Auburn Clay, Rush & York

Townships), and WAYNE (South of Baughman, Chester, Green &

Wayne Townships) COUNTIES

ELECTRICIAN......................$ 29.40 20.06

ELEC0540-003 06/05/1997

TUSCARAWAS COUNTY (North of Auburn, Clay, Rush & York Townships)

Groundman; & Truck Driver...$ 14.65 8.18

Line Equipment Operator.....$ 19.02 8.69

Lineman; & Cable Splicer....$ 21.86 9.01

ELEC0575-001 12/31/2012

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, (Page 30 of 137)

Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY

(Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion

Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)

ELECTRICIAN......................$ 31.20 13.55

ELEC0575-003 06/03/2013

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PICKAWAY (Deer

Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE, ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)

Cable Puller................$ 10.38 6.75

Installer...................$ 23.78 9.37

ELEC0648-001 09/03/2012

BUTLER and WARREN COUNTIES (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships)

CABLE SPLICER....................$ 28.83 15.04

ELECTRICIAN......................$ 28.33 15.02

ELEC0683-001 05/27/2013

DELAWARE, FAIRFIELD, FRANKLIN, MADISON, and PICKAWAY

(Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships) COUNTIES

(Page 31 of 137)

Electricians:

Cable Splicer...............$ 31.20 15.09

Electrician.................$ 30.60 15.09

ELEC0683-006 06/03/2013

DELAWARE, FAIRFIELD, FRANKLIN, MADISON & PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships)

Cable Puller................$ 11.75 4.20

Installer...................$ 24.20 8.93

ELEC0688-001 05/27/2013

ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley &

Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown &

Jefferson Townships), MORROW, RICHLAND and WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships) COUNTIES

ELECTRICIAN......................$ 26.50 15.06

ELEC0688-004 06/03/2013

ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley &

Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown &

Jefferson Townships), MORROW, RICHLAND & WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)

Cable Puller................$ 11.16 5.22

Installer...................$ 24.56 8.63

(Page 32 of 137)

ELEC0972-001 06/01/2012

MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton &

Wilkesville Townships), and WASHINGTON COUNTIES

Electricians:

Cable Splicer...............$ 31.61 20.56

Electrician.................$ 31.36 20.55

ELEC1105-001 05/27/2013

COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College

Townships), LICKING, MUSKINGUM, PERRY, and TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry &

Bucks Townships) COUNTIES

ELECTRICIAN......................$ 28.13 14.56

ELEC1105-002 06/03/2013

COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hillard, Butler, Harrison, Pleasant & College

Townships), LICKING, MUSKINGUM, PERRY & TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry &

Bucks Townships)

Cable Puller................$ 10.09 7.27

Installer...................$ 23.33 9.54

ELEV0006-003 01/01/2013

ELEVATOR MECHANIC................$ 42.61 25.185 A&B

(Page 33 of 137)

FOOTNOTE:

A. Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

ELEV0011-001 01/01/2014

ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, GREENE, HIGHLAND,

MIAMI, MONTGOMERY, PREBLE, and WARREN COUNITES

ELEVATOR MECHANIC................$ 40.66 26.785+a+b

PAID HOLIDAYS:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after

Thanksgiving, and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

ELEV0017-001 01/01/2014

ERIE and HURON COUNTIES

ELEVATOR MECHANIC................$ 45.10 26.785+a+b

(Page 34 of 137)

ELEV0037-001 01/01/2014

ASHLAND, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE,

FRANKLIN, HOCKING, HOLMES, KNOX, LICKING, MADISON, MORGAN,

MORROW, MUSKINGUM, PERRY, PICKAWAY, RICHLAND, ROSS, TUSCARAWAS,

and VINTON COUNTIES

ELEVATOR MECHANIC................$ 40.62 26.785+a+b

ELEV0044-001 01/01/2014

ALLEN, AUGLAIZE, HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD, and

WYANDOT COUNTIES

ELEVATOR MECHANIC................$ 44.06 26.785+a+b

(Page 35 of 137)

