DOD Explosives Safety Site Plan-Attachment D.pdf
PDF 410 KB Posted
- Attached to
- EOD Proficiency Range
- Solicitation number
- S-24800-00015594
- Issued by
- Oregon
About this file
This is a Department of Defense Explosives Safety Site Plan document for the Portland installation, specifically addressing the siting of explosive ordnance disposal (EOD) facilities and their compliance with quantitative distance (QD) requirements. The document analyzes three primary facilities—Pro-1, Hold-1, and Hold-2—located at the Portland base, with an analysis date of October 3, 2017, utilizing the AF2013AUG16 QD Engine and ESS version 6.1.0.243. The site plan evaluates the required and actual distances between explosive storage facilities and potential exposure facilities, ensuring compliance with safety separation distances mandated by Department of Defense explosives safety standards. Pro-1 is classified as an Explosives Production and Readiness (EPR) facility containing 1.25 pounds of explosives with a required QD distance of 12 feet, while Hold-1 and Hold-2 are both Explosives Proper Handling (EPH) facilities containing 5 pounds of explosives each with required QD distances of 19 feet.
The document confirms that all paired facility relationships meet or exceed required QD distances, with actual distances ranging from 20.61 feet to 93.81 feet against required minimums. Facilities classified as non-applicable for QD purposes, such as roads, railways, boundaries, and parking lots, are identified as exposures not requiring quantitative distance calculations. No such facilities were found within the Inhabited Building Distance (IBD) of the sited facilities at Portland. The site plan includes detailed diagrams and zone evaluations showing the spatial relationship between Pro-1, Hold-1, and Hold-2, with orientation designations and facility descriptions using standardized military explosives safety nomenclature and classification systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
These facilities have been classified as non-applicable for the purposes of QD. Such facilities might include roads, railways, boundaries, or parking lots.
200 ft
200ft 1.25lbs 1.1
PC
S-
Pr o-
H ol d-
H ol d-fe et
Ex pl os iv es S af et y Su bm itt al D ra w in g
Fa ci lit y
N um be r:
Pr o-
Ba se
/L oc at io n:
Po rtl an d
An al ys is
D at e:
/3 /2
AF
AU
G
R ev ie w
D at e: P E
S
E S
C A
P A
_P E
S _A re a
In st al la tio n
P E
S _A re a ro ad
_b rid ge _a re a ve hi cl e_ dr iv ew ay
_a re a ve hi cl e_ pa rk in g_ ar ea ro ad
_a re a ra ilr oa d_ ce nt er lin e pe de st ria n_ si de w al k_ ar ea ai rfi el d_ su rfa ce _c en te rli ne ai rfi el d_ su rfa ce _a re a
EXPLOSIVES SAFETY SITE PLAN
NGB-Portland-17-S011
SECTION I - GENERAL INFORMATION
INSTALLATION:
Portland
LOCATION: DATE:
03 Oct 2017
QD Engine: AF2013AUG16
ESS: 6.1.0.243
SECTION II - DATA ON FACILITY TO BE SITED
FAC # &
OWNER
FACILITY
DESC
RQD IBD RQD PTR 1.1
(xx)
1.2.1
MCE
1.2.2 1.2.3
MCE
(xx)
1.3 1.4
Hold-1 Portland
EPH 68 ft 41 ft 5 lbs
SECTION III - PES/ES QD PAIRED RELATIONSHIPS WITH FACILITIES BEING SITED
FAC # &
OWNER
FACILITY
DESC
ACT &
RQD
DIST
ORIEN-
TATION
1.1 (xx)
1.2.1
MCE
1.2.2 1.2.3
MCE
(xx)
1.3 1.4
Hold-2 Portland
IM
EPH Actual:
20.61 ft Required:
19 ft
As ES 19 ft T12.1
AGM(UB):AGM(UB)
Actual:
20.61 ft Required:
19 ft
As PES (reverse)
5 lbs 19 ft T12.1
AGM(UB):AGM(UB)
Pro-1 Portland
IM
EPR Actual:
68.5 ft Required:
12 ft
As PES (reverse)
1.25 lbs 12 ft T12.1
AGM(UB):AGM(UB)
SECTION IV - EXPOSURES NOT REQUIRING QD
These facilities have been classified as non-applicable for the purposes of QD. Such facilities might include roads, railways, boundaries, or parking lots.
Name PES Side Distance Type Notes
No such facilities were found within IBD of the sited facility.
EPH K-18 13 ft 440lbs 68ft 5lbs 1.1
PC
S-
Pr o-
H ol d-
H ol d-fe et
Ex pl os iv es S af et y Su bm itt al D ra w in g
Fa ci lit y
N um be r:
H ol d-
Ba se
/L oc at io n:
Po rtl an d
An al ys is
D at e:
/3 /2
AF
AU
G
R ev ie w
D at e:
IB
D
_Z on es
E va lu at io n_
Zo ne s
EXPLOSIVES SAFETY SITE PLAN
NGB-Portland-17-S012
SECTION I - GENERAL INFORMATION
INSTALLATION:
Portland
LOCATION: DATE:
03 Oct 2017
QD Engine: AF2013AUG16
ESS: 6.1.0.243
SECTION II - DATA ON FACILITY TO BE SITED
FAC # &
OWNER
FACILITY
DESC
RQD IBD RQD PTR 1.1
(xx)
1.2.1
MCE
1.2.2 1.2.3
MCE
(xx)
1.3 1.4
Hold-2 Portland
EPH 68 ft 41 ft 5 lbs
SECTION III - PES/ES QD PAIRED RELATIONSHIPS WITH FACILITIES BEING SITED
FAC # &
OWNER
FACILITY
DESC
ACT &
RQD
DIST
ORIEN-
TATION
1.1 (xx)
1.2.1
MCE
1.2.2 1.2.3
MCE
(xx)
1.3 1.4
Hold-1 Portland
IM
EPH Actual:
20.61 ft Required:
19 ft
As ES 19 ft T12.1
AGM(UB):AGM(UB)
Actual:
20.61 ft Required:
19 ft
As PES (reverse)
5 lbs 19 ft T12.1
AGM(UB):AGM(UB)
Pro-1 Portland
IM
EPR Actual:
93.81 ft Required:
12 ft
As PES (reverse)
1.25 lbs 12 ft T12.1
AGM(UB):AGM(UB)
SECTION IV - EXPOSURES NOT REQUIRING QD
These facilities have been classified as non-applicable for the purposes of QD. Such facilities might include roads, railways, boundaries, or parking lots.
Name PES Side Distance Type Notes
No such facilities were found within IBD of the sited facility.
EPH K-18 13 ft 440lbs 68ft 5lbs 1.1
PC
S-
Pr o-
H ol d-
H ol d-fe et
Ex pl os iv es S af et y Su bm itt al D ra w in g
Fa ci lit y
N um be r:
H ol d-
Ba se
/L oc at io n:
Po rtl an d
An al ys is
D at e:
/3 /2
AF
AU
G
R ev ie w
D at e:
IB
D
_Z on es
E va lu at io n_
Zo ne s
File details come from the government source that posted it. Updated .