Project Title: CONSTRUCTION OF A NEW JOB CORPS CENTER IN MANCHESTER, NEW HAMPSHIRE
The purpose of Amendment 0009 is to provide vendors with the final changes/corrections/updates to the solicitation as shown within the next pages.
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X
E. IMPORTANT:
is
(a) By completing Items 8 and 15, and returning ____1______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. N/A
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 5
(Signature of person authorized to sign) (Signature of Contracting Officer)
0009 2/14/2013 3107
U.S. Department of Labor, ETA/OCM Division of Contract Services 200 Constitution Avenue, NW Room N-4643 Washington DC 20210
To all Offerors/Bidders DOL121RB20590
X 10/18/2012
N/A
X
MARIA J. PIZARRO, CPCM CFCM
Branch Chief, Contracting Officer Division of Job Corps Procurement, A/E & Construction Branch
Solicitation DOL121RB20590 Page 2 of 5 Amendment 0009
Construction of a New Job Corps Center Manchester, New Hampshire
Summary of Changes
QUESTION & ANSWERS (Q&As)
Please find the following clarification to the Q&As:
Question: I require a list of the approved vendors/ fabricators for the Food Service Equipment as there are no vendors or model numbers listed in the specifications.
Answer: Please review the specifications; the specifications are Open Specifications, with the intent that several manufacturers shall be able to provide the noted equipment. Provided equipment must meet all requirements including ALL referenced standards and Quality Assurance.
The following changes have been made within the solicitation and indicated so by way of a changed bar next to each line/sentence that has been revised. Please refer to the entire Solicitation, Amendment 0009 for specific changes.
SECTION A: SOLICITATION/CONTRACT FORM
1. Standard Form 1442, page 1, Block entitled “Page of Pages” has been corrected to 1 OF 75.
2. Standard Form 1442, page 1, Block 13.A. entitled “Additional Solicitation Requirements” concerning the bid due date has been changed from 01/16/2013 to 02/14/2013.
TABLE OF CONTENTS
Listings within the Table of Contents have been changed/corrected to include the corresponding pages throughout the solicitation.
SECTION B: SUPPLIES OR SERVICES AND PRICE/COSTS
Page B-1, Sub-section B.2 entitled “CONTRACT TYPE” has been added.
SECTION C: DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Pages C-1 through C-4, Sections within the Divisions and have replaced in its entirety with those located within the Specifications. In addition, the following sentence has been added within the “List of Drawings”:
Solicitation DOL121RB20590 Page 3 of 5
“Please refer to www.fbo.gov for any and all drawings included within the original Solicitation and Amendment(s).”
SECTION D: ADDITIONAL REQUIREMENTS
Page D-1, changes have been made to clarify markings required for documents.
SECTION E: INSPECTION AND ACCEPTANCE
1. Page E-1, Sub-section E.2 entitled “INSPECTION AND ACCEPTANCE”, the COR Bill
Dakshaw has been replaced with Johannes Hoffman.
2. Page E-1, Sub-section E.2, fourth paragraph, has been edited.
SECTION F: DELIVERIES OR PERFORMANCE
1. Page F-1, Sub-section F.2 entitled “52.211-10 COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK (APR 1984)” has been edited.
2. Page F-1, Sub-section F.3 entitled “PERIOD OF PERFORMANCE” has been corrected.
SECTION G: CONTRACT ADMINISTRATION
1. Page G-1, Sub-section G.1 entitled “PRE-CONSTRUCTION CONFERENCE & INFORMAL
PARTNERING SESSION” has been edited.
2. Page G-3, Sub-section G.6 entitled “PROJECT SAFETY”, last paragraph has been added.
3. Page G-4, Sub-section G.8 entitled “CONTREACTOR DAILY PROGRESS LOGS/REPORTS” has been edited.
4. Page G-4, Sub-section G.9 entitled “SCHEDULE OF PROGRESS” has been edited.
5. Pages G-4 and G-5, Sub-section G.10 entitled “INVOICE PREPARATION AND
SUBMISSION”, first paragraph has been edited and the Department of Labor’s e-invoicing procedures have been added.
6. Page G-9, Sub-section G.15 entitled “EQUITABLE ADJUSTMENTS”, under “Direct Cost”, second paragraph has been edited.
Solicitation DOL121RB20590 Page 4 of 5
7. Page G-11, Sub-section G.18 entitled “AS-BUILT RECORD OR MATERIALS AND INSTALLATION”, first paragraph has been edited.
8. Page G-12, Sub-section G.19 entitled “SUBSTANTIAL COMPLETION”, third paragraph has been edited.
9. Page G-13, Sub-section G.19, fifth paragraph has been added.
SECTION H: SPECIAL CONTRACT REQUIREMENTS
1. Page H-1, Sub-section H.1 entitled “NOTICE LISTING CONTRACT CLAUSES
INCORPORATED BY REFERENCE” has been edited to include an additional FAR Clause.
2. Page H-2, Sub-section H.7 entitled “52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTACTS” has been added.
SECTION I: CONTRACT CLAUSES
1. Page I-2, Sub-section I.1 entitled “NOTICE LISTING CONTRACT CLAUSES
INCORPORATED BY REFERENCE”, adds an additional FAR Clause.
SECTION J: LIST OF ATTACHMENTS
1. Page J-1, “ATTACHMENT NUMBER 1" entitled “Davis Bacon Wage Rates” has been updated.
2. Pages J2 through J5 “General Decision” listing has been updated.
SECTION K: REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS
1. Page K-1, Sub-section K.1 entitled “NOTICE LISTING CONTRACT CLAUSES
INCORPORATED BY REFERENCE” has been edited.
SECTION L: INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Page L-6, Sub-section L.10.6 entitled “CONTRACT FORMS”, third paragraph has been edited.
Solicitation DOL121RB20590 Page 5 of 5
2. Page L-6, Sub-section L.11 entitled “BIDS SUBMISSION REQUIREMENTS” has been edited to reflect the current bid opening date.
3. Page L-7, Sub-section L.13 entitled “BID OPENING ADDRESS” has been corrected to reflect the appropriate Sub-section number and the new location of the bid opening.
Except as stated above, all other terms and conditions remain unchanged.