ELEV0045-001 01/01/2014

WAYNE COUNTY

ELEVATOR MECHANIC................$ 42.84 27.085+a+b

ELEV0048-002 01/01/2014

JACKSON, PIKE, and SCIOTO COUNTIES

ELEVATOR MECHANIC................$ 41.79 26.785+a+b

* ENGI0018-001 05/01/2014

ADAMS, ALLEN, ASHLAND, AUGLAIZE, BELMONT, BROWN, BUTLER,

CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD,

FAYETTE, FRANKLIN, GREENE, GUERNSEY, HANCOCK, HARRISON,

(Page 36 of 137)

HIGHLAND, HOCKING, HOLMES, JACKSON, JEFFERSON, KNOX, LICKING,

MADISON, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM,

NOBLE, OTTAWA, PERRY, PICKAWAY, PIKE, PREBLE, RICHLAND, ROSS,

SANDUSKY, SCIOTO, SENECA, TUSCARAWAS, VINTON, WARREN,

WASHINGTON, WAYNE & WYANDOT

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 33.49 13.90

GROUP 2.....................$ 33.24 13.90

GROUP 3.....................$ 32.74 13.90

GROUP 4.....................$ 32.49 13.90

GROUP 5.....................$ 32.24 13.90

GROUP 6.....................$ 32.12 13.90

GROUP 7.....................$ 31.08 13.90

GROUP 8.....................$ 29.90 13.90

GROUP 9.....................$ 24.44 13.90

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Boom & Jib 250' & Over

GROUP 2 - Boom & Jib Over 180' through 249'

GROUP 3 - Boom & Jib 150' through 180'

GROUP 4 - Master Mechanic

GROUP 5 - Barrier Moving Machine; Boiler or Compressor

Mounted on Crane (Piggy-Back Operation); Boom Truck (All

Types); Cableway; Cherry Picker; Combination Concrete Mixer

& Tower; All Concrete Pumps with Booms; Crane (All Types);

Crane-Compact, Track or Rubber Over 4,000 lbs Capacity;

Crane-Self Erecting, Stationary, Track or Truck (All

Configurations); Derrick (All Types); Dragline; Dredge

(Dipper, Clam or Suction) 3 Man Crew; Elevating Grader or

Euclid Loader; Floating Equipment; Forklift(rough terrain with winch/hoist) Gradall; Helicopter Operator & Helicopter

Winch Operator (Hoisting Builders Materials); Hoe

(AllTypes); Hoist (Two or More Drums); Horizontal

Directional Drill; Hydraulic Gantry (Lift System); Laser

Finishing Machine; Laser Screed and Like Equipment; Lift

Slab or Panel Jack; Locomotive (All Types); Maintenance

Engineer (Mechanic and/or Welder); Mixer, Paving (Multiple

Drum); Mobile Concrete Pump With Boom; Panelboard (All

(Page 37 of 137)

Types on Site); Pile Driver; Power Shovel; Prentice Loader;

Rail Tamper (with Automatic Lifting & Aligning device);

Rotary Drill (All) used on Caisson Work for Foundations &

Substructure work; Side Boom; Slip Form Paver; Straddle

Carrier (Building Construction on Site); Trench Machine

(Over 24" Wide); & Tug Boat

GROUP 6 - Asphalt Paver; Bobcat-type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Bulldozer;

C.M.I. Type Equipment; Endloader; Hydro Milling Machine;

Kolman Type Loader (Dirt Loading); Lead Greaseman; Mucking

Machine; Pettibone-Rail Equipment; Power Grader; Power

Scoop; Power Scraper; Push Cat; Rotomill (All), Grinders &

Planers of All Types & Vermeer Type Concrete Saw

GROUP 7 - A-Frame; Air Compressor Pressurizing Shafts or

Tunnels; Asphalt Roller (All); Bobcat-type and/or Skid

Steer Loader with or without Attachments; Boiler (15 lbs.

pressure & over); All Concrete Pumps without Booms & with

5" System; Forklift (Except Masonry); Highway Drills-All

Types (with Integral Power); Hoist (One Drum); House

Elevator (except those automatic call button controlled);

Man Lift; Material Hoist/Elevator; Mud Jack; Pressure

Grouting; Pump (Installing or Operating Well Points or other Type of Dewatering Systems); Pump (4" and over

Discharge); Railroad Tie Inserter/Remover; Rotovator (Lime soil Stabilizer); Submersible Pump (4" and over Discharge);

Switch & Tie Tamper (w/o lifting & aligning device); Trench

Machine (24" & under); & Utility

GROUP 8 - Ballast Relocator; Backfiller & Tamper; Batch

Plant; Bar & Joint Installing Machine; Bull Floats; Burlap

& Curing Machines; Clefplanes; Compressor on Building

Construction; Concrete Mixer, Capacity more than one bag;

Concrete Mixer, one bag capacity (side loader); All

Concrete Pumps without Booms with 4" or Smaller System;

Concrete Spreading Machine; Conveyor, used for handling building materials; Crusher; Deckhand; Drum Fireman in

Asphalt Plant; Farm Type Tractor, Pulling Attachments;

Finishing Machines; Form Trencher; Generator; Gunite

Machine; Hydro-Seeder; Pavement Breaker (Hydraulic or

Cable); Post Driver; Post Hole Digger; Pressure Pump (over

1/2" discharge); Road Widening Trencher; Roller (except

Asphalt); Self-propelled Power Spreader; Self-propelled

Sub-Grader; Shotcrete Mahine; Tire Repairman; Tractor

(Pulling Sheep Foot Roller or Grader); VAC/ALL; Vibratory

Compactor (with Integral Power) & Welder

(Page 38 of 137)

GROUP 9 - Allen Screed Paver(concrete); Boiler (Less than 15 lbs. pressure); Crane-Compact, Track or Rubber under 4,000 lbs.; Directional Drill "Locator"; Inboard & Outboard Motor

Boat Launch; Light Plant; Masonry Forklift; Oiler; Power

Driven Heater (Oil Fired); Power Scrubber; Power Sweeper;

Pump (Under 4" discharge); & Submersible Pump (Under 4" discharge)

* ENGI0018-002 05/01/2014

ERIE & HURON

Crane (Boom & Jib 200' &

Over, Up to 299'); Master

Mechanic....................$ 36.46 13.90

Crane (Boom & Jib 300' &

Over).......................$ 36.71 13.90

GROUP 1.....................$ 35.71 13.90

GROUP 2.....................$ 35.56 13.90

GROUP 3.....................$ 34.11 13.90

GROUP 4.....................$ 33.33 13.90

GROUP 5.....................$ 33.01 13.90

GROUP 6.....................$ 25.93 13.90

GROUP 1 - A-Frame; Boiler or Compressor Operator, Hydraulic

Pump & Power Pacs Mounted on Crane or Piggy-Back Operation;

Boom Truck (All Types); Cableway; Cherry Picker;

Combination Concrete Mixer & Tower; All Concrete Pumps;

Crane (All Types); Derrick (All Types); Dragline; Dredge

(Dipper, Clam or Suction); 3 Man Crew; Elevating Grader or

Euclid Loader; Floating Equipment; Gradall; Helicopter

Operator & Helicopter Winch Operator Hoisting Building

Materials; Hoe (All Types); Hoist (Two or More Drums); Lift

Slab or Panel Jack Operator; Locomotive (All Types);

Maintenance Engineer (Mechanic); Mixer; Paving (Multiple

Drum); Mobile Concrete Pump with Boom; Panelboard (All types on site); Pile Driver; Power Shovel; Robotic

Equipment Operator/Mechanic; Rotary Drill (all), used on

Caissons for Foundations & Sub-structure Work; Rough

Terrain Forklift with Winch/Hoist; Side Boom; Slip Form

(Page 39 of 137)

Paver; Straddle Carrier; Trench Machine (Over 24" Wide); &

Tug Boat

GROUP 2 - Asphalt Paver; Bulldozer; CMI-Type Equipment;

Endloader; Horizontal Directional Drill Locator and

Operator; Kohlman Type Loader (Dirt Loading); Lead

Greaseman; Mucking Machine; Power Grader; Power Scoop;

Power Scraper; & Push Cat

GROUP 3 - Air Compressor, Pressurizing Shafts or Tunnels;

Asphalt Roller (all); Fork Lift; Hoist, One Drum; House

Elevator (Except Automatic Call Button-controlled); Laser

Screeds & Like Equipment; Man Lift; Mud Jack; Boiler (Over

15 lbs. Pressure); Pressure Grouting; Pump Operator (

Installing or operating Well Points or other type of

Dewatering system); Trencher (24" & under); & Utility

Operator

GROUP 4 - Compressor on Building construction; Conveyor, building material; Generator; Gunite Machine; Concrete

Mixer, Capacity more than one bag; Concrete Mixer, One Bag capacity (Side Loader); Pavement Breaker, Hydraulic or

Cable; Post Driver; Post Hole Digger; Road Widening

Trencher; Roller; & Welder Operator

GROUP 5 - Backfiller & Tamper; Bar & Joint Installing

Machine; Batch Plant; Bullfoat; Burlap and Curing Machine;

Cleaning Machine (decontamination included); Clefplane;

Concrete Spreading Machine; Crusher; Deckhand; Drum Fireman

(Asphalt); Farm-type Tractor, Pulling attachments;

Finishing Machine; Fork Lift (Masonry Work); Form Trencher;

High Pressure Pump (Over 1/2" discharge); Hydro Seeder;

Pump (4" and Over discharge); Submersible Pump (4" and Over discharge); Self-propelled Power Spreader; Self-propelled

Sub-grader; Tire Repairman; Tractor, Pulling Sheeps Foot

Roller or Grader; & Vibratory Compactor, With Integral Power

GROUP 6 - Inboard & Outboard Motor Boat Launch; Light Plant

Operator; Oiler; Signalman; Power Driven Heater (Oil

Fired); Power Scrubber; Power Sweeper; Power Boiler (Less than 15 lbs. Pressure); Pump (Under 4" discharge);

Submersible Pump (Under 4" discharge); Signalperson; Bob

Cat-type and/or Skid Steer Loader; Grade Checker; VAC/ALL;

Rod Man

* ENGI0018-007 05/01/2014

(Page 40 of 137)

WOOD COUNTY

GROUP 1.....................$ 34.24 13.90

GROUP 2.....................$ 33.99 13.90

GROUP 3.....................$ 33.49 13.90

GROUP 4.....................$ 33.24 13.90

GROUP 5.....................$ 32.99 13.90

GROUP 6.....................$ 32.87 13.90

GROUP 7.....................$ 31.83 13.90

GROUP 8.....................$ 30.65 13.90

GROUP 9.....................$ 25.19 13.90

GROUP 1 - Boom & Jib 250' & Over

GROUP 2 - Boom & Jib Over 180' through 249'

GROUP 3 - Boom & Jib 150' through 180'

GROUP 4 - Master Mechanic

GROUP 5 - Barrier Moving Machine; Boiler or Compressor

Mounted on Crane (Piggy-Back Operation); Boom Truck (all types); Cableway; Cherry Picker; Combination Concrete Mixer

& Tower; Concrete Pump with Booms; Crane (all types);

Crane-Compact, Track or Rubber over 4,000 lbs. Capacity;

Crane-Self Erecting, Stationary, Track or Truck (all configurations); Derrick (all types); Dragline; Dredge

(Dipper, Clam or Suction) 3 Man Crew; Elevating Grader or

Euclid Loader; Floating Equipment; Forklift (rough terrain with winch/hoist) Gradall; Helicopter Operator, Hoisting

Building Materials; Hoes (all types); Hoists (with two or more drums in use); Horizontal Directional Drill; Hydraulic

Gantry (lift system); Laser Finishing Machine; Laser Screed and Like Equipment; Lift Slab or Panel Jack; Locomotive

(all types); Maintenance Engineer (Mechanic and/or welder);

Mixer Paving (Multiple Drum); Mobile Concrete Pump (With

Boom); Panelboard (all types on site); Pile Driver; Power

Shovel; Prentice Loader; Rail Tamper (with automatic lifting & aligning device0; Rotary Drill (all) used on

Caissons for Foundations & Substructure work; Side Boom;

Slip Form Paver; Straddle Carrier (building construction on

(Page 41 of 137) site); Trench Machine (Over 24" Wide); & Tug Boat

GROUP 6 - Asphalt Paver; Bobcat-type and/or Skid Steer Loader with Hoe Attachment greater than 7,000 lbs.; Bulldozer;

C.M.I. Type Equipment; Endloader; Hydro Milling Machine;

Kolman Type Loader (Dirt Loading); Lead Greaseman; Mucking

Machine; Pettibone-Rail Equipment; Power Grader; Power

Scoop; Power Scraper; Push Cat; Rotomill (all), Grinders and Planers of All Types; & Vermeer Type Concrete Saw

GROUP 7 - A-Frame; Air Compressor, Pressurizing Shafts or

Tunnels; Asphalt Roller (all); Bobcat-type and/or Skid

Steer Loader with or without Attachments; Boiler (15 lbs.

pressure and over); All concrete Pumps (without booms with

5" system); Fork Lifts (except masonry); Highway Drills-all types (with Integral Power); Hoist (One Drum); House

Elevator (except those automatic call button controlled);

Man Lift; Material Hoist/Elevator; Mud Jack; Pressure

Grouting; Pump (Installing or Operating Well Points or other Type of Dewatering Systems); Pump (4" and over

Discharge); Railroad Tie Inserter/Remover; Rotovator (lime soil stabilizer); Submersible Pump (4" and over Discharge);

Switch & Tie Tamper w/o lifting & aligning device; Trench

Machine (24" & under); & Utility

GROUP 8 - Ballast Relocator; Backfillers & Tampers; Batch

Plant; Bar & Joint Installing Machines; Bull Floats; Burlap

& Curing Machines; Clefplanes; Compressor on building construction; Concrete Mixer, Capacity more than one bag;

Concrete Mixer, one bag capacity, (side loader); All

Concrete Pumps without Booms and with 4" System or Smaller;

Concrete Spreader; Conveyor, used for handling building material; Crusher; Deckhands; Drum firemen (in asphalt plants); Farm Type Tractor, pulling attachments; Finishing

Machine; Form Trencher; Generator; Gunite Machine;

Hydro-seeder; Pavement Breaker (Hydraulic or Cable); Post

Driver; Post Hole Digger; Pressure Pump (over 1/2" discharge); Road Widening Trencher; Roller (except

Asphalt); Self-propelled Power Spreader; Self-propelled

Sub-Grader; Shotcrete Machine; Tire Repairman; Tractor, Pulling Sheep Foot Roller or Grader; VAC/ALL; & Vibratory

Compactor, with Integral Power

GROUP 9 - Allen Screed Paver(concrete); Boiler (Less than 15 lbs. pressure); Crane-Compact, Track or Rubber under 4,000 lbs. Cpacity; Directional Drill "Locator"; Inboard &

Outboard Motor Boat Launch; Light Plant; Masonry Fork Lift;

(Page 42 of 137)

Oiler; Power Driven Heater (Oil Fired); Power Scrubber;

Power Sweeper; Pump (Under 4" discharge); Signal Person; &

Submersible Pump (Under 4" discharge)

IRON0017-001 05/01/2013

ERIE (Eastern 2/3) and HURON (East of a line drawn from the north border through Monroeville & Willard) COUNTIES

Ironworkers:

Ornamental, Reinforcing, &

Structural..................$ 30.85 19.18

IRON0044-001 06/01/2013

ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line)

Fence Erector...............$ 22.70 18.40

Ornamental; Structural......$ 25.00 18.40

IRON0055-001 07/01/2013

CRAWFORD (Area between lines drawn from where Hwy #598 & #30 meet through North Liberty to the northern border & from said

Hwy junction point due west to the border), ERIE (Western one-third), HANCOCK, HURON (West of a line drawn from the northern border through Monroeville & Willard), OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT (North of Rte. #30)

(Page 43 of 137)

Fence Erector...............$ 19.40 18.32

Furnaces & Kilns

(Temperature units over

125 degrees Fahrenheit).....$ 29.00 18.00

Pre-Engineered Metal

Building....................$ 23.59 19.35

All Other Work..............$ 28.32 19.35

IRON0147-001 06/01/2013

ALLEN COUNTY (Northern half)

IRONWORKER.......................$ 24.94 18.62

IRON0172-001 06/01/2013

COSHOCTON (West of a line beginning at the northwest county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HIGHLAND (Eastern one-fifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, MADISON, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE, ROSS, VINTON and

WYANDOT (South of Rte. #30) COUNTIES

IRONWORKER.......................$ 27.67 17.69

IRON0290-001 06/01/2013

ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CLINTON (Excluding south of a line drawn from Blanchester to Lynchburg), GREENE, HIGHLAND (Inside lines drawn from Marshall to Lynchburg & from the northern county line through East Monroe to Marshall), MIAMI, MONTGOMERY, PREBLE & WARREN (Excluding south of a line drawn from

Blanchester through Morrow to the west county line) COUNTIES

(Page 44 of 137)

IRONWORKER.......................$ 26.23 18.63

IRON0372-001 06/01/2013

ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) and WARREN (South of a line drawn from Blanchester through Morrow to the west county line) COUNTIES

IRONWORKER, REINFORCING

Beyond 30-mile radius of

Hamilton County Courthouse..$ 26.95 18.00

Up to & including 30-mile radius of Hamilton County

Courthouse..................$ 26.70 18.00

IRON0549-003 12/01/2012

BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM

(Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border)

IRONWORKER.......................$ 30.00 16.49

IRON0550-001 06/01/2013

ASHLAND, COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Route #224), RICHLAND, TUSCARAWAS &

Ironworkers:Structural, Ornamental and Reinforcing.......$ 25.26 17.47

(Page 45 of 137)

IRON0769-003 06/01/2013

ADAMS (Eastern Half), JACKSON (Southern Half) & SCIOTO

ZONE 1......................$ 31.24 20.38

ZONE 2......................$ 31.64 20.38

ZONE 3......................$ 33.24 20.38

ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.

ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., IRON0787-002 06/01/2013

MORGAN, NOBLE & WASHINGTON

Ironworker.......................$ 29.13 19.25

LABO0083-001 06/01/2013

ADAMS, HIGHLAND, JACKSON, PIKE, ROSS, SCIOTO & VINTON

LABORER

GROUP 1.....................$ 31.74 9.70

GROUP 2.....................$ 31.99 9.70

GROUP 3.....................$ 32.14 9.70

LABORER CLASSIFICATIONS

GROUP 1 - Building & Construction; Carpenter Tender; Bottom

Man; Mason Tender; Mortar Mixer; Pipe Layer; Plasterer

Tender; Sheeting & Shoring Man; & Signalman

GROUP 2 - Air & Machine Driver Tool Operator; Asphalt Raker &

(Page 46 of 137)

Smoother; Burning & Cutting Torch; Chain Saw; Form Setter

(Street & Highway); Hand Spiker; & Powered Concrete Buggy

GROUP 3 - Gunnite Machine Operator; Gunnite Nozzle Man; Miner

(Tunnel & Caisson); Mucker (Tunnel & Caisson); & Powder Man

& Blaster

HAZARDOUS & HIGH WORK IN EXCESS OF 25 FEET ABOVE SOLID BASE -

$.25 PREMIUM

WORKERS HANDLING CREOSOTED OR INJURIOUS CHEMICALLY TREATED

MATERIALS - $.25 PREMIUM

THE ERECTION, ALTERATION, REPAIR OR DEMOLITION OF REINFORCED

CONCRETE CHIMNEYS, MASONRY CHIMNEYS, SILOS, & FURNACES

RECEIVE THE FOLLOWING RATES:

0 TO 25 FEET - BASE RATE

25 TO 100 FEET - $1.00 PREMIUM

100 TO 150 FEET - $1.25 PREMIUM

150 TO 200 FEET - $1.50 PREMIUM

200 TO 250 FEET - $1.75 PREMIUM

OVER 250 FEET - $2.00 PREMIUM

LABO0134-001 05/01/2013

COSHOCTON, HOLMES & TUSCARAWAS

GROUP 1.....................$ 21.43 9.70

GROUP 2.....................$ 21.83 9.70

GROUP 3.....................$ 22.36 9.70

GROUP 4.....................$ 22.78 9.70

GROUP 1 - Building & Construction; Signalman; Flagman;

Carpenter Tender; Finisher Tender; Concrete Handler;

Utility Construction; Guard Rail Erector; & Hazardous Waste

Removal (Level D) Personal Protective Equipment (PPE)

GROUP 2 - Bottom Man; Scaffold Builder; Tunnel; Pipe Layer;

Air & Power Driven Tool; Burner on Demolition Work;

Swinging Scaffold; Mucker; Caisson…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